Appreciate that, Jeannie, and thanks to everyone for being here as we go through CleanSpark's financial results for Q1 of 2026. Please take a look at the earnings press release we put out today, which you can find on our website. Our 10-Q is going to be filed soon. Once a replay of this webcast and a transcript are ready, they'll be posted on our site as well. Joining me on this call are Matt Schultz, who serves as our Chairman and Chief Executive Officer, along with Gary Vecchiarelli, our President and Chief Financial Officer. A portion of what we say today will be forward-looking, reflecting the best view we currently have of the world and our business. Everything we state and share remains subject to the risk factors laid out in our 10-K. We're also going to cover some non-GAAP financial measures related to how we performed, and you can review those during this call. The reconciliation of those non-GAAP financial measures appears in our press release, which is on our website. With all that said, I'm happy to hand things over to Matt.
Good afternoon, and thanks to everyone for being here. In CleanSpark's journey toward becoming a digital infrastructure and data center development firm, this quarter marks substantial progress—one that leverages what our mining operations do well while widening the range of possibilities our assets can serve. Our Bitcoin mining operation remains large in scale and sound at its core, producing steady cash flows and reinforcing the balance sheet. What has changed is what we can now do with that cash. No longer does CleanSpark run on just one track; we are assembling an infrastructure platform whose several earning streams each hold value on their own, all rooted in hard-to-obtain, utility-grade power. Mining supplies the funding, AI turns it into revenue, and digital asset management keeps it optimized through every cycle. When it comes to how we view AI development, three phases come to mind. The first is locking down scarce power and land. The second involves aligning with tenants on technical and commercial terms, and the third is structured, long-term monetization; across a number of assets, we now sit solidly in that second phase. Consequently, looking ahead, the company we see is characterized not merely by hash rate but by how good, how big, and how adaptable its infrastructure is, along with its capacity to direct capital toward whichever opportunities yield the most at any given moment in the cycle. In assessing our AI expansion options, economics per megawatt keep improving thanks to scale, power quality, and contracting structures, even while more capital is required. Even with this shift, Bitcoin mining stays the bedrock of what we do. We run at full capacity, hashing daily, and throw off robust cash from a mining footprint exceeding 50 exahash per second. This quarter, even with Bitcoin's price behaving badly and network difficulty climbing, revenue came in above $180 million with gross margin north of 47%; that money lets us finance growth on our own terms. It affords us room to keep assets fully monetized as we finish diligence and commercial alignment, instead of getting pushed into speculative development. Our strategy was designed to hold up under various market scenarios—whether Bitcoin prices fall, AI rollouts lag, or capital markets tighten—without triggering panicked choices. Back in November 2025, we closed a $1.15 billion convertible offering, a piece of our strategic evolution. Some of those proceeds went toward buying back $460 million in shares, which pushes total repurchases past $600 million since December 2024 and means roughly 20% of shares outstanding have been repurchased. Dilution isn't a strategy in our view—discipline is. Now, on power and land: we historically grew CleanSpark by picking up and improving many sites under 100 megawatts. Those continue to deliver and have risen considerably in value as energized land grows scarcer and more prized. In studying the AI market, we spotted a chance to seize on demand for bigger sites. Up until not long ago, Sandersville — roughly 250 megawatts of power already online — stood as our sole large-scale property that could handle hyperscale workloads. That situation is no longer the case. In October 2025, we picked up 271 acres in Austin County, Texas, together with 285 MW of contracted power that ERCOT has fully approved, giving us certainty around energization plus the possibility of substantial behind-the-meter optionality from gas capacity; then in January came a second development effort in Brazoria County, Texas, backed by a transmission facilities extension agreement, which unlocks an initial 300 MW demand load that can grow to 600 MW. Put together, these holdings create a Houston-area infrastructure hub carrying close to 900 MW of total potential utility capacity, put together deliberately to back multi-phase AI campus deployments. Looking forward, we anticipate shifting out of portfolio formation and into commercialization milestones. Such milestones will arrive in varying shapes — site-specific announcements, development partnerships, and structured long-term offtake agreements. Yet each one mirrors a single underlying truth: our assets are being pulled into the AI market, not pushed. Over time, we believe, as those options turn into contracted visible cash flows, the market will more and more appreciate the embedded option value sitting in our power and land portfolio. At Sandersville, we bolstered our position further by acquiring a 122-acre parcel sitting directly next to our substation and power infrastructure. We carried out these additions in close consultation with a select group of potential counterparties. Crucially, these conversations have moved beyond theory. We are working from tenant-driven specifications, not internal assumptions. We have now cleared initial screening and entered advanced diligence across multiple sites, covering power studies, cooling validation, and commercial structuring. The choices we are making today regarding substation design, cooling architecture, and campus layout cannot be reversed, and they signal confidence in where demand is heading. What makes AI monetization exciting to us isn't merely scale — it's the duration, predictability, and capital alignment of those cash flows compared with traditional