Americas Gold and Silver Corporation (USA) Earnings Call Transcript
August 14, 2026
Earnings Call Speaker Segments
At this point we'll hand the conference over to Chairman and CEO Paul Huet. Go right ahead.
Thanks, and good morning, everyone. Welcome to the second quarter 2026 conference call for Americas Gold and Silver. This call is being recorded, as it always is, and it'll be posted on the events page of our website later today. Today's webcast presentation will also include references to a slide deck. With me on the call today are Warren Varga, our Chief Financial Officer, who will take us through the key financial takeaways for the quarter, and Oliver Turner, our Executive Vice President of Corporate Development. I'll start with a few housekeeping items, then go through the key operational and strategic highlights from the second quarter before I hand the call to Warren. Let's move to slide three. Before I begin, I'd like to remind you to review our cautionary statements about forward-looking information and non-GAAP measures that are contained in our second quarter MD&A news release and our presentations. Please also note that, unless otherwise stated, all dollars are U.S. dollars. Let's go to slide five. Safety remains the foundation of a strong operating culture, and I really want to congratulate all of our employees on their continued commitment and performance with zero lost time accidents, which now extends well over a one-year period across both our operations in U.S.
And down in Mexico as well—great work from everyone there. In Q2, the team achieved meaningful advances throughout the business: output at Cosalá rose 26% compared with a year earlier, we kept moving forward on the big infrastructure improvements at Galena Complex, and of course there was the enormous elimination of those debt obligations tied to variable gold and silver prices, which we'll get into a bit later. Silver production on a consolidated basis came in at roughly 665,000 ounces for the quarter, equal to just over 800,000 ounces on a silver-equivalent basis. Those figures showed the strong operating results Cosalá keeps delivering. At Galena, the lengthy shutdown tied to phase 2 of the shaft, along with the upgrades, is now firmly behind us. In fact, we're currently benefiting from that better infrastructure—something we badly needed. Even more important, we're still on course to hit our full-year 2026 guidance of 3.2 million to 3.6 million ounces of silver. As we've said before, output has consistently been weighted toward the back half of the year, since capital gets deployed on infrastructure. On the financial side, we posted another solid quarter, with consolidated revenue climbing 71% versus a year ago to $46.3 million. Across the first half of 2026, revenue totaled $114 million—a 126% increase over the comparable period a year earlier. What strikes me is that even as we keep investing capital and keep putting in the effort, those first six months of this year come close to matching what we generated in the final 12 months of 2025.
We're making significant moves here—substantial changes aimed at boosting revenues and further enhancing profitability. As I said earlier, we've also finished phase 2 of the number 3 shaft modernization at Galena. We resolved the remaining variable future delivery obligations for silver and gold, and encouraging high-grade drilling results kept coming in across the whole company. Taken together, these achievements put us in a good position for the next stage of our growth program. Let's go to slide six. On the operations side, Cosalá delivered another solid quarter. Silver output rose 26% year-over-year to roughly 337,000 ounces. Higher grades supported that, and even more importantly, better recoveries did too. I'm really pleased with the team and all the work we've done on metallurgy and on lifting those recoveries. It also included commercial production from EC120. Cash costs at Cosalá fell to $16.91. That was mainly because of, obviously, higher grades and copper by-product credits. As for our drill bit efforts, resource conversion drilling keeps delivering very strong, encouraging results at San Rafael upper zones and the 120 zones. Our drilling consistently returns silver grades averaging approximately two to three times the inferred mineral resource grades previously reported. Let me give you just one example.
This one I picked out specifically, but it really was impressive. Look, SR568 is one of our holes among the examples. We hit an intersection of 14 m at 600 g per ton. I'll repeat that, since the results are so great. 14 m of 600 g per ton. The mineral resource itself had predicted 110 g. So in that same area, we're talking about a five-time increase over the model grade. Importantly, these intercepts sit immediately adjacent to existing mine infrastructure, which gives us the chance to fold these results into our mine plan in maybe Q4, but certainly without doubt into 2027. So we're quite excited about it. Our very strong operating performance in Mexico came from finally entering the heart of the ore body at the EC120, and it's a great example of why we're so excited about this mine over the next coming years. Having a diversified production base like we do, along with tremendous exploration potential across all our assets, gives us both operational and financial strength as we continue to scale the company. I just want to give a quick shout-out to our team in Mexico on a job well done and a strong quarter.
