Comstock Inc. (LODE) Earnings Call Transcript & Summary
May 7, 2026
What were the key takeaways from Comstock Inc.'s May 7, 2026 earnings call?
In the first quarter of 2026, Comstock Inc. (LODE:US) reported a net loss of approximately $9.4 million, consistent with prior year levels, as the company transitions into a phase of operational development and commercialization. Revenue was recognized from pilot plant operations and deferred revenue from solar panel collections, with management signaling an expected increase in revenue as the commercial plant becomes operational in June. The company has maintained a strong cash position of over $53 million, following an oversubscribed equity financing of $57.5 million, and anticipates significant cost reductions and cash inflows from the sale of non-core mining assets, expected to be finalized in Q3 2026.
What topics did Comstock Inc. cover?
- Operational Development and Commercialization: Management emphasized the transition from balance sheet recapitalization to operational execution, stating, "We are now transitioning from a period defined by successful balance sheet recapitalization... into a period focused on operational development, commercialization and monetization."
- Revenue Recognition and Growth Expectations: Comstock recognized revenue from its pilot plant and expects increased revenue as the commercial plant goes online in June, with management stating, "We expect... revenue and deferred revenue increase as we move forward this year."
- Cost Management and Asset Monetization: The company anticipates annual cost savings of up to $1.5 million from the sale of mining assets, with management indicating, "We expect the sale of the mining assets to reduce cash spending by up to $1.5 million annually."
- Future Facility Developments: Management confirmed that the second facility's capital expenditures will not commence until the first facility is operational and profitable, stating, "We will not pull the trigger on facility #2 purchases until we're satisfied with the ramp-up of facility #1."
- Market Demand for Silver: The outlook for silver remains strong, driven by demand in photovoltaics and electronics, with management noting, "The deficit in the industry... is clearly persisting."
What were Comstock Inc.'s May 7, 2026 results?
- Net Loss: $9.4M (vs prior year levels, inline)
- Cash Balance: $53M (after $14M paid for facility and recovery solutions, positive liquidity position)
- Equity Financing: $57.5M (oversubscribed offering, strong capital position)
- Operating Expenses Increase: $1.7M (driven by higher headcount and facility costs, planned increase)
- Projected Cost Savings from Asset Sales: $1.5M (annual reduction expected from mining asset sales, positive outlook)
- Revenue from Pilot Plant: null (expected to increase as commercial plant comes online, positive outlook)
Comstock Inc. is positioned for growth as it transitions to operational execution and monetization of its assets. The anticipated ramp-up of the commercial plant and the strong demand for silver present potential catalysts for revenue growth. However, the company must navigate operational execution risks and ensure a steady supply of feedstock to realize its growth objectives.
Earnings Call Speaker Segments
Good afternoon, and thanks for tuning in to Comstock Inc.'s discussion of first quarter 2026 results and our business outlook. My name is Zach Spencer, and I serve as Treasurer and Corporate Secretary. The date today is Thursday, May 7th, 2026. This is a live stream, and we are recording the session. Shortly after we finish, a recording will be made available in the investor relations portion of our website. Earlier today, we submitted our Form 10-Q covering the quarter that closed on March 31st, 2026, and put out a press release that summarizes results at quarter-end. You can find both of those documents on our website. Just a reminder that Comstock trades on NYSE American under the symbol LODE, L-O-D-E. With me on the call are Corrado De Gasperis, who serves as Comstock's Chief Executive Officer, and Judd Merrill, Comstock's Chief Financial Officer. Once they finish their prepared remarks, we'll open things up for questions. Ahead of this call, we received over 25 questions. Should you have more questions while we're on the call, please submit them through the Zoom Q&A window, and we'll get to as many as time permits. Forward-looking statements will be part of today's discussion. Because of risks and uncertainties laid out in our SEC filings, actual results could differ materially. You can find full risk disclosures in our filings on the investor relations page and on the SEC website; and now it's my pleasure to hand things over to our Chief Financial Officer, Judd Merrill. Judd, the floor is yours.