compute. All through this process, we are expanding responsibly; by that we mean being infrastructure first, aligned with customer requirements, and disciplined in capital deployment; in this market, racing ahead is frequently riskier than proceeding deliberately, and we are deliberately optimizing for durability rather than velocity. As we map out this evolution, we have put in place an optimized operating model that lets us keep running our mining infrastructure right up until load transition. Once that transition happens, we anticipate redeploying miners elsewhere in our portfolio where they can keep operating profitably. Earlier, I said that Bitcoin mining will always be core to our business, and that's because it keeps giving us a strategic advantage in power acquisition. That advantage is now converting directly into differentiated positioning in AI infrastructure. We have seen this movie before. The discipline that let us scale mining profitably across multiple cycles is the same discipline we're applying here. Only now, with larger contracts, stronger counterparties, and materially longer duration cash flows. Before turning to Digital Asset Management, I want to briefly comment on the AI lease market. In AI infrastructure, we think there are real advantages to being a second mover, much like what we saw with Bitcoin mining. On the lease side, the economics keep getting better in several ways. Rates are up, the terms for sharing risk are fairer now, and the credit markets behind these projects are still deep and supportive. As we work through big contracts, we weigh lease rates, delay provisions, capital structures, and the quality of counterparties so we can get the best overall return profile. Winning one deal isn't the point — what we want is lasting, scalable partnerships that let us monetize our expanding portfolio as time goes on. I'd also like to say a few words about Digital Asset Management. DAM isn't about trading; it's a capital allocation and liquidity management function with set mandates and risk limits. This quarter, DAM brought in more than $13 million in premiums and cash. That's roughly 24% of normalized adjusted EBITDA, and it reflects better capital efficiency throughout our business; the results come from process and are fully woven into our wider financial framework. Looking ahead, we see several routes to creating value happening at once. Continued operational strength, more clarity on AI monetization, and careful balance sheet management that keeps our strategic flexibility intact... With that, I'll hand the call over to Gary.
Appreciate that, Matt. Let's jump straight into the figures for our fiscal first quarter of 2026. During that quarter, our revenue was up year over year by roughly $19 million, which works out to a gain of nearly 12%. Bitcoin output stayed more or less level, yet we brought in close to $100,000 per Bitcoin during the quarter, versus $84,000 in the comparable quarter a year earlier. Gross margins slipped a bit, going from about 57% a year ago to 47% in this quarter. The main factor behind that slide was the rise in network difficulty compared with a year ago. Power prices ticked up slightly as well, reaching $0.056 per kWh versus $0.049 per kWh a year ago. That said, it mirrors our choice to keep hashing through periods of higher cost and higher revenue rather than curtailing purely on the basis of some arbitrary power price threshold. In this quarter, we posted a net loss of roughly $379 million, against net income of about $247 million a year ago. That swing came mainly from mark-to-market adjustments tied to Bitcoin's fair value at the close of each period. Our adjusted EBITDA came in at negative $295 million, versus positive $322 million a year ago, again driven largely by mark-to-market adjustments. Now let's look at how Q1 stacked up against the Q4 that came right before it. Revenue fell by about $43 million, or 19%, landing at $181 million. That decrease stems chiefly from two outside headwinds: climbing network difficulty and weaker Bitcoin prices. Given those pressures, we saw some of the lowest hash prices ever recorded during the quarter, which highlights how much it matters to run a fleet with strong uptime and efficiency. On a quarter-over-quarter basis, our cost per kWh edged down from $0.059 in Q4 to $0.056 in Q1, which partly cushioned the 19% drop in revenue. Consequently, gross margins stayed solid at 47%. Regarding overhead expenses, keep in mind that the earlier quarter contained about $25 million of expense tied to the separation from our previous CEO. As we said on last quarter's call, we do anticipate that professional fees, payroll, and G&A line items will rise as we carry out our AI strategy. Beyond that, I want to emphasize that the AI data center business delivers stable cash flows along with high margins, and both of those will carry CleanSpark through the peaks and valleys of Bitcoin mining economics. Adjusted EBITDA for this quarter is -$295 million, compared with $182 million in Q4. Once again, it's worth noting that the gap comes from non-cash mark-to-market adjustments, and the current quarter includes roughly $350 million of those charges. If we normalize, factoring in the mark-to-market adjustments, our normalized EBITDA would come to $55 million, or about a 30% normalized margin for this quarter. That figure represents cash generated by our operations. Bitcoin's value at our September 30 balance sheet date stood at approximately $1.5 billion, and at December 31 it was $1.15 billion, with the difference being the $350 million non-cash mark-to-market adjustment I referenced earlier. Now, if we look at the balance sheet, you'll notice that our cash position went up by more than $400 million from Q4. The reason for that is the $1.15 billion, 0% convertible deal that we completed in November. As everyone is aware, we allocated part of those proceeds toward clearing the remaining balances on our Bitcoin-backed lines of credit, and we also bought back $463 million worth of stock. That resulted in roughly $420 million in net cash proceeds, and the bulk of that will remain on our balance sheet. Beyond our cash position, we held about $1.15 billion in Bitcoin value at the close of Q1. Our total debt sits at roughly $1.8 billion, which on a net debt basis works out to about a 1.1 