I want to thank everyone for being with us this morning. Before I hand things over, I should note that some of what gets said on today's call may include forward-looking information, and actual outcomes might not match the conclusions or projections contained in that forward-looking information, including but not limited to statements regarding estimates of mineral reserves and resources, the timing and amounts of anticipated future production, production costs, capital expenditures, future mineral prices, plus the cost and timing tied to developing new projects. For a full discussion of the risks, uncertainties, and factors that could cause actual financial results and performance to differ from the estimates set out in the forward-looking statements, please see Allied Gold's press release issued last night announcing Q2 2025 operating and financial results. I'd also like to remind everyone that this conference call is being recorded and a replay will be available later today. Replay information along with the presentation slides that accompany this conference call and webcast can be found on Allied Gold's website at alliedgold.com. I'll now hand the call over to Peter Marrone, Chairman and CEO.

Peter Marrone executive
#2

Operator, many thanks, and thanks to all of you for joining this call. Joining me today are members of management, among them our Head of Exploration, Daniel Racine — you're familiar with him, and he'll discuss our operations. Johannes is at operations and is on the call to take questions, but Daniel will handle the better explanation, or at least the continued explanation, regarding production. Jason LeBlanc, our Chief Financial Officer, is also here. Let me start into the presentation. On the first couple of pages, we discuss a few matters that are fundamental to mining and frequently need a bit more time to finish. Drilling for high grades in Côte d’Ivoire and in the Sadiola refining block models, which will carry on into the second half of the year, and why that matters. It lets us gain confidence in higher grade areas for forecasting, certainly better short-term planning, plus more reliability and predictability. One action we took in the second quarter was deciding to do additional stripping, additional waste removal at Agbaou. We carried on with waste removal at Bonikro, and we started certain cost reduction initiatives in Côte d’Ivoire and Sadiola, along with procurement improvements.

Peter Marrone executive
#3

So what's the goal here? The goal—especially when you factor in the block model improvements and the waste stripping at Agbaou—is to reach better grades during the back half of the year and after that. We stated publicly that we anticipate output being skewed toward the latter six months, roughly a 55%-45% split, with a very large jump in production at substantially reduced costs in Q4. I believe it's worth walking through a couple of items that maybe show up in our MD&A and our financial results, but I think it's worth emphasizing. Our original guidance for the year did not factor in that waste stripping at Agbaou. It tacked on approximately $850 per ounce to its costs, which would carry a big effect on overall output given the scale, about $160-$180 per ounce. This was a call made by executive leadership. Making that call was not mandatory, but absent the waste removal, our costs at Agbaou would be closer to the norm. That said, we put together a plan for Côte d’Ivoire that covers underground drilling, plus drilling of areas next to our mining tenements. It also covers getting the most out of production and holding down costs in order to fund that.

Peter Marrone executive
#4

At Agbaou, stripping waste makes room for about 4,500 oz of extra output in the current year, and from drilling alone, plus the waste-removal work done so far, we figure on somewhere between 11,000 oz and 15,000 oz of additional production in the following year. Absent that, we'd have started scaling the mine back as of next year. What it buys us is cash flow and the runway needed to finish the rest of the program already underway, and we'll keep making the case through year-end and on into the first quarter of next year for extending mine life. As most of you are aware, the worst outcome for any operation is a shutdown or suspension, above all where there's visible room for improvement and for added mine life. I'll be blunt: this call was made by this management in the second quarter. To put it more precisely, it was my call. What we gave up was a single quarter's costs, traded for a lifeline and longevity. That waste removal did carry a cost, as we disclosed, but the logic behind it — my logic — was that roughly 20,000 oz of extra output across 18 months, meaning the back half of this year plus the whole of 2026, at that operation is worth far more than the expense.

