Home / Transcripts / Eagle Materials Inc. (EXP) · May 19, 2026

Eagle Materials Inc. (EXP) Earnings Call Transcript & Summary

May 19, 2026

New York Stock Exchange US Materials Construction Materials earnings 35 min

What were the key takeaways from Eagle Materials Inc.'s May 19, 2026 earnings call?

Eagle Materials Inc. reported strong financial results for the fourth quarter and fiscal year 2026, achieving record revenue of $2.3 billion, up 2% year-over-year, and earnings per share of $13.16, down 4% due to lower Wallboard sales volume and prices. The company maintained a robust capital return strategy, returning over $400 million to shareholders, while also signaling continued investment in modernization projects that are expected to enhance operational efficiency. Looking ahead, management expects capital expenditures to peak in fiscal 2027, with a range of $490 million to $525 million, reflecting ongoing strategic growth initiatives.

What topics did Eagle Materials Inc. cover?

What were Eagle Materials Inc.'s May 19, 2026 results?

Eagle Materials demonstrated resilience in a challenging economic environment, with strong revenue growth and strategic investments positioning it well for future demand recovery. However, the ongoing challenges in the Wallboard segment and external economic factors warrant close monitoring. Investors should watch for the impact of infrastructure spending and the normalization of the housing market as potential catalysts for growth.

Earnings Call Speaker Segments

Michael Haack executive
#1

Bailey, thanks for that introduction, and welcome everyone. Joining me today are our CFO, Craig Kesler, plus Alex Haddock, who serves as Senior Vice President of Investor Relations, Strategy and Corporate Development. There's a slide deck that goes along with this call, and you can access it at eaglematerials.com through the webcast link. Once you've got those slides open, I'd ask you to look at slide one, where we've placed our cautionary disclosure regarding forward-looking statements. The risks and uncertainties connected to those statements could cause results to come out differently than what we talk about today. If you'd like more information, that disclosure lays it out, and you'll also find it at the end of our press release. Thanks for joining us to discuss another year in which Eagle Materials executed well. Throughout fiscal 2026, with the economy facing unusually large uncertainty, the Eagle team still produced impressive financial and operational outcomes. Revenue reached a record for a fifth straight year, totaling $2.3 billion for the year, alongside robust earnings per share of $13.16. In addition, we returned over $400 million in cash to shareholders. Investing in the things that matter has been a consistent practice throughout Eagle's long history. I'll start with the safety of our workforce. Across the last 5 years, our businesses combined have typically maintained a total recordable incident rate that sits below the industry average. During fiscal 2026, we additionally increased our near miss hazard observations — which serve as the strongest leading metric for averting safety incidents — by 24%; as for securing the long-term durability of our operations, we have completed or launched a number of highly strategic investments. The most prominent example: across the coming 18 months, Eagle will wrap up modernization work at Mountain Cement, one of our oldest cement facilities, along with one of our oldest Wallboard plants located in Oklahoma. Such projects demonstrate how we keep prioritizing investment in our assets so they remain in like new condition. Work on the Mountain Cement plant modernization stands at approximately 60% complete, and we anticipate that commissioning of the new kiln line will begin in late calendar 2026. Work on the wallboard facility in Duke, Oklahoma, has reached about the 30% mark, and our target for bringing that new wallboard line online is the back half of calendar 2027. Through these investments we'll lower where our costs sit, improve dependability, and expand what each site can produce, which adds even more production flexibility throughout our plant network and strengthens the low-cost edge we already hold over competitors. Our quarries represent yet another strategic investment focus. For