Good morning, everyone, and welcome to the Third Quarter 2026 Earnings Conference Call of Blackstone Digital Infrastructure Trust. Joining me today are Nick Pell, President and Chief Executive Officer; Mike Forman, Chief Investment Officer; Tony Marone, Chief Financial Officer; and Andrew Winchell, Executive Vice President of Strategy. This morning we filed our 10-Q and released a press release summarizing our results, along with an 8-K and an investor presentation announcing our inaugural transaction; all of these are available on our website and have been filed with the SEC. I'd like to remind everyone that forward-looking statements will be part of today's call, and those statements carry risks, uncertainties, and other factors beyond the company's control. Actual results could differ materially. To learn about some of the risks that might affect results, please see the Risk Factors section in our prospectus dated May 13th, 2026, as supplemented by our most recent 10-Q. You can access these filings, and our other filings with the SEC, on the SEC's website at www.sec.gov; we assume no duty to update forward-looking statements. We'll also refer to certain non-GAAP measures on this call. Reconciliations of historical non-GAAP measures can be found in the press release and the 10-Q. This audiocast is copyrighted material of Blackstone Digital Infrastructure Trust and may not be duplicated without our consent. Turning to our results, for the third quarter we reported GAAP net income of $0.15 per share, while funds from operations, or FFO, came in at $0.15 per share, and adjusted FFO, or AFFO, was $0.17 per share. Since BXDC remained substantially invested in cash during the third quarter and had no real estate operations, our results for the quarter are not representative of the earnings profile we expect once our first transaction closes, which we anticipate will happen late in the fourth quarter of this year. With that, I'll now hand the call over to Nick.