Peter Marrone executive
#5

That's just on the value side. Additional value comes from keeping the operation running continuously rather than suspending and shutting it down, plus how we handle reclamation and closure costs and our employees. We can now say with confidence that Côte d’Ivoire will produce 180,000 to 200,000 oz in 2026. My expectation is that when guidance comes out at the start of the year, we'll be able to tell you comfortably that we can move toward the upper end of that range. One more point I'd like to make: there are two things we should have explained better. The first is how complex mining is, especially at these operations — think about what we call the refinement to the block models. Think about the time required to overhaul a block model given all the drilling and informational data tied to the operation across so many deposits in current and planned mining areas. This isn't a single open pit. There are multiple mining areas, especially at Sadiola and Côte d’Ivoire. I offer that only as an example. I'm not defending poor behavior. We could have moved faster, but the decision taken — the executive decision, my decision — was to take the time to get it right.

Peter Marrone executive
#6

The second point is that our weighting is heavily toward the back half of the year. During that latter six-month stretch, we anticipate achieving better grades and more operational flexibility at Sadiola. Keep in mind that we're able to treat a greater share of the fresh ore, and that material is plentiful relative to the oxides. As a rough indicator, July production came in on plan with our budget. For the third quarter, we expect output of approximately 91,000 oz, as we guided, which is comparable to what we saw in the second quarter. On costs, we're seeing considerably better levels. At Agbaou, we're already $1,000 under the Q2 figure. Bonikro sits at roughly $1,800 per ounce, and that should move lower as the year progresses and through the remainder of the quarter. Sadiola is running about $400-$500 better than the second-quarter result we posted. During July, we're turning out gold at approximately $2,000-$2,100 per ounce, and we anticipate that figure continuing to decline for the rest of the quarter and certainly as we move into Q4. One more critical item is the mobilization of new mining equipment. The mines within this company were handed over with a former mine contractor. When a new mine contractor came in, it was with the historical mining equipment, and that fleet was reaching its last legs.

Peter Marrone executive
#7

We were essentially patching up that machinery. Today we have fresh mine fleets, and a large portion of them has already shown up, and because of that gain, our fleet availability is at a level that lets us confidently tell you that the second quarter and into 2026 will see greater throughput and more operational flexibility, which will also bring about operational improvements. Exploration. We have been receiving notable feedback regarding developments on the exploration front, and let me start with the bottom line. Our exploration budget has been raised from $20 million to $37 million. Our balance sheet gives us confidence — enough confidence to commit another $17 million. It is tied to performance across our three operations. At Agbaou, as I noted earlier, we are aiming to extend mine life through a pit expansion, high-grade underground prospects, and targets located beyond the compensation area. Oumé represents that development north of Bonikro, where we are observing substantial resource growth that will lengthen its mine life. At Sadiola, we are aiming for a major boost to total inventory, but equally important, we have made a discovery of new oxide ounces, and those new oxide ounces will deliver added operational flexibility along with gains in production and in costs.

Peter Marrone executive
#8

For the second quarter at Kurmuk, we hit the milestones we set for the project, equipment is arriving on site, and later this year we anticipate pushing the resource model forward. Daniel is going to cover operations. He'll get into Kurmuk and some of the specifics, but let me give you the big picture. At that level, the key milestones are these: substantial mechanical completion before year-end, the power line ahead of the close of the first quarter, mining and sequencing — which has already started — and we anticipate having a minimum of four months of stockpile on surface when operations begin, with a portion of that stockpile at considerably higher grade. As we commission the plant from April through the close of the second quarter next year, we don't want to run that high-grade material. Formal production kicks off in June next year, so we remain on track to deliver, for the partial year next year, 175,000 oz. At Sadiola, the phase I expansion is almost finished, and as I said, that gives us greater operational flexibility, since we're able to put more of that plentiful fresh ore through the plant.

Peter Marrone executive
#9

On the long-term side, we have consistently discussed the second phase expansion, but at this point we are examining chances to carry out an incremental expansion, which would let us reach a production level comparable to phase II without needing to lay out the entire $400 million required for that bigger plant, and we will be able to share more on this by the close of this year once our technical studies are finished. A few additional observations concerning Mali are worth making, and in my view these are important points. Conditions in the country have improved considerably. The geopolitical environment is better. Mining investment and private investment now receive more support. Exploration has brought geological improvements to the asset, as I mentioned, along with optimization and enhancements of the asset, and with that phase I expansion now closer to completion. All of this has brought us to a further point: we concluded that we were in a much stronger position to deliver value to shareholders through a progressive, self-reliant approach with respect to power, rather than pursuing corporate transactions that would reduce our engagement in and our ownership of that asset.