Thanks, Zach, and good afternoon, everyone. I have a few prepared remarks, and once I'm done with those, we'll walk through the slide deck together. Looking at the first quarter of 2026, what we see is the transformation we advanced during 2025 continuing to move forward. What matters even more is that this quarter marks the point where execution starts happening at scale. We've exited a period defined by a successful recapitalization of the balance sheet, institutional banking, and capital formation, together with stronger and broader governance, and we've now entered a period focused on developing operations, commercializing what we have, and monetizing it. Let me share a few points regarding Q1. During our prior investor call earlier this year, we noted that we had completed an equity financing that was oversubscribed, generating $57.5 million in gross proceeds, which comes to $53 million after subtracting offering expenses. At the close of Q1, we had a little more than $53 million in cash. That total reflects the $14 million we've already disbursed for our initial facility between August 2025 and March 31st, 2026. We estimate needing $10 million for the recovery solutions we'll build going forward to produce silver, copper, and other metals. For our second facility, the estimate is $13 million, and we won't deploy it until the first one is operational, scaling up, and turning a profit. Of that original $14 million earmarked for the first industry scale facility — the one many of you have signed up to tour on May 28th at our AGM — $6.8 million was used during the first quarter. At this point, construction spending on our initial facility is essentially complete. In addition, we invested $7.75 million in SSOF, and we did so at a very appealing valuation. Once we made the commitment to natural gas capable of supplying as much as 300 MW to those sites and to the rest of the Comstock properties in Silver Springs, we became positioned to monetize at a higher value. We also recorded a $1.4 million cash gain from selling royalty rights connected to the earlier disposition of our northern mining claims, which shows continuing momentum in turning these non-core assets into cash. On a separate note, we have now reached preliminary agreement on terms to sell off all the mining assets we still hold. Due diligence is underway right now, and we expect to announce a definitive agreement during the third quarter. Should this deal go through, it would bring about substantial simplification, a meaningful amount of cash, a balance sheet that's cleaner and stronger, and considerable upside when it comes to annual cost savings. During the quarter, we booked revenue from our pilot plant along with deferred revenue tied to solar panel collections, and as we move through this year—bringing the commercial plant online and starting to showcase it to customers in June—we're beginning to see growth in both revenue and deferred revenue. Operating costs overall were up by roughly $1.7 million. The main drivers were more staff to support metals operations, pricier facilities — that includes our industry scale site at Silver Springs — and greater spending on professional, legal, and commercialization efforts, since we anticipate marketing, sales, and metals costs ahead, plus costs tied to various monetization transactions. Turning to items below the line, interest expense dropped substantially versus the prior year, reflecting that the legacy debt obligations have been eliminated. In fact, as of this week they are fully extinguished, and we foresee no interest expense going forward. Interest income climbed significantly, reflecting our strong cash position. Derivative related impacts are still there, but they mattered less than they did a year earlier, and they ought to be low or zero moving forward, since substantially all of our make-whole contingencies have now been satisfied. The net loss this quarter came to roughly $9.4 million, which is mostly consistent with the levels of a year ago; about half of that loss came from the mining and Bioleum segments, while the other half came from metals and the corporation. We anticipate that selling the mining assets will cut cash spending by as much as $1.5 million each year. We also anticipate that the simplification that results will bring costs down further. From an execution standpoint, what truly matters is the quality and speed of the work we're carrying out right now. The higher operating expenses we've booked are intentional. They reflect the capacity we planned to build, the creation and rollout of quality systems at industry scale, and the supporting infrastructure — operations, sales and logistics included; we're also investing in the people and systems required to back growth spanning multiple sites. At the same time, reduced costs from legacy financing, mining and administration, plus a simpler capital structure, have begun showing up in our numbers. On liquidity and capital, we stay in a very solid place. As we've said previously, the financings we completed recently mean we're fully funded. We have cleared out nearly all of the old obligations and the expenses associated with them. We also completed a few smaller divestitures and reached agreements on additional mining activities, while continuing to move forward on several ways to monetize assets outside our core focus, which we expect to be meaningful. So what's the impact? It put us in a position to grow and run our first-of-a-kind, industry-scale facility that is completely paid off, to add metal storage and logistics capacity across several states, to complete our initial metal recovery designs, and to test a system processing 1 ton per day, ideally at our current site here in Nevada, and after that to obtain permits and push ahead with our second facility in Las Vegas. As we look forward, the financial model begins to shift. Looking ahead to 2026, our revenue mix should transition away from project work and toward throughput. As feasibilities grow, unit economics ought to improve. For the facility to turn a profit, we need 20% utilization; for the company overall, it's 50% utilization — that's where our attention sits. Meanwhile, we stay strongly committed to generating money from legacy mining and real estate assets, while also pushing forward the SSOF related opportunities and securing non-dilutive capital sources, such as grants and industrial financing. In summary, Q1 was a successful quarter of positioning, deployment, and readiness, and the remainder of 2026 is about executing at scale and monetizing our mining and real estate assets. At this point I'll hand things over to Corrado, who can give us more detail on how operations are going and what the team is observing firsthand at Metals. Corrado?