Let me take you through the upgrade we finished at the Galena Complex. The Phase 2 improvements I referenced at the number 3 shaft are now complete, and plenty of folks ask, "So what does that actually mean?" Let me explain. Those upgrades raised hoisting throughput from about 42 tons per hour — the level we inherited — to a sustained rate of 85 tons per hour, which we're maintaining day in, day out. In fact, we've reached peak performance of 105 tons per hour on several occasions. As a quick reminder, the work involved raising the hoist motor from 1,750 horsepower to 2,250 horsepower and adding a second 2,250 horsepower motor as a critical spare — the first critical spare in the company's history. We enhanced the load system, finished mechanical and electrical work, and, more importantly, improved the braking and control system, all to support this new production rate. We've also kept investing in the underground fleet and communications infrastructure, including over 10 new mobile equipment units plus a fiber optic system and communications that will enable real-time equipment tracking, future automation, and better mine connectivity.
I believe a number of you have visited our mine, and on my first trip there, when I looked at those Femco phones, I hadn't laid eyes on Femco phones since roughly 1988 in Timmins. This communication was something we badly needed. It's going to help us enormously as we keep expanding our operations. These upgrades form an essential piece of our de-risking and growth plan, building out the infrastructure needed to handle higher mining rates and scalable production growth at Galena. Let's move to slide eight. Before handing the call to Warren, I'd also like to acknowledge everyone behind the progress at Galena, and there has been an enormous group, including all those on site, our team in Toronto, our team in Reno, who are devoting tireless efforts and hours to ensure we are spending the dollars on capital improvements at Galena so it stays sustainable forever, for the next 30, 50 years. Frequently I don't mention some of these matters, and we don't celebrate some of these other matters, but I want to give a quick shout-out that at Galena this year, we've brought in seven new members who were inducted into the Galena Complex 25-Year Club.
I've spent 39 years working underground in a mine. It's quite uncommon to find folks who put in 20 years at a single operation, and I just want to recognize all of those people. Their know-how, their dedication, and their hard work helped lay the groundwork for the Galena Complex, and they keep shaping what comes next for all the generations still to come. I'd like to pause and thank each of them, and all our employees, for the commitment and effort they bring to the operations and the communities. With that, I'll hand the call over to Warren for some financial updates.
Thank you, Paul, and good morning to all of you. Earlier today, we issued our interim condensed consolidated financial statements, which are unaudited, along with our MD&A covering both the three and six months that ended June 30th, 2026. You can find these documents on our website, and they're also posted under the company's profile on SEDAR+ and EDGAR. Quarterly revenue came in at roughly $46 million, which is 71% higher than the $27 million recorded in Q2 2025, mainly because realized silver prices were stronger. Across the first half of 2026, revenue reached $114 million. As Paul mentioned earlier, that's nearly equal to what we generated in the whole of last year — a 126% increase over the $50.5 million posted in the first half of 2025. For Q2 2026, the average realized silver price was $67 per ounce, versus $34 per ounce during Q2 2025. We recorded a net loss of about $5 million for the quarter, or $0.02 per share, compared with a net loss of roughly $15 million, or $0.06 per share, in Q2 2025. That year-over-year improvement is mainly driven by the higher net revenue I mentioned, though it was partly offset by foreign exchange losses, a derivative loss tied to the Royal Gold settlement, and increased income tax expenses. Adjusted earnings for Q2 showed a loss of approximately $0.9 million, or essentially $0 per share, against an adjusted loss of $12.1 million in Q2 2025.
Adjusted EBITDA came in at roughly $12 million, or $0.04 per share, versus an adjusted EBITDA loss of $4.1 million in Q2 2025 last year. Consolidated cost of sales was $32 per silver equivalent ounce sold. Cash costs averaged $25.68 per silver ounce sold, while all-in sustaining costs came to an average of $40.63 per silver ounce sold in the quarter. AISC averaged $37 per ounce sold for the first half of 2026. We closed the quarter with about $89 million in cash and cash equivalents and $49 million in working capital, which was in line with expectations as we keep deploying capital into our growth plans and finished settling the Sprott and Royal Gold obligations. I'll now hand the call over to Oliver.