Peter Marrone executive
#10

Our company became listed on the New York Stock Exchange. A share consolidation was also finalized by us, and we lowered the stakes held by certain bigger investors via secondary trades. Thanks to all of that, we have made considerable progress from a market standpoint too, and that serves simply to summarize a few of the steps we have taken up through the second quarter of this year. On that note, I will now hand things over to Daniel so he can discuss our operations.

Daniel Racine executive
#11

Thanks, Peter, and good morning to everyone. I'll walk you through a few operational and project highlights from the second quarter. Production came in solid at 91,017 oz, consistent with plan and tracking well against our full-year guidance. All-in sustaining costs were $2,343 per ounce sold. The reason for that was sales trailing production because of the timing of gold shipments, which will turn around and work in our favor in Q3. In addition, as we outlined in our guidance, a higher gold price pushes all-in sustaining costs up through higher royalties, particularly the ad valorem component. Broadly speaking, we've noted that for each $100 per ounce rise in the gold price, all-in sustaining costs go up by $15 per ounce. Our guidance baseline was $2,500 per ounce. With the average realized gold price above $3,250 per ounce in the second quarter, consolidated all-in sustaining costs took a hit of more than $100 per ounce. At Agbaou, under our revised strategy to reach more ore down the road and give exploration more time to extend mine life, we put waste removal ahead of ore extraction so we could better manage stormwater in the pit and lock in access to higher grade ore in the second half of 2025 and beyond.

Daniel Racine executive
#12

The combination of mine sequencing and additional stripping pushed all-in sustaining costs up by roughly $850 per ounce compared with the first quarter of 2025. We anticipate waste movement will stay at a comparable level through the rest of the year, but ore feed, gold grade, and production should rise substantially on a quarter-over-quarter basis, which brings costs down in the second half of the year. As we mentioned earlier this year, we anticipated output would be weighted to the latter half, with a 45/55 split between the first half and the second half of this year. Q3 production ought to be comparable to Q2, whereas Q4 output should be considerably greater, ranging from 118,000 to 122,000 ounces. We expect costs to decline as production climbs in the second half, supported by better gold and lower spending. With gold assumed at $3,000 per ounce, we look for all-in sustaining costs to average $1,850 per ounce in the second half of the year, trending lower quarter over quarter. Thanks to continued exploration success, an extra $17 million has been allocated in 2025 toward an incremental program across Côte d’Ivoire, Kurmuk, and Sadiola. The 2025 exploration budget now totals $37 million.

Daniel Racine executive
#13

When it comes to Côte d’Ivoire, we’ve committed $7.5 million in fresh funding to chase chances for lengthening mine life — that covers drilling at Agbaou West and the East pit expansion, the Hire-Akissi-So underground target, plus additional new targets. Over at Sadiola, we’re putting in another $5.7 million so we can keep testing and extending the structure at Sadiola Main, Tambali, FE2 Trend, Sekekoto Trend, and FE4. That exploration targets both oxide and fresh mineralization, though near term we lean toward oxides. For Kurmuk, we’ve set aside an extra $3.7 million in budget, aiming to bring in new mineral resources and shift inferred into indicated. Drilling will keep going at depth and along strike at Dish and Tsenge, and we’ll also drill the Urchin target near Ashashire. All of this supports the company’s objective of building an inventory exceeding 5 million ounces at Kurmuk. At Sadiola during Q2, output came to 49,283 oz, and the all-in sustaining cost (AISC) was $2,471 per ounce. As noted earlier, costs reflect the impact of a higher gold price within the royalty structure — particularly given the larger relative contribution from Korali-Sud this quarter, which carries higher royalties than Sadiola. Worth noting: we’re wrapping up phase one at Korali now, and looking ahead, the plan centers on mining within the Sadiola mining license, which lowers the royalty effect on our cost structure.