Thanks, Judd. Yeah, no, that's a fantastic summary; we've set things up to generate revenue from these assets exactly the way Judd described. We're accomplishing that in mining, we're accomplishing that in SSOF, and all of it serves the expansion of metals. Let's move on to metals. I recall we chatted, was that 2 or 3 weeks back, you know, regarding the year-end report. I must say a tremendous number of things have happened over these past 3 weeks. I've genuinely been eager for this update. You know, particularly with metals, you know, we've by now received, deployed, we're putting together and commissioning the facility. A lot of you, as Judd mentioned, will be there on the 28th to view it. Quite a few of you have visited during the past 2 months, you know, starting in January. Each time somebody comes, even if only 3 or 4 days separate the visits or an entire week, the plant appears dramatically different. This is going to be not just the first industry scale, high speed, high throughput, zero landfill solution, but it will serve as a showcase for everybody, honestly, but above all, our customers. Our customers are building serious momentum; they're strategic, they're regional, they're national. They grasp as we talk with them what we plan to accomplish, but we'll be in a position to demonstrate it to them as early as June, and lots of them have already booked appointments to come in June and in July when we'll be running our first industry scale facility in Silver Springs. Naturally, our goal, as Judd stated, is to make it profitable, increasing it to 20% utilization, 50% utilization, and naturally, we want to operate it at full capacity; we're additionally working on improving the downstream production line. You'll notice the CapEx, you know, which up to now has stayed remarkably aligned with our plan, but we've also moved downstream to boost recoveries, particularly for glass, and we can already accomplish that as of today. As Judd stated, before this year ends, we'd like to possess a 1 ton per day fully integrated metal recovery capability; we're avoiding the term refining; this is the final occasion Fortunato said I'm allowed to use the word refining. We're recovering these metals at extremely high purities. We're already recovering glass right now to specifications that even 2 months back we didn't realize we were capable of. The outcome of that, I'm going to explore a bit further now, but it's produced a number of extremely large scale companies that wish to utilize our glass for items such as, you know, fiber optics, for items such as cement additives, an entire spectrum of uses. We're improving the production line. We're going to be boosting recoveries. We've moved away from honestly fretting about, you know, where will all this glass locate a home? We were concerned about it in a professional sense. You know, we were laboring very diligently on locating a home for it. At first, the values of those homes were rather low. Right now, those prices are elevated, and there are dynamics at play, you know, around those materials. That's a huge development, possibly among the most noteworthy, you know, points raised in this conversation over the past three weeks. We've also pinpointed our second facility; the permits for it have already been filed. Two days ago we sat down with our regulators. It's a very encouraging step forward. As Judd said, we won't buy equipment for facility number two until the first is operational, and honestly, until it's operational and ramping in terms of the volume passing through that machine. We have a good capability to adjust that amount. You've heard from us frequently that demand for silver and the silver market are robust. Photovoltaics drive it; electronics drive it. The shortfall in the sector, you know, which is fairly young, you know, across the past half a decade, is obviously continuing. China appears to play a larger role in that continuation. The forecast, naturally, for silver, which, you know, went past 80 bucks a share, an ounce, sorry, yesterday and is sitting at roughly $80 an ounce today, stays very strong. As for our process, the way to consider our offtake is that aluminum is steady eddy; we've sold our aluminum cleanly, clean aluminum, from the very beginning; it's definitely the least maintenance-intensive piece of our offtake stream. The tailings we've sold, as most of you know, to subpar refiners. I suppose the positive update there is we used to ship our tailings to Asia. Now we have, and we've locked in, a niche domestic offtaker. We're quite pleased about it since the economics are superior and the logistics, naturally, are far better. We continue to see that as a short-term situation, you know, since we're working intensely on our own metal recovery process, where we expect this year you'll hear us prove and show that we can recover silver from these materials; that will be the initial goal for 2026, the announcement that we're recovering our own silver, you know, at a 1 ton per day pilot scale, obviously, and after that eventually that we're recovering copper, that we're recovering pure silicon and silica, and then finally, you know, the doré of these remaining critical minerals. Couldn't be more thrilled about what that means. That means we'd then be fully integrated, selling every one of our materials while remaining in the zero waste category domestically and overall. The glass was the item I brought up earlier; we have a bake there. I'm gonna show you the equipment tied to that. Let me address the capital because we've stayed remarkably on plan here. You know, I think broadly, when we talked in aggregates, we'd reference $12 million-$15 million as the final capital. Judd mentioned $13 million. That's our actual figure for Facility #2 . We put $11 million into the facility. In just a minute, I'm going to show you a few images of it arriving and taking shape. That covers every piece of equipment needed to load a panel, crush a panel, condition a panel, sort a panel, and bag it. The whole operation, truly from soup to nuts, is what gives us those three streams. On top of that, we ended up spending $1.1 million more on power generating systems. There's a fairly widespread recognition that grids are weak and grids are short. Our plan never involved relying on the grid — we have our own robust natural gas feed directly into our facility. Frankly, the capital required for these power generating systems ran a hair higher than the upgrades originally planned for the facility off the grid. Yet the cost of the power is actually lower. That makes us very happy. $2 million has been spent. What you're looking at represents money spent. $2 million went toward leasehold improvements. Comstock Metals spent that money. The landlord is responsible for that money. That money will come back, you know, from the landlord; we had a need for speed, we got all that done. The building looks incredible.
