In the first quarter of fiscal 2026, Air Products and Chemicals, Inc. reported earnings per share (EPS) of $3.16, a 10% increase year-over-year, exceeding the top end of guidance. Revenue growth was flat, attributed to a strong prior-year helium sale, while adjusted operating income improved by 12%. Management maintained full-year EPS guidance of $12.85 to $13.15, indicating a 7% to 9% growth at the midpoint, despite ongoing headwinds in the helium market and a sluggish macroeconomic environment.
What topics did Air Products and Chemicals, Inc. cover?
- Earnings Performance: Air Products reported EPS of $3.16, which was a 10% increase year-over-year and exceeded guidance. CEO Eduardo Menezes stated, "I’m pleased with the progress that our global team is making to improve our bottom line results."
- Revenue and Volume Trends: Revenue growth was flat due to a tough comparison against a nonrecurring helium sale from the prior year. CFO Melissa Schaeffer noted, "Volume was flat as favorable on-site volume was offset by lower helium."
- Guidance Maintenance: Management affirmed full-year EPS guidance of $12.85 to $13.15, indicating a 7% to 9% growth at the midpoint. Schaeffer emphasized, "We remain focused on delivering these results through pricing actions and productivity."
- Capital Expenditure Strategy: Air Products plans to reduce capital expenditures by approximately $1 billion in fiscal 2026. Menezes stated, "We expect CapEx to decline significantly after these products go on stream."
- Helium Market Challenges: The company continues to face headwinds in the helium market, with management projecting a 4% EPS impact for the year. Menezes mentioned, "We continue to see the same trends we've seen before" regarding helium volumes.
What were Air Products and Chemicals, Inc.'s January 30, 2026 results?
- Revenue: $3.0B (vs $3.0B est, inline)
- EPS: $3.16 (beat by $0.30)
- Operating Margin: 24.4% (up 140 basis points YoY)
- Operating Income: $800M (up 12% YoY)
- Return on Capital: 11% (slightly lower than last year)
- Capital Expenditures: $4B (maintained for fiscal 2026)
Air Products' solid earnings performance and maintained guidance reflect resilience in a challenging environment. However, ongoing helium market headwinds and project uncertainties present risks. Investors should monitor the execution of strategic partnerships and the impact of macroeconomic conditions on future performance.
Earnings Call Speaker Segments
Good morning, everyone, and thank you for joining us for Air Products' First Quarter Fiscal 2026 Earnings Conference Call. Eduardo Menezes, our Chief Executive Officer, and Melissa Schaeffer, our Chief Financial Officer, will lead today's prepared remarks. To go along with what we have to say during the call, we've put together presentation slides, and you can find those in the investor relations area of the Air Products website. Today we'll be sharing forward-looking statements, which represent what we expect in the future. Such statements rest on present-day expectations and assumptions and carry a range of risks and uncertainties. Because of those risks and uncertainties, what actually happens could differ materially from what these statements suggest, including but not limited to the matters covered during this call and described in the forward-looking statements and risk factors portions of the reports we file with or furnish to the SEC; we assume no obligation to revise any forward-looking statements. Be aware that in today's presentation, we'll discuss several financial measures, among them earnings per share, capital expenditures, operating income, operating margin, the effective tax rate, ROIC, and net debt- to- EBITDA, whether for the whole company or by segment. Unless we say otherwise specifically, anything we state about these measures concerns our adjusted non-GAAP financial measures. You can locate reconciliations of these measures to our most directly comparable GAAP financial measures on our investor website in the applicable earnings release section. At this point, I'm happy to hand the call over to Eduardo.
Thanks, Megan. Good morning, and I appreciate everyone being on the call with us today. If you could please move to slide 3. We released our results earlier today for the first quarter of fiscal 2026. Adjusted operating income came in with a 12% gain, and that improvement was spread broadly across the segments we report. Earnings per share reached $3.16, which is a 10% increase compared with the prior year, driven by better productivity even as economic conditions stayed weak. Our operating margin came in at 24.4%, also higher, while return on capital stood at 11%, a bit below last year but holding steady from the prior quarter. I'm happy with how our team around the world is progressing on lifting our bottom line results, and this first quarter is a strong beginning to our fiscal year. I've now completed a full year at Air Products. During that period, we've made meaningful moves to sharpen our focus on the core industrial gas business, such as cancelling projects, optimizing headcount, and rationalizing assets, all of which are reflected in our results. Turning to slide 4, we have three main priorities for 2026, which align with the longer-term strategy we laid out last year. First, unlock earnings growth; second, optimize large projects; and third, maintain capital discipline. Regarding unlocking earnings growth, we are reaffirming our full year earnings guidance, which at the midpoint implies an improvement of 7%-9% for