Hello, everybody, and thanks for joining us for the Eos conference call covering the 4th quarter and the full year 2025. On the line with me today are Joe Mastrangelo, who serves as Eos CEO, along with our COO John Mahaz, our CTO Francis Richey, and Nathan Kroeker, our CCO and Interim CFO. During this call, we might make forward-looking statements, which include, among other things, our present expectations regarding results in the future and the outlook for our company. If any of those risks come to pass, or if our assumptions turn out to be wrong, then what we actually report could differ materially from what we expect or what those forward-looking statements imply. The risks and uncertainties that apply to forward-looking statements get described in the filings we make with the SEC. Forward-looking statements reflect our beliefs and assumptions only as of the date they are given. We have no obligation to revise these statements shared on this call to account for events or circumstances arising after today, or to account for new information or unanticipated events, unless the law requires it. Remarks today will also refer to non-GAAP financial measures. More information, which includes a reconciliation between non-GAAP financial information and U.S. GAAP financial information, appears in the press release. Non-GAAP information ought to be treated as supplemental and is not intended to be viewed on its own or as a replacement for the associated financial information put together in accordance with GAAP; furthermore, the non-GAAP financial measures we use might not match, or be as comparable to, similar non-GAAP measures that other companies present. A replay of this conference call will be accessible by webcast through the Eos Investor Relations website at investors.eose.com. Joe, John, Francis, and Nathan are going to guide you through our business outlook and our financial results, and after that we'll move on to Q&A. With that said, I'll hand things over now to Eos CEO, Joe Mastrangelo.
Thank you, Liz. Hello, everyone, and good morning. We appreciate you being here. During this quarter, we keep working within an energy landscape shaped by a single obvious force: demand for electricity is speeding up, while the grid's adaptability and dependability remain limited. For a business such as Eos, that situation opens doors. Across the 5 years since we became a publicly traded company, our message has centered on delivering a product that offered flexibility, dependability, and the ability to perform several discharges within 1 day, or handle long or short discharges, with fast response times. The market wants precisely that. Data centers may dominate the news, and they are reshaping how we view our grid, and they are forcing us to make choices within quicker time frames than we ever have in the energy industry, yet additional demand sources exist across the sector. Areas such as electrification and transport, plus electrification of heating, and rising domestic output within the United States, are driving greater load growth for our grid; that aligns perfectly with our technology. In energy storage, our direction is shifting from handling volatility toward delivering dependability. You need a buffer resource that keeps the grid in balance, while also letting you adjust to sudden shifts in load growth. A vision for a product and a vision for a company can only take you so far. What matters is execution. Looking at our quarter and our year, yes, records were set by us. Our volume rose, our margins got better, sequentially, quarter-over-quarter and year-over-year; orders booked during the quarter were excellent, and Nathan will explain how those orders map to various use cases that will drive future growth for the company. The key point is that our guidance was missed, and as the CEO of the company, that responsibility is mine. What John, Francis, Nathan, and I will discuss today is expanding our team's capabilities, our product's capabilities, and how we take that product to market, manufacture it, and install it, so we can deliver dependable performance. Dependable performance matters not only for hitting guidance, which is significant, but for meeting our customer's operating needs as the grid changes and demand appears. We believe our product satisfies those future requirements. We must keep growing the company and keep refining and delivering consistent performance for our shareholders and our customers. I believe our team can accomplish that, and we will present the early results that start to demonstrate how we can deliver dependably going forward. So, looking at the fundamentals, sure — revenue grew 7x compared to last year, and we're sitting on the largest cash balance this company has ever had, plus we're narrowing the loss and getting closer to profitability. We took out the going concern note from our 10-K, and Nathan will get into that shortly — what it really tells you is that we're running this business with a strategic mindset, and that matters going forward. Meanwhile, we rolled out Indensity, and Francis will share more on that. What Indensity does is take the product we already have and repackage it so it's simpler to run, simpler to maintain, simpler to build, and simpler for buyers to use several times per day; this isn't a restart, it's an upgrade of what's already there. On top of that, we've got a duty to keep our field assets running dependably, and Nathan plus the projects group are on it. Looking at the big picture, I feel proud of the work we put in and let down that guidance wasn't hit — we'll do what it takes so that won't repeat down the road. On the following page, let's go over how the installed base keeps growing. Right now, we reach 20% of the U.S. We've got 20 projects in place. The company keeps widening its footprint and keeps running out in the field. As of today, our Z3 product has put out close to 300 megawatt-hours of power. Each cycle teaches us something, and each cycle lets us improve and better grasp what our customers need, and that's the way we apply it. Also, we do bring up revenue concentration among a handful of big customers, but on the bottom right of this page, you'll see we made deliveries to 11 separate customers, and revenue arrived from 18 separate customers. That gap of 7 comes either from commissioning and installation revenue or from service revenue on equipment we installed previously. Looking at this map, as future quarters arrive, we'll bring in additional states. Our aim is to reach 25% within the coming months. We'll also put a Europe map in as we ship to Germany and hold out for the cap and floor program to wrap up in the UK; the team's efforts here have us excited. We'd like to paint a picture of how we run things. We have discussed before what the operating hours look like out in the field, and that is truly where our learning happens, and Indensity is what came out of that; these customers shown on this map provide us feedback so we can deliver a product that will meet what the industry needs going forward, while collaborating with Nathan, John, and the teams to make the equipment we have in the field more rugged, so it can run flawlessly and give customers the performance they need. Turning to the next page, let's discuss some operational metrics. I'd like to begin in the upper left-hand side, where our quarterly revenue profile is shown. Going back to Q4 2024 and ahead to Q2 of last year, those are quarters that are growing at basically 30%; essentially that means taking our line, installing it, improving upon it, and achieving 30% throughput on the same asset base. Then you get to Q3 of 2025, when we began bringing bipolar manufacturing in, and you see a 2x step function from Q2 of 25 into Q3 of 25. We double it once more, which again reflects bringing more of the bipolar manufacturing online. By year end, John will walk through that we hit our 2 gigawatt hour capacity coming out of the Turtle Creek facility. On an annualized basis, we're up 7x, and our capacity will support the demand we see. What matters here as we consider capacity management and as John walks through this, and as I think about it, and you take what John's going to discuss and combine that with what Nathan is going to discuss commercially, is that you're not operating the factory at full capacity at any single point in time.
