Home / Transcripts / Consolidated Water Co. Ltd. (CWCO) · March 17, 2026

Consolidated Water Co. Ltd. (CWCO) Earnings Call Transcript

March 17, 2026

NASDAQ US Utilities Water Utilities earnings 37 min

Earnings Call Speaker Segments

Rick McTaggart executive
#1

Good morning, everyone, and thank you, Chloe. For 2025, revenue and operating income across our retail, bulk, and manufacturing operations landed exactly where we had forecast for the year. Services revenue, however, came in below our expectations, and the only cause was a permitting delay related to the 1.7 million gal /day seawater desalination plant under construction in Kalaeloa, Hawaii. In our view, such delays are normal, given the complex, multi-agency approval path that a project of this scale requires, and Consolidated Water is not at fault for any failures here. Indeed, over the past year, every other major milestone for this phase of the Hawaii project was achieved, including successful pilot testing, confirmation from the Honolulu Board of Water Supply that the water we can produce reasonably matches the quality of their existing supply, and that our water would cause no harmful effect to the Board of Water Supply's system or to their customers' assets. Finally, we completed 100% of the design work for this project. With those other major milestones now behind us, we are positioned to start construction as soon as every permit has been granted. We keep collaborating closely with the Honolulu Board of Water Supply and the regulatory authorities in order to move the permitting process forward and lessen the impact on our schedule. Although total revenue on a consolidated basis came in a bit lower than the prior year, our consolidated gross margin improved in both percentage and dollar terms, and consolidated net income from continuing operations rose markedly versus 2024. All four of our business segments delivered higher gross profit in percentage terms, which reflects very favorably on how carefully we manage efficiency and costs. Our retail water operations kept expanding in 2025, fueled by the strength of the Cayman Islands economy and rainfall that was historically low across our exclusive utility service area on Grand Cayman. Population and business activity on the island kept rising, and combined with extremely scarce precipitation, that produced a record volume of water sold to a record number of customers in 2025. While revenue in our Caribbean-based bulk segment dipped slightly over the past year, largely because of reduced fuel-related charges passed through to our customers, we still delivered greater profitability in dollars and a higher gross profit percentage in this segment; lower costs of revenue drove that gain, once again reflecting our emphasis on operational excellence across our bulk businesses in the Bahamas and the Cayman Islands. Revenue for our services segment fell in 2025, mainly as a result of two major design build projects finishing in 2024 and the pause in Hawaii project activity while we wait for a key project permit to be issued; that pause followed completion of the pilot plant testing phase of the Hawaii project in early 2025. Services segment revenue generated under our O&M contracts totaled $32.1 million in 2025. Also contributing to the services segment's revenue decline, though to a smaller extent, was a reduction in non-recurring consulting revenue — which, as it happens, came back up over the most recent quarter. Within services, the falloff in construction and consulting revenue was partially offset by recurring O&M contract revenue, up 9%. Services segment revenue generated under our O&M contracts totaled $32.1 million in 2025. That O&M increase was driven by additional revenue from our PERC Water subsidiary, plus REC in Colorado. It includes revenue from a new municipal customer in Southern California and from added services provided to a major federal client, spanning the second half of last year under an agreement expiring at the close of this month. Throughout the year, our manufacturing segment continued to post gains in both revenue and gross margin, reflecting what was produced over the past year — largely higher margin products for nuclear power and municipal water customers — together with our sustained focus on getting the most out of efficiency and throughput at our plant. Completion of our new 17,500 sq ft manufacturing facility in the third quarter of 2025 has driven efficiency and throughput up further still, and it is vital to expanding that segment through ongoing diversification of customers and products. That diversification is taking place chiefly in the municipal water client, or municipal, portion of our business; now, before I move on to recent developments and our outlook for the rest of the year and beyond, I want to pass the call to our CFO, David Sasnett, who will take us through the 2025 financial details.