This covers the construction and leasehold upgrades at 600 Lake Avenue, plus the whole storage complex — that's the figure directly beneath, $1.1 million — and you can view the photos beside it showing the fencing and the storage, all of which is now coming online. Many of you will see all of it yourselves by the close of this month. Strip out the leasehold improvements and we sit at roughly $13 million, which is remarkably right on plan. Honestly, the metals team has done an outstanding job controlling their capital budget and their capital spending. Another $1.5 million is going to be spent by us. $0.5 million for this product upgrade has already gone out the door. Here's what happened, and I'll pull up a picture of it right now. Bear with me for one second. What happened is we've been in discussions with some of the biggest glass manufacturers in the country, and before this we were discussing utilizing this glass for recycling — bottles, tiles, and vases. Fiber optics and cements are part of the conversation too. Our glass is being presented by us, and it's free of laminates, plastics, glues, and contaminants of that sort, yet it still carried some dust, still carried small shards of aluminum. So the eddy system you're looking at was put together by us, and it magnetically strips out all the metals — truly just tiny traces of leftover metals — and then cleans everything so our glass satisfies the strictest specifications of the nation's finest glass manufacturers, and we're in the final stages of negotiation with multiple parties. Frankly, I can tell you every one of those parties wants all of our glass. So from a supply and demand standpoint, we find ourselves in a very, very good place. As for the actual facility, this is an older photo that you've seen previously, with the facility filled, naturally, with solar panels; that's no longer the case. Construction on the building and its leased-space upgrades is essentially complete. Work is now proceeding on putting the machinery together. Throughout that work, we documented things with photos so you could see the layout taking shape and how the pieces are fitting into place. It will definitely be entirely assembled before this month ends. All of the components, among them the electricity-producing units and the scrubbers mounted outside, have arrived at the site and are in the process of being put together. The storage building, which you can observe, has a complete fence around it and is now arranged very well indeed. As for the roadway, upgrades are underway right next to it, which will let us move material from storage into the processing plant with maximum speed and efficiency. Significant progress has been achieved on the core facility and its three main off streams. Considerable work has also gone into improving portions of our offtake, particularly within glass. In addition, we've made substantial headway on recovering metals from these materials; the process has been designed, and that design effort is finished. Our main partners are committed. Pilot and bench testing is underway at multiple sites. As Judd said, the hope is that all of this comes together as one integrated solution able to process 1 ton per day, and we would prefer to have it situated at the 600 lake facility. That's exactly what we sat down with regulators about earlier this week, and honestly, I walked away from those conversations feeling as pleased as I possibly could. I also wanted to give you a look at the market side. Progress in the market keeps building. We're moving forward with strategic customers. Strategic customers are engaged with us — whether through customer agreements, master service agreements, or in certain instances, arrangements involving co-location and potential joint operating agreements. Those are really interesting. I believe this picture that everybody has already seen demonstrates so clearly how California, Arizona, and Nevada stand for the oldest panels, the biggest end-of-life market anywhere in the country. The next map you're going to view has been updated; the map currently in front of you is two years old. In the map you're about to see, California, Nevada, and Arizona appear in exactly the same way, but you begin to notice what's taking place across the rest of the country. Within just the past two years, the growth of deployments throughout the southern U.S., along the eastern seaboard, and even reaching the mid-Atlantic, and the northern Midwest, has been extraordinary. Part of that comes from what has occurred over the last two years. Frankly, some of it reflects better data, yet it's clear this isn't a regional story. This market is large. A question I get constantly is, "Well, what about new deployments? The solar industry has really run into some headwinds, hasn't it?" My immediate response to that is we're less concerned with what gets deployed today since our focus is end of life. End of life is our market. Have no doubt, just look at the projects currently under development. It doesn't appear or feel as though the solar industry has run into a wall. Sure, it faces certain political and other headwinds, but that's a relative matter. Believing that wide-scale deployment isn't occurring would definitely be wrong. Our projections remain steady. We feel very confident about how this facility performs when running at 90% utilization. We have a lot of confidence in getting strong silver yields. After reaching that point, the first stage of recovery is to start pulling out our own silver; we're aiming for more than 90%, and because silver prices are so high, the value we get from recovering metal starts to look just as good, maybe even better, than what we earn from tipping fees — that's the core idea. That's where we're headed. None of this factors in better recovery rates for our own metals. What's counted here is only glass sales, aluminum sales, and sales of those tailings. All right, let me move on to Sierra Springs for a few updates. Things there have been just as busy—maybe even busier—than what's going on in the metals side. I believe we can tell folks that Judd is completely focused on monetizing and selling off all our mining assets. Those are now in diligence and closing stages. That's huge; that's great news. We're not able to reveal anything until the final contracts are signed, sealed, and delivered. Per Judd, we anticipate that happening with a strong likelihood in Q3. On the Sierra Springs front, we're putting capital to work there. We set aside dedicated capital for Sierra Springs. A path to gaining control of this enterprise has been greenlit by both their board and ours. The reason we're seeking control comes down to our success in securing power for this property. It's hard to picture a more favorable market for sales or monetization. I nearly said, there's no better marketplace anywhere on earth at this moment than critical minerals. Demand for land with power access spans generations. That's remarkable. What we possess becomes quite valuable once power is available.
