I'll move a bit quicker than normal here—good morning, good afternoon, or good evening, whichever fits wherever in the world you're dialing in from. Contango events always draw a very international crowd, as usual. So we've got people joining from Switzerland, from APAC, from Alaska. Thanks to all of you for being here. Joining me today is Rick Van Nieuwenhuyse, the CEO of Contango Silver & Gold, who was good enough to release a major corporate update right after Labor Day so we'd all stay informed. Rick, how are you doing?
Good. Good to see you, Romeo.
Yes, great to see everyone. So let me explain how today's session will go for those of you here in the room. If you're a regular attendee, feel free to tune out for the next 30 seconds — you've heard this a million times. That said, there's a chat box at the bottom of the screen. I'd really encourage you to submit questions whenever you like during today's event; it's likely to be on the shorter side — we're looking at roughly half an hour. As always, though, I have quite a few questions ready based on the release, but I also want to hear from all of you. A few questions came in early by email, so we'll be sure to cover those. After that, we'll take on whatever arrives from the live audience too. A couple of quick housekeeping notes. This session is being recorded and should be ready for replay around midday Eastern Time—definitely by today. So it'll land in your inbox. It will also be posted on 6ix's YouTube channel. You'll also see a request meeting button at the bottom of the screen—click it if you'd like the chance to meet with the Contango Silver & Gold team. Right after the event wraps up, I'll send that along together with your registration details. That button works whenever you like during today's event, even once it's finished. Now, onto the interesting part. Rick, let's dig into the press release, since yesterday's announcement comes across like a checklist where every single box is marked off. You've got 3 core assets, 2 jurisdictions, drilling, road building, underground development — everything delivered on time and on budget within one field season. For most companies of your size, whether larger or smaller, getting even one of those programs across the line is a real struggle. So I'd really appreciate it if you could walk us through what goes on behind the scenes to pull off such a busy season with this much happening at once.
Well, I believe I mentioned earlier in the year that this year was going to be focused on execution and simply getting things done. And that's essentially what we accomplished. It really begins with assembling the entire team. Keep in mind, we merged 2 companies, Contango Ore and Dolly Varden Silver; so the first order of business was really bringing the teams together and integrating those 2 teams. And I think we've shown that we did that flawlessly. It's been a very successful year, a very busy year. I think we're at close to 70,000 meters of drilling overall across the 2 main projects, and that covers exploration drilling, infill expansion. We've also completed geotechnical work and similar activities at Johnson Tract. But yes, it's been a very busy year, and every project has executed precisely what we had planned. At Lucky Shot, the underground development, the exploration drilling, announcing results; we're on track to put out an MRE on that early next year, in the first half of next year. At Johnson Tract, road building actually ended up accomplishing more than planned. We got the laydown area fully finished, which we had actually anticipated doing next year, but we completed it this year. So the road now connects the camp and the proposed portal site. Permitting on the portal side is, I'd say, substantially complete. You never truly ever finish permitting. There's always something being permitted.
Exactly. We're renewing it, or there's always a permit.
Right. It's simply — it's a continuing — it's a process, and we have substantial permission there to build the tunnel. So next year is going to be about constructing the tunnel, and after that it will be about carrying out the infill drilling at that site. So — and then, naturally, Kitsault, I believe that's the one that truly shows how well the teams have collaborated; we had planned a drill program of 40,000 meters. We're going to exceed 50,000 meters; and that's purely because of the efficiencies and the team simply working together. And that's a hard location to drill. It's a remote project, it's supported by helicopter, it's steep terrain. And I really must thank all of our contractors, the helicopter contractors, the pad builders, the tree fellers, the drillers, the geologists. It's been an extremely busy year. And I think what needs emphasizing is it's been an extremely safe year; we've completed all this work, the 70,000 meters of drilling, the road building, the bridge building, underground drilling, underground tunneling, and it's been 100% safe, no LTIs, and that's the way we want to work, and that's the way we want to execute our programs.