Daniel Racine executive
#14

Phase I expansion construction is still moving forward on schedule, and we expect it to be finished in Q4 2025. I'll go into more detail on that on the next slide. At Bonikro, output came in at 25,775 oz, with an all-in sustaining cost (AISC) of $1,592 per ounce. That strong result reflected higher grade, greater throughput, and better recoveries. First half stripping should lead to substantially lower costs starting in Q4 of this year, carrying into 2026 and beyond, since grades are expected to be higher and waste removal will be minimal. At Agbaou, production reached 15,959 oz at an all-in sustaining cost (AISC) of $3,104. As I mentioned earlier, mine sequencing and increased waste removal pushed the cost up, and this should lead to higher production at lower costs for the rest of this year, and it lets us access more ore in 2026, allowing exploration to focus on long-term targets to extend mine life. Turning to our Kurmuk project, we're pleased to report that things are going very well. We hit several significant milestones in the second quarter. The first picture shows graphically what our focus was during the first half of this year and in the second quarter.

Daniel Racine executive
#15

At the close of the second quarter, we moved from the concrete contractor we had planned to use to the structural and mechanical contractor. We began delivering key components to the site and ramped that up — items like the CIL tank, the Ball mill, which appears in the bottom picture, and fabricated steel, among others. Other major components were on their way to the site in line with the schedule, while the mechanical contractor had been mobilized earlier in the year together with the equipment, and during Q3 the focus is on ramping up activities. One very important milestone for the start of operations was reached in Q2: the substantial advancement of the key bulk earthwork outside the process plant area, which we completed ahead of schedule. That covers the main water dam, which is taking in water as we speak, and the tailing facility, which is well advanced. Getting these two areas ahead of the rainy season was key for us so that we can store water for the planned startup in 2026. Another achievement that matters greatly to the execution schedule is the progress we made on the permanent accommodation camp, bringing it to near completion during the quarter, which lets the project and mining operation ramp up their manpower requirement as per the schedule in the second half of the year.

Daniel Racine executive
#16

On the mining side, the mining fleet mobilization continues—the shovel and truck were delivered to site in July, and mining pioneering wrapped up during the quarter. As for next steps, we intend to kick off bulk mining with that new fleet now in Q3, letting us build an ore stockpile before commissioning. Engineering will be finished in Q3, and we anticipate meaningful mechanical advancement in the plant area by year-end. The EEP is expected to energize the power line in Q1 2026, and we look for commissioning and the first gold pour in mid-2026. Moving to Sadiola, the phase I expansion is coming along nicely as well. Engineering was completed in the second quarter. The team has essentially wrapped up concrete work and turned those areas over to the mechanical and structural contractor. Much like Kurmuk, steel and the Ball mill have been delivered to site. Power supply for phase I has also been secured, and the crushing plant is currently being shipped. Looking ahead, stage one crushing should be running in Q3, and ramp-up of the new mill is expected in Q4. As a reminder, the phase I expansion matters a great deal for Sadiola, since it enables the plant to handle 5.7 million tonnes per year of ore, with blending of up to 60% fresh ore.

Daniel Racine executive
#17

A large share of the reserve—7 million ounces—sits close to the existing operation and consists of newly identified mineralization, with grades exceeding those of the oxide material currently in inventory. Now that phase I is running, Sadiola should deliver 200,000 to 230,000 ounces annually on a sustainable basis while we prepare for the following expansion phase. To that end, we are pushing ahead with progressive expansion studies designed to set out a growth strategy requiring less capital, building on the capacity already installed following phase I. Our target is to wrap up the trade-off study before this year ends, and it will cover an update on the chance to lift recovery through flotation and Albion. During Q2 we moved the second phase of Albion metallurgical testing forward, flow sheet development is progressing at present, and we anticipate finishing those studies in Q4 as well so they can guide the expansion path I just described. Finally, we have devoted considerable time and effort to honing our power requirement and refreshing the power supply strategy for Sadiola across its expansion phase. As Peter noted, we have settled on a shortlist of solutions that we are currently negotiating, and we anticipate completing that by Q4.

Daniel Racine executive
#18

Having said that, I'll now hand things over to Jason.