Eagle to succeed across every business line, what matters greatly is the limestone, gypsum and rock found at each quarry, along with how near those quarries are to their plants. Having control over decades' worth of our key raw materials hands us a vital competitive advantage when it comes to cost and a steady, high-quality supply. That's particularly important when costs jump and supply chains get messy. It also allows us to keep delivering the same dependable, top-quality product that customers can count on for decades. At our plants, we generally maintain quarry reserves that cover over fifty years, and because we keep investing in land, we've preserved that 50-year average on a rolling basis. Turning now to the broader macroeconomic landscape affecting our operations. Headlines and short-term fluctuations can easily distract us, leading us to focus too heavily on how near-term product demand might be indirectly impacted. Even so, we remain disciplined and keep a through-the-cycle perspective. Looking at it from that angle, we stay deeply confident in the long-term structural forces that should continue lifting our sectors through numerous future cycles. When it comes to building and restoring this country's infrastructure, schools, hospitals and homes, along with other uses, what we manufacture is indispensable. Although demand for our main products remains far below the peaks reached previously, America's population is much larger now, and the nation's housing stock is aging at unprecedented rates. At the same time, nothing scalable or workable can replace our offerings, and limited availability of cement, wallboard and aggregates will constrain how much capacity gets added within each of those industries over the medium to long term. Our competitive standing should prove durable when demand picks back up, because we enjoy cost advantages in production and we keep putting money into sustaining those advantages. In fact, Eagle is already showing us that pattern despite the uneven conditions businesses face right now. Inside the cement segment, tighter circumstances have emerged across a number of our regional markets in infrastructure work and in nonresidential construction applications that use large amounts of cement. Given that federal infrastructure dollars tied to IIJA have yet to arrive, combined with healthy state infrastructure budgets and the data center builds that help every area where we operate, the outlook for volumes in our heavy materials operations remains positive everywhere we do business. As for expenses in our cement operations, near-term turmoil in energy costs should leave us fairly protected, because we secured our main fuel prices for fiscal 2027 back during last winter. Turning to Wallboard, the housing picture over the short term continues to face a number of affordability obstacles, as we've talked about. The biggest one is that buyers need some relief on mortgage rates before existing homes start changing hands more freely, and that in turn ought to bring new home construction activity back to a more normal level. Looking at it from a historical standpoint, our Wallboard volumes have stayed consistent. And what matters most is that pricing has been comparatively stable, which doesn't surprise us when you factor in the limited supply and the raw material difficulties the rest of the sector is dealing with. There's a lot of room for profit growth across our main business lines — both in cement and aggregates, where volumes are now turning upward, and in Wallboard, where we expect volume to recover over the medium term as the homebuilding market gets back to normal. We're set up well to take advantage of that room. Through the whole cycle, we've kept investing in our businesses so we can grab upside when it shows up. Craig will get into this, but we've made our already strong balance sheet even stronger, and along with the extra free cash flow we generate, that lets us make sensible, disciplined investments that make our competitive position even better. Because of the strict standards we apply on both strategy and finance, we're going to stay patient and make certain that the investments we make — whether acquired or built internally — strengthen steady growth across the entire cycle; so with that said, I'll hand things off to Craig.