Great. Something I picked up on in the PR is that the release contains a fairly significant Manh Choh story. I suspect it may be drawing less notice. I've definitely seen it get less attention than I believe it deserves. Every mill modification needed to recover the higher-grade sulfide ore out of the South Pit is finished and performing as intended. As I understood it, that was one of the genuine technical uncertainties heading into the year; so what does it mean now that it's been proven out. Is that behind you?
For Manh Choh, the opening six months of this year were never going to be easy — those first 2 quarters were always going to be a struggle. What the first half was really about was moving from North Pit over to South Pit, with a great deal of pre-stripping. That means plenty of equipment shifting waste material so we can reach the ore in South Pit, or the main pit. And naturally, that ore carries more sulfide. It's a higher grade and richer in sulfide, which is why the oxygen plant had to be installed so recoveries reach adequate levels. That work has been finished — completed in the last quarter — and the plant is running now. As a result, we should be seeing recoveries somewhere between the 80s and low 90s, depending on the sulfide content. How much sulfur is present really determines how efficiently the oxygen plant performs. So that piece is behind us, and we're looking ahead — right now we're in the middle of the third batch for the year, and we'll likely keep running all month, possibly stretching a little into October. That means production will in fact span probably 2 quarters. How Mike chooses to report that, I'm not certain, but I'll leave it to him to work out; still, it's an exciting period for Manh Choh, since those higher grades sit in the main pit. I call it the main pit because it's the larger one; and with pre-stripping now largely complete, we should see our costs decline and our production rise; and we'll capture the genuine benefit of that next year — we're guiding toward 75,000 ounces of production along with a lower cost, $1,200 to $1,300 all-in sustaining cost. So — and once more, the oxygen plants are installed. In fact, they've put in a redundant system. So it's — we should be seeing those efficiencies show up in the recoveries and in the throughput.
All right. Great. I really want to turn to Lucky Shot, since that's news that has me excited for this year. Twelve months ago, no one was discussing a KM vein system. Now your drill contractor shows up this week to put roughly 1,100 meters into it from the new West Drift extension. So for investors who are just getting up to speed, we're here that mostly follow another project of Contango's. What is KM? And why is this jump in the queue for everybody's attention?
Right, so the KM vein is a brand-new find, and that's the thrilling part. When you're exploring a district — and Lucky Shot is a district — it isn't just one small vein; there's an entire network of veins throughout it. But at Lucky Shot itself, the vein we were chasing runs pretty much east-west and dips toward the north. While we were driving the tunnel to test it with drilling, we used fan shots — that fan-shot style of drilling across the tunnel — and we hit a vein dipping at right angles, essentially a conjugate vein. We called it KM after Keith Miles, one of the guys who worked with us on the project. Sadly, he's passed away, but he'd been in the district a long time. He was a miner there for quite a while. So that vein dips at right angles, and it's a new discovery. Nobody has ever explored it, and it's never been described in the district before. That's what makes it exciting, and the fact that it was running as high as 10 ounces per tonne — that makes it very exciting too. Grade is king, as the saying goes. The vein was dipping away from us at the end of the tunnel, so we've now extended the West tunnel by about 100 meters, and the vein sits above us. So we'll drill fan shots above us like this, holes like that, and we'll outline an area of roughly 100 meters by almost 100 meters. It's a slightly irregular shape, but roughly that. When you're seeing these multi-ounce grades, you can build ounces fast. That drilling gets started at the end of the week. The drillers should be fully set up — the airbag is in, electrical and water are in now — so they'll get going, and it'll probably take about a month to finish that drilling. Then, unfortunately, it takes a couple of months to get the assays back, which is always the frustrating side of exploration — particularly this time of year, when everybody and their brothers are out drilling and the labs are packed. But that information will come out before the end of the year, that's our plan.
Absolutely. Folks send us messages daily wanting to know why assay results from the company haven't come out yet. That decision isn't always in the company's hands, honestly. Let me make sure you all get this. At times these labs get genuinely jammed up. During busy season, it takes a while.