the full fiscal year. We expect EPS growth to come mainly from our continued emphasis on pricing actions and productivity, plus contributions from new assets. We are on track to meet these expectations, even with ongoing helium headwinds in a sluggish macroeconomic environment that will constrain volume growth for the fiscal year. Even with those headwinds, we're seeing areas of resilience in key sectors like refining, electronics, and aerospace; for instance, earlier this week we announced our newest supply contracts with NASA to deliver liquid hydrogen to several U.S. facilities. On our second priority, we keep making progress optimizing our large project portfolio. Since coming to Air Products, I've made it a priority to de-scope and de-risk our clean energy project portfolio. As part of that effort, in December we announced that we are in advanced negotiations with Yara International regarding the low-emission ammonia projects in Saudi Arabia and the U.S. I'll provide more detail on our next steps shortly. Lastly, on our third priority, we continue taking steps to drive discipline in capital allocation so we can improve our balance sheet position, while also investing in strong base business growth and returning cash to shareholders. As we've said before, we expect to cut capital expenditures by roughly $1 billion in fiscal 2026, and we remain on track for that goal. Fiscal 2026 and the first part of 2027 are heavy CapEx periods for the clean energy projects in Canada and the Netherlands, and we expect CapEx to drop significantly once these products go on stream. Turning to how we give money back to shareholders: earlier this week we said our board approved raising the dividend, which makes 44 straight years of increases. Our dedication to disciplined capital allocation hasn't changed, so we stay positioned to keep up our solid history of delivering cash back to shareholders. Now please go to slide 5. Back in December, Air Products put out a joint press release together with Yara International, saying the two companies are in advanced talks regarding low-emission ammonia projects located in the U.S. and Saudi Arabia. Our view is that this possible partnership offers a strong strategic fit, since the capabilities involved complement one another. Such a collaboration would link Air Products' worldwide industrial gas know-how to Yara's global ammonia supply network plus its world-leading expertise in crop nutrition and ammonia. Regarding Saudi Arabia, advanced negotiations are underway on a marketing and distribution agreement under which Yara would handle distribution and commercialization of all the renewable ammonia currently used by Air Products to make green hydrogen in Europe. Finalization of that agreement is expected during the first half of 2026. When it comes to the U.S. project in Louisiana, what we aim for is a traditional industrial gas project scope and return for Air Products. With that goal, negotiations are taking place for Yara to buy the ammonia production distribution assets belonging to our Louisiana project and to sign a 25-year hydrogen and nitrogen supply agreement covering an industrial gas facility that Air Products would construct, own, and run. Turning to slide 6, let me state plainly that a high bar has been set for proceeding with the Louisiana project, consistent with our disciplined capital allocation strategy. Steps have already been taken to secure a world-class partner for producing ammonia. Doing so would give us traditional industrial gas company scope along with a long-term offtake agreement covering supply of hydrogen and nitrogen combined. Before reaching a final investment decision, we also need a partner for the carbon capture and sequestration portion. An RFP process for the CO2 transport and storage scope has already been launched, and active discussions are happening with multiple key sequestration service providers. Even more critical, we need a highly reliable capital cost estimate built on agreements with reputable EPCs that satisfy our return requirements. One essential FID condition for Air Products is that the project deliver a return on go-forward capital substantially above our traditional hurdle rates. Full clarity regarding project costs should arrive within the next few months. Taken as a whole, the project carries numerous favorable economic elements, such as its location and eligibility for 45Q tax credits, which push returns per share for the project significantly higher across the first 12 years of operation; we are watching recent reports concerning fertilizers CBAM tariffs in Europe. CBAM took effect on January 1, 2026, and any proposals to change the existing scheme would require discussion and approval by the EU. Should the CBAM regulations be altered in any way, that would ripple indirectly into the Louisiana project we're considering, since significant CBAM tariffs apply only to imports of gray ammonia. Taking the broad view, if this project moves ahead, the regulatory exposure tied to CBAM shifts sits with Yara. Together with Yara, we are monitoring this matter intently and our work on the cost estimate continues. Rest assured, the management team at Air Products along with the board will devote whatever time is required and apply an extremely rigorous level of diligence regarding capital costs prior to arriving at our own FID. At this point, I'll hand the call over to Melissa, who will go through our financial results in considerable detail and walk us through the 2026 outlook. Melissa?