D. Kesler executive
#2

Thanks, Michael. Fiscal 2026 brought in $2.3 billion in revenue — a record, and up 2% from the prior year. Q4 revenue likewise climbed 2%, hitting a record $479 million. Those increases were driven by greater cement sales volume along with what the two acquired aggregates businesses added, partially offset by weaker Wallboard sales volume and pricing. For the year, earnings per share came to $13.16, down 4%. That decline stems from lower net earnings, chiefly due to reduced Wallboard sales volume and prices, which was offset by a 5% decrease in fully diluted shares stemming from our share buyback program. Moving on to how each segment did, which you can see highlighted on the slide that follows. Within heavy materials — that's our Cement, Concrete and Aggregates segments — revenue was up 10%, and the main drivers were an 8% rise in cement sales volume along with a 19% gain in concrete and aggregates revenue. Aggregate sales volume reached a record 6.6 million tons, a 70% jump compared with a year earlier, which reflects what our acquired aggregates operations contributed. Notably, organic aggregate sales volume climbed 24%, pointing to solid underlying demand. For both business lines, the increase in sales volume came on the back of ongoing strength in public infrastructure spending, plus important pockets of private nonresidential construction activity like data center development. A 10% increase in operating earnings was also recorded, mainly due to greater cement sales volume, though this was partly counterbalanced by a 1% drop in net cement sales prices. Turning to the Light Materials sector, as shown on the following slide, annual revenue there declined 9%, landing at $881 million, which reflected reduced sales volume for Wallboard and recycled paperboard along with a 4% decrease in Wallboard sales prices stemming from ongoing weakness in residential construction. Sector operating earnings came in 15% lower at $331 million, largely attributable to diminished Wallboard sales volume and pricing. Now, regarding our cash flow: we keep producing robust cash flow and deploy capital prudently, in line with our long-term strategic priorities. In fiscal 2026, our operating cash flow increased 12%, reaching $614 million, which speaks to the strength of our business and how resilient our operating model is. Capital expenditures came to $417 million for fiscal 2026, mainly because of investments tied to modernizing and expanding the Mountain Cement plant in Laramie, Wyoming, along with modernization work at our Duke, Oklahoma Wallboard facility. These efforts are significant long-term investments that will boost plant efficiency, make operations more reliable, and improve our competitive standing. As we look toward fiscal 2027, we anticipate capital expenditures will land somewhere between $490 million and $525 million, which reflects continued momentum on these strategic growth initiatives plus the sustaining capital investments we keep making throughout the company. We think capex will hit its high point in fiscal 2027. The Mountain Cement project should come online later this calendar year, and we expect the Duke project to wrap up around the middle of fiscal 2028. Meanwhile, our commitment to giving capital back to shareholders hasn't changed. In fiscal 2026, we handed back $414 million altogether by way of quarterly dividends plus buying in about 1.7 million shares at a cost of $382 million. As we ended that year, about 2.9 million shares remained open to us under the buyback plan currently in effect. Finally, turning to the makeup of our capital, which continues to leave us with substantial financial strength and flexibility. Over the course of the fiscal year, we made our balance sheet even stronger by issuing $750 million in 10-year senior notes carrying an appealing 5% interest rate. That deal bettered the maturity schedule for our debt, boosted committed liquidity, and brought our capital structure into closer alignment with the long-term strategic investments currently happening at our Mountain Cement plant and Duke Wallboard facility. A share of the proceeds also went toward paying down borrowings under our bank credit facility, which gave us even more financial flexibility. As of March 31, 2026, our net debt-to-capital ratio stood at 50%, while our net debt-to-EBITDA leverage ratio came in at 1.9x. We view those amounts as remaining sensible and aligned with how we intend to expand. At the close of the quarter, our cash stood at $298 million, alongside roughly $1 billion in overall committed liquidity. Equally significant, we don't have any major debt coming due soon, leaving us well placed to continue putting money into the business while preserving a sturdy, adaptable balance sheet. We appreciate your joining today's call. Bailey, please begin taking questions from the line.

Trey Grooms analyst
#3

Congratulations on finishing the fiscal year so strongly, especially when it comes to margin performance. Perhaps we could begin right there. Could you take us through some of the main positives and negatives affecting margins in each segment during this quarter?

D. Kesler executive
#4

Sure. Thanks, Trey. Well, regarding cement, as you noticed, our volume was really solid. Our regions keep delivering strong results. That volume — the additional volume was favorable this quarter, since we experienced nice flow-through. We — like Michael said, many of our solid fuels have been committed via supply agreements for this year. So our performance there remains excellent. The plants achieved really strong plant efficiencies this quarter compared with a year earlier. Then over on the light side, the wallboard business keeps delivering excellent results. The paper mill delivered yet another record year for us; that facility is operating extremely well. Those plant efficiencies throughout the enterprise truly show up in the margin profile being produced.

Trey Grooms analyst
#5

Yes. That’s great; and regarding how strong cement volumes were during the quarter. Could you discuss a bit what drove that and perhaps what you’re observing purely from an underlying demand standpoint as we head into the part of building season that is seasonally stronger?

D. Kesler executive
#6

Yes. We noted in the release, part of it was that the fourth quarter of last year faced a really difficult comparison or really difficult weather conditions. So the comparison was relatively easy. But like we’ve discussed, public infrastructure’s underlying strength is still positive, with state budgets in very healthy shape; and then when it comes to private nonresidential construction areas, we mentioned data centers. Those have been extremely strong, particularly in the regions where we operate. So those are the two major drivers behind underlying demand. And then, as you said, really during what would typically be a fairly slow construction season. So we’re excited about how construction season has begun here in April and continues into May and is shaping up to be a good year in fiscal 2027.

Trey Grooms analyst
#7

Thanks. That's my final question. Regarding cement, even though you've rolled out price hikes in the majority of your markets now, as discussed on earlier calls, pricing dipped a bit — could you share whatever detail you can on how customers are responding to those increases? And how should we view that pricing as we head into the busiest building period? I realize you noted that in certain regions among your markets, things are getting somewhat tighter; so any insight you can offer on the cement pricing side?

