In the first quarter of 2026, Discovery Silver Corp. reported revenues of $285 million, reflecting a 4% increase quarter-over-quarter, driven by higher gold prices. Net income rose to $81.7 million, a 25% increase from the previous quarter, with earnings per share at $0.10. Management maintained guidance for the year, expecting production to ramp up significantly in the second half, particularly from the newly acquired Kidd operations, which are anticipated to enhance processing capacity and contribute to growth objectives.

What topics did Discovery Silver Corp. cover?

What were Discovery Silver Corp.'s May 14, 2026 results?

Discovery Silver Corp. is positioned for growth with the acquisition of Kidd operations and strong exploration results. However, operational challenges in Q1 may pose risks to achieving production targets. Investors should monitor the ramp-up in production and the company's ability to manage costs effectively as catalysts for future performance.

Earnings Call Speaker Segments

Operator operator
#1

Thank you. At this point I’ll hand things over to Mark Utting, Senior Vice President, Investor Relations for Discovery. Mr. Utting, the conference is yours to begin.

Mark Utting executive
#2

Thank you so much, operator. And thank you to everyone on the line for being with us on Discovery's First Quarter 2026 Conference Call and Webcast. With me today are numerous members of Discovery's senior management team. Tony Makuch, our President and CEO, will be speaking, as will Alison White, our Chief Financial Officer, Pierre Rocque, our Chief Operating Officer, Eric Kallio, our Senior Vice President, Exploration, and José Jabalera, our Senior Vice President, Corporate Affairs and Sustainability in Mexico. Once again, quite a few other members of our senior executive team are here in the room as well. Before we begin, I want to remind you that we will be making forward-looking statements on today's call. Such statements rest on current expectations and projections regarding future events. They carry risks and uncertainties, and actual outcomes might differ from what those statements contain. I point you to slide 2 and to our website for additional information on this. Furthermore, we will also be referring to a number of non-GAAP measures during the presentation. Such measures lack any standardized meaning, and they under GAAP, and so they may not be comparable to other issuers. I point you to slide 3 in our deck and to our website for more details.

Mark Utting executive
#3

To wrap up, every dollar figure we mention will be in U.S. currency unless we say otherwise. So, moving on to the quarter — first off, as a lot of you are already aware, we're aiming to more than double the gold output at Porcupine, taking it past 500,000 ounces annually. Simultaneously, we're advancing our Cordero project over in Mexico, which will yield roughly 14 million ounces of silver each year, at minimum across the initial 10 years. We intend to hit those performance levels while sitting, on average, in the bottom half of the worldwide cost curve for gold as well as silver. These milestones will be reached through a disciplined investment strategy centered on returns for investors. In the first quarter, several key developments took place that support our growth targets. To be specific, we announced the purchase of the Kidd operations in Timmins. We additionally reported ongoing excellent exploration results within and near Timmins, and we carried on with our investment programs, which will allow us to both expand and optimize the operations we currently have. Going into a bit more detail on those, with Kidd on slide 6, we made public the acquisition of the Kidd operations on March 2nd.

Mark Utting executive
#4

We anticipate that deal will wrap up quite soon, probably within the coming few weeks. For our company, this represents a significant milestone. Reaching more than 500,000 ounces of gold output each year means we need extra milling capacity. By way of the Kidd Met Site, we have a chance to expand processing capacity dramatically and to handle various ore types. There are numerous additional advantages too, among them bringing in valuable infrastructure that will underpin future growth at both Hoyle Pond and Pamour, including development of TVZ. It provides exposure to critical minerals — copper, zinc, and silver — via Kidd Creek Mine, contributes substantially more exploration upside to our portfolio, which is already very large and highly prolific, produces cost synergies, and — this matters a great deal — brings in a very large, highly skilled workforce that will assist us with our current growth plans. Moving to the following slide, this shows you the Kidd Met Site along with a conceptual plan for what we anticipate doing and are right now assessing. It is a conceptual plan; it sort of indicates, shows you how we are thinking about the way forward. Perhaps here I will hand things over to Tony to discuss that.

Tony Makuch executive
#5

Alright. Maybe just a few straightforward points. First, everyone should recognize that the Hoyle Pond underground operations actually sit beneath the Kidd Met Site. There's a blue rectangular box shown here, and it's meant to illustrate where any new vent raises we could establish for the Hoyle Pond Mine might go, along with a possible location for a new shaft if we chose to develop for the TVZ zone. I think what we're showing here — we've referenced this before — is that the Kidd Met Site has four circuits. You can see the label A division, and we've attempted to lay out conceptually what building a new conventional gold circuit at the plant, sized at 5 million tons to 7 million tons per annum, with the Borden crushing, would involve and how it would fit in. We would keep using the B division there as well, which is the base metal circuit, its flotation circuit. On the C division, we're working quite hard at the moment. That one has roughly 1 million tons a year of capacity. We're examining the idea of bringing the Borden ores here and running them through this division as early as we can within the next 6 months to 12 months, which would free up 2,000 tons to 3,000 tons of A&M capacity in the Dome Mill for conventional processing.