Thanks, Eduardo. Good day, everyone, and thanks for joining us on this call. If you would, please turn to slide 7, where we give you a high-level look at how we performed financially in the first quarter. Starting with sales, volume came in flat, since favorable on-site volume got offset by weaker helium, and that included a sizable non-recurring helium sale in the Americas during the prior year, which made for a tough comparison in the first quarter. On non-helium merchant products, price came up, especially in the Americas and Europe. Operating income rose 12%, while margin climbed 140 basis points, helped by business mix and non-helium price, which offset the tough year-on-year comparison. Margin also got better even with a 50 basis point headwind from higher energy costs passed through, led by the Americas. Results also benefited from lower costs, mostly thanks to productivity, net of fixed cost inflation, along with reduced maintenance. Earnings per share came to $3.16, up 10% from the prior year, which beat the top end of our guidance range. Return on Capital was 11%, down versus the prior year but stable sequentially, as we keep executing on our project backlog. Let's turn to slide 8 now. First quarter earnings per share of $3.16 rose $0.30, or 10%, from the prior year. Even with ongoing helium headwinds, which take in the prior year non-recurring helium sale in the Americas of roughly $0.10, the base business keeps showing strong resilience amid an uncertain macroeconomic environment. Favorable on-site volume, non-helium pricing actions, and continuing productivity improvements drove results this quarter. Now on to slide 9. I'll walk through our results by segment. More details on the quarterly segment results are available in the appendix. For the quarter, Americas sales rose 4%, driven by higher energy pass-through. Operating income got better on price, on-site volume, and lower maintenance, partly offset by prior year non-recurring items and fixed cost inflation. Sales in our Asia segment rose 2%, while operating income rose 7%. That gain came from productivity and reduced depreciation from certain gasification assets held for sale, partly offset by lower helium. Our new assets made a modest contribution as they kept ramping up, and they'll contribute more in the second half of the fiscal year. Europe sales and operating income both rose on volume and price, plus favorable currency. Higher volumes came from on-site, including a prior year turnaround, and non-helium merchant. Operating income also took a hit from higher costs tied to depreciation and fixed cost inflation, despite productivity improvements. In our Middle East and India segment, operating income got better on lower cost, while equity affiliate income stayed flat. Finally, the corporate and other segment results improved on lower costs, including productivity actions. Let's move to slide 10 now. We keep generating strong cash flows from our base business. Our investments in both energy transition and traditional industrial gas projects remain on track with our expected capital spend for the fiscal year. On top of that, we gave back just about $400 million in cash to shareholders and raised the quarterly dividend — that makes 44 straight years of increases. Turning to leverage, our net debt-to-EBITDA ratio stands at 2.2 x. Keep in mind that right now, while construction is underway, we are consolidating the joint venture's investment in the NEOM Green Hydrogen Project onto our balance sheet. As we've said before, the plan is to deconsolidate after the project comes on stream and the joint venture takes over operations. So we've made an adjustment to our leverage ratio so that it better reflects Air Products' investment. If you'd go to slide 11, we'll go over our outlook there. We are holding our fiscal full year guidance at $12.85-$13.15, in light of uncertainty surrounding the macroeconomic environment; our focus stays on delivering those results via pricing actions and productivity, along with bringing new-site assets on stream, and from those we anticipate greater contributions in the second half. For the second quarter of 2026, we anticipate earnings per share of $2.95-$3.10, which would be a 10%-15% improvement over the prior year. Our outlook bakes in growth from pricing actions and productivity, partly offset by lower helium. As a reminder, we anticipate that our second quarter earnings per share will decline sequentially because of normal seasonality, especially as it relates to the Lunar New Year and higher planned maintenance; we are likewise keeping our guidance for capital expenditures at roughly $4 billion in fiscal 2026, as we work to de-risk our Louisiana project and optimize our portfolio; at this point we'll open up the call for questions. Operator?
Hello, Emily Fusco here, speaking on behalf of David Begleiter. When it comes to the double-digit return you're aiming for on the go-forward CapEx, what should our thinking be regarding the returns on that $2 billion of capital that's already been put into the project? Also, does the 45Q credit factor into that double-digit return on a go-forward CapEx basis? Thank you.
I'm guessing this question has to do with the Darrow project, correct? So, yes, Air Products is going to take the 45Q credit, and it's part of the return. And, you know, on a go-forward basis, that's an overall return for the project, and that's everything we're going to disclose at this time.
Good morning, everyone. My first question concerns helium. Clearly, during this quarter, you had to absorb that one-time sale from twelve months prior when comparing year over year. Could you discuss how far the ongoing business has fallen, and what sort of drag do you expect that to create in Q2 and across the remaining months?
Hello, Duffy. Yes, our quarter came in above what we had projected. For helium, I believe demand from the aerospace division across the Americas proved quite robust for us during the prior quarter. Beyond that, the same patterns we observed previously remain in place. As we've mentioned, we keep striving to grow volumes among new accounts, and we are putting in significant effort to boost sales through new customers and new agreements, particularly within electronics. Still, on the whole, the guidance we provided at the start of the year — that we'd be down roughly 4% for the year in EPS terms — remains our strongest estimate right now.
Thanks. Turning to the gasification facilities in China, what gain did we see from reclassifying them as held for sale? Also, how do we expect the timeline to play out, and is there a chance of significant proceeds from them?
That contributed roughly 1%, David, to the total results in the quarter. I'd say we remain engaged in the effort to divest those assets. A number of bids have come in, and we've moved ahead with talks. Predicting such matters is never easy, yet our expectation is still to complete it within this fiscal year.
Great. Thank you, guys.
Hopefully sooner than later.
Thanks very much. Does Air Products get income — or the full amount of income — from Gulf Coast Ammonia? Also, how much money went into that project, and which assets do you actually hold?
Thanks for asking, Jeff. Yeah, we, you know, we're in the middle of, you know, getting the plant started up. So the plant is producing product. For the last few months it was running at, you know, as much as 80 to 90% of capacity. To be honest, this week we're carrying out a turnaround that had already been scheduled so we can finish off the remaining pieces, and our hope is to get everything operating at full capacity and complete all the obligations tied to that site over the coming weeks. That's essentially where the project stands overall. When Air Products first announced this project roughly five or six years back, I believe we were upfront about what the investments amounted to in terms of the figures. I can follow up with you separately and provide the figures we released back then. At Air Products, the situation is that we hold ownership of the SMRs—meaning the hydrogen output—along with the air separation facility, while the ammonia unit and its storage tank belong to the customer. That's essentially the arrangement in place at that location. A link exists between the plant and our hydrogen pipeline network, and in fact a portion of the hydrogen gets brought in that way. There's a reformer on site with a capacity I believe is roughly 175 million cubic feet per day, which likely represents about 70% of what the ammonia loop needs when it operates at full 100% capacity, with the remaining hydrogen supplied via the pipeline.