It's not simply a matter of us being situated somewhere that's incredibly well known and highly sought after for data centers and businesses like these, and each company named on this list has already established operations here. On top of that, there are others we're currently negotiating with who want to come in; our site is positioned right next to everything being developed. In the past, when we said immediate proximity, we were referring to a 10-minute drive to Google, a 12-minute drive to Switch, and a 15-minute drive to Apple. Nowadays, that immediate proximity means being literally across the street from our properties. By agreeing to provide as much as 300 megawatts, we put ourselves in a position with roughly 800 to 900 acres available, so we could generate revenue from that land, doing so in parallel with Microsoft, Tract, and the numerous other businesses involved in land, power, and compute. Becoming a land developer isn't our goal. Being a land power compute firm isn't what we're after either. What we want is to extract the greatest possible value from these holdings. Three years back, there may have been a slight premium for land with power versus land without it—that was likely the case when virtually anyone could apply to their local utility and receive power. That's no longer the situation; that is not the case now. At present, when a property lacks electricity, it draws almost no buyer attention. Once power is available, though, folks are practically battering down your door and competing with one another, you know, to secure a spot. There's still effort required on our end to get the land into ideal shape and lock it down. That's the reason we're committing funds. When I say getting the land perfected and secured, here's what I mean: for the same amount of money, we gain not just control of the entity—which is to say, more than half—but also the entirety of the land, along with the titles, the water rights, and the power, all locked in, free of debt and free of obligations, which we can then bring to market with a major counterparty. If Tract says it plans to put $100 billion into this area over the coming decade, all you need to do is stop by and look at the 1,100 acre project they've got going on the Peru Shelf. Just come see for yourself the 1,500 acre build-out taking shape in the space separating us from the Peru Shelf. Getting to the Peru Shelf takes just 12 minutes, and the stretch in the middle, between them and us, adds another six minutes — you're basically partway there. Every bit of this sits just up the road. Across the street from where we are is where their third development is located. Land that comes with power changes everything. Actually, what we've discovered is that discussing land on a per-acre basis is really the wrong term. These companies instead measure things in terms of land per megawatt. Land is necessary. Roads are necessary. You know, you need standard infrastructure. That's something we already have. Ideally, flat terrain is what you want. You know, all the development we see happening around us is spending incredible sums, it appears, it seems, it looks that way, to level out mountains. Ours is flat, and for that reason it holds much higher value. Power is the thing you need; with power, anything can happen. When land has power access, that's what drives the worth higher. Our metric isn't dollars per acre — it's dollars per megawatt. What's your cost per megawatt? Quite a lot. Quite a lot, correct? These kinds of valuations are becoming extremely, extremely compelling for us. In closing, let me say the metals business is going to be commissioned. Before this month ends, what you'll see is a plant that's fully assembled and fully connected. Come June, it will be running. Come July, it will run without interruption. We remain on schedule for that — Q2 operations, followed by a ramp-up. That's a handful of months behind what we'd initially wanted, yet still on schedule to be running in Q2, and it's a showcase; we'll take great pride not just in demonstrating how it runs, but we're even prouder at this point about the customers taking offtake of every material we produce. That's thrilling. We won't set off the equipment purchase, you know, until we're truly content with all we observe on serial number one and with how panels flow through serial number one. That isn't to say site two hasn't been secured; that isn't to say beginning the permitting isn't smart and efficient, but there's no need to pull the trigger on capital until the market, you know, until the market indicates it's the correct move. We anticipate — we very strongly anticipate — announcing the mining transaction during the third quarter, getting it wrapped up and finished. Like Judd said, cash will come to us, upside will be retained by us, cost will come down, and the company will be simplified dramatically. We anticipate news during the third quarter regarding Sierra Springs. In transactional terms, that doesn't mean the same thing as it being sold. It happening that fast isn't something we believe, though we do believe positioning will occur, and we will engage with meaningful counterparties toward that goal. Like I said previously, I do anticipate, you know, from that point, you know, 100 days, 120 days, we ought to have considerable clarity regarding what the monetization strategy looks like. Compared with when we last spoke, the options are larger, wider, and more likely. The work being done on that front has been remarkable. Anyone who has visited since January — and a lot of you have, our new directors included, and I really want to thank them for making the trip to actually see the land, the facilities, and the projects in person — can feel a real sense of enthusiasm about what's underway. So what are we ultimately trying to achieve? Our goal is to turn our mining assets into cash and do the same with Sierra Springs, in the most intelligent way possible, and then let our treasury finance something that is clearly turning out to be far more than just a business that recycles solar panels. That's certainly one way to describe it, but really it's an exceptional industrial materials operation. I'll leave it there, Zach, and I think we're ready to take questions.
Thanks, Corrado. Like I said when we started this call, over 25 questions had already come in before it began. And I can tell there are a good number of further questions arriving via Zoom.
Right.
Corrado and Judd, we'd like to start with this question: going forward, what do you intend to do with the mineral and mining properties you own?
As I believe we mentioned at that point, a sale is underway. I think, you know, in the past we chose our language carefully. The term we favored was monetize, and we figured joint ventures were possible. We figured earn-ins were possible. You know, all of that is now behind us; a clear route to a full sale exists; at this point, a full sale means cash coming in and, as Judd noted, something meaningful. Equity may deliver some upside for us. Royalties will most certainly deliver upside for us. We feel really good about how that value looks to us. And we feel even better about putting that capital back to work in our solar recycling business.