Nick Pell executive
#2

Appreciate that, Tim. This marks a major step forward for BXDC. We're pleased to share news of our inaugural investment: a controlling interest in a pair of newly constructed powered shell data center campuses, structured as a sale-leaseback transaction with Amazon. This is a landmark deal, struck directly with an investment-grade hyperscaler, and it showcases Blackstone's deep relationships with the largest global firms — the companies underpinning the AI and digitalization megatrends and the most relevant customers for BXDC's investment approach. From the time we went public, finding the right assets to create a dependable base for predictable cash flows, future growth, and long-term shareholder value has been our top priority; we scrutinized numerous deals against the rigorous criteria of our established investment approach, continually assessing opportunities as market conditions changed. That disciplined method, we believe, has delivered results, because we navigated capital markets turbulence successfully and have now secured a distinctive, high-quality investment for our shareholders that strongly strengthens Blackstone's position as a premier capital solutions provider in the rapidly expanding stabilized data center sector. To begin, I’ll walk through the deal in depth, and then I’ll discuss the strong pipeline of opportunities in front of us. We have executed a definitive agreement to purchase 75% controlling stakes in a portfolio valued at $5 billion, consisting of 13 powered shell data center properties situated on two campuses, with aggregate power capacity of approximately 50 megawatts. These facilities are newly constructed and entirely leased to Amazon under triple-net terms, with an initial lease period of 12 years and 32 years when fully extended. Importantly, Amazon will act not only as our tenant but will also retain a 25% minority stake as our joint venture partner, which, among other advantages, demonstrates significant long-term alignment. These assets are coming to us at a 7% going-in cap rate — the high end of what we target — and that's a very appealing entry point when you consider how creditworthy our investment-grade rated tenant is. We additionally managed to craft the lease so it fits Amazon's operating model and our emphasis on dependable cash flows with minimal continuing landlord obligations, which is another result that came out better than what we had anticipated for turnkey data center assets. On top of that, the lease carries 2.75% yearly rent escalators, and those underpin an 8.1% GAAP yield along with solid organic AFFO per share growth, all while keeping Amazon responsible for operations and maintenance of the assets. Taken as a whole, we think these terms comfortably exceed what we told investors to expect at the IPO, and they more than make up for the increased cost of debt financing. That produces an initial AFFO yield somewhere in the low-to-mid 5% range, compared with the mid-to-high 4% illustrative yield we presented on the roadshow. Beyond that, our investments carry several other appealing features: a cost basis over 50% under the projected turnkey replacement cost, rents over 70% lower than what comparable turnkey assets command in these markets, the significant spending on servers, racks, and mechanical and cooling equipment — all of it funded and maintained by the tenant — and an Amazon parent guarantee covering the lease payment obligations. Two markets make up our portfolio, which is diversified, and more than two-thirds of it sits in Northern Indiana. Within the broader Chicago data center market, that area ranks as the fastest-growing submarket, and it is experiencing robust demand because of strong connectivity, advantaged power pricing, scale, and development headwinds in Illinois. Essentially every major workload can be supported in this location. Our Northern Indiana assets are located just 60 miles from downtown Chicago and within 1 to 2 milliseconds of latency to Chicago's major interconnection hubs, which means they can serve AI training, inference, and core cloud. These highly desirable Indiana attributes are driving the four largest hyperscalers to grow their footprint here significantly over the next two years. Indiana today already matches the Chicago market in size. By the end of 2028, we anticipate Indiana will grow to more than three times its current size, ending up 50% bigger than metro Chicago. On its own, that would rank it as the sixth-largest data center market nationwide, and combined with Chicago it would be the fifth-largest. Our remaining portfolio is located in Mississippi, an emerging hyperscale market that offers considerable power access thanks to its position in the energy-rich Gulf. Thanks to robust connectivity to Atlanta and Dallas, this market is also able to accommodate a wide range of use cases, spanning AI training, inference, and cloud. Amazon itself is making a similar bet, having publicly shared intentions to put substantial money into data center infrastructure throughout the state. Taken as a pair, these regions provide the electricity capacity, network links, and operational conditions that hyperscale operators require — the reason each serves as a vital hub for Amazon and the reason the company keeps putting capital into them. Our willingness to commit in these areas demonstrates BXDC's distinctive capacity to anticipate where markets are heading and to secure attractive risk-adjusted yields, a clear benefit of the deep insight into the data center sector that we draw from Blackstone. Bringing it all together, we are glad to present a transaction that, in our view, satisfies every criterion we set out at the time of our IPO. The assets we just delivered are essential to operations and sit mostly in a Tier 1 market. Long-term triple-net leases cover them entirely, and the tenant is an investment-grade rated hyperscaler that is aligned with us on a long-term partnership. Both the going-in cap rate and the rent escalators land at the top of the ranges we target, and we expect that to produce strong returns for investors. These powered shell assets came at an attractive basis, which provides downside protection and raises the odds of renewal, positioning us for long-term value creation. We think that being able to collaborate closely with Amazon on a tailor-made solution for their objectives played a key role in creating an attractive deal for both sides, and we're eager to proceed together toward completion by the end of the year. We also see this deal as signaling a meaningful change in the way hyperscalers think about allocating capital, which strengthens the opportunity set ahead for BXDC. Given that capex is projected to surpass $800 billion in 2026 by itself and to rise even more in 2027, hyperscalers require access to a wide range of capital sources. They've clearly diversified the ways they fund growth, tapping both debt and equity markets; and now that those markets are dealing with dislocation, we think sale-leasebacks represent another significant capital source for hyperscalers, especially when certainty of execution matters most. With that in mind, we see BXDC as well positioned to serve as a long-term capital solutions provider, and we regard the hyperscaler sale-leaseback market as one more avenue of growth for us, an avenue that doubles our total addressable market to more than $2 trillion by 2030, and we look at this transaction as a solid blueprint for deals to come. Investor attention has clearly centered on the recent volatility in the capital markets. What matters here is our belief that volatility will continue to generate attractive opportunities for BXDC, especially given that our investable universe is set to grow substantially in the near term. The roster of potential investments we described at the time of our IPO continues to expand, with fresh data centers reaching the market each quarter. Just in 2027, we are monitoring over $300 billion of newly built data centers owned by developers and hyperscalers that are slated to come online across the United States, and we expect still more to arrive in 2028 and later years. Keep in mind that more than 50% of the deliveries we anticipate for 2027 sit outside the traditional Tier 1 markets — they're in emerging hubs like Richmond, San Antonio, and Reno. That pattern demonstrates how limited supply is driving demand across state borders toward operating environments that offer more fertile ground. Quite a few of these places are going to turn into tomorrow's Tier 1 markets, in much the same way Phoenix, Atlanta, and Columbus have matured into established Tier 1 locations over the last several years. Even though Tier 1 markets stay our main focus, we think we might also uncover additional opportunities that suit our strategy in high-growth markets, as those markets continue drawing hyperscaler customer demand and evolve into more established data center markets down the road. We think BXDC's first deal provides a solid base for seizing the huge market opportunity in front of us, and it plainly demonstrates our capacity to craft innovative capital solutions and produce appealing risk-adjusted returns for shareholders amid a shifting market. Blackstone's worldwide platform—its size and its distinctive sourcing pipeline—opens the door for us to a broad range of on- and off-market transactions. Since BXDC is currently the sole publicly traded company focused on buying stabilized data centers, it holds a unique place from which to seize this very attractive investment opportunity. Thanks again for your time and for backing BXDC. I'll now turn things over to Tony, who will go through our financial results.

