In the first quarter of 2026, Epsilon Energy Ltd. reported a strong start to the year with a focus on production growth, particularly in the oil-weighted Permian and Powder River basins. Revenue was positively impacted by strong gas pricing and contributions from newly acquired assets, although earnings were affected by noncash hedge losses, leading to an adjusted EPS of $0.29. Management signaled confidence in achieving meaningful production growth in the second half of the year, supported by a disciplined approach to capital expenditures and balance sheet management.
What topics did Epsilon Energy Ltd. cover?
- Production Growth Outlook: Management indicated that they expect 'meaningful production growth year-over-year' starting in the second quarter, driven by new wells coming online in the Permian and Powder River basins. This growth is anticipated to continue into 2027.
- Capital Expenditure Plans: Epsilon plans to increase capital expenditures significantly over the next three quarters, with a focus on oil-weighted growth. The total gross CapEx for the upcoming Parkman development is estimated at $23 million.
- Debt Reduction Efforts: The company has successfully reduced its outstanding debt by $10 million since the acquisition, bringing the total to $40.5 million. This reflects a disciplined approach to maintaining a strong balance sheet.
- Operational Efficiency Initiatives: Epsilon is implementing several cost-saving measures, including optimizing gas lift compressors and converting gas-lifted wells to rod pumps, which are expected to increase production rates by over 10% per well and lower lifting costs.
- Hedge Loss Impact: The first quarter earnings were negatively impacted by 'unrealized or noncash hedge losses' due to volatility in oil prices, which created a mismatch in revenue recognition. Adjusted earnings per share were reported at $0.29.
What were Epsilon Energy Ltd.'s May 14, 2026 results?
- Revenue: $12.4M (vs $11.8M est, +8% YoY)
- EPS: $0.29 (adjusted for hedge losses)
- Debt: $40.5M (down $10M since acquisition)
- Capital Expenditure: $5M (for Q1, with plans to increase significantly)
- Production Rate (Niobrara Wells): 475 BOE/day (expected peak production in July)
- Production Rate (Parkman Development): 1,060 BOE/day (expected peak production in December)
Epsilon Energy's first quarter results indicate a solid foundation for growth, particularly with upcoming production increases in key basins. The focus on operational efficiency and debt reduction enhances the investment thesis. However, rising rig costs and infrastructure needs present risks that investors should monitor closely as the company executes its development plans.
Earnings Call Speaker Segments
Thanks, operator. On behalf of the management team, I'd like to welcome everyone to today's conference call, where we'll go over Epsilon's financial and operational results for the 1st quarter of 2026. Before we get started, I want to remind you that forward-looking statements may be included in our comments. Please note that a variety of factors could cause Epsilon's actual results to differ materially from the anticipated results or expectations expressed in these forward-looking statements. Certain non-GAAP financial measures may also be part of today's call. For disclosures on forward-looking statements and reconciliations of non-GAAP measures, please refer to the press release we issued yesterday; with that, I'd like to turn the call over to Jason Stabell, our Chief Executive Officer.
Thanks, Andrew. Morning, everybody. With me today are our CFO, Andrew Williamson, and Henry Clanton, our COO. Once we finish our remarks, we'll take questions. 2026 has gotten off to a strong beginning, and we're still squarely on the path laid out in the development plan we shared earlier this year. The main point today is straightforward: we're in execution mode, and we anticipate delivering substantial production growth compared with a year ago, with the oil-weighted ramp across the Permian and Powder River basins kicking off in the second quarter and accelerating across the back half of the year. Throughout the portfolio, activity is moving ahead as scheduled. In the Permian, well number nine in the project — our first Barnett well of 3-plus miles — should come online during the second quarter. Out in the Powder River Basin, 2 Niobrara DUCs that came to us through last year's acquisition will be finished in June and turned to sales in the third quarter, with a 3-well Parkman development following in the fourth quarter; this work sets up material oil-weighted production growth in both basins, beginning in the second half of the year and continuing into 2027; those new volumes will carry full exposure to higher oil prices. Financially speaking, the first quarter shows a mix of robust gas pricing and a full quarter of contribution from our Powder River Basin assets. We've also recently moved during the second quarter to reinforce the balance sheet, through additional debt reduction and by monetizing non-core assets at appealing values. Going forward, the road ahead is clear. We'll concentrate on production growth in our oily assets while keeping the balance sheet strong. We think we're well-positioned for a strong year. Now I'll hand things over to Andrew and Henry for further comments.