Yeah. That's a frustration I think everyone across the industry is coping with at the moment. It's — well, we'd end up going off on a tangent about that.
Yeah, absolutely. I really want to get into the surface drilling at Coleman, since it finished up with 29 holes—one of them being that 2.45-meter intercept grading better than 86 grams—and you've got 10,000 meters of underground drilling continuing through February, which feeds the FS slated for next year, unless I'm wrong about that. So in what way did that KM and the Eastern L2 extension shift how that study might turn out compared with what you were modeling 6 months back? Because it seems to me it's shifted quite a lot.
Yes, of course, KM vein will be included in the plan. And clearly, that remains exploration. We sampled wherever possible, and it performed very well; so 1,100 meters of drilling will be carried out, and we’ll see what results come back. But what is clearly significant about KM is that it sits right in front of us. Very little development work is needed to actually bring that into production. So if we end up hitting a lot of plus 10-gram material in that vein, we’ll look to fold that into the overall mine plan; and it may well alter our overall development scheme for the deposit. But we’re not there yet; we’re just — we’re still going to go do the exploration. In the meantime, construction of the East drift is almost complete, which is basically just opposite the West drift down the Enserch tunnel, and then one goes off west and one goes off east. The East drift is nearly finished, and a second drill rig will be brought in, and then drilling there will start in about a month or so. So — and that is targeted on the classic Lucky Shot vein system in package, literally right underneath where they mined it before. And so — and then in the meantime, we advance the tunnel and build 2 more drifts further down further at the end of the tunnel to continue extending the Lucky Shot vein down dip, further down dip. Obviously, if we really like what we see at KM, we’ll adjust and we’ll — the exciting thing about KM is it’s never been explored. So right now, we’re just going to test 100 meters of it, but we’ll keep going, we’ll probably keep testing it, especially if it keeps running multi-ounce. We like multi-ounce.
Yeah. Having a drill core that's worth a large sum of money — just the core itself — is exciting. That's pretty neat. I do want to...
All that visible gold, right, is what gets reported, and that's what's exciting. For geologists, it's always exciting. So when you look — by the time the core reaches me to examine, it has all those little red circles marked on it, which makes finding the great gold really easy for me.
A lot of folks may not realize this, but exploration geologists might just be the biggest adrenaline junkies on the planet. They're basically base jumpers. I don't think that's widely understood. That said, I want to spend a second on Johnson Tract, since I'm jumping around among your projects; and I hate to push back on you, because I know in the past you've framed it as a permitting story. But from where I sit, it seems like this summer it moved up into something of a construction story, given that the road from camp to the portal is built, 2 bridges are in, and the portal pad is finished. So what does having that pad ready to go open up for this project in 2027?
What I mean is, this positions us to keep delivering and to get that tunnel constructed. The crew we're assembling at Lucky Shot for tunnel work is going to move over really smoothly — all those people we work with, and have worked with for some time now, will shift from Lucky Shot down to Johnson Tract and begin tunneling there. So there are a couple of things we need to do to make that work, because once we're underground, we want to stay underground all year. That means we're upgrading the camp. We're beginning that work this year; it won't be finished until next year; but next year we want to operate year-round right through the winter; so the camp needs a substantial upgrade; but yes, the portal sites are completely ready. I think the photos show you the bridges are solidly built. They're nice, sturdy bridges. The road looks excellent. You could drive a sedan on it if you wanted; it's a nice — it's a good road; we have plenty of material to work with, and that was — that's a major benefit of operating at Johnson Tract, since you have a lot of — there's a big river system running right through there; and so there's lots of material available; it's nicely channeled, and then obviously, that's the role the bridges and their abutments play with gabion baskets. You know, to keep the water controlled, but it isn't kind of spreading everywhere. So yes, it's been a good, solid year of work. We have a great crew out there too. And again, they work safely. And so we're really proud of what they've achieved in a relatively short span of time.
