Thanks, operator. Good morning, everyone, and I'm glad you could join us today as we go over what we delivered in the second quarter of 2026. With me are Bob Rasmus, our Chief Executive Officer at ARQ, and Shimon Steinmetz, who is ARQ's Chief Financial Officer. You can catch this call as a live stream through the Investors portion of our website, and the presentation for today is available to download there as well. We'll also put a replay of the webcast up on our site, and if you need to reach ARQ's Investor Relations team, the address is investors@arq.com. Before we go further, a heads-up about what you'll hear today: our presentation and comments include forward-looking statements, which fall under Section 21E of the Securities Exchange Act. Those statements rest on what we know right now, and they come with risks and uncertainties that could make our actual future results, performance, business prospects, and opportunities turn out materially different from what those statements express or imply. Among those risks and uncertainties — though not the only ones — are the factors laid out on Slide 2 of today's slide presentation, in our Form 10-Q covering the quarter that ended June 30, 2026, and in other documents we've filed with the Securities and Exchange Commission. Other than when securities regulations specifically mandate it, we assume no duty to revise those factors or any forward-looking statements in light of later occurrences, advancements, altered conditions, or for any other cause. Furthermore, it is particularly crucial to examine the presentation in today's remarks alongside the GAAP references found in the financial statements; with that said, I'd like to hand the call over to Bob.

