Good day, ladies and gentlemen, and welcome to the Q4 FY '22 earnings conference call for Indiabulls Real Estate Limited. <<operator_script>> Please be aware that this conference is being recorded. At this point I'll turn the conference over to Mr. Sachin Shah, President of Indiabulls. Thank you, and over to you, sir.
Thanks, operator. Good evening, everyone, and thanks for being with us on today's call as we go over the results for Q4 and the fiscal year that closed in 2022. First, a quick introduction from my side. I'm Sachin Shah, and I've joined Indiabulls fairly recently as the company President. Before coming to Indiabulls, my role was Chief Investment Officer at Embassy REIT. I'd also like to extend a welcome to Mr. K.G. Krishnamurthy, who was appointed recently as our Non-Executive Chairman of the Board. Not long ago, IBREAL published its results for the quarter and the financial year that ended on March 31, 2022. Our quarterly financial statements, along with the earnings presentation covering how we performed, are available in the Investors section of our website at indiabullsrealestate.com. With me on today's call is Mr. Anil Mittal, our Chief Financial Officer since 2014. I'll begin with a review of the business, and after that Anil will take you through a brief look at the company's financial performance. Then we'll open the floor for questions. The business and operating highlights for Q4 and FY '22 are as follows: we closed the quarter with new bookings of 0.5 million square feet and presales of INR 326 crores, representing growth of 30% -- 34% by area and 77% by value quarter-on-quarter.
For the entire year, our bookings came in at 1.7 million square feet, alongside presales totaling INR 1,383 crores. Mumbai remains our dominant market, accounting for 60% by area and 84% by value. In quarter 4, we recorded collections of INR 333 crores, compared with INR 292 crores during the previous quarter — that's a 14% rise quarter-on-quarter. Across the full year, collections reached INR 1,281 crores. Construction spend for the quarter was INR 134 crores, versus INR 111 crores in the prior quarter, marking a 22% quarter-on-quarter increase. For the whole year, construction spend totaled INR 435 crores compared with INR 322 crores in FY '21, which is a 35% year-on-year increase. The ratio of construction spend to collections was 40% in Q4 versus 38% in Q3. It came to 34% for the full year ended March 31, 2022. Also for the full year ended March 31, 2022, we delivered roughly 1 million square feet across 3 projects, compared with 0.4 million square feet in FY 2021. Net surplus from our OC and near-completed inventory and ongoing projects was INR 7,161 crores, with an estimated inventory value of INR 9,287 crores and pending costs of INR 4,946 crores. Total estimated net surplus, including planned projects, came to INR 8,708 crores.
As of March 31, 2022, sold receivables total INR 2,822 crores, and within that, receivables give 2.5x coverage for the cost still pending on OC near-completed projects. Moving along, we're glad to report that OC has come through for one of our key projects, Sky Forest, and that has released a net surplus of INR 1,033 crores. It also carries unsold inventory today of INR 437-odd crores. For the company, this marks a significant milestone, since it frees up liquidity in the near term. Turning to an update on the merger with Embassy Group and other business updates: the latest development on the merger scheme is that the Bengaluru bench of the NCLT granted approval to the scheme on April 22, 2022, subject to approval from the Chandigarh bench of the NCLT. As you'll recall, shareholders approved the scheme on February 12, 2022, and the company is waiting for the final hearing before the Chandigarh bench of the NCLT. Some further developments have also occurred. The Board of Directors has received a request from the founder and existing promoter, Mr. Sameer Gehlaut, asking to be reclassified as a promoter. The company's shareholders approved that reclassification request on February 12, 2022. And on that basis, the company has filed an application with Savi.
IBREAL has also moved its Mumbai and Gurgaon offices to new locations at present, since the company wants greater flexibility and more independence from the rest of the group. In addition, as part of the merger process, the companies have begun discussions about integration when it comes to projects and operations, accounting and HR policies, systems and IT processes. We expect the merger to be fully completed between July and August this year. As we move forward, our focus is threefold: to complete our OC near-completed assets, which will have released a large amount of near-term and visible cash flows; to spend time and attention on the planning and design of our upcoming launches — these include BLU Annex, Sector 104, Thane Phase 2, and these have a gross development value in excess of a few thousand crores; and three, to ensure a smooth integration with the Embassy Group as the merger comes to a completion. Strengthening our balance sheet will remain a top priority as we look to accelerate growth over the next 12 months. In this context, I would like to inform that the company has recently concluded a fundraise of INR 865 crores, approximately USD 114 million, to a qualified institutional placement. The placement witnessed nearly 50% of the demand from new investors, and 70-plus percent of the book was allocated to long OD investors.
We’re grateful for the continued trust and backing from the investment community during what has been an extraordinary institutional placement that took place halfway through a merger, all while geopolitical headwinds persisted and markets remained turbulent. This capital is going to be important for addressing near-term cash requirements and for supporting overall growth by finishing projects that offer the greatest visibility on cash flow. The money was used mainly to retire certain existing debt, to cover customer refund liabilities, and to fund construction of projects currently underway. Also, in the quarter, the company signed a term sheet for the disposal of land at Sector 106, Gurgaon. Then, on April 8, 2022, the company signed a share purchase agreement connected with that disposal and has received INR 80 crores as an advance. The total consideration for that disposal is INR 580 crores. The new capital raise, cash proceeds from that land sale, and past project sales — including the London assets — plus proceeds from delivery and completion of projects like Sky Forest will, at this time, be enough to let the company reach its growth ambitions. We have a clear plan for execution and for finishing the projects where these funds will have delivered.
