Home / Transcripts / Barfresh Food Group, Inc. (BRFH) · August 14, 2026

Barfresh Food Group, Inc. (BRFH) Earnings Call Transcript

August 14, 2026

NASDAQ US Consumer Staples Food Products earnings 31 min

Earnings Call Speaker Segments

Riccardo Delle Coste executive
#1

Good afternoon, everyone, and thanks for being with us on this call about our second quarter 2026 results. Let me begin by laying out the larger picture of where things stand. Barfresh is currently in the midst of a transformation — moving away from complete reliance on third-party co-manufacturers toward owning and operating its own production. Three areas of the business were affected by that effort during this quarter. Those are our commercial momentum in the education channel, the ramp-up at our existing Arps Dairy facility, and the build-out of our bigger plant in Defiance, Ohio. Each of the three advanced during the second quarter, even if the pace was slower than we would have liked on some fronts. I'll go through them one at a time. After that, Lisa will walk you through the numbers in detail. Turning to the commercial side, this year is focused on stabilizing the business, bringing production control in-house, earning back customer trust, recovering the customers lost because of supply interruptions, and positioning ourselves for a strong 2027. Revenue for our Frozen Beverage and Food segment, which consists mainly of legacy Barfresh products, rose 9%, largely on the strength of contributions from Arps Dairy. Together with the Raw and Processed Milk segment, which contributed $2.9 million of revenue during this quarter, the acquisition successfully generated top-line growth and let us reengage with customers to rebuild the legacy Barfresh business; we're eager to see those rebuilding efforts bear fruit in the second half of 2026. The production side is where we came up short. Results for this quarter came in under our expectations. Ramping up at the existing Arps Dairy facility took more time than our model assumed. The additional cost associated with that slower ramp-up weighed on both our gross margin and adjusted EBITDA beyond what we had planned for when guidance was issued back in May. At the midpoint of this year, we've decided to take a more cautious view regarding the pace at which production will return to normal levels. Lisa will go over the updated full-year guidance in a moment, and that change is captured there. Our confidence in the size of the prize once the manufacturing platform runs at full capacity remains exactly where it was—nothing here shifts that belief. Now I'd like to walk you through more specifics about the causes behind the shortfall and how we're responding, starting with why we made the acquisition in the first place. Acquiring Arps represented a vital move strategically, because co-packers had become something we relied on. The broader scarcity of cultured dairy manufacturing capacity had exposed us to risk. Certain co-packers chose not to renew their agreements, while others simply were unable to supply the volumes we required. Acquiring Arps was essential for guaranteeing continuity of supply within a supply chain that was already under strain. And that is precisely what it has provided. We managed to produce our goods and keep up sales to our customers, and that was our main goal for the year — getting supply stabilized. That being said, the expense has ended up greater than we first expected, because of the shape of the infrastructure and equipment at the old Arps facility. When we began running the volumes we required, we pushed some of that infrastructure and equipment to its limits, and we had no choice but to carry out the repairs needed so our products could run dependably. Getting the facility to operate at the volume we require with our products has demanded more labor and money than we had projected. Those elevated costs are the ones showing up in our margin and operating costs during this quarter. I'd like to offer additional detail about the state of the plant itself, since it clarifies much of what took place this quarter. The facility was older, and the equipment and infrastructure