Thanks, Corrado. Moving on, our next question concerns Comstock Metals. Rivals have stated openly that they achieve over 15 grams of silver for each panel. Is LODE able to verify the actual amount of silver being recovered per panel at present, rather than the maximum that is only theoretical?
Yes. Yes. There's plenty being said by those we compete against. I believe it's quite accurate to state 16, 17, 18 grams for each panel. For most panels, that's exactly what we keep observing. Thin-film panels, Zach, significantly lower, all right? Significantly lower with thin-film panels. Far less weight when it comes to thin-film panels; additionally, we sometimes receive wafers of rejected material intended for manufacturing clients that contain only silver and silicon. It differs, yet for the vast bulk, we're discussing roughly half an ounce for each panel. You could say 16, 17, 18 grams for each panel. It's quite consistent. Recovering an extremely high proportion of that figure is what we're aiming for. How should that be understood? For instance, beyond 90%. Right now we produce tailings, including silicon, silica, with plenty of silver inside. Those get shipped to a refinery. In the future, recovering those metals is what we want; receiving payment for just 45% or 50% of the silver isn't what we want; recovering and being paid for 90+% of the silver is what we want. Whenever dust gets away or, say, residue remains on the glass, what happens? Silver is present in that dust. Upgrading the glass leads to capturing and recovering additional dust, which translates to additional silver; our expectation is to begin with a fairly high recovery rate and then simply keep enhancing and keep capturing and keep enhancing the recovery of those, of those minerals. I don't, I don't know. For instance, whether there's significant variability, depending on which kinds of panels. As soon as we begin running the machine, we'll manage to estimate the proportion we're capturing, and we'll manage to concentrate on Look, the goal is the theoretical maximum that some may write off the theoretical maximum as nonsense, yet lacking knowledge of what the theoretical maximum is leaves you with nothing to aim for. Knowing what we're truly recovering would be valuable, and then simply persisting in the effort. Reaching the theoretical maximum is impossible, naturally, yet that's what we aim toward. Those two figures, what we're truly recovering against what we eventually recover, are what we'd report once we reach fuller operations. Given that this is a first of a kind operation, the answer remains unknown to us at this point.
Thanks, Corrado. Regarding the solar panel feedstock supply the company expects, what portion has already been locked in via long-term customer agreements? And how much visibility does management have when it comes to future volumes?
We've devoted a great deal of discussion to this topic, including when our new board members came by a few weeks back. You know, to be clear, this is the single most uncertain item; it's the single most uncertain item. Putting it that way isn't entirely fair, though, since we're in the process of signing master service agreements with big customers. The companies we're dealing with take the management of their environmental liabilities extremely, extremely seriously. They demonstrate that seriousness through the tipping fee they pay us. They also demonstrate it by wanting certificates of destruction, you know, extremely, extremely fast; from our standpoint, getting this system operational, you know, begins to move significant volumes of material. Let's talk about that first low threshold Judd mentioned, the one at 20%. When we say operating at 20% capacity, what we mean is handling 2,000 tons of material per month — 2,000 tons every month, alright? We've got, you know, upwards of 6,000+ tons of material just sitting there, ready and raring to go once the machine is operational. We're pretty confident that our business and our customers could get behind that level. That level isn't thrilling, okay? It's more of a floor we want to stay above no matter what. And it's not a guaranteed win either, right? So we've got to keep pushing to get those panels in, and then ramp them up to significantly higher utilization levels. So 2,000 panels a month — I think for the first three months, that's basically just sitting there waiting to be processed. We'd probably run at that slower pace initially, because while we're ramping, we're debugging, optimizing, tweaking, and then we'll let the market drive our growth from there. It comes down to how much visibility we have. We've got somewhere in the range of three, four, five months of visibility. When the equipment becomes operational and those boards begin moving through, that figure will rise and get better as time goes on. What reassures us the most regarding risk is that we don't require especially heavy usage. None of that is intended to imply that we're indifferent to it being extremely high.
Corrado, how confident are you that the new equipment will run without any problems?
We have confidence in every piece of machinery. I want to state that precisely and with attention to detail. Every phase of manufacturing—starting with the primary crushing units, moving to the curing ovens, then the secondary shredding and separation operations—all of these rely on the identical engineering team, the identical builder, and the identical vendor that we used and ran at the demo site for more than 2 years. We are approaching 2 and a quarter years at this point; that is positive, yet what is even more positive is the magnitude at which we now run the equipment. As you are aware, the 20 times magnitude increase from the demo to our current state is a magnitude Fortunato has worked with in previous roles and previous businesses. Although this marks the initial occasion that such magnitude is being used on solar panels, it is not the initial occasion that such magnitude is being used on different materials. Obviously, issues always arise, interruptions always happen, but on the whole we are eager to begin and to start running, and we definitely do not identify any catastrophic defects, yet we do anticipate interruptions and obstacles, though, similar to, nothing that will genuinely disrupt, as you know, our commercial operation.
Thank you. Are you able to provide fiscal year guidance on revenue?