Tony Makuch executive
#6

So you can see those circuits—that’s the area right here—which we’d convert into a gold refractory flotation circuit. On the other side, all of the AB, BC, and D circuits located here could at any time be run as combination-based metal circuits if needed, and/or as a gold circuit as required. To give you a sense of what this could unlock for us, basically—you know, sorry—7 million to 9 million tons per year of new gold processing capacity at the Kidd Met Site. The A division as a conventional circuit, the C division for processing, and 1 million tons per year for processing the Borden ores, and the D division, which we would then use to process refractory ores at Timmins—effectively the refractory ores would be the TVZ zone that we’re talking about. The general location where it sits—sorry, this figure doesn’t show where the Pamour operations are here, but the Pamour open pit operations are less than half a kilometer from the bottom of this page. The idea would be that all the Pamour ores would be trucked, and same as the Hoyle Pond ores, would be trucked and processed through this new circuit.

Mark Utting executive
#7

All right, that's great. Moving along to slide 8, the next key development we want to cover is exploration progress. Given all the production we currently have and the additional output coming, we believe this ranks among the most compelling exploration stories in the industry as well. We put out a press release on April 23rd — that's the most recent one. I won't go deep into the specifics; Eric will walk through the details of that release shortly. At a high level, I'll simply note that resource conversion and extension drilling at Hoyle Pond, Borden, and Pamour keeps delivering very strong results. That release also featured excellent results at a number of district targets close to those operations, plus positive results at our near-term projects, specifically Dome and TVZ. There's considerably more information on all of that which you'll be hearing very soon. Slide 9 covers our investment programs during the first quarter. Sustaining capital came to roughly $21 million for the quarter, primarily tied to capital development, mobile equipment, and infrastructure investments at Hoyle Pond and Borden. I'll add that our capital development activities at those mines remain very much on track.

Mark Utting executive
#8

We're also putting in new mobile equipment at Pamour, along with some investments at TMA 6 — our tailings facility project too. Sustaining capital came in a bit under what we'd planned, and that was mainly because delivery schedules for the new mobile equipment shifted into the second quarter and other quarters of the year. Growth capital came to $40 million. The investment in TMA 6, which includes our new deposition strategy and pre-stripping at Pamour, made up the vast majority of that. And again, pre-stripping at Pamour was very much in line with expectations. Moving to slide 10, this brings us to the operating results. In the first quarter — Alison will walk through all the financial numbers in a few minutes, and then Pierre will add some further color on operations as well. As you know, in our year-end results we indicated that production in 2026 would be weighted toward the second half of the year, and that Q1 would likely be our lowest production quarter of the year. Well, production came in at 60,200 ounces for the first quarter. What I'll say is that a highlight of the quarter was Hoyle Pond. It had a very good Q1, with an average grade exceeding 12 grams per tonne.

Mark Utting executive
#9

Additionally, total mine tonnes went up 4%, and we closed the quarter with stockpiles near 1.3 million tonnes, which will assist us in managing throughput levels as well as grades through the rest of the year. Similar to production, unit costs should improve considerably during the second half of the year. You know, one factor behind our guidance ranges being as broad as they are is the variability we anticipated in the quarters ahead. I will say the AISC figure for the quarter came in line with guidance, and we do expect that figure to get better as we move into the second half of the year. Turning to slide 11, it provides a visual of, well, Dome Mill, but in particular the crushing circuit in the foreground. As we said, we anticipated quarterly production this year would be lowest in Q1, and a major reason for that was mill throughput. We achieved 698,000 tonnes during the quarter. You know, regarding the decrease from the prior quarter, most of it was anticipated, an expected decline stemming from scheduled downtime and our understanding of how severe winter conditions would affect our crushing plant at Dome. We've said since we announced the Porcupine deal at the start of last year that we were examining replacing the three-stage crushing system, that it required replacement.

Mark Utting executive
#10

You see, that comes down to it being inefficient and driving up unit costs, since it tends to break down, especially during winter, and in the end because we will have to relocate it to clear the way as we push back the Dome pit when Dome Mill starts production. The longer-term fix here is single-stage crushing plus a SAG mill, and that forms part of our forward plans for hitting our growth targets. For the near term, we're continuing to hold growing quantities of critical spares onsite, and a newly designed secondary screening system is set to arrive at the end of June, with installation taking place during the scheduled shutdown in July. The measures we're putting in place now are meant to help us once next winter arrives. Moving on to slide 12. Here you can see our guidance, and I can tell you we're still on track to meet all of our guidance for 2026. We've finished the weakest quarter of the year. We anticipate substantially higher production, especially in Q3 and Q4. A key contributor on that front will be Hollinger. We started ramping up Hollinger in Q1 and finished the quarter mining roughly 2,000 tons per day.

