Skanska AB (publ) (SKAB) Earnings Call Transcript
November 5, 2026
Earnings Call Speaker Segments
Good morning, and a warm welcome to the presentation of Skanska's Third Quarter Report for 2026. I'm Antonia Junelind, Senior Vice President for Skanska's Investor Relations. And here on stage today, I have our President and CEO, Anders Danielsson; and our CFO, Pontus Winqvist. Shortly, they will take you through the quarterly results, including a business, financial and market update. And after the initial presentation, we will open up for questions. [Operator Instructions] So with that, I will hand over to you, Anders, to start the presentation this morning.
Thank you, Antonia, and welcome, everybody. Good to see you. And before we start with the figures, I want you to look at the picture here on the screen. It's the inference of Studio A in Warsaw. That's a commercial property development project that was constructed and developed by Skanska and also divested back in 2024. And we also, in the third quarter, divested our second building next to this one, Studio B to the same investor. And we also divested a building in Budapest H2 office in the third quarter. So I can just to start with say that the market for both the residential development and commercial property development is continue to be good in Central Europe. But now let's look at the figures. So the third quarter 2026, solid performance overall, very strong performance on the construction, operating margin, very good and also a record high order backlog, coming back to that. In the third quarter, the project development were negatively impacted by impairment charges for some land goodwill and completed projects. But we have good results from sales, both when it comes to commercial and residential properties in Central Europe. The investment properties portfolio delivered stable results in the quarter. We had a good -- continued good strong cash flow from operations. And the operating margin in Construction, 5% in the third quarter, very strong. And also when you look at the rolling 12 months margin of 4.5%, well above our target of 4%. Return on capital employed in Project Development, 1.6% on a rolling 12 on the same rolling 12 on investment properties, 4.1%. And that gives us a return on equity on a rolling 12, 11.4%. So we have a robust financial position that is maintained and very important for us. And we also managed to reduce the carbon emission with 65% in our own operations since the baseline year 2015. So if I go into each and every stream here, starting with Construction, we increased the revenue to SEK 46 billion, and that increased with 7% in local currencies. Order bookings were on a record high level, SEK 68 billion, same level as we had in Q2, so very strong. And that gives us a book-to-bill of 128% on a rolling 12-month basis. And as I said, record high order backlog of SEK 328 billion. Operating income, SEK 2.3 billion. And again, operating margin in third quarter, 5%. And the encouraging thing here and the positive is all geographies deliver good results, and that's very critical for the success. And that's something I'm really satisfied with. And we are well above our target, and we have a backlog at all-time high. Residential Development revenue, SEK 1.5 billion, slightly lower than same period last year, and we also sold less home than last year. We started basically 2 projects. We are selective when we start project, but we do want to start projects where we see that we have the right location and the business case supports the targets, of course. So we started one in Central Europe, a big one, close to 200 homes and also a smaller one in Norway. We have overall a solid sales and strong profitability in Central Europe. And the Nordic operation is slower. So we are -- we see that we're selling in low-margin projects, older, low-margin projects. And we also have impairment charges in the quarter of nonstrategic land and also goodwill. Moving on to Commercial Property Development. Operating income, SEK 171 million, and we have a gain on sale of over SEK 500 million here in the quarter. So we are -- we have divested 2 projects, as I said, one in Warsaw, one in Budapest on good margins, good solid gains. So the return on capital employed, 2.5%. We have 17 ongoing projects, and that corresponds to close to SEK 13 billion in investment upon completion. And we also have 17 completed projects, SEK 19.5 billion in total investments. The good thing here that we see the leasing rates are 82%. So we do have a positive cash flow, and it's a high-quality building, a good location and attractive amongst our tenants. And the -- of course, the asset impairment charge is negatively impacted. And we also started one new project in Central Europe, [indiscernible]. Investment Properties operating income, SEK 87 million, stable result, economic occupancy rate at 80%, slightly lower than the last quarter. We have a churn in the portfolio that 5, 6 years has been completed for 5, 6 years. That's natural. But I'm confident that we have good discussion with potential tenants and also the current one. The portfolio consists of 7 very high-quality office building in 3 largest cities in Sweden, and the value is currently SEK 8.3 billion. So I'm moving back now to Construction and look into the details in the order bookings and the development. Here, you can see 5 years back, the development on the order backlog, the blue bars here. So you can see, as I said, the record high level we have currently. So we have been successful in selecting the right projects and also projects where we see competitive advantage and where we can see that we have the right team in place, so we can also increase our margin