David Sasnett executive
#2

Appreciate it, Rick. Good morning, everyone. Looking at 2025, we posted $132.1 million in revenue, which represents a decline of only 1% compared with 2024. That softening was primarily attributable to reduced revenue from our services segment, as well as a modest drop in bulk segment revenue. These decreases were partially offset by higher revenue in both the retail segment and our manufacturing segment. Retail revenue climbed 6.6% to $33.6 million, supported by an 8.3% increase in water volume sold, which hit a record 1.09 billion gal. That improvement was driven by substantially reduced rainfall — specifically, historically record-low rainfall on Grand Cayman — together with an approximately 7% increase in customer accounts inside our license area. Within our bulk division, sales dipped by just under 1%. The reason was cheaper energy, which lowered the portion of our Bahamas rates tied to energy pass-through. Turning to services, the downturn largely came from plant construction revenue shrinking to $13.5 million in 2025 from $18.6 million in 2024. Contributing to the earlier figure were $8.2 million of extra revenue tied to PERC's contract with Liberty Utilities, along with $1.3 million from the Red Gate contract in Grand Cayman, both booked in 2024. By mid-2024, those two contracts had largely wrapped up. On top of that, construction revenue recognized for the Hawaii project declined by $2.9 million in 2025, since the pilot plant testing stage there had concluded. Construction revenue from new contracts helped make up for some of those construction revenue decreases. Revenue in our Services segment from O&M contracts came to $32.1 billion for 2025, up 9% versus 2024. That gain came from additional revenue produced by both PERC and REC. Revenue in our manufacturing segment rose $1.1 million, or 6%, reaching $18.7 million, compared with $17.6 million in 2024. Gross profit for 2025 stood at $48.4 million, equal to 30% of total revenue, versus $45.6 million, or 34% of total revenue, in 2024. This better result reflects higher revenue in both the retail and manufacturing segments. For 2025, continuing operations gave us net income of $18.6 million, which works out to $1.16 per diluted share. In 2024, that figure stood at $17.9 million, or $1.12 per diluted share. When you factor in discontinued operations, net income attributable to Consolidated Water shareholders for 2025 came to $18.3 million, or $1.14 per diluted share. That's versus $28.2 million, or $1.77 per diluted share, in 2024. Now, looking at the balance sheet: over the course of the year, CW Bahamas accounts receivable balances fell to $20.7 million at December 31st, 2025, down from $28.4 million at December 31st, 2024. The drop came about because we collected sizable payments—on top of what was billed during the period—against the overdue receivables that CW Bahamas holds from the WSC. By February 28th, the amount owed to us by the WSC had reached $22.6 million. We continue to be in touch with Bahamas government representatives on a regular basis, and they consistently express their intention to bring down the past-due receivable balances at CW Bahamas by a meaningful amount. That said, we are unable right now to predict if such a reduction will actually take place, nor can we say when it might occur. Turning to December 31st, 2025, our cash and cash equivalents totaled $123.8 million, working capital was $141.9 million as of that date, and stockholders' equity came in at $221.7 million. Looking at our cash and working capital as of December 31st, 2025, both are up versus where they stood at the end of the prior year — cash is $24.4 million higher, and working capital grew by $9.1 million. On these calls we've noted many times that our balance sheet carries no meaningful outstanding debt at present. Looking ahead across the rest of 2025, the liquidity we anticipate requiring covers approximately $11.1 million for capital expenditures related to operations we already have, and included in that amount is roughly $1 million earmarked during the first half of 2026 for a Bahamas project. Beginning in the third quarter of 2025, the quarterly cash dividend we pay went up 27.3%, which took it to $0.14 per share. In January of 2026, dividend payments came to approximately $2.3 million. Should our board declare future quarterly dividends, those could add to our liquidity needs as well. We keep assessing the best way to deploy our substantial cash position and strong liquidity so as to boost shareholder value. That wraps up our financial summary for the year, and now I'll hand the call back to Rick.