Thank you, Warren, and good morning to all of you. A key strategic move we made in the quarter was completing the settlement of the precious metals delivery obligations we had left. In Q2, we closed out the outstanding silver delivery obligation with Sprott Mining Inc., along with the outstanding gold delivery obligation with Royal Gold. Those deals make our capital structure simpler and stronger, they lower the cash debt service we will owe going forward, they take away the mark-to-market volatility these instruments would have caused later, and they give us more exposure to silver prices down the road. As the slide shows, the transactions eliminated over $76 million in future obligations tied to variable metal prices and over $28 million in yearly debt servicing obligations. And all of that came at a cost of only 3.3% in combined dilution for shareholders. That is a meaningful strengthening of the company's financial foundation, and it lets more of the value created by operational execution and silver price performance reach shareholders directly. With that, I will hand the call back to Paul for some closing remarks.
Thanks to both Oliver and Warren. All in all, Q2 was another quarter of meaningful progress and showed the momentum we're building across the business. We posted strong revenue growth, moved the next phase of our Galena growth plan forward by completing the number 3 shaft modernization, made our balance sheet stronger by settling the precious metals delivery obligations we had remaining, and kept delivering strong operating and drilling results at Cosalá. As we go through the second half of 2026, our focus stays squarely on safety and on executing our growth strategy, raising production as the Idaho operations ramp up, and continuing to unlock the long-term value of our asset base. Silver is also becoming increasingly important to the technologies driving the modern economy, including artificial infrastructure, data centers, electrification, and advanced manufacturing. As those technologies scale, we believe silver's unique electrical and thermal properties will keep reinforcing its strategic importance. At the same time, we continue to advance the largest drilling campaign in the company's history and to progress our antimony strategy alongside our joint venture partners, United States Antimony Corporation, positioning Americas Gold and Silver to play an increasingly important role in the U.S.'s critical minerals supply chain. We believe that the combination of high-grade silver exposure, growing domestic antimony production, and significant operational growth potential positions us, Americas Gold and Silver, as one of the more unique precious metals growth stories in the sector today.
Having said that, I will now hand things back to the operator, please, so we can move on to some questions.
Thank you. Should you wish to ask something, dial star one on your phone's keypad to lift your hand and enter the queue. To take yourself back out of the queue, just dial star one once more. Please hold briefly for your first question. Your first question is from Dalton Baretto with Canaccord. Your line is open.
Yeah, thanks, operator. Morning, Paul and team. I'm reviewing the production profile for Galena here. You've reaffirmed guidance. I get that Q2 is a trough quarter. Looking at H1, it's roughly 35% at the low end of guidance, so there's a big H2 ahead, and I think part of that ties to throughput, part to grade, and some perhaps comes from Crescent. Could you break that down for us and give us some reassurance on the back half of this year? Thank you.
Hey Dalton, thanks for asking. Obviously, Q2 was always planned as a quarter where we'd be putting money into infrastructure in Idaho. To be specific, as you're noting, we had to complete that shaft work in order to maintain 85 tons per hour. Going forward, with that behind us and us skipping days now, we're seeing days of 1,000, 1,200 tons a day, which our mine has never seen before, and we keep advancing our long hole system. Look, we've just blasted our 13th long hole stope as equipment begins to be delivered and is being received at, by the way, Dalton, both operations. Look, guidance is for the company. It is not for Galena. Guidance remains at the company level, and that's one of the great things we have as a company — we have optionality. You mentioned some really important things at the start. Obviously, grade matters. Grade is helping us significantly, specifically at Cosalá, and recoveries. At the Galena Complex, we don't differentiate between Crescent and Galena. Crescent, we've always said, "Look, we bought it. It was a great investment.
We definitely have confidence in that investment. Crescent fits into a longer-term vision. It will produce some ounces, though not a lot. The real point is positioning ourselves for what comes next at Crescent. And now, with the shaft upgrades plus the communication and the equipment, we find ourselves delivering more consistently at Galena Complex. Looking at Q2, across the company we're at roughly 40%, which means 60% for the second half of the year. We're quite confident about hitting the guidance we laid out, Dalton. So thanks for asking. I hope I covered it.
Thanks, Paul. I really appreciate that. So maybe just to follow up—this is perhaps a bit of a housekeeping point—but looking at production compared with sales across H1, there's roughly a 9% lag. Will that also be caught up during H2?
Is your question specifically about production as opposed to sold?
That is correct.
Right. Those ounces are already moving through the first month of Q3. That usually just has to do with getting the production from our mill over to the smelter. So there's nothing beyond that here.
Appreciate that, Dalton.
Understood. Appreciate it, everyone. I’ll rejoin the queue.
Justin Chan from SCP Resource Finance has the next question in the queue. Your line is open.