Tony Marone executive
#3

Thanks, Nick, and good morning to all of you. Starting with what we posted for the third quarter: GAAP net income came in at 15 cents per share, FFO was 15 cents per share, and AFFO reached 17 cents per share. Interest income from cash and cash equivalents totaled $18.9 million during the quarter. On the expense side, G&A was $1.8 million, and interest expense was $1.6 million, with that latter figure reflecting fees associated with our revolving credit facility. Just a reminder that during the quarter closing September 30th, 2026, we had no real estate operations, so we don't consider these results to be indicative of our near-term or long-term earnings power. On the balance sheet side, we ended the quarter with $2 billion in total assets and GAAP book value of $19.34 per share. That was essentially all in cash and cash equivalents, because we had no debt outstanding; we also still had $1 billion of unused capacity available through our revolving credit facility. As Nick described, following the quarter's end we entered into a definitive agreement with Amazon covering a sale-leaseback transaction, which is our first investment. That deal carries certain closing conditions, and we anticipate completing the investment before the year is out. Assuming nothing else changes, our fourth-quarter numbers should come in largely in line with what we saw in the third quarter for the stretch before the closing date, and after that we think our results will better reflect our business plan. Per the deal's terms, BXDC's stake in the $5 billion joint venture will be $3.7 billion. We plan to finance our portion with $1.9 billion in cash — putting all of our IPO proceeds to work — along with our $1.9 billion allocated share of asset-level financing. Notably, a committed bank facility is already in place while we pursue various capital markets executions, in keeping with our approach of building a diversified, stable balance sheet and pairing our investments with conservative, well-structured financings. For BXDC, the implied leverage level after this transaction is expected to come in at roughly 49%, though our long-term target of 40% remains something we are committed to. In addition, to the extent needed to meet our REIT requirement of distributing the taxable income generated during the 7.5 months from IPO to 12/31, our Board of Directors may declare our first dividend in the fourth quarter. If we do declare a dividend, this special dividend should not be seen as a proxy for run-rate performance; we expect 1Q '27 to be more representative of our ongoing business, earnings, and dividend. Looking ahead, we stay focused on driving long-term shareholder value and on canvassing the market for our next investment opportunity. As we build a high-quality portfolio, broaden our diversification, and grow in scale, we anticipate achieving a cost of capital that lets BXDC take advantage of an opportunity set expanding quickly. Thanks once more for being with us on this call. At this point I'll have the operator open the lines for questions.

Michael Funk analyst
#4

Hello, good morning everyone, and thanks for joining to ask questions. I have two, if I may. Nick, you mentioned it briefly in your prepared remarks, talking about Indiana and Mississippi perhaps becoming emerging Tier 1 markets, a bit different from what you described at IPO. Could you expand a little on how you view markets beyond the traditional Tier 1 ones, and which other markets could fit that framework?

Mike Forman executive
#5

Thanks very much, Michael. Mike Forman here. More than two-thirds of the portfolio sits in Indiana; that belongs to the greater Chicago market, a Tier 1 market. I'd say Northern Indiana by itself, or Indiana by itself, is already roughly the same size as Chicago. It's growing far faster. I'd take it a step further. I'd say Indiana resembles Chicago, only better from a data center standpoint; it gets the same connectivity benefits, yet its operating environment is far more favorable. That's the reason you see every major hyperscaler, at least all four of the big ones, expanding substantially in Indiana versus only one in Chicago. That's why Indiana will be so much bigger here very soon compared with the Chicago market. Turning to Mississippi, it's becoming a more and more important hub, driven by inexpensive power, land that's available, and policies that favor development. Importantly, Mississippi sits within the energy-rich Gulf; in fact it ranks as the third-largest energy center in the United States, behind only Texas and Pennsylvania. You're beginning to see a prevalence of quite a few third-party developers and users expanding pretty substantially across the region, and over time it's going to be a very large data center destination. I think in a world where power is getting harder to access, you'll see data centers move to wherever the power is. Moving the data is easier than moving the power. That region will become increasingly large as time goes on.

