Ladies and gentlemen, good evening. I'm Akash, moderator for the conference call. Welcome to Mold-Tek Technologies Limited Q2 and H1 FY '27 Earnings Conference Call. We are pleased to have with us Mr. Lakshmana Rao sir, who is the Chairman and Managing Director of Mold-Tek Technologies Limited. [Operator Instructions] Please note that this conference is being recorded. Before we begin, I would like to point out that this conference call may contain forward-looking statements about the company, which are based on the beliefs, opinions, and expectations of the management as on date of this call. These statements do not guarantee the future performance of the company and may involve risks and uncertainties that are difficult to predict. I would now like to hand over the floor to Mr. Lakshmana Rao sir, Chairman and Managing Director. Thank you, and over to you, sir.

Lakshmana Janumahanti executive
#2

Good afternoon, gentlemen, and thank you very much, Akash. I'm very glad to inform you that fabulous results have been announced by Mold-Tek Technologies for the Q2. The 6 months stand-alone profit has doubled that of the last full year PAT by INR 21 crores compared to 10 point... Is this full year? So the PAT for the stand-alone performance is at INR 20 crores for the 6 months period. And for the quarter ending September, company stand-alone turnover has gone up by 39% to INR 92 crores, and PAT has more than grown 4x -- to be precise, 4.4x to INR 20.19 crores, that is for the H1. And coming to the Q2, the turnover has been INR 46.64 crores, up by 25% compared to last Q2. And profits have more than tripled from INR 3.15 crores to INR 10.16 crores. Similarly, EBITDA also grown by 32.5% recording one of the best quarters ever in the history of the company. The last year, full year profitability was -- after tax is INR 10 crores, whereas in this first 6 months itself, company has achieved a INR 20 crores stand-alone profit. However, after adding the consolidating the bills numbers, the PAT has come down to INR 18.62 crores compared to INR 10 crores last year for the full year. Current year H1 itself, company consolidated profits have shot up to INR 18.62 crores. And compared to the last year H1, the jump is by almost 375%. That is 4.7x improved in the profitability. So these are all possible due to the improved product mix of the company, improved diversification and operational excellence especially, and also entering into high value-added Engineering Services in poles and towers, and also in Structural Steel Detailing. And adding that, our Structural Steel Design also started contributing reasonable numbers and improved operational efficiencies have resulted in this kind of stellar performance. So I think we can have more details discussed in question-and-answers more. Back to Akash.

Operator operator
#3

[Operator Instructions] The first question comes from the line of Mr. Kaustav Bubna from BMSPL Capital.

Kaustav Bubna analyst
#4

So similar to last quarter's call, I have the same question on how sustainable is this margin -- EBITDA margin and profitability performance that we've had in the first half? Can we maintain the same type of margins and profitability going into the second half? Will it be even better? And then is there any sort of quantitative and qualitative guidance you can give us into FY '28? The reason I ask this is because even in the U.S., there's a lot of volatility in many different aspects, politically et cetera. So what's management's view on every -- on this?

Lakshmana Janumahanti executive
#5

See, I can understand Kaustav, because of the erratic performance in the past few years, ups and downs. But now I can assure you that the company is on a very solid ground. We have taken steps to eliminate the loss-making BIW segment. We have downsized it considerably from 150 resources to just 40, 45 resources. And we have been trying for electrical vehicle-related automobile services for the last 3 years without much success. And those numbers used to vary a lot. One quarter, it used to be 0.5 million and then down to 100,000 in the next quarter. So that kind of uncertainty is now completely eliminated from the company's performance. And that's why you are seeing a quarter-on-quarter consistent and rather improved performance. I'm also glad that the company, what we acquired, Beryl, has received some major orders in the last month -- couple of months ago, and they are now becoming operable from October onwards. So hopefully, in Q3, Beryl might be in the positive, which it continued to be in the negative in the last 2, 3 quarters. So that is another favorable development. And in the poles and towers and distribution -- power distribution services, which come under MES, we have several new contracts signed and several new fixed teams are being created for very well-known utility services companies in U.S.A. So we are scampering to add people in that domain and training the managers or retraining some of our engineers into that domain and finding that growth also will be adding from Q3 or if not Q3, Q4 onwards. As I said in my press report, we are also adding a new domain altogether in the civil and land development, which will be completely a new domain for Mold-Tek, and that has very good prospects. And we are starting with one of the leading companies in U.S., which can take us off in that new field in the coming year. It might take a couple of more months to build up the expertise, but from Jan, Feb onwards, those numbers can also be sizable. So I can assure you, I think at least for the next 1, 1.5 years or 2 years going ahead, company's performance will be on the positive track. If Beryl also starts making contributions, which we are taking steps to revamp the management and focusing them on designing and other areas of high value, we are confident that Beryl also will start contributing from next year. So all -- overall put together, the --whatever disturbances or ups and downs caused by electrical vehicle and our automobile team will be removed from the future -- for the future. And with these solid gains in other domains, the company's stack is now well laid.