Hey Paul, Ollie, and the rest of the team. I was hoping you could help us understand what's actually going on right now on the ground, first at Galena and then at Crescent. At Galena, for instance, you've got additional shaft capacity. My guess is that, at least in the early going, you're able to hoist a substantial amount of waste material out of the mine, and after that stoping and mining would ramp up to fill that capacity. Then at Crescent, you're in the development phase. I just wanted to ask whether you could zoom in on those two operations for a moment. Maybe give us a little more color on what's happening at the mine.
Sure thing, Justin. I’d like to remind everyone that as soon as next week, we’re going to host a site analyst visit — and I think many of you will be able to come to our site and physically see a lot of what we’re doing. You’ll leave with some exciting perspectives, and there’s a great deal of work happening at the mine. Let me start specifically with the Galena Complex. We’re carrying out quite a bit of waste development, and you’re right. With the shaft work now complete, we’re consistently seeing many days of moving significantly more tons. We need to get ahead on waste development. When we took over this mine, it had not received much capital for a number of years in drilling. There was no exploration for a decade. In waste development, we were behind. We’re catching up on waste development at both Crescent and Galena. Now that phase 2 of the shaft is finished, we’re squarely focused on that paste fill plant that we desperately need.
We’ve been using sand fill. That method is significantly slower. It isn’t nearly as capable. It’s a much older approach. After the paste fill plant is finished and commissioned, we’ll be filling stopes in roughly—let’s say 36 hours instead of 10 days. A lot of what you’ll observe when you visit next week—you’ll see it at Crescent—you’ll see drilling, and you’ll see waste development underway so that we can reach a position where we have a secondary egress. At Crescent, we don’t have a secondary egress. Before we can extract any of the ore, we must establish that, as we know, to comply with MSHA rules. Again, I’ll repeat it, but the best thing we’re doing here at Galena is preparing ourselves for the remainder of the year, and carrying out waste development so we can keep going Quarter after quarter—we have to get more long hole stopes. We have to move away from the jacklegs. To accomplish that, we need the waste development ahead of us.
We have to separate out the upper cuts and the lower cuts, and after that introduce the long hole stopes. Once more, I'd say I'm fairly proud that 13 long hole stopes are already complete. Keep in mind, this mine has existed for 100 years. Everything has always been done using underhand cut and fill with jacklegs. What we're doing is modernizing something that has been around for a long time and altering a mining method together with our team, and that is progressing quite well. Those are the major things happening across Galena. Turning to Mexico, I'd describe it as steady as she goes. I mentioned that we are reaching the heart of EC120. Most of you are familiar with Mike Doolin, who has been with us for years. He has played a tremendous part with our team there in getting recoveries up. Those recovery rates are a very, very significant factor in why we saw $16.91 costs on our cost per ounce compared with $30.61. Grade and recoveries. Recoveries matter a great deal to us. Very focused, many projects underway, but we're carrying them out safely and on time and on budget.
All right, understood. That’s really helpful context. One quick administrative question. My notes from earlier indicate that you intended to conduct an internal study at Relief Canyon. Does that remain part of the plan, and will any information about it become available publicly, or will it remain internal?
Yeah. Look, the response is affirmative. We have consistently been quite firm that during the prior year we did not undertake Relief Canyon, and no work was performed there. In the current year, we are finishing an outside study concerning Relief Canyon. I wish <<inaudible>> were present. I am not precisely certain which month it will be released, but I will say this to you, Justin: when you are here the following week, I will inform you of the specific month when it is scheduled to be released. The question being posed is whether we are still proceeding with it. The response is affirmative.
All right, that's great. So perhaps only the final question—regarding capital for Q3 and Q4, is there anything notable, I suppose, distinguishing the two? Should we simply assume deployment is fairly similar, or would it lean pretty heavily toward Q3 just because of when the paste plant comes online?
No, I'd say the guidance and the plans we laid out to you folks earlier in the year still stand. Look, we just held our board meeting. We're pretty much on track to deliver capital the way we originally intended. I think we might be shifting maybe $1 million here or there, but there's no $30 million, $40 million, "Oh, this is changing." There are no big buckets being moved around.
Understood. That said, when you look at Q3 versus Q4, does it come through unevenly, or is it fairly smooth across those two quarters?
I'm trying to recall them off the top of my head here, Dalton, so bear with me. I think part of it leans more toward Q4 — let me give you an example. The paste plant is finishing up, or getting close to finishing, so a number of those invoices will arrive toward the back end. So we'll see somewhat more spending in Q4 on a few of the larger projects. Then there's that shaft relining we've discussed all along, which you'll get to see for yourself next week. After you visit next week, Justin, I think you'll see the projects we're doing. I'd say Q4 might be a bit higher. It won't be Q3, Q4 divided by two.