Michael Funk analyst
#6

Thanks for that, and if I could squeeze in one more. We've noticed other companies spotting the chance to pursue a comparable approach. I'm just curious whether there's a competitive bidding process involved for these assets?

Nick Pell executive
#7

This deal came about through direct negotiations with Amazon, simply because it was a joint venture the two of us were assembling. Once again, it was purely a direct conversation with Amazon.

Michael Funk analyst
#8

Great, thank you all again. Congratulations.

Nick Pell executive
#9

Thank you.

Ari Klein analyst
#10

Thanks, and good morning. I'm hoping you might be able to give us a bit more color on how the deal came together. My sense is that at the IPO the initial focus wasn't really on hyperscale leasebacks, which you had spoken about as a potential there. Then, looking forward, have your views changed regarding where more of the potential pipeline of deals would come from, whether that's stabilized data centers from third parties or hyperscalers? Thank you.

Nick Pell executive
#11

Thanks for the question. Look, we always believed the possibility for sale-leasebacks existed, and that held true at the IPO, and I believe we brought it up in a number of our meetings. We certainly looked at a number of different transactions over the last six months, including those involving developer stabilized data centers. I would say the market is basically all of it. What's been great here with this transaction is that it really shows the sale-leaseback market is there. There's appetite among these counterparties to transact and recycle capital in the same way developers are eager to recycle capital into their development pipelines. The hyperscalers are also trying to meet this tremendous demand for compute that they see from their customers, and to continue the build-out of this digital infrastructure. I think it's the same force driving the capital recycling from both constituents. I'd say it's both. We still see that developer market opportunity as real and growing every quarter, as we mentioned, but we also now see this huge opportunity set with the hyperscalers who own half the market today; that's really how you get to what I alluded to, which is a $2 trillion addressable market by 2030.

Ari Klein analyst
#12

Thanks. Perhaps a quick follow-up. On that stabilized data center piece, with some of the difficulties around adding new capacity, the political pushback and all that, and what that might mean for the value of in-place capacity, do you detect a reluctance, or more reluctance, among stabilized owners when it comes to selling those data centers?

Mike Forman executive
#13

Good question. Look, I'd say we completely agree with you. As supply constraints ramp up against ever-growing demand, which remains very strong, stabilized assets, assets that are already there, already have power, already have a tenant, become more valuable in our view. Even so, I wouldn't say we're seeing reluctance from groups to sell. In fact, maybe the reverse. Capital markets volatility, given, again, growing development budgets and the need to recycle capital, is actually generating growing appetite or interest in selling or recapitalizing assets. It feels like a really good setup for the reasons you just mentioned.

Ari Klein analyst
#14

Thank you.

Benjamin Tsaff analyst
#15

Good morning, and thanks for the question. You already touched on part of this, but the deal terms suggest an LTV of roughly 50%. I'm curious whether your thinking about leverage has shifted at all from the initial plan, and would you expect to apply some of the future rent toward paying down debt? Thanks.

Tony Marone executive
#16

Sure. Our long-term view of targeting that 40% leverage hasn't changed; we saw this as a great transaction, and we wanted to put all of our IPO proceeds to work, so moving up to closer to the 50 in this particular instance made sense. We would expect future acquisitions to use lower leverage so that you kind of average down toward that 40%.

Nick Del Deo analyst
#17

Morning, guys — thanks for taking my questions. Nick, you mentioned this briefly in your prepared remarks, but I was hoping you might expand on it a bit more. You've stressed the desire for assets that are fungible across customers and use cases so asset value is preserved when the lease expires. Could you speak to how these assets measure up on those dimensions, and how much flexibility Amazon has built into the designs?

Nick Pell executive
#18

Thanks for the question, Nick. Like I said, these assets are Amazon spec — obviously they built them themselves, which is why there's a sale-leaseback here. They do design with maximum flexibility in mind so the facilities can serve a range of use cases, whether that's training, inference, or cloud, and they have the ability to flex for the changing needs of their underlying customers. On flexibility, I'd rank them extremely high. Obviously these are powered shells as well, so as the owner here, what we really own is just that — the land and the powered shell — and Amazon really controls all the various configurations inside the data halls themselves, which lets them be very flexible and adapt to the changing marketplace with their respective customers. In many cases, I think that's sort of ideal from that standpoint.