I'll now pass things to our CFO, Anil Mittal, who will go into more detail on a few of the financial highlights covering both the quarter and the full year that closed on March 31, 2022.
Thanks, Sachin, and good evening, everyone. Let me walk through the financial highlights for Q4 of FY '22. On a consolidated basis, revenue for Q4 of fiscal year '22 came in at INR 273 crores, compared with INR 356 crores in Q3 of FY '22. Adjusted EBITDA in Q4 FY '22 was INR 58 crores, against INR 19 crores in Q3 '22 — that's a 200% rise quarter-on-quarter. Margins were 21% in Q4, versus 32% in the same quarter a year ago. Interest and finance charges for Q4 FY '22 were INR 24 crores, compared with INR 34 crores last year, which is a 20% decline year-on-year. Turning to the full-year highlights for the period ended March 31, '22: consolidated revenue was INR 1,541 crores, against INR 1,662 crores in FY '21. Adjusted EBITDA for FY '22 came to INR 276 crores, versus INR 476 crores a year earlier. Interest and finance charges for FY '22 were INR 110 crores, compared with INR 228 crores last year — a 52% drop year-on-year. Now some other financial updates. Gross debt stands at INR 1,310 crores, and after adjusting for the liquidity <<inaudible>>, net debt is INR 1,500 crores. All in all, group liquidity remains robust, exceeding INR 305 crores.
The average cost of our borrowing comes to 10.7%, and our debt equity ratio stands at 0.4x. As I wrap up my remarks, I want to restate that our company maintains a strong balance sheet along with enough liquidity to cover both operations and our expansion plan. We also remain favorably positioned to take advantage of growth opportunities. Thank you. I'll hand it over to Sachin for his concluding remarks.
Thank you, Anil. So, to sum up: we keep taking a number of positive steps — along with the merger that's underway, and a reduction in debt across the operations of our business. Our project pipeline looks good, and land banks are the key raw material that we aim to turn over faster going forward. This has been a tough transitional period for the company, since the merger has taken longer than expected because of COVID and other factors. I want to reassure our employees that I'm feeling optimistic about our future, and that both Gurgaon and Mumbai ought to play a significant role in the company's growth as we move ahead to become part of a larger platform. To our stakeholders, I give you my assurance that senior management is focused on making sure the transition is smooth and quick. So our attention now shifts to execution and new launches as we aim to be a leading real estate developer of residential and office assets in India. I'll now hand things back to our moderator for the Q&A session.
<<operator_script>> Our first question comes from Manish Agrawal, who is calling in from JM Financial.
Sachin, could you please give us an update on the reason the merger timeline has slipped? If you could just walk us through it. Previously, we had been looking at something closer to a June timeline.
Manish, as you’re aware, the merger is handled through the NCLT process. And with what India went through again in January and February, the course has moved a bit more slowly than we expected. That said, as I mentioned, Bangalore has completed the NCLT process. Chandigarh has completed the second hearing and we have that order in hand as well. Right now we’re just waiting for the report from the ROC and VRD and the tax departments before the final wearing takes place. After that, the merger is done. So I’d definitely say we’re now weeks away from the merger being completed rather than months.
Understood. And then, could you walk us through what the debt profile would look like <<inaudible>> would be the main thing — if you could just discuss Sky Forest and similar services of ?
Is that about how the debt profile would look after the merger, or before it?
After the merger closes, and then 1 year looking ahead.
Okay. Once the merger is done, we think the merged entity would carry debt of about INR 6,500-odd crores. The company would have that INR 6,500 crores of debt, but it would equally hold finished inventory worth nearly INR 5,500-odd crores. So the OC and near-completed projects on both the Indiabulls and the Embassy side come to roughly INR 5,500 crores in net surplus value. The thinking, then, is that although on day 1 you begin with a debt figure that is a little higher, across probably the coming 12 to 24 months we expect that debt to come down by more than half, purely on the strength of the finished inventory we hold, which is 2.4 million square feet from the Indiabulls side and roughly 3 million-odd square feet from the Embassy side.
Sure. And when it comes to sales velocity, where do we see things heading next year in FY '23, for both entities at some point?
So my thinking is that after the merger closes and things settle into a steady state, what we're aiming to hit is somewhere around INR 2,500 to INR 3,000-odd crores in sales annually. That's the goal, that's what the management team wants to see. A big chunk of that comes from our finished inventory. So again, this isn't a case where we need to develop the asset — it'll be a finished asset. So I think that's really the target we're looking to reach once the entity is combined.
And within that INR 2,500 crores to INR 3,000 crores of sales, are you also counting the Indiabulls BLU and Juhu launches?
No. What I’ve really been talking about here is mostly our OC assets that are nearly finished. Anything we’ve launched, and those are projects the company plans to launch early in calendar year 2023, that would go beyond those numbers.
There are two deals, and one of them in particular is the Gurgaon land parcel, where we've gotten INR 80 crores and INR 500 crores is still owed. So where does that stand? When should we expect that money to come in? And finally, the former Indiabulls promoter is also supposed to pay the company back. So when is that anticipated?
