Thanks, operator. And I appreciate all of you being here with us today. Aqua Metals put out a press release earlier today that gave an operational update and went over results for the second quarter, which closed on June 30th, 2026. You can find that release in the investor relations area of the company's site, aquametals.com. Leading today's call are Steve Cotton, our President and Chief Executive Officer, along with Eric West, our Chief Financial Officer. Before getting started, I want to remind everyone that management will be sharing forward-looking statements on this call. For an overview of those forward-looking statements, plus the risks, uncertainties, and other factors that might make actual results differ materially from them, please see the company's report on Form 10-K. Aqua Metals urges investors not to put undue reliance on any forward-looking statements. The company does not specifically commit to disclaiming any obligation to update or revise such statements as new circumstances or unanticipated events arise, except where the law requires it. Also, a reminder that once the formal remarks wrap up, we'll hold a question-and-answer session; so with that, I'd like to hand the call over to Steve Cotton, President and CEO of Aqua Metals.

Steve Cotton executive
#2

Thanks, Dan, and good afternoon to all of you. We appreciate you being on the call for our business update and financial results for the second quarter. At this point, Aqua Metals has moved beyond demonstrating a technology into commercial execution. Across the past several years, we have shown that AquaRefining is effective; we have displayed products of battery grade. Our operating hours have been increased, and we have confirmed several process flows. All of our current efforts focus on establishing a profitable critical minerals processing business in the United States. Going forward, you will notice us characterizing the company somewhat differently; that choice is intentional. Aqua Metals is a U.S. We're a company in the critical minerals processing space, working to bring recovery and refining technologies to market at reduced cost. This isn't some brand-new venture — it's simply a sharper way of describing what we've been constructing all along. Our view hasn't changed: the domestic battery supply chain's greatest opening isn't another plant making batteries. What's needed is the infrastructure to handle manufacturing scrap and spent batteries as those plants ramp up. That's exactly what Headwaters ARC is meant to be. We're wrapping up final diligence on a Midwest location featuring about 150,000 sq ft of industrial infrastructure that already exists, plus roughly 50 or more acres, and it sits just a short drive from six major LFP gigafactory projects. Feedstock proximity is what makes the economics of this business work, and that site puts us right next to one of the country's fastest-growing sources of LFP manufacturing scrap. If built out as a full campus, Headwaters is engineered to handle roughly 20,000 tons annually. Financing, permitting, and commercial agreements all still have a bearing on that scope and timing. Let me emphasize one thing: we've intentionally changed how we approach commercialization. Instead of attempting to construct everything on day one, we've broken the project into sensible commercial phases. Phase I is meant to rely on pre-processing equipment with a commercial track record to recover aluminum, copper, and high-specification black mass domestically from segregated LFP battery materials. This route gets us to revenue from commercial operations a lot sooner, and it cuts the risk involved in executing the plan by a wide margin. Once that operating base is up and running, we bring in AquaRefining during phase II, pulling battery-grade lithium carbonate, iron phosphate, and graphite out of the very same black mass. It's in that second stage that we see Aqua Metals generating far more value over the long haul. Our choice is to put capital to work in stages, deliberately, with value rising at every stage. In our view, that's a far wiser way to commercialize. A number of you have already listened to us lay out commercial plans, so allow me to be blunt about the bar we hold ourselves to. Our word was that we'd build once and build right, with feedstock, off-take, and financing all secured prior to putting AquaRefining to work at commercial scale. We haven't altered that benchmark at all. By taking the Headwaters project in stages, we're able to clear those requirements incrementally. Over the quarter, real headway was achieved on each of the key work streams needed to get us there: site diligence moved ahead. Engineering moved ahead. Our review of commercially demonstrated pre-processing partners carried on. Talks grew broader with both feedstock providers and prospective offtake buyers. Multiple financing arrangements have been pushed forward, and our intention is to fund Headwaters mostly at the project level rather than drawing on our balance sheet. Eric will walk you through the details more thoroughly. The innovation center has stayed in operation, and it has now accumulated more than 5,000 operating hours overall in service of commercial engineering. Every one of those work streams is connected. They all serve one objective: bringing Headwaters online commercially as fast as possible, while keeping execution risk as low as we can. Here's something I want investors to understand — why LFP materials come first for us. Lithium iron phosphate, or LFP, is becoming the chemistry of choice for energy storage systems, and for a rising portion of EVs. Gigafactory capacity is expanding at a rapid clip. As a result, manufacturing scrap is expanding at a rapid clip as well. Our market analysis, which relies on third-party industry research projections, indicates that recyclable LFP scrap will rise roughly 15-fold by 2030, and BloombergNEF forecasts U.S. storage capacity of roughly 235 gigawatt hours by 2035; in our view, that opens up one of the biggest underserved critical minerals processing opportunities anywhere in North America. In contrast to batteries rich in nickel and cobalt, LFP calls for an economic model that is different. Our phased commercialization strategy has been built specifically around that opportunity. Let me be clear that LFP is our starting point, not our ending point. The same platform architecture — mechanical pre-processing, then AquaRefining and product recovery — is meant to stretch to NMC materials, or nickel manganese cobalt, and eventually to certain mined materials and industrial waste streams. We have already put the process to the test on mined feedstocks. Headwaters is meant to serve as the first node in that platform, not the entire business. At the same time, AquaRefining is still the technology that sets this company apart. Compared with conventional processing methods, our process is built to remove one-time use chemicals, cut waste, make workers safer, and bring operating costs down. The innovation center keeps validating commercial process flows while also backing engineering for Headwaters, so that technology foundation is still very solid. Financial discipline is another area where we are pleased; we have come into this commercial phase with no debt. We are deliberately aligning capital deployment with commercial milestones, and our goal is not merely to construct a facility. We're aiming to build a business that turns a profit while being disciplined about how we deploy capital, and that difference is important. Looking ahead, here's what we need to accomplish during the remainder of 2026: wrap up due diligence on the site, secure site control for the long haul, pick the partner for phase I processing, advance feedstock and offtake contracts, sustain our engineering work, finish raising the capital, move permitting along, and continue making progress toward a final investment decision. These are tangible milestones that investors can monitor over the coming quarters. I'd like to be upfront regarding the timing of when the economics become visible. Once a final investment decision for phase I is reached, we intend to disclose capital cost, anticipated throughput, product mix, and expected operating cost. That's where I'll close. In our view, Aqua Metals has arrived at a significant inflection point. The technology foundation is in place, and the market opportunity keeps getting stronger. The approach we're taking to bring this to market is fully settled at this point, and day in and day out our people stay dedicated to carrying out that roadmap with rigor. We feel enthusiastic about what lies in front of us, and we're grateful for the ongoing backing from those who hold our stock. So with that, we'll turn things over to Eric, who will walk through the financials, and after that we'll take your questions.

