CPS Technologies Corporation (CPSH) Earnings Call Transcript
October 30, 2025
Earnings Call Speaker Segments
Thanks, Ali. Hello, everybody. With me this morning is our President and CEO, Brian Mackey. We're eager to go over what we delivered in the third quarter with all of you; however, before that, our Investor Relations adviser, Chris Witty, will give a short safe harbor statement. Chris?
Thank you, Chuck, and hello to everybody this morning. Prior to starting the operational section of our discussion today, I want to note that any remarks made during this conference call which are not purely historical constitute forward-looking statements as defined under the Private Securities Litigation Reform Act of 1995, and they ought to be viewed as vulnerable to the numerous uncertainties present in CPS' business activities and surroundings; these uncertainties encompass, though are not restricted to, the continuing war in Ukraine, additional geopolitical developments, economic circumstances, such as the present government shutdown, market requirements, and competitive elements. Factors of this kind might lead actual outcomes to vary significantly from what is expressed in any forward-looking statement. Further details are available in the documents we file with the SEC; at this point I will hand the call over to Brian so he can share his view regarding the quarter, and afterward Chuck will go through the financial results more thoroughly. Brian?
Thanks, Chris, and hello everybody. The past few months have been quite productive for us here at CPS. We've now posted record revenue for our company three quarters in a row, hitting $8.8 million, as we shipped more units to meet rising customer demand. That demand keeps growing, which is shown by the $15.5 million order for our power module components that we told you about earlier this week. In the quarter, we announced our fifth and sixth federally funded research contracts of 2025. Right now, we're running 3 Phase 2 SBIR programs at the same time. Also, as Chuck will go over shortly, we finished a successful secondary offering, raising more than $9.5 million in net proceeds, with share purchases made by members of the management team, including Chuck and me, plus several members of our Board of Directors. At this point I'd like to hand the call over to Chuck so he can give further details on our financial results, and after that I'll share some additional perspective. Chuck?
Thanks, Brian. Our third quarter brought a number of achievements, and we're glad to walk through them with you today. For the period, CPS posted record total revenue of $8.8 million, compared with $4.2 million in the third quarter of fiscal 2024 — that's more than double on a year-over-year basis. Versus the second quarter of 2025, which was itself a record, this works out to revenue growth of roughly 9%. The bulk of that gain came from demand that stayed strong, together with the higher shipments that followed from better capacity utilization and manufacturing throughput. The overall pickup in our growth directly informed our choice to raise capital as we prepare to relocate to a bigger, more efficient manufacturing site. That gives us extra space to lift production as demand requires, something we expect to see unfold over the coming quarters and years. I'll come back to that shortly. Gross profit for the third quarter came in at $1.5 million, or about 17.1% of sales, versus a gross loss of $0.5 million a year ago. Just as in other recent quarters, the year-over-year gain reflected greater revenue along with better manufacturing efficiencies. Sequentially, our margins keep improving modestly, and we stay committed to pushing them higher as productivity rises and asset utilization improves. Selling, general and administrative expenses were $1.2 million in the third quarter, against $1.0 million a year earlier. Even as we ramp production and invest for growth, we keep our costs in check. Throughout this fiscal year, SG&A has stayed fairly steady. The company recorded an operating profit of roughly $276,000 in the third quarter, versus an operating loss of about $1.5 million a year ago, and net income came in at just over $200,000, or $0.01 per share, compared with a net loss of approximately $1 million, or $0.07 per share, in Q3 of fiscal 2024. Now for the balance sheet: we closed the quarter with $3.2 million in cash and $1.1 million in marketable securities, compared with $3.3 million in cash and $1.0 million in marketable securities at the start of 2025. Shortly after the third quarter ended, we finished a public offering that, as mentioned earlier, brought in more than $9.5 million in net proceeds. Although this capital will be used broadly for general corporate purposes, the main driver behind the raise was a planned relocation to a manufacturing facility close by that will support long-term growth and product expansion. A search is currently active to find the ideal site for our needs. We expect that location to offer nearly twice the usable floor space. The move should be finished during calendar year 2026. That added capacity ought to cover CPS' manufacturing requirements for the foreseeable future as we keep scaling the business. I'd also like to take a moment to thank the team at ROTH Capital publicly for the investment banking services they provided. The assistance they provided, together with what everyone on the team contributed — our accountants, our attorneys, and so on — played an essential part in getting this capital raise done. As of September 27, 2025, trade accounts receivable came to $5.4 million, compared with $4.9 million as of December 28, 2024. At the close of the third quarter, inventories had climbed to $5.4 million, which mirrors greater output and customer demand, against $4.3 million when the fiscal year began. Moving over to liabilities, payables and accruals reached $4.8 million, versus $4.0 million as of December 28, 2024. Brian is now going to walk through the period in greater depth.