debt-to-liquidity ratio. Above all, the converts don't mature until 2030 and 2032, and we still have many options available for capital. Another thing worth noting is that our outstanding share count is down nearly 20% over the past 15 months, since we haven't issued even one share of equity on the ATM or through any other offering. To echo Matt, dilution is not a strategy, discipline is. Now shifting to our balance of more than 13,000 Bitcoin, I'd like to emphasize that we are among the first, if not the only, company with scaled operations that is also treating Bitcoin as a productive capital asset. During the prior call, we went into detail about our DAM strategy in its first full quarter. You might also recall us mentioning our crawl, walk, run approach, and I'm pleased to report that we are now entirely in the walk phase. We've reached full utilization of the portion of our Bitcoin balance that we intend to use for yield generation, which comes to 40%, or roughly 5,200 Bitcoin. Our DAM strategy produced $13 million in cash returns on the Bitcoin HODL during the quarter, a period when Bitcoin's price declined mark to market. I'd like to call out a few key figures that reflect our core DAM strategies; we apply a covered call derivative program on top of our monthly production and sales of Bitcoin, and that led to an increase of $7,700, or 8%, per Bitcoin above the average sales price of about $97,200. On the whole, the $13 million in total premiums also works out to an annualized return of 4.2% on our average HODL balance, which beats our 4% target. ... We pulled all of this off within 6 months of our first trade. Crucially, all of it was accomplished by monetizing elevated volatility, particularly in October, while holding the average delta under 20. I'd also like to note that we've brought another instrument into our treasury management toolkit. The basis trade is a market-neutral strategy that seizes the gap between Bitcoin's forward price and its spot price. Crucially, this approach carries no price risk and produces returns from the very same kinds of market structure dynamics that we called out in our thesis from the start. Through this basis trade, we were able to make our cash balances productive and beat the risk-free rate by nearly 200 basis points, since the cash assigned to that trade generated an annualized yield above 5.5%. Such opportunities come and go in cycles, but we'll stay opportunistic in response to market conditions, completing the flywheel we had in mind at the time we started our DAM team; lastly, I want to spend a bit of time on our capital strategy moving forward, particularly given our push into AI data centers. Looking at capital, I have strong confidence that both the capacity and the desire to finance an AI data center with a grade A tenant are there. There was a high-yield deal from our friends at Cipher, priced at an appealing 6.8%, which signals the quality of leases signed recently and the capital this market has available. Demand for their recent $2 billion bond came to roughly $13 billion, an oversubscription of 6x. We haven't settled on any single method for financing our AI data center builds, but our focus is on assembling a capital stack that keeps dilution to a minimum. That effort carries on through selling monthly Bitcoin production to fund our OpEx. Combining our present cash balance with the capacity on the built Bitcoin-backed lines of credit, we have more than $800 million in liquidity we can access without selling any of our Bitcoin HODL. That liquidity gives us optionality, and we'll keep using the lines of credit opportunistically in the marketplace for creative purposes. Matt covered our present efforts and our direction, and we look forward to sharing on upcoming calls the relationships and ecosystem we're building, one that takes a more fulsome approach than what the market currently has. We're still early in the innings of our AI data center journey, yet the market is moving fast, and CleanSpark is responding decisively. Talks with grade A credit quality tenants continue, and the question isn't if, but when. With that, I'll hand it back to Harry to lead us in the Q&A.
Appreciate that, Gary. At this point we'd like to invite the analysts on the line to ask their questions. Operator, if you could share the instructions and handle the queue for the Q&A portion, that would be great.
Hello, everyone. Thanks. I'd like to hear a bit about what you're observing regarding demand conditions for HPC, and perhaps how that has shifted over the past 90 or 100 days, and also what qualities matter most to you when choosing a leasing partner?
Hi Mike, appreciate the question, and thanks for picking up coverage recently. It's good to have Northland on board. What I can share is that when I stepped back into the CEO seat 6 months ago, we came into a marketplace filled with a great deal of excitement about getting a deal signed; and what we're observing at this point are certain penalty-type provisions from those early leases — for example, you know, forfeiting a substantial chunk of revenue because an RFS date slipped by a single day, plus varying terms that only have backing at the individual site level instead of at the parent co-level; this has opened the door for us to genuinely step back and assess the landscape. I can share that, you know, we — Gary, Harry, and me, along with a few members of our team — were at the Pacific Telecom Conference out in Hawaii, and the response we got from putting forward an end-to-end solution was extraordinarily favorable. We've taken a highly pragmatic approach regarding the assets we've built up, where they sit, how far they are from fiber networks, the availability of behind-the-meter generation, and because of that, we've started engaging with several trillion-dollar balance sheet companies that have interest in long-term leases on a number of these assets. So demand, as we see it, keeps ramping up. Also worth noting, Amazon came out earlier today discussing their plan to put $200 billion into AI infrastructure in 2026, which tops the $140 billion the street had projected. So when you look at the demand underlying that, we feel quite confident, and if the inbound inquiries and discussions we're having with hyperscalers mean anything, concerns about a bubble are greatly overblown.