Bob Rasmus executive
#2

Thanks, Anthony, and good morning to everyone on the line. There's quite a bit to get through today, so I want to start with a quick look at the main items we plan to discuss. To begin with, the numbers from our second quarter highlight just how solid the underlying business is and how profitability in our core PAC segment keeps getting better. Q2 is normally a softer stretch because of seasonality, and on top of that we had the biennial plant turnaround that wrapped up in April, yet adjusted EBITDA came in well above what we posted a year earlier, with gross margin rising about 520 basis points. What this quarter really shows is the earnings power of our PAC business — one that isn't held back by the GAC difficulties that dragged on the same period last year. Powdered activated carbon is still the backbone of this company, giving us both steady operations and the financial footing from which we can pursue several paths to growth, and I'll get into those in a moment. Next, I want to take you through where things stand with our granular activated carbon optimization review. PFAS continues to be a central priority for us. We're still sharpening our estimates on what GAC development will cost and how long it will take, but at the same time we're pleased with how customers are responding to what we refer to as our path for PFAS strategy, which we think may deliver a near-term answer to the PFAS compliance problems facing some of our water customers. Demand stays robust for products that help water utilities lower PFAS contamination, and interest is widespread in solutions that allow customers to reach compliance right away. Our view is that by adopting our new PAC for PFAS, some water companies might avoid having to make the sizable capital investment that granular activated carbon requires in order to satisfy the EPA's PFAS standards. I want to be clear that this isn't a solution that works for everyone. It's meant for water systems that are already close to meeting the PFAS standards. Beyond helping with near-term PFAS compliance, using PAC for PFAS lets these water companies keep using the equipment they already have, potentially sidestepping new CapEx tied to GAC systems. And third, we still see a number of opportunities to bolster both our balance sheet and our profitability in the near term. Among them is the possible monetization of Corbin along with our coal waste purification technology, which could have several valuable end market applications. Last, I want to share how excited I am about Shimon Steinmetz stepping in as Chief Financial Officer. I can't overstate how much it matters to have someone experienced and dedicated in the CFO role. Shimon has already come forward with a number of ideas for running the business more efficiently and productively from a financial standpoint, and he'll go into more detail on those shortly. I look forward to working alongside Shimon to build value for our shareholders. Now to our second quarter results. Revenue came in at roughly $30 million, a modest increase from a year ago, supported by ongoing strength in both volume and pricing. We view the slight shortfall in chemicals revenue as a matter of timing rather than demand, and we believe we'll make it up later in the year. Our gross margin came in at about 38.5%, which is an increase of roughly 520 basis points compared with the same quarter a year ago. That number captures how PAC profitability has kept getting better, since we didn't have the GAC start-up expenses that dragged down the year-ago stretch. Adjusted EBITDA landed at about $5.8 million — a big jump from the $3.7 million figure we posted a year earlier, and comfortably above where we were in the first quarter of 2026. Those results show the fundamental power of the PAC business, the pricing rigor we've maintained, and the gains from our cost and operational programs, all achieved without GAC production holding us back. Our biennial turnaround at the Red River plant wrapped up in April, and notably it came in under budget. As of today, we're restating our full-year CapEx guidance, which sits between $8 million and $10 million. All told, this was a robust and promising quarter during what is normally our slowest stretch of the year. Now that I've gone through our core markets, I'd like to shift to where we believe growth opportunities lie. I realize plenty of you are eager for an update on our strategic optimization review. Before I address that, though, I'd like to take some time on an exciting growth initiative in PAC — one tied directly to the PFAS opportunity, which our sales team has taken to calling PAC for PFAS. PAC for PFAS is a fresh lineup of powdered activated carbon offerings built to serve the PFAS removal market. As a reminder, demand in that market stays robust, with mandatory PFAS monitoring and public reporting for U.S. water companies starting in April 2027; we've been exploring ways to assist customers in getting ready for the wider compliance changes scheduled for 2029 to 2031. When that happens, every water company will have to reduce PFAS levels beneath the new 4 parts per trillion threshold, down from the earlier 70 parts per trillion threshold. Adjusting to these shifts will prove costly for a lot of water companies, because GAC application generally demands new equipment at a meaningful expense. With such a short runway before monitoring reporting kicks off in Q2 2027, we set out to give customers something that works as either a permanent or an interim solution, allowing compliance at a lower capital cost by using existing equipment wherever feasible. That's exactly what PAC for PFAS delivers. Drawing on our best-in-class research and technology capabilities, along with our specialized product engineering and manufacturing, we've created a PAC product able to remove low levels of PFAS contamination. Although the maximum contamination level it can handle hasn't been confirmed, we think a meaningful number of water companies — especially those marginally outside the 4 parts per trillion compliance level — stand to gain. For those customers, the appeal comes in two forms. First, they can reach compliance or move toward it without the significant capital expense of installing the vessels, systems and equipment a GAC solution typically requires. And second, for the many utilities already using PAC for taste and odor control, our product can tackle PFAS and taste and odor simultaneously, eliminating the need to double up on treatment. From what we've heard in early talks with customers, this product's pricing could land in a range comparable to what we charge for our conventional GAC offerings. Let me be clear: our perspective on how well bituminous granular activated carbon performs at PFAS removal is unchanged. Should adoption go well, this offering might address a genuine near-term challenge for customers, and at the same time it would bring a higher-value item into our portfolio. Trials with customers are still underway, so I don't anticipate a material contribution over the rest of 2026; however, I do see the possibility that this meaningfully lifts our performance in 2027 and beyond. Our technology team built this product as part of our aim to develop and market high-performance specialty products, custom-designed to serve our end users' needs. It stands as another great illustration of our technical and sales teams partnering with customers rather than treating them as counterparties. When we solve customer problems in real time, those relationships grow stronger, benefiting both sides. Let me be clear, exciting as this is, I don't think it has any material effect on our sales potential in the GAC market. Instead, it's a neighboring solution for particular customers, and many of them may well become GAC customers down the road. I'd like to turn now to an update on where things stand with our strategic optimization review and GAC. That strategic optimization review is still ongoing.