Thanks. On your corporate line, it appears there was a sort of overrun on the cost of equipment sold. What was the amount? And what did that come to compared with a year ago?
Yeah. Hello, Jeff. It's Melissa here. How are you?
Hello, Melissa.
This quarter, we did observe a bit of a rise in equipment sales; in the Q, you'll notice that our results took a hit of roughly $30 million during this quarter; that's in line with what we experienced in the same quarter a year ago; and clearly, once we get this up and running, that drag on our results will disappear, but once again, it came to around $32 million this quarter. And as you're aware, that falls under percentage of completion accounting, so that also represents our best estimate of upcoming costs. Therefore, we've booked the entire future cost.
Yep. Thank you.
Thank you, Jeff.
Yeah, good morning, and thanks for taking my question. So maybe for the first one, could we break down a bit that margin gain we saw in the Americas? I mean, it certainly seems like price might have contributed, but that volume decline of, I believe, 4%, you know, is fairly substantial. So I suppose, can you help us break down where those 150 basis points of improvement originated?
Yeah. I'll have Melissa respond to that, but yeah, that one-time helium effect that we have is reflected in the Americas volumes. Melissa?
Sure, happy to address that, John. In the Americas, we definitely saw solid volumes at our sites. That applied specifically to our HyCO business and to non-helium merchants, so volumes came in positive. Pricing also held up well in the Americas during this quarter across products other than helium. As for costs, regrettably they came in slightly negative relative to the prior year, though naturally we keep pursuing cost productivity; margins therefore improved this quarter, yet we still expect further gains as our attention stays fixed on productivity.
All right, that's reasonable, and I appreciate the detail. Could you also fill us in on where things stand with Alberta right now — specifically what the outlook is for project offtakes, how that effort is moving forward, and anything new regarding the construction schedule and expenses? Thanks.
Sure, John — when it comes to the time and cost of construction, there's no change. We relied on the very same estimate we gave you, roughly 12 months back. That puts it at about $3.3 billion, with startup occurring in the first part of 2018. So we're still pushing ahead along those lines. Relative to before, I'd say our certainty about this project is considerably greater now, both on scope and on cost. Talks with additional possible off-takers are ongoing. Until we have something more concrete that we can pass along to you, that's not a topic we're able to discuss.
Understood, and thanks a lot for joining the call.
Vincent Andrews here — good morning to everyone. Eduardo, I'd like to follow up on something from the fiscal fourth quarter call. Back then, someone asked you about the $2 billion already spent on Darrow and how much of that might be recouped. My recollection is that you mentioned roughly half could come back through equipment sales and similar avenues. What I want to confirm is whether that figure was meant to fully address the question. Perhaps it was — if so, let us know. Should you choose, for any reason, to halt Darrow, does it simply come down to selling off the equipment and anything else, recovering $1 billion out of the $2 billion laid out? Or would Air Products face additional costs, whether minor or major, from deciding not to proceed with the project? I have one more question after that.
Right, so I believe what I was attempting to convey is this: that question simply has no definitive answer. That 50% figure, at the time, was really just an estimate. It could turn out bigger, it could turn out smaller. There's no way to know how much value will be recovered unless you move ahead and actually reach that negotiation, since ultimately what matters is what that equipment is worth to whoever might buy it. Naturally, we're examining that simultaneously. I'd say the assets we've already constructed in certain instances for this project are highly tailored to it. With the likely exception of the ammonia loop, which is fairly standard and resembles what's used on other projects. That piece of equipment would stand a better shot at commanding a strong market price. Air separation plants are likewise widespread, but this particular one runs at very high pressure and was engineered and fabricated according to U.S. standards and U.S. codes, so its market is limited. Ultimately, we cannot — nobody can state with precision how much would be recouped should we not proceed. What I'd say is that our actual exposure comes down to the capital outlaid prior to our decision to halt any new purchases on the project, which we did one month after I came aboard the company. So the sole funds going into this project are essentially for equipment that's showing up, bought before that point.
All right. As a quick follow-up, I realize your plan is to reach a go, no-go call on this around the middle of the year, but is that date completely locked in, or given the CBAM ambiguity right now — and let's just take it as a given that this matters a great deal for Yara's economics — if there's a reason to delay it while the EU wraps up whatever it is they will or won't do, could the final investment decision instead slip to a later point in the year?