Eric West executive
#3

Appreciate it, Steve. Now I'd like to walk through several income statement items for Q2 of 2026. Our net loss came in at roughly $4.5 million, equal to $1.31 per basic and diluted share, versus a net loss of about $6.8 million, or $7.44 per basic and diluted share, in Q2 of 2025. That per-share figure also reflects more weighted average shares outstanding across 2026. Operating expenses overall were about $4.6 million this quarter, against roughly $7 million a year earlier. Within the current quarter sits an extra non-cash credit loss provision of about $2.1 million tied to Lion Energy. The comparable quarter last year, meanwhile, contained a non-cash impairment charge of roughly $3.8 million. Plant operations, research and development, and general and administrative costs came to about $2.5 million, versus approximately $3.3 million in the same quarter last year, which shows how we keep concentrating on controlling our core operating cost structure. On Lion Energy, given what unfolded during the quarter, we revised our estimate of expected recoveries. As of June 30th, our total allowance for credit losses stood at roughly $2.5 million, which equals 60% of the approximately $4.2 million gross balance, a figure that also includes accrued interest. That left us with a net carrying amount of about $1.7 million. This allowance is an accounting estimate of expected collections; it is not a determination of what Aqua Metals is legally owed, nor a waiver of our rights. We stay committed to pursuing recovery through appropriate legal and commercial avenues. We closed the quarter with about $4.7 million in cash and cash equivalents, working capital of roughly $4 million, and no notes payables outstanding. Cash used in operating activities reached approximately $6.5 million over the first six months of the year. In Q2, we brought in roughly $581,000 in net proceeds under the ATM program, which lifted total ATM proceeds for the first six months of 2026 to about $1.9 million. We keep managing our operating spend carefully. As today's release notes, we are advancing project financing, staged equipment financing, third-party real estate structures, and economic development opportunities for Headwaters ARC, with Newmark's advanced manufacturing practice group engaged as an advisor. Our intent is to fund the project substantially at the project level, so that corporate capital supports operations and staged execution. Our objective is to preserve financial flexibility while advancing Headwaters ARC through disciplined milestone-based capital deployment. With that, I'll hand the call back to the moderator to begin Q&A.