Bob Rasmus executive
#3

This now covers more than just bituminous-based granular activated carbon. It also takes in a wider operational review, and through that review we've spotted opportunities in both the near and medium term to run our furnaces longer and bring product costs down. On top of that, we're looking hard at the best ways to leverage our technological strengths and the relationships we've built. What we're ultimately after is maximizing what comes back to our shareholders. Our review isn't finished yet, but it has already surfaced a number of ideas for making our core PAC business more profitable. Those results touch on a few different things: the PAC for PFAS we talked about earlier, plus a set of operational efficiencies aimed at boosting plant capacity and cutting costs. We think there's a genuine, reachable chance here to grow EBITDA substantially. So then, where does bituminous-based GAC come into all of this? The PFAS opening is still very attractive. We keep seeing a significant role for GAC in delivering solutions to our customers. With that in mind, and as something we might do in the interim while we figure out the best route to get our own bituminous-based GAC product up and running, the early progress on PAC for PFAS gives me encouragement. My belief is that this could add meaningful volume, price, and margin to our PAC business, all while continuing to help take PFAS out of the water in this country. The GAC portion of the review still isn't finished, but we know enough now to share considerably more than we were able to last quarter. To complete the conversion and resolve the problems we described before, we've gotten cost estimates from 2 independent engineering consultants. There's a pretty wide spread across those estimates. Because any estimate at this point still carries uncertainty, the range we're currently looking at for the project could land somewhere between $40 million and $60 million. Depending on the final design, that figure may move. We're trying to tighten it up, and we'll bring you up to date as that happens. Here's what I really want to make sure comes through clearly, since it's the single most important piece of this update. Putting that number out there doesn't mean we've made a decision to put money into it, and it doesn't mean we're abandoning GAC, either. Both of those things hold true simultaneously. Our view is still that GAC represents a genuinely differentiated opportunity for this company, one that very few others are positioned or equipped to go after. And we won't commit capital of this size until we're confident it will produce a return that makes the investment worthwhile. In the meantime, every bit of our focus is on making the business we already have more profitable. That means continuing to drive our PAC business toward a higher earnings run rate, seizing the extra capacity and cost improvements the same review process has turned up, assessing the monetization of Corbin, and recognizing that building out PAC for PFAS is a near-term method of meeting that demand while we sort through the bigger GAC decision. As that base grows stronger, so does our capacity to finance GAC on sensible terms, including by taking on more debt instead of issuing equity. I've made it plain that under no circumstances will we put money into GAC; the market, as we see it, has been pricing in the worst possible combination: that we end up watering down shareholders' stakes to pay for it while failing to earn a decent return from it. Since we believe the full story is richer than what the market is currently discounting, we wanted to hand you a sharper view of the expense involved and of how we plan to proceed. Let me say more about what I touched on earlier regarding Corbin monetization. By the midpoint of the year, things are moving in a promising direction with our asphalt partner, and our blending component product came through trials with strong results. A successful crack test was carried out by that partner at Auburn University's National Center for Asphalt Technology; the effort now moves into the following stage of technical validation and third-party laboratories, encompassing performance and durability evaluations measured against rigorous highway safety standards. Through Q4 2026 this validation effort will run, with feedback starting in Q1 2027. Commercializing new asphalt road products follows a very intricate path, so the headway achieved makes us quite happy. As I noted, we are hard at work assessing the most efficient route to monetize the Corbin asset together with its associated technologies. Where asphalt is concerned, beyond running the Corbin facility as a feedstock supplier, it's possible we end up licensing the technology, divesting the plant, or entering some type of joint venture. On a separate track, we keep reviewing unsolicited interest expressed by third parties regarding an asset sale or joint venture spanning a wide range of applications, among them silicone wafers, rare earth materials and other specialty products. Having said that, I'll hand things to Shimon for a thorough financial review, plus an introduction and his first impressions now that he's come aboard.

