Home / Transcripts / 5E Advanced Materials, Inc. (FEAM) · September 29, 2025

5E Advanced Materials, Inc. (FEAM) Earnings Call Transcript

September 29, 2025

NASDAQ US Materials Metals and Mining earnings 16 min

Earnings Call Speaker Segments

Paul Weibel executive
#1

Good afternoon, everyone, and thank you for joining us today. We've just wrapped up a year of real change in Fiscal Year 2025, moving beyond development work and into getting ready for commercial operations. Throughout our project, we saw validation on many fronts — starting with the SK1300 pre-feasibility study and continuing through customer qualifications and milestones in our supply chain. Before we get into specifics, I'd like to walk through the main accomplishments of Fiscal Year 2025. The economics of the project have been shown to be strong. A pre-feasibility study covering just phase one, which we released not long ago, backs up a mine life of 39.5 years, an after-tax NPV of $725 million, and a project IRR of 19%. Turning to the commercial front: our high-purity boric acid has been qualified successfully with 14 customers spanning several segments, and full-scale production testing is now underway with a tier one specialty glass manufacturer. Regarding financing, we obtained a non-binding LOI from USXM covering a potential $285 million project debt facility — a significant milestone on the path to locking in funds for phase one construction. When it comes to keeping the project FID on schedule, milestones are now established, and we're in a strong position to proceed toward FEED engineering and a final investment decision in mid-2026. In today's remarks, I'll cover these four areas in greater depth and discuss the upcoming Fiscal Year 2026. To start, the SK1300 pre-feasibility study that came out not long ago gives us solid evidence that our Fort Cady resource and reserve has real scale, solid economics, and staying power. Only phase one is addressed in this study — any later expansions, along with more valuable boron derivatives, are left out. These findings really highlight how robust the underlying fundamentals of our project are. A pre-tax NPV of roughly $725 million comes through, alongside a project IRR of 19%. On an after-tax basis, the NPV lands at about $469 million, with a project IRR of 16%. Across the mine's lifespan, we figure free cash flow at close to $3.7 billion pre-tax, and payback after taxes takes slightly less than six years. A 39.5 year mine life is laid out in the study, backed by 5.4 million short tons of boric acid reserves. The first phase is designed to produce 130,000 short tons of boric acid annually, and we think that volume is very much required in the current worldwide marketplace. When it comes to costs, we're projecting all-in sustaining costs of $555 per ton, and the initial capital requirement sits at roughly $435 million. Contingency as well as a gas cogeneration unit are both included in that figure; backing up these projections is actual operating information gathered from our small-scale plant, which verified the recovery rates and efficiencies we had anticipated. Feedback we've gotten thus far from analysts, potential buyers, and the investment community has been extremely positive. Now I'd like to shift focus to how we're gaining momentum with customers, an area where the validation keeps building. Back in earlier this year, 14 customers completed successful qualification of our boric acid. Our customer base touches many sectors, everything from specialty glass and fiberglass to ceramics, insulation, agricultural, defense, and chemicals. Demand keeps building for high-purity boron sourced here in the U.S., and more buyers have moved into later-stage testing. Let me move from the wider picture to something more specific: a while back, we hit a significant milestone with a tier one specialty glass manufacturer. We wrapped up a full trial covering logistics and handling, shipping 2 tons of product from the port of LA in California over to Taiwan. The trip took about 20 days, and the material passed every on-site handling check, including successful use in a glass furnace. As a result, we received approval to move forward with testing the product at full scale within that potential client's manufacturing operations. Right now, the batch meant for this large-scale trial has already been produced and is ready for shipment; we're working on the shipping purchase order, and sending out 20 tons of premium boric acid is anticipated very soon. The forthcoming trial ought to take 2 to 3 weeks for transport overseas plus roughly 5 weeks of evaluation in a commercial glass furnace. On top of that, our team has begun producing the next lot of premium boric acid intended for additional major LCD glass producers who are lined up to conduct a comparable test. We've shown that our operation works, that it can grow, and that it meets the toughest quality requirements anywhere in the world, every time. Now that we've hit those milestones, we've officially kicked off talks about long-term offtake, and we've made 2 formal presentations — the most recent one laid out concrete offtake terms. Lately, the supply-and-demand picture we've put together has been landing well with the customers we're talking to, and the way the industry is shifting is opening up a obvious opening for 5E Advanced Materials, especially after what one of the two big boric acid manufacturers announced recently. At 5E Advanced Materials, we and our stakeholders share the view that a fresh market producer is fundamentally needed to cut supply chain risks, and the approach we've taken so far has bolstered confidence and deepened trust among the boric acid market and investor communities. Last, I'll walk through our roadmap to FID and financing. We're still tracking toward an FID by mid-2026. Early FEED engineering work has kicked off, and 5E aims to clear the formally staged gate into FEED engineering before the year ends. An application has been readied for the XM Engineering Multiplier Program, targeting a loan facility of $8.5 million to $10 million, which would supply the capital and liquidity to fully fund FEED engineering. After reaching the FEED stage gate, our expectation is that finishing that process will require roughly 8 to 9 months, putting FID sometime in mid-2026. A formal response went out from us last week regarding the U.S. Geological Survey's draft critical minerals list, and our position is firm that boron belongs on it. That draft came out before the second largest boric acid manufacturer, which noted that a strategic review of their business is underway. As things stand today, our view is that the boric acid market in the United States has a single point of failure. Looking at the financial results that are publicly available, the second biggest manufacturer of boric acid — and the sole point of failure within the U.S. supply chain — has experienced cost increases of roughly 60% since 2017, measured on a B2O3 basis. In light of the significant announcement from the largest U.S. boric acid producer, together with their 2018 reserve downgrade and what we consider to be deteriorating business fundamentals, boron needs to be added to the proposed critical minerals list. If this producer were absent, the United States would forfeit its standing as the second largest producer, and our nation would shift from being a net exporter to a net importer. An oligopoly is what characterizes the boron market. America has exactly one vulnerability where everything hinges on a single source. Unless more money flows toward fresh boric acid ventures, the U.S. will find itself relying on Turkey for boron and China for the advanced boron materials it critically needs. We view 2025 as the turning point for boron, because third-party analysis points to shortages emerging in 2026 — a finding that, in our view, makes the case for a new entrant in this market. Looking ahead, several important catalysts are what we'll be concentrating on during the next few quarters. Those include advancing to full-scale testing with several specialty glass manufacturers, securing additional qualifications along with initial offtake agreements, getting a small XM loan to fund FEED engineering expenses, completing the engineering deliverables needed for FEED readiness, driving the bigger project finance and XM loan effort forward, completing our mine plan tied to the horizontal well trials, and lastly, the possibility that the U.S. Geological Survey will do the right thing by adding boron to the final critical minerals list. In wrapping up, I want to express appreciation to the people who work for us and the partners we collaborate with for their commitment. Considering everything we achieved during Fiscal Year 2025, we're in a strong position to progress toward FID around the middle of 2026 and to build lasting worth for those who hold our shares as well as for everyone with a stake in what we do. Thanks very much — I'm eager to take your questions now.