Thank you, Chuck. Following 3 straight quarters where we set revenue records and saw underlying performance get better, we're now focused on what comes next — pushing CPS forward and elevating it onto a higher growth path. A central piece of that involves scaling up our production capacity so we can satisfy increasing demand, along with the essential task of making our operations more efficient. As Chuck noted a moment ago, it became clear that we need more room, and that's what prompted the capital raise. Over the coming months, our plan is to relocate into a bigger manufacturing facility, which will position us to handle the greater demand we foresee in the periods ahead. That covers serving the expanding requirements of the customers we already have, freeing up floor area for new products entering the market, and growing our product development resources in light of more federal funding, all while we keep building out our pipeline; this is a really thrilling moment for CPS, and we're well positioned to seize the many opportunities in front of us. With that said, even though Q4 will be solid, because of the holidays, scheduled shutdowns at certain vendors and customers, and similar factors, it's unlikely our fourth quarter results will deliver yet another quarter of record revenue; that pattern generally matches what we've seen in prior years. And in the same way that 2025 stands out as an exceptional year performance-wise, we expect fiscal 2026 to stay strong too. We're also quite happy about the new contract we announced recently, worth roughly $15.5 million, from a multinational semiconductor manufacturer that has been with us a long time. Per the agreement's terms, CPS will supply advanced power module components across a 12-month span, which started October 1, 2025. The order's value is up 16.5% compared with a year earlier, which shows growing demand for CPS' high-performance, application-specific solutions. These components are going into systems that support high-speed rail, along with energy and grid infrastructure, which underpins the dramatic rise in electricity demand coming from data centers and other uses. This demonstrates the ongoing strong momentum behind our aluminum silicon carbide product line. Meanwhile, we keep enjoying considerable success in securing new research contracts from the federal government. That lets us put our existing intellectual property to work meeting clearly defined customer needs that carry substantial commercialization potential. To illustrate, during the latter part of September, we announced our newest Phase II small business technology transfer, or ST, to the U.S. Army; this funded program gives CPS $1.15 million across a 24-month period so we can keep developing a 40-millimeter controlled fragmentation warhead. For that use case, a high-density material is capable of yielding smaller fragments that carry greater kinetic energy. So generally speaking, tungsten-heavy alloy materials work best. But conventional manufacturing and machining approaches wouldn't be practical given how strong, brittle, and hard these materials are. In Phase 1, CPS successfully showed results producing a tungsten heavy alloy warhead through our proprietary QuickSet injection molding process. First-round testing produced outcomes that matched what the Army needed technically; during Phase 2 those early findings are going to be built upon so that fragmentation gets better, design rules are created and made uniform, and work shifts off the lab bench into initial-rate output. What we're aiming for in the near term is a build that meets the Army's performance standards for the Mk 19 40-millimeter warhead. Testing to assess how it performs and to refine design parameters will be handled by the New Mexico Institute of Mining and Technology's Energetic Materials Research and Training Center, known as EMRTC. When it comes to researching energetic materials and explosives, EMRTC ranks among the top facilities for both study and testing. Phase 2's purpose is to lay groundwork for a strong, inexpensive, large-scale production approach built on tungsten heavy alloys, and after that to look into chances for volume manufacturing. On top of that, we see potential to investigate additional munition sizes, to build using different high-density materials, and to chase other uses calling for an intricate geometry formed from small-area high-density materials. Worth noting: this effort draws on technology CPS has built up across many decades — specifically our QuickSet injection molding process, the very one we've relied on to turn out literally millions of commercial units, our AlSiC baseplates among them. Dr. Mark Occhionero, whose knowledge has been essential to creating and applying these methods at CPS for more than 40 years, is going to keep heading up this STTR work. Applying these production techniques in this novel way opens up meaningful fresh growth prospects for CPS; that direction fits extremely well with our vision of tackling customers' hardest materials problems by aiming our distinctive intellectual property at them in a targeted way. September also brought news of a fresh Phase 1 SBIR contract awarded by the Department