You're building capacity so the company has the chance to grow and deliver, and you're putting in a cushion so you can handle and ride out the hiccups that show up in any factory. Anyone who's spent time around an industrial process understands that things never run flawlessly, and you have to account for that in your planning. That's the foundation we're putting in place to reach the steady production I mentioned before. If you look at the bottom of the page, you can see the gap getting narrower and margin improving. Profitability hasn't arrived yet, but we're moving in the right direction. Structurally, this company is profitable. What's left for us to do—and what John will cover—is sharpen the efficiencies and refine the processes behind how we run this company. Thorn Hill, along with getting our second line operational, will reveal the full entitlement of just how efficient this company can be. Simultaneously, you adopt a lean mindset in your daily work; that lean mindset reminds you, "I have to improve at everything I do." Waste exists in these numbers today. That's something we acknowledge. We recognize we must improve. When you take all of that in and start thinking about ways to take cost out of what we make, ways to build it more efficiently, ways to perform out in the field—because productivity and profitability go beyond the factory walls—ways to run our field operations more efficiently, ways to validate things and complete installations faster than we had planned, that is how we get to our profitability. We have a clear path in view to get that done; if we perform up to what we're capable of, this business makes money. That's what we're in the process of building today. Density is a step function change in that regard. Z3 Cube is a profitable product. We are going to make that profitable. Indensity changes how we show up against rivals. Customers get improved footprint density from it; we can expand capability more quickly; producing the item becomes less complicated; and through Indensity we gain the means to contend not just over price, but also to keep removing expense so we hit the profit levels we're targeting. The efforts John and Francis are putting in excite me, and what Nathan is observing in the market really excites me too. I'll pass it to John to kick this off, then he'll hand it to Francis and Nathan.
Thanks, Joe. Morning, everybody. It's wonderful to be back with all of you once more today. My first complete quarter since joining Eos was Q4. I want to be upfront regarding our operational situation. To begin, some genuine strides deserve recognition. Our self-assembly automation is now finished, which means the battery line runs entirely automatically; we ended 2025 setting production records throughout every operation and shipped our fourth straight quarter of record revenue. This ramp was supported by 26 key suppliers, which let us reach our 2 gigawatt hour line capacity. A dedicated team getting many things right is what makes that possible. Yet we also missed our operational goals. That responsibility rests with me. During our last call, I expressed confidence in the ramp plan; early results had been solid, and we possessed the extra capacity needed to meet guidance. In the end, three quite solvable problems kept us from fulfilling our commitments. One isolated supplier non-conformance was the first, and it cost us one week of production. We tackled it head-on, partnering closely with that supplier to pinpoint root causes and corrective actions fast. Stronger controls went in both internally and at our suppliers. That particular problem is now resolved. Second, automated bipolar production needed more time than we anticipated to reach quality targets. Rework and lost revenue resulted; we enhanced tooling, cut variation within the automation process, and made material specifications tighter to bring bipolar production into a stable state. Laser detection has also been added, giving us improved visibility and control over any process variation. Third, downtime on our battery line far exceeded industry norms, the line's design intent, and our internal forecast. Running at approximately 10% equipment downtime is what best-in-class operations and our own expectation call for. That's what I expect, and it's what our automation partners expect too. As utilization climbed through the year and the line ran more hours, we sat nearer the mid 30% range. Together with our automation partners, we fixed problems involving robotics, hardware, controls, maintenance schedules, and spare parts. We've strengthened our technical capability and our team as well, improving time to resolution. Q1 has seen downtime get substantially better; this lever is within our control, and a path to world-class performance exists. Demand wasn't the cause of any of this, nor was anything structural; what we had was a major ramp involving first-generation automation designs. Although I did not anticipate how large these issues would be, the lessons, the actions, and the execution that follow are mine to own. Since coming aboard, a key focus for me has been spotting single points of failure within the system; this was 1st-generation automation being operated at high volumes for the very first time. Sometimes those weaknesses stay hidden until you put the operation under stress; we've now done exactly that. It has let us find and close gaps in our automation, our organization, and our operating system. We're methodically hardening the process so that these failures won't happen again. What we've achieved has produced better quality along with operations that are repeatable and predictable as Q1 began. A shortage of redundancy stands as the largest structural danger we face right now. Should our main line fail, everything halts. Line 2 alters that situation, and during the prior call I noted that we are altering the design on that line to push performance even higher. Line 2 is coming along nicely and getting ready for factory acceptance testing over in Wisconsin. Redundancy was deliberately engineered into key stations by us. Once running, it removes our biggest single point of failure and provides flexibility we currently lack; efficiency is another area we're tackling. I've said this previously: right now, materials move through 3 floors and 2 buildings, covering more than 2 miles from beginning to end. Such a design wastes money. Through line 2 together with the Thorn Hill expansion, we're reworking the layout to support single-piece flow, cutting material handling and complexity by a substantial margin. While pursuing the entitlement for line output, we found inefficiencies that cause longer end-to-end production times and greater labor costs needed to reach that target. Those problems are being resolved by us. This lets us run more efficiently with a cheaper cost structure. Equipment should start showing up in Q2, with fully automated production as the Q4 goal. One last thought. 2025 brought heavy automation implementation, capacity expansion, and swift change. Nothing ever goes perfectly on day one. Turning new capability into repeatable, disciplined operations is my responsibility. The gaps have been identified, the root causes have been dealt with, and we're putting in place the redundancy and process rigor needed to scale dependably going forward. The path ahead gives me confidence, and so does the team's capacity to carry it out. Now I'll hand things to the person who helped me ramp up fast, our CTO, Francis Richey.