Kaustav Bubna analyst
#6

And what's the opportunity on the semiconductor front? I saw in your press release, there's a semiconductor opportunity. So is that new business for us? Or is that something that the company has already been participating in? And what's the opportunity there?

Lakshmana Janumahanti executive
#7

Semiconductors? I think you are getting mixed up. This is regarding our other company, Mold-Tek Packaging Limited, which is -- this is Mold-Tek Technologies. I'm talking about the engineering services company. Is it a wrong... semiconductors in the note, I don't think so. It is about data centers maybe. We are developing data centers, designing. You are asking for this.

Kaustav Bubna analyst
#8

There was a mention on semiconductors also, but...

Lakshmana Janumahanti executive
#9

The manufacturing projects, which data centers -- we are providing designing and detailing services to data centers.

Kaustav Bubna analyst
#10

Is it in your advanced opportunities in data centers, semiconductor manufacturing and convention center projects?

Lakshmana Janumahanti executive
#11

Semiconductor manufacturing projects maybe, the project buildings.

Operator operator
#12

The next question comes from the line of Mr. Mahesh Tolani from Goquarter. I don't find any response. We are going for the next question. The next participant is Mr. Ramesh (sic) [ Rupesh ] Tatiya from Long Equity Partners.

Rupesh Tatiya analyst
#13

Congratulations on fantastic set of results, sir. I have several questions. So first is, I think the Work-on-Hand has come down quarter-on-quarter. So any qualitative comments around that, why that happened and how it will progress through the year?

Lakshmana Janumahanti executive
#14

See, the Work-on-Hand has dipped a bit from about $4.5 million last quarter to around $4.2 million now. But in the month of October, we have record bookings again and the number is now better than what it was at end of June.

Rupesh Tatiya analyst
#15

That is good to know. The second question is in the stand-alone business. Can you give rough idea about how much is Steel Detailing segment, how much is Utility segment, how much is BIW segment? Some rough idea, on H1 basis is fine.

Lakshmana Janumahanti executive
#16

I can tell you roughly 75% to 80% of the revenue is coming from Structural Steel Detailing and those areas. And in the overall $5.4 million -- I think $5.3 million -- $4.4 million has come from Civil Structural Work. That's almost 80%, 80%, 82%. And the rest is from fixed teams of MES and also from MES alone. That is -- MES means automobile services. That's now come down to hardly $100,000 in the quarter, whereas the fixed teams are growing. That's where we do the utility services, that is the electrical towers and distribution services.

Rupesh Tatiya analyst
#17

And this utilities piece is expected to grow faster, right? That is correct?

Lakshmana Janumahanti executive
#18

We are ramping up very rapidly from a team of 30, 40 people last year, we are already 70, 75 and planning to ramp it up to 120 people by March next year because it's very difficult to build up these skill sets. So apart from recruiting from outside, we are developing the training and training the modules to...

Rupesh Tatiya analyst
#19

And in the Steel Detailing side, we are trying to climb the value ladder in terms of going into design, going into what you say, connector design. So can you just give some update on that also? How is that going?

Lakshmana Janumahanti executive
#20

The connection design is still improving. We are in line with our aspiration of reaching about $1 million in this year. And we are also looking at opportunities for acquisition in the design field, structural designing, still yet to find the correct fit. But once that happens, that segment also will take off.