of Energy. Roughly $125,000 in funding comes with this new contract, provided by the Office of Nuclear Energy, supporting a research project that stretches to April of next year. What CPS is building is a high-performance, sustainable impact limiter that relies on novel construction methods and materials, meant to make transporting spent nuclear fuel and high-level radioactive waste safer. This effort proceeds alongside the Phase 2 research money we already hold from the DOE for modular radiation shielding; all told, we've now gotten 1 Phase 2 award and 5 Phase 1 awards in 2025 by itself; it's encouraging to witness growing curiosity about our technology from a widening set of agencies and the assorted departments inside them. Other SBIRs already in motion remain on our plate, among them a Phase 1 with the U.S. Navy aimed at cutting weight from the Marine Corps amphibious combat vehicle, a Phase 2 to develop novel metal matrix composites for thermal energy storage that answers the needs of NAVAIR's advanced anti-radiation guided missile extended range program, and the DOE Phase 2 award covering development work on modular radiation shielding for transporting and using microreactors, plus non-SBIR funding from the U.S. Naval Air Command at China Lake. Our technical team keeps pushing these programs forward so they satisfy what these different customers require. We keep looking for more SBIR contracts, since we think we can deliver a distinctive technical answer that also carries commercialization upside for the business. On the current federal government shutdown, we're still tracking how it affects CPS, and so far that effect has been fairly limited; when it comes to federally funded research efforts that already have contracts in place, our development activity keeps going; in certain instances, the federal staff we deal with, or the contractors backing them up, aren't available right now. Even so, up to this point this hasn't materially affected what we do, nor has it gotten in the way of getting paid once we send invoices under an active contract. Should the shutdown eventually produce a more substantial adverse effect on CPS, it might stem from slower movement on new proposals, which CPS has already turned in and which are currently being reviewed, or on new research topics the government intended to release soon. Depending on how long the shutdown lasts, there could be some delays in those areas, or there might not. Quantifying the effect is hard, but on the whole, it hasn't significantly affected us so far.
Over the past several quarters, we've significantly scaled up our manufacturing capacity to meet rising demand, and we keep securing new development contracts as we create innovative answers to real-world challenges. Meanwhile, as Chuck noted, we're dedicated to enhancing gross margins and overall bottom-line performance. We're striving to boost both operational efficiency and production levels, and we're confident that with our new power module contract worth $15.5 million, margins will keep getting better in the upcoming quarters. The prospects for the next year have never been brighter, and we're eager to capitalize on our new manufacturing operations once a new location for our company is determined. As usual, we stay hopeful about future armor orders, though the short-term picture is still unclear because of the government shutdown. Broadly speaking, we think today's military spending patterns are favorable to us. We'll keep collaborating with Kinetic Protection, our ally in this space, on naval vessel procurement choices or other uses throughout the defense sector, especially when the federal government resumes operations. In addition, the company is stepping up its push to launch new and proprietary offerings, like our radiation shielding solution and our ALMAX materials. In fact, we completed our initial commercial order for ALMAX during the quarter; we've also just grown our technical team. To be specific, we brought on a manufacturing engineer for our production staff and an additional PhD for our R&D team. Even though these fresh hires hurt our margins in the near term, we view the addition of these essential people as investments in CPS's ongoing expansion. To wrap up, I think the future has never appeared more promising since I joined 2 years ago. With persistent strong demand, such as our new $15.5 million contract, a widening range of research agreements, an expanding lineup of technical solutions that meet customer needs and an upgraded production facility on the way plus a greatly strengthened balance sheet, which will supply the vital resources needed to boost our results and grow our abilities. We're prepared to elevate CPS to the next stage when it comes to revenue, overall performance and returns for our investors. We've traveled a tremendous distance in a brief span; and relative to 2024, the company has become a bigger, quicker-growing, more pertinent organization with distinctive capabilities for both industry and government. The future looks extremely promising, and I'm immensely proud of all our team has achieved this year. We can now take questions from investors. Ali, I'll hand it back to you.