Okay, I’ll take the first one. We expect the proceeds for 106 to come in, maybe within the next 2 to 3 months. A definitive agreement has been signed. The company still holds the land, and no registration has taken place yet, but there were certain CPs that had to be satisfied. We are working toward completing those CPs and obtaining the approvals. There will also be a final press release that goes out in the newspapers. That process takes 30 days. So I expect — hopefully — that within the next 90 days we can finish the prospects for 106. Regarding the London receivables, let me walk you through that in a bit more detail. The original purchase price was more than INR 2,000-odd crores. During the last 2 years, while COVID was rampant, Sameer paid down nearly 2/3 of it. Roughly 60 million pounds is left and needs to come into the company. Management met with Sameer, and he explained the delays were because of COVID. He is expected to complete this project within the next few months and has assured the company that those funds would arrive before December 31, 2022.
There's a binding share purchase agreement of some kind in place with the promoter, and it falls under U.K. law. <<inaudible>> also holds certain rights under that agreement. But I think the main takeaway here is that although Sameer has run into delays of roughly 18 months, what he's requesting is an extension of as much as 9 months in order to pay these funds down. And we expect full repayment of these funds before the year is out.
And is there any interest being shared around those additional 9 months?
Regarding the agreement, a 5% interest rate on the British pound applies starting April 1, 2022.
Samar Sarda from Axis Bank has the next question.
Sachin, I've got a few things I wanted to ask. First, about the BLU launch — is it right to assume that any new launches would only take place after the merger and the name change? Would that be a fair assumption?
I'd say that assumption holds up, and it's not really down to the company deliberately slowing things. The way I see it, any new launch requires substantial planning work behind the scenes. You need MOEF approvals, and RERA approvals are also necessary. So I think it follows naturally — given the timeframe, the new launches on our radar, whether that's Thane Phase 2, Sector 104 in the North, or the BLU Annex, will by their nature take place after the merger has closed.
Isn't it the case, though, that you'd want to bring it out under the Embassy name — something you're not able to do at this point?
Right. Naturally, being a combined platform, our intention is to introduce it under the Embassy brand, though I believe that will come about on its own. It isn't that we're deliberately delaying. I'd say it's simply that the timeline works out this way: the merger should close in a matter of weeks from today, while the approvals likely remain a few months off. Once that happens, they'll be introduced as a merged entity beneath the Embassy brand.
All right, right before I take the next question, one quick follow-up regarding BLU. That <<inaudible>> parcel of land that had originally been slated for a commercial building with <<inaudible>> — my understanding was that this was a non-committed arrangement with Bharat and the existing group project. So, to launch a residential project on that site, would consent be required from 2/3 of the current 336-odd units?
Out here, we actually have approval from every flat owner to launch residential, so I don't think there's any need for us to go back and request any additional approval like here.
Okay, and regarding the NCLT process — in case I missed it, is there a likely date for the next hearing related to NCLT Chandigarh? And would that be the final hearing of the last quarter's call as far as the whole process goes, at least on the merger?
Yes. The upcoming session at NCLT Chandigarh is going to be the final one. NCLT Chandigarh will pass the final order at that point. After that, you likely need about 3 weeks before the swap takes effect, and then what would ultimately become a single, larger publicly traded platform.
Right. And you mentioned the funds from Mr. Gehlaut arriving, and even though there's a contract in place, is there any sort of fallback or security that Indiabulls Real Estate as a company holds, given that the money has been delayed for <<inaudible>>? Is there any other security Indiabulls must retain or currently has with regard to Mr. Gehlaut's money returning to the company?
No. Look, I think, first, as I mentioned, this is a contractual commitment from Mr. Gehlaut to the company to repay these funds. As I said, the share purchase agreement falls under U.K. law — sorry, <<inaudible>> law, which is very similar to U.K. law. Also, we're in a situation where he has in fact paid for 2/3 of the asset. I'm sure he wants to get this finished as well. There have also been discussions previously between management and Mr. Gehlaut, as well as regarding G.T Nirvani and Mr. Gehlaut, in which the new incoming management likewise feels quite comfortable that repayment will happen by the end of the year.
Our next question comes from Jeevan Patwa, who is calling in from Sahasrar Capital.
Yes, Sachin. Could you just repeat that once more for me? So at the start, the debt stood at roughly INR 5,500 crores on the Embassy side and INR 1,000 crores on the Indiabulls side, correct? That adds up to INR 6,500 crores. And at this point, we've already raised INR 850 crores through the QIP, right?
Correct.
So did we make that adjustment, or is it still unadjusted?
No. So a portion of that has gone toward reducing the debt, right? We're also directing those funds into construction. On top of that, there are certain liabilities — customer refunds and RERA obligations, for instance — that the debt is servicing. So ultimately — and proceeds keep flowing in as we keep selling more units, which also goes toward bringing the debt down. So my expectation is that on day 1, once the 2 companies come together, we'd be sitting on debt of roughly — well, I'm quoting a forward-looking figure here rather than a historical one — around INR 6,500 crores. There will also be cash within the system. We ought to have proceeds from the land sale too, 106, which comes to roughly INR 500-odd crores. The London receivables should mostly arrive by year-end, approximately INR 620 crores. And since Sky Forest has now obtained its OC, over the next — I'd say 6 to 9 months — we should get a further INR 1,000 crores out of Sky Forest as well.