Rupesh Tatiya analyst
#21

And then on coming to Beryl, so how is -- I mean, I think there is this hurricane happened recently, fires, I think the damage was in Georgia, Florida, and Alabama, and I think we have license to practice in Florida and Georgia. So does that provide you any meaningful opportunities for next, I don't know, 6 months, 12 months?

Lakshmana Janumahanti executive
#22

Yes. It will certainly improve it. I wouldn't say it will be a huge opportunity, but certainly, the number of inspection cases and then our expert witness and design and repair services division will certainly get more traction due to this recent cyclone. But apart from that, we are now looking at much stronger stability for the company, Beryl. And we are looking at other domains like civil and architectural, which can also -- Beryl also can play a role in it. So that's a new opportunity we got, wherein Beryl will play a part role, and it will help all of us to ramp up the numbers in that new domain. More details, I'll be in a position to discuss probably next quarter.

Rupesh Tatiya analyst
#23

Look forward to that. And this land development segment, I think maybe some color around that, what kind of order booking you see in a year or so?

Lakshmana Janumahanti executive
#24

That is the area, we, along with Beryl, are tying up, already tied up an MOU with the client and the work has to really take off from November end. So hopefully, when we meet next time in Feb, March, I'll be able to share more details.

Rupesh Tatiya analyst
#25

And just final question, Beryl EBITDA breakeven in Q3. Is that a good probability there?

Lakshmana Janumahanti executive
#26

It is just a little below the breakeven. They had a small loss of about $25,000, which has come down compared to the previous quarter, which was $70,000, $75,000. So it's now $25,000 loss in Q2. And hopefully, in Q3, we look forward to it crossing the breakeven.

Rupesh Tatiya analyst
#27

And you said the next 12 to 18 months, we expect good growth. So 20%, is that a good number to model?

Lakshmana Janumahanti executive
#28

Top line growth, what we achieved is around -- in the stand-alone, it is 23%, including the dollar gains. And for the consolidated, it was 25%, I think -- 24% in H1. So we continue to see at least 18% to 20% top line growth in the consolidated and maybe around similar 20%, 25% in the stand-alone, subject to dollar fluctuations.

Rupesh Tatiya analyst
#29

During next year, right, next 12 to 18 months?

Lakshmana Janumahanti executive
#30

Yes, next 12 months.

Operator operator
#31

The next question comes from the line of Mr. Manish, an individual investor.

Unknown Analyst analyst
#32

Congratulations on good set of numbers. I have a couple of questions. One, did we have any ForEx gain or loss during the quarter? And if yes, what was the amount?

Lakshmana Janumahanti executive
#33

In fact, ForEx gain -- ForEx loss is around INR 70 lakhs in this quarter compared to INR 1.5 crores gain in the last quarter. So that means if you effectively take away the ForEx element, the profit growth compared to Q1 is much better. What it is showing is 6%, but it, in fact, would be more than 14%, 15% at the operating level without...

Unknown Analyst analyst
#34

And going forward, I mean, do we expect similar volumes as profits or losses on a limited scale given that rupee has stabilized around that INR 96, INR 97 level?

Lakshmana Janumahanti executive
#35

Now the rupee is stabilizing around INR 95, we'll be having some ForEx gain rather if it stays somewhere at that level. Otherwise, it will be neutral. So in the Q3, we will have some benefit if the dollar remains around INR 95 levels, we'll have some gain rather than the loss which you suffered in Q2.

Unknown Analyst analyst
#36

And my second question was on Beryl. So one of our previous calls, we talked about outsourcing Beryl's -- what do you say -- work to India slowly but steady. I think the target for that was Q4 of FY '27. So where are we on that?