I'd like to ask about — congrats on that great new order from a customer you've had for a long time. Could you maybe say a bit more about what you're hearing from other possible participants in the power module area, <<inaudible>> whether big or small.
Sure. As we've examined how our revenue has grown over the course of this year, we look at a range of different customers in both metal matrix composites, which you mentioned, and hermetic packaging. What we've typically observed is an increase pretty much everywhere. Bigger customers are placing larger orders, as shown by a recent contract, mid-sized customers, and smaller ones too — demand has risen. So when it comes to the customers we already have, they're buying more. On top of that, we've brought some new customers into the portfolio, yet no single factor has been responsible for that growth, whether looking back previously, leading up to now, or in what we're told during conversations with these customers about what lies ahead; it's really widespread.
And then, Brian, maybe as a follow-up, when you're considering bringing on more space and capacity, could you share a bit more about your approach to planning that shift? Will you be stockpiling product for important clients? In what way would you handle that and cope with the changeover once it arrives?
Correct. Yeah, it's every one of those things. Clearly, relocating is disruptive at its core. So at this point we're putting together thorough strategies for carrying out a phased relocation while ensuring safeguards are in position to reduce the impact, for example, stockpiles get accumulated at this location, stockpiles get accumulated farther along the chain from CPS to ease the transition, if you will. But our goal is to equip the fresh site to suit what we require. We've got hydrogen lines, oxygen lines, and so on. And afterward, when we're set to carry out the relocation, it would basically happen one work cell at a time. Thus it would be a kind of leapfrog arrangement in which, for a period, we'd be using 2 buildings, yet progressively shifting a growing portion of the business into the fresh site until we wrap up that effort. And every bit of that would take place over calendar year 2026.
Understood, that's quite useful. And perhaps only for my own benefit, regarding what you might term chances to score, there are plenty of intriguing possibilities. Is there any one you feel especially enthusiastic about? Then, specifically on radiation shielding, the Army recently introduced the Janus program, which I'm certain you noticed. Do you have any opinions about what might be possible there?
Absolutely. To begin with radiation shielding, we certainly perceive prospects in that space; we're aware we possess a solution that interests both users and customers working within the nuclear sector. Consequently, those talks keep progressing. Adoption-related talks and testing-related conversations form a natural component of such a process, as one would expect. Thus, that represents a domain of considerable interest for us, along with certain other items too. What I mean is, ALMAX material offers wide-ranging uses owing to how it behaves materially. As a result, we're having compelling discussions in that regard. Then there's the item I mentioned moments ago concerning the controlled fragmentation warhead — that remains at an early point within Phase 2; we're only roughly 1 month into the Phase 2, 2-year program. Still, we're aware it received funding since the Army feels enthusiastic about what they observed; they genuinely require that product, yet machining it is simply not practical, and that would truly be the sole other route to achieve such an outcome. So we're eager to watch how that develops as we keep driving it ahead and, more precisely, satisfy the specific requirements they've set forth, which might deliver meaningful potential for us down the road too.