Mark Utting executive
#11

For this year, we anticipate Hollinger yielding more than 40,000 tons. During the first quarter, there were just a few thousand. We additionally anticipate seeing elevated mill throughput levels, backed by those substantial stockpiles I referenced. With that said, I'll hand things over to Alison White, our CFO, who will review today's financial results.

Alison White executive
#12

Thanks. I appreciate that, Mark, and good afternoon to everyone joining us. Turning to slide 13, we can review the strong quarter and the solid beginning we've made to 2026, which shows the momentum we continue to carry forward from last year. Revenue was strong in Q1 at $285 million, up 4% from the prior quarter, mainly because gold prices were above average for the whole quarter. With that four times during the quarter, combined with the ounces sold in that same period, cash costs came to $1,417 per ounce. As we said before, unit costs are expected to peak in the first half of the year and are set to get better in the second half of 2026 as output and sales volumes rise and we start seeing the gains from the investment aimed at optimizing the company's operations. All-in sustaining costs came in at an average of $2,041 per ounce sold, which mirrors the higher operating cash costs per ounce sold and is partly offset by reduced spending on sustaining capital in the period. That sustaining capital came in under plan because of the later timing Mark mentioned earlier for new mobile equipment delivery and for the construction work currently underway at the Tailings TMA 6 project.

Alison White executive
#13

EBITDA rose on a quarter-over-quarter basis to $178 million — a 41% jump versus Q4 2025 — and that's thanks to higher revenue as gold prices keep climbing. Since Discovery became an operational company last year, momentum has kept building steadily, with EBITDA increasing in each quarter of 2025 and now once more in the first quarter of 2026. We also kept up the pattern of producing strong free cash flow, posting adjusted free cash flow of $63 million, which reflects an adjustment of $87 million tied to a payment made in the quarter to meet the company's 2025 income tax obligation. Discovery put $67 million into capital expenditures to keep advancing the asset base at Porcupine, carrying forward the vision and capital allocation plans of reinvesting in the business to add value. Net income for Q1 2026 came in at $81.7 million, up 25% from Q4 2025, and earnings per share and adjusted earnings per share both landed at $0.10. The quarter-over-quarter rise in net income came from the one-time $45 million reclamation expense for non-operating mine sites recorded in Q4 2025, plus the benefit of higher revenue and lower depreciation and depletion expense in Q1 2026. Partly offsetting all of that was the effect of an income tax recovery of almost $5 million in Q4 2025, which was also offset by $49.6 million of income tax expense in Q1 2026 for the current year, along with higher share-based compensation costs incurred in the current quarter as well.

Alison White executive
#14

The income tax recovery for Q4 2025 came about because of a $40.9 million deferred tax recovery tied to revised reclamation cash flows. With that tax item wrapped up, let's turn to slide 14 and go over our financial metrics. Across every one of our key financial measures, we've kept building on the momentum that started last year. Revenue and EBITDA rose in each of the last four quarters, and in the same way, thanks to strong earnings generation, we're still seeing positive momentum in operating and free cash flow, with Q1 adjusted operating cash flow of $130 million and adjusted free cash flow of $63 million, as I noted earlier. That positive free cash flow generation bolsters the company's balance sheet and opens the door to redeploying capital into the business. Please join me on the next slide for a look at our liquidity position. Discovery's cash balance came to $384.9 million at quarter end. A stronger gold price environment delivered $130 million of adjusted operating cash flow, partly offset by the 2026 tax payment and the continued capital investments covered earlier. Discovery's liquidity position remains robust. With $385 million in cash on hand, a $250 million revolving credit facility, and a $100 million accordion feature, we have meaningful financial flexibility.

Alison White executive
#15

Our view is that this strength on the balance sheet provides the footing needed to move our strategic priorities forward with confidence. So with that, I'll hand things over to Pierre, our Chief Operating Officer.

Pierre Rocque executive
#16

Thank you. It is a pleasure to be presenting today. I will be speaking to slide number 16. During Q1, we produced 60,269 ounces of gold, with total gold pour of 59,258 ounces. As Tony mentioned earlier, we expect production to ramp up, particularly in the second half of the year. The change in production in Q1 2026 versus the previous quarter reflected lower tonnes processed. The impact of this reduction was partially offset by a 15% improvement in the average grade, reflecting a significantly higher grade at Hoyle Pond and a higher average recovery rate. More than three-quarters of the reduction in tonnes processed was planned and related to the scheduled maintenance, as well as the impact of severe winter conditions on the crushing circuit. The company is currently advancing plans to replace the crushing circuit. Total ore tonnes mined increased by 4% compared to Q4 2025. We have close to 1.3 million tonnes of stockpiled material that is available for processing at the end of Q1. Tony discussed the crushing circuit at the mill in his remarks. I'll point out that during operating days, the Dome Mill continued to show improved performance. Daily throughput at the mill exceeded 11,000 tonnes per day on 26 days in Q1, including 10 days when the mill exceeded the operating capacity of 12,000 tonnes per day.

