Aehr Test Systems, Inc. (AEHR) Earnings Call Transcript
November 2, 2026
Earnings Call Speaker Segments
Thanks, operator. Good afternoon, everybody, and welcome to the Aehr Test Systems conference call covering financial results for the first quarter of fiscal 2027. On today's call I'm joined by Gayn Erickson, Aehr Test's President and Chief Executive Officer, and Chris Siu, our Chief Financial Officer. This afternoon, after the market closed, Aehr Test put out a press release announcing results for the first quarter of fiscal 2027. You can find that release on the company's website at aehr.com. Today's call is being webcast live, and a replay will be posted on the investor relations page of the company's website. Before we begin, please note that management will offer forward-looking statements today, which are based on information and estimates currently available. Those statements involve risks and uncertainties, and actual results could differ materially from what the forward-looking statements express or imply. The company's latest periodic and current reports filed with the SEC discuss the factors that could cause such differences. Forward-looking statements, including any guidance given on today's call, speak only as of today's date, and Aehr assumes no duty to update them. I'll now hand the conference call to President and Chief Executive Officer Gayn Erickson. Gayn?
Thanks, Todd. Good afternoon, everyone, and thank you for joining us. I'll begin with a brief review of our first quarter highlights and provide an update on the key customer programs and markets that are driving our business, with particular attention to the robust demand we're seeing in the AI and data center infrastructure markets. Chris will then go over our financial results and outlook before we open the call for questions. We got off to an excellent start in fiscal 2027, with record quarterly revenue, strong bookings, and meaningful progress on several major AI semiconductor customer programs. Revenue for the first quarter reached a record $33.0 million, up 200% year-over-year and 75% sequentially. Non-GAAP net income came in at $9.4 million, a 163% increase from the prior quarter, which shows how operating leverage is working in our business as revenue scales. These results reflect growing AI production demand and our capacity to fulfill customer capacity requirements. Bookings came to $46.7 million, a book-to-bill of 1.4. Effective backlog, which includes bookings received after the quarter closed, stood at $109.3 million as of November 1st. Given our strong first quarter performance, the sizable backlog, and visibility into customer production requirements, we are lifting our fiscal 2027 revenue outlook to $150 million, versus the prior guidance range of $130 million to $150 million. That amounts to 200% revenue growth over fiscal 2026 and reflects our increased confidence in the production ramps and customer programs behind our business. For the entire fiscal year, we anticipate non-GAAP net income equal to no less than 20% of revenue. Additional specifics regarding our financial outlook will be shared by Chris Siu. Across wafer-level as well as package-level burn-in, demand keeps speeding up, fueled by growing semiconductor complexity, power requirements, and deployment in mission-critical applications. As devices grow more sophisticated, thorough test and burn-in are becoming indispensable for guaranteeing reliability and performance, which is fueling rising uptake of our solutions across numerous markets. At Aehr, that is showing up as growing production demand from current customers plus fresh chances to qualify our solutions on other devices with those same customers and with new ones. To begin with wafer-level burn-in, interest in our FOX wafer-level burn-in solutions is picking up quickly. Our lead customer for AI processor production keeps adding capacity, and in August we announced a follow-on order worth $22 million for multiple systems made up of fully automated FOX-XP systems with integrated WaferPak auto aligners and complete sets of proprietary WaferPak full-wafer contactors. We are carrying out this customer's capacity expansion plans and are encouraged by its forecast for additional capacity in both the short and long term. We have also made substantial progress with a major supplier of AI accelerators, CPUs, and network processors, which successfully completed a benchmark evaluation last quarter. One customer chose to buy a completely configured XP wafer-level burn-in test cell, and it will be set up at one of that customer's main outsourced semiconductor assembly and test, or OSAT, partners located in Taiwan. There, the system is going to be assessed in a high-volume production setting, using the very same device that came through last quarter's benchmark testing successfully. Installation is anticipated in early calendar 2027, and a high-volume production decision ought to arrive a few months following completion of the installation and validation work. From our perspective, this customer ranks among the largest potential burn-in system opportunities Aehr has ever pursued, with substantial potential extending across multiple product lines and multiple manufacturing sites. This deal is a significant step for us — it means broader adoption of wafer-level burn-in for cutting-edge AI processors, and it also means we'll be rolling out our wafer-level burn-in solutions across several products and product lines for a single customer. When these advanced process nodes end up inside expensive multi-die packages that also hold other processors, high bandwidth memory, and parts like electrical and optical I/O chips, being able to catch early life failures before final assembly can bring real cost and reliability benefits. There's another trend gathering momentum too: certain devices customers are developing may require production burn-in screening at the wafer level, because infant mortality failures in some devices may just not be screenable effectively once you get to the package level. Regarding silicon photonics, we received extra production orders from several customers for our fully automated FOX-XP systems, which are used to burn in photonic integrated circuits for high-speed optical interconnects and data center applications. We think broader uptake of optical interconnects — among them emerging co-packaged optics architectures — is going to drive further demand for wafer-level reliability screening. Turning to silicon carbide, we're seeing additional WaferPak orders along with greater utilization of