Lakshmana Janumahanti executive
#37

Nowadays currently, one person who is under L1 processing is now currently positioned in Tampa. He is a professional engineer himself -- Indian, but qualified in the U.S.A. And he is now currently taking charge of the design and representing Mold-Tek at Beryl as a design head. And he has a team of 5 people already built up here in Hyderabad, who will be supporting him in his future growth. This $1 million Hillsborough County order, what we received 2 months ago, he's predominantly designed. So it is now -- timing is good that work can be handled through our design team, which is strengthened with our 6 engineers. So we look forward to better performance coming from Beryl, if not -- Q4 is -- will be impacted by several holidays in U.S.A., but at least from Q1 of -- their Q1 or our Q4, it should be contributing handsomely.

Unknown Analyst analyst
#38

So when do we see the full benefit of the Beryl acquisition kind of playing out in terms of...

Lakshmana Janumahanti executive
#39

I'm confident it will happen in '27, '28 for us because it takes at least a year to understand the business, set up the correct KRA and people in place and also get the outsourcing moved to India. So it's hardly 9, 10 months we acquired Beryl. And now we got a full grip on the subject and people have been placed there and our CEO is also frequently traveling and spending time, redesigning the team over there in Beryl so that it will be more design-oriented rather than just inspections, which is their predominant forte as of today. But the design team is to be really strengthened, which we have done now. And I think with this going into the market, we'll be in a position to improve the Beryl performance.

Unknown Analyst analyst
#40

And one final question, if I can squeeze in that. We are also in the lookout of a few other acquisitions. And I guess we are planning a trip to U.S. to finalize that. So any update on that?

Lakshmana Janumahanti executive
#41

We had a good conversation with the prospective seller. We are also studying into their line of business and their ability to ramp up. So we have few concerns which we have expressed to them, and we are waiting for their reply. I don't say that we have made any confirmed diction on that. It is still liquid. But we are still looking at other options also where we are very clear this time that not only the business should be relevant, but also the person should be capable of ramping it up and scale it up. So on that count, we are still not satisfied. So we are still looking at other options.

Operator operator
#42

[Operator Instructions] The next question comes from the line of [ Rhea Shah ] from Aarti Securities.

Unknown Analyst analyst
#43

So my question was regarding that the company has secured multiple datacenter-related projects. So like are these initial engagements with new clients or like they offer potential for repeat business, like how could we see this multiple vertical become over next 2 to 3 years? If you can throw some light on that?

Lakshmana Janumahanti executive
#44

Data center designing, I mean, mainly drafting, detailing what we are doing is something unique. And now it's not our first job, almost 5, 6 data centers we have done in the last 1, 2 years. But now we are getting more and more traction. I think we have 2 or 3 data center Work-on-Hand and further are also expected. Once we have that expertise, obviously, our name will be in the market and any new data centers that are coming up across U.S., we will definitely considered a preferred retailer. So that will be a good addition to have and that will improve our workflow.

Unknown Analyst analyst
#45

And also regarding the 3-year agreement with a leading plant engineering company. So does the MSA include committed business volumes or will the revenue depend on individual project allocation?

Lakshmana Janumahanti executive
#46

No, it is a fixed team arrangement. And in fact, the team is still under buildup. We have against 25 people they wanted, we have only 10 to 15 people currently being offered, and we are in the process of ramping up. These numbers we'll be adding from end of November or end of December at the most. So as I said, in power distribution, poles and towers, there is a very big depth of talent and we are one of the very few companies outside U.S. having that kind of skill set. So we are now trying to double the manpower through training and interactions with the clients.

Unknown Analyst analyst
#47

And one last question is that the company currently has sufficient energy, engineering manpower and execution capacity to support growth. So in the future, will it require significant recruitment or infrastructure investments?