Rick McTaggart executive
#3

Appreciate it, David. Turning to our retail water operations in Grand Cayman, we felt good about the ongoing expansion there, which David already touched on, both in terms of sales and volumes sold. Our bulk water operation based in the Caribbean kept delivering stable, recurring revenue over the long term. Water demand in the Cayman Islands is driven mainly by shifts in tourism levels and how much rain falls. Based on data released by Cayman's Department of Tourism Statistics, air arrivals of tourists to the Cayman Islands rose 2.9%, reaching roughly 450,000 during 2025 versus the year before. That most likely played a role in our retail sales gains. One thing worth noting: preliminary figures indicate that January of this year was likewise an outstanding month for tourist arrivals in the Cayman Islands, and we're eager to see what effect that ends up having on our sales. That said, the first couple of months of this year also brought much wetter conditions. Rainfall rose by about 280% across the first two months of 2026. We expect that, too, is having an effect on our sales during the first quarter of 2026. As for our Cayman Water utility license, back in February of last year we got a new concession from the government that authorizes and preserves the terms of our 1990 license until OfReg puts a new license in place. Talks between Cayman Water and OfReg regarding a new license have picked up more than in prior quarters, though they're still in progress. Turning back to the Hawaii project, during the quarter just ended, we finished. Actually, during the quarter just ended, we finished 100% of the design work for BWS's seawater desalination plant, and our attention now is on securing the remaining permits so our client can issue a notice to proceed with building the project. That involves actively answering regulatory questions and working with BWS to reduce schedule impacts. Because construction activities were deferred, anticipated revenue recognition and the related cash flows tied to the Hawaii project have essentially been pushed into future periods; we expect building on the project to resume, or to begin, later this year, and we see the construction phase of this major project adding substantially to our revenue and earnings growth in later reporting periods. Revenue from our construction service segment is expected to stay under the record level we hit in 2023 until construction gets underway on the Hawaii project. Turning further to our services segment, as we announced during the quarter just ended, we won two water treatment plant construction projects, both new, comprising a $3.9 million drinking water plant expansion in Colorado along with an $11.7 million wastewater recycling plant in Northern California. Revenue tied to these projects should mostly be recognized this year, and the combined value of the two obviously comes to $15.6 million. REC, our Colorado subsidiary, landed the first project, and this drinking water plant expansion will help us build a track record to chase further design build opportunities in Colorado. During the fourth quarter, we told you that our PERC Water subsidiary had won the remaining contract to build a wastewater recycling facility for a golf club in the San Francisco Bay Area. This groundbreaking project is designed to turn untreated wastewater into irrigation water, and it should conserve between 36,000,000 and 38,000,000 gal of drinking water each year for that golf club. Since the facility is going to be built underground, we chose to begin work on it once Northern California's rainy season wraps up, so that construction delays stay to a minimum. As a result, we anticipate recognizing revenue from this project mainly during this year. In the interim, we have been securing subcontracts and placing orders for long lead equipment tied to the project. That work goes on. Through its customized design report, or CDR, program, PERC Water provides thorough, project-specific blueprints for water infrastructure that take into account life cycle costs, scheduling, and performance metrics. By delivering certainty around cost, schedule, and water quality, these reports cut risk and maximize plant performance for our clients, and they have proven especially appealing to big home builders and private utilities. Over in Arizona, PERC keeps leveraging its CDR program to chase a number of design build possibilities for developers across the Phoenix metropolitan area. Just as happened with the Liberty Utilities project in Arizona a few years back, we think some or all of these CDRs will eventually result in a design build contract for these key wastewater treatment facilities. As I noted, these kinds of opportunities usually come with a longer sales cycle. Turning to our manufacturing operations, in August 2025 we completed an expansion of our Fort Pierce, Florida facility, adding 17,500 sq ft of plant space and raising total manufacturing space to 47,500 sq ft. With this expansion, we can take on greater production volume and juggle multiple projects simultaneously. The timing is especially good, since bidding activity for municipal water projects in Florida has risen substantially. Because these municipal initiatives come with lengthy lead times, we expect them to fuel growth in 2027. Our deep experience building large scale nanofiltration and RO systems, combined with where we sit in Fort Pierce, Florida, should, we believe, leave us well positioned to keep expanding that portion of the business within the Florida market. As we have shared before, we carry an NQA-1 certification from two major nuclear industry companies, and we are seeing fresh interest in U.S. nuclear power solutions. These specialized manufacturing credentials also set us up for ongoing growth. Looking ahead through the coming year, we believe our diversified business segments will keep producing better results for shareholders; that includes ongoing growth in our retail business in Grand Cayman, our long-term stable recurring revenue from our Caribbean-based bulk water business, and the growth potential of our U.S.-based manufacturing design build and O&M businesses. With worldwide need for clean water still rising, our solid financial position lets us act fast on chances in desalination and water infrastructure across the Caribbean and North America, plus any possible strategic buys or partnerships; so with that, I want to turn the call over to questions. Chloe?