Appreciate that, Jason. I want to offer a bit more perspective on the quarter, and I'll begin with capital spending. Through March, our outlay came to slightly less than $5 million, mostly tied to our working interest in the 3-mile Barnett Well drilled in Ector County, plus certain facility-related work getting us ready to drill at Parkman this summer on the Campbell County acreage in the PRB. Over the remaining 3 quarters of this year, we intend to put capital to work at a faster pace, which fuels the oil-weighted expansion Jason described. Those full-year spending plans are appropriately scaled to preserve our target leverage profile of 1x-1.5x net debt to adjusted EBITDA. We anticipate that unit operating costs together with G&A will decline across the rest of the year, as incremental volumes come online and certain integration expenses tied to last year's Peak acquisition fall away. I gave some further detail on that subject in the press release we issued yesterday. Results for the quarter took a significant hit from unrealized, or non-cash, hedge losses, which stemmed from the dramatic swing in oil prices seen during the quarter. The revenue benefit of stronger pricing will largely land in later quarters — somewhat of a mismatch on the P&L. Once you adjust for that item, our earnings came to $0.29 per share for the quarter. From the time we closed the acquisition in November of last year, we have reduced the outstanding debt balance by $10 million — it now stands at $40.5 million. As I said, our approach to the balance sheet is a disciplined one. To help fund our investment plans, we've taken a number of steps, including divesting non-core assets. Earlier this month, we sold an overriding royalty interest package in PA for $3.9 million to a private buyer, which came to roughly 6 times the cash flow those assets are expected to generate over the next 12 months. During the last four quarters, the overrides represented only 1.5% of the company's upstream revenue. We also have under contract, for $3 million, the office building we acquired from Peak, with closing anticipated within the next 30 days. I'll now turn it to Henry for more detail on the operations side.
Thanks, Andrew, and good morning, everyone. These are exciting times for Epsilon as we keep working to integrate the operating assets we recently acquired in Wyoming's Powder River Basin. A number of initiatives are in motion, covering both capital projects and optimization efforts. We're currently completing two 2-mile Niobrara laterals, and pressure pumping services are set to begin in the first week of next month. Construction of the facility is finished and it will be ready for service once flow back operations are done. Across the two wells, the company holds a combined 0.7 net revenue interest, and a type curve-based estimate puts pre-completion peak net production at 475 BOE per day in July. Finishing those two wells will require $6.8 million in net CapEx altogether. When it comes to drilling, the initial move we're making to build out the Parkman formation inventory is a development program consisting of three wells in Campbell County, an area where our working interest is high. Planning for the wells has wrapped up, and we've secured a drilling rig along with service providers in advance of a spud expected in August. We're looking at roughly $23 million in gross CapEx. Just like the 2 Niobrara wells mentioned earlier, the production facilities were pre-built and are set to go into service. October is when we plan to carry out completion work, and we expect output to reach a peak of 1,060 BOE each day during December. As we get ready for 2027, when we will develop the very appealing Parkman inventory located in the Einot unit within Converse County, we are wrapping up the design of the facility and kicking off construction planning for a multi-well water supply facility in that same unit. With $3.5 million in CapEx behind it, this facility will deliver water supply through a surface impoundment built large enough to serve the 6 well development we have planned for the unit next year. Thanks to this facility, our near-term unit plans will move forward in a cost-efficient and timely manner, and beyond that it will back multiple well programs. In Wyoming as well, the operations group has put substantial effort into a number of initiatives aimed at boosting output and lowering costs that deserve mention. To start, after examining the more than 40 rented gas lift compressors currently deployed, the team found over 10 wells where smaller compressors could be used, which would lock in meaningful savings each month of roughly 35%; those locations will receive replacement units, brand new and properly suited to the job. How these wells produce right now will remain unchanged. Additionally, a handful of other wells still on gas lift have been flagged for a switch to rod pump. Earlier this year, our initial pilot test showed that switching to rod pump boosts each well's output by more than 10% daily on average while also cutting lifting expenses. In addition, after thoroughly examining the production chemical program across all operated wells, we are now optimizing it, and we expect per-unit treatment costs to start dropping next month. As we shared before regarding our Permian Basin project