Shimon Steinmetz executive
#4

Bob, thanks, and thanks to all of you for being here today. It's a real thrill for me to become part of the ARC team. This business sits at a crucial moment in its expansion, and I believe there's tremendous opportunity ahead. As for what I'll be concentrating on during the first few months in this role, my attention is especially on pushing for stronger operational and financial efficiency throughout the organization, bolstering our financial planning and analysis work, and finding ways to cut costs and boost profitability — all of which supports the growth priorities that Bob described. Now, regarding what we released last night, Arq posted another solid set of financial results for the second quarter, with revenues of roughly $30 million, a modest increase year-over-year. Improved volumes and pricing remain the main drivers. Our gross margin for the quarter came in at about 38.5%, an increase of roughly 520 basis points versus the second quarter of 2025, which reflects continued gains in PAC performance and the absence of GAC start-up offsets. On the biannual plant turnaround finished in April, the related cost of $3.1 million was capitalized. That work came in under budget, and we don't expect to have to do it again before April 2028. We recorded a net loss of about $700,000 for the quarter, compared with a net loss of $2.4 million in the second quarter of 2025, which reflects the better operating performance I just mentioned. Adjusted EBITDA came to roughly $5.8 million, a meaningful increase from $3.7 million in the same period a year earlier. That gain reflects the ongoing strength and rising profitability of our PAC business, our pricing and cost initiatives, and the absence of the GAC production costs and challenges that dragged on earlier periods. Our adjusted EBITDA also included add-backs for severance tied to recent leadership changes in noncash equity compensation. Selling, general and administrative expenses came to $6.8 million, which is a $900,000 increase versus the prior year period. That was mostly driven by severance and recruiting costs connected to recent leadership changes. Research and development costs for the second quarter were around $1 million, versus $2.7 million in the prior year period. A good portion of that is due to higher spending in the prior year period related to GAC ramp-up. All in all, our second quarter performance was strong for what is usually a softer shoulder quarter, and it shows the earnings power of the PAC business. We're still focused on making the PAC business even more profitable and believe it is now truly cash generative on an annual basis. Moving to the balance sheet. We finished the second quarter with total cash of $12.1 million, of which roughly $11.2 million was restricted. The change versus year-end mainly reflects capital expenditures, the turnaround, and the timing of working capital. Unrestricted cash at quarter end was lower than in recent quarters, and I want to speak to that directly; it reflects the timing of our borrowing base and receipts rather than any shift in our liquidity position. The draw on our borrowing line clears in the middle of this week. Since the quarter closed on a Tuesday, the way payroll, other payables, and slower customer collections fell around the end of the period meant the unrestricted cash balance we carried on June 30 didn't show the level of cash we'd normally have on hand. To make that clearer, unrestricted cash rose to $3 million by July 1. Then, at July 31, 2026, it was roughly $3.1 million. As of June 30, our credit facility placed no constraints on us, and plenty of availability remained under our borrowing base. Total debt on June 30 was $30.9 million, which included about $21.4 million tied to the MidCap revolving credit facility and roughly $8.1 million tied to the CTV loan secured against the Corbin asset. That's an increase of roughly $2.2 million compared with December 2025, mostly from a larger amount drawn on the MidCap facility. Today we're also restating our 2026 CapEx forecast, which stays in the range of $8 million to $10 million. Last, we're confirming our guidance for the full year 2026 once more. Our expectation remains revenues in the range of $120 million to $125 million, along with adjusted EBITDA between $17 million and $20 million across the full year. We still expect to cover our operating needs and CapEx through cash we already hold, cash we generate, and continuing cost reduction efforts; we're also confident that additional credit could be brought onto the balance sheet, thanks to our strong asset base and improving profitability. And we're already examining options for improving the terms of our current facility so they better match where the business stands now. Naturally, we'll share any updates on that process whenever it's suitable. With that, I'll hand it back over to Bob.

Bob Rasmus executive
#5

Thank you, Shimon. Ahead of moving into the Q&A portion, I'd like to leave everyone with three main points. To begin with, our PAC segment keeps performing well, and its profit-generating capacity was on full display during this quarter. The second quarter is normally a period of seasonal softness, and even so, our adjusted EBITDA came in significantly above what we posted a year earlier, while gross margin rose by approximately 520 basis points compared with the same period last year. Now that the warm summer months have arrived, I have strong confidence in how the third quarter will shape up. Next, unlocking value throughout the company will be a primary area of emphasis over the coming months and quarters; that covers not just newer offerings such as our PAC for PFAS strategy, but also broadening the customer base, making operational performance more efficient, and achieving sensible cost reductions at every opportunity. I'm of the view that we can transform the current business into something considerably more efficient and profitable than what exists now. We're aiming to grow adjusted EBITDA by as much as 50%. Now that Shimon has joined us, I'm confident the correct leadership group is in place to execute this strategy. Finally, our PFAS strategy stays at the heart of our efforts to grow. It's my belief that maintaining discipline in how we allocate capital and return value to shareholders comes first. My aim is to provide top-tier solutions to our customers and, by doing so, generate robust returns for those who hold our shares, including myself, since I'm a substantial investor. The PFAS opportunity continues to be fundamental to our capacity for growth. We think PAC for PFAS can function as a lasting answer as well as an effective stopgap while we complete our plans for granular activated carbon. To wrap up, our core PAC operation keeps producing dependable results. Beyond PAC for PFAS, there are several paths to expansion that we are energetically pursuing. We're eager to bring you up to date on how we're advancing across every piece of this strategy. Having said that, I'll return the floor to our moderator so we can begin taking questions.