Thank you, John. I'm glad to be on the call with everyone today. My role is chief technology officer, and I've spent 11 years at Eos. When I joined Eos, it was a company of 15 people, and it has been a fulfilling journey alongside a remarkable group of scientists and engineers, working on the chemistry, battery, system, and software across several product iterations. My background is in chemical engineering, and what drives me is taking technology to scale and optimizing it so we can create profitable products, especially those that rely on electrochemistry. During my years at Eos, the market landscape has shifted considerably, and Eos has shifted with it. We began with an aqueous zinc-based battery. As our technology kept progressing, we discovered more efficient approaches to configuring our systems and brought in improved power electronics for performance control, most recently through the Eos Z3 Cube. In the early days, customers just wanted to purchase a DC battery system and would then integrate it themselves into larger AC systems. A lot of them now prefer a complete system in which Eos supplies the batteries, software, controls, AC integration, and site design — a full project that's simple to install and run. Many of these storage solutions also need to be installed in urban or suburban settings. We've had Z3 systems running in the field for over two years and have tested them for an even longer period at our Edison test facility, gaining insight into how they perform in harsh conditions. We've run them in extremely cold climates as well as in hot desert locations with strong winds that stir up sand and dust capable of affecting how the system operates. The field serves as the ultimate proving ground, and that has enabled us to enhance system resilience and reliability, plus our software and controls, which resulted in the launch of Dawn OS. With DawnOS, customers can manage and optimize how their system performs through monitoring and control of each individual battery, delivering better operability; that's where Indensity fits in. We co-developed this product together with our customers, discussing their operating requirements and running load profiles at our Edison test facility. Same chemistry, same battery, same software and controls, but different packaging and improved performance. We're now entering a new stage of growth and opportunity — one that sets Eos apart from every other battery energy storage solution available commercially. When we describe Indensity as a differentiated product, three key elements are our focus: serviceability, cost, and site energy density. The Indensity Core makes serviceability substantially easier; we borrowed an idea from aviation and envisioned an Indensity Core much like an aircraft engine that never needs on-wing service. Rather than disconnecting the whole system to service a single part of it, Indensity is built for quick disconnect, so individual units can be serviced safely with an ordinary forklift, which prevents disruption to the entire system and keeps operations running without interruption. Our solution provides an edge across the entire industry, since we're now able to service every 133 kWh Indensity Core unit without a crane, while rivals typically need one—plus they lose multiple megawatt-hours of energy whenever service or site-wide power augmentation happens. With the modular core design, units can be stacked vertically, up to 12 units high, which markedly boosts site energy density and lets us reach customers in places incumbent technology just cannot serve, like densely populated, space-constrained locations, where safety frequently plays a key role in decision-making. Thanks to this new solution, we can readily configure systems around a customer's energy and space needs; it's an exciting moment, and I've been fortunate to lead Eos's evolution from cell testing to battery manufacturing, and now to delivering battery energy storage systems integrated with advanced controls and software. I'm incredibly enthusiastic about what lies ahead and how our product addresses our customers' needs. Thank you, everyone; with that, I'll hand things over to Nathan.