D. Kesler executive
#8

Sure. Across nearly all markets, we've got cement price increases set for April 1. In a few of our Western markets and in the South, no increases were put in place. However, we're working through carrying those out, and we do have elevated freight expenses that will have an effect on a net basis; that shows up in cement when we move the terminals. It also shows up in Wallboard, as we mentioned in the release, but we're in the middle of putting those into effect, and a solid volume backdrop is definitely a plus and provides support for that.

Anthony Pettinari analyst
#9

To build on what Trey asked, and there's a bit in the release covering this, but can you provide additional detail when it comes to putting numbers around how diesel and freight costs are affecting things? And perhaps remind us what portion you purchase directly, what portion operates sort of like a pass-through, as opposed to needing to lift prices in the open market? If you could sharpen the picture of how a higher diesel environment hits both the cement and the Wallboard business, that would help.

D. Kesler executive
#10

Sure; let's begin with Wallboard, since that may be somewhat simpler to grasp. Our Wallboard pricing is on a delivered basis, so the freight bill falls to us; and quarter over quarter, we experienced roughly a $2 rise in freight costs, possibly approaching $3. That therefore hits what we refer to as our mill net, our net sales price. That's the way diesel, on a delivery basis, affects the Wallboard business; cement is somewhat more nuanced, since there's a greater mix of customer pickup, which the customers would handle, versus delivery into our terminals for them to collect. We handle the freight into the terminal; and once more, we observed some inflation there, a couple of dollars per ton; and so, thinking about operating costs, we definitely consume diesel in the quarry operations. We're quite fortunate, once again, that our quarries sit near our facilities, meaning the limestone quarries supplying cement plants, the gypsum quarries supplying the wallboard plants are close to the facilities; so we aim to keep those freight costs as low as possible, yet we did see an impact, though the delivery cost is a far more significant figure for us at present.

Anthony Pettinari analyst
#11

All right, that's quite useful. Then perhaps one quick additional question. From a cement standpoint, I realize your exposure to imports isn't as significant as that of certain other businesses. However, with fuel expenses climbing and ocean freight presenting difficulties, is it the case that imported cement is arriving at a steeper price, or is there a notable effect in that area?

D. Kesler executive
#12

Indeed. We bring in material to a handful of markets — South Texas and Northern California. And indeed, what we've observed is — we monitor the Baltic Dry Index, and it has definitely risen lately amid all the problems occurring around the world, including not only energy costs but additional elements affecting ocean freight rates; and indeed, that has driven those expenses higher, which once more places upward pressure on a product supplied into the U.S.

Timna Tanners analyst
#13

Some people are saying that the true driver behind those strong Q1 volumes is data center demand. So I'd like to hear your take on that. You brought up the cement side, I realize. You also noted that comparisons are easier and mentioned some other elements, but could you go a bit deeper into what you're observing regarding data centers and give us a reminder of how significant that segment is within your end markets?

D. Kesler executive
#14

It's absolutely quite significant. Regarding public infrastructure, we pointed to two items; activity there remains solid across our markets. That said, data centers were clearly a major factor behind the gain. And I should note, we aren't anywhere near the final stages of data center construction; in plenty of our markets we're only at the start, with more soil stabilization and that kind of work. So that's definitely — it's interesting. When you consider what makes up the demand picture, we discuss private nonres. In the past we'd typically think of hotels, office buildings, schools, that sort of thing. These days there are pieces of private nonresidential that simply weren't around 10, 15 years back, be it warehouses or these data centers. Fabrication facilities have been part of the mix for some time; so certain pieces of private nonres, in my view, carry far more weight than folks anticipated and definitely more than anything we've witnessed historically.

Adam Thalhimer analyst
#15

Craig, could you shed a bit more light on those cement price hikes coming April 1? And then, when it comes to wallboard, how likely is it that pricing hits its floor in the near term?