Lakshmana Janumahanti executive
#48

See, we are looking at two angles. One is internal development, improvement of the efficiency. Our -- one of the major reasons for improved performance is operational efficiencies have gone up. Per person capital -- per person revenues have gone up by almost 15% compared to last financial year for the first half of the year. And we have an incentive system and retraining -- multiskilling progress training that's going on for the last 1 year is yielding very good results. So both these incentive system and productivity improvement and training is creating a much better utilization of manpower. And the manpower per capita contribution has gone up from last year Q2 at INR 4,500 is now at INR 5,220 -- so there's a significant improvement in the productivity, more than 15%, 16%, which is in turn resulting into the bottom-line improvement. And we are also bringing in automation and some of the tools to improve the output and also quality without sacrificing quality. On that ground, your company has started working, and I'm sure this will also progressively result in better improvement in the output. So there is no need for huge recruitments going forward. That will be client-driven or project-to-project-driven. We don't want to now create a situation like in BIW where we entered 3 years ago, built up a huge team and could not find the proper work for them for the last 2 years, which has impacted our performance. So now the ground rules have changed to efficiency drive, finding in-house and looking at solid segments of growth. And as I said, the recent civil and land developmental work is also related to structural side, and that makes our complete domain of civil and structural detailing or designing to almost to a conclusion. What we now require is a full member design team that is still we are looking for that can only be created with a proper acquisition. Once that is done, we'll be Head of Civil Engineering Services for U.S. right from A to Z.

Operator operator
#49

[Operator Instructions] The next question comes from the line of Mr. Madhur Rathi from Counter Cyclical Investments.

Madhur Rathi analyst
#50

Sir, firstly, if you can help me understand what would be the employee utilization levels considering the efficiency as well as the scope of work has improved?

Lakshmana Janumahanti executive
#51

Efficiency of the employees has improved by 15%, but still I see a prospect of growing another 15% further from here. That means without increasing much of headcount, our revenues can shoot up another 15%. And accordingly, the bottom line can also improve. But it requires a lot of training and then systems and methods of automation, which we have now initiated a few months ago, and that is showing good results. And I hope that the numbers and -- efficiency numbers especially, can improve with all the automation and the new method of incentivization we have created so that the merit gets rewarded and motivated and the output and quality, both are being measured in a systematic manner and an open system so that the employees are more motivated to do better job. So that process has started about 7, 8 months ago and yielding very good results, and we continue to improve upon it so that it will become a regular standard for the company.

Madhur Rathi analyst
#52

Got it. And sir, if I look at, Beryl, since you have acquired and you mentioned that we have received some record orders in October. So if you can help us understand how has the scope of work changed? And earlier, we used to do closer to $15,000, $20,000 or right now maybe closer to $22,000, $23,000 per employee on annual basis. Sir, can this move to $30,000, $40,000 that we can extract from our customers? Or can we charge those kind of revenues to our customers, if you can help us understand on that?

Lakshmana Janumahanti executive
#53

This is same the other way, like say, from $23,000, if you have 15% improvement efficiency, it will go to $36,000, $37,000. Another 15% can take it to even $35,000 per person per month. So that is possible given the efficiency drive and incentivization and also the automation we're bringing in. It is quite possible.

Madhur Rathi analyst
#54

And sir, on the orders that you received in October, if you can help us understand what are these? Are they of higher value in nature? Just color on these would be very helpful.

Lakshmana Janumahanti executive
#55

No, you're talking about the orders of Mold-Tek or Beryl?

Madhur Rathi analyst
#56

Beryl, that you mentioned that we received in October.

Lakshmana Janumahanti executive
#57

That Beryl order is mainly design-based order from the county of Hillsborough. And the work will be starting any time -- I think it started in October initially. This -- like, the municipality will be selecting a few engineers who are eligible for executing the work for residents. And Beryl -- about $1 million work, which has to be executed in the next maybe 6 to 12 months in the -- as for the residents coming in. So we have also initiated a marketing effort from India, showcasing Beryl's background and trying to put our Beryl name coming up in the search more easily. And that kind of marketing initiatives also will help more residents to reach for Beryl service and Beryl will be in a position to invoice the government. So this process of combined marketing effort with the design orientation is going to improve the performance of Beryl in the coming quarters.

Madhur Rathi analyst
#58

And sir, just one final question from me. Sir, how do we see order booking increased?

Lakshmana Janumahanti executive
#59

Three years is a long period in this kind of business, but I can say that if we make an acquisition of a structural engineering company that suits our line of activity with the civil and land development lines, what we are now opening up, we will be a one-shop solution provider for the entire gamut of civil projects. And then we can definitely command better respect and even pricing from the general contractors and builders.

Operator operator
#60

[Operator Instructions] The next question comes from the line of [ Anshu Sharma ] from Vortex Capital.