So, if you take a look at the situation, we're carrying debt of about INR 6,500 crores, and against that we'll have proceeds of around INR 3,000 crores coming in to offset it.
All right. So by the close of this year — that's FY '23 — it ought to be roughly INR 3,500 crores. At that point it should drop to that level, right?
By the close of FY '23?
Correct — March '23.
Honestly, pinning down the exact figures is difficult. Still, I'd probably say the first year, simply because mergers of this kind take somewhat more time. And once we start getting into the rhythm of it, my feeling is that in year 1, debt will come in at roughly INR 4,000-odd crores. Then after that, by year 2, we ought to bring it down even more, to somewhere in the INR 2,000 crore to INR 2,500 crores range.
Right. So the inventory, or the surplus, from the finished project that we're seeing — what was given in the presentation — that's been somewhere around INR 8,500 crores, correct? And the new launches aren't included in that. That's where the value comes to roughly INR 5,800 crores. So that's action to... Yes, go ahead.
No. So Jeevan, let me — yes, what you're looking at as a complete surplus figure of 8,500 — INR 8,700-odd crores, that also takes in the planned bucket on the Indiabulls side. So the BLU Annex tower is included in that. But none of the Embassy's assets are part of that INR 8,500 crores. What we're looking at today, the company present, which is the quarter 4 results for the fiscal year ended FY '22, are all stand-alone numbers of Indiabulls.
Indiabulls. So if I’m looking at it on a combined basis — since it’s the combined entities — how much would the surplus be?
Okay, so let me kind of step back for a moment and look at the combined entity. On the residential side, for Embassy, the surplus on the near-completed and OC assets comes to about INR 3,500-odd crores, correct? And that's just the 3 million square feet out of the 53 million square feet that Embassy is contributing to the portfolio — to the platform, right? Then Embassy has made the decision that another 7 million square feet of residential assets — and it holds 42 million square feet of commercial assets. So if you look at the residential asset, the planned assets of 7.8 million square feet, the surplus there is around INR 2,500 crores, right? And then the commercial asset, which is that 42 million square feet, that one's tough to — as of today, kind of quantify because...
My main goal there was really to get a handle on the near-completion projects and the OC-type projects over on the Embassy side. So that INR 3,500 crores figure — is that what we're looking at?
Yes, that’s correct — I did.
Right, so that comes to INR 3,500 crores. And as for Indiabulls, the figure is INR 8,500 crores?
No. So that INR 8,500 crores from Indiabulls takes in what you've already got underway as part of your plan. When I look at just the near-completed portion, it comes to about INR 2,000 crores.
So the combined surplus in finished goods, or OC as it's called — that comes to INR 5,500 crores in total, correct?
That's exactly right.
Right, understood. And that ought to build up across the coming 2 to 3 years?
Our goal is to have that released across the coming 24 months.
Our next question comes from Rithvik Seth at one of financial consultants — apologies, Ritwik.
I've got a question about the Indiabulls projects that are ongoing — those shown on Slide 24. We noted a surplus of roughly INR 5,400-odd crores. So are these 5 projects currently under construction, or is construction not happening at the moment? That's the first thing I wanted to ask.
Yes. So even though we describe these as ongoing projects, as you can see, BLU Estate & Club is the fifth tower at Project BLU. That isn't planning in design phase. So construction there hasn't begun, but we expect to start, as I said, probably in the first quarter of calendar year 2023. Indiabull's Park is under construction. As you can see, it's already sold 3.7 million square feet, with 1.2 million unsold, right? Thane as well, as you can see, the first phase is sold, and as I was mentioning, we're looking this year to launch Phase 2. The Gurgaon project, that Sector 104. Now, what happened out here is it initially started selling product, but over time, that project did not move forward. What we've done is actually anyone who had come into it before, we refunded their money. And now, we're looking to launch roughly 6 of the 18 acres, that would be roughly 1.2 million of the 3.8 million square feet, possibly in the next -- by the end of the year, or again, like I said, early next year. So that's a project that will again get launched, and at least 1.2 of that 3.8 will get launched pretty soon.
Your final project is Gurgaon, 109 — that's a commercial building. There's very little remaining to be sold there. Basically, the project just needs to be completed. However, it has a good amount of sold receivables that need to come out of it. So the focus would be on that.
Right. So my basic question is this: since we’ll need to put money into the projects that are close to finishing, and after that shift to the ones already underway, and given some pressure on liquidity, would it be reasonable to think those projects first have to get going, then sales begin, and after that the receivables come in? Is that a fair way to look at it?
So look, as I mentioned before, what we're really concentrated on is the OC nearly finished on both fronts — the Embassy front and the Indiabulls front too. Our attention is on that 2 million square feet, 2.1 million square feet which remains unsold across the Indiabulls projects, since that alone carries a fairly big net surplus that should bring in roughly INR 1,800-odd crores. And those projects, once again, are at a very late stage — many of them already have their OCs. So that's roughly the Indiabulls portfolio, and that's where we're putting our attention in the near term. Meanwhile, on the Embassy front, they have 3 million-odd square feet that is now, I'd say, 99% complete, and every one of those has its OC. <<inaudible>> only received its OC last week too. So once again, the emphasis there would be on how to sell, market, and liquidate close to 3,000 or INR 3,500-odd crores of finished inventory in that pool. So that is what will drive revenue and cash flow here. But at the same time, across the coming 2 years, we can't halt our ongoing projects. So we'll need to be judicious yet keep spending on those projects, because that will then become the next set of projects that will be, kind of, up for delivery and completion.