Gerard Sweeney analyst
#6

Let's begin with the GAC. I'm aware of the figure you provided; my recollection is it was $40 million to $60 million for CapEx. I'm not suggesting you won't take any action. However, given that context and that figure, that figure, I believe, lands in the territory where I think you previously stated you could utilize debt to chase this as an opportunity. Is that right?

Bob Rasmus executive
#7

That's accurate. Yet I also want to emphasize that the evaluation effort continues and that there are really 2 fundamental reasons behind that range. First, there are 2 distinct designs within the 25% contingency. What we're doing is refining and sharpening the features of our preferred design, which will let us further fine-tune the cost and tighten the scope of what we're doing. But our main priority, as I stated, is that we will only do what delivers the best value for our shareholders, what generates maximum shareholder value. And that means staying focused on transforming our core pack business. And although bituminous-based GAC is appealing, we won't chase it regardless of the price.

Gerard Sweeney analyst
#8

I just want to confirm that figure was included in a few of the calculations we talked about previously. Now moving on to PAC, specifically PAC for PFAS. Does anything about this product stand out on the manufacturing side or in terms of additives that lets it target the PFAS market? And my next question is a yes or no one: what amount of capacity can you sell into the PFAS market compared with, say, the foundational market?

Bob Rasmus executive
#9

Gerry, I'll take your second question first. We view the PAC business in its entirety. What we're doing, and what we've already done through the strategic optimization review, is figure out how to raise total capacity and how to best use our furnace time so we can produce and sell the largest possible pack volumes in connection with that. PAC for PFAS is essentially a custom-made answer for one particular market segment. That particular target market is sizable, and it's genuinely custom-made and aimed at those entities that are close to but not yet meeting compliance, who can use this specially formulated product to reach compliance. This product could be significant for ARC because of its appealing volumes, pricing, and margins. We would anticipate, and do anticipate, that the ASP for PAC for PFAS, along with margins, will be considerably higher than the ASP and margins we get from our standard PAC business.

Gerard Sweeney analyst
#10

What volume are you able to offer for the PFAS-to-PAC market?

Bob Rasmus executive
#11

Right. In certain ways, that figure remains to be determined, yet the truth is that should we do so well that we hit the limits of what we can produce — and we still possess a considerable amount of idle capacity — we would at that point swap PAC in for PFAS by cutting back on manufacturing some of the goods that bring in thinner margins.

Gerard Sweeney analyst
#12

And clearly, those are excellent results. What kind of a drag did the turnaround create during the quarter? Then I'll follow up on that, and I'll get back in the queue. But how much did the turnaround weigh on things? And clearly, as we head into Q3, the peak season, we ought to be expecting a really strong quarter.

Shimon Steinmetz executive
#13

Thanks, Gerry. Simon here. Turnaround costs came to $3.1 million, part of which we capitalized; as a result, that effect won't show up at all on the income statement. We capitalized the operational expenses, and we're going to amortize them across the next 2 years, correct? As for the turnaround impact that was expensed and won't recur next quarter, it's roughly — that effect comes to approximately $300,000 in expensed costs.

Bob Rasmus executive
#14

Alright. So look, there was a bit of expense involved, though it wasn't significant. I mean, a 38% outcome — we'd happily accept that any day; and as we head into Q3, it ought to be seasonally robust too, particularly when it comes to volume.

Shimon Steinmetz executive
#15

On top of that, we basically had the plant closed for 3 to 4 weeks as well. So that plays a role too, and it's not something you can tie straight to the financial statements.

Gerard Sweeney analyst
#16

Congratulations on an excellent quarter, and I'm happy to see the PAC for PFAS making progress. A number of my channel checks suggested this could be a really compelling opportunity, so I'm grateful for that.

Jason Tilchen analyst
#17

I'll begin with a quick follow-up to the previous question. When it comes to commitments tied to existing PAC production capacity — something that in the past has been seen as a good thing — could that potentially slow down how quickly you shift some of your current PAC output over to the PAC for PFAS side?