Gerry Sweeney analyst
#4

Morning to both Rick and David, and I appreciate you letting me join.

Rick McTaggart executive
#5

Hi there, Gerry.

Gerry Sweeney analyst
#6

I had a couple of additional questions about the desalination project in Hawaii. I'm just wondering which permit that is and who is in charge of securing it.

Rick McTaggart executive
#7

Well, I suppose it's fine to tell you that it's the State Historic Preservation Department. I believe we brought that up during the November call. I mean, that.

Gerry Sweeney analyst
#8

Yeah.

Rick McTaggart executive
#9

Before we're able to submit requests for every one of the building permits, the ground clearance permits, and items of that nature, that permit has to be in hand, you know. We are moving forward with it, you know. For everyone, it's simply a really slow process. It isn't only us.

Gerry Sweeney analyst
#10

Understood. Does Consolidated have to handle that permit, or does the city take care of it?

Rick McTaggart executive
#11

That falls on the client; they've been handling every inquiry and that kind of thing coming from the department.

Gerry Sweeney analyst
#12

Understood. After we get that, we still have to file additional building permits and so on, is that right?

Rick McTaggart executive
#13

Yes, that's right. From what I understand, this permit has to be obtained before we can apply for several other permits.

Gerry Sweeney analyst
#14

Understood. So, making your best guess here — after that historical permit comes through, any sense of how much time the remaining permits would need? Or does it stay somewhat open-ended, simply given how permitting works?

Rick McTaggart executive
#15

Again, from what I understand, those tend to be somewhat more straightforward. The design work is done on our end, so what remains would involve having the regulators approve each of the different components of that design, which would then let us proceed toward building permits. I have to say I'm somewhat hesitant here. You can see the situation unfolding, since.

Gerry Sweeney analyst
#16

Yeah.

Rick McTaggart executive
#17

We ended up pushed back from the prior year, during Q4 — what I mean is, because of where the share price stood and matters along those lines. Predicting things like this is really quite hard. That's the reason we put it in our remarks that, you know, at some point in the later part of this year — what I'm saying is, we'd definitely anticipate construction getting underway at some point in this year, though pinning down precisely which quarter that lands in is a bit tough right now.

Gerry Sweeney analyst
#18

Understood, that's logical. I was just trying to figure out what additional milestones or phases come after those legacy permits, because knowing that would help clarify the timing and shape of how things unfold. That's helpful. The next thing I wanted to ask about is the O&M revenue, which came back up this quarter. I think you mentioned a few project wins, but I also think another project was reaching its end. If I'm not mistaken, that's PERC and REC I'm referring to, not the Caribbean. Looking ahead, how does that business's pipeline and opportunity set appear?

Rick McTaggart executive
#19

There's a great deal happening in that area, Gerry. So, at the moment, we're pursuing a few pretty significant opportunities. One of them, well, it's a very crowded space. These are larger O&M deals, I'd say. We believe we bring some strengths to the table. Both are located in Southern California, as you know, and we feel that our footprint there along with our track record gives us an edge. Sure, the market's competitive, and we're just grinding away, you know, attempting to land a few of these. Should we win these projects, they could be major victories for us.