Pierre Rocque executive
#17

Operating cash costs came to an average of $1,417 per ounce sold, versus $1,185 in the quarter before, and the rise largely reflects higher mining costs driven by the increased mining rate in Q1 2026 as well as the effect of lower gold sold. All-in sustaining costs at the site level averaged $1,875 per ounce sold, about the same as the prior quarter, since the effect of higher operating costs was partly offset by a decrease in sustaining capital expenditures. At this point I'll hand the call to Eric Kallio, Senior Vice President, Exploration.

Eric Kallio executive
#18

Thanks, Pierre. Good afternoon, everyone. I'm on slide 17. Before I begin, I'd just like to note that exploration had yet another strong quarter. We drilled another 67,000 meters, with excellent results at both the operating mines and the growth projects. With that in mind, there's again a great deal of new information, and my plan today is simply to walk through some of the highlights, beginning with the current slide on Hoyle Pond. As the slide shows — a long section viewed toward the south — work at the mine remains focused on the lower S Zone, including another five holes close to the lower boundary of the current resource, with very positive results. Several holes contain visible gold and high grades directly down plunge with deposit P, and others point to possible new high-grade lenses to the west. On that front, we're very pleased with progress here so far and intend to keep at least 2 rigs-3 rigs active here in the near term. In addition, we're bringing in another 2 rigs-3 rigs in the mid to upper part of the mine to begin advancing those projects as well. Moving to the next slide, number 18, we see the TVZ area, which was another important drill project for us in Q1.

Eric Kallio executive
#19

As we've said before, TVZ is a major mineralized zone located in the southeastern portion of the Hoyle Pond mine. Past operators partially drilled and defined it, and now we're back, adding further holes to underpin a maiden resource estimate scheduled for later this year. With that in mind, the slide gives you an overall picture of the target area, covering the Main Zone, the drill platform, and also the existing workings at Hoyle Pond mine. To spend a moment on the main target, what we have here is basically a big northeast-plunging structure that, according to drilling completed so far, runs from at least the 850 level down to the 1,680 level and stays open in both directions. Within it, the zone is made up of a set of lenses, shown here in different colors — the biggest is TVZ2, the large green one located on the zone's south side, while the rest are clay bins lying directly to the north. On the drill platforms, it's worth noting that the project already has several locations with platforms installed through earlier work, and these can be brought into use quite quickly with only a small amount of effort.

Eric Kallio executive
#20

Beyond that, every new hole we’ve drilled has come from only the 1210 and 1680 levels, and we’ll also begin at 1410 before long. Moving to slide 19, you can see a closer look at the zone in long section, with recent drill results showing that everything looks good so far. For 1210, shown at the upper right of the slide, we had multiple new holes with broad high-grade intercepts close to the first hole we reported in Q1. At 1680, there were several more that cut appealing grades and widths near the lower boundaries of earlier drilling. To give you a sense of what we’re seeing, the 1210 intersections include 4.23 over 55, 6.41 over 11, and 5.18 over 9.1, while 1680 intersections include 4.32 over 19, 4.24 over 10, and 4.73 over 6. It’s important to note that each of these intersections is similar to or better than other holes drilled previously in both areas. Drilling beneath the 16 level remains very limited. With that, we’re very pleased with progress so far. The program continues with three drills active on the 1210, 1680, and 1410 levels.

Eric Kallio executive
#21

You should be seeing quite a few fresh results coming in from both the upper and lower sections of the zone in the very near future. We've also begun rehabilitation work on a new 4th platform at the 1430 level, along with the 900, and those will deliver additional platforms as we move through the year. Moving to the next slide, number 20, we have the Owl Creek area, where we finished another 12 holes close to the historic pit and also at the 750 zone, located 750 m to the east. As shown here, drilling around the historic pit featured eight new holes resurfaced from the 650-meter level with highly encouraging values, with multiple holes cutting broad, high-grade zones near the east side, and one more that keeps expanding the overall footprint toward the west. Key intercepts on the east side that confirm the width of the higher-grade zone include values like 4.11 over 39 over 3, 5.24 over 10, and 4 over 13.8. The key intercepts to the west include 4.5 and 2.2. Drilling at the 750 zone features 1 new hole, intended to verify and extend mineralization close to the 250 level and at the lower boundaries of historic drilling, and it was very successful as well, with an intercept of 5.76 over four and a half and 2.57 over 8.9.