over time. And that's also what we have seen in the last few years. So I can say the strategy we are working with for many years now really pays off now. So it's very encouraging to see. And here, you can see also the order bookings per quarter, the orange line here and the book-to-bill ratio that's well above 100% now, 128%. So really good. And if I look into each and every geography on the order bookings, you can see to the left here, the quarter, single quarter, SEK 68 billion. And of course, as you can see, the U.S. operation is really driving this, close to 70% of order bookings in the single quarter is in U.S. But it's also good if you look at the Nordics, if you look at book-to-bill there, 107% for the whole Nordics, very strong in Sweden, 123% and a very fantastic figure, 160% in U.S. So that gives us the overall book-to-bill of 128% which corresponds to 22 months of production. So we are in a very good place. We can continue to be selective. The market is still good in many places. So we have a really good position for the future. With that, I hand over to Pontus to look more into the figures.
Thank you, Anders. So then if we look a little bit further into Construction, you can see that the third quarter revenue came in at SEK 46 billion. It's an increase of 7% in local currencies, 9% in Swedish krona. And you might also remember that when we were presenting the first and the second quarter, we had a little bit slow start, but we also saw that we -- it's likely that we will see revenue increase going forward. And now you can see that it's actually coming here in the third quarter. When it comes to operating income, it's also quite an increase, actually 28% between the last third quarter and this third quarter. So we are ending at SEK 2.3 billion in an operating income. And following then quite a strong margin. You heard we have 5% in the isolated quarter. And on a rolling 12-month basis, we are on 4.5%. Looking then into the different geographies. It's actually an improved both results and margin in all of our geographies. So I think that's a really strong sign. And if you're looking into the U.S. result here, it's actually up 40% compared to the third quarter last year. So as Anders said earlier, I mean, a really good performance here from Construction. Going then into Residential Development. It's slightly lower revenue because we are selling a little bit less than what we did last year. The S&A here, you see is going up quite a lot from SEK 118 million to SEK 244 million. And the reason for that is that the goodwill impairments it's hitting the S&A goodwill impairment for the residential business in Norway of SEK 143 million. We also had other impairments, mainly for nonstrategic land of SEK 340 million. And all in all, this you see takes us down to a negative result and negative operating margin. If we then look into the different geographies, you see that these negative results and the impairments mainly coming from the Nordics. So you see we have SEK 480 million negative result in the Nordics, while the Central European business here continues to deliver a very solid result SEK 111 million and operating margin of 23%. So we continue to see the pattern that we have seen the last number of quarters with a very strong Central European performance, while we have a weaker margin and result in our Nordic operations. Regarding number of started and sold units, you can see that it is a little bit slower when it comes to both started and sold units. And here, the important thing is, I think Anders said that in the beginning also that we are starting projects when we have the right financial fundamentals in place, then we are ready to start. But if we don't have that, we are not starting it. Yes. So yes, -- of the number of homes in production, you can see that we are basically on the same level as we were last year. So a little bit shy of 3,000 units. It's under production. We are increasing our sales rate coming from 51% to 56%. And the absolute majority now of the ongoing projects that we have, they are in the Central European business. The unsold completed homes are continued to be reduced and are now 298 units. Commercial Property Development. You see that here, we were divesting 2 projects. So we have an increase in the revenue to SEK 3.2 billion, gives us in total, an operating income of SEK 171 million. And we also saw a handsome profits from those 2 divestments. So in total, we had a gain on divestments of SEK 513 million. We also had write-downs in this quarter, SEK 378 billion, and most of those write-downs are connected to our completed U.S. properties. Looking into the unrealized gains in our commercial property portfolio, you see that, that is going down somewhat compared to the second quarter, and that's mainly because we have divested 2 properties then as you saw with a good gain coming out from those. If you look into our completion profile of the properties that have been completed in the third quarter, you can see that we are now at 82% occupancy rate on those, coming up a little bit from the second quarter where we were at 77% for the completed portfolio. So then you see here over the coming years that we are not foreseeing to complete any projects during the coming 2 quarters. And then after that, we have some time for those that are not fully leased to continue to work with the leasing. Then talking about leasing. Leasing is always a little bit lumpy between the different quarters. And in this quarter, we were able to lease out 22,000 square meters. And we have a leasing ratio of 54% compared to the completion ratio that was 57% by the end of this quarter. Going then into our own properties, investment properties. It was a very