Tate Sullivan analyst
#2

Hello, and thank you. Thanks, Paul. Could you go over what you said regarding the California boron mine disruption? What exactly was the announcement you referenced?

Paul Weibel executive
#3

Hey, Tate. Yeah, no, I appreciate you, Donald, and thanks for asking. At the close of August, Rio, when they named the new CEO, put out announcements that they had streamlined their business. In the past, Rio was divided into 4 different business segments, and going forward, they're now set up with 3 business segments, which are one, iron ore, two, copper, and three, aluminum and lithium. Basically, the industrial minerals, which I think is where their diamonds, borates, and titanium business was located, are now under the Office of the Chief Commercial Officer according to the release, and a strategic review is underway for them.

Tate Sullivan analyst
#4

All right, thanks for explaining that. For boron to be included on the U.S. Geological Survey critical minerals list, does it take — I mean, is it a 3-month or 6-month procedure, or what has to occur regarding the review?

Paul Weibel executive
#5

Excellent question. We were in D.C. I traveled down there and had a meeting with Interior in July. The rumor going around was that at some point during this fall, the draft list would be released, and nobody said anything about whether boron would or wouldn't be included, but basically the right step for getting boron onto the list is basically to file public comments. My instinct at that moment told me a draft list should be expected by October. I was happily caught off guard, since it arrived earlier than that, and I believe it was possibly the first week of September or the last week of August when the draft list came out, which basically started a 30-day public comment period. Every comment can be found on the Federal Register, and we filed our comment, as did, I think, 8 other organizations, and you can look up boron on the Federal Register within the comments, and all of them are posted there. I was glad that a few well-known organizations did participate, and at this point we're not sort of the lone voice in the room, sort of sounding the alarm that supply chain issues exist in this market.

Tate Sullivan analyst
#6

All right, thanks a lot.

Paul Weibel executive
#7

Wonderful. Thanks. I'm grateful for the questions and answers on this call. As we mentioned, we feel that at 5E Advanced Materials, the resource is the right one, and the timing is right as well. Our commitment is to create a robust and durable boric supply chain that supports America's industrial foundation for generations ahead. We're eager for Fiscal Year 2026 and to hit the milestones we've projected as we move into 2026. Thank you.

Operator operator
#8

Thanks. That wraps up the call for today. At this point, feel free to hang up. We appreciate everyone for joining.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete 5E Advanced Materials, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to 5E Advanced Materials, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.