Jason LeBlanc executive
#19

Thanks, Daniel. Q2 delivered strong financial results, with adjusted EPS of $0.14 and operating cash flows of $116 million before taxes and working capital. Our balance sheet remains solid: cash and cash equivalents stood at roughly $219 million when the quarter ended. We also have a $50 million credit facility that is undrawn, plus additional liquidity from upcoming draws on the Kurmuk stream totaling about $88 million. During the quarter, we helped liquidity by closing a bought offering and arranging a block trade, which strengthened the balance sheet and boosted our flow. Going forward, we anticipate that 55% of annual production will be generated in the latter half of the year, with Q4 carrying more of the weight. Even more important, lower unit operating costs expected over the rest of the year should have an amplified impact on cash flow generation. With that, I'll turn the call back over to Peter.

Peter Marrone executive
#20

Let me return to the guidance topic, folks: 175,000 oz during the first half of the year, compared with an expected and planned 210,000 oz during the second half — that 45 to 55% split — and $1,850 in all-in sustaining costs. As of the close of the second quarter, Korali is no longer something we depend on. The ore we process from Sadiola proper gives us improved economics. Within the mining tenements, we hold oxide ounces at Sadiola that carry a lower cost and that we run through our current plant. Phase one wraps up by the end of this year, giving us added flexibility to mine fresh ore, which is plentiful and available at reduced cost. Grades will be higher starting this quarter and continuing into the next one at Agbaou, and through 2026 — and the same holds for Bonikro. Lastly, looking further out, into next year, we still project production of approximately 600,000 oz next year at better costs, and that output drives stronger EBITDA. Commissioning at Kurmuk is now eight months off. On the milestones ahead: an exploration update reflecting the successes achieved so far — the ones that justified that additional $17 million Daniel mentioned for Sadiola — is anticipated in October, Kurmuk in November, and Côte d’Ivoire in January, along with a more thorough plan, due by the close of the first quarter of next year, covering how we intend to extend mine life and the successes we will have achieved in extending mine life at Agbaou.

Peter Marrone executive
#21

We'll have the reserve and resource update for Kurmuk by the close of the fourth quarter of this year. For Oumé, we'll give an update as part of what we're doing in Côte d’Ivoire later this year. As Daniel said, the Sadiola phase I expansion will be completed later this year. We'd like to remind all the investors and analysts who will be at Kurmuk in January of next year. On the Sadiola expansion update, again, what Daniel called the interim steps, or the modified expansion instead of phase II, that comes by the first quarter of next year. As I said a moment ago, the Agbaou reserve and resource update is set for the second quarter of next year, and Kurmuk operations will start within eight months, with commissioning beginning in April and production in June. Operator, I'll hand the call back to you for any questions.

Operator operator
#22

Thanks a lot. We're going to start the Q&A portion now. Right now, I'd like to remind everybody that if you want to ask something, you press star and then the number one on your phone's keypad. Once more, that's star one if you'd like to pose a question. We'll take a brief pause so the committee roster can be put together. The first question is from Carey MacRury at Canaccord Genuity. Go right ahead.

Carey MacRury analyst
#23

Morning, everyone — thanks for joining. Peter, things seem to be moving along nicely at Kurmuk. I'm curious, though: given the costs you've incurred so far, how are you doing against the budget assumptions you laid out?

Daniel Racine executive
#24

Hey Carey, Daniel here. Yeah, from a cost standpoint we’re on track. There are some patterns showing up, as happens with any project, but we also have options we can use regarding the next steps. At the moment we’re focused on working out the plan for the remaining part of the project and making a few adjustments. Obviously, the goal is to stay inside the budget set for the project.

Carey MacRury analyst
#25

All right. On the balance sheet side — clearly, if that $145 million from Ambrosia doesn't come through, do you believe there's sufficient cushion there for me to ride things out while prices stay this low?