D. Kesler executive
#16

Sure. Adam, I'll tackle the second half of what you asked first. We've got a price increase for Wallboard on June 1. Much of that stems from the transportation expenses we've been seeing over the past several months — as I said a short while ago, we sell Wallboard on a delivered basis, so that freight bill comes back on us. That's why we do have an increase letter circulating. More broadly, Adam, if you look at where demand for wallboard stands today in the United States — Michael brought it up — it's dramatically below the trend you'd have anticipated given the population growth we've had here in the U.S., and so on. So demand and pricing will be tied together. But considering how our business is performing at this level of demand, I'm very, very proud of how that business is running and how our people are operating our facilities. As for the cement price increase, like we said a little earlier, we also have increases in most markets for April 1. Those are in progress. Some nets against freight bills will offset that. Still, given the demand environment, we're moving ahead with those April 1 increases too.

Adam Thalhimer analyst
#17

Okay. And Craig, you said capital expenditures for this year would be roughly $500 million, give or take. I'm just wondering, if you took away those two major capital projects and only had maintenance CapEx, what would the figure be? And after those 2 large capital projects wrap up, what's the maintenance CapEx going to be forever?

D. Kesler executive
#18

Yes, Adam, good question — it's something we pay close attention to. Like I said, in fiscal '27, that $500 million figure will truly be the high point. Once you look ahead to fiscal '28, as the Duke — or rather, the Mountain Cement project will be finished, and the Duke plant will begin — will be done within that year; that amount begins dropping considerably. What I refer to as sustaining capital requirements falls in the $150 million range. I don't believe we're — for fiscal '28 exactly at that run rate, we're likely still around $250 million with the Duke plant wrapping up in the first half of the year. But once you're in the back half of fiscal '28, assuming no other major project emerges, we'd be sitting at that $150 million yearly run rate.

Philip Ng analyst
#19

Nice quarter — congratulations. On the Wallboard side, I'd say your volumes trailed the industry pretty significantly across the last 2 quarters. That pattern turned around quite well. Was anything one-off behind it, like rebates or the way contracts were structured? Or is this a solid catch-up, where you're winning back some share now?

D. Kesler executive
#20

No, Phil, nothing stands out that I'd flag. About a year ago, as we discussed, regional advantages and similar factors had us beating the industry. This was simply — over the past couple of quarters, it's just that normalizing; so seeing us land in line with the industry isn't a surprise.

Philip Ng analyst
#21

All right, that's useful. Craig, do you have any initial sense of what April and May are looking like so far? Housing's obviously remained quite uneven, but is there anything you can share regarding order trends for wallboard?

D. Kesler executive
#22

Well, like you mentioned, with housing, it's tough to — that crystal ball isn't exactly transparent. Over a longer horizon, though, it's obvious: this country needs considerably more houses built. We're way underbuilt. Exactly how that plays out across the coming 6 to 9 months, I'd say, remains somewhat uncertain. Still, looking at a longer stretch, there's substantial potential in that business — for volume, for price, and as a result, for margins.

Philip Ng analyst
#23

All right. Regarding cement, volumes in 2026 were definitely very robust. Granted, part of that reflects comparisons against weaker prior periods. When we think ahead to April, May, and honestly, 2027, ought we to anticipate growth in positive volume terms, considering the momentum you're observing in infrastructure across certain data center projects? I raise this simply because industry figures — PCA, or whatever the new name for that format is — seem to project volumes declining by roughly low single digits, yet you clearly are witnessing that momentum. So please help us sort through what you're observing and how demand conditions this year ought to be viewed.

D. Kesler executive
#24

Yes, Phil, it's curious; we've observed those same figures; and look, I believe partly it comes down to our regional footprint being — we definitely saw it during calendar '25 beat the national average. The national average declined in '25, while we rose modestly. Yet going market to market, region to region, whichever way you'd frame it, our markets did better than the national average. So as we move into calendar '26, our fiscal '27, I believe we stay optimistic regarding the underlying demand environment for the reasons already discussed. So yes, we still anticipate positive momentum in volume. Of course, recognizing the ACA reports a different figure. Yet once more, that might be more of a national average sort of matter. Still, when we examine our markets, we keep seeing solid momentum there. Do I believe we'll keep posting double-digit sorts of increases? I'm not claiming that. However, I do believe we'll keep seeing improvement across our markets.

Timna Tanners analyst
#25

I'd also like to hear your perspective on the recent talk regarding federal and state gas tax holidays, plus the proposed substitute for the IIJA, and what effect you believe that would have on Eagle and the broader industry?