installed FOX systems, which points to improving demand. We have direct evidence from EV automotive suppliers that companies relying on our wafer-level burn-in systems are viewed as preferred vendors when it comes to their quality and reliability screening. Increasingly, we find that companies carrying out reliability screening via wafer-level burn-in treat it as a real differentiator in their markets. We're continuing to go after gallium nitride and other power semiconductor uses, where reliability screening has shown itself to be essential for the end markets involved. Compared with silicon carbide today, GaN offers a considerably wider application space, and screening it for early life failures has turned out to be much more difficult. In this area we consider ourselves the market leader, and over the past six months we have brought on two more production customers. On the memory side, we're still working with major manufacturers on next-generation wafer-level burn-in. NAND flash opportunities are progressing more slowly than we anticipated, because of limited incremental manufacturing capacity as well as the timing of volumes for new high-bandwidth flash architecture. On a separate note, an emerging DRAM architecture for high-bandwidth memory that incorporates more sophisticated logic within the base die could open up wafer-level burn-in possibilities prior to assembly into advanced memory packages. Those engagements are ongoing, and Aehr still views them as long-term opportunities for us. Let me now shift to the package level. Our Sonoma high-power package-level burn-in operation is growing as well. Each month we are delivering and setting up over twelve systems to back our lead hyperscale customer's production ramp for its first AI processor built on Sonoma. Our enlarged manufacturing capacity is enabling that shipment cadence. Qualification on Sonoma has been completed successfully by the same customer's second AI processor. Like we said back in October, we've gotten follow-on orders for extra systems, burn-in modules, and software improvements to help with initial production sampling and a production ramp we expect in calendar 2027. What matters here is that the customer's forecast sees this second processor eventually hitting larger production volumes than its first processor, which is running on Sonoma right now. This processor needs more power and more advanced thermal management, and that includes several thermal zones inside one package, each controlled independently. We're also moving ahead with evaluations of our Sonoma high-power systems alongside other AI processor suppliers and hyperscale customers, for engineering qualification as well as potential high-volume production applications; these engagements involve bringing up processors at Aehr and at customer sites both here and in the U.S., and in Asia. These processors cover data center-focused chips for training and inference, plus very high-volume edge-based processors built for mission-critical real-time inference applications. Beyond growth at the wafer level, we keep seeing package-level applications drive our business. On the consumable side, which complements our system sales, our proprietary WaferPak contactors and Sonoma burn-in modules serve customers' continuing production needs and new device introductions. Right now we expect those products to make up roughly 35% of our fiscal 2027 revenue.
With our installed base growing across AI processors, silicon photonics, silicon carbide, and gallium nitride applications, we're seeing more opportunities for those engineering qualification and production-driven purchases. I'd also like to point to a significant shift in how our business looks that might not come through clearly from the individual customer programs we've talked about. In the past, Aehr had just a small number of customers capable of generating meaningful production orders. Now, that potential exists across more than a dozen customers, covering AI processors, silicon photonics, silicon carbide, gallium nitride, and other applications. That's meaningful diversification — not just across customers and end markets, but also across both our FOX wafer-level burn-in and Sonoma package-level burn-in platforms. Individual customer orders and production ramps can still swing a lot from quarter to quarter, but we now have a far wider range of customer and production opportunities feeding into our growth outlook. We think this breadth lowers our reliance on the timing of any one customer program and puts Aehr in position for more diversified, sustainable long-term growth. Importantly, this growing customer base, together with the rising number of devices being qualified for production and the growing installed base of our systems, is opening up multiple opportunities for additional revenue growth beyond our fiscal year. To keep up with expanding demand, we've added manufacturing capabilities, including in Southeast Asia; these investments are supporting our current customer production ramps and giving us capacity for further growth. We keep working closely with suppliers to meet customer delivery requirements; we're also planning more manufacturing expansion and targeted investments in engineering, customer support, and sales to support growth beyond fiscal 2027. Our priorities stay the same: delivering on existing production commitments and moving additional customer programs through qualification and validation. Before I hand the call to Chris, I'd like to welcome Vijay Rao to our board of directors. Vijay brings 30 years of experience in the technology industry and deep expertise in hyperscale data center infrastructure, including AI accelerators, high-performance memory, and optical networking. His grasp of semiconductor reliability requirements will be valuable as we grow our presence in AI and data center applications. To wrap up, our record revenue, strong quarterly bookings, record effective backlog, and expanding customer opportunities have boosted our confidence in the year ahead; with existing customers increasing production, more AI processor programs moving toward commercialization, and a significantly broader pipeline of opportunities across both our wafer-level and package-level burn-in platforms, we believe Aehr is exceptionally well-positioned for continued growth in fiscal 2027 and beyond. Our focus stays on executing against existing production commitments, expanding our installed base, and converting additional qualification programs into long-term production business. With that, I'll turn it over to Chris.