Specific guidance hasn't been given by us. Some folks are out there discussing things. You know, I believe I want to stay with this: look, at the beginning, we're going to process 2,000 tons each month. After we have two or three months, you know, behind us, after we've done additional customer channel checks, after we've made additional customer visits — a lot of our customers, you know, have a box they need to check, and that is watching this machine run. You know, I think from that point, we'll be able to offer much better guidance.
All right, shifting to SSOF. When it comes to the Sierra Springs properties, what's the best way for us to think about how these assets are valued?
So this is the piece I’ve been discussing — what land costs on a per-square-foot basis. What I can tell you is that the figures we use to support what we do are per-square-foot land prices in the single digits. In the areas right around us, we observe the market for powered land — meaning our own communities and the nearby ones that are already engaged in this — sitting in the double digits. That’s genuinely striking: we’re putting money in below single-digit thresholds while expecting to reach above double-digit thresholds on a per-square-foot basis. What the market is telling us and what we’re picking up is that for a private company with small megawatt counts — really, if you have no megawatts, nobody will even talk to you. At 5 MW, 10 MW, 15 MW, 20 MW, you’re seeing folks assess what you deliver at roughly half a million to — I’m not sure — three-quarters of a million per megawatt. At larger scale — 100 MW, 200 MW, 300 MW, and God willing, 900 up to a GW — the range becomes $1 million to $4 million per MW. Those figures are astonishing, all right. For public entities that hold that sort of leverage, the value is high, and that’s precisely where our expectations are beginning to rise for Sierra Springs. People say, “My God, if that’s true, then this is worth more than your entire market cap.” Well, that’s the problem we’re addressing — setting it right with this effort — and that’s the reason we believe we must monetize it, because otherwise people simply won’t accept it. Others need to come in and confirm it. Others need to come in and do transactions with it before anyone will believe it’s genuine. A tremendous number of subject matter experts are now arriving to provide second and third opinions on this position, and I can tell you the positions look very strong. It’s underway. Over the past three weeks I’ve devoted more time to this than I did across the prior 30 weeks, and it feels very good. At last, things are progressing. I give credit to some of our directors for stepping in and supporting me on this. I give credit to Judd for stepping in and helping support me on this. This isn’t a one-man effort. We’re advancing, advancing very strongly, and the partners are — I want to say lining up, though it feels more like they’re circling the wagons. It’s truly gaining traction. I don’t want to come across as wildly over-optimistic. It’s extremely complex. It’s very detailed work, with very diligent counterparties. Rest assured we’re performing the work at the level of detail and diligence required to satisfy their standard for doing a deal, and we’re quite excited about that.
With land sales, where will the capital be used?
The one thing we're focused on is putting money behind the expansion—ideally explosive expansion—of the metals side of our company. What we're becoming is an industrial materials company that starts out national and grows into an international one. A whole supply chain is being put together. Something we may not have discussed much is the logistics system the metals group is putting in place. You know, with plant managers in California and plant managers in Ohio, we're lining up logistics. We're lining up customers. We're lining up suppliers, and the supply chains are terrific. Take glass—we've got some customers there, and it wasn't just a nice surprise that we're working with some of the biggest glass makers in the country. It was a real nice surprise that in some instances their plants sit within 30 minutes of where we are. Glass, as you know, doesn't move very far. When the price you're getting is $20, $30, $40 a ton for something, shipping it a long way doesn't work. Things are coming together here quite nicely. The top priority, Zach, is expansion of the metals business. Ideally, aside from the cash we're laying out to get the position in Sierra Springs just right and to get the power delivered to those lands so those high values can be realized, aside from that cash, everything goes to metals. Turn mining into cash and move it into metals. Turn SSOF into cash and move it into metals. That's the ideal scenario. As of today, we aren't putting money into Bioleum. That's the thing nobody wants to bring up. Bioleum isn't being funded by us right now; their runway lasts until the end of the summer as they go about raising their capital. I'm optimistic about them raising that capital, but we're watching it extremely closely, right? It's a large investment. It carries meaningful value, and we're optimistic about the team handling it. At this moment we have no plans to put money into anything besides metals and SSOF so that it can be turned into cash for metals. I hope that comes across clearly.
Absolutely, that's right. Thanks, Corrado. Could you give us the latest on Bioleum, along with what you anticipate from that investment moving forward?