Okay, so our plan is to take the surplus from the OC once it's close to completion, put those funds into the projects already underway, and from there move forward with the projects we've planned. That would be...
Right. So we will have a CapEx plan covering the coming 2 years. And because we're producing substantially more liquidity and surplus at the same time, what we'll do is essentially deploy those funds to begin reducing debt as well.
Yeah, yeah, got it. All right, and sir, my follow-up question concerns the fixed cost of the combined entity. On an annual basis, what would the fixed overheads be for the merged entity?
Honestly, it's hard to say this early what that figure would look like once things settle. Still, my guess is that in year one it would come in a bit on the higher end — somewhere in the range of INR 175 crores to INR 200-odd crores, in my view, and that covers employee costs along with all the other overheads as well.
Yeah, yeah, got it. Last thing—could you shed some light on the 42 million square feet of commercial assets that Embassy is going to bring in? What's the plan there? And how are we thinking about funding that over the next 3 years?
Okay, so regarding Embassy's 42.5 million square feet — that's a substantial amount of commercial space, and it's entirely located in Bangalore. Now, Bangalore is still the biggest absorber of office space, and what we're also observing at the moment is a great deal of appetite to expand, with multiple RFPs currently in the market that are at a late stage for a fairly sizable amount of development. My feeling is that we need to take that 42.5 million square feet, scrutinize it, and determine how much of it can realistically be developed as commercial in the near term, and how much may actually need to be converted into residential as well as plotted, simply to turn capital over faster here. That's truly the sole objective here. So, for instance, there's a project known as Embassy Knowledge Park Summit, spanning 216 acres. I believe the original plan there was roughly 50 acres of residential alongside 150 acres of commercial. But as we get this project launched, we may need to assess how much additional residential could come first, since I think one of the crucial things we want to focus on is avoiding sitting on excessive raw material for an extended period.
We're eager to figure out how we can turn this into, you know, the expense of pushing cash flow out there. So, at this point, we don't yet have a game plan for the 42.5 million square feet. But as we progress and begin examining these land parcels, and start looking at planning and design, I think we'll get a much clearer picture of how much is commercial, how much is today, and how much gets converted into residential, and we move forward with that right away.
I'd ask Mr. Seth to get back in the queue for any follow-up questions. Our next question comes from Ankit Babel of Shubhkam Ventures.
Sir, I'd like to return to the topic of the commercial projects. In your January presentation, you noted that the planned commercial projects carry an annual rental potential of roughly INR 4,000 crores. I just wanted to get a sense of by which year you expect that potential to actually materialize — how many years would that take?
Okay, so look — I was making precisely the same point, since our commercial portfolio is really quite big. It comes to 42.5 million square feet. Two possibilities exist. First, you consider building out the whole thing as commercial, and you reach roughly INR 4,000-odd crores in rental income. Second, you may choose to take a portion of that commercial and churn it faster, shifting it into residential, which moves more quickly. That said — perhaps I'll just take you through the economics of what 1 million square feet of commercial development might look like, right? So suppose you're putting up 1 million square feet here at about INR 5,000 a square foot; that costs around INR 500-odd crores. You'd likely require 30% equity, which works out to INR 150-odd crores out of that INR 500 crores. Once this 1 million square feet is built, you have an asset that starts out, say, renting at INR 65, INR 70. That said, Embassy has 3 parts that sit well above this figure. Embassy GolfLinks, I believe, is approximately INR 140 to INR 150 a square foot.
Embassy comes in at INR 100 to INR 110 per square foot, while Embassy TechVillage runs INR 90 to INR 100 a square foot. That said, since these are fresh greenfield projects, let's just take an assumption of INR 65 out there. On that basis you'd get rental income of about INR 78 crores annually. At a 90% NOI level, that works out to roughly INR 70 crores in NOI. Assuming an 8% cap rate, that would come to approximately INR 878 crores in value, and after your debt repayment of 350, you'd be left with an equity value of around INR 550-odd crores for each INR 150 crores you put in to build 1 million square feet of commercial space. Our plan is that while we want to kick-start commercial, getting our master plans done and all our approvals in place will take some time, but at some point, what we'd love to do is develop at least 1.5 million square feet of commercial each year.
No. So once more, what I have to get clear on is this: how long are you going to need in order to build out all of that 42 million?
So to be clear, if I'm putting up 1.5 million square feet annually, that gives you the time frame — 42.5 divided by 1.5 million feet. But sitting on it that long isn't my aim; it's to turn part of that 42.5 million square feet into residential that moves faster as well.
All right, then once you wrap this up, what's your debt going to be?
It's a bit early to forecast where debt would land as we build out 42.5 million square feet. That said, capital will be recycled, so I doubt debt levels would climb all that much.
All right, all right. So if we're looking at INR 2,500 crores to INR 3,000 crores in annual sales, with roughly INR 6,500 crores of debt right after the merger, and even at INR 4,000 crores — would that still be profitable?
Yeah, because see, I also have INR 2,000 crores in cash on day one when the merger — sorry, INR 3,000 crores in cash available on day one — not day one, but once the Sky Forest proceeds arrive, along with the land sales, London receivables and the QIP proceeds. So that amount of cash will be there with me. And I'm looking at generating roughly another INR 4,500 crores or INR 5,000 crores of net surplus from my OC and near-completed projects as well, like I said.