required more fixing and care than we had expected. Much of this didn't become apparent until we started producing our own items and once ice cream volumes began climbing. At that point, the facility couldn't consistently handle both Barfresh products and the ice cream operation at the same time without one undermining our capacity to fulfill the other. So the ice cream operation was moved elsewhere, which lets us now direct the plant's capacity and our enhancement work toward Barfresh products and toward building the larger-scale capability that both lines will need moving forward. Our plan is to return the ice cream operation to the plant once the rest of production is completely stable and we're regularly hitting the volumes and efficiencies we're aiming for. This did affect both our revenue and our profit during the quarter, but we see it as short-term and essential for keeping our attention on our main branded offerings. On a positive note, we've made major gains in how much we can produce at the older plant, which allows us to keep serving customers, and we expect that progress to continue across the second half of the year and all the way until we relocate to the new plant. Our people are handling equipment setup, training and fine-tuning processes, and completing work on the bigger 44,000 sq ft site in Defiance, Ohio, is at the heart of that work. Our goal is to get part of the core products commissioned by the close of 2026, with the remaining products coming online soon afterward. Once it's up and running, we anticipate a significant boost to our throughput, efficiency, and profitability. This continues to be our number one operational focus; regarding the new facility in particular, we're still finalizing the plans for finishing construction and installation. There's a $2.4 million grant that's been approved for us, and we have to spend it by year-end — we're on schedule to make that happen. The convertible note funds were meant to pay off the mortgage on the property, and that is precisely what took place. At this point, the property and building are owned outright, with no debt against them. We've consistently stated that we intend to secure a fresh mortgage along with extra equipment financing so the project can be finished. Project costs have risen beyond what we originally expected, and the figure keeps shifting; it's possible we'll have to tweak our strategy so the economics pencil out; that part is not yet settled, and we're in the middle of working it out. We anticipate margin getting better during the latter half of the year as throughput rises at the old facility. After the new facility begins operating, we anticipate much stronger margin gains, plus more capacity for products we already have and ones that are new. All told, this acquisition represents a major strategic pivot for the business. It guaranteed we could continue serving our customers, which we've managed to do, and it let us eliminate most of our co-packers. When construction at the new facility wraps up, we'll be in charge of our own manufacturing, positioned for profitability, and presented with numerous paths to profitable growth. That's the operational picture. Turning to the commercial picture, the Education channel is where our focus lies, and it's still our biggest near-term opportunity. We continued growing our customer base during this quarter. Several educational institutions we recently signed on began using our offerings during the 2025/2026 academic term, and we expect deployment at every one of their locations by the 2026 to 2027 term. As further contracts for the current year are finalized ahead of the upcoming academic term, we look forward to announcing additional new educational channel victories in the coming weeks and months. Word about the strides we've made in manufacturing and the dependability of supply we're building continues to circulate through our broker network, and that narrative is resonating as we win back former customers and add new ones prior to the start of the next academic term. That covers the big picture — now I'll pass it to Lisa, who will walk us through the figures.