Mickey Legg analyst
#4

Yeah. Thanks, guys. Hey, Steve. Hey, Eric. Perhaps we could begin with you going into more detail about how this represents a natural progression from your last project — moving from something closer to recycling into a greenfield refinery, and then into pre-processing infrastructure alongside the gigafactories nearby. Could you say more about that? In what way ought we to think about this progression, and why are you confident that this part of a supply chain is underserved? Thanks.

Steve Cotton executive
#5

Yeah, Mickey. Good question. Everything comes down to locating the market and delivering the appropriate solution for it. Our real focus is on the reality that an enormous underserved opportunity exists for LFP chemistry batteries, given those six gigafactories located in that region. We perceive a chance to gather those batteries and concentrate on that chemistry, which is a simpler chemistry. We also lower the risk of the initial phase by putting in place a standard collection and processing equipment set that pre-processes the material into aluminum, copper fines, along with black mass production, and afterward install the AquaRefining and aim it at the lithium, without needing to be concerned at first with nickel and cobalt; we regard this as risk reduction, a cheaper point of entry, a phased strategy situated right in the middle of the market where demand is greatest, since we're putting up many gigafactories and, as a nation, we simply aren't developing the capacity to process these materials and retain them domestically. Taken together, that is truly the rationale driving how we are tackling this and managing to do it in a manner that safeguards our capital throughout.

Mickey Legg analyst
#6

Understood. All right, that's useful. That brings me to my following question, which concerns what you've taken away from the equipment procurement and the headway you've made in that area. It looks as though you're moving along well, but I'm just wondering, what ought we to watch for there? Is there anything specific you've gained from it?

Steve Cotton executive
#7

Are you referring to the equipment procurement for phase one?

Mickey Legg analyst
#8

Yes.

Steve Cotton executive
#9

Yeah. On which vendor will supply the machinery for phase one, we've essentially reached the moment of choosing; that gets us pretty excited, since we've witnessed this machinery running at scale, and rather than accept any tech risk for gathering, pre-processing, and manufacturing those first products that bring in revenue, we'd be in a position to take machinery already proven at scale, roll it out, and get it working. For Aqua Metals, signing that deal and then advancing toward buying that machinery and putting it to use at the Project Headwaters site is genuinely a crucial element of what comes next.

Mickey Legg analyst
#10

Understood. Alright, so for the final question: in the near to midterm, what milestones ought we to be watching for? Would it be additional economics like those in phase one, which is certainly near the top of my list?

Steve Cotton executive
#11

Yes. Naturally, there are many milestones ahead. That covers the final designation of the particular site, followed by the portion involving equipment supply, the real estate financing, and tenant improvements for that real estate. Luckily, this is a building we think we can upfit very quickly. You'll see news flow regarding that supply component — about the equipment, about the facility, about the location, and, naturally, about the commercial side, meaning feedstock and offtake contracts.

Mickey Legg analyst
#12

Alright, that covers everything on my end. Appreciate it, everyone.

Steve Cotton executive
#13

Thank you, Mickey.

Dan Scott executive
#14

Appreciate it, operator, and thanks to Mickey for asking. The opening question was directed at Steve: would you take us through the reasoning behind the phased approach at Headwaters, specifically how it opens the door to revenue sooner than constructing a greenfield facility would, and also why LFP is the material the company has chosen to begin with?

Steve Cotton executive
#15

Yes, absolutely. The key thing to understand about Headwaters, really, is that the site is already there, as I mentioned. We've got roughly 150,000 sq ft of industrial infrastructure that already stands, plus 50 or more acres of land around it. Because we're beginning inside an existing structure, we aren't spending on a complete greenfield build-out before we're able to run even one ton of material through — and that's genuinely what allows the phased strategy to function. Phase I, as I was discussing with Mickey, is built around mechanical processing that's commercially demonstrated, already at scale, and turns out valuable high-spec black mass along with aluminum fines and copper fines as products, drawing on that proven equipment an established supplier can provide right now. Phase II is where our patented AquaRefining technology comes in, letting us take that black mass and turn it into battery-grade lithium carbonate plus iron phosphate and graphite, all produced here in the U.S. Phases after that would broaden the platform into NMC — nickel-manganese-cobalt — along with other critical mineral-type feedstocks. We've structured each phase so it gets its own capital and its own validation before we move ahead to the following one. Regarding LFP, though, as was asked, we're letting the feedstock and the demand guide us. Our market analysis, informed by third-party and industry research, indicates that recyclable LFP manufacturing scrap should rise substantially — roughly 15x — by 2030. BloombergNEF forecasts that U.S. battery storage installations will hit approximately 235 GW of installed power capacity and 948 GW hours, an astonishing quantity of battery energy storage capacity, by 2035. Today's U.S. shredders handling that pre-processing are focused on nickel and manganese and cobalt — that is, NMC scrap — which drives up the cost of that feedstock and therefore leaves LFP underserved. Headwaters, as I said before, is located just a short drive from six major LFP gigafactory projects. Our preference is to build where feedstock is expanding most rapidly and where processing capacity simply isn't there yet.