stable quarter here. You can see that we had an operating income of SEK 87 billion, roughly the same that we have had the last quarters. If you look into the comparable quarter, you see that it's a higher number there, SEK 143 million, and that's because we had a revaluation in the third quarter last year. So that's the difference. The underlying result is the same basically. And we have stable market values. We haven't done any changes to those, and we have an average valuation yield of 4.7% on those. And the economic occupancy rate are 80% -- so if we are summarizing up the group result here, you see the operating income coming from the businesses of SEK 2.2 billion. Then we have central costs of SEK 116 million. It's a little bit higher than what you see during the third quarter last year. And the reason for that is that we had some release of provision from our PPP portfolio within Central in the comparing quarter. Otherwise, I think we have good control of our central costs and so the underlying costs are actually going down. And if you then look into the taxes, you see that we have a tax cost of SEK 541 million, representing a tax rate of 24%, and that's quite representative, I would say, for the structure that we have for the business right now. The lower tax rate in the comparable quarter was because we had some changes in our forecasting from where the profits actually was to be generated from. Cash flow. We are delivering a strong cash flow, I would say, from the business operations. You see that SEK 2.8 billion is coming in and supported by a positive development from the working capital within construction. So -- and also, we had net investments in the quarter, of course, we didn't have any one properties that were delivered during the quarter. And then, of course, we are continuing to produce within our existing projects, which means that we then are net investing in those. But anyway, I mean, you see that it came out with a positive cash flow of SEK 2.8 billion. When it comes to the working capital, you see that we are on, I would say, most likely all-time high levels. We have SEK 37 billion in working capital, and we have a positive currency impact of SEK 1 billion, but you can also see that the underlying cash flow coming in from our construction operations are -- continue to be very strong. Yes, regarding investments and divestments, I have said that we are having some net investments during this quarter because not delivered any seed properties. And therefore, you also see that we have a slightly increase in the capital employed because of those net investments. The available funds within the group is then also very strong, I would say. You see that we have SEK 26.3 billion, of which unutilized credit facilities is SEK 7.2 billion. So it's continuing to be strengthened through the good cash generation that we have within the business. And that adds up in our financial position. You see here that we have our adjusted interest-bearing net receivable is coming up with around SEK 3 billion since the second quarter and is now ending at SEK 11.6 billion. You can also see on the graph here that we have had a very stable situation when it comes to our financial position over the last number of quarters. So by that, I leave over to you, Anders, to talk a little bit about the market.
Of course. So if I look into the market and starting with construction, we see a strong market on the civil operation, both in U.S. and in Sweden. So that's very encouraging. You also see a stable market in most of the other countries. One exception is U.K. that the willingness to invest is there, but there's some lack of funding currently, but we look forward to that. On the building side, we see good demand, stable market in U.S. and mostly stable also in the European countries, except for Norway and also here U.K. But it's driven by a high demand of infrastructure investments, both traditional, but also energy, water. We see strong demand in defense investments and also on the tech side, both data center and semiconductor facilities. Residential Development, strong market in the Central European continue to be strong, very high demand on apartments in the cities where we operate. And we also see a weaker market continue to be weak in the Nordic countries. Some signs of improvement in Sweden, I would say. We can see we're selling more -- a bit more, but it's too early to say that it's a normalized market in our view. So we continue the next 12 months a bit slow. On the Commercial Property Development, stable market in Central Europe and in the Nordic. We see a slower market in the U.S., driven by the transaction market is still slow. We see that the leasing market is more activity on. So we're leasing out. We continue to lease a good leasing ratio, as you have seen previously. And also in more -- definitely more activity on the transaction market in both Central Europe and in the Nordics. And investment properties, the market is stable. So we have a healthy occupancy rate, and we can see that our office building in the Nordic Swedish market is really attractive. So if I summarize the quarter here, very strong construction operation, very strong profitability, cash flow and order intake. And in the third quarter, the project development were negatively impacted by some impairment that we saw -- that we talked about, but good result from sales, both in commercial and residential development in Central Europe. And again, the investment property portfolio delivered stable results. And cash flow from the business operation is very strong, and we have managed to maintain the very strong financial position in the company. With that, I hand over to Antonia to open up the Q&A.