Yeah, there’s a great deal happening. On that note, I definitely want to discuss Contango more broadly and sort of pull together all of the work. At Kitsault you’ve got 50,000 meters, at Lucky Shot there’s a 5,800-meter plus underground program, and at Johnson Tract there’s road construction — every bit of it funded by Manh Choh cash flow rather than returning to the markets, which at the moment is excellent; that’s welcome news for everyone. I would really like it if you could speak to the financial discipline, I suppose, that’s required to hold all of these programs to budget simultaneously.
Yes. That's the point where collaboration really comes into play — you draft a budget, present it, and then essentially review it: are you truly laying things out correctly from a cost perspective, and also from a scheduling perspective? Just yesterday we held a large meeting with the entire team, going over what has been achieved this year, what the intentions are for next year, and what it requires in terms of dollars. What does it require in terms of personnel? Those are the two essential items. And then ensuring the scheduling is right, so that you carry out the right work at the right moment. So you aren't attempting to complete tasks when conditions are awful. Day-to-day weather is difficult to forecast, but certain portions of the season are definitely wetter. And once more, so — let me offer an illustration: we ended the surface drill program at Lucky Shot somewhat early since we received roughly 6 inches of snow; and we aim to operate safely; that's a major criterion for us. And so we agreed, fine, we had a few holes we were able to drill. We agreed, let's simply finish up. And this snow wasn't the type that was going to melt away. You could kind of sense that 6 inches turning into 12 inches, not a pleasant sunny day ahead; so those are the kinds of things we want to — if you end up slightly short, it's no big issue. Those are holes we can drill next year or the year after. So — but that scheduling and simply ensuring your budgets are accurate. I don't want to call it tight, because we always want a contingency for matters we don't always use; but — and most of those stem from weather delays; yet we had plenty of equipment operating this year, road construction equipment; we had many helicopters transporting equipment. And once more, performing that at the proper time of year and performing it safely are the key elements of remaining on budget.
Speaking as someone from Ottawa, you develop a feel for whether 6 inches of snow are going to stay put. Give us a sense of it. These are the ones — these will stick around, and you do get that sense...
Alaska definitely saw winter arrive quite early this year. I believe that caused many people to shut down ahead of schedule.
Yeah, I saw photos of snow still on the peaks in August, which tells you conditions up there are pretty different. But I'd like to look ahead to 2027. This kind of follows on, I suppose, from the previous question, since as we discussed, every one of the assets is requesting capital. You've got underground drilling running through February, drift development and camp extraction, the expansion at Johnson Tract, and of course the engineering work at Kitsault targeting the MRE. How are you thinking about ranking these dollars? How does that math work out strategically for the team?
Okay, I suppose the place to begin is really Manh Choh and what we anticipate that operation will produce, and our financial projections are built on a gold price of $3,700. So I'd say we're taking a cautious stance on that front; and consequently, the cash flow that will come our way—we clearly intend to deploy more capital than that. And so we are—we have plans laid out, and I'll make a bit of a forecast here. A feasibility study is going to be completed at Lucky Shot. The bulk of the work gets finished this year as far as the tunneling goes, and the drilling will carry over into roughly February of next year. After that, it's simply a matter of crunching the data to finish a feasibility study. And once more, I refer to it as feasibility light since it relies on the DSO model—we aren't constructing a mill, a tailings facility, and a large power plant to operate everything; effectively it's a mine plan plus a transportation plan, and they're putting together an offtake arrangement for the production. And so for Lucky Shot, I'd say that's fairly uncomplicated; and then obviously we can pull the trigger at the beginning of the second half of the year on the development plan. Here's the feasibility study—we're going to carry out the feasibility study. Over at Johnson Tract, the tunneling follows from what we're doing at Lucky Shot this year. We'll be doing the same at Johnson Tract next year. We likely won't begin until equipment has been mobilized in and all of that. So in reality we probably won't start tunneling until August, September—the latter part of the summer—because everything has to be set up; but after that you're operating year-round since your camp has now been upgraded. And then at Kitsault, I believe there will be somewhat less drilling; we had 5 rigs turning this year. I think there will be only a couple next year, and we'll be working toward—we'll provide another update to the MRE. We have one coming out shortly—certainly before the month is over. But then we have another 50,000 meters of drilling from this year that needs incorporating. So that gets updated in the first half of next year. Even the assays probably won't all be back until January, late in the year. And so then I'd say by the close of the first quarter, early in the second quarter, we ought to have the MRE updated. And so I guess all the programs are—we aren't doing identical things across every program. They're each slightly out of phase, and so—which is nice, as I mentioned, the drill team and the underground mining team from Lucky Shot can essentially move over to Johnson Tract. And you know you've got a solid group of people who have worked together, can work safely, and get things done efficiently.