Lisa Roger executive
#2

Thanks, Riccardo. I'd like to take you through the details of what we reported for the second quarter of 2026. Our revenue came in at $4.7 million for Q2 2026, up from $1.6 million during the same quarter in 2025 — that works out to 190% growth compared with a year earlier. Arps Dairy added $3.2 million to revenue, which included $2.9 million from Raw and Processed Milk sales, while revenue from our Frozen Beverage and Food segment — made up mostly of legacy Barfresh products — rose 9%. For the second quarter of 2026, we recorded a gross loss of $150,000, equal to -3.2% of revenue, versus gross profit of $506,000, or 31.1% of revenue, in the second quarter of 2025. Startup and implementation costs, along with productivity that fell short of what we anticipated at our existing processing facility as it keeps ramping toward full-scale operations, drove that decline. Selling, marketing, and distribution expense for Q2 2026 totaled $561,000, which is 12% of revenue, down from $634,000, or 39% of revenue, in Q2 2025. That year-over-year improvement came from lower personnel costs as we lean more on our broker network, reduced equipment maintenance costs thanks to a higher mix of single-serve products, and the addition of Raw and Processed Milk sales, which bring minimal distribution overhead. G&A expenses reached $794,000 in the second quarter of 2026, up from $673,000 in the same period a year ago, largely due to higher personnel recruiting and other administrative costs tied to the Arps Dairy business. Our net loss for Q2 2026 was $1.9 million, compared with a net loss of $880,000 in the second quarter of 2025. Adjusted EBITDA for the second quarter was a loss of roughly $1.2 million, versus a loss of roughly $600,000 in the prior year period. You can find a reconciliation of net loss to adjusted EBITDA in our earnings release. Now let's look at the balance sheet. As of June 30th, 2026, our balance sheet showed approximately $1.4 million in cash and accounts receivable, along with approximately $2.2 million of inventory. Back in March 2026, we closed a $7.5 million senior convertible note financing. Those proceeds went toward paying off the existing mortgage on our manufacturing facility in Defiance, Ohio, plus other obligations. On top of that, we had previously been approved for a $2.4 million grant to buy and install specialized equipment needed for full-scale production operations, and that grant has to be utilized in 2026. Given our first half results and the slower-than-anticipated ramp in production efficiency at our existing facility, we're revising our full year 2026 guidance. Because of the removal of the ice cream mix production and slower growth stemming from the last school year's supply constraints, we now expect fiscal year 2026 revenue of $23 million-$26 million, which represents 62%-83% growth compared to fiscal year 2025; we now expect fiscal year 2026 adjusted EBITDA of -$1 million to -$2 million, and we expect to be adjusted EBITDA -$0.5 million To breakeven in the back half of this year. There are a few more details I'd like to share regarding the revision to our adjusted EBITDA outlook for fiscal year 2026. Roughly $1.8 million stems from increased processing expenses at Arps Dairy, and about $0.8 million comes from losing the Arps Dairy ice cream mix business, which resulted from production problems tied to equipment and infrastructure limitations. A further $0.8 million is tied to rising material costs, with approximately $0.6 million coming from a postponed revenue recovery for legacy Barfresh product lines, plus another $0.6 million connected to other synergies that have not yet been achieved, mainly involving inbound and storage freight as well as cold storage costs. We do anticipate revenue will strengthen on a sequential basis during the third and fourth quarters of 2026, driven by new school district wins ramping up for the 2026 to 2027 school year and by continued gains in production efficiency at our current facility; at this point, I'll hand the call back to Riccardo for closing remarks.

Riccardo Delle Coste executive
#3

Thanks, Lisa. Now, ahead of the Q&A, I'd like to wrap up with a handful of points. To start, during Q2 our Education channel kept recovering, and we anticipate a robust second half as fresh school district contracts and repeat buyers scale up heading into the 2026 to 2027 academic year. Next, this quarter's results landed under what we had projected, which stemmed from a productivity ramp that moved slower than intended at our current Arps Dairy site. Those inefficiencies are being tackled, gains are already visible, and we anticipate ongoing sequential gains throughout the year. Third, getting our 44,000 sq ft Defiance, Ohio building finished stays our number one operational focus. In our view, that site will mark a significant step change for our production economics after it's commissioned. And fourth, nothing has changed regarding how confident we are in the long-term potential ahead once our integrated manufacturing platform is completely live. When the new plant is up and running, we'll hold an outstanding platform for expanding sales across existing products within our current and new channels, plus new products within our current and new channels. At present, we stay committed to reliably serving our key education customers while we rebuild toward the growth this business can, we know, achieve. Having said that, I'd like to hand the line over for questions. Operator?

Anthony Vendetti analyst
#4

Thanks. Riccardo, I want to get a clearer picture here. What was the actual problem that forced you to shift ice cream manufacturing away from that site? You mentioned that conditions should get better in the back half — but has that problem been fully resolved, or is it still being worked on?