Understood, that's clear. Fine. Many thanks for the additional detail.
Sure thing, Justin.
The following question is from Jamie Spratt at Haywood Securities. Your line is open.
Morning, and congratulations on the steady gains at both Galena and Cosalá. I’d like to begin with a few Galena questions. Following up on what Justin asked, let’s talk about long hole. Paul, I suppose the paste plant is really the key factor that lets you increase long hole, together with catching up on capital development. Still, thinking it through, how will the split between cut and fill and long hole shift in the second half of 2026 and on into 2027?
Yeah. So look, Jamie, great question, but you nearly answered it right at the start. You were correct. Look, to get long hole established, we need waste development, which is what we're doing right now. To cycle the stopes at the rate we want for ourselves, we need the paste plant. So those two things you led with are really critical. We've always said, look, we could finish this year in a range of 30%-40% long hole by the end of 2026. Man, we've made some big shifts here. This isn't something that's going to — nobody could ever come into this mine after 100 years, flip a switch and go, "Oh, it's all long hole." There's equipment, and we've got 10 new pieces. All the scoops are remote capable. The only thing you didn't touch on, Jamie, and you touched on everything else, was the equipment and the remote controls that we — Look, given that it's a shaft, it's a little more work to get things done. We've got to take pieces apart, swing them down. Not the end of the world. People do it everywhere else on the planet who have shafts like us.
Yet merely pushing it lower along a decline isn't all we do. That requires a bit more work as well. Aside from that, drilling is progressing nicely. The stopes will be visible to you. You'll see that we aren't piling on much dilution. Through long hole, we're removing these zones very effectively and with precision. That 30%-40% range this year — our goal for next year was always to move toward 50%-60% — and year after year, sustaining a 20%-30% gain on more long hole and fewer jacklegs. The mine will never be 100% long hole. Certain spots in our mine are flatter lying, dipping a little flat, where long hole won't work as well, and we won't dilute our grades down to the — we won't cut our grades by 40%, 50% in the areas that are somewhat more flat lying. And those may account for 15%-16% of some of our veins.
Thanks, that's useful. Yeah, and then I suppose my second question is about Galena. I think you ended up having to push back some high-grade output in Q2 because of the fire in that area. So how should we think about grade moving through Q3 and Q4? Q2 clearly isn't representative, but will it be near Q1 or higher than that? If you could just give us some direction there, that would help.
Sure, I’ll address that. The first point I’d like to make about it — and it was a small fire — is that I’m going to pause for a moment here, Jamie, and go over it quickly. I want to remind everybody that no one was hurt in that fire, and the speed at which we got our miners out was incredible. Local agencies, state and federal, even praised us for how fast our team responded and how fast we evacuated our mine. And the reason we could do that so fast — and I think it’s important, Gerald, to hear this — is that we always think, well, we’re spending capital here or spending capital there. The capital we spent on the shop having a secondary, a redundant motor was so helpful in getting our people out. In the past, people would not have gotten out. In fact, there was an incident a number of years ago, 3 years ago or something, where people were underground for more than 24 hours. Before I answer the question, I just want to tell people, look, that fire was a small fire. It did displace things. It is one of our better grades, so if it is not going to mean that the grade in the second half is going to be better, it means that we are going to be able to achieve our guidance.
As we mine every other section of the mine, those zones show better grade within that particular scope. They'll form part of our second-half output. That area has now been fully settled, and we're back in it. I want to hand it to Jamie — you gave me the opening to really boast about our mine rescue team as well. The month before, our mine rescue team had just taken the nationals, a massive event. The fact that we have a mine rescue team this strong, a team this responsive, an emergency and rapid response team this good, means it hardly needs saying that this went off without a hitch, with no incident. A quarter later, we're back in that same area, and the ounces will flow into the second half of the year, which lets us make our second half easier.
That's excellent. I just have a single question about Cosalá. As I see it, Q1 and Q2 appear to have come in ahead of plan. What's behind Cosalá's strong performance? I suppose we're right in the middle of EC120 at this point, so the grade is contributing. What's causing the outperformance, and how sustainable do you consider these improvements to be?