Dan Scott executive
#16

Thanks, Steve. Appreciate it. Moving on to the next question: Sierra ARC got announced, and then it was sold, and the team has stated, "Build once, build right with concentrated feedstock, committed offtake, and bankable financing as the gates before building." So in what structural way does Headwaters differ? And does phase I get through those very same gates?

Steve Cotton executive
#17

That is a reasonable thing to ask. Nothing about the gates has shifted. To put capital to work at commercial scale, we still require contracted feedstock, committed offtake, and bankable financing. What is different now is that we have a structure allowing us to meet those requirements one after another, instead of needing to resolve every one of them before a shovel hits the ground. Sierra ARC was the first-of-its-kind build, and it demanded the entire capital commitment upfront. Once the market turned against the industry, and lithium prices collapsed, we took the disciplined step at that moment to sell the asset and safeguard the balance sheet. Headwaters looks almost the reverse. As I said, Phase I is engineered around commercially proven equipment rather than first-of-its-kind technology. We have brought in Newmark, a top global commercial real estate advisor, to chase those third-party real estate structures covering the land, building, and site development. Negotiations on equipment payments are proceeding under staged terms linked to milestones. Phase I does not bypass the gates. It is really about how we arrive at them. A facility where feedstock enters and product exits is what turns feedstock conversations into contracts and what allows a Phase II project to be financeable on project-level terms. Same discipline, just sequenced in a different way, to sum up.

Dan Scott executive
#18

Moving on, the number of shares outstanding has risen quite a bit across the last 5 quarters. When it comes to paying for phase I — whether through real estate arrangements, equipment financing that's staged, or the ATM — how should people who already hold stock in the company be thinking about that? And what's your approach to financing this business all the way up to a final investment decision?

Eric West executive
#19

Eric here — I'll handle that question. I want to begin by describing the position we were in when the quarter closed. As of June 30th, our cash stood at roughly $4.7 million, and working capital was about $4 million. Operations consumed about $2.7 million of cash across the quarter. Through the ATM, we brought in roughly $581,000 during that same quarter, leaving approximately $48 million of capacity still available on it; debt remained at zero throughout. Now, on the subject of dilution, let me be straightforward: the capital we raised came during one of the toughest periods this sector has ever gone through, and without that decision, the company would not be positioned to go after Headwaters at all. Our approach was to raise ahead of need instead of scrambling later, and while doing so we kept the business running lean. Looking ahead, the goal is to finance phase I while using as little equity capital as we can. When you look at the three layers' architecture — the first being land, building, and site development — that piece accounts for a substantial share of what phase I costs. Newmark has been brought on to chase third-party real estate structures, whether a long-term triple net lease or something comparable. For the second layer, we've been working toward equipment payment terms that come in stages tied to project milestones, instead of covering all of that money up front. As for the third, corporate capital stays reserved for operations and staged execution, with ATM usage kept measured. In parallel with all of this, we have submitted economic development packages at the state and local levels; those conversations keep moving forward. Between now and when the final investment decision gets made, what lies ahead is diligence, engineering, permitting, and negotiation — not construction — and our cost structure for operations sits below where it was 12 months ago. Our management is oriented around milestones, not a calendar. Nothing in these structures has been signed yet, and we won't call any of them finished before they actually are. Our preference here is unambiguous: capital at the project level and backed by assets comes before corporate equity, and money gets deployed once milestones are hit rather than in advance of them; no capital will go into construction before the conditions we've established are satisfied, and each quarter we'll report our progress against the milestone lists.

Dan Scott executive
#20

Appreciate that, Eric. Moving to the next question, which concerns how durable the model is: what happens to Headwaters if lithium prices decline back down to the low points seen last year? Is there real demand here at home for the phase I products, or does that material end up shipped abroad, as is the case with the bulk of U.S. black mass right now?