Appreciate that, Francis. Morning, everyone. I'll begin with the commercial side, which saw a highly active fourth quarter. Let's first examine the results. We closed out the quarter sitting at a bit above $701 million in backlog, having booked close to 1.1 gigawatt hours spanning eight customers and nine separate projects — that works out to a 9% rise over the prior quarter. Over those three months, we brought in over $240 million of fresh orders, nicely spread across commercial and industrial, Distributed Generation, and front-of-the-meter utility scale uses. Allow me to provide some context on three of those orders, which demonstrate the operational versatility of what we offer and how we engage along the energy value chain in varying customer use cases. To begin, we entered a 50 MWh master supply agreement alongside a Midwest developer to carry out projects backed by Commonwealth Edison's Distributed Generation Rebate Program. Under that program, new energy storage systems receive a $250 per kWh incentive, and the initial purchase order tied to this agreement has already been executed, with delivery planned for later in the year. Now for the second one worth highlighting, which matters just as much: we signed two initial projects involving systems destined for Florida hotels together with a developer holding a strong pipeline of further projects, and we anticipate those additional projects will come to fruition across the next 12 to 18 months. For the final one I'd like to flag, we landed an order from a global power company — one positioned as a focused, renewable and energy storage platform — to provide a Z3 system that will be installed at a national lab for integration testing. We're actively pursuing large-scale opportunities alongside this customer, making this a highly meaningful project for demonstrating what the Z3 can do. Each of these three efforts illustrates how we're forging long-term partnerships set to scale into bigger, more meaningful growth opportunities down the road. Shifting to the wider pipeline, we closed the quarter with a commercial pipeline worth $23.6 billion, equal to roughly 99 gigawatt hours of opportunity — a 4% increase quarter-over-quarter and 64% higher year-over-year. Hyperscaler and AI-related projects continue to serve as a primary growth driver, since we observe customers seeking firm, dispatchable capacity along with behind-the-meter load smoothing solutions. Leads tied specifically to data centers climbed 50% quarter-over-quarter, and our active data center pipeline expanded by over 40%. A large share of these opportunities have been purpose-built for the Eos Indensity solution. As we've stated in our public filings, Eos has been submitted for a 300 MW, 8-hour project at the Brooklyn Navy Yard through NYSERDA's Bulk Storage Procurement Program. There's also a separate project submitted under that same bulk storage program in Con Ed Zone K with the customer mentioned earlier — the one testing our product at the national lab. Looking at it from an application standpoint, we're seeing a growing number of opportunities move toward co-location with generation assets, natural gas and renewables alike; such applications generally call for longer discharge durations. Because of this change, 8-hour or longer systems now make up 63% of what's in our pipeline. Let me focus on PJM briefly, since recent capacity market reforms there have produced sustained elevated clearing prices, and that's making long-duration storage economics better; this fits nicely with the framework agreement we already have with Talen. Also, Bimergen, a publicly traded long-term partner on the New York Stock Exchange, said they've technically selected the Z3 system for the 400 megawatt-hour Redbird project in ERCOT. Beyond that project, we're currently working on another 2 gigawatts of development pipeline spanning ERCOT, PJM, and MISO. On the whole, near-term backlog is growing quite strongly while the long-term pipeline keeps expanding, and both put the company in a great position as demand keeps accelerating for integrated, long-duration storage solutions. Turning to the financials, there's plenty to be proud of, and as Joe and John said earlier, our attention is on the work still ahead that will produce profitable growth. Let's look back at 2025; that year brought genuine operational progress; we finished it with fully automated battery module manufacturing. We put continuous process improvements in place; we introduced DawnOS, and we completed several product component cutovers, all while significantly scaling production. Those foundational steps are now plainly showing up in financial results. We posted a fourth straight quarter of record revenue and yet another consecutive quarter of gross margin improvement, as production volumes increased and sub-assembly automation began production. Revenue for the fourth quarter reached $58 million, almost twice Q3; it surpassed the first three quarters of 2025 combined, and also all revenue from prior years combined since the company went public. Full-year revenue came to $114.2 million, over 7x growth year-over-year. As John pointed out earlier, sub-assembly automation marks a meaningful inflection point for our manufacturing strategy. It widens available capacity, it makes product consistency and quality better, and it raises labor productivity, ultimately bringing overall unit costs down. Well, this only started contributing late in Q3. What Q4 showed us strengthens our confidence in how this business scales. With volumes rising, fixed cost absorption is improving, which drives continued margin improvement. Gross loss for the year totaled $143.8 million, a 408 percentage point margin improvement year-over-year, thanks to much higher production volumes and continued product cost out; this quarter, we rolled out a new non-GAAP metric, adjusted gross profit. Our view is that this excludes stock-based compensation and depreciation and amortization, and gives a clearer picture of core operating performance while aligning us better with industry peers. On that basis, adjusted gross loss for the year was $128.5 million. Operating expenses for 2025 were $115.4 million, up 26% year-over-year, reflecting targeted investments to support scaling initiatives and further enhanced product solutions. Looking back across the year, we put money into engineering and rolled out DawnOS along with Indensity. We wrapped up a number of financing deals, and at the same time we attracted talented, high-impact people to join the company. Out of $115 million in OpEx, $25 million — that's 22% — came from non-cash items, mostly stock-based compensation plus depreciation and amortization. For the year, net loss totaled $969.6 million, versus $685.9 million the year before. It's worth noting these results contained $746.8 million in non-cash impacts tied to fair value accounting adjustments, refinancing, and other non-operating items. The biggest contributor to that loss came from our stock price rising 135% year-over-year, which triggered mark-to-market revaluations on both the warrants and the derivatives. As our share price keeps shifting, this line item will keep swinging around, and it isn't connected to how the company operates. All told, we ended 2025 with an adjusted EBITDA loss of $219.1 million, which represents an 812 point margin improvement. Even though that's up in absolute dollars compared with last year, the margin gain along with 632% revenue growth shows unit economics and operating leverage are getting better as we keep scaling. Those improvements came mainly from operational efficiencies tied to more manufacturing capacity and larger production volumes. Moving on to cash, we closed the year with a bit under $625 million of cash on the balance sheet — the strongest cash position the company has ever had. During the year, we stayed very deliberate about fortifying our balance sheet, and that effort really came together with the refinancing we finished in November, in which we retired 80% of our existing 2030 converts; we brought our interest rate down by 500 basis points, and we brought in $474 million in cash. We were able to free up an additional $11.5 million in restricted cash. On top of that, exercising our public warrants brought in roughly $80 million in gross proceeds. Because of all those moves and our current company outlook, we've taken out the going concern language that appeared in our filings in prior years. That's a major milestone, and it speaks to how strong our cash position is and to the ongoing gains in our underlying operations. When you add it all up, 2025 was a foundational year for the business. We grew customer relationships, we moved key partnerships forward, we scaled our production, we implemented automation, we improved our margins, and we launched both a new software and a product configuration that builds on our existing technology while addressing the evolving market needs. There's still plenty of work in front of us, but the foundation we've built puts us in a good spot for continued growth, better profitability, and long-term value creation. With that, I'll hand the call over to Joe.