D. Kesler executive
#26

Sure. Your question's final portion is quite new. A bit of that language has appeared within roughly the past 24 hours. What it suggests, I believe, is that clearly there's both a wish and a necessity to keep extending the IIJA and the updated form of it. My sense is that will benefit public infrastructure across a lengthy stretch of time. Speculating about precise dollar figures, or exactly the method and timing, feels a bit premature, yet it's definitely favorable. Regarding the earlier portion about gasoline tax holidays and similar measures, historically those tend to be fairly short-lived — you get energy price surges like this one and attempt to offset them. However, the projects already in our pipeline have their support in place, and I don't expect this to affect those projects going forward.

Timna Tanners analyst
#27

All right, thank you for that. And if I may, when you look beyond this current period of unusually high capital spending, could you walk us through your approach to allocating capital? Is there anything you're seeing in the way of a pipeline for acquisitions? Or could you offer a big-picture sense of what the M&A landscape looks like?

Michael Haack executive
#28

Sure. I'm glad you asked about that. We're constantly on the lookout for M&A deals, provided they're sensible and satisfy the financial return thresholds we've set. So I believe we've been transparent, and we'll stay transparent, that our capital allocation always prioritizes growth, above all when it can be obtained at an attractive value. Keeping our assets in like-new shape, and after that giving cash back to shareholders. That has defined us over the past 10 years, and it will keep defining the way we put our capital to work.

Tyler Brown analyst
#29

Craig, my sense is that when you combine Mountain Cement with Duke, those initiatives will likely require roughly $760 million in total spending. I realize these efforts serve both as expansion and as upkeep; however, once we approach perhaps fiscal '29, should we be thinking about some conceptual payoff from that deployed capital? In other words, can we frame it as $760 million put to work at a certain EBITDA multiple? Or is there any framework at all for evaluating that down the road?

D. Kesler executive
#30

Yes, Tyler, excellent question. Let me return to those initiatives. What I'd say is they represent strategic commitments for the long haul that will deliver additional output while also sharply bringing down the operating expense base at both locations. As we've noted, the Mountain cement facility in Laramie, Wyoming ranks among our oldest cement operations, and it will see its cost base reduced mainly via greater energy efficiency and a far more fuel-efficient setup; Duke is essentially the same or quite comparable. So I don't want to downplay what these initiatives will achieve. That said, when we commit capital to efforts like these — and we've done comparable things in the past — our aim is a return in the double-digit range. So yes, you've identified the correct horizon, once we reach fiscal '29. At that point, both initiatives will be finished and ready to operate. And the expense reductions involved will represent a hugely significant contributor to that overall gain.

Tyler Brown analyst
#31

All right. Great, that's useful. Now for something a little more in the weeds, I guess. But earlier you said the paperboard plant is performing really strongly. And clearly, when you look at what that plant contributes to EBIT, there's no question about it. But stepping back, does $40 million of EBIT represent a solid baseline? Or did this past year have a favorable arrangement involving revenue and costs not lining up? Or any insight at all there, just in terms of the longer-term model?

D. Kesler executive
#32

Those earnings can be maintained. One reason is that we have certain pass-through arrangements; so roughly 60% of their sales volume moves under long-term supply agreements, and inflators and deflators are built into those agreements. So sure, OCC declined this year, yet we're able — should it rise, that gets passed on. Occasionally there's a quarter's delay in that. But a good deal of it comes down to a team at the paper mill truly executing at a high level, a plant — strong plant efficiencies. That's what drove much of it and — yet the earnings are extremely, extremely sustainable.

Michael Haack executive
#33

Thanks, Bailey. As we wrap up this call, I'd like to recognize and express gratitude to every one of my Eagle teammates for the attention and dedication they showed during the turbulence of the last couple of years. That focus has allowed us to produce strong financial results while also achieving great progress on our two-plant modernizations in fiscal 2026. Looking ahead to our fiscal year 2027, even with uncertainty still present, we will remain consistently focused on safety, operational excellence and high-return, value-enhancing investment opportunities. I appreciate your joining our call today. I'm eager to keep you updated on our progress through fiscal 2027.

Operator operator
#34

That brings us to the end of this call. We appreciate everyone joining us for today's presentation. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Eagle Materials Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Eagle Materials Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.