Thank you, Gayn, and good afternoon to everyone. Our results for the first quarter show solid execution against rising customer demand, with record revenue for a first quarter, bookings above revenue, and meaningful operating leverage as we keep scaling the business. Importantly, we grew quarter-end backlog to roughly $101 million even with substantial shipments made during the quarter, and our effective backlog came to $109.3 million, which gives us considerable visibility into our fiscal 2027 outlook. I'll start with a quick update on manufacturing capacity, then review bookings and backlog, the first quarter financial results, cash flow and the balance sheet, and finally our updated fiscal 2027 outlook. In the first quarter, we kept building out manufacturing and customer support capabilities to address growing demand. Beyond expanding our Fremont operations, we started shipping Sonoma systems from an existing contract manufacturer located in Southeast Asia. That operation provides capacity for over 20 more Sonoma systems each month, which gives us added flexibility to support customers' growing production requirements. During the quarter, we shipped several Sonoma systems from this facility to the Taiwan-based OSAT in support of our lead hyperscale customer, and the ramp went smoothly. This asset-light approach to manufacturing let us raise production capacity and responsiveness without a comparable rise in infrastructure or capital spending. We're also growing our local support capabilities in Taiwan. Once we signed a fresh lease in Hsinchu, we brought on additional customer service resources and intend to hire selectively in sales and customer support as our wafer-level and package-level burn-in programs ramp toward greater production volumes. Now for bookings and backlog. Bookings in the first quarter totaled $46.7 million, which is more than 300% above the $11.4 million recorded in the same quarter a year earlier. Orders for FOX wafer-level burn-in systems, WaferPak contactors, and auto aligners used in AI processor and silicon photonics applications accounted for most of that increase. Backlog at quarter-end stood at $100.9 million, versus $80.6 million at the close of fiscal 2026. Notably, we pushed backlog past $100 million even as we recognized $33 million of revenue in the quarter, a sign of robust new order activity. Once you include the $8.4 million of extra bookings that came in after the quarter closed, effective backlog as of November 1st was $109.3 million. That sizable backlog, combined with growing manufacturing capacity and the visibility we have into production programs already underway, provides a solid base for the fiscal 2027 revenue outlook we've updated. Revenue for the first quarter set a record at $33 million, a 200% increase over $11 million in the same quarter last year and a 75% rise sequentially. That performance came in ahead of consensus and showed strong execution in both our package-level and wafer-level burn-in programs. Revenue encompassed shipments of Sonoma systems to our top hyperscale client in Taiwan, along with several FOX-P system deliveries—among them a FOX-XP system and WaferPak auto aligners—to our leading AI processor customer, plus FOX-NP system shipments to customers serving the power semiconductor market. Contactors and related products brought in $13.5 million, equaling 41% of total revenue; this category covers WaferPaks used in wafer-level burn-in as well as burn-in modules and burn-in boards for package-level burn-in. Compared with the $2.6 million recorded in the same quarter a year earlier, when it accounted for 24% of revenue, that amounts to more than fivefold growth. This particular piece is extremely important to the way our business model functions. We expect that as the installed base expands and customers increase output or add new devices, there will be greater need for our proprietary contactors, WaferPaks, BIMs, and BIBs. Those repeat orders add to system sales and open opportunities for recurring production-related revenue, although the portion of total revenue they account for will vary quarter to quarter with product mix and shipment timing. Non-GAAP gross margin was 48.5%, an 11 percentage point increase from 37.5% in the same quarter last year. This improvement was mainly due to larger sales volumes and a better product mix. The year-earlier quarter had included a bigger share of lower-margin third-party probers as well as an automated aligner upgrade that was sold as part of our complete solutions. Non-GAAP operating expenses came in at $7.8 million, compared with $5.7 million during the same quarter a year earlier. That increase was driven largely by additional research and development spending, such as engineering staff and materials tied to AI-focused initiatives. These investments are aimed at particular opportunities, among them wafer-level burn-in validation for a major AI processor customer, next-generation package-level burn-in programs, and development work related to memory. Even though Non-GAAP operating expenses rose roughly 36% year-over-year, revenue was up 200%, which demonstrates considerable operating leverage as we scale. We posted an income tax benefit of $0.3 million, resulting in an effective tax rate of negative 3.7%. This benefit was mostly attributable to discrete tax items, among them disqualifying dispositions from stock options and excess tax benefits arising from the vesting of restricted stock units. Non-GAAP net income came in at $9.4 million, equal to $0.28 per diluted share, compared with $0.2 million, or $0.01 per diluted share, in the same quarter a year earlier. On a sequential basis, non-GAAP net income climbed 163%. Stock-based compensation and acquisition-related adjustments are excluded from non-GAAP net income. Turning now to cash flow and the balance sheet: cash used in operating activities totaled $3.1 million in the first quarter. We ended the quarter with $105.1 million in cash equivalents and restricted cash, down from $116.5 million at the close of fiscal 2026. Operating cash flow reflected working capital investments, among them purchases of long lead time components to support anticipated AI-related production demand and customer delivery schedules. The purpose of these investments is to make sure we have the materials on hand as production volumes rise. We're still carrying no debt, which matters, and the liquidity we have puts us in a position to make these investments and keep growing. Turning to the fiscal 2027 forecast: because of how well we did in the first quarter, the size of our backlog, the manufacturing capacity we've added, and better visibility into what customers need to produce, we're lifting our revenue outlook for the full year to $150 million; previously we had guided to a range of $130 million-$150 million. That works out to 200% growth in revenue year over year, or three times what we posted in fiscal 2026. For the full fiscal year, we still anticipate non-GAAP net income equal to no less than 20% of revenue. The higher outlook takes into account the backlog we have now, the demand we expect from production ramps already under way, and our delivery schedules. Thanks to added production capacity, a solid balance sheet, and a sizable backlog, we feel we're in a good position to deliver on our full-year outlook while putting money into growth opportunities past fiscal 2027. Before we start taking questions, I want to note that Aehr is scheduled to meet investors at the NYC CEO Summit on December 15th; we hope to see some of you there. That wraps up our prepared remarks. Operator, we're ready for questions now.