Appreciate that, Nathan. To close things out, I'd like to discuss how we see 2026 shaping up, now that we're putting out revenue guidance for the first time. The way our guidance has progressed is something you can track — starting from 7x, you know. Should you take the middle point of our 2026 guidance range, that works out to 3x what we achieved in 2025. Given everything John and Francis have described, we have strong conviction in the numbers we're providing. Here's a helpful way to frame this guidance: $300 million of it is derived from backlog, while the stretch up to $400 million depends on certain larger projects we've mentioned, which need to clear the standard approval steps with grid operators before our customers can install them. The developments you're seeing get us excited — the NYSERDA projects Nathan brought up, our collaboration with Talen and PJM, plus what we're observing in places such as Virginia, along with ERCOT's expansion and data center growth. Our confidence is high that Indensity shipments will start in the back half, the later portion, of this year. That's the bridge from $300 million to $400 million. Throughout the year, we'll provide updates on how we're tracking against that trajectory. There's another item worth considering — something we never formally guided on, though it's come up a few times during earnings calls: we discussed reaching gross margin positive status in Q1. Sadly, given where our volume ended up last year, material costs got pushed into Q1. As a result, our timeline to profitability will slip as we move through 2026. We have a lot of confidence in the projects Francis is advancing on the technology side, in John's work driving productivity gains and taking cost out, particularly material costs, and in Nathan's efforts delivering improved efficiency in the field — all of which should get us to gross margin positive during the second half of 2026. The guidance we're providing, in that $300 million-$400 million range, is something we feel really good about. With that, I'd like to thank everyone for joining us today, and we'll now move into the Q&A section, beginning with a few questions submitted through the say tool from our retail shareholder base. Alright, here's the first one. Regarding Project AMAZE's 8 GWh annual production targets, what level does Eos anticipate reaching by the close of 2026 in terms of annualized manufacturing nameplate capacity? Currently, our target sits at 4 GWh. That aligns with the customer requirements we currently have. Our real aim is to get Thorn Hill positioned for fast expansion. Here's the thing — in thinking through how we approach this, the objective is getting capacity brought online inside the window when customer demand arrives, and that's precisely what John is working toward. It isn't only about the capacity of equipment we're putting in — it also involves other parts of the broader supply chain. I'll hand things over to John now so he can add a few remarks. Our goal for this year is 4 GWh of nameplate capacity exiting 2026. That aligns with our current backlog, and beyond that point, we can bring on additional capacity whenever needed. John, I'm not sure if there's anything you'd like to add.
Yes. During the past several months, we have brought on board a number of automation collaborators for automation machinery, all with the goal of cutting down lead times. We have brought on board a nationwide construction partner capable of delivering a building quickly, which aligns with the implementation-related commitments we have made regarding automation; beyond that, we have collaborated with our vendors to figure out the points at which their situations shift, the moments when they must bring on extra capacity, and how long their schedules run, which allows me to remain ahead of Nathan when it comes to placing orders.
Before we take the next question, let me just close with this. We aren't out there pursuing volume for its own sake — what we're doing is building capability. The capability we're focused on is the ability to deliver dependably. When you hit the switch at home, you expect the lights to turn on, and we aim to make a product that lets that happen. We'll stay very disciplined in how we go about serving customers, and just as disciplined in how we approach our working capital and cash balances while we grow. Turning to the second question: what recent operational metrics and achievements support hitting your Q1 2026 positive gross margin target, and what portion of the margin improvement hinges on the Indensity transition as opposed to efficiency gains on the current Z3 module automation line? I addressed the first half of that question on the last page, at the time we issued guidance. What I'd say is this — beneath it all, we see a structurally profitable business that simply has to get better at day-to-day execution, and we have a very clear path for doing so; we have the leaders, the team capability, and the equipment needed to make it happen. The pages John mentioned, along with the operational page I included, demonstrate that structural profitability — we just need to execute to reach it. The Z3 2 is a profitable product. The Indensity Core adds better performance for customers, lets us manufacture faster, and lets us compete head-to-head on price point against any technology in the market. John, would you like to add anything on how you see profitability evolving?