[Operator Instructions].
[Operator Instructions] Our first question over the phone comes from Julia Sundvall with ABG.
A few questions from my side. And I would, of course, like to start with a super strong construction margin. Could you please give us some flavor on the year-on-year improvement? What's the driver behind this? And is it any one-off effect? Or how should we think?
Julia, I can start with that. It's a strong improvement, of course, but we don't have any one-off effect in the construction margin in the third quarter. So it's more -- so I think you should look more on a rolling 12-month basis, which is also very strong 4.5% -- but in the quarter, we have completed or maturing large, very profitable projects. And since we have a conservative profit takeout in the early days of a project, we get this boosting the margin somewhat in a single quarter. But the underlying -- it's representative for the underlying performance.
Yes. Perfect. And on the order backlog, it's on a very high level now. Are you still disciplined within the order backlog? And can you say anything about the margins in the backlog? Is it at the levels we see now? Or is it higher? Or how should we view it?
It's a very high quality in the backlog. We don't tell you the market about the exact margin. But I can say that I'm very confident in the quality and the margin in the backlog definitely support the target we have for the construction operations. I'm confident in that.
And I don't know how much you can say about it, but you talked a little bit earlier in the quarters about a high burning rate in the data center orders. Do you see this kind of effect now? Or how should we think about the data center orders in the order backlog?
Yes. We saw -- if you look at the first couple of quarters in the U.S., where most of the data center was a bit slow, but it definitely has taken off now in the third quarter. So in general, the data center has a higher burn rate because they are shorter projects, quite large project on shorter time compared to the average.
And I will ask that we continue with the online queue.
Our next question comes from Keivan Shirvanpour with SEB.
A couple of questions. Maybe first of a follow-up question on the construction margin. Would it be possible to get a sense of how much of the operating profit in the quarter that comes from these projects that have reached these critical milestones?
That's nothing we go into. But I say if you look at the rolling 12-month basis, 4.5%, that sort of represent the performance over time. So that gives you some sort of guidance.
Okay. And then my second question is on the cash flow impact from the sold but not transferred properties, it's SEK 3.9 billion. Could you say something about the timing? For instance, how much is it this year and how much is beyond 2028?
I don't have the exact number of that in my head, but we divested -- we will see some cash flow during the fourth quarter and some of the cash flow from the sold coming into next year, depending on when they will be delivered.
Okay. But I think I calculated it around SEK 1.5 billion or so in 2029. Is that a rough estimate for you? Or how you see that figure?
No, I'm not sure if I was following the question. You mentioned a number here. What's that number?
Yes, I calculated it's about SEK 1.5 billion that is due in 2029 in the cash -- of the cash flow that you receive.
I can't answer that because I don't really know what that SEK 1.5 billion is coming from.
But maybe could...
Keivan, can you still hear us?
Yes, I can hear you now.
Yes. Would you like to continue with an additional question?
Yes, I could just a final question, and that is also a follow-up on the revenue growth in Construction, mainly in the U.S. You said that the revenue has started to pick up quite a bit. Can you say something about the backlog conversion rate in the coming quarters as you mentioned it's a higher share of projects that are quite large that have a shorter duration. Is it -- could we assume some type of similar increase in revenue given that.