Is there anything in life that comes with a 100% guarantee? No, of course not. That said, our target remains roughly the midpoint of the year. What keeps being our biggest challenge is making certain the capital cost is one where we have strong confidence in how it gets executed. That's the work in front of us. As for CBAM, we attempted to lay that out in our slides. The effect there is quite indirect. Should something occur, any impact arrives indirectly, and honestly, for Yara that impact is indirect as well. Under how this agreement is structured, we'd make hydrogen along with nitrogen and sell those to them; they'd turn it into ammonia, and from that point onward it sits with them as their responsibility — they could take that ammonia and sell it in the US, sell it in Asia, or sell it in Europe. Should it head to Europe, it would still face a CBAM tariff that is very low. So the effect truly is indirect — if something happened regarding CBAM, what then happens with the gray sale? So, well, all I. This is a call Yara itself must make. From what they've told us verbally, they see it as a low probability, yet it remains something they must factor into their decision, and we're waiting on that. Ultimately, I'd say 99% of the decision hinges on the construction cost, more than on anything else.
Okay. Thank you for all the detail.
Good morning, everyone. I appreciate the question. To start with, you're asking about the opportunity in space. Obviously, you just closed some agreements with NASA this week. Could you share a bit about what that opportunity looks like, what we have in front of us with commercial space providers, how that segment is doing, and where you expect the growth to come from? Then I have one more thing to ask after that.
Yeah, this is definitely a booming area. Air Products has been involved in this space since the 1960s, correct? Ever since we began providing liquid hydrogen to NASA, and that's still going on today. I'd estimate that aerospace probably accounts for more than 2% of our overall sales when you factor in all the offerings — you know, hydrogen, helium, oxygen, and nitrogen. So for us, it remains a really significant segment. Naturally, the market is evolving. There are more commercial launches now. A portion of them rely on hydrogen, while others don't. So we're pursuing those opportunities and attempting to expand our market share, but this market matters a great deal to us. That said, Melissa, I believe you have additional points to add.
Right, right. Thanks, Eduardo. So, because this topic has drawn quite a bit of interest recently, we've been having a lot of discussions about it. So, going by the customers that we serve, we estimate that Air Products holds roughly 40%-50% of the overall space market share in the U.S.; and when it comes to how we're growing, I believe what we expect is that for projected sales, we're looking at roughly 6%-7% growth each year. So clearly, this is a market we've concentrated on for many decades, and it's something we will keep concentrating on.
Thanks a lot. Then regarding your volumes, I found it noteworthy that year-over-year, European volumes have risen 5%. Has Europe recovered? Should we see this as some kind of rebound, or do we stay cautious when it comes to volumes in Europe?
So we're still taking a careful stance. There are, you know, many factors feeding into this math, so we had some turnarounds during the prior year, meaning those turnarounds aren't happening now, and that gave us a solid boost on the volume side. That said, conditions in Europe are, as reported, let's just say difficult right now. Still, I'd point out that our European operations differ from what we do in other parts of the world, since that business is truly fully integrated into package gases and other segments. Like other industrial gas companies, we're seeing far more strain among large on-site customers than we are in retail, in package gas and so on. So it remains a significant business for us, and quite profitable. Our management team there is highly experienced, and they're handling the fundamentals and managing to deliver strong results even with the economic conditions we face in that region.
Thanks to you both.
Excellent, I appreciate it. Eduardo, you've now been in the role for 12 months, and you've had an opportunity to assess the pricing approaches that were in place before, along with where things stand on costs. How do you expect these areas to develop over the course of the year? My guess is that you've got a solid grasp of costs at this point, yet it also appears that a gap has opened up between the improvements we're seeing on cost and pricing and, clearly, the pressures coming from helium. What I'd really like to understand is the pace at which that gap closes as the fiscal year moves forward. Any insight you could offer on either of those subjects would be very much appreciated.
Appreciate that, Chris. Your audio was cutting out somewhat, yet assuming I got the gist, the subject is the chance around pricing. As you're able to see from what we posted for Q1, a significant portion of what we gained came through price as well as productivity. To me, that's simply the regular blocking and tackling involved in running a business. When your operations span 40 countries and your workforce numbers more than 20,000 people, that's just what you do. My view is that Air Products possesses a solid management system along with strong management talent, which allows us to keep advancing on price as well as productivity. What I'd say is that for the remainder of the fiscal year, we anticipate results stemming from those 2 areas will look a lot like what we delivered in Q1. Helium is a special case, and we're putting effort into that too, aiming to achieve the best possible outcome in a market that's long. Outside of helium, though, I'd tell you that we've got the proper tools, we continue to press forward, and we look for the same results that Q1 gave us.
And only as a brief add-on, clearly there's a great deal happening across technology at the moment, and simply considering the size of your footprint in Asia, plus certain of those clients overseas, could you maybe offer us just a small amount of insight regarding how those of us in the investment community ought to be approaching content when we're, you know, examining items such as N2, HBM, and so on and so forth, you know, when it comes to purified nitrogen, you know, neon, every specialty, rare gas? In what way should we be contemplating the expansion among your customers compared with when that ought to appear in your results, presumably across this year and clearly for many years ahead? Thank you very much.
Appreciate that, Chris. So yeah, these days electronics is really the standout part of the market. Obviously, when it comes to AI, that shows up in what the chipmakers are reporting, in what ASML and others are reporting. We're seeing a large number of RFPs and a large number of inquiries. Traditionally in this market, the products keep growing — you know, they keep getting larger and larger — and we used to see, you know, products arriving every, you know, 2 or 3 years. And what I believe we have witnessed over the past 24 months, and will keep witnessing over the coming 24 months, is that these investment decisions by the big chip manufacturers are speeding up. As you're aware, we hold very strong positions in Asia. Over there, we keep pushing hard to sign new business. We're carrying out projects that, you know, when combined at a single site, can reach close to $1 billion in CapEx, and we see a chance for new products in that same CapEx range, you know, with decisions coming within the next 12 months.