Nice work on a solid quarter and the guidance, everybody. I want to come back to your comments on the new wafer-level benchmark and your note that you expect to know, it seems, sometime in the first half of calendar 2027 whether they'll commit to high-volume orders. But most of all, I'm interested in what you said about the largest opportunity this company has ever gone after. Could you give us some relative sense of the revenue range you mean there?
Sure. What stands out, past the bare numbers and size, is the sentiment we're picking up from that customer and others, particularly around the new devices they have coming out — and I do mean coming out in 2027 and 2028, which again is fairly close, including 2027, when the next processors arrive — there's essentially a whole new generation of processor variants entering the market. I'll keep this general. My goal is not to get too detailed about any single company. Anything I mention, I could attribute to two or more customers expressing the same view. However, sometimes what a manufacturer brings to market is referred to as one processor—essentially a single chip—even though it may contain four AI accelerator chips. It might also hold twelve stacks of high bandwidth memory, plus another four or eight chips for optical or electrical I/O interconnect. That applies in the near term. Some publicly discussed devices already carry twelve or sixteen compute chips internally. Beyond that, a shift is underway regarding the raw count of CPUs relative to accelerators, along with combined CPU-accelerator infrastructure devices, which are quite compelling. The difficulty keeps growing, and it turns out that when you combine even identical devices inside one package, burn-in becomes very challenging, since each device operates at a different thermal level and power level depending on the physics of the process. When you bring them onto a shared substrate with a shared heat sink, achieving the ideal screening temperature for a given device turns difficult, or in fact impossible, since its neighbor runs hotter or colder. At the wafer level, we can isolate each die and hold every device at precisely the same burn-in condition for temperature, voltage, and current. Doing that at the package-level burn-in stage simply can't be done — not by us, and not by anyone else. There's this whole attitude of, "Hey, this really matters to us," and then rather than talking about a single device under test that may be on Sonoma, it could be four or eight devices. So the real count is larger. We assembled some figures to make it clearer for people. Consider one of our systems: in the AI configuration, it's what you'd call a 9-wafer system. For every million units you ship in a calendar year, that system would need to test — you'd need approximately 5 to 10 of our systems for each million units annually. That's assuming perfect linearity, i.e., the same quantity ships on day one of the year as on the final day. Remember, you multiply that by 9, which gives 45 to 90 wafers of capacity. Multiply that by our ASPs, and the figure can run, consumables included, $6 million, $7 million plus. That works out to $35 million to $70 million per million units. When you look at the accelerator markets we've been observing, in 2027 by itself they total somewhere around 25 million units or so. That spans NVIDIA's and AMD's GPUs plus the TPUs and other ASICs from all the vendors, and CPUs are twice that. So for us these numbers are staggering and sobering. That is why we keep emphasizing and discussing all the infrastructure we are building so that we can deliver tens of these systems each month, for instance — it is because of these figures. Will we capture every one of them? Maybe one day, but that is not what we are aiming for; still, you secure one, two, three top performers, and those are substantial figures. You have a customer who says, "I want to think about this for all my devices or most of my devices or every device where you could implement it," and all at once it turns into the largest deal you have ever encountered. So, that is the source of those figures.
Great, that's clear. I just have a quick follow-up about silicon carbide, given demand improving and the preferred vendor customer status, and so on. Could you remind us what revenue from silicon carbide was in fiscal year 2026, and what level would be reasonable to expect in fiscal year 2027?
Yeah, we always put it far too simply by saying that out of the $50 million we did in FY 2026, it was under 10%, more or less. That's about the ballpark.
Roughly 10%.
Silicon carbide. When I mix up GaN and silicon carbide — I do that at times with power semis — but the silicon carbide was the one; that was, in contrast, silicon carbide accounted for 90% of our revenue a couple of years before. So it was just around $10 million, and I believe we've already announced a $7 million order. I think we may already have orders larger than that; so silicon carbide will grow this year. We've had a few recent customer meetings that are hopeful and optimistic. As I might put it, I'm kind of in the — we've made the investments; the infrastructure is there; we know how to build these things at high volume, both the systems and the WaferPaks. I'll just announce them when they come in. But it does seem that everyone's utilization is roughly full, and there are people talking about pushing further up the silicon carbide ramp, mostly again for traction inverters for EVs, some EV charging infrastructure and solar. On the horizon, more of it is all the data center stuff. It doesn't feel like that's really high volumes in the immediate near term yet, but that's coming as well.
Excellent. Appreciate it. That's all from me.
Thank you, Chris.
Thanks.
Hi, everyone. Congrats. Fantastic quarter. It's good to witness this breakout. Gayn, perhaps — and I might be mistaken — but I believe you said before, or maybe Chris did, that revenue linearity was weighted toward the front half. I'm curious whether that still applies given the full-year guide being raised to $150 million plus. How do you see that linearity playing out across the year?
Well, roughly a month or so into the quarter, a couple months in, customers began returning and telling us, "Hey, I know I put them in your second quarter. Could you pull them in?" Actually, that's basically everyone at the moment — ship as fast as you can; we managed to smooth a few things by pulling in Q1. I mean, just run the numbers: if you're at 150 and we did 33, you've got about 120-ish, something along those lines remaining.
Yeah.