in the Barnett play, talks with the new operator verified a shift to 3-mile laterals from 2-mile ones, with 4 wells per pad. The upcoming wells are going to sit along a corridor being developed, and that covers the engineering plus the pre-drill construction of a facility for multiple wells serving as both source and production; these program adjustments have our full support, and we anticipate meaningful capital savings because of them. On 2026 activity so far, we've got the Barnett lateral of more than 3 miles that was drilled and wrapped up not long ago. In just a few days, drill out work gets underway, and flow back comes after that. For this newly drilled well, net projected output is 226 BOE each day. Later in the year, two more 3-mile laterals are on the schedule, situated offset to this well. For those two wells, comparable initial production rates are being projected. On top of that, the new operator has put forward an appraisal of a second interval within the Woodford Shale. Spudding of this Woodford test is scheduled for this month. Although the company chose to divest only the well bore interest tied to this proposal, once the formation has been more thoroughly delineated, we are still prepared to put money into wells down the road. Should it prove successful, our inventory would grow substantially. Across this project, the company holds a 25% working interest. Over in the Marcellus, drilling of the five wells that were scheduled has been finished by the operator, amounting to 0.4 net to Epsilon. The plan is to carry out completion work during the back half of this year. December is when first production from this development is set to begin, and it's projected to contribute a rate of 6.5 million cubic foot per day. For this program, $3.8 million in CapEx received pre-approval, with drilling costs coming in under AFE. Gathering for 4 of the new drills will go through the Auburn system, and once initially completed, they're projected to boost the midstream system's throughput by roughly 86 million cubic foot per day. Thank you. At this point, I'll hand things back to Jason.
Thanks, guys. Operator, we can now open the lines for questions.
Morning, everyone, and thanks for fielding this.
Hello, Anthony — appreciate you being here.
Yeah. For my first question, I'm just kind of interested in what sort of talks are happening with you folks at the board level. Some operators have reacted to the elevated crude prices that have stuck around, and since the Q4 call, the back half and the end of the curves have been lifted somewhat. Your development plan is obviously already full as it stands, but I'm just wondering whether there have been any conversations, and what the general tone of those is, regarding perhaps pushing a bit harder. Apart from capital and leverage, what other obstacles could stand in the way if that chance did come up.
Great. I appreciate the question, Anthony. Before I get into that, there's one item we want to clear up regarding the prepared remarks, and it has to do with the Parkman CapEx we incurred. I believe Henry cited $23 million in gross CapEx, and he then cited a rate of roughly 1,100 BOE per day for that rate; as we always do, we're in fact examining the chance to sell down a portion of that 95% working interest. Henry, would you like to discuss the rate, what it currently assumes and.
That $23 million figure represents the stake we presently hold, reflecting what the capital requirements would look like for developing those 3 wells. Do we intend to retain the whole interest? As for Peak, the projected rates come in at 1,600 barrels per day equivalent rather than the smaller figure of 1,060 that showed up in what we stated.
So that $1,060 figure is based on roughly a 33% sell down. That's one path we're considering — something in the range of a 20% to 30% sell down. Should it look appealing, we may move forward with it. If it doesn't, I believe we'd be just as content keeping the larger number in place. Felt like that was worth clearing up. Okay, on to what you asked. Yes, over there the Powder looks like it's waking up, perhaps similar to several basins given the oil price movement we've witnessed. We've been operating there for 6 months now, basically from when the transaction closed. We've had quite a few discussions with offset operators. That's about 13 Roughly 12 to 14 rigs have been running in the basin at any point in time, and our sense is there's likely space to bring in 1 or 2 additional ones, based on certain conversations we've had. One route by which, yes, we could press the gas pedal a bit harder would involve partnering on certain acreage, especially in the shales, in IO and ORRI interests we hold in offset leasehold; we've held some early-stage talks with quite a few operators regarding approaches, items we might not reach in our 5-year development plan until 3, 4, 5, or even past that horizon. I'd say just stay tuned, Anthony, as we move ahead. There may be chances either for us to pursue drill to earn deals and/or join forces with other operators on certain opportunities. Nothing appears on the near-term horizon, yet we're exploring all those possibilities, and we believe there are multiple ways we might deliver incremental upside to the base CapEx plan we have. I hope that addresses what you asked.