Understood. As a quick follow-up, regarding your trio of locations — Sealy, Sandersville, and Brazoria — would you describe demand as even across all three, or does one stand out from the rest? How would you assess that?
Honestly, what's drawing the most interest at the moment is likely Sandersville, since that one comes in at 250 MW. The substation there is already finished on our side, and power is already flowing to it. As for Sealy, the first 207 MW gets energized in Q1 2027, so demand around that project looks robust. And, of course, the site that follows has generated plenty of appeal as well. Still, I'd say what makes the Georgia data center landscape plus that energized site so attractive is how compelling they are to the offtake clients.
Great. Well, best of luck the rest of the winter and spring.
Appreciate it, Mike. Thank you.
Hi there, good evening. I really appreciate you taking my question. So, as a brief follow-up: you brought up some quite encouraging CapEx remarks from businesses such as Amazon. To me, that points to growing need for AI data centers. Would you characterize that as a sign of demand, let's say, throughout the industry from the different hyperscalers you're in talks with, or is caution starting to creep in?
Yeah, I'd call that a resounding yes. Just to mention something briefly, Jeff Thomas, the person heading up our AI venture, has spent this whole week in the office alongside us, and most of the time, he's stepping out to head into his office, shut the door, and handle an incoming inquiry. So I'd say demand is ramping up quickly.
Well, that's definitely welcome news. I realize you both said you want a combination of what we might term quality alongside scalability when it comes to clients. Considering the construction obligations you've already taken on, how sure are you that you can, say, get a contract signed within a fairly short timeframe?
Our confidence is very high, Brian. To be upfront, the holdup in... honestly, I wouldn't even label it a holdup. When we did this 6 months back, and after that our earnings call happened 7 or 8 weeks ago, we indicated we'd anticipate signing a quality lease in under 1 year, and I'd describe that as significantly sped up. Yet the discipline we're applying — you can look at certain leases that other Bitcoin miners have posted, and in the public filings they're heavily redacted, which stems from how punitive some delay provisions are. So while we think through this, we're in fact operating on a basis of design together with the offtake customer. We're designing it beforehand and then making sure we can hit the delivery timelines so that potential overhang of failure to deliver risk gets removed. So staying disciplined on this and building specifically to the basis of design for the offtaker, which includes implementing the approved reference architecture from the chip manufacturers, will let us have that certainty to lock down the supply chain prior to entering these commitments, ensuring we don't face that fail to deliver.
Great, great. I appreciate the extra detail there. Then, if I can, just one last item regarding Bitcoin mining. Given how efficient you are, you're in a stronger spot than nearly anyone as the next halving approaches. Has your thinking shifted in any way when it comes to running Bitcoin mines alongside your push into HPC?
That's a wonderful question, Brian, and what we've discovered is that when new energy sources come online, certain communities—particularly the smaller ones—have an incentive to turn those megawatts into revenue very quickly. The difficulty lies in constructing a data center for a hyperscaler with an approved basis of design, and folding in that reference architecture takes 12 months at best, with 18 to 24 months being a typical delivery timeline. We're able to leverage the infrastructure we already have for Bitcoin mining, as we did in Cheyenne, Wyoming, where we landed a 100-MW lease with a hyperscaler; we pulled that off purely because we agreed to begin covering power bills within six months, rather than within a year and a half, and that matters to these communities. So Bitcoin mining will keep serving as that instrument for us. You heard us mention on the call something we hadn't disclosed previously since it wasn't material, which is that we hold a 122-acre parcel next to Sandersville. What's the significance? It means I'm able to run 11 exahash of profitable Bitcoin mining right up to the moment we switch the power over to serve the data center for our end-use client. Also, on the map of our projects, there's something we haven't discussed—a 15-megawatt site in South Dakota. The utility in that area had rolled out a blockchain-specific tariff that, combined with an interruptible load, delivers the lowest cost per kWh of practically any site in our portfolio. That flexibility lets us move that mining to a profitable location once we've brought up a data center behind it. We regard it as something of a loss leader, though it does make money.
Yeah. That's great. I appreciate the detail, and thanks once more for taking every one of my questions, Matt.
Of course. Thank you, Brian.