<<operator_script>> Our following question comes from Sudarshan Mall, calling on behalf of Dhunseri Investments.
I think most of my questions have been addressed. Sir, I just wanted a bit more color on this: while we do have fairly good visibility into the cash flows from our projects that are nearing completion, I wanted to understand what necessitated this QIP, which will be carried out at such lower levels — we've done a fairly high level of dilution at fairly low levels? And beyond that, we haven't aggressively repaid debt either. So I just wanted to get some texture on that.
No, I think when it comes to your capital base, one issue is that you can have the best intentions and want to act at what seems like the ideal moment for you, but the macro markets don't necessarily support that. We were out there looking at raising equity, and we sensed there was a window of opportunity to bring in the money. As you can see, since that point, the tide has turned pretty dramatically. So yes, on one hand, I can understand why people feel that maybe this equity wasn't -- why raise it now, and why accept the dilution at these levels. But I think it's also important to remember that we're strengthening the balance sheet. We're looking at the bigger platform, coming soon. And we want to have a runway out here so we can execute on our game plan. And if we do that, I think there's a great deal of value out here. So there may be some near-term pain out here in order to ultimately have the liquidity to execute on our plan.
Moving on, our following question comes from Jeevan Patwa, who is calling in from Sahasrar Capital.
There's one thing I'd like to get clear on — we've also built a platform that involves foreign funds. So in what way will we be putting that platform to use? Could you expand on that a bit?
Right. So alongside Ivanhoe Cambridge, on the Embassy side, we have an AIF and office development platform. Once this closes, that platform will fold into the combined company. The concept is an 80-20 structure, sized at as much as 500 million, yes, split between the two entities. So although EDL would put in about 100 million, there's a scenario in which certain of our land parcels are sold into that platform. And then EDL — ultimately the merged entity, EDL — would participate for 20% of the equity. The real point here is growing the business faster by using somebody else's balance sheet. On that 20%, return on equity would in fact be, I'd say, supercharged, since you're collecting fees and you're earning promotes — back-ended promotes here. So it's really just a different approach to growing the business, quite similar to what Godrej has done with its fund as well.
Given how cheap the price is right now, would Blackstone, Mr. Virmani, or Embassy consider putting additional funds into the company?
On this call, I don’t think it’s really my place to speak for Blackstone. That said, Blackstone is coming in as an 11% shareholder, and it’s committed to being in the business and to being an important part of it. As for Mr. Virmani putting in more funds, I think the one thing that’s known about Virmani is that he is committed to putting in funds if the business requires it in order to grow the business. So with that, I can definitely speak on his behalf.
Our following question comes from Abhinav Bhandari with Nippon India.
Just one question. Looking ahead over the coming 12 to 15 months, I’m simply trying to gain a wider sense of what we’ll be paying out for construction spending, settling liabilities, any land payments still pending, and new business development. Taking all 4 of those buckets together, what might the broader outgo be?
I'd like to ask you for another quarter before I come back to you on that. It has been difficult. I mean, I'm aware of what the exact figures are, but marrying the two is hard. But obviously the one focus is on a -- as I said, existing OC and near-completed. For those projects, very little spending is required between the two companies. My sense is roughly -- for the next year or so, it's roughly INR 900-odd crores in terms of construction costs. I think one key area we'll also have to look at is that certain loan principal repayments will happen over the course of the next 1 year. As you can see in the IBREAL deck, it says that in less than a year, roughly INR 964-odd crores of debt needs to be repaid. So that's also something on top of our mind, with respect to refinancing those loans or paying them down from cash flows from sales. I hope that answers your question, at least partly. But I think by the time the projects are over, we'll be able to present a much more detailed combined integrated plan with respect to project spend.
Right, right. I have a wider picture now. Just one -- only one clarifying question: how are things coming along with the Juhu project? And when might the launch there be expected?
Right. So, as we've clearly talked about before, as you're aware, Embassy has handled that up to now, but it falls under , and it's going to roll into this entity. So going forward, it will form part of what becomes a combined EDL. But the thinking is this: look, it's a great site — 2.5 acres on Juhu Beach at Juhu Tara Road. My understanding is that Embassy aims to launch it by Q4 FY '23.
Our next question comes from Dixit Doshi at Whitestone Financial Advisors.
I have a few questions plus one point I'd like clarified. Looking at your presentation, you provided the average selling price in that last deck you showed. If I recall, it came to roughly INR 30,000 for a BLU. Am I missing something here, because my understanding is that everything is selling above INR 50,000?
Right. What you're seeing here — that's measured in salable square feet, so 50,000 on RERA corporate works out differently. And <<inaudible>> it stood at the very same figure.
Alright, so two questions. First, on the Embassy side: whatever commercial properties Embassy currently has, is any of it generating rent — completed inventory? And also, when we build commercial property at Embassy, do we always intend to sell it to some REIT, or do we also consider a different approach where we'd keep owning it and collect the rent on it?