Eric Kallio executive
#22

With that said, we remain quite happy with how the project has advanced so far and intend to keep going with 2 drills in the near term. If you look at slide 21, there's a broad overview of the Borden Mine, where we drilled an additional 24 holes in the northeast section of the mine. What you're seeing here is that current work remains focused on the main zone, the target situated furthest to the right on that slide. Every hole is being drilled from the 585 drift, mostly testing down plunge to the northeast of the mine workings. On top of that, we also observed drilling get underway on the lower portion of the East Lower Zone, or ELZ, which is a second mineralized structure that shares similarities with the main zone located 500 m to the west. It's worth highlighting that in both zones, drilling down plunge is still limited and remains open for expansion. Yeah, I won't dive into much detail on the results here. They're nicely summarized in our press release, and I suppose I could simply note that we keep enjoying a great deal of success with drilling, achieving very good grades and widths across both areas, within and beyond the resources.

Eric Kallio executive
#23

I'd say yes — I'm quite upbeat about where the site is headed. If you go to slide 22, there's Pamour, where we finished 67 more holes close to the existing open pit resource, plus Pamour West, which sits 1.48 km to the west, and the North Contact Zone, located north of the phase 2 pit. The drilling around the open pit took in six additional holes meant to upgrade and grow the resources. Because of that, Q4 results came in comfortably above expectations, with several strong highlights across all the areas. At Pamour West, six more holes were drilled and hit the historic mine at the Broulan property. Through Q4, we also kept intersecting some very good values along strike from Pamour in a comparable geologic setting. Work at the North Contact Zone involved five new holes testing the major east-west contact north of the Pamour pit, and those are beginning to deliver quite encouraging results. One thing worth stressing: no material from Pamour West or the North Contact area factors into the current resource estimate, and we'll be putting in serious effort to fold this in when we update later this year. Four drills are still turning — two on extensions of the Pamour pit, one at Pamour West, and one at the North Contact.

Eric Kallio executive
#24

Moving to slide 23, we have the Dome, where drilling carried on as we get ready for the updated resource estimate later this year. As the image shows, most of the new drilling is aimed at the northeast section of the resource pit, though it also took in the final holes from the southwest area. Work in the northeast took in 10 holes designed to assess mineralization on the Dome Fault, close to the lower parts of the current resource, and it went very well, showing a tight match in geology, with grades and widths similar or better than the historic holes, which were mostly drilled prior to 1970. The southwest drilling consisted of four holes testing the exploration target south of the existing open pit, as Q4 went on uncovering fresh growth opportunities for expansion down the road. Two rigs remain active at the site, and both are now on the north side of the pit. Given the results and progress so far, the project stays on schedule for a new resource estimate before the end of 2022. To sum up, everything is progressing nicely, and there is plenty more ahead. With that, we'll hand things over to José Jabalera, Senior VP Corporate Affairs and Sustainability, Mexico.

José Jabalera executive
#25

Thank you, Eric. Hello, everyone. We're continuing to move the Cordero project forward in Mexico. As part of that progress, we're including the water and power studies in the work. Also, following the recent event — the Flood in Mexico event — with the president, when she announced incentives on the investment, we held meetings with senior Mexican authorities, and that led to — they scheduled a site visit at the project so it can go into the final stage of evaluation for our MIA. That visit will take place next week, allowing us to keep advancing the processing of the permits for SEMARNAT. With that, I'll hand things over to our CEO, Tony Makuch.

Tony Makuch executive
#26

Alright. Thank you, José. And thanks to everyone for the presentation. You know, we had a pretty solid quarter. During this quarter, our mines truly exceeded the mill when it came to throughput. The mill faced some weather-related difficulties, but as we move forward, we're working to get those issues fixed, and we anticipate really strong processing results as the year progresses. I really want to express gratitude for the dedication of everyone across the company who put in the effort and delivered all the success this year. We truly value that. To sum up, on the other side, as you can tell from exploration and a few other areas, we saw some meaningful developments during the first quarter that back our growth goal. The Kidd acquisition is a truly key value driver for the company and one of our — there are plenty of synergies and considerable value in what we gained from Kidd and then capitalize on here. The key point is unlocking processing capacity. As you can see, I'm trying to show you somewhere in the range of 7 million to 9 million tons of additional processing capacity that can be unlocked from that.

Tony Makuch executive
#27

If you work out the numbers on your own regarding where we believe it could go, that's the answer. Should Eric keep delivering ongoing exploration success, we have plenty of resources at our disposal, and plenty of gold remains in the Timmins area — and several of these targets sit directly inside mines that are already operating, on infrastructure that's already running. We keep putting capital in, and we do so in the right way to build value, and as I mentioned, and as Mark covered, our growth goal is to get to more than 500,000 ounces of gold output. If you run the figures, you'll see we have substantial plans in place, and we expect to even go a bit beyond that. With that, perhaps I'll simply thank everyone for joining the call, and we're glad to take any questions.

Operator operator
#28

Thanks. To ask a question, hit star one on your phone’s keypad. If you want to take your question back, just hit star one once more. Our first question is from Larry Liu at CIBC. Your line is open.