Mike, thanks — good afternoon, and I appreciate the chance to ask. Matt, I'll aim this one at you first. I appreciate what you said about the HPC business, with CleanSpark in advanced discussions — or diligence stages, rather — with possible tenants, and that a basis of design is currently in the works. I'm curious: which milestones should we watch for going forward, and what timelines do you expect over the coming couple of quarters?
So here's how I see it: when you're working with a hyperscaler, the process is such that we could hurry up and execute a lease just to grab a headline, and then we'd be exposed to possible losses if we failed to deliver. That's why, as I said earlier, we're pushing toward that basis of design. One thing I'd call a key differentiator that may have flown a bit under the radar is this — we issued a press release about an MOU with Submer. Mike, you've followed our company long enough to know we never make a material disclosure without a firm contract in hand. We thought that mattered as we enter some of these talks, since Submer has done very well constructing a modular MEP. That means mechanical, electrical, and plumbing, plus all the fiber runs, with everything matching the reference architecture the chipset manufacturers require. Our approach, then, will be to construct the gray space and the tilt-up shell, then slot in the reference architecture — which also gives us flexibility. So should a hyperscaler wish to switch from one kind of chip to another, that modular approach is available to us. It also cuts the timeline, because all of us have heard the horror stories about peers with a couple of thousand tradesmen crowded onto the same West Texas sites, unable to keep up with housing, food, and bathroom facilities. Our view is different. Rather than a one-off, stick-built data center, we construct the shell to the specifications the end customer needs, then produce the MEP portion in a factory, making it consistent, duplicatable, and scalable — unlike anything else in this space. Establishing all those build parameters in advance matters to us, so that once we put pen to paper, there is absolute certainty we can deliver the product as expected, on time.
That's useful detail. Matt, thanks for that. Gary, perhaps this one's for you. Given the recent drop in Bitcoin's price, does your HODL strategy shift in any way? From following this company for some time, I know you've traditionally taken a very dynamic approach to HODLing, one that generally moved with whatever the market was doing. So I'm interested in how you're viewing the HODL stack right now.
Yeah. Hey, hey, thank you, Mike. Yeah, given that you've followed us for a while, you're aware that optionality is what this business was built on, so that option remains available should we decide to, quote, unquote, "dip into the HODL" and let go of a portion of that Bitcoin. What I can tell you is that we don't intend to do so, even at the current prices. In our view, the strategy remains sound, and one element of the hedge for us is really selling, you know, close to 100% of what we produce operationally each month; so at present, that approach truly hasn't changed. On the other hand, I'd add that we don't anticipate retaining 100% of the Bitcoin we produce operationally either, since doing so would cause our cash to be depleted much faster. As we said back when we raised the convert funds, you know, our expectation is to deploy most of that capital toward expanding into AI data centers, because we see that as where the company is headed.
Well, Mike, perhaps I can just add a bit more—one additional layer regarding the Bitcoin mining side of things. In our most recent disclosure, we stood at 16.07 joules per terahash, and Taylor, along with his team, is actively rolling out the 13.5 joule per terahash machines inside immersion-cooled containers across 5 different locations. As a result, we anticipate that our fleet efficiency will keep getting better. During the last cycles—I mean, we've gone through this a number of times—we observe a sort of washout in the sorting process, and fleets that are less efficient typically unplug. So we also think there's a very strong chance for us to grow our share of the network hash rate organically, simply by default, as other miners who are less efficient get forced to unplug.
Excellent, I appreciate you taking the time for my question.
Appreciate it, Mike.
Yeah. Hi, thanks, and good afternoon, and I appreciate you taking my questions. And just thinking about, you know, the progress ahead in HPC, you know, and I'm aware Jeff came aboard a few months back now. You know, Gary, you mentioned the possibility of elevated SG&A down the road as we sort of expand the team and prepare to, you know, shift into this new business. Like, how should we frame costs and processes, and where do we stand in terms of... You know, we've watched other companies go out and assemble teams. Where, you know, and recognizing we already have plenty of skilled, capable folks within the organization, how should we think about, you know, employee-level growth here?
Yeah. Hey, Greg, thanks for asking, and that's a great question; investors bring it up to us fairly often. I'll tell you, providing guidance on that is tough because, you know, although we have a plan to add a certain number of FTEs, when those actually land is really what's going to determine what the figures will be for the fiscal year. On top of that, we have flexibility in that we can rent services, so should we require services from somebody, we could engage outside consultants or contractors to help cover that gap while we're waiting to bring on the full-time talent. ... And there's, you know, that might differ from what it would cost to bring on a fully burdened employee. So we aren't ready to provide numbers for that at this point. I don't think it's anything, you know, that's material that's, you know, putting us at risk or anything. I think we've been pretty measured about adding people, right around the time we will need them, so I think you'll see that gradually rise throughout the rest of the year.