Unknown Analyst analyst
#61

Congratulations on a good set of results. I have a question regarding Beryl only. So Beryl has expanded into residential engineering, permit engineering, plan review, and building inspection. So are these new services generating revenue? And what contribution can they make to the combined performance?

Lakshmana Janumahanti executive
#62

Right through the conference, I'm talking about Beryl. So yes, Beryl is in the field of permits and inspection and designing also. But the designing has been far neglected area because they don't have proper engineers and they could not really grab the opportunity of designing. So our idea of acquiring Beryl is that with their contracts in the inspection, depositions and expert witness services and to something in design, we will be in a position to grab more and more design work. That is where our strength and our focus is also. So acquiring Beryl is not for immediate profitability, but to create a set of -- new set of customers, that is residents, counties and municipalities of U.S.A., rather than working only for high-rise buildings. High-rise buildings constitute hardly 2% of the overall construction in U.S.A., and we have been living with them with only that domain for last 20, 25 years. So compared to that, residential and land and structure -- sorry, civil structural, architectural, all these services and design, they contribute 40x to 50x more than structural steel detailing. So by entering through Beryl, we are reaching that part of the business. Now the civil and land development, which we have got an opportunity from a U.S.-based client, Beryl's background is helping us. Though there are only a couple of people in Beryl who have that knowledge, that will be good enough to showcase to the client that we have team leaders who can train our Indian team. So like this, the benefits of Beryl acquisition cannot be counted only at what Beryl is contributing, but what Beryl can bring Mold-Tek into other lines of business. So that is where we are looking at the bigger picture. And as Beryl alone also will be positive run to that at least from next financial year for sure.

Unknown Analyst analyst
#63

And sir, regarding the Body-in-White fixture segment, how much progress has the company made in reducing this dependence on this traditional segment? So -- and apart from that also regarding the new verticals such as plant engineering and transmission and distribution, have they started generating meaningful revenue?

Lakshmana Janumahanti executive
#64

Yes. BIW has been brought down from 155, 160 people to hardly 50 people now. And that team is having moderate work. So we are also relooking into whether any further reduction is required, maybe another 5, 10 resources if they are found to be redundant, we want to retrain them in poles and towers and replace them. Already training is going on for a set of 20, 25 people, whom we want to absorb in other domains. And second question of yours, that pools and towers distribution, engineering services. We are very rapidly progressing. The numbers are going to add further by December because it's, in fact, clients want more, but we are not in a position to deliver because those engineers are not readily available here, and we have to develop through training. Fortunately, we have been in this line for the last 4, 5 years with the emergence of data centers across U.S.A. The power distribution demand across the country has improved, gone up by several times, demanding more and more engineering work required in that domain. So from a small team of 30, 40 people last year, today, we are around 70, 80, and we have demand for beyond 120 people. So -- and that too on a fixed committed basis. So those numbers will start adding from December onwards because though the demand is for 120, 110 people, we could currently have only 70, 75 people working and the remaining 45 people are under various stages of training. So starting from Jan, I hope things will be much better in that domain. And the plant engineering, we are just doing with a small team and SPM. These are, again, multiskilled teams are being used there. So there's no buildup of a team unless we see what coming in that channel. So whatever we learn from BIW experience, we want to be careful in ramping up teams where there could be seasonality or big swings in the demand.

Unknown Analyst analyst
#65

And sir, last question regarding the future plans. So looking ahead, which business segments are expected to be the highest growth drivers for Mold-Tek over, let's say, 2 to 3 years? And what are the key milestones the investors can track to the team?