Yeah, and just to add one more thing regarding what you asked, Chris — you brought up new assets, and you're right. We definitely do have new assets starting up, just like we said when we laid out our guidance. And on top of that, as we've mentioned, with the electronics business this is a ramp, so most of those contributions are going to land in the back half of this year.
Thanks a lot.
Yeah, thanks, and good morning. I was hoping to dig into, if possible, the deconsolidation of NEOM that's coming up. Could you speak to when that's anticipated to happen and what exactly sets it off? And then, on the subject of how it hits the finances, I, I appreciate the detail you gave on slide 10 about your net debt balance and leverage ratio. I'd like to know if there would also be any meaningful effect on your income statement as you go through that event.
Right. Appreciate that, Kevin. We've discussed the deconsolidation topic for some time, yet I believe it deserves a fuller explanation for those who invest with us. Since we serve as the EPC — that's engineering, procurement, and construction — for the joint venture alongside Air Products, consolidation applies on our end because we hold the deciding votes throughout that stretch; therefore, given that control right now, it stays consolidated. But once the joint venture begins operating, decision-making becomes equal across all three owners. So when operations begin — which, as mentioned, happens in mid-2027 — deconsolidation of that joint venture will take place. As you correctly pointed out, the debt would then leave the full balance sheet and sit inside the equity affiliate line. That means you'd observe our debt profile shrink at that moment. Building toward the 2027 deconsolidation, naturally, the operating company will bring on more resources; consequently, extra costs will flow through O&M as we approach onstream. After deconsolidation occurs, clearly that drops away, and just 1/3 of those operating costs will affect us. So operating costs will rise somewhat as we ramp up toward onstream in 2027, and following that they'd be deconsolidated, leaving only the 33% showing up via the equity affiliate line.
Got it. That's really, really useful. And then second, if I could, would you speak to how helium prices moved from one period to the next, and whether that Asia price of -1% would have come in flat, you know, or maybe even positive, if helium were taken out?
Absolutely, and I appreciate the question. So yes, helium remains a challenge for us on both the volume side and the pricing side. During this quarter, looking at it globally, helium alone accounted for a 1% decline in price. When it comes to Asia, that region is quite fascinating at the moment given the macroeconomic pressures. Under normal circumstances, we would have recorded a modest price increase. That said, due to what helium is doing, we did end up seeing a negative result there. In the Americas and Europe, though, pricing would have risen by a considerably larger margin, yet the helium drag pulled it down somewhat. Still, Asia is, without question, the region taking the biggest hit.
All right, thanks a lot.
Hello there, good morning. My question concerns the operating margin in Europe; it appears there was a roughly 150 basis point drop quarter over quarter, moving from Q4 to Q1. My sense is that the energy pass-through ought to have helped somewhat on a sequential basis. Revenue was roughly flat. Depreciation came in lower. So is what we're looking at here maintenance costs? Or perhaps you can help us grasp what was driving those sequential margin pressures, and what should our expectations be for the margin path in Europe across the remainder of the year?
Yeah, appreciate that question, Mike. The margin specifically for Europe is in fact being impacted by cost, and we do have considerable productivity in that region. That said, we did see meaningful depreciation; so depreciation on a year-over-year basis is actually, I believe, somewhat higher. That's mostly due to some insourcing as well as some acquisitions of our supply chain assets where we're experiencing a depreciation impact along with some fixed cost inflation. It's mostly wage inflation that we're observing in Europe, and that is compressing the margin.
Yeah, and there is also some seasonality.
Yes.
During this period, as is typical for this — you know — the final three months of the year.
Okay. My next question concerns how many of your clients are currently consuming volumes beneath their take-or-pay floors. I'm also wondering whether that pattern shows up most strongly in Europe, or if you might describe what you observe across each region regarding those minimum commitments.
Right, that isn't something we typically share, Mike. There are a few instances in Europe, and. still, I'd characterize it as a fairly small share of our overall business — Melissa?
Utilization is definitely one of the metrics we keep an eye on. When I look at how it breaks down for the Americas, Europe, and Asia, the figures land in a fairly comparable range — the mid- to high 70s. That's also quite close to where things stood in fiscal 2025. So utilization hasn't shifted in any major way, though there is.
Yeah, they take a case contract by contract.
Yes, that's right.
Each situation is looked at individually.
Absolutely.
Sure — in Europe, both steel and chemicals are getting hit. That said, it isn't the case that each customer in each place feels it identically, correct? So what matters is the location of your assets and which customers you serve. If you want to frame it that way, I'd say luck isn't really the issue. What matters is the effort made 20, 30 years ago to pick the right customers. Even so, thus far we aren't seeing much of an impact in Europe — with the qualification that our on-site business there isn't as large as what we have in Asia and the U.S.