Larry Liu analyst
#29

Hey there, Tony, Alison, Pierre, Eric, Mark, and everyone on the team. I suppose I'll kick off my first question by asking about Kidd Creek. Could you remind us, you know, of the opportunities you see there? Does buying Kidd Creek alter how we ought to view the near-term mine plan? And also, you know, could you remind us of the steps that lie between now and closing our transaction into one?

Tony Makuch executive
#30

Okay, so first off, regarding the Kidd acquisition — the mine is still running. We anticipate that it will keep operating and producing ore, certainly through the remainder of this year. We're putting in serious effort on what can be accomplished there, in a way that's safe and efficient. I'd say that represents a bit of an opportunity. There are substantial exploration lands that came with this, and that really ties into a long-term exploration effort. But if I could, let me move to slide 7, where I attempted to highlight that the largest piece is unlocking value at the metallurgical site. What that gives us is additional mill capacity. With very little capital outlay, we can process ore at the Kidd Met Site in the C division. We intend to process refractory gold ores like TVZ in the D circuit. Again, these don't require major capital spending for us, and they don't necessarily take a major amount of time either. Assuming everything goes as it should, we're currently doing some test work and working to firm that up — it could be somewhere between September of this year and March of next year when we'd actually be processing more ores there.

Tony Makuch executive
#31

So that quickly frees up 2,000 to 3,000 tons per day of capacity at the Dome Mill for the gold ores. As Mark brought up, we have a substantial quantity of stockpiles sitting on surface as mining keeps building them up. There's considerable opportunity in that. The major piece is that engineering work starts now, and we'll be figuring out what's required to construct an entirely new mill circuit at Pamour — sorry, at Kidd — to treat the Pamour ores, and that circuit is a conventional gold one running 5 million to 7 million tons annually. One of the real advantages here is having a brownfield site with more than 100 MW of power already available. All the water we need is there. We have a site, a cleared site, with actual concrete foundations in place. They aren't the final foundations for everything we'll do, but it's definitely an area used historically for metallurgical work, and we can move in, build a coarse ore bin, install a primary crusher and a SAG mill, and then grade that, say, as a 5 million to 7 million ton a year gold circuit to process all the Pamour ores and truly unlock the value of Dome Mill then.

Tony Makuch executive
#32

You know, just consider it for a second. That provides us with somewhere in the range of 7 million to 9 million tons per year of processing capacity, spanning from six months from now, you know, grossing from six months out to three years out. We see the opportunity right here. That's the primary piece. When it comes to closing, I mean, things are going well. We're working toward some, you know, final transfers or closing plans, et cetera, together with the provincial government. You know, we're sort of thinking we're gonna get this thing closed before the month ends. Something can always come up. But we're, you know, I think we're essentially dotting the i's and crossing the t's at this very moment.

Larry Liu analyst
#33

Absolutely, and thanks, Tony, for that response. So I suppose this is somewhat a follow-up regarding Kidd Creek, and I won't go too deep into it either. How comfortable are you, then, with bringing copper, zinc, and silver into your portfolio? Would that, you know, be a useful experience for potentially having some base metal processing capacity from Cordero down the road?

Tony Makuch executive
#34

Right. So, as part of this, we’ve got the offtake agreement set up with Glencore, and honestly the terms under that offtake aren’t significantly different from the ones they gave to their own Kidd site. That gives us an advantage when it comes to getting work done. It’s a going concern business. It’s producing 3,000 tons per day, or running at a 1.2 million ton a year capacity right now, and it will keep going at that rate for the remainder of this year. We still need to work with them on plans once we take over. The operation will keep producing a copper concentrate and a zinc concentrate. The copper concentrate is shipped to the Horne Smelter. The zinc concentrate goes to Quebec, to Montreal. That’s all in place, and we have that agreement set up with Glencore, and it’s great learning capacity for what we’d do as we advance Cordero as well.

Larry Liu analyst
#35

Perfect. That sounds good. Sorry, Alison, if I may, I apologize ahead of time. This will be a tax question. If I look at this quarter's free cash flow, before adjustment, a big item would be the taxes paid for last year from Porcupine taxes. Looking ahead, should we expect more of a monthly installment, or how should we view taxes, cash taxes paid going forward?

Alison White executive
#36

Larry, that's spot on. To start with, I appreciate you raising this. Nobody ever enjoys discussing taxes, so it takes some courage to bring it up. Still, you've got it right — we will be, and indeed we already are, making payments on a monthly basis in 2026. The reason the 2025 payment came as a single event was mainly that the prior year was our first one operating for only part of the year.

Larry Liu analyst
#37

Great. That works. All right, Tony and the team, many thanks for the reply. I’ll go back into the queue. Thanks.

Operator operator
#38

John Tumazos from Very Independent Research has the next question. Your line is open.