Steve Cotton executive
#21

Right. There are a couple of things that shield the model. First, lithium isn't really the main point of phase I. What phase I produces is black mass, aluminum fines, and copper fines; across this segment, the people running processors typically get paid for accepting feedstock, meaning revenue shows up before processing even starts. Compared with a pure refining operation, that mix is a lot less exposed to lithium prices. Second, there's the cost position. As we've said throughout, AquaRefining is built to get rid of those single-use chemicals, cut down the waste streams and the disposal expenses tied to them, and accomplish this in an environment that's much safer and needs far less labor — that's mainly where the operating cost edge comes from. Our view hasn't changed: holding a lower operating cost position is what lets a platform keep running across an entire price cycle, not just during a strong one. To put it in context, anyone on this call can look back at lithium carbonate pricing and see the substantial recovery from the 2025 lows. Meanwhile, where domestic demand goes, aluminum and copper obviously have deep, well-established U.S. offtake channels, and pricing has been robust, especially as of late. Black mass is where the difference lies, and that difference proves our point. Today, the bulk of black mass made in this country gets shipped abroad, since there isn't sufficient commercial-scale refining capacity domestically to handle it. That's exactly the gap phase II is meant to shut. In our view, domestic refining is a demand problem whose answer is already sitting there waiting for capacity, not something anyone has to create.

Dan Scott executive
#22

All right. So we've got a final question here. You've characterized Headwaters as built for roughly 20,000 tons annually once the campus is fully configured. What does that capacity translate to for the business, and could you offer investors some sense of the phase I unit economics underlying it?

Steve Cotton executive
#23

Alright, let me lay out the structure clearly since that answers the question. Phase I handles the pre-processing side. To go a bit deeper, our plan is to put in 2 pre-processing lines, each running roughly 10,000 tons per year. At the full phase I configuration, that works out to about 20,000 tons per year. Phase II doesn't increase the tonnage the building handles; instead, it takes the black mass produced by phase I at capacity and converts it into refined products. At that stage, instead of selling black mass, we'd refine it in-house and sell greater volumes of lithium carbonate, iron phosphate, and graphite rather than black mass. Scope and timing are still contingent on financing, permitting, and all those commercial agreements, naturally. Worth noting: this isn't a production forecast, and at this point it isn't guidance either; that structure is intentional and sits at the heart of how we're handling that risk. We aren't wagering the company on one build; this initial line gets the operation and the commercial relationships up and running. The next line expands what we've already demonstrated. Phase II then adds value to the material we'll already be handling, instead of needing new or different feedstock types. The capacity is sized around us taking a share of the LFP manufacturing scrap generated by the Gigafactory projects located within that short drive from the site I referenced earlier. On the economics, what I'll give you is a standard we're holding this to, not a specific forecast. Phase I must earn its own return. Nobody is being asked to fund phase I based on the promise of phase II. Before we bring phase I to a final investment decision, the case must show positive EBITDA and positive cash flow at the project level, plus return on invested capital meeting our investment criteria in each case after ramp-up and under commercial assumptions we can support. Should it fail to clear that bar, we don't move forward. Two points I want to be precise about. That's an investment criterion, not financial guidance. It's project-level economics, a different measure from consolidated company results that carry corporate costs. On sizing, the phase I products are, once again, copper and aluminum and high-specification black mass, all priced off observable markets. With the throughput and the product set, you really have the framework to run the numbers. Those numbers shift with metal prices, obviously. What determines where we land within that range is commercial rather than technical: what we pay for the feedstock, or even get paid to take the feedstock, the mix of material we receive, what we recover, and what those products fetch at the time. A number of those terms are ones we're actively negotiating and haven't quite signed yet, which is why we aren't putting estimates on the record before the agreements that determine them. When we reach the final investment decision for phase I, our plan is to give you the capital cost, the throughput we expect, what the product mix looks like, and the operating costs that already exist — at which point you'll be in a position to build a more accurate model.

Dan Scott executive
#24

Appreciate it, Steve; that wraps up the Q&A portion. Perhaps I can hand things back over to you so you can share a few final thoughts.

Steve Cotton executive
#25

Thanks for that, Dan, and thanks to everyone who joined the call and is listening in on Project Headwaters and Aqua Metals; we're genuinely eager to keep the market informed as we reach those milestones one at a time across Q3 and Q4. We look forward to sharing more updates shortly.

Operator operator
#26

Thanks. That brings today’s conference call and webcast to an end. At this point, you’re free to disconnect, and I hope the rest of your day goes wonderfully. We appreciate your participation.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aqua Metals, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Aqua Metals, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.