All right, excellent. So then, I believe it's been common knowledge that we would be purchasing additional land at Sandersville for at minimum 2 or 3 months. Now that we own that extra land at Sandersville, does that alter the nature of the discussion at all? Matt, it appears we're concentrating on — it appears that a portion of this call involves you concentrating on possible terms for a few of these HPC contracts. And in what way does — I'd imagine that owning the land is very important. My question, I suppose, is this: Was the absence of ownership over a portion of the land, and possibly leasing it, essentially a dealbreaker?
Hi Greg, this is Harry. I believe you're completely correct. We see the completion of the land expansion at Sandersville as a highly methodical process in advancing the AI data center project at that location. It enables us to enter a highly particular basis of design alignment exercise, which is currently in progress, and it additionally introduces a degree of precision regarding the compute and power ramp for the data center deployment, since these projects involve complexity that goes past, as you know, getting the data center operational by the RFS date. There's an extended commissioning procedure that tenants generally assume within the framework of the project's overall life cycle, and the ability to chart those timelines and those work streams thoroughly is essential as we proceed through the complete commercial scope of the talks; in numerous instances, they are dictated by certain technical elements within the ramp process.
Hello, and thank you for taking the question. Could you perhaps share some perspective on the way ERCOT's suggested large load batch study process might affect the energization schedule for the Sealy site, along with the approval and development timeline tied to your Brazoria County, Texas project?
Hey, Steven. Yes, it's Harry once more. Glad to address that. I believe the initial element here is that the study process ERCOT has put forward for rollout hasn't been finalized as of yet. A comment period is still underway in which they're collecting member requests regarding how those members wish to shape that process, and how it will be introduced to the market; therefore we're awaiting something like the ultimate version of it. Yet considering, you know, the initial reports there, we've held quite a few in-depth conversations with a number of counterparties we're engaged with there. That covers the substation developer, it covers the utility, it covers a few of the political people, and clearly a few of the teams at ERCOT too. I believe the assets we hold in the state sit in a highly advantageous spot with respect to this, this fresh element of the process for several reasons. The initial one is that the large load studies completed at Sealy, it's finished, and at the second location, it's at a very advanced stage, and we've gotten the notice to proceed language at both of them. So that's roughly point one and two. Following that is that the interconnect and the FSA pieces are signed, and the third at Brazoria is that the CAIC has been funded, and at the Sealy location, the substation is already being built. So these are, these are substantially advanced projects, and what we've observed is that the perspective on the batching and the study rollout is mostly being shaped by project maturity, as well as location. What we've heard back regarding the utility of both of those locations, the same utility, is that the location we picked sits at a point in the overall ERCOT transmission system that will be the least affected by this sort of reevaluation process. So we feel very, very good about where these two assets fit within the system and how they're gonna be handled, but until ERCOT releases final language, you know, we can't, we can't have 100% visibility into that yet.
All right, excellent. Appreciate it.
Hi, everyone. I appreciate you letting me ask something. There are two things I want to cover. I suppose the first one follows on from what was said about ERCOT. When you look further out at the pipeline and think about bringing on additional power, are there any other power markets that currently appear somewhat more appealing compared with Texas? And if so, where might we see that happen? Then I want to ask a second thing about the HPC tenant side.
Thank you, John. Well, I believe we've long carried a strong tradition of building a varied portfolio. That shows in how we sign power agreements at present. We have a sizable footprint up and running in Georgia. Our presence in Tennessee is considerable too. Wyoming and Mississippi are the two smallest, though they certainly aren't small. So I believe what we can achieve is further growth across those markets, thanks to the relationships and the quality of the communities we've built up so far. Beyond that, though, I think the flip side of what you're asking is whether big data centers lean toward power that sits in front of the meter or power that sits behind it. We're exploring those questions within the company along both paths. So we believe there's an enormous amount of opportunity in Texas and beyond when it comes to the in-front-of-the-meter approach. Our team has grown extremely skilled at finding, negotiating, and completing deals for that kind of power. And we're also seriously assessing the potential for behind-the-meter power too, in locations where we can either secure a smaller in-front-of-the-meter load, or where there's an especially rich commodity setting that would let us supply behind-the-meter generation along with the data center tied to it. So, you know, at our core we're a people-first company, and our power and land groups are ready to grow the portfolio very, very widely in a diversified manner, while also bringing that behind-the-meter possibility into what we can do.
Excellent, I appreciate the update. Moving to what you said about the HPC tenant, I'm simply attempting to determine how far along the positioning has gotten. Is it? Have we narrowed it to a single prospective tenant that appears significantly ahead, or do we still have three sitting in the last round of competition? Some additional detail would help.
Give me something I'm able to respond to. Honestly, John, what I'd tell you is that for Sandersville, we started with more than one possible offtake tenant. By a factor of ten, I'd add, one particular front-runner stands out, enough so that our people are working alongside theirs regarding where things go on the site. A slide in our deck may have shown you a mock-up depicting the data center's layout. Thus, alongside one particular offtake, we've moved things quite far, though it is definitely not locked in anywhere else. What I mean is, the fight for megawatts and land today outpaces what it was back when we told everyone about our plan to grow into AI. Therefore, no doors are being shut by us, yet a clear front-runner exists in my view.