I would say it's a mixed picture in U.S., how long the duration is of the order we have in the backlog. On the civil market because we have been successful on traditional infrastructure market as well in U.S. So it's -- we have a diversified portfolio. Yes, data center has been semiconductor has been a big part of the single quarter order intake. But if you look at the whole backlog, we are quite diversified. And generally, the civil infrastructure projects are much longer than the data center. So it's a mix definitely. But we have a high burn rate on the building right now, and they have picked up. But I don't give any forecast.
So let's continue with the next caller, which I believe is Graham Hunt from Jefferies.
I've just got 2 also on construction. Just in terms of the very strong order intake in Q3, I suppose just wondered if you had any color or insight into sort of what drove that? Was it just timing of certain bids coming through? Is it sort of the end of the series of tenders? Just trying to understand kind of how we should think about that or if there's been any pull forward from Q4. And in that context, obviously, you just had the midterm results. Any kind of commentary there in terms of how you're seeing the U.S. market in the light of the Democrat success yesterday? And then -- sorry, I just follow up -- just last question on data centers in the Nordics. Could you give us any comment on the pipeline that you may be seeing or not seeing in the Nordic countries with data centers at the moment?
All right. Thank you, Graham. The construction operation, very high order intake, of course. And I would say that's a lot of those projects we have been working with for a long time. So it's also a coincident that we boost the third quarter with that. But we saw the same level, as you know, on the second quarter. So it's definitely a good hit rate on the project we have been working for a long time. The second question about the Democrats and the Congress -- it's too early to say any impact. I can say that we have been working in the U.S. for over 50 years, and we have been working for a lot of administration and different Congress and the majority in the Congress. We are used to that. And my experience is definitely that the willingness to invest in traditional infrastructure is definitely on both sides. So we will watch it carefully, but I don't expect any dramatic changes in the short term. Data center in the Nordics, we have a few in Finland, but we also have building in -- have been building in Sweden and also in Norway. We can see -- but this is on a lower level, of course, than we see in the U.S. But we can see that a lot of our customers wants to invest in data center in the Nordic as well. But they need permission, permits takes some time in our countries here in the Nordics. They also need access to power, land, of course. So that's something that takes some time, but I would expect it to increase.
Very good. So we're moving to next person in line, which is Arnaud Lehmann from Bank of America.
I have 3, if I may. Firstly, on construction sales growth, you delivered high single digit at group level, I think, 7% excluding currency and obviously, double digit for the U.S. Do you believe that, that could be the new run rate based on the order bookings and the level of the order book into 2027? That's my first question, please.
Yes. We don't give any forecast, but we have seen a pickup in the revenue now, as you say. And the order backlog definitely support the revenue going forward, but I will not give you any figures on that.
Okay. Okay. Fair enough. And coming back on the construction margin, some of it is -- well, you have higher sales, but your SG&A are stable. So they go down a little bit as a percentage of sales. Are there any specific impact to mention there? Or it's just steady cost management and just higher revenue?
I would say it's the latter. It's nothing special that is happening. Of course, the S&A percentage is easier to hold on a good level if you see an increase in the revenue. But we are focusing on managing the costs in all our businesses and on central level. So I think it's cost management. It's nothing else.
Okay. And last one, if I may, sorry. Just on the cash performance, pretty good in the quarter. Is it all related to order bookings in construction? Or are there any other effects you'd like to highlight?
No, I think the majority of the improved cash flow is coming from the working capital development within construction. So that's we continue to see that we have favorable payment plans, et cetera, when it comes to our new and existing construction contracts.
And I believe that, that was our final question. And I will just turn to our operator, George, if you can please confirm that.
Absolutely. This was our last question.
Thank you very much. So that means that we have answered all the questions that you had for us here today. So I would like to say thank you for joining us. Our next earnings call will actually not be aired from here. We are moving head offices. So next time, you can come and see us in our new head office, the beautiful project that we have developed ourselves called Olivin here in Stockholm. So I hope to see everyone there. Thank you very much, Anders, Pontus, for your presentations and answers here today. And as I said, thank you for joining us here in the studio. And lastly, I would like to say thank you for everyone joining us online. I wish you a lovely rest of the day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Skanska AB (publ) transcript - plus 261,000+ transcripts from 13,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Skanska AB (publ) earnings transcripts and 261,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $145 - full transcripts, speaker segments, full-text search,