Peter Marrone executive
#26

That's a genuinely solid question. Although we did address it somewhat, I believe diving into somewhat greater depth is worthwhile. Carey, we discussed an upfront payment of $145 million for a 50% interest in our stake in Sadiola. During negotiations, there was some back-and-forth regarding when part of that sum would be delivered. Would it be paid upfront? When would closing take place? Let's frame it as a full $190 million—$145 million of which would be entirely upfront, with the remainder arriving over several quarters, which reflected what the negotiations were and where they stood. I think we need to view this through the lens of what it means over a 12-month or 18-month horizon given the higher gold price. Where did we stand in February on the gold price? Where do we stand now? With gold at a higher level, especially given the floor of the collars Jason has put in place at no less than $3,000 into next year, our conclusion was that we will generate at least that amount in cash flow during that period. We receive no benefit from selling a portion of Sadiola for that $90 million–$145 million, even at that $145 million upfront figure, since we are generating that much in cash flow.

Peter Marrone executive
#27

Those payments were actually spread out across a period of five to six years. That is among the factors that brought us to the view that we were better positioned, partly owing to the gold price, but partly owing to enhancements made to the asset. And on the subject of enhancements, we are now nearing the tail end of finishing the phase I expansion, which delivers, as Daniel mentioned, a very comfortable and dependable 200,000 to 230,000 oz at improved costs. We have plenty of fresh ore. The difficulty for this operation is that it was built as an oxide mine, with a plant suited to oxide ore. That has been true through today with the exploration work. We are now starting to get some clarity on that. Through today, that has been the difficulty — namely, locating oxide ore. With the capacity, via the first phase expansion, to process additional fresh ore, we can more comfortably generate that 200,000 to 230,000 oz at improved costs, producing stronger cash flow. At a gold price of $3,000, that cash flow equals what the upfront payment was.

Carey MacRury analyst
#28

Alright, that helps. Thank you. Perhaps just one final question from my side. Regarding that $1,850 cost guidance, you mention it assumes $3,000 per ounce. Should we continue applying the $15 for $100 ratio? As you know, gold is currently sitting right around $3,400.

Jason LeBlanc executive
#29

Yeah. Hey, Carey. Jason here. Yeah, no, it's going to be higher just because that guidance was provided. You know, call it at the margin for movements in gold prices. We've seen gold prices move quite a bit. The impact on royalties isn't purely linear. There's a curve to it, right, because of step-ups. I'd put it closer to $20 on a $100 basis going forward here.

Carey MacRury analyst
#30

All right, that's wonderful, thank you. Appreciate it, everybody. I'll make sure to relay that.

Peter Marrone executive
#31

Carey, honestly, this isn't simple. It would be great if we could just hand over a raw figure and state that's precisely the situation, but predicting the realized gold price isn't something we can do. We do have those ad valorem royalties, and they're tied to the gold price. At a $3,000 gold price, Jason's $20 per ounce is a sensible figure. So why did $3,000 get used? When we look at the average across the first and second quarter, our realized gold price was approximately $3,000. That's why it serves as the baseline.

Carey MacRury analyst
#32

All right, that's reasonable. I appreciate it.

Operator operator
#33

Should you wish to pose a question, please hit star one on your phone's keypad. The following question is from Mohamed Sidibé at National Bank Financial. You may proceed.

Mohamed Sidibé analyst
#34

Hello, Peter and the team, and thank you for taking my question. Perhaps I could begin with Sadiola and your choice not to proceed with selling any stake in the mine and the power solution. Could you give us a bit more detail on the power solution and on how you expect Allied Gold to take part in it? Should we anticipate some financial investment from you in that? And how might that affect your cost profile over the coming years? Thank you.

Peter Marrone executive
#35

Yes. Mohamed, that’s another very strong question. Among the many factors behind why we decided to take this route, solar stands out as an appealing option, correct? As part of the corporate transaction, we had considered 20 MW supplied by solar paired with battery backup. When we examine it through the lens of installed capacity compared with utilizable capacity—since solar does not produce during cloudy periods and certainly will not produce at night—we looked at installed versus utilizable, and then at how large the order-of-magnitude gap is between a smaller solar field and a smaller array of solar panels compared with a larger one: it is an order-of-magnitude difference. To achieve 20 MW with installations ranging from 100 to 120 MW, the ratio is even larger for the battery backup that accompanies it. That is a very large solar field. It is a very large battery backup system. The cost is not incremental—not a matter of, hey, what if we move from 8 MW to 20 MW? It is not the gap between $40 million and 2.5 times that amount. It is an order-of-magnitude difference. That was affecting our costs. We have said publicly that we want to reach an average somewhere in the range of $0.16-$0.17 per kilowatt hour, but we want to get there from the get-go.