All right, that's the arithmetic. My sense is that each quarter within that three will tick up a bit, so you can more or less even them out. It seems this quarter will come in somewhat above the last one, and we expect the next quarter to be higher still, with the fourth quarter possibly the strongest of the year. We'll see. A lot of this is interesting too, and I don't—we just lifted our guidance. I don't want to get ahead of ourselves, but there are genuine possibilities, both when it comes to potential demand and our capacity to ship as we move into the second half. I mean, we're feeling really good about the year and frankly about heading into the following year as well.
All right.
Yes, I’d just like to add that for the second quarter, we’ll still be looking at a very strong quarter.
Yeah.
For us in particular, we've made a commitment to get our systems delivered to our hyperscale customer.
All of that sits in backlog.
Right, every bit of it is in backlog. In Q2, we have to ship it all — if not every item, then the bulk. We still have a really solid quarter ahead in the second quarter.
Yeah.
That's helpful. Chris, that's a valid observation. A book-to-bill ratio of 1.4 is impressive, but given that you've shifted toward more of a turns business — as you run at these fresh levels, and perhaps Gayn, I'd like your perspective on this — do any portions of your supply chain make you hesitant, when it comes to running at, let's say, this kind of level, or are you referring to figures that are far, far larger and tied to this benchmark customer should they proceed? What's your approach to strengthening your supply chain's resilience? I have one additional question.
That's something we've had underway for a while now. I mean, twelve months back we were loudly hyping capacity additions, and it looked a bit strange to be bringing on all that capacity when we were only doing $50 million for the year. What it came down to was that we could see ahead of time what they'd be telling us, so we were getting the infrastructure in place. With $33 million in the first quarter, 3x what it was the year before in the same quarter, we're already performing really well against it. To be honest, even with that said, we believe the infrastructure we've established supports exceeding 150, and I'm pushing the team to have substantially more capacity ready for next year—perhaps even sooner. We're pursuing several approaches with our subcontractors. Final assembly of our wafer-level systems happens here; meanwhile, package-level system final assembly can now be handled completely at one of our subcons. All of those units ship straight to our hyperscaler. For the foreseeable future, wafer-level final assembly will remain here, though the subcons keep taking on a growing share of the sub-assemblies. Right now, completing an entire wafer-level burn-in system takes us X hours here. I expect that by year-end we'll have cut it to roughly a third of that, which would let us handle about 3X the capacity, so to speak. We keep pushing ahead on every one of those fronts, and we're also committing capital — putting money down with suppliers, securing long lead items plus extra aligners and similar equipment, so we have some buffer and can ship very quickly as well.
That's my final question. That's useful. Thanks, Gayn. Regarding the benchmark customer and the wafer-level burn-in, it really appears to be an escalation toward buying one of your systems and relocating it to Asia. Do you have any expectation for how that qualification process would look as it moves toward a PO? Is that something?
We do.
What's the right way for us to think about this?
We are. Between the two companies we have what we call a statement of work, and I'd say nearly all of the final details are in place, making it very clear what's required and what's needed. I think we were also pushing on them — and they pushed on us — to make sure that what's in there qualifies it as a true production system as well. Units per hour, uptime, all those normal things you'd expect with production. Their attitude was basically, "Fine — doing it in Fremont is impressive, but can you pull it off in volume production while our OSATs are watching closely?" That scenario isn't new to us. Maybe we haven't disclosed every detail along the way, but FOX systems are already up and running in Taiwan. Those deployments are quite captive, so I can't say much, yet customers have purchased them and locked them down for their particular needs — we understand what high volume looks like on these tools. For them, this will be the first real look at it. Many folks are still wrapping their heads around the idea that nine wafers, each carrying multiple kilowatts, can be tested simultaneously — and done so in a hands-free, high-volume manufacturing setting. Once they witness it, something clicks: "What else could I apply this to?" We already have a solid picture of how it comes together. A Gantt chart lays out the timeline. Plenty of specifics are being ironed out that must be completed to guarantee the facility is properly established, and that contributes to why it will take time. Shipping won’t happen until the start of next year. That material is theirs, and we still have tasks to complete. During the benchmark, we showed them certain items that had been prototyped—so to speak—and validated, but now we need to demonstrate those in the volume production setup. Some capabilities can be added to our installed base through upgrades, and they’ll encounter those for the first time in high-volume production. This kind of effort is always substantial. I don’t want anyone to assume this work is simple. But sometime around January, February, or March, once they’ve reviewed the data, they should be in a position to make decisions about planning their capacity. We’ll collaborate with them on their projections and on which devices they’d prefer to prioritize first; we’re hopeful and optimistic, and we’ll put in serious effort. During the past week, I got to meet with them face to face, and their leadership was direct in saying this is extremely important to them. They are truly dedicated to making it work. That sort of commitment usually comes across as a positive indication.
Great. I’ll get back in line. Congratulations once more. Thanks.
Thanks, Jed.
Hi, Max. My apologies for that. Sorry again — I had myself on mute there, folks. For the first question: you slipped it into the prepared remarks regarding the consumables revenue mix. I believe you stated the expectation was 35% for fiscal year 2027. What did that figure stand at in fiscal year 2026? I can't recall whether you've given us something like a long-term target, but if you've recently given it thought, could you tell us what you anticipate it being going forward?
What was it for 2026?
Yes, 2026, if my memory serves me right, falls within the 20s. Yet when it comes to the long-term model, our thinking has consistently centered on roughly 30% — that's essentially what we talked about. That said, clearly this year Q1 stood out as an exception at 41%. For FY 2027, though, we're anticipating something in the neighborhood of 35.