Bob Rasmus executive
#18

No, Jason. We have ample capacity available to us, and the strategic optimization review has allowed us to create even more. That, together with the cost reduction efforts we've made on the operations side, leaves us with ample room to serve the PAC for PFAS market.

Jason Tilchen analyst
#19

Regarding the extra capacity you found during this review, do you have a sense of how significant the needed investment would be, or when it might become usable?

Bob Rasmus executive
#20

That's a great question — no, the capital spending needed is de minimis, both for PAC for PFAS and for capturing those efficiencies. That's the reason Shimon, during his remarks, restated our full-year CapEx guidance, which sits in the range of $8 million.

Jason Tilchen analyst
#21

Then there's one more thing I wanted to ask. I'm attempting to connect a few of the points that came up. From what I understand, you mentioned that as things stand, no GAC output is anticipated for 2027, and the deck provided a 12-month build schedule serving as an approximate timeline. Should I take that to mean you won't reach any conclusion until this year is over, while you keep assessing how the PFAS test pilot might work with clients and customers? Or does it instead mean you're simply being cautious about how this proceeds, and a choice might come together earlier than that?

Bob Rasmus executive
#22

Being cautious is exactly how we're handling this process, which is the reason we've told people to anticipate zero bituminous GAC sales or production during 2027. Like I said before, we're focused on refining and improving the design, getting the cost down as much as possible, and then figuring out which path ahead delivers the greatest benefit to shareholders. So could a conclusion arrive later in the current year? Absolutely. And could that conclusion slip into '27? Absolutely.

Aaron Spychalla analyst
#23

To start, I'd like to revisit the PAC for PFAS. Could you explain whether those would be handled through contracts or on a spot basis? Also, what are the main gating factors, and what does the timeline look like for customer evaluation? Then, as a second question, is there any R&D investment that could become necessary as a result of this?

Bob Rasmus executive
#24

Yes. No, our expectation is that these would be contract sales rather than spot sales. So there would be a strong, repeatable business tied to that. The R&D work is already complete. The product was truly created through 2 routes: first, from conversations involving our sales force and our customers and potential customers, and second, through consultation with and development by our technology team, which, as I've consistently mentioned and you've heard from me, ranks as best-in-class. So that effort is finished. At this point, we're in the testing phase with customers and a target market group, and those early tests are very encouraging.

Aaron Spychalla analyst
#25

Apologies if this was covered already, but do you have any perspective on the testing schedule and when larger volumes might kick in?

Bob Rasmus executive
#26

Sure. The testing continues; a number of tests are already finished, and we're collaborating with customers. Some sales should come during the second half of 2026, with a meaningful contribution on volumes, ASP and gross margin arriving in 2027.

Aaron Spychalla analyst
#27

Okay. Then regarding that $40 million to $60 million for GAC, does that cover only Phase 1, or have you previously mentioned possibly considering both Phase 1 and Phase 2? I'm just attempting to grasp what larger requirements or expenses could be involved if you move ahead with an additional build-out.

Bob Rasmus executive
#28

That relates to Phase 1. Once more, so everybody understands clearly, Phase 1 involves 25 million pounds of bituminous GAC capacity. A portion of that spending would also serve a potential Stage 2, yet Stage 1 would need all of it.

Aaron Spychalla analyst
#29

Then, for my final question, let's talk about free cash flow. Now that the turnaround is finished, does the business look like it's near a $20 million EBITDA run rate? Could you outline your thinking on how EBITDA converts to free cash flow going forward?

Bob Rasmus executive
#30

Absolutely; my approach is to view it across a 2-year span, since the biennial plant turnaround has to be taken into account. Shim said in his remarks that we expect this to keep occurring every 2 years. So considering CapEx of $8 million to $10 million annually, and bumping that up somewhat for growth and/or inflation; let's say $20 million at the high end, or even $22 million or $24 million at the high end across a 2-year period. And it depends on whether you use $20 million of EBITDA or $30 million per year. That means you're producing $40 million to $60 million of EBITDA, while spending about $24 million at the absolute high end, I think, for CapEx during that stretch; so free cash flow comes out somewhere between $16 million and $26 million.