John Tumazos analyst
#39

Thanks for taking my question. I'm trying to picture or get a sense of what the fourth quarter technical study will look like. Last year's January study set out resources for four deposits and output from three of those. Given the drilling results, are we going to have resources from four additional deposits — TVZ, Owl Creek, if you're pulling material from Hollinger, and now that we've bought Kidd Creek? Will the new report lay out eight separate resources and contemplate production from every one of those eight?

Tony Makuch executive
#40

That’s a solid question. Eric, feel free to jump in. Some of that—actually, John, you’re not offline.

Eric Kallio executive
#41

Okay, so let's say there are three primary ones — those are the operations we'll be giving an update on — and then we also have Dome and TVZ. That's definitely the base plan. As you mentioned, we've already got the results at Owl Creek. We'll see whether there's sufficient drilling to establish a resource there by year-end. At year-end, those five are really what we're targeting.

Tony Makuch executive
#42

Hollinger is something we have and could talk about or bring in. There'll be a few items coming from Kidd. Kidd is still in progress. Incidentally, we will provide something from Kidd. It could form part of a separate report there, John.

John Tumazos analyst
#43

Does the 131 million tons Glencore reported at Kidd clear the bar you've set?

Tony Makuch executive
#44

Well, it was — okay. Whether it was exactly that figure, I can't say for certain, but yes, the amount of drilling and how good the workmanship is — none of that is in question from our side. Eric?

Eric Kallio executive
#45

What I mean is, we didn’t produce that 43 to 101 report. That one is a JORC report. We’re aware it was completed previously. What I mean is, the drilling has consistently been carried out to a measured and indicated standard for the mining by areas, really, where the bulk of the resources sit in the deeper section of the mine. Really, those could be added to the resources, but the real reason they aren’t putting it in is not the quality of definition of the drilling. They have uncertainties regarding other parts of the mining approach.

John Tumazos analyst
#46

I just want to confirm I understood you correctly, Eric. Were you saying there will be a resource for Hollinger or Owl Creek, or not?

Eric Kallio executive
#47

At the moment, there's no plan in place for that, though it could happen depending on how the drilling turns out.

Tony Makuch executive
#48

Is Owl Creek the one you mean?

Eric Kallio executive
#49

Yeah, that's Owl Creek.

John Tumazos analyst
#50

When you draw material from Hollinger, do you have the resources available without drilling them, relying on prior data, given that you're running ore through the mill?

Eric Kallio executive
#51

The material we're extracting is fractured ore, meaning it comes from inside the mine itself.

Tony Makuch executive
#52

Yeah, there's material at Hollinger. You know, that's a fair point — the material we're mining at Hollinger was part of a historic resource, or a resource from the previous operators. You know, that's work we're doing, and it's something we're considering, but it may be more work, John, for 2027, only because, you know, in terms of the level of drilling and the other work we needed to do to verify to complete a 43 to 101 level or a one level report, it may more roll into 2027 for Hollinger. It is one of the key areas and a lot of potential for sizable resource there.

John Tumazos analyst
#53

If I could squeeze in one more question: when do you anticipate the single stage crusher will be in place at the Dome Mill, and where are you planning to locate it? Will it sit apart from the current mill site, in case ten years from now you relocate the mill site?

Tony Makuch executive
#54

So John, what we're considering at the moment regarding the primary crusher is either placing an ore bin on site — a new ore bin plus a truck dump at site — and doing fine crushing, hauling crushed material over from Pamour, and locating primary crushing at site. That's one option. A second option would involve putting it there instead. We're actively working on that right now. There's some engineering work underway in the background — if I had a drawing handy, I'd show it to you. That background work concerns the secondary and tertiary crushing plant and extending into the tailings area, where we'd excavate and do some foundation work to accommodate placing it at present. That would constitute the first phase of what we undertake at the Dome Mill. Yeah, I mean, the reality is that we could leave the mill where it currently sits, run a different crushing configuration there, and keep operating — we can operate the Dome pit for anywhere between 10 and 15 years, depending on the throughput rate we choose to mine at, before we'd even need to relocate and swap out the mill at Dome.

John Tumazos analyst
#55

Thanks — and well done on everything you’ve accomplished.

Operator operator
#56

We'll take the next question at star one. Ken Ilodibe from SCP Resource Finance has the floor now — your line is open.

Ken Ilodibe analyst
#57

Hi Tony and everyone. Congrats on the quarter, and thanks for taking my question. Changing topics to operations—you've mentioned that production and costs will get better through H2 as throughput and mining rates ramp up, I guess. What I'd like to ask is: what are the key things we should be watching over the next couple of quarters to judge whether that ramp up is on track as expected? And maybe, more broadly, is there anything you're seeing so far in April into May from an operational standpoint that gives you confidence in this ramp up?

Pierre Rocque executive
#58

Yeah, I just want to be sure I got your question right. You're asking what we'll be keeping an eye on this year and how things are going for us in Q2, is that right?

Ken Ilodibe analyst
#59

Yeah, that's right.