Thanks. Let's return to CBAM as it relates to ammonia. When it comes to Section 27, is that something important we should keep an eye on, and do you happen to know what happens next with Section 27? My understanding is that it hasn't been approved so far.
Well, John, I wouldn't call myself an authority on European Union rules. I doubt anybody truly is. But based on what I've gathered, what we're looking at is a proposal still requiring approval. Over in Europe, legislation exists on multiple tiers. Take directives — those are essentially recommendations that each nation must put into practice. CBAM, though, functions more along the lines of a tariff, meaning it counts as legislation, and it likewise needs the whole EU to sign off, with any modifications requiring that same approval. And as I'm sure you're aware, CBAM ties into the CO2 ETS program. Essentially, it serves as reimbursement to European manufacturers for the CO2 levy they're required to pay, and that CO2 ETS program has been running for roughly 15 years at this point. So my view is that altering it would mean altering the whole CO2 ETS program. That's the reason I believe folks keep telling us the odds are extremely, extremely slim. Still, our responsibility is to operate the company and reach our own conclusions, and regulation amounts to nothing more than a signal we should factor into those conclusions.
All right. So over in America, when you're putting in bids for fresh ASU projects, does securing electricity supply for additional capacity pose any kind of problem, given how much competition there is from data centers and that sort of thing?
Sure, absolutely — we're definitely observing higher electricity prices when it comes to new agreements. Our organization has a highly developed approach to sourcing power for what we sell. Naturally, that's the primary raw material for our air separation operations, which means we maintain continuous engagement with the providers. If something fresh comes up right now, you'd have to sit down and work out the rates. Yet ultimately, in the case of an on-site arrangement like the ones we handle, the cost gets passed along through the pricing formulas we apply, so it lands on the buyer's plate. When it comes to merchant offerings — whatever electricity gets consumed producing liquid oxygen, liquid nitrogen, and similar items — we also put significant effort into transferring those expenses onto our purchasers. So we aren't entirely shielded from electricity pricing, though we strive hard to shift this burden into the marketplace and stay prepared for any uptick in costs. That said, it's undeniable that data centers are driving up need and introducing imbalances into today's electricity market.
Thanks.
Hello, good morning. So, just a couple of quick follow-ups tied to earlier questions about NEOM. Does anything hinge on the relationship with Yara at Darrow? And are those go/no-go calls being looked at independently? Also, do you expect the same CBAM-related concerns to affect Yara's willingness to take the NEOM offtake?
No, there's no linkage at all between the two projects, or between the two possible contracts; and once more, my response mirrors what I gave on the other one, correct? The goods out of NEOM are going to be green, meaning CBAM will have precisely zero impact on that product. As for how it plays out for other products entering Europe, that would be a secondary effect across the broader market, and we have to watch whether that materializes, and what the consequence would be. Still, to repeat what I said earlier, it remains highly, highly uncertain that any impact would land on the CBAM scheme as it stands now. Yet if one does arise, the effect on this project would be indirect.
Understood, that's really useful. So from an equity affiliates standpoint, how much do you expect the NEOM JV to contribute in terms of run rate? And considering the debt structure and the initial fixed cost load, should we anticipate a loss when that asset first ramps up?
No, a loss isn't what's going to happen, and, but, you know, disclosing our joint venture results isn't something we can do. We're aware that our stake is 33%, or the expected results here, but it may not end up being a loss.
Thanks.
Hi there, good morning. I suppose I'll pick up where we left off with Darrow and CBAM, and check whether you might give a somewhat different response this time, or maybe not. But considering the choice Yara would have to make here — I realize CBAM has no direct effect on Air Products, yet it does shape the economics on Yara's side, if their plan is to carry that into Europe. And, well, if they come back saying the regulation's future is unclear, we need one more year to weigh it, we want to find out whether anything will shift — is that cost of waiting something you'd be ready to live with, or does it instead set off, we have to explore a plan B or one of those other alternatives, since we won't just wait around for a year? How would you game theory that for yourself?
Yes, you — it's a hypothetical question right now, correct? So we didn't, shall we say, give that thought, and, and, I have to wait and see when that occurs. I'd simply say that, the lens through which we view this project, right, when I joined here, you know, Air Products had been constructing a complete ammonia facility, you know, handling the CO2 sequestration on its own and was set to be a producer and seller of ammonia. We halted the project as it stood, right? So as things stand now, the base case is the project is stopped. Yet at the same time, we said the project carries positive attributes and could turn out to be a good one, so let's try to find — let's try to see whether a solution exists to create some value out of this project. And I believe we've completed the hardest step at this point, which is locating a credible, you know, truly world-class partner ready to shoulder the commercial risk on the ammonia, which is exactly what this is, right? The purchasing of hydrogen and nitrogen and producing the ammonia, so they're bearing that commercial and operational risk for the ammonia. So this is the toughest piece of the puzzle here. We have to confirm that the capital cost is, that the product works for both sides, so that the project, the capital cost will land within the figures that we assume to be with them. But, you know, I'd say that, you know, at this point, this is more a matter of which one is plan A, which one is plan B, depending on how you view it. But, you know, as we stand today, if nothing happens, we're going to return to where we were, 11 months ago, which is, you know, we will not move ahead with the project as proposed. So that's where things are, and I'd say that, you know, the way I see this is that we have just two possibilities here, right? Either we won't proceed, or we'll proceed with a solid project — correct? Those are the only two scenarios I'm considering. Naturally, plenty of effort goes into making sure that if you do proceed, your capital costs are nailed down and the project holds up. But those are the two possible results; so my hope is that our shareholders view this as a free option, you know, on a solid project on top of the existing base case, which is not proceeding.