Tim Moore analyst
#31

Seeing the adjusted EBITDA margin bounce back to that elevated level absent the GAC drag was encouraging. First off, my question goes to Shim. We're aware you've only held the position a short while, and part of what I'm asking may be unfair, yet perhaps you've had a chance to look within the company since the announcement of your hiring in late May. Could you share an initial, preliminary impression — maybe your first read on commercialization and the potential for accelerated growth? Bob has discussed certain strategies, and I'd just like to hear what you're observing as the company gets going.

Shimon Steinmetz executive
#32

Certainly. Thanks so much for asking. As you said, I was named 2 months ago, though I've actually occupied the seat for only about 10 days at this point. Even so, what excites me the most is genuinely the demand and the strength in the existing tech business, since that product still enjoys tremendous demand, which we saw this quarter through upsized volume and pricing ability in the quarter. Beyond that, the new launch of PAC for PFAS adds further strength in that core capability, with some pricing protection. That's a higher-margin business. So in the end, once the high-demand PAC business stabilizes, we'll continue to have pricing power with the PAC for PFAS element. Clearly, I needn't mention that people are very excited. Across all my management meetings and discussions, and in learning where things stand and how the business is running, the executive management team is fully engaged. They grasp the setback of the GAC plant and are fully aligned, seeking new products, new cost opportunities, et cetera, to get the business back in fighting shape. And that leads me to the last opportunity. There are significant opportunities to take cost out of the business. We have already identified about 5 different categories of non-people-related cost reductions that are timely. We need to negotiate them. We need to sharpen the pencil and find them; but I believe there's significant opportunity to generate cash just through cost removal.

Tim Moore analyst
#33

That's genuinely useful context, and it was great to hear about what's happening in there, particularly since you've been involved for under 2 weeks. I simply wanted to ask a bit more about something Bob said in his prepared remarks. He brought up, I believe, the objective of a 50% rise in EBITDA. Then he walked us through the possible EBITDA range, perhaps $30 million to $40 million when it comes to free cash flow conversion. I just want to confirm that this 50% increase and that $30 million to $40 million EBITDA figure; all of it excludes GAC. I just want to make sure of that.

Bob Rasmus executive
#34

And let me make sure I understand what you're asking, Tim. First, what I meant was, that $30 million is our target for next year when it comes to cost takeout and also product expansion. That works out to a 50% rise above the top end of this year's target, the guidance we've provided, which is roughly a 45% gain versus the previous year on that measure. I don't believe I brought up $40 million except in connection with a 2-year timeframe there, not one year.

Tim Moore analyst
#35

That works for me. Targets appeal to me, and that seems like a solid one. I simply want to confirm this excludes GAC, and that perhaps within 2 years you might reach $40 million?

Bob Rasmus executive
#36

Correct. No, definitely. Building the greatest possible shareholder value is our focus, our complete focus. And our primary PAC operation has become one that keeps expanding. What matters most is that bituminous-based GAC isn't what drives our growth, though that was previously the situation. Therefore, whenever we discuss these figures, there's no value, no earnings potential, no contribution coming from bituminous-based GAC.

Peter Gastreich analyst
#37

Nice job on the numbers. It's encouraging to hear that you're locking in the approach for PAC on PFAS, plus a few of those other levers. I want to begin with what's happening across the industry. Palagon recently said they're raising prices globally by as much as 25%, starting next month; and I realize Bob is not going to discuss what rivals are doing, but I'm just wondering whether you could give a big-picture take on what's driving the industry. Looking at it from a market standpoint, is it simply tight supply? Is it higher costs? Does imported material play any role here? Or is it everything at once? I'm just curious how you'd describe the landscape as we head toward the close of this year.

Bob Rasmus executive
#38

A few points, and like you said, I won't get into why our competitors do what they do; but as an organization, we've been very successful at lifting our ASP throughout the past 12 quarters. Costs have gone up; that's why we're concentrated on bringing those costs down everywhere; we've also observed a tight market; and when it comes to particular parts of that market, even though we have yet to reach a go or no-go determination regarding GAC, that market is still very robust. When it comes to cleaning up PFAS and helping water utilities hit the 4 parts per trillion threshold, bituminous-based GAC continues to be the top technology available; and the PAC for PFAS, as I said, serves as both a near-term opening and possibly a lasting answer for some; but that, once more, without wandering off topic, I believe ties back to a tight market, and I believe it ties back to broader inflation from a cost standpoint.