Mike Forman executive
#19

We’ve really dug into this quite thoroughly, Nick, and we feel very confident that we could reposition it for a different customer if that ever became necessary. I’d also like to stress again what Nick mentioned. At the time we formed this company, our expectation was to acquire turnkey assets at a cap rate in the low 6% range, but what we’re actually doing is purchasing powered shells at a 7% cap rate; we see that as very compelling relative value and are genuinely excited about what we’ve managed to accomplish here.

Nick Del Deo analyst
#20

That's really helpful context. Thanks, guys; and then perhaps one for Tony. Could you share where you expect mortgage rates to end up?

Tony Marone executive
#21

We're roughly sketching something like SOFR plus somewhere in the mid to upper 100s as we weigh a range of options.

Nick Del Deo analyst
#22

All right.

Tony Marone executive
#23

Financing costs are a bit higher than they were during the IPO, but our view is that the yield on the asset more than makes up for that.

Nick Del Deo analyst
#24

Thanks.

Cameron McVeigh analyst
#25

Good, thanks. After the midterms, I was wondering whether you see any possible obstacles to building in states such as Texas or Ohio that switched in the election, and whether that changes your strategy at all from here. And then second, I'm curious whether you still anticipate some cap rate compression down the road. Thanks.

Mike Forman executive
#26

Now that the election is behind us, my expectation is that development will be harder than it was before. You'll still see a great deal of development, and you'll still see a great deal of growth in the business. We anticipate our TAM continuing to expand dramatically in the years to come. Whatever amount of development there might have been as of a couple weeks ago, there will likely be somewhat less. The key point is that we're focused on buying stabilized, existing cash-flowing assets that aren't really exposed to many of these headwinds we're discussing. As was kind of said earlier, with some supply constraints, again, against very strong demand, that makes these assets more valuable. We believe this strategy is very well positioned for the world we're in today, and it will be noisy out there.

Madison Rezaei analyst
#27

Hi everyone, and congratulations on the deal. I've just got one quick question. If I remember correctly, the 24-month priority arrangement with the wider Blackstone covers turnkey deals. Does BXDC also hold priority on hyperscale sale-leasebacks such as this one, or might you end up competing against other Blackstone funds?

Tony Marone executive
#28

No, I'd view that priority as covering data centers more broadly, and this was our deal to do.

Madison Rezaei analyst
#29

Great. If I could squeeze in one more quick question: could you expand a bit on those lease guarantees — are they in place right through the whole lease term, and are there any exit provisions we ought to know about, and so on?

Tony Marone executive
#30

No, the guarantee is a full parent guarantee for the entire lease term.

Madison Rezaei analyst
#31

All right.

David Guarino analyst
#32

Thank you. Regarding the JV, I'd like to ask whether you could address why Amazon chose not to divest its whole stake. Was it simply a reflection of where BXDC's capital stood at the time, or was there another reason?

Nick Pell executive
#33

Honestly, among the elements of this transaction that excite us most is the joint venture, because we truly built a long-term partnership and relationship with Amazon here. They clearly had a desire to keep owning part of these assets, given the appreciation potential they see over the long term. From our side, we like it for obvious reasons: we have long-term alignment with Amazon as our partner in these facilities, and they are the ones actually running them, paying us rent across the lease term and the possible renewal options. As I mentioned in my remarks, we view it as an exciting blueprint to pursue, ideally doing more with Amazon or other hyperscalers. Forming these joint ventures with hyperscalers, or even with developers, is really central to what we do. Our aim is to provide capital markets solutions to hyperscalers and developers, matching our capital with their capital recycling needs, and letting these highly predictable, investment-grade-backed cash flows accrue to public investors. In a lot of ways, I think we couldn't be more thrilled to have this joint venture in place with them.

David Guarino analyst
#34

Great, thanks.

Tim Hayes executive
#35

Thanks, Katie, and thanks to everybody joining today's call. Feel free to get in touch if you have any questions.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Blackstone Digital Infrastructure Trust Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Blackstone Digital Infrastructure Trust Inc. earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.