Okay. And before I widen the scope, I know I’m going to focus specifically on Kitsault for a moment. This marked the first complete field season with Kitsault operating under the Contango Silver & Gold name. Every one of the 8 earlier target areas was drilled, and Homestake was drilled as well. That means 123 holes, and as best I understand it, we expect an updated resource estimate to arrive within the next few weeks; so once that MRE is released, I’d urge everyone to watch closely for it. What should investors be watching to assess whether this season at Kitsault was a success?
Right, so there is a total figure, of course, and a substantial portion of those inferred resources will have been shifted into measured and indicated — and indicated is truly the category to keep your eye on. With underground mines, you don't actually reach measured status until you're underground. So that represents a meaningful chunk. Naturally, we have a new zone being drilled at the 470, and that one won't factor in until next year, since it's a fresh discovery made this year. So — but that's — we will discuss — we will definitely draw attention to it when we put out drill results, which are also due out shortly. But sticking just to the MRE, it's essentially infill drilling plus general expansion of the resource; and bear in mind, the resource already out there publicly, this 60 — nearly 65 million ounces of silver, million ounces of gold; that is fairly old. I mean it got rebranded, sort of, but my understanding is it's a resource from around the 2017, 2018 era, and 150,000 meters of drilling has happened since then. Much of that infill. So the aim of the program wasn't to produce 65 million ounces of silver, 150 million ounces of silver, or whatever figure, it's to carry out infill drilling and to genuinely grasp the geologic controls. So it's a far tighter resource estimate. You'll notice much less inferred. And of course, where you have new discoveries, you'll get more inferred material on those. And that, obviously, is something a lot of this year's drilling will update too. So — but the MRE coming out in a couple of weeks, watch for inferred converting into indicated. Of course, gold and silver prices have moved considerably since that was published in 2023, I believe it is, under the Dolly Varden banner. And that — the gold and silver prices we used will differ from today's. We're going to stay with consensus pricing, which I believe sits in the $50 neighborhood for silver and $3,500 for gold. So there will be some changes. And as you raise the gold price, you lower your cutoffs, or you lower your average grade, and all those dynamics have to work. We'll attempt to explain all of that in the press release, but we'll hold another forum like this one, and we can go through it in more detail.
No, that's — I’m eager to dig into those figures thoroughly; so for my part I genuinely can’t wait, and I’m sure investors feel the same, and surely everyone who phones you says they can’t wait. I do want to wrap up with the calendar, and after that I’ll move to questions. I know the chat has plenty in it. Quite a few arrived by e-mail. This final one is from me, I promise, and then I’ll be quiet. But I want to finish on the calendar since Torbrit, North Star assays are coming very soon. Kitsault MRE, as we stated, probably arrives this month. The remaining Lucky Shot surface assays land in October, Q3 financials in November, underground results nearer the winter. As far as I understand, Rick never takes a vacation. But for someone new to the story, which of these moments matters the most? Like what should a keen investor be watching most closely for the remainder of the year?