Pierre Rocque executive
#60

Okay. As you know, we don’t break out those four sources separately, so I’ll speak in broad terms. What I’d tell you is that mining rates are coming along very nicely. We don’t see any problems at any of our operations. Naturally, as Tony mentioned earlier, grades move up and down, largely because of sequencing and some block-model adjustments we’re making over the course of the year. On that point, Ken, I don’t expect any trouble getting material to the mill, whether that’s Q2, Q3, or Q4. On processing capacity, we did mention that we had a few mechanical issues in Q1. I just want to draw your attention, and everyone else’s, to this: if you look at what we processed in Q1 of 2026, roughly 7,700 tons per day, and compare it with the previous operator, which in Q1 2025 processed about 4,800 tons per day, you can see we’ve already made some improvements. Later this year, some of the mechanical parts—secondary screens, to name one—are going to be replaced. That will raise the availability of the process plant.

Pierre Rocque executive
#61

Like I said before, during Q1 we actually went above the 12,000 tons per day in-place capacity. Our aim is to push past that 12,000 tons per day across the remainder of the year.

Tony Makuch executive
#62

So pointing back to that, if you want to track how we're delivering that ramp-up, there are really two main indicators to keep an eye on. The first would be daily mill throughput — you'll see the mill generating and handling more on a day-to-day basis, moving up from an average of 10,000 tons a day to 10,500 tons to 11,000 tons a day, or whatever the figure ends up being. The second piece is our quarterly gold production, you know. Those are the two chief drivers at the moment, if you like, so that's what you watch.

Ken Ilodibe analyst
#63

All right. Would it be reasonable to describe it this way: over the long term, you're pursuing a single-stage crusher replacement, yet nearer term, you have confidence in how reliable your current equipment is?

Tony Makuch executive
#64

So in the near term, our focus has to be on plant reliability, and the largest piece of that is the screens — specifically the secondary screens. That's the source of some of the issues we've seen. There are many areas across the plant. Near term, it comes down to reliability in our secondary and tertiary crushing circuit, mainly the screens. After all, you're sizing the material before it heads to the fine ore bin. That matters most in the near term. Over a longer horizon, processing work involves relocating the actual primary crusher to a different site and addressing other areas. An even longer-term item is swapping out the three-stage crushing circuit for a primary crusher plus a SAG mill. That one is planned for Dome. Turning to the other aspects, with the Kidd Met Site, we currently have several initiatives underway there. One of them is bringing Borden ore in through the C circuit and freeing up capacity — that provides roughly 700,000 to 1 million tons annually of new capacity at the Dome Mill, since we're processing that material at the Kidd Met Site. The second piece is what we're going to do to construct a new conventional gold circuit of 5 million to 7 million tons a year at the Kidd Met Site, along with the work we're going to carry out on it.

Tony Makuch executive
#65

The third piece is the refractory gold circuit that we’ll have available at the Kidd Met Site. As Eric can walk through, you can see what our resources come out at. Looking just at the resources at Pamour, Hoyle Pond, Borden, and Dome, we had well over 15 million ounces of resources. You know, you don’t want to mine that over 30 years, I don’t know. We should be able to mine that faster. The first part, without adding any exploration success, we need mill capacity, so that’s a big value driver. Second part is you can see it, Eric, and all the exploration success we’re having. Definitely we need more mill capacity, and then we can become more discernible in terms of, you know, as Pierre said, we focus on higher grade and proper margin as we understand all the different deposits. We have the potential to build a lot of new mines here and with that, you know, the mill capacity, and those are the things we’re working on, right?

Ken Ilodibe analyst
#66

All right, that covers everything from my side. I appreciate Tony and the team for answering my questions. Wishing you the best in Q2, and I'll hand things over to the next person in the queue.

Tony Makuch executive
#67

Let me just restate that, by the way, when we discuss mill capacity, you know, we aren't constructing new mills. We're on brownfield sites that already hold permits. All we're doing is modifying the plant site. There's no need to bring in power. There's no need to bring in water systems. There's no need to build substantial new foundations. We actually have tailings areas already in place. We simply need to modify permits on. We're working on and within existing operations to grow this stuff. We're not going to greenfield building brand-new permitting, brand-new processing operations. Sorry. Carry on.

Operator operator
#68

That wraps up the question and answer portion. Mark Utting will now take over for some closing remarks.

Mark Utting executive
#69

Much appreciated. Once more, I’d like to express gratitude to all of you for joining the call. As you’ve gathered, we certainly have plenty happening, to put it mildly. Considerable progress is being made on our side. Even more is still ahead. That’s beneficial for several reasons, and one of them is that we will certainly have far more to discuss during our next quarterly call. We’re eager to talk with you at that point. Have a good remainder of your day. Thank you.

Operator operator
#70

That wraps up the conference call for today. Thanks for being with us. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Discovery Silver Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Discovery Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.