Nice work on a strong quarter, and kudos for the contract you announced not long ago. Could you walk me through the way revenue from that newly announced deal gets recognized — will it come in at a fairly even pace across the life of the agreement, or will a portion of the volumes be weighted toward the later part, to be delivered after you've relocated to the bigger plant?
Across the contract's duration, it ought to be pretty consistent. As Brian said before, I believe, while the relocation is actually happening, we'll have aimed to stockpile inventory ahead of time, so the customer won't feel any effect from the move. So — and with this specific customer, normally the product goes to a third-party plater, gets plated there, and then is shipped along to the customer whenever they require the product; so we'll be accumulating inventory both here in the U.S. and at the plater, so that the customer won't experience any disruptions — shouldn't experience any disruptions during that stretch. And like I said, it ought to be fairly steady and even across the year.
Right. I'd say this breaks down into a couple of pieces. For the most part, it's a requirement the customer places on us at a certain level, but beyond that, the reason we need to make this change is so we can bring in more floor space and more production capacity. Once that's up and running, the amounts we handle each week are going to ramp up. So it's really a mix of the two.
Understood. Okay, that makes the contract and the AlSiC business overall much clearer. Next, in what ways has the federal government shutdown impacted you, whether in moving forward with the SBIR process, procurement, or collecting receivables? Any details you could give on that would be useful.
Regarding billing, only earlier this week, we sent an invoice via the government process...
Two invoices.
Two invoices, and the money came through right away. That means we now have an active contract in place, and payments have arrived. It was good to see that. As for the funded contracts already in progress, disruption has been quite limited, since our technical team has basically taken over the program and is carrying out the research work at this point — sometimes they'd normally speak with the funding agency, check in roughly every month or every 2 months, that kind of thing. What we've observed is that rather than perhaps 4 or 5 individuals joining that call, it could be 2. So usually we can still obtain an answer, or if some clarification about the path forward is needed, somebody is available, yet that isn't really all that essential for us, given that we put forward a research plan that was approved and funded, and we are carrying it out. So for the most part, we hold the initiative, and the bigger risk is likely tied to whether the government will release new topics promptly, a month from now or 2 months from now, which remains less certain for us.
Got it. Okay, you touched on this a little when you were responding to Chip, but I want to dig into ALMAX a bit more; the way I see it, this appears to be a pretty significant commercial opportunity, and it was only just recently validated either by execution or by delivery of your first order for that product in this quarter. Could you share any additional color or commentary about the further commercial opportunity there and how we ought to expect this to play out over the coming years?
Yes. To start, when we talk with companies in certain sectors that might want this material, a lot of them don't know the CPS name. Others do recognize it. So the real work is reaching the appropriate decision-makers and design engineers, and so on. From there, they go through their own way of adopting things. They request samples — that's what we're sending out right now — because they need to confirm the material meets their performance specs and figure out how it could fit into either an existing program or a new one they're working on. So we see this as a volume opportunity that builds up gradually. No one's going to place a massive order on their first day. The progression will be small, then medium, then large. Even so, those are exactly the kinds of discussions we're now having, which is why we've launched a targeted business development push to grow our team. There's a physician position we've posted and are actively trying to fill to go after these new opportunities, since the groundwork involved is substantial. So results will come over time, but our belief in this material's broad applications is strong, and a lot of those uses are in areas where we haven't traditionally operated. That's why we're pinpointing trade shows, industries and applications, refreshing our website, and so on, so we can engage with those opportunities much more directly.
All right. I appreciate that, Ali. And I want to thank all of you for being with us on this call, and for the continued attention you give to CPS. We're eager to talk with you once more following the close of Q4. Should anything come up on your end before then, feel free to get in touch with the person who advises us on Investor Relations. Thanks so much.
Thanks. That wraps up today’s call, everyone. At this point you’re free to leave the lines, and we hope the rest of your day is great — we appreciate you joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete CPS Technologies Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to CPS Technologies Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.