Okay, so the silver narrative is really compelling, in my view. And we were looking to — personally, I was looking to pick up Kitsault since it's a world-class asset. High-grade silver projects are quite rare; and Kitsault is a silver mine. It also contains some lead, zinc, and gold; and just so you know, regarding the MRE, we won't be seeing a big jump in gold because that drilling at Homestake was entirely infill. Homestake and Homestake Silver hold all the gold. So that figure won't be expanding substantially since it was — once more, that was purely about upgrading inferred resources. So expect plenty of news flow regarding Kitsault and its silver grades; it's a high-grade silver deposit. Homestake and Homestake Silver contain a substantial quantity of gold. We essentially split the district into these 2 target zones, Torbrit and Dolly Varden in the south, which is gold with — pardon me, it's silver with lead and zinc, and very little gold. And then in the north, you have Homestake and Homestake Silver, which are silver rich while also holding a substantial quantity of gold. Again, low base metals. But yes, I'd say the emphasis on — when it comes to news flow, there will be plenty of news flow regarding Kitsault in the coming — across the coming several months, essentially through year-end, and it's silver, silver, silver.
Great. No, this is exciting. All right. We’re going to move into questions that came in by e-mail and then some items in the chat. Starting with the first one — it was quite a lengthy, involved question, but what it comes down to, I’ll focus on, I believe, just the core of it, namely, could you give us an update on the mill?
Yes. The short answer is that there’s nothing new I can share with you, except that we’re — we keep pursuing a number of opportunities to either build a mill or buy one. Both of those options are under consideration. So I dislike telling you to stay tuned, but at this moment that’s genuinely all I’m able to say. Those discussions are certainly moving forward on several fronts.
Thanks. Someone asked whether you could say something about seasonal exploration work at Manh Choh. I'm curious whether there's any possibility, anything involving you and Kinross regarding extending the life of that mine?
Yes. The quick answer is that no results are available yet from this year's drilling. And I should mention that a fairly serious fire in the Tok area — right near the town of Tok, literally — interrupted this year's drilling. Unfortunately, a number of people lost their homes. So that certainly disrupted our field season and essentially made it shorter; so together with the early snow I mentioned, all of those factors combined. So results from this year's drill program will come out later in the year. My guess is toward the end of the year. And our next joint venture meeting, I believe, will be in November. So that's probably the window when we'll get some additional results on the exploration side.
All right, that's great. Also, three individuals sent emails asking something we've already addressed — namely, when will you update, and when do you anticipate an updated MRE for Kitsault? As you mentioned earlier, likely this month, so everyone keep an eye out.
Couple of weeks.
We have some questions that came in through the chat. The first one — and I already gave a heads-up that we may wind up forwarding this to Mike, since there's plenty of math involved — but I'll toss it to you regardless, Rick, for whatever guidance you can offer. He's asking: if you assume you reach your 2027 production guidance of 80,000 ounces at $1,500 AISC, what would be a reasonable range for operating cash flows in fiscal year '27? And he'd like that figured at $5,000 per ounce of gold, but go ahead and use whatever gold price you've got an answer for...
$5,000 gold price?
Yes. That's right. That's what he's looking at...
That figure is going to come in well above $200 million, and likely close to $250 million. With gold at $5,000, sure, that's a sizable number. Next year is the standout year for this project, and indeed, assuming $5,000 gold, we are going to generate quite a lot of cash flow.
Yeah, and speaking as a gold bull of the degenerate variety, my own view is that we'll hit $5,000 by year-end, though who really knows.
That doesn't shock me at all. What I mean is, at the core, nothing is different. The money printing continues, and the Fed is caught in a tight spot. The Fed is also at odds with the Treasury, and these are interesting times — but you had better hold some gold and silver.
Absolutely, that's my perspective as well — physical stock and all that you can access. And the same individual just mentioned in the chat that we ought to say this each time we give a public update, and I appreciate that comment. I'm in agreement. Brad, I'll get that question every time this subject arises. So I'll break it down — I'll have you doing some math on every single occasion. A few more questions. Wesley is asking which indigenous groups you partner with at Johnson Tract.