Joshua Spector here. Appreciate it.
Matthew DeYoe speaking. Morning, everyone. Two things from me, though. First, Germany-based Uniper put out word of a deal to purchase 500 ktpa of green ammonia tied to the fresh AM Green green hydrogen facility in India, which appears set to come online around 2028. May I ask whether you placed a bid for that one? If so, why do you figure you came up short? Or if not, what kept you away, given something like the NEOM profile? Then, apologies for piling on with another Darrow question, but my understanding is the business is putting construction out to bid among several EPCs in an effort to secure fixed economics. Any grounds to think that approach would work out better than simply picking, say, a single one?
Eduardo Menezes responding. Fine, two separate items, correct? So, on the.
Yeah.
When it comes to green ammonia, that's a complex topic. Here's how I tend to look at it: suppose you're producing ammonia via electrolysis. To get 1 metric ton of ammonia, you'd need roughly 10 MW of power. So when I hear folks claim they'll build a project somewhere like India and offer ammonia at a certain price — and I come across those same articles you likely do, where figures like $600 or $700 get mentioned — you have to understand what that number really means. It's essentially like exporting power out of India at six. You're pouring in enormous capital so that, ultimately, you're shipping power from India at $60 per MW or $70 per MW. That's actually beneath the domestic rate. So it becomes very hard to make sense of the economics when people describe doing green hydrogen and green ammonia in those kinds of jurisdictions. Take our Saudi Arabia project — that's publicly disclosed, you can check it. Saudi Arabia's renewable power market is quite robust, and agreements get signed there with power prices under $0.02, or $20 per MW. We operate inside that framework. We're constructing our own renewable power, and, shall we say, if you work out our internal power cost for the project, it likewise comes in under $0.02 per kW, or $20 per MW. Our project is currently being built. We can show you videos, we can bring you there. The power economics hold up. I won't offer remarks regarding what others are up to, or MOUs and similar matters. Plenty of such activity is happening across Europe, with many announcements. Still, the sole genuine project actually under construction right now belongs to us. My understanding is that India's situation differs somewhat, since they're attempting to leverage an existing facility, and I don't question that they'll eventually get something built. That said, I'd point out the regulatory risk involved — and the fact that when something appears too good to be true, it usually is. Having that sort of power export at such a cheap rate from a nation like India strikes me as questionable. That covers the green ammonia part. As for your question regarding the EPCs, we aren't going to comment on what we're doing in our activities. So, generally speaking, I'd say this is a really big block plant, and the blocks themselves are quite clearly defined. You've got an air separation unit, a hydrogen unit, an ammonia unit — so there are several paths you could take. The real question is figuring out what actually makes sense. That requires working through a process, getting a handle on the local market, and understanding what appetite the EPCs have and what options are available to them. So we're examining each scenario, and we're working to ensure we do what's best for our shareholders, for Yara, and for our customer — in this instance, Yara. And as a matter of fact, they'll be taking part in that process alongside us, and at this stage we're not prepared to state precisely how we'll carry out this project.
Got it. Thanks.
Morning. My question relates to productivity tied to AI, in a general sense. Suppose results turn out stronger than we anticipated, or stronger than what people expected a few years back — would those gains land in your on-site operations, or do the terms of your contracts require that some portion, or perhaps all of it, gets handed over to customers? And in a similar vein, for merchants, I suppose it comes down more to competitive conditions within the local market. Would that be accurate?
Yes. AI, you know, is applicable across the board, correct? So regarding how it gets deployed, and who ends up benefiting, that hinges on the particular use case, right? Take this example: if I say, "I'm deploying AI to bring down my electricity expenses," in the talks with those who supply my power — if there's a customer agreement structured as a true pass-through on cost, then that saving gets divided in some manner. When AI is applied to cut how much power we consume, typically that gain stays with our products, since ultimately what we provide is a promise to the customer of a ceiling on power usage. So everything depends on the specific situation, though that's just one narrow AI application. We apply AI extensively across areas like administration, our SG&A functions, and our engineering work — and those represent internal expenses, which are not, per any contract, shifted onto customers. That said, just like every other business, we aim to operate more efficiently so we can compete better in the market. So one could draw the inference that eventually, in some manner, these advantages flow to our customers; however, pinning down what proportion that ends up being is quite hard. Hopefully that answered it. I'm uncertain whether that matches precisely what you had in mind.
Thank you.
Okay.
Thanks. Once more, I want to express my gratitude to all of you for being with us on this call. We value the interest you show in what we make, and we're eager to talk through our results with you once more when the next quarter arrives. Take care, stay well, and have a good day. Thanks. Goodbye.
That wraps up our session for today. Thanks once more for joining us. At this point, please go ahead and end the connection, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Air Products and Chemicals, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Air Products and Chemicals, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.