In some cases it could reach 50%, and our business is in a strong position. The reason I want to mention that is that part of the, I suppose, advantages and drawbacks of operating in the consumable business, which is proprietary to our products, is that once you have an install base of, say, 1,000 blades or 1,000 wafers of capacity, then every one to three years, when new devices are released, they will purchase complete new sets of WaferPaks. So for perhaps 1,000 wafers of capacity out there, which would be around 100 of our systems, let us say, that is times nine, so, you would get perhaps 300 WaferPaks, even though no new systems were bought by them that year. So as time passes, that number accumulates to the point that Currently, roughly one-third of each sale is WaferPaks, while two-thirds is systems. When you hear 30%, you think, "Oh, that is merely a solid growth year, not much rebuy." That is partly accurate. As we begin to see that infrastructure; in fact, that is the earliest signal. The silicon carbide guys over the last year and a half have been purchasing only WaferPaks, and at present they are coming in with higher forecasts for additional WaferPaks or additional consumables. Perhaps it could be 50%, and again, it could be 50% because you are having a poor year for systems and that is all there is. I am speaking even in a strong year, it could be 50%.
Yeah, I can double-check for you, Max. Keep asking questions.
All right, let's move on to the next question. Please go ahead.
Great. Yeah. No, that was excellent; so this is the final question here. I mean, fantastic guidance, and you smashed the numbers; this quarter pushed it up to the top end of the range from last quarter, so at $150 million. Looking out to the last three quarters, it is about $117 million to get there. You got about $109, $110 in the backlog right now. Really only calling for seven million dollars of orders. Correct me if my thinking is off here, but it almost seems cautious that you folks will only receive seven million dollars or eight million dollars in orders by the end — I mean, whatever the lead time happens to be. So walk me through that. Is there anything — capacity, supply chain — where you folks are being a bit more conservative? Or help me understand.
I believe we're attempting to stay conservative. Yes, that's fair-
Yeah.
To be clear, supply isn't the constraint on that right now—we're able to ship more than that figure. What we're talking about is orders from existing customers and the timing they've given for wanting delivery; by and large, everywhere you look, they do plan ahead and forecast it, so more orders could come in and we'd still get them out this year. We simply felt 150 was a nice, clean number to be conservative with at this point.
All right, that covers everything on my end, folks. Appreciate it.
Yes. Max, in response to what you asked, WaferPaks or contactors revenue came to 29% last year.
Consumables.
Consumables, yeah.
30 last year.
Thanks, guys.
Thanks, Max.
Thanks a lot.
Yes. Hi, everyone. I'd like to add my congratulations on those excellent results. Once that benchmark customer is essentially fully operational with wafer-level burn-in, do you anticipate that this will speed up adoption among other customers? Is there a set of prospective customers who are simply holding off until they observe more customers embracing wafer-level burn-in before committing fully?
My view is that this customer has extremely strong visibility. To put it plainly, that brings both upside and risk, correct? We're genuinely thrilled about what we've demonstrated to them — being able to complete the proof of concept and all of that, and validate it before we move forward; they've supplied us with new devices. Up to now, we've been able to examine them and say we can test every one. I'm certain they might hand us one we can't, but by and large, I think they're also trying to assist us along, so to speak. Yet I think it isn't only them. What we're observing is growing momentum and buzz across the industry, in the trade press, and at trade shows around wafer-level burn-in. It's amusing at times — people describe wafer-level burn-in as a test insertion, when we're the only company capable of doing it. They treat it as a segment, but right now we're truly the only ones performing it, and people acknowledge that to us. I think this absolutely carries the potential that, if things go well, others will be even less worried. In fairness, the very first wafer-level burn-in customer we served is also an AI accelerator supplier. They use TSMC wafers. TSMC took part in qualification and the buyout process for what that looks like. We believe they've been quite visible to other customers who know about it — whether those customers pass by it at the OSATs or simply are aware. There've even been a few rumors about them stepping up and discussing it publicly, which I'm not prepared to confirm at this moment. They're very pleased with us, and we're a partner to them. That in itself has helped. Actually, there's some chance they're the ones who prompted the new benchmark customer to show interest once it became clear they could do it. They all feed off one another, not unlike some of what happened in silicon carbide previously, before, obviously, the EVs just went quiet, right? We were beginning to win everything.
Yeah, understood. All right. Yeah, that's completely logical. Appreciate it, Gayn. Chris, regarding gross margins, they rose to 48.5% in this quarter. What's the right way to view that moving ahead? In other words, is that roughly sustainable, and what are the various puts and takes involved?
Right. For all of FY 2027, I'd say that range holds. Of course, there will be quarter-to-quarter swings — Q2 especially, since we'll be shipping quite a few Sonoma systems to our hyperscale customers. Q2 will likely come in below what we showed for Q1. Across the full year, it'd be plus or half a percentage point, plus or minus.
Okay, perfect. Thanks a lot, guys, and congrats again on the results.
Thank you.
Thanks, Kevin.
Hi, Gayn. Hi, Chris. Nice quarter — congratulations, and I appreciate you taking my question. First thing, on this again: the benchmark AI processor opportunity looks like it's coming along really well. Could you walk us through the pacing, given that the Taiwan installation isn't slated until early next year? Did that schedule line up with what you'd expected?