Gerry Sweeney analyst
#20

Understood. Okay. Just one more thing I wanted to ask. Clearly, the West Bay facility got finished. A million gallons per day of water was needed for that. My recollection is it wrapped up during Q4 of last year, but what's our thinking there? What I mean is, that brings extra volume. It's my assumption it won't all be consumed immediately, though perhaps that's what happens, but I'd just like to know how much of that water, or that million gallons per day, is essentially already committed or will get used, assuming you can see that far out.

Rick McTaggart executive
#21

Well, what I'd say is, we did use it during last year since our quarters were fairly large. I think, you know, our asset planning looks at something like a five-year window, five to 10-year window. You know, it somewhat hinges on what this heavier rain is going to bring this year, since our production capacity gets based on peak demand, which usually happens in December, January, February, those kinds of months; things begin getting wetter during the summer. Demand eases back. What I mean is, we rely on that capacity and we installed the initial 1,000,000 gal, I suppose, roughly two and a half years back, and right after that we began growing it because more capacity was required. If you look at how our volumes have grown across the past five years, since after COVID, it's really quite striking, so.

Gerry Sweeney analyst
#22

Understood. All right, that's fine, and thank you for that. I'll rejoin the queue. Appreciate it.

Rick McTaggart executive
#23

Sure thing. Thank you, Gerry.

John Bair analyst
#24

Good morning, guys.

Rick McTaggart executive
#25

Hey, John.

John Bair analyst
#26

John Bair here — I appreciate you having me on the call.

David Sasnett executive
#27

Morning to you, John.

John Bair analyst
#28

I feel like I should already have this figured out, but when you raise energy cost recovery, how fast does that show up in your bulk services? Sorry — bulk services. Does that happen each month, every three months? What's the mechanism?

Rick McTaggart executive
#29

This happens on a monthly basis. Each month, we review what the typical expense is for fuel and electricity, and after that, we pass that amount along to the customer.

John Bair analyst
#30

Alright, then. Regarding the next item you brought up — that federal services contract wrapping up at month's end, if I recall correctly. Would that be up for renewal? And assuming so, can others submit bids for it, or is the whole thing already settled?

Rick McTaggart executive
#31

Right. That contract was something we originally competed for when COVID was going on, and it has been extended annually from then on. From what we know, there were a few others. This isn't tied to how we performed or to any specific reluctance on their side to keep us on. I suppose the military had other priorities it needed to handle, you know, at that installation. They handed it over. As we understand it, that contract is going to a municipal organization located immediately adjacent to the base. No competitive process took place; they simply awarded it to that public utility, that municipal utility.

John Bair analyst
#32

Oh, all right; well, during your prepared remarks you did speak broadly about project opportunities and that kind of thing. I was simply a bit curious. You mentioned that plenty of municipal projects exist out there. I'm just wondering how much there is. Could you address the mix between public-private possibilities and just the public projects; put another way, is there, say, for instance, potential in data center water aspects that might be a newer opportunity for you?

Rick McTaggart executive
#33

Right, honestly, John, data center work isn't what we're after. What I'm referring to is pretty dependable municipal business. In Florida especially, regulations have shifted regarding shallow aquifer withdrawals and similar matters. Whenever new drinking water capacity gets added, it's under construction. When cities have gone past what their shallow water withdrawal permits allow and must tap deeper, saltier aquifers, that hands us a substantial opening in the low pressure RO segment. There are quite a few projects, and every one is municipal, so simply pick any city along Florida's East Coast, and each is examining ways to grow drinking water production capacity. You've got Pompano Beach, Delray Beach, West Palm Beach, Stuart, Port St. Lucie, all the way up. Quite a few projects are underway that create chances for us to manufacture the equipment. We've achieved considerable headway in recent years collaborating with Florida's consulting engineers. Our products and our quality genuinely win them over, and we're being written into specifications on quite a few of these projects.