Peter Gastreich analyst
#39

For my second one, I've got a technical item that sort of builds on what we discussed regarding PAC for PFAS. Assuming I've got this right, then essentially the PAC for PFAS handles the issue in part; in other words, does that mean it's able to reduce PFAS to some specific parts per million, which doesn't quite get us all the way to compliance, yet moves us partway? Is that how it should be viewed?

Bob Rasmus executive
#40

No, it isn't. What PAC for PFAS accomplishes for one particular market segment that sits near compliance but isn't there right now is that they're able to deploy our PAC for PFAS offering to bring themselves into compliance. That delivers 2 advantages. First, clearly, is being compliant ahead of the EPA rules regarding allowable PFAS in the water system. Second, they're able to rely on equipment they already have and avoid the CapEx, which at times can be significant, of installing GAC systems so they can satisfy those standards; that applies to one specific slice of the marketplace. There's a separate, very sizable slice of the marketplace that might also use PAC for PFAS. Yet eventually, the volumes required for that slice to reach compliance make using the GAC the more cost-effective route. Our focus is on that market along with those customers and prospective customers that sit near compliance but aren't there yet, where PAC for PFAS represents an economically appealing substitute for bituminous-based GAC.

Peter Gastreich analyst
#41

And do rivals exist that could provide this too?

Bob Rasmus executive
#42

Our view is that when it comes to that, we're pretty much one of a kind.

Peter Gastreich analyst
#43

Alright, let me ask one additional item, actually two more items, simply to clarify things. Regarding the GAC CapEx range, to make sure I have it right, does it run $40 million to $50 million, 5 to 0, or does it run $40 million to $60 million, 6 to 0?

Bob Rasmus executive
#44

It runs $40 million to $60 million, 6 to 0, and that figure reflects the 2 designs; however, as I mentioned, one design is our preferred one, and we are striving to complete it and refine the numbers where that design is concerned.

Peter Gastreich analyst
#45

for that particular design and within that bracket, are we thinking about one specific capacity number, or does that figure also cover a span of possible capacities?

Bob Rasmus executive
#46

the capacity we have our eye on comes to 25 million pounds of GAC. As I noted before, a portion of that spending would serve a possible second line, should we ever choose to build one. Regardless, the full amount of that outlay — be it 40 million, 50 million, or 60 million — would be needed in order to get to that 25 million pound capacity.

Bob Rasmus executive
#47

Thanks, Dylan. Granular activated carbon has clearly been top of mind for investors, and deservedly so, but I believe the market is viewing us incorrectly. When we initially laid out a route to $30 million of EBITDA driven by granular activated carbon, our valuation sat at about 10x that projection; today we have traveled close to 2/3 of that distance, and yet we trade below 5x this year's guidance and at roughly 3x our $30 million target. We recognize that each business grows at a different pace, but we see a disconnect, and it stems purely from the fact that this EBITDA is being delivered through a different product mix; ARC has been transformed so that our growth no longer depends on granular activated carbon. Our attention has been, and will remain, on making our foundational PAC business as strong as possible, and our guidance, performance and expectations for 2026 capture significant gains in that core business, in both relative and absolute terms. Furthermore, following our strategic optimization review, we are confident we can make the PAC business considerably more efficient and profitable than it is now, and more profitable than what we anticipate for 2026. Those gains will be achieved through new products- products plural, not merely PAC for PFAS- along with broadening our customer mix, simplifying operations, raising effective furnace capacity, and capturing cost savings at every opportunity. As I said before, we aim to lift adjusted EBITDA in our core PAC business by as much as 50% while keeping the granular activated carbon optionality intact. I appreciate everyone's time today and your ongoing interest in ARC, and we look forward to giving the market more updates.

Operator operator
#48

That brings us to the end of today's teleconference. At this point, you're free to drop off your lines. We appreciate you taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Arq, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Arq, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.