Yes, quite close, actually. I'd say it's within roughly 30 days of our original thinking, so it's fairly consistent. We've been getting together with them on a regular basis, working through WaferPak designs across a number of different devices. Part of the issue was that we weren't even certain which device they'd want to use for what you might call the production benchmark or the production evaluation. They picked the same one we ran the original benchmark on, but we didn't know whether it would be that device or one of the others. I think we're sorting through that, and these things take time. Everyone is extremely busy at the moment, as you'd imagine. Behind the scenes, we're completely dedicated to pushing these things through. Some of the items I referenced — and I won't get into the specifics here — relate to certain new features in the system that we've actually patented and that haven't gone out without NDAs. We're simply not discussing some of those features. We're putting them in place behind the scenes and getting it done. Their timeline hasn't held us back on that at all. Again, I'd expect that somewhere within the first couple few months of the quarter, they'll have seen enough to set off the next steps. Perhaps it'll happen sooner — we'll see. But if we can succeed at this and they keep engaging with us on the various devices they're discussing, that would be fantastic.
Great. As a follow-up, I want to focus on competition. A bigger supplier of system-level test recently rolled out what it describes as AI burn-in features. That really doesn't look comparable to what Aehr provides, but could you walk us through how their method is different from FOX's accelerated life screening?
Sure. To start with, as everyone on this call knows, when the topic is screening and burn-in, every semiconductor gets tested. Parts are sorted good versus bad, and they might also be tested for quality, speed grade or similar. There are platforms available — the two leading ones for all AI high-performance computing platforms are the V93000 from Advantest. I always like to point out that this originated at my former employer, HP Agilent Verigy. Buying Verigy was among the best acquisitions ever, since it has performed so well for them. Then there's the UltraFLEX from Teradyne, which has been picking up share. Those two are the main players. If you said it was 99%, I'd accept that, okay? Testing happens both at wafer and at package level. Once the device is good at the very end, okay, a customer takes it, installs it in a computer, puts that into a rack, and then ships it to the final customer, a data center. What they're discovering is that those devices fail early — days or weeks afterward. Initially what happened was that the data center, the rack suppliers, Computer Micro and Supermicro and those companies, would actually burn in the rack, running it for a week to screen out what they called infant mortality among the processors that were failing. Jensen and others made public comments saying, "Listen," in a large white paper produced by Meta that discussed the failures occurring in data centers, and now people needed to implement burn-in and screening. These are methods that have been used for many years with companies like Intel and AMD to screen their processors, but all the new processor companies were fabless, working through TSMC, and lacked any of that infrastructure. People are scrambling, "What should I do? Because I don't want to do this at the rack level." One of the first things they did was look at what are known as SLT machines. Besides the final test systems I mentioned from Advantest and Teradyne, there is another insertion called an SLT insertion, which essentially boots up the device in its native application. Picture it on its own motherboard. Companies in this space include Hon Precision, Chroma, AEM. Teradyne just came out with one — I believe that's what you're referring to with their Titan, or maybe Triton, I can't recall which — a platform that's an SLT machine, built for speed, high speed, and designed to look and feel like the real application. It has excellent thermals, and it delivers ATE performance, but it was made for a specific insertion. Now, you could run burn-in on that thing; typically those are very pricey platforms carrying high-speed digital signals and so on. One issue is that the burn-in condition used to accelerate these infant mortalities isn't the same as user mode. We actually raise the devices to far higher temperatures than they see in the normal user environment, essentially to strain them and age them. So in 3 hours, we might make a device look several months old or more; we can correlate this to screen out those infant mortality rates by taking the devices to very high voltages and very high temperatures with extreme accuracy, and essentially aging them precisely 3 months, not 3 years. We don't want to wear them out. That's what our burn-in insertion does. Several companies out there have discussed attempting to use SLT derivatives, system-level test derivatives, to try to perform burn-in. When we're involved in package-level burn-in deals right now — and there are a number of them ongoing — people aren't asking us about the SLT alternatives; they want what they'd call a real burn-in system, like Sonoma, that's aimed at handling those high voltages and high temperatures with massive parallelism at low cost. We believe Sonoma gives us the best package-level burn-in system on the market. To be fair, other customers exist, and other companies build them. In some cases, one challenge is that they might build one for their own use, and they might have an advantage because they save some cost by building it themselves. They may not match our performance, but perhaps they're willing to make some of the other technical trade-offs. In package-level burn-in, we actually see that business growing and growing, and we think the real competition isn't really an SLT machine. More interestingly, the real competition to package level is the FOX system from us. The wafer-level system provides capabilities on both fronts technically; we can do things at wafer level that nobody, including us, can do at package level. We're proving that to customers through these benchmarks, which would get a customer to want to shift from package level to wafer level. So in that scenario, the sole option left—unless you intend to infringe on our IP, which we will defend aggressively—is to attempt using a standard prober alongside an ATE system, stepping in and testing as many devices simultaneously as possible in order to drive cost-effectiveness downward. What we can do is frequently test a quarter of a wafer at once across all the processors, which folks consider crazy given that the V93000 and the UltraFLEX normally handle a single device at a time. We run one quarter of all the die in parallel across 9 die and 9 wafers simultaneously. Occasionally, by the way, we might test one-eighth or thereabouts, yet we manage to do so quite cost-effectively. Because it happens at wafer level, the expense of testing there amounts to a small fraction of the yield gain achieved by shifting to wafer level. Our belief is that ultimately this is the direction people will move toward, and it is both thrilling and frightening—like hosting a party and wondering what happens if literally everyone shows up. That roughly describes where we stand, and we enjoy a fantastic front-row seat via the Sonoma platform for discussing people's next-generation devices, where in certain cases they remark, "You know what? We need to get to FOX by the time that part launches." We are, so to speak, playing with an entirely different deck of cards compared with our competitors.