Riccardo Delle Coste executive
#5

It's somewhat of a mixed situation. All of these things connect to one another. Once we began producing at the older plant and ramped up output while reducing our reliance on co-packers, it became clear that both the infrastructure and the machinery required more work than we had initially anticipated. Because of that, our capacity to make products when we needed them was seriously constrained. Relocating the ice cream portion — particularly during the peak season across the summer — became unavoidable. It also gave us a chance to concentrate on the smoothie items, and we've achieved meaningful gains in producing those in-house and raising throughput. Week by week, things keep getting better as various areas of the old plant get upgraded, maintained, or swapped out. We've delivered a substantial improvement. What shows up in the Q2 results reflects obviously lower seasonal sales, and beyond that, it was still early in the build-out of production, so significantly more expenses were flowing in throughout that stretch. We've implemented numerous enhancements along the way, and we keep enhancing efficiency and yields from the production facility we're running today. We anticipate further gains as we move through the rest of the year, thanks to all the infrastructure and equipment upgrades already completed — much of that work is now behind us.

Anthony Vendetti analyst
#6

When you first conducted due diligence on that facility, did it simply lack sufficient depth? Clearly, as you mentioned. Yeah.

Riccardo Delle Coste executive
#7

Yeah, it was thorough. What we struggled with was that, given the particular items we make, we couldn't evaluate it at full capacity, essentially, using our real output. Sure, the machinery existed, sure, the machinery had been examined, yet only once the strain began being applied to the whole site and simultaneously to the ice cream operation did those additional shortcomings surface more clearly.

Anthony Vendetti analyst
#8

Regarding those school agreements you've secured, and the fact that you managed to get the ice cream out there — I'm not sure how fast you pulled that off — but did you manage to satisfy every one of those school contracts for Twist & Go?

Riccardo Delle Coste executive
#9

100%.

Anthony Vendetti analyst
#10

In the.

Riccardo Delle Coste executive
#11

Absolutely.

Anthony Vendetti analyst
#12

Okay, good.

Riccardo Delle Coste executive
#13

Yeah.

Anthony Vendetti analyst
#14

Okay.

Riccardo Delle Coste executive
#15

Absolutely. Beyond even that, throughout the summer months we've been accumulating stock, and thanks to our weekly output, our manufacturing capability is adequate to satisfy those requirements. That's truly the reason we had to invest in upgrading the infrastructure along with the machinery at the old facility, enabling us to accomplish this, and accomplish it we have. When it comes to supplying goods for our customers and our contracts in the education channel, we've gotten that squared away and we feel quite confident about it, and we're already making product in order to do so.

Anthony Vendetti analyst
#16

Part of the EBITDA loss guidance you gave includes what it costs to bring the production facility up to the speed it can ultimately handle and to eventually absorb the ice cream production adequately at some stage. Do you believe any further CapEx is required to make sure that occurs either more quickly or with less chance of becoming a manufacturing/production problem down the road?

Riccardo Delle Coste executive
#17

There could be a few smaller items, though we believe we are now near the end of that with the existing facility. Attention has shifted at this point to the new facility.

Anthony Vendetti analyst
#18

All right. So regarding Twist & Go specifically, or dairy too, though I'm focused more on Twist & Go — that product needs a certain protein level, which clearly comes from the yogurt-type blend inside it. When it comes to what it costs to make that item, what kind of inflation are you observing? Have those costs gone up, or are they fairly flat?

Riccardo Delle Coste executive
#19

Yes, they've gone up. Once again, it's somewhat of a mixed picture. Certain ones increased, while on others we managed to achieve some savings. Even so, we keep exploring options to offset whatever cost hikes arise, plus reformulating when we can, to make the product more efficient and capture savings on ingredients.

Anthony Vendetti analyst
#20

All right, excellent. I'll jump back in.

Riccardo Delle Coste executive
#21

Like Lisa sort of brought up, we do have a per-case cost target, correct? The 2 pieces she went through were $1.8 million in cost variance tied to getting the Arps Dairy facility up and running — clearly the biggest gap versus our guidance — plus another $800,000 related to the ice cream business. So when you take just those 2 figures, they're clearly the 2 largest individual drivers. So once we reach the per-case rate we expect on the manufacturing side, which depends entirely on equipment, processing speeds, and reliability, that should be an easy gain as soon as those targets are hit. In the same way, simply restoring the ice cream business, if that's ultimately the path we take, that's yet another fairly meaningful contribution, or.