Yes. When I examine things through a lean lens, waste exists across every part of what we do, and so does room to get better. Earlier I brought up downtime — cutting it, getting more out of our fixed assets, and making better use of labor. There was also talk of yields — pushing those higher while trimming scrap. Turning to materials, we have a number of projects lined up that will bring material costs down, and beyond that, they'll also shorten assembly time along with manufacturing time. We keep searching for methods to raise run rates, for methods to boost efficiency, and once we're in Thorn Hill, we'll gain an optimized cost view when it comes to material handling; the distance literally shrinks from two miles to 1,000 feet. When you factor in all the material handling involved, there's a sizable chance to cut costs from that single item alone.
To wrap things up, I believe John made an excellent observation regarding Thorn Hill. As time goes on, our goal is going to be bringing the footprint together at a single site so that we can realize every one of those synergies. That's going to be a component of the strategy going forward as we consider growing; and with that said, we'll finish with the same questions, and the operator will hand things over to our sell side for any Q&A.
Thanks. Morning, everyone. So, my initial question concerns the guidance, and it might have two parts. First, a few months back, you held quite an elevated outlook for Q4, and obviously, you missed that, and at this point we're seeing, you know, a fairly substantial climb in 2026. How are you thinking about what makes up the guidance and, in a sense, reducing the risk in the figures you've provided compared with what you've guided to in the past?
Morning, Stephen. Appreciate you asking. To start, when you consider that range — similar to what I mentioned during our discussion of the guidance itself. We're examining the gains John put in place after the fourth quarter wrapped up, examining the order backlog we need to work through to reach the low end of that range, and then examining the possibilities we're pursuing, plus the reality that we're adding a new line to deliver the high end of that range. Our effort has been to genuinely think through how we might shift our discipline as an organization so that what took place in 2025 doesn't repeat. That range spans $100 million, with a midpoint of $350 million. What remains consistent about this company is the demand out there for the product; what we're attempting in 2026 is to gain better control over our scale, achieve the manufacturing throughput quality and margin expansion we require, and honestly assess where we believe we can end up without pursuing a degree of difficulty that's a 10, but instead arriving at something we can handle as time goes on.
All right, that's useful. I figure this is right, but regarding growth by quarter — my guess is that Q1 comes in higher than Q4, yet marks the bottom, and then climbs as the year goes on. Does that sound like a sensible shape?
Okay, so Stephen, regarding what's ahead of us — we don't provide guidance for individual quarters, as you know — but when you think about how we're entering this year, we're starting from an elevated level. We're fulfilling the schedules our customers need. As I look at what we've got to get out to customers, I'd expect us to be roughly in line with the figure from Q4, and commissioning revenue factors into that too, and after that, we should grow on a sequential basis.
Okay, great. Thanks. I'll get back in line. Thank you.
Thanks, Stephen.
Hello there, everyone, and good morning. I appreciate you making room for this. Thanks a lot. Is my audio coming through clearly for all of you?
Hi, Julien. Yes, we can hear you fine. Good morning to you, Julien.
Hey, hey, everyone, one really fast question. Let me return to what was said regarding that $300 million-$400 million range — could you share a bit more detail on what, exactly, those larger projects you mentioned consist of? Which specific ones look especially ready, right? Once more, just so we can perhaps measure them against this year's milestones and see what would come to fruition; and also, if possible, say a little about — you know, you now have a substantially bigger backlog overall. How long does that backlog run, when you consider that, you know, let's say $300 of it is being consumed this year, so to speak?
Yeah, Julien, terrific question. Look, I believe we should revisit the substantial, large-scale items. Look, I think all of us understand the industry requires power, and requires it fast. Yet we still function within a structure where approvals and, and, you know, queues take a long time, so we're sort of protecting ourselves against that. Like, you know, Nathan mentioned two big projects at NYSERDA that, once NYSERDA approves them as part of its Bulk Storage purchase, would move into delivery nearly right away. Like, that accounts for two of them in there. We've discussed PJM and what we're doing alongside Talen. There are additional projects we hold that we haven't talked about with major hyperscalers that might potentially come in. Then Nathan discussed what seems to be... You know, at first glance, they appear to be small projects, but they're small projects with a, with a substantial opportunity pipeline that you execute and expand and keep executing, and we simply have to work through that. We'll keep everyone informed on that, as we proceed from there.
Understood. And if I might ask one more thing on that point.
Of course.
The defense sector looks pretty interesting right now, I have to say. Could you share your thoughts on that end market and what opportunities you're seeing? What does the project look like there — scope, timeline — and could you expand a bit on what you mentioned moments ago, plus when we might expect some of that to actually materialize? Again, what does that look like?