Lakshmana Janumahanti executive
#66

See, the key investors benchmarks are always the work on hand on one side and the other side, I mean, some of -- like you already asked the questions regarding BIW. The lines which are unpredictable and wavering in nature in all 25 years of our service of our existence, BIW is the only line where we used to have 200% workload to 20% workload. And nowadays, it's becoming more often, they are having less work. That is why we have taken a call to remove or reduce the team size. And going forward also, we don't see much light at the end of the tunnel for BIW. So that will be slowly reduced to a nominal size just to keep in case it takes off, the senior people can handle some work and outsourcing the rest of the work to some of the small players is the action plan. So another area where you can see for growth is poles and towers, where at least for next 5 to 10 years, some of the contractors and utility managers are telling me in my trip to U.S.A. recently that they are expecting the growth in the next 5 to 10 years to continue because of the several data centers that are coming up across U.S.A. and substations and power lines have to be drawn and they have to be created in the next 5, 10 years. So I see that is one area where we can grow. And this new area of civil and land development is completely a new domain where Beryl also can contribute marginally, at least in introductory and take up stage, they can be of help. And together, I see that area can be a big winner in the next financial year.

Operator operator
#67

[Operator Instructions] We have a follow-up question from Mr. Kaustav from BMSPL Capital.

Kaustav Bubna analyst
#68

I was just wondering when you mentioned you want to do an acquisition to improve your gamut of offering, are you planning on adding -- becoming an EPC player or you will only focus on design and detailing?

Lakshmana Janumahanti executive
#69

Sorry, what did you say last sentence?

Kaustav Bubna analyst
#70

Are you intending to eventually become a EPC player or you will only focus on design and detailing?

Lakshmana Janumahanti executive
#71

See, we definitely want to stay designing and detailing. We don't want to become EPC and take up the construction and monitoring because that will be too much of a responsibility and importance of presence in U.S. is much more required. So designing and detailing player himself, including architectural services can be right hand to a GC, as the general contractor or a builder in the U.S. state. So that is the role we are aspiring in the next...

Kaustav Bubna analyst
#72

And what this acquisition would you focus on like what -- are you willing to pay a high valuation? Are you looking at a distressed deal? I mean, how do you look at the acquisition when it comes to not affecting the numbers which are currently doing well for the company and you project it to go well for the next 2, 3 quarters, at least how do you not let the acquisition temporarily affect the numbers?

Lakshmana Janumahanti executive
#73

See, going forward, we don't need any other company other than structural designing company. And in structural designing, the numbers are always better than what we are even today because a structural designer commands a much higher pricing, hourly rates and also respect in terms of a project execution from the general contractor and the builder. So our acquisition in future will be certainly more in that direction, a structural designing company, which has ability to expand, ability to ramp up with the addition of Indian team. So that is what the criteria, and that's what we are looking forward in an acquisition. So the numbers will be much better. Even no Beryl, not even Mold-Tek can beat the numbers because of the high fees they command.

Kaustav Bubna analyst
#74

And if AI spends were to slow down in the United States, right? And if AI infrastructure spends then were to slow down because of this, then would that impact our pole business and data center business? Or is there enough demand in the existing infrastructure for us to cater to when you talk about the next 2 years guidance?

Lakshmana Janumahanti executive
#75

Yes. When I mentioned that one of the questions, data centers, we have done 4 or 5 in the past 2 years, and we are doing 1 or 2 now. And each is about 300,000 to 500,000. So a drop in AI and data centers in future also is not going to really impact us drastically in the Structural Steel Detailing. We do anything, any high-rise building, any plant, any stadium, any airport expansion, any -- anything you talk about big structures, we are there. So a data center happened to be a big building, like a huge warehouse, which we also do simultaneously for several other contractors. So what I'm saying is data centers is good. It is a good addition to us to have. But if AI and data centers business stop growing in future, we'll find something else, a lot of manufacturing activities, a lot of commercial activities. That is why one of the acquisitions of Beryl makes sense in the long run because Beryl is residential service provider. So we are never in residential. We have been always in high-rise buildings, which are commercial and big buildings like stadiums and airports and commercial buildings or even [Technical Difficulty]. So by getting into Beryl acquisition, we are expanding our residential design and residential detailing and permit drawings. So that is the idea of when we acquired Beryl. And I'm sure, if not now, in a year's time, next year, it should be a positive decision.

Kaustav Bubna analyst
#76

I was talking more on the poles business, the opportunity, the power opportunity in the U.S. I was talking on that front.