The Johnson Tract project is held by Cook Inlet Regional Incorporated, an Alaska Native Corporation. And there are also quite a few villages with tribal councils. On that same side of Cook Inlet, Tyonek is the nearest, while Ninilchik, Seldovia, and Salamatof are others located across Cook Inlet. Kinik is another, and those are likely the primary ones we've interacted with regularly. At the moment we're examining some — carrying out work involving gravel material. We're collaborating with 2 of the tribes on this since they hold the surface. I shouldn't call it the tribe. In fact, it's the village corporation that holds surface rights. So we're dealing with those quite regularly. Yes, so those are the main ones. They're essentially all across the Cook Inlet area, which is why the regional corporation is named Cook Inlet Region; the regional corporation therefore owns the subsurface and the surface at Johnson Tract itself, but elsewhere village corporations hold surface lands, and that's where we're working with a couple of them regarding possible borough material sites for constructing the road down — once we begin building the road toward the coast, those sort of — that's where we're working alongside the villages.
Thanks; and Trevor has a question — he says he doesn’t believe so, but he’s wondering whether opposition at Johnson Tract might create any difficulties for the project’s next stage?
I believe a lawsuit has been filed by the Center for Biodiversity and Cook Inletkeeper. The Center for Biodiversity is a national NGO, while Cook Inletkeeper is an NGO focused on the state of Alaska. Their primary worry involves beluga whales and the endangered subspecies—Cook Inlet beluga whales are an endangered subspecies. So clearly, we're putting substantial effort into figuring out where those whales are located and where they are during particular seasons. That way we know which areas we ought to steer clear of. Those studies are underway at present. We essentially have close to a full year of data at this point, or nearly a full year of data. All of that is going to feed into the environmental permitting process, which is proceeding for the road construction down to the coast as well as the barge landing facility. All of it will be included there. And that's all—every permit required on the federal side falls under FAST-41. So it's—you visit the dashboard, simply go to FAST-41 and type in Johnson Tract, and it will bring you straight to the page; then you can view every permit we're required to obtain, all the work we were required to complete to secure the permits, and understand the timing. And basically—and clearly, we've got—we must finish all of our work on schedule to remain within the overall time frame, which we are doing; but we will—the process is going to unfold across the next 2 years. So by May 2028, we ought to be in a position to begin construction of the road and the barge landing facility. So I suppose the fundamental question was whether there's a potential for a lawsuit to delay the project. Look, we're in the United States, and potential for lawsuits always exists. So that's simply part of the landscape; we believe we're doing things in a manner that minimizes our environmental impacts at Johnson Tract because of the approach we're taking with the direct shipping ore model on its own; and clearly, we're gathering as much science as possible to understand specifically where the beluga whales are and when they are there. So from a technique standpoint, winter or summer, where they're coming from and where they're going. But we'll understand all of that, and we can design a program to minimize the impacts.
All right, thanks. Let’s return to the numbers. And again, if it isn’t right at the top of your mind, I’ll send this to Mike by e-mail. But do you know where net debt will land at the close of fiscal year ’26 and fiscal year ’27?
Right, so I can't recall the precise figures offhand, but my sense is that it sits at roughly $47 million at the moment, and come the close of next year, it will be fully gone.
Alright. There you are. Thanks for that. And if you need anything more truly specific, Brad, we’ll connect you with the team afterward. One question from Gillen in the chat: how did production at the North Pit at Manh Choh compare with what Contango’s reserve report assumed?