Understood. That's great. Thanks, everyone.
Hey, everyone. Gareth here, filling in for Brett. I was wondering if you could provide some more specifics about the two new locations in Texas. At what point do you anticipate power being ready at those sites, and how do you see the schedules unfolding from here?
Yeah, of course. Let's start with the Sealy project. We've got 271 acres of land secured. Gross power comes to 285 megawatts. The initial 207 to 209 arrives in the first half of 2027, followed by roughly 40 in 2028 and another 40 in 2029. That schedule stems from the transmission agreement through which we obtain the power. The second project is located in Brazoria County, with a bigger footprint of as much as 477 acres there. The structure is that we've executed that agreement, though we haven't closed yet, and there are certain closing conditions tied to it that we anticipate finalizing here in Q1. How quickly energization happens depends on some of those closing conditions, so we don't have the same kind of definitive clarity that exists at Sealy, but in my view, Q4 2027 to Q1 2028 is a sensible range, and everyone within the company is pushing to get that energization date as near to the early end as they can.
Great. Thank you.
I really appreciate you taking the question, and congratulations on everything you've accomplished. Gary, you brought up a capital raise that a competitor recently completed, and I'd like to ask — when we consider the liquidity on hand, plus the significant room you have ahead that you're presumably going to expand into through leases — should we interpret that remark as any kind of signal about how you'd prefer to stand across from a counterparty in terms of what type of counterparty it is? You know, negotiating directly with a hyperscaler, being in a position to complete high yield raises, where the credit quality of that counterparty might make that possible, I suppose? When you think about picking who you do business with, especially with everything going on around raising money and what that money costs — how should we be looking at that? Thanks a lot.
Sure thing. Appreciate it, Paul. What I can say is that having tenants with that top-tier credit rating matters a great deal to us, since we believe those are the easiest to finance and come with the most favorable cost of capital. That's where our attention is. As far as the structure goes, I bring up that Cipher transaction from recently, because the high yield route appears to be a strategy several of our competitors have begun pursuing; we're willing to explore it too. We're glad to observe that the conditions are improving, you know, for that as well as for the agreements and leases supported by that bond. Additional alternatives exist too. Clearly, the cost of capital is somewhat greater, yet ultimately, the wonderful thing here is — and this term has come from us for many quarters or even years — optionality, correct? Numerous choices sit before us. Still, I believe it's reasonable to say that at present we'll stick to a strategy likely validated within the capital markets, and everything begins with a Grade A tenant.
Thanks. Maybe a follow-up as well. Matt, I think you brought up the Sandersville project and those 122 acres being designed around tenant-driven specifications, so how should we interpret the implications for terms? You also pointed out that across the discussions you're having, the terms under consideration appeared to be more favorable. Since you're proactively employing tenant-driven specs to prepare those sites for HPC, does any sort of prepayment or deposit talk come into play in the conversations you're having?
Appreciate that, Paul. It's a bit early in the discussions to address that head-on, but what I can say is that, you know, clearly, a variety of leases have been introduced. Modified gross has come up, triple net has come up, hosted agreements have come up, and miners have come up that committed to purchasing the chips on their own; so what I can say is that our initial focus, and I don't — my intent isn't to diminish the quality of any other transaction, but when we consider the financing options, I believe it matters to us to secure a meaningfully better deal than what I think the market would otherwise have anticipated. I think our interest lies in structuring a deal directly with a hyperscaler, rather than necessarily with a neo cloud that a hyperscaler backs. And we believe we'll establish the benchmark for the quality of the agreement and the, I suppose, win-win is a phrase we use often within the company. Expectations will definitely be there. Our feet will be held to the fire, so to speak, to deliver, but it doesn't come at the risk of an existential threat if we fail to deliver. So, you know, we're negotiating all of those terms, and I think once we announce the first lease, what you'll see is a basis or a model for what you can expect going forward.
Great color. Thanks so much.
Thanks, Paul.
Thanks for that. Evening, everyone. If Bitcoin is sitting around, say, $63,000 right now, what portion of your mining rigs can be run profitably? Put differently, what share of the fleet clears the hurdle rate needed to keep running?
Appreciate that question, Jim. So the efficiency of our fleet got better, then it slipped somewhat, and that slippage was intentional, since better mining economics led us to bring on some equipment that isn't as efficient. What I can say is Taylor and his crew are always doing live analysis tied to power costs, network difficulty, and Bitcoin's price. This morning, while Gary and I were putting together this presentation, they came to us with a list, and I'd put it at under 10% of our fleet that isn't profitable at the present $30 hash price. So most of it is profitable, and the small slice sitting at or beneath the break-even line consists of machines we added to capitalize on a $125,000 Bitcoin 1.5 quarters back. So pulling those offline doesn't hurt us. That said, when we disconnect those weaker machines, or dial them back, or underclock them, the efficiency of our fleet overall goes up.