Lisa Roger executive
#22

Right.

Riccardo Delle Coste executive
#23

Explanation for that part.

Lisa Roger executive
#24

Yes. Regarding what you mentioned on the cost of materials, that comes to an additional $800,000, and our view of it is through the lens of possible reformulations or other chances to save on costs.

Anthony Vendetti analyst
#25

Understood. That's because the.

Riccardo Delle Coste executive
#26

Just those 3 pillars by themselves carry a lot of weight, and they fall squarely inside what we can influence when it comes to making things better.

Anthony Vendetti analyst
#27

All right. Since, on the whole, I realize that the gross margin on the dairy operation is far smaller compared to what you get with Twist & Go, is that right?

Riccardo Delle Coste executive
#28

That's right. Yes. Which is exactly why our attention is squarely on the Barfresh items.

Anthony Vendetti analyst
#29

Sure. That makes sense. All right. I'll get back in line. Appreciate the additional detail.

William Gregozeski analyst
#30

Hey, Riccardo. You just said that, I guess, with school sales, everyone's receiving the product they want. Compared with the first half a year ago, Barfresh sales are up only slightly. With all the school signings, why aren't we seeing greater demand?

Riccardo Delle Coste executive
#31

Well, two things. We clearly faced supply constraints, and that's exactly why we made the acquisition to begin with. We understood heading into this year that certain customers who had the product were forced to remove us from their menus since we couldn't supply them. This year was really focused on getting manufacturing operational and communicating with customers. That harm had already been caused last year, if you will. As we enter the new school year, we're gaining new customers and winning customers back, but we won't see that until the following school year, which is beginning to take shape now. For many school districts, the first half of the year is still a carryover from the prior school year, correct?

William Gregozeski analyst
#32

Understood. So as things stand right now, are you able to serve the schools you already have, the ones you lost, and the new ones for the school year that's coming up?

Riccardo Delle Coste executive
#33

That's right. Yes. Going by our projections, yes, we can.

Lisa Roger executive
#34

Yeah. We continue to have support from.

Riccardo Delle Coste executive
#35

Once more, it all circles back to that.

Lisa Roger executive
#36

Co-manufacturers are still backing us too; we aren't entirely dependent on Arps, and that's a positive, since ramping up and reaching efficient production capacity has taken us some time.

Riccardo Delle Coste executive
#37

Yeah.

William Gregozeski analyst
#38

All right. So third-party manufacturing is still being used for a portion of this?

Lisa Roger executive
#39

That's right.

William Gregozeski analyst
#40

Alright.

Lisa Roger executive
#41

With regard to our 10-Q, it includes something of a breakdown showing the work we performed in-house as well as the work handled by co-manufacturers.

Riccardo Delle Coste executive
#42

Again, that comes back to the reason for really focusing on the Barfresh products.

William Gregozeski analyst
#43

Yes. All right. Since the guidance doesn't break this out, I'm not sure whether you're able to tell us, but for the last six months of the year, how should we think about the way the two lines — Barfresh and Arps — divide up? In other words, will Barfresh account for a big chunk of that?

Lisa Roger executive
#44

All of the growth comes from Barfresh, since Arps simply involves steady milk producing components. So yes, the fluid milk segment you're seeing tends to stay pretty stable all the way through. Growing that piece isn't part of our plans.

William Gregozeski analyst
#45

All right. After that, you brought up matters around financing and all of that. Is there any possibility that you folks will need to return to the market in order to bring in capital?

Riccardo Delle Coste executive
#46

That isn't something we intend to do. The property is ours outright, with no debt against it. So what we intend is to secure a mortgage against that property, which forms one piece of the plan, alongside other choices for financing equipment that exist — that is what we're looking at currently.

William Gregozeski analyst
#47

Okay. All right. Thanks, guys.

Operator operator
#48

Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Barfresh Food Group, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Barfresh Food Group, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.