Lakshmana Janumahanti executive
#77

And the power utilities, yes. If the sudden drop in AI comes in and data centers stop happening, probably our utilities growth might taper down from what we are anticipating 70 to 100 to 125 will certainly happen. But whether that 125 will become 200, 300 people might give a question. But as of today, our contribution or our performance is based on hardly 70 engineers who are working in that domain. But if the domain improves, we'll have much further growth. But if the domain stagnates, I don't think there will be an impact as of today, at least from the current level of performance.

Operator operator
#78

[Operator Instructions] We have a question from [ Mr. Raghav Srivastava ], an individual investor.

Unknown Analyst analyst
#79

Sir, I want to understand what are the key operational bottlenecks that could restrict the company's ability to scale up over the next 2 years? And what steps are being taken to address them?

Lakshmana Janumahanti executive
#80

See, one of the main things that could happen in growth is change in demand patterns in U.S.A. If suddenly U.S. stops growing or they don't go into manufacturing or the civil industry, construction industry gets into a negative trajectory. That could probably be only thing which can impact our performance. That too marginally because when such a thing happens also, U.S. will continue to grow at least at 2%, 3%. And we are hardly serving, as I said in my previous answer, to a domain, which is hardly 2% of the overall U.S. construction industry, that is high-rise buildings. Now with the residential buildings entry through Beryl and the new client we acquired recently, our domain is going to be much bigger. So even if something shakes in the high-rise building domain, let's say, in a couple of years, our entry into residential line, which is 10x to 20x bigger than the domain where we are operating, can definitely give a good support and growth. So I don't see anything that is drastically going to impact our operations in the near future. And coming on automation front, which can impact manpower or better utilization or better quality, we are also in the forefront of that. And we already initiated steps to benefit from AI or automation in a very small way. And whatever benefits we gain, that can also further improve the overall performance, I guess.

Unknown Analyst analyst
#81

I have one more question. So how do we assess the current demand environment from U.S.-based clients? So are clients increasing outsourcing to India? Or are they adopting a more cautious approach towards new project awards?

Lakshmana Janumahanti executive
#82

No, no, no. Everybody now in U.S.A. has no choice but to outsource, especially in core engineering like civil. There's no civil engineers coming out in U.S. in numbers they require. Core engineering of mechanical, co-engineering of civil, UAA or anything, there will be increasing demand only. And the manpower availability within U.S. for such engineers is rapidly diminishing. So they're really looking forward to outsourcing. But I don't think will come down. What may happen to individual companies may differ. But overall, outsourcing as such as to grow in U.S., there's no other choice.

Unknown Analyst analyst
#83

Sir, one last question I had. What is the strategy to improve the contribution from higher-margin projects and reduce dependence on relatively commoditized engineering assignments. Can you throw some light on it?

Lakshmana Janumahanti executive
#84

See, one of the ways to improve is improving your productivity and using automation to get more output is a way to gain even in a traditional market, like detailing what we are doing. And entering into structural designing, residential designing, architectural services is other way of growing into high value-add services. So I think Mold-Tek is doing both the things simultaneously, while we are concentrating on efficiency improvement and automation to improve our traditional lines. We are entering into residential, we are entering into civil architectural land development areas, which are high-end demand and also utility and power distribution, which are in a real takeoff stage. So we are, I think, at the correct sweet spot as of now.

Operator operator
#85

There are no further questions. Now I hand over the floor to Lakshmana Rao sir for closing comments.

Lakshmana Janumahanti executive
#86

Thank you. So I thank all the investors and analysts who have been attending this con call of Mold-Tek Technologies Q2. And I also take this opportunity to wish you all a very happy and prosperous Diwali and the New Year. And I hope we'll have more opportunities to discuss about the company's future in the coming quarters. Have a nice day, and thank you very much. Thanks, Shekhar, for arranging this conference.

Operator operator
#87

Thank you, sir. Ladies and gentlemen, this concludes your conference for today. On behalf of Mold-Tek Technologies Limited, we thank you for your participation and for using Door Sabha's conference call service. You may disconnect your lines now. Thank you and have a pleasant evening.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Mold-Tek Technologies Limited transcript - plus 260,000+ transcripts from 13,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Mold-Tek Technologies Limited earnings transcripts and 260,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $145 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.