John Bair analyst
#34

That's nice to hear. Well, that sort of brings us somewhat into my final question here. I was wondering whether there are any fresh opportunities, any new market possibilities that your manufacturing segment could go after, now that you've grown it and all that. Are you exploring any new potential market openings for supplying equipment?

Rick McTaggart executive
#35

Yes. Actually, you could sort of look at the municipal RO system market as a kind of opportunity that's come back around. I mean, for several years we didn't really bring in much business from that market, and our attention was more on turning out, you know, smaller equipment and assemblies and piping and things like that. You know, having this bigger space in Fort Pierce lets us take part in a much larger way in the municipal water market and to, you know, build those big assemblies that, you know, production skids that are needed for those kinds of plants. That's really where our focus is right now. You know, there are other, you know, the nuclear market, I mean, there's we keep making products for that market. It's a bit more cyclical, I suppose, than what we're seeing in the municipal market at the moment. There's just a really strong demand for that kind of equipment, so that's where we're putting our efforts.

John Bair analyst
#36

When we talk about that nuclear market, would you say it's mostly here in the US, or is it, you know, worldwide, I suppose, generally put? Is that pretty much where the attention is?

Rick McTaggart executive
#37

Right. Regarding those 2 customers of ours, they market their goods both inside the country and around the world. I can't really pull that figure straight from memory, though I'm aware there are initiatives in the U.S., Canada, Japan — things along those lines — and Korea where these items get deployed.

John Bair analyst
#38

Very good. Well, thanks for taking my questions.

Rick McTaggart executive
#39

No problem at all.

Rick McTaggart executive
#40

That's right. I simply want to express my appreciation to all of you for being with us on this call. And by the way, happy St. Patrick's Day. I can't wait to talk with each of you when our Q1 report comes out in May. Stay well. Thanks.

Operator operator
#41

Thanks. As we get ready to close out the call today, I want to go over the safe harbor statement, which addresses the warnings regarding forward-looking statements that we've shared with you on this call. What we've discussed during this conference call includes forward-looking statements, as outlined by the Private Securities Litigation Reform Act of 1995 — this covers things like statements regarding future revenue, future plans, objectives, expectations and events, along with assumptions and estimates, without limitation. Forward-looking statements can be recognized when words or phrases like believes, estimate, project, intend, expect, should, will, or similar expressions are used. Anything we say that isn't a record of what already happened depends on what the company right now expects, believes, assumes, estimates, forecasts, and projects about its operations, the sector, and the markets connected to it. If we make a forward-looking comment on this call, it should not be taken as a promise about how things will turn out, and it comes with specific dangers, unknowns, and premises that can't easily be foreseen. What actually happens, and the results we post, may end up substantially different from whatever those forward-looking comments describe. Several elements might lead to or play a part in these discrepancies. Among them are weather patterns and tourism activity across the regions where we operate; the economic, political, and social circumstances of every nation where we currently do business or intend to; how we get along with governmental bodies and the other clients we serve; regulatory issues, which encompass settling the talks to renew our retail license on Grand Cayman; our capacity to move into new markets effectively; and assorted additional risks spelled out in the company's periodic filings with the Securities and Exchange Commission. Should you want further details on the risks and uncertainties tied to the company's operations, kindly consult the management's discussion and analysis of financial conditions or results of operations, along with the risk factors portions of the company's SEC filings, which include, without being limited to, its annual report on Form 10-K and its quarterly reports on Form 10-Q. Anything predicted in today's discussion reflects only the current moment. Unless the law demands otherwise, the company firmly states it has no duty to revise or refresh those predictions should its outlook shift, or should the events, situations, or conditions behind them change. A quick note: a recording of this call can be accessed beginning tonight. Dial-in details for that replay are in the earnings release issued yesterday, which you can find on the company's site, cwco.com. We appreciate your joining today's presentation. That wraps up the conference call. You're free to hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Consolidated Water Co. Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Consolidated Water Co. Ltd. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.