On defense, I think you begin with the NDAA, correct? That's essentially the mechanism by which the Department of Defense makes its purchases. Under the NDAA, they're instructed to procure American-made goods, and I believe we've got that American-made offering. As we move through this, there are many steps involved when it comes to coordinating with various government branches to secure approval. One major factor that speeds things up for us is the due diligence we completed with the Department of Energy for our loan. We're engaging with every branch of the military to understand their requirements. What we're focused on is figuring out what they need. They've also got substantial power growth on their side, and we're looking at how to satisfy those demands. We walk them through the product and demonstrate its capabilities. Additionally, when collaborating with the military, we're taking steps to ensure we satisfy every one of their specifications, because we want to start strong; that's an effort we'll keep pushing on, and we're actively pushing on it now, and we dedicate a considerable amount of time in Washington explaining to everyone what this technology can do.
Understood. That's great. I appreciate it. And finally, if I may, considering the guidance you've provided for 26, what's your view on how lines three and four will ramp up?
Yeah
regarding the schedule and how quickly that ramps up, correct?
Clearly, you've got the first line, and now the second one is here, but the third and fourth— Joe Mastrangelo: Yes.
Isn't this essentially a question regarding 27?
Julien, wouldn't you agree that what it really boils down to is carrying things out with discipline? That's a genuinely solid question, right? John has us relocating into a different facility. When you consider throughput efficiency along with cost, that different facility changes everything. Turtle Creek operates as a completely active plant, and it's now producing at 2 gigawatt hours. As 2025 wrapped up, it reached the capacity it was designed to hit. If you adopt a lean approach, you're constantly examining ways to enhance things and figuring out how to do better. That principle governs the way you run your production operations, and it also governs the way you go about adding capacity. Here's what we've communicated to John: put together a strategy we can actually carry out, one where we can get production lines up and running between the moment a customer places an order and the moment it goes out the door. When orders start arriving, we'll be in a position to make that happen. During John's tenure, he accomplished a lot. In Q4, production went up by 80%. Beyond that, looking at manufacturing output on a sequential quarter-over-quarter basis, he came in and overhauled our automation and the partnerships around it. He brought us together with tier one automation suppliers, restructured the way the various components of that work were handled, and set those vendors up so we could establish a framework agreement strategy with them. With that in place, we can send them a signal, and their delivery can be quicker than what currently happens on line two. Regarding the second line we're operating today, one factor involves it being a newly constructed facility. We have a substantial amount of work ahead of us there. Our priority is getting everything set up correctly, ensuring the ramp proceeds smoothly, and managing the shift and balance between the two sites.
Yep, that's logical. Great. Thanks so much, everyone. I appreciate it.
Thank you, Julien.
Morning, and thanks a lot for fielding our questions. I'm just wondering whether you could say something about what the competitive landscape looks like these days. Clearly, you folks are moving along nicely when it comes to your backlog, yet one peer of yours that's publicly traded and has historically focused on lithium-ion has spent the past couple of quarters really promoting its long-duration pipeline. You know, a really sizable long-duration project located up in Minnesota was just announced not long ago. Speaking in general terms, I realize those two situations involve entirely different technologies, but a broad take on how competition is shaping up would be terrific. Thank you.
Mark, I think to start, it reflects what we've been saying about our backlog, that longer-duration discharges are becoming a reality. It's good to see other businesses pursuing this, since it demonstrates that what we've discussed for 5 years is now an actual market. I've mentioned this often—there are numerous applications, and I always compare it to how energy storage will eventually resemble gas turbine technology. You've got various gas turbines serving various purposes at various efficiency levels. What got announced in Minnesota, with delivery in 2028, is a solid illustration of customers seeking longer-duration energy storage, longer than our offering. Meanwhile, Nathan demonstrated that our pipeline for longer duration has grown by more than 40%. It now represents 40% of our pipeline. Sorry, that came out wrong. It's growing steadily, and I believe established companies see a market for that kind of product. I think we've developed—thanks to Francis's efforts and the team—a solution that performs in the 4 to 16-hour range, which will matter a great deal. We've been running load profiles at our test site in Edison, New Jersey, based on data center load profiles, and our technology aligns very well with those. That gives us confidence, but demand is substantial, and having other competitors is positive; it will be a competitive market, and I believe our product can hold its own.
Yeah, makes sense. I'll take the rest off the line. Thank you.
I appreciate that, Mark.
Morning to you all, and thanks for fielding our questions.
Hi there, Craig.
To start with, could you share your thoughts on how gross margins might differ, the possible gaps in gross margin, when comparing orders from the U.S. versus those from abroad? Is there any benefit overseas from being manufactured in America, given that certain trading partners are looking to adjust their trade balances at a national level? Could you also shed some light on how long the testing by that overseas utility's national lab is expected to take, and on how much potential order volume there might be if they conclude that your offering is the best available?
Craig, only a few points to add there. What's driving international interest in what we sell, I'd say, has more to do with how it performs than with politics. Folks seem to be focused on the results our product produces rather than on trade balances. When you've got something where you can walk through its intrinsic value, that's what draws buyers in, domestically or abroad. We're beginning to plant seeds, starting in Germany, and clearly there's a substantial pipeline of opportunity in the U.K. that Nathan mentioned; on that final point of yours, the customer Nathan brought up is a global utility running tests here in the United States at a lab connected to a project for the NYSERDA program. We're moving through that process, and honestly, that testing is terrific. We're glad to do it, since it hands us data we can show people about how the product performs and lets us put it through its paces, and that's where, you know, efforts like this, that's what surfaces Eos Indensity and better performance for the product we've got out in the field.