That's a really good question. Let me give you the bottom line on it. The ounces are accurate. When you look at total ounces, it tends to come with more tonnes at a lower grade — and that relationship isn't unusual. There's a concept we refer to as a grade tonnage curve. What that means is you can mine additional tonnes at reduced grade and still end up with the same ounces, and that's more or less the situation we're seeing. I think it comes out of the way the resource was estimated. This is a skarn — I don't want to get too technical here, but it's a skarn-type deposit. So it tends to occur at really high grades across relatively narrow widths. When you're estimating those, what the model is telling us is that we've overestimated the grade and underestimated the tonnes. And when you're mining, you're obviously working at a much more detailed level than your block model predicts, so you have a lot more data points. And so pretty much consistently, we're seeing slightly lower grades and more tonnes, but the same ounces.
Okay. Someone mentions in the chat that Contango right now trades at just 2 times cash flow and calls that insane. I tend to agree. Rick, I'll ask you not to say anything about that, but that's simply what came from the chat. One question — and I think this is a good chance to discuss how indigenous corporations operate in general in the States. Because they want to know where the indigenous groups stand on Johnson Tract. Like, what's their feeling about the project?
Obviously, that land was chosen by them for mining purposes. I won't go into the whole long story, but the short version is that before the Alaska Native Corporation was permitted to form and pick lands, the state and federal government had already taken every piece of land with oil and gas potential; as a result, Alaska Native corporations were left to choose lands that carried traditional cultural importance. And then, economically speaking, it came down to mining and trees; so those were the — and that was roughly the sequence in which they wound up selecting the land; so in short, Cook Inlet Regional has strong interest and holds a royalty. It's a classic mining arrangement, a mining lease, very much like what we did at Manh Choh. The tribe holds a royalty. So the tribe has done really well as the mine has produced plenty of free cash flow and plenty of royalty payments. So that will work the same way with Cook Inlet Regional; and they are very supportive of the project. They want us to do it right; they don't want us to go out there and make a mess; and so we have — that's the reason we hold regular meetings; and they know — they would not have let us become involved in the project if we were going to make a mess. That's not — that's their land, they are not going to let that happen. That's the thing about private landowners. That's the — that's the thing about private landowners. Private landowners look after their land.
Yes, it's theirs.
If you're looking for a mess, just check out what the government went and did.
Fair, fair note.
Yeah. No, I think — and there's — in Alaska, regional corporations exist along with village corporations, and the lands they hold are surface lands, and those tend to sit right around the villages and the lands that were traditionally important to them. And then tribal governments exist as well; so there are — there are many different layers to sort of work with and interact with. And look, I mean, Chickaloon is one of the villages. It's one of the ones furthest away from the project, but they are aligned with the Center for Biodiversity. So they are not in favor of the project; so not all the villages are supportive. Still, that's only one piece of the political landscape and the forces at play that you've got to navigate. And we make an effort to engage with everyone involved — clearly, the regional corporation holds the land, so our collaboration with them is very close. We also work alongside and engage with the villages, and the same goes for the tribal councils.
That's really useful, and thanks for the added background—I believe many folks, particularly those watching from Canada, don't quite grasp this, since the arrangement there is quite different.
Very different.
Yes, very different setup...
Alaska really isn't like any other place in the lower 48. It's simply a world apart.
Yeah, I figure it's useful for folks to hear that. Let me wrap up, though, with one last comment from the chat. Bruce is over there giving his own version of a Ronald Reagan line, as I recall it. If you're looking to get something messed up, invite the government in to handle it. I'm inclined to agree. But Rick, I really appreciate it. This struck me as a strong update. Everyone ought to go through the release in its entirety, though I hope this conversation gave you a bit more background. Should you have further questions, just click that request meeting button near the bottom or get in touch with Contango whenever you like. I'll make a point of getting back to you with answers promptly. Rick, many thanks. Thanks for making time for this, as usual. I believe this gives everyone some genuinely useful additional context about the release.
That’s much appreciated, and thank you for the excellent questions. Should anything else come to mind, please feel free to pass it along — you can also send those to <<email_hidden>>, and we will definitely respond.
Awesome. Thank you, Rick. Thanks everyone for joining. Have a great day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Contango Silver & Gold Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Contango Silver & Gold Inc. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.