Okay, so again, you're asking questions about Embassy. As you know, this is an Indiabull's earnings call. But just to give you a sense, Embassy, or the combined entity, at some point would look to develop an asset, and we'll look to monetize it not by stratus selling it, but it will be by selling it to someone like Embassy REIT, or it could be any other REIT, or it could be a large international or institutional investor. So the idea is to build, lease, and then sell it to, like, a buyer of these types of assets. We are looking for stable income. One thing being discussed is whether, at some point, a combined entity would give a ROFO, which currently Embassy Property Developments has with Embassy REIT. But personally, I feel that makes a lot of sense for this combined entity, because I'd love to have a relationship with a buyer of assets. And I think it will make sense for Embassy REIT as well, because they have a ready kind of pipeline of assets coming to them on a kind of regular basis. So — but again, the price has to be right.
A lot of related-party checks would be involved in that. You'd need two independent valuations done, and minority shareholders at both companies would have to cast votes on it. I think there are plenty of checks and balances, but yes, of course, it would make sense to sort of have...
All right, and then second, regarding Indiabulls' residential property — when you bring up these planned projects, that set doesn't take in the additional land bank, so what's the plan for that 3,000 acres of land bank belonging to Indiabulls?
Right. So every figure you're seeing for Indiabulls does not take into account the land bank numbers. I think we are still getting a handle on the development potential and what we're able to do with that land bank. As you know, 106 was 40 acres, and that was sold for 580 crores. I wouldn't want you to extrapolate those figures, but I think there is valuable land out here in West as well as North India. And I think we need to spend a bit more time putting our plan together on that. I think the focus right now was on near-term liquidity, near-term visibility of cash flow. And with that, we, I think, come up with a plan for which projects to attack at least over the next 12 to 24 months.
Alright, and this will be my final question. Regarding projects, how many are you planning to launch during FY '23 across both Indiabulls and Embassy on the residential side — either in square feet or value terms is fine?
My sense is that in the coming FY '23, the plan would be to launch <<inaudible>>, which is BLU Annex. For Indiabulls, that comes to roughly 900,000-odd square feet. If you take that 30,000 figure you mentioned, the gross development value there would actually be at least INR 3,000-odd crores. You might also consider launching 1 million-odd square feet in Sector 104. Looking at the gross development value for that, it would come to close to INR 1,000-odd crores. There's also the possibility of launching Phase 2 in Thane. We need to do a bit of work there, but my sense is that would add another INR 1,000-odd crores. So a lot of value sits in some of these new projects we're looking to develop soon.
So those could land during this financial year, and then there's whatever Embassy launches as well — Phase 2, or any other project?
Right, exactly. I believe that's Slide 17 in the deck, which addresses this. But of those 5 projects, I've picked 3. And the reason I'm discussing those is that, in my view, those 3 are the critical ones we could aim to launch within the next 12 months.
And that INR 2,500 crores to INR 3,000 crores in annual sales that we're aiming for — we're not counting this. Mostly, what we're targeting comes from OC-received or nearly finished inventory?
Yeah, that's right. That is correct.
Our next question comes from Anil Agarwal, who is calling in from AAA Investments.
My first question was really about Q4 pricing, correct? So is there any deliberate decision we're making there to bring the price down and boost sell-through, since BLU prices for Q4 show 26,000 and so on, which is lower for all the other projects?
That's a fair question. What I'd say is that, at least as it shows up for BLU, it comes down to a handful of units that are still sitting there, right? In any project, prices tend to climb to a certain point, and what you're left with is essentially the units nobody picked, right? So today at BLU, we've got about 7 units remaining to sell, which are basically the podium units in Tower D. So the price takes some of that into account as well.
Okay, but when it comes to the new launch, are you expecting pricing to stay at 30,000 and higher?
The effect should be significant—ideally, even greater than that.
Okay. So on the cost escalation side, how do you expect that to unfold? I realize you've actually given a figure for the pending construction cost, but do you see any upside risk to that number?
We've actually factored that into a number of our figures, since with completion this far along, we had to sort of assess what's happening on that front. A lot of it also comes down to contracts already being signed. What's left is finishing work rather than steel at this stage. And we've also observed that although there was a spike, things have calmed down somewhat since. So my hope is that the spike proves short-lived, doesn't hit us too hard, and that we get past it sooner rather than later. Over the long term, then, it won't have much impact on our profitability.
Okay, so regarding Embassy sales — I'm just trying to get a handle on this. Last year, as I understand it, they moved roughly INR 400 crores of inventory at BCTR, versus INR 3,500 crores of inventory that you're aiming to sell, say, across the coming 24 months. So how do we close that distance between where things stand now and where we want them to be?
Okay, so from what I gathered on the Embassy side, and this has been true on the Indiabulls side as well, there were a lot of projects that were to blame out there — they took longer than expected to finish, but they are complete now. So the main focus area for both companies, really over the last year — and I know Embassy had focused on this — was finishing what was 95% complete but had taken longer than expected for delivery to actually happen. And I think that really shifts how someone perceives your project. So what you have today is roughly 3 million square feet of finished inventory, which maybe last year would have been 3 million square feet of inventory that was 95% complete. But even though it's at 95%, going to 100%, it's only 5% more, because these projects have been sitting there for some amount of time. The whole perception in the market changes once you get to an OC level. And that's really why we feel we can hit INR 2,500 crores to INR 3,000 crores. Maybe the first year is slightly less, but as we get to the second year, we can definitely hit that, because it's projects that are now completed and what your marketing has is kind of finished inventory out here.
So you can really experiment with it and shift that inventory around, which is a luxury you don't get when a project is 95% complete.