Let me share two extremely important points regarding Bioleum. First, feedstock represents the choke point for that sector. Feedstock is the choke point for that sector; the renewable fuel industry's issue is uniquely that there is a limited supply of soybean and vegetable oils, and a limited supply of used cooking oils. The government is aiming for 16 billion gal of renewable diesel and fuel within the U.S., yet merely 4 billion is being produced, since those fats, oils, and greases are insufficient. Period. So what is Bioleum's role? It takes woody biomass — the most plentiful kind — and transforms it into feedstock oils with the greatest yield, the least cost, and the lowest CI score; this is achieved using a dedicated crop supplied by Hexas Biomass. We possess not just the cheapest source, but the most dependable feedstock supply. To my mind, that is a quite straightforward pitch to present to the capital markets. Such a pitch was unavailable just a few months back, since Hexas began operations only in December, and fully integrating Hexas into the solution has required them a couple of three months; at this point they possess something I consider entirely distinctive, you know, and robust; that, you know, that's, you know, that's the first, you know, key point, you know, concerning Bioleum. The second is that they simply must, you know, draw the appropriate kinds of investors, you know, toward that solution. To address your question, our preference is for them to, you know, complete a Series B and afterward become publicly listed. Once they complete a Series B and afterward become publicly listed, they then constitute a liquid investment, you know, giving us considerable flexibility in how we monetize. Could there be appeal in that technology, appeal in that asset, leading to their acquisition? That too is quite possible, all right? Their current path is, you know, Series A, Series B, IPO. You know, I believe they have a genuinely solid track to accomplish that. The less they depend on us for that, the greater our happiness, since we are building a global industrial supply chain for our metals business.
Thank you for that, Corrado. Can you highlight capital spending for 2026?
Right. I believe Judd brought up that the first facility took $14 million. That's finished. All systems are ready; we're just awaiting the final oven shipments. Those ovens are enormous. The oven — and the ovens — were set to arrive at the end, so we're always coordinating when they show up. Everything has landed. A lot of the oven parts came in; they're arriving roughly every second day, correct? By the close of May, not only do we anticipate that all of it will be on site and put together, with that cash used. An additional $1.5 million is going toward upgrades for this glass system. A portion of that has already been paid out. The remainder has already been placed on order since these large glass suppliers tell us, "Hey, the moment you begin sending us this glass, you had better keep going," right? We now have some truly large and thrilling customers that we're going to serve with these materials. We're going to direct $10 million toward a 1 ton per day fully integrated metal recovery system, which used to be called refining. A 1 ton per day metal recovery system that will begin generating silver, copper, aluminum, silicon metal, and additionally, you know, dorés of highly critical minerals. I don't wish to brush aside the silica and the silicon metal, because consider this: 1 ton per day. Assuming you've got 1 ton per day, and Fortunato can pull out 1 lbs of metal, we would be incredibly pleased. Should you extract a pound of metal, there remain 1,999 lbs of material. Nearly all of that is silica glass, silicon metal. If we bring that up to the specification grades the market wants, we're selling 100% of everything. That is precisely our thesis; that is precisely our marketing. The values that this will suggest once we're recovering every metal are multiples. You know, we're truly aiming to get that finished. Out of that $10 million, Zach, a portion of it is the equipment, okay? It nearly always — and nearly always, and I'd say nearly certainly in our situation — shows up as R&D expense. Even when you've got tanks and recovery cells and washers and separators, it's going to be R&D expense. After we've demonstrated the 1 ton a day, portions of that equipment will head into labs, and then we'll begin constructing a 25 ton per day system, which would be closer to the demonstration facility we've run for more than two years for the solar recycling; after that has been proven and the final investment decision is reached, we'd move to something like a 250 ton a day, which would be an industry scale, first of its kind metal recovery facility in the United States. To answer your question, $1.5 Million will go toward upgrading downstream. $10 million will be directed, we think of it as investment in a 1 ton per day recovery system. The GAAP accountants will label it R&D expense. So look, we're not going to move ahead with buying for Facility #2 until we feel good about how Facility #1 is ramping up. You know, at first our thinking was that might happen as early as May or June, but honestly now it feels like August or September would be the soonest, and it could slip past that — we're not rushing, okay? What we are rushing on is getting Facility #1 ramped up and making this entire damn thing profitable.
Thanks, Corrado. Time's almost up, and I believe every significant question has been addressed. Should yours have gone unanswered, email it to ir@comstockinc.com, and we'll try our hardest to reply straight away or put the answer up on X. If you aren't yet among our followers on X, you can find our primary account under Comstock Inc. — go ahead and follow. Corrado, ahead of closing things out, share a few closing remarks regarding what's left of Q2 and the goals for 2026 as a whole.
So, I suppose I get to announce that in 21 days, we'll all be talking together once more — that's a pretty good spot to be in. At the Annual General Meeting, which is 21 days out, we've already had something like 50 + folks sign up, so it should be a fantastic day. A tour of the facility is on the agenda. You'll get a look at the showcase. And by the way, if you still haven't registered, the cutoff is roughly three days from now. Kindly get that done, because otherwise we'll have no choice but to shut registration down. From a logistics standpoint, we simply can't manage it if folks keep signing up. If your proxies have arrived, please cast your vote. We'd truly appreciate it — everything on our end is ready to go. Our board, our management team, our balance sheet — all of it is ready to go. Execution is the whole story. Three weeks from now, we won't just talk about further execution; we'll give you the visuals of that showcase and that plant going live. Zach, after that point, it all comes down to the panel flow, correct? Panels flowing in, product sales heading out, just like a normal, real company. That's something we're excited about. And we're excited to see everyone on May 28th too.
Absolutely. Appreciate it, Corrado. That wraps up Comstock's business update and earnings call for the first quarter of 2026. Thanks for being with us.
Thanks everyone. Speak soon.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Comstock Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Comstock Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.