Understood, that's useful. Thanks. Could you also talk about what we're planning to spend on capital expenditures in the current year and the following one, in terms of both total dollars and how it breaks down between Bitcoin and HPC?
Hi Jim, Gary here. What I can say is that our emphasis will be placed on putting capital to work in AI. That figure runs from $9 million to $11 million per megawatt, and as you're likely aware, that's what most of our competitors in this industry are currently reporting, and it matches what we ourselves are observing. So how much actually gets spent will truly hinge on — that dollar amount will hinge on the build's design, the customers, and the timing of when we execute those leases. But I can tell you that the vast majority — the predominant share — of it will be tied to AI DC. As for Bitcoin mining, my view is that putting money in, especially at the levels we're seeing, doesn't make much sense given the sticker prices the big manufacturers are quoting. If you look at our balance sheet, as of 12/31, we held roughly $130 million in prepaid deposits for Bitcoin mining equipment and miners, and around $112 million of that had gone through September. So we're still rolling out some infrastructure — mostly immersion cooling and miners — which will help push that efficiency down, but we have no plans to spend a meaningful chunk of our cash on mining unless the economics shift. We should remember that we're roughly two years away from the next halving, and in any cycle, as the halving gets nearer, that ROI window shuts quickly, and at present it simply isn't sensible. So every dollar we can should be redirected toward AI CapEx.
Great. Thanks. I appreciate that.
Hi, everyone. Good evening. Thanks for letting me ask. I'm sitting in for Matthew Galinko at the moment. I was curious whether you have any perspective or perhaps forecasts regarding how we ought to approach thinking about network difficulty given where Bitcoin prices stand today.
Yes, certainly. I believe that what we've observed across the past 14 days, along with the difficulty adjustment scheduled for Saturday, matters because it's the biggest downward difficulty adjustment since the China mining ban back in 2020. That comes from two things. First, there have been major weather occurrences throughout the whole country over that stretch, with either demand response programs being triggered or power prices exceeding the break-even threshold for economics; so that definitely plays a role in this difficulty adjustment. The second element is obviously Bitcoin price has dropped substantially; therefore the next difficulty adjustment on the way will be a big one; and then considering the price movement we've witnessed during the later portion of the difficulty adjustment window we're currently within, we might see even more downward pressure on difficulty on top of that. So I think in the end, this reflects the self-healing characteristic of the proof of work in Bitcoin mining system; and when you get these kinds of market forces, the network adapts so it can establish that security model meant to keep generating blocks and handling transactions.
I want to make one more point, since looking back over history, whenever Bitcoin's price climbs and hash price improves, the worldwide hash rate trails behind, correct? There will be a stretch, typically weeks, possibly 1 month or so, during which miners figure out how to get connected, since miners simply don't hang around waiting for hash price to settle. Normally, they aren't sitting on racks, merely waiting for Bitcoin's price to hit some level. Going downward, it's the reverse, since the majority of miners, not every one, but the majority, understand their break even point, because that represents an actual punitive cash penalty, since power bills must be paid. Thus, when Bitcoin mining economics decline, what we've observed, at minimum historically, is that hash rate drops off quite fast, quite near to that. The reason is miners ask themselves, "Well, hey, why should I absorb a loss of X dollars when I could simply purchase Bitcoin, and I'd end up with more Bitcoin than if I truly mined it?" So given that, wrapped in the reality that we operate a shrinking fleet with falling joules per terahash, meaning our efficiency keeps rising, and we're more efficient, and we're generating more Bitcoin for each watt we push through these machines, theoretically we'll be among the final ones to shut off, and we will mine a greater quantity of Bitcoin as that global hash declines.
Thanks for that. So I suppose this is just a follow-up regarding the opportunities in Texas. Is there a timeline you can share for bringing a behind-the-meter opportunity into your portfolio?
Yeah, I appreciate you asking. My sense is that it's too soon to have a view on precisely when that kind of opportunity would happen. What I can tell you is that we're looking at several different types of behind-the-meter deployment. Certain energization schedules among them take longer, while others can reach the market much more quickly. And so in the end, decisions of that kind will be made together with the tenant community, and we're really aiming to meet their need and satisfy that compute demand, whether that comes through one form of behind-the-meter generation or another.
That's great. I appreciate it. Thanks, everyone.
Thanks.
Appreciate it. And once more, thanks to all of you for being part of today's earnings call. We're eager to keep in touch and to bring you our future results over the quarters ahead. Keep watching for further progress and the exciting achievements that lie in front of us here at CleanSpark.
This concludes today's conference. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete CleanSpark, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to CleanSpark, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.