Yes, Jamie, those are genuinely excellent questions. The truth is, we've been discussing this EC120 zone for a year now — that includes the period when our team and I handled the due diligence personally. We're operating in it right now. We're actively mining there. We're drilling in areas right next to it. I think I selected a hole somewhat selectively, and it's difficult not to feel quite proud of something measuring 14 m wide at 600 g. That sits right in the middle of it, very close to where we are. We aren't mining it at present. You can see the cash costs. Thanks to some of the copper credits coming our way, our costs are dropping from $30 an ounce to $16.91 an ounce. We firmly do believe it's highly sustainable. We believe that Cosalá, and I probably should have started my response to you this way, and in fact, I owe my team in Mexico an apology. I ought to have begun by noting that one of our greatest strengths is our team in Mexico. There are no expats among them. Every member of that team is an expert, and they're led by Gabriel Soto, who performs remarkably well, heads our operation there, and receives very strong backing from the executive team here.
However, consider what we've managed to achieve — the drilling we've completed, the new zones we're mining, and I'd mention grade too, along with our metallurgy work. A huge amount of effort went into figuring out how to boost recoveries by 4%-10%, and today we're seeing roughly 10% higher recoveries compared with what we had before. Several of these recovery-focused initiatives, which are technically driven, have paid off handsomely for us. We genuinely think this cost structure, the ounce profile, the grade, and the recoveries can all be sustained, and EC120 will show more of that — and you're already getting a taste of it as we share some of the drill results too.
Perfect, thank you. That covers everything I needed. I appreciate your time in answering my questions.
Heiko Ihle from H.C. Wainwright has the next question. Your line is open.
Hello, team. Case Bongirne here, speaking in place of Heiko. Congratulations on a strong quarter, and thanks for fielding our questions. To start off-
My apologies — was that Heiko? Sorry about that. Did someone drop off? Was it Heiko?
Case here, stepping in for Heiko.
Oh, my mistake. Sorry about that, Case. Yeah, on our end it dropped out for a second there. So apologies from me, Case. Please go ahead, Case.
That's completely fine. I think to start with, you brought this up before, but could you bring us up to speed on where things stand with the move to long hole stoping, and also share anything you can about how those stopes have been performing up to now?
Yes, absolutely. I’ll just say this again. We have just completed our 13th stope. I frequently remind people that our neighbors next door are doing an excellent job with long hole mining—they’re performing phenomenally. Seeing that we can do it does not surprise me. When you visit the mine and look at some of the results, we are mining some of these stopes at roughly 1.2 to 1.3 m wide. That is 3.5 ft wide. It is extremely narrow. We could not have done any better if we had mined it with jacklegs. Had we mined that same stope with jacklegs, the way it was done previously, we could not have made it any narrower. What that means for us and our shareholders is that we can mine at a rate of—instead of around, say, 50 tons a day in each blast—long hole stoping will produce around 200 tons per day, and sometimes in certain cases per shift, depending on where we are mucking from and how long the tram is. But when we examine the reconciliation of the long hole stopes against our model, we see a flat line—it is exactly as if we had mined it with jackleg.
The key distinction is this: with long-hole mining, a stope can be cut in roughly 28 days, whereas that identical stope would have required 12 to 14 months using handheld drills. That's exactly where the contrast lies, and we're confident further gains are coming once the new paste plant is installed. Upon completion and once we're operating it in 2027 — we've consistently stated that 2027 is when we'll begin using it — that will simply make things better for us. It enables us to operate more effectively. Actually, I appreciate the question about the long wall. I did want to briefly welcome our new General Manager, Brian Dara, who is performing excellently with our teams there, leading them as we keep transforming this into a more modernized mine. Brian, Peter, welcome aboard. Go ahead, Case.
That brings our question-and-answer portion to an end. At this point I'll hand things back over to Paul Huet, who has some closing remarks for us.
Thank you. First off, I'd like to express my appreciation to everyone for being on this call. We're all aware of how packed each of your schedules is. I want to give a shout-out to our teams in Mexico and the U.S., whose dedication never wavers when it comes to making this company better, safer, and a great place for shareholders. Through the capital we're investing, together with cutting nearly $90 million in debt, what we're doing is positioning ourselves for success. Those are enormous strides that set our company up for where we need to arrive. We're very proud of that. Naturally, I want to thank all the analysts working with us as well as our shareholders. Enjoy your Friday, and we're excited about the site visit, where we'll be seeing most of you shortly. Best wishes.
Thanks. That brings us to the end of today's conference call. You can go ahead and disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Americas Gold and Silver Corporation transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Americas Gold and Silver Corporation earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.