Thanks — that was a thorough response, and I appreciate it.
You're welcome.
Thanks.
Hello, Gayn. You said there's an opportunity opening up for you in HBM memory, and I believe I caught you saying it comes through the base die of the HBM stacks. Is that what I heard?
Yes, for high-performance memory, HBM. Correct, the HBM DRAM. A characteristic of the HBM standard, per the JEDEC standard — and new devices are arriving that actually fall outside the usual JEDEC standard — is that the DRAM devices get stacked atop a logic interface chip built on a high-speed logic process. So, for instance, a TSMC would manufacture it, and then Micron or Hynix would make the DRAM and place it on top, or Samsung; that chip carries a high-speed interface plus other logic, among it some built-in self-test capabilities. Yet that device itself still must be screened, burnt in, and address some form of infant mortality, since a later failure could leave you with 12 DRAM die sitting above it. $500 or $1,000 of die.
Okay. That base die chance — does it arrive via the paid evaluator? Is that among the possibilities further ahead?
We've been told of this chance by multiple types of suppliers. How does that sound?
All right. Also, at SEMICON West's CEO Summit, you described to us a breakthrough you achieved in managing each device's temperature on the wafer to within half a degree centigrade — which is phenomenal. That breakthrough involves a brand-new, super-duper WaferPak you created and recently patented. Will this coming step in the paid evaluator involve that complete set of nine super-duper WaferPaks? What name are you giving them?
Super-duper WaferPaks. No. The name we've been using is the DiTC, meaning die temperature control.
Okay.
It can genuinely control, on its own, the thermal conditions of every single die being tested at wafer level — which is crazy. Nobody had even considered such a thing previously. That capability is built into our WaferPak and engineered bespoke for every wafer undergoing test. So yeah, it's a rather neat capability.
So that's going to be in the complete production system you're launching at the start of the year?
Yes.
In the evaluation?
Yes, it will be.
All right. That strikes me as quite a remarkable way to stand apart, honestly—being able to demonstrate a complete burn-in system, genuine burn-in, without destroying any parts that carry a thermal runaway risk from leakage and similar issues, just as you laid it out.
Yes. You've got it, though it might be the reverse—if I frame it another way, it might land even harder. Once thermal runaway begins, here's what happens as these parts warm up: their resistance falls, which pulls more current, and then the heating rises with the square of that current. The difficulty is obvious. As they get hotter, resistance drops further and more current flows. In our terminology, that's thermal runaway. Within milliseconds or seconds the device goes straight into thermal runaway, destroys itself, and literally burns up. Right? That's bad. Right? You're saying we can sidestep that. True—but what matters even more critically is this: look at a few of the packages now reaching the market. They might contain multiple die, yet every one of them connects to a single substrate. Those die don't all burn in alike, and their leakages differ, so each will produce differing power and differing heat—different self-heating. What people typically do is find the hottest die and regulate its temperature so it won't slip into thermal runaway; however, once they do that, the coolest die isn't at the burn-in condition. And their customers say, "Well, what do we do now?" So that part really isn't burned in optimally, which means that infant mortality, or that failure rate, will slip all the way through to the data center.
That customer is actually paying-
And folks say, "Well, that's just the physics. That's the most we could do.
That customer is in fact paying for a burn-in yet isn't receiving it across a complete package, so they're still experiencing infant mortality failures during use-
That's right.
despite the fact that they're the ones footing the bill.
Right. Push that to its limit — and that limit isn't all that distant — and an effective burn-in simply becomes impossible, leaving you to admit, "Well, failures are going to happen in the data center." Some folks argue, "You know what? Those data centers will be situated far away, and failures are not something you can have.
Yep.
Right? We've begun using that term inside the company—terrestrial data centers are far simpler than some of the new ones now arriving. Once you begin examining these real-time edge inference devices, where a failure literally means life or death—okay? We're reaching those scenarios in which burn-in has to happen, and folks ask, "But how will we pull that off?" Right? What a great moment to be in the burn-in business.
It seems like your wafer-level burn-in system combined with your super-duper DiTC WaferPak really should be an easy win.
I completely agree with you.
So what’s your approach to selling it? Just get it sold. Sell it. Anyway. All right, nice work. That was everything from me.
Thank you, Larry.
Thanks, Larry.
Okay, thanks, operator. Thanks, everyone; we truly appreciate all of you hopping on for this one; it's been quite an interesting situation. We steered clear of election day tomorrow, so we didn't expect to be going head-to-head with Apple, so we're grateful to those tuning in live or catching up later. As always, should you have any questions, please reach out to the IR, Chris or me, and we'll gladly get back to you as quickly as we can. Thanks so much. Bye-bye.
Thanks to all of you. That brings today’s event to a close. You’re welcome to disconnect now, and I hope the rest of your day is wonderful. We appreciate your participation.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aehr Test Systems, Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Aehr Test Systems, Inc. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.