Peter Marrone executive
#36

The optimal way to achieve that delivery is through a mix of thermal, a bit of diesel, and solar. Solar ought to be considerably smaller. Our estimate is roughly 8 MW, maybe up to between 8 MW and 12 MW, while also ensuring scalability. One additional thing I consider significant here is that we truly want it to be scalable. The initial proposal gave us the power we needed, yet solely for phase one. We still needed to increase from 20 MW to 38 MW. Through this method, we now possess the adaptability to accomplish that, and to do so in a modular fashion. We can in fact add to the thermal capacity with one more engine. We can add to the solar through installing a larger solar array along with battery backup. That incremental step aligns with the strategy we are pursuing for expanding the asset. You raised the question of whether there is an upfront sum we must invest. The response is that we view this as already installed and turnkeyed. We pay a per-kilowatt-hour amount within the range I just outlined to you, taken as an average.

Peter Marrone executive
#37

That is essentially the path we would take. Still, we retain the option of participating as an investor. This forms part of the ongoing talks amid the wider geopolitical situation in that country. Electricity is becoming more and more critical there. To help meet certain government goals aimed at spurring investment, there is limited flexibility, along with some difficulties involving the power grid—as you know, or the two grids. One route open to us involves building this out at a larger scale than our own needs require, so it can serve as backup whenever necessary while also feeding electricity back to the grid. These are among the matters we are pushing forward, with discussions close to completion. We are weighing a direct investment, which would give us a stake in the game rather than merely an offtake from whoever installs it.

Mohamed Sidibé analyst
#38

Appreciate that, Peter. Perhaps I could turn to operations. On Sadiola, and particularly the feed out of Korali-Sud — since the royalties there run higher, and I understand that work is largely finished by the close of Q2, should we still be counting on some contribution from it in Q3? That could end up affecting both the royalties and the cost at that site. Thank you.

Johannes Stoltz executive
#39

Morning, Mohamed. Johannes. No is the answer. Over the near term, no extra ore sources from Korali-Sud were planned by us. Our focus is on Sadiola with oxides, and after that the fresh material as we move ahead.

Mohamed Sidibé analyst
#40

Great, thanks. Regarding Agbaou, I just wanted to check something on the CapEx and waste stripping as we head into the second half of the year. I get that production will be higher thanks to the better grade and throughput in that period, but on waste stripping, my assumption is that it will keep running at these levels through the second half so we can get a clearer picture for 2026 — or should we expect that to trend lower too? Thank you.

Peter Marrone executive
#41

We’ll keep stripping, and we’ll keep removing waste, but the expense for each ounce is going to drop a lot since we’ll be moving into better grades. Put another way, the denominator gets bigger. Ounces go up compared with the second quarter. Jason, please go ahead.

Jason LeBlanc executive
#42

Yeah, Mohamed, just picking up where Peter left off. I believe that’s right. Like we said on waste, total tonnes will be comparable, but that activity is bringing in more ore. The strip ratio comes down quite a bit. That’s what produces the lower costs Peter referred to.

Mohamed Sidibé analyst
#43

Perfect, I appreciate that. Much obliged for the call. I’ll return to the queue.

Operator operator
#44

That brings us to the end of the question-and-answer session. I'll hand things back to Peter Marrone now so he can offer some closing comments.

Peter Marrone executive
#45

Thank you all very much for joining us on this call. We have quite a few presentations lined up for sales desks along with meetings with our investors, and we're looking forward to those. Naturally, we're also looking forward to our third quarter results. I'd like to stress once more why we believe that guidance for the second half of the year into 2026 is well within our reach, given all the steps and approaches we've taken through to the end of the second quarter of this year. Thank you all very much for being part of the call.

Operator operator
#46

That brings us to the end of today's conference call. Thanks to everyone for being with us. You can go ahead and disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Allied Gold Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Allied Gold Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.