Would one assume that international sales are going to be slightly lower gross margin?
No, I wouldn't take that for granted.
All right, that's my final question. I'm sorry if I've done this arithmetic too hastily, but it appears roughly $65.75 million of operating cash flow, before changes in working capital, went out the door during the quarter. How do you think about slowing that drain as you get to positive gross margin in the second half of 2026?
Alright, so as Nathan mentioned, our objective is — we've funded the business, and our priority is to be responsible stewards of that money. When you consider that, a key factor in why we eliminated the going concern issue for the business this quarter is that we can see a path toward running it strategically and over the long haul. Naturally, there was a rise into a build plan that later evens out, but after that we'll rise again. We got through that period. When we consider the company's current position, we hold cash that lets us expand it over the long term.
Okay, thank you.
Thanks.
Yes, thanks. Just two short questions. I believe during the prior quarter you said the yield for the bipolar line that began, if I recall correctly, in July, stood at ninety-eight percent. What I wanted to ask is what the fabrication yields came in at during Q4.
John, go ahead. Yes, John, you handle that one.
The bipolar yields are increasing from that point onward. Essentially, by January, we are reaching the objective. That has been cut down considerably, and we will keep doing that. We hadn't expected that from the automation. For that automation, the target is 97% for a stat yield. We are making solid progress toward it.
Great. Then could you briefly take a moment to discuss how things have gone out in the field — safety, reliability, and commissioning timelines — compared with what was expected?
Yes. My apologies for that. I have no idea what occurred.
Absolutely. What I was getting at is whether you could take a brief moment to discuss field reliability for the units delivered during the last 6 to 9 months. Things like how commissioning has been paced, any safety concerns, installation, scheduling, and so on — all of it in the context of how that pattern has looked across roughly the last 6 months and how it connects to the guidance you provided. I'm just trying to get a handle on that lag, plus what reliability and uptime have looked like.
Jeff, I'm not sure — I don't know whether you caught it, I don't know where we got cut off earlier. Anyway, we keep pushing forward and executing out in the field, getting the new product online and running. We held our operations meeting this morning, and we're still seeing solid cycles in the field. As Francis mentioned, we keep learning from every cycle and feed those lessons back into the installed base when it comes to how commissioning is paced. It's a combination and a rhythm of factors — permitting presents difficulties, there's work to get the site ready, there's getting our equipment operational, there's pulling all the pieces together — and we handle that alongside the customer, one customer at a time. If you look back at that page I displayed, we ship to 10 customers, book revenue on 18 customers, and that connects directly to the commissioning work we do.
Understood. And just real quick, when the use case stretches out to 6, 8 hours and past that, are you getting a higher price for that? Or does pricing stay the same for something under 4 hours versus something longer?
Well, Jeff, I'd say it really hinges on the lens you use. When you examine what Eos offers and you examine our ASP in the backlog, it's above what you'd anticipate for a product of shorter duration. Our approach is selling on a Levelized Cost of Storage basis, which runs somewhat higher on the CapEx side but much lower on the operating cost side; that's the basis customers use when deciding what to buy.
Great, that covers everything I wanted to ask. Appreciate it.
Thank you, Jeff.
Right. Thank you all. And once more, I appreciate the question and everyone staying involved. There are a few things I'd like to wrap up with. To start, demand for storage of energy over long durations that comes from domestic sources simply isn't in doubt. The grid is transforming. Load growth is genuinely happening, be it from AI, from electrification, from industrial reshoring. Those amount to structural shifts in the power grid of the United States, and they aren't cyclical. What the market wants is increasingly aligned with what we offer, and that's the basis on which we've set up Eos for the long haul. Next, 2025 was about laying a foundation: making our balance sheet stronger, scaling up manufacturing, standardizing how our product architecture is designed, and tightening our operational cadence. We turned in excellent revenue growth. That shows the progress achieved; the path isn't linear at this point, yet it has direction, and it keeps getting better. Third, 2026 is a year in which disciplined execution has to be demonstrated. Our guidance captures what, as we sit here right now, we believe is within our control. We'll keep everyone posted as the year unfolds and as we see where we end up. I'm pleased with how the team is positioned. When execution gets better, predictability gets better. We recognize that's ultimately the thing we must zero in on; that's where the team directs its attention each day. Profitability for the business. Well, it's an equation of scaling. Automation, how we handle material movement, efficiency, adopting a lean way of thinking, locating waste, removing waste, resetting, then repeating the process over and over. You can observe the sequential margin improvement that we have to sustain until we reach margin profitability. Delivering long-term value to shareholders as well as customers is the company's aim. We bolstered our liquidity. That lets us run the company with more strategy. It provides runway so we can execute. Eos, after all, is an infrastructure business, correct? Businesses in infrastructure get built on discipline, on consistency, and on operational trust. That's the thing we're building. That's the thing we must demonstrate and deliver. We're grateful for the questions, the focus, and truly the attention given to Eos by all of our stakeholders. We're eager to show this ongoing improvement and progress quarter-over-quarter as we build a terrific energy infrastructure company. Thank you for listening today.
We appreciate everyone joining us on this call today. That brings the program to an end. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Eos Energy Enterprises, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Eos Energy Enterprises, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.