Turning to liquidity — you've mentioned some short-term constraints, and we do hold a sizable land bank. I realize you've given us a bit of leeway, but considering that landbank and the prices 104 and 106 fetched, shouldn't we be examining this far more aggressively as a way to reduce debt and improve the balance sheet situation?
Yes, certainly. We're examining that for the roughly 3,000 acres. Of course, <<inaudible>> approximately 3,000 acres. Nasik accounts for a substantial portion of it — around 1,400 acres. That site might prove appealing for industrial use. It could be quite an attractive spot for a party arriving to establish manufacturing facilities there. So I believe efforts are underway on that front. And ideally, within the coming several months, we'll arrive at a plan regarding what should be done there.
Okay. But going by your own assessment — I mean, how much would that INR 3,000 crores actually be worth? I realize that figure is somewhat speculative. Still, in your view, what would the land bank be valued at as of today?
Well, I think — listen, I won't speculate on this because it's land. As you know, land values can swing quite a bit, in either direction. I think there wouldn't be — I'll give you folks a figure here on sort of this land value for assets that are sitting as well. And I think let's have us work on that, and let's work on our plan. And then maybe I think we'll return to investors with a plan for certain land parcels.
Okay, let me try putting the question a different way. I'm talking about land parcels that are roughly comparable to a 106 — what portion of that land falls within the 3,000 acres?
No, I think the best reference is probably Slide 22. There you can see the land parcels and the acreage of each one. And you can see the cost paid for the land. Much of this was done at least over 10-plus years ago. So I think just from those numbers, at least you get a sense that the book base today stands at INR 562 crores. And one other thing I want to correct you on here: the 106 was not among the 3000 acres. It was among the planned projects. So what you're seeing is a surplus emerging from the planned projects on the IBREAL side. But that comes through as a land sale number. So I just want to set you right on that.
Our following question comes from V.P. Rajesh, who is on the line with Banyan Capital.
To clarify something about that 60 million pounds loan—should we be expecting partial payments at some point during the year, or should we be expecting a single bullet payment during the year, as you mentioned earlier?
To be clear, there haven't been any talks about paying in installments. So our expectation is that the entire amount arrives no later than December 31 of this year.
Got it. Okay. Now regarding the projects you currently have underway, is there any of them that looks likely to miss its RERA deadline, or that is in default right now on those RERA deadlines?
We do have some past projects that have missed the RERA deadlines, like Enigma and Centrum. And what we're doing is we've cleaned it up fairly substantially over the last several months. And we're looking to kind of get those settlements completed as we actively look to hand these projects over to the RWAs. So in my mind, these are 2 very late-stage projects that we're looking to hand over, and we're looking to solve the problems and get out of these assets. And in fact, just these RWAs are now in contact with Embassy services directly and are looking to kind of basically use them for facilities management.
Got it. And for the Lucina project, what sort of sales velocity are you seeing there?
My apologies — which one do you mean?
Lucian <<inaudible>>, which I believe comes from <<inaudible>>.
Yes, my apologies — Panvel, correct? So what exactly is the question regarding that?
How would you describe the pace of sales in that project?
Okay, so on that project again, I believe we have to — sales velocity has fallen off, even though it had — it sold pretty well. If you look at Panvel, we're — let me just get the figures. Right, so I think we've sold 0.08 million at an average base selling price of about 135. You've got INR 4,500 per square foot there, but in terms of , in terms of how many units remain to be sold. Can I get back to you on that? I mean, the exact question you raised. Can I come back on precisely that?
Right, so my final question concerns the NCLT process. Are there any circumstances you can see where that deadline might get extended past September 30?
This isn't something I anticipated. I really didn't expect it. Given how things have progressed at this point—we're nearly at the end—so it's not something I expect. On Panvel specifically, there were 35 — look, Phase 1 is fully sold out. In Phase 2, we have 3,500 units, and approximately 2,750 of them are sold. That leaves about 750 units still to sell. I think we need to sit down and figure out a plan for how we can move that inventory faster. So once again, that will be one of the key focus areas for FY '23.
Our next question comes from Niraj at NJ Investments.
I've got a question about those near-completed projects you listed on Slide 23. So if I understand correctly, both of them — the one at Savroli and — why is that one so far overdue, right?
Yes. Savroli is made up of different phases, but Vizag, as you can see, has roughly INR 48 crores of cost still pending. So that's certainly a project we intend to complete in the current year and hand over.
Ladies and gentlemen, because of time limits, that was our final question for today. I'll now turn the conference back over to management for their closing remarks.
Okay, thanks to all of you for being here and for tuning in to this call. This marks the first earnings call that Indiabulls has conducted up to now. We anticipate holding more of these going forward, since we're nearing a resolution regarding the merger. Ideally, on a bigger platform, we want to introduce plenty of various changes. A few of those are already visible today within the company — whether that's K.G. Krishnamurthy serving on the Board or the reporting that has been released this quarter. That said, once again, I believe the aim is that we want to head toward a plan in which the combined entity satisfies every standard of corporate governance you would expect from it. So, with that, I'll wrap up too, but thank you, everyone, for spending the time to hear us out today.
Thanks. That brings this conference to a close on behalf of Indiabulls Real Estate Limited. We appreciate you being with us, and you can go ahead and disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Embassy Developments Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Embassy Developments Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.