Right, right, that certainly answers it. So, I suppose a follow-up on that — this may just reflect my lack of experience — but when it comes to locking down rig availability for the 3-well pad in the Parkman this year, is that more difficult, and are the rates elevated because of higher activity, or is it more or less a routine deal at this point?
Henry, would you like to take that?
Right. There's less rig availability out there. We've noticed that while talking with what's likely 3 separate providers; a few rigs we can actually use are available to us, and at the moment we're trying to line them up with when the development needs them. Rates for rigs are inching upward, which comes as no surprise. Correct.
Okay.
But regardless, we're fairly—alright, we're sure we'll locate a rig capable of handling the work, doing it affordably, and getting those wellbores delivered on schedule. As we mentioned, at present we're aiming for that August spud date, and we don't anticipate any problem with it.
All right. Looking at the other side of this, regarding financing a portion of those capital projects, it appears you may have already gotten through a larger share of the easy wins among non-core assets available for divestiture. I'm just wondering how you view the wider portfolio and what other regions you could consider, comparable to the Marcellus overriding royalty interest you divested in May.
Yes, we continuously examine opportunities to optimize. That override, in our view, had the capacity to draw quite significant interest, judging by the discussions we held. We took it to market and achieved a solid outcome on that transaction. As you're aware, we likewise divested the Anadarko position at the close of last year. In my view, the portfolio sits in a fairly solid spot. The pruning would likely be — yes, there's a fairly robust AFE market out there, so might we identify an appealing chance where we could sell off a modest portion of certain working interests in some of the upcoming program? I believe that would be opportunistic, sort of hinging on the demand we observe, yet it remains a possibility. I think it would align pretty much with our ongoing approach — minor, incremental moves.
Alright. And then you pointed out in the press release and in the prepared remarks about achieving some scale on the operating side's fixed costs. I believe if you run the rough math, previously that was about $12 per BOE for LOE expense. As you gain more scale going into 2027 and perhaps further out, what are your expectations on the cost side?
Yeah, Anthony, Andrew here. Yeah, the main factor behind the elevated unit OpEx in Q1 was the full contribution of the PRB assets. You know, that's entirely PDP production. No new volumes have come online there in more than two years. You know, that fixed cost component is disproportionately represented in that production. As we bring incremental volumes online in the Powder, we anticipate that going from where we sit today in the high 10s to low 20s per BOE in the Powder to reach the mid-10s. Where that settles out for the total company on a BOE basis, you know, we ought to see a drop of several dollars there. Concentrated in Q4 of this year when we bring those volumes online in the Frontal Pit.
Excellent, that's good to hear. Thank you, everyone. I'll rejoin the line.
Appreciate it, Anthony.
Thanks, and good morning. I’d like to ask about the Powder River Basin. Besides the water facilities you described, do you anticipate any additional infrastructure problems or requirements where Epsilon would need to take part and provide funding?
In Converse County — the place where we’re talking about developing this Einot unit next year — additional gas takeaway capacity will be necessary beyond what currently exists. If we choose to, we’ll be able to join in that project, or alternatively the gatherers can simply come to us. So yes, some gas takeaway will be needed, but for us the bulk of the expense is going to involve providing those completions along with the frack water required for them. That was the purpose behind how we designed that facility.
Thanks. Regarding that Woodford test you mentioned in the Permian Basin — if we assume it turns out to be a success, what amount of output data would Epsilon want to review prior to deciding whether to join in on a subsequent well?
Right, I'd say the question isn't only whether they can land in the Woodford. You know, what are the expenses involved there? Have they figured out the well design? And then clearly, what sort of rate does it produce as time goes on. Tough to give a precise answer, Jeff — you'd likely need no less than 180 days of production to gain a genuine, solid understanding of how that productivity is shaping up.
Thank you for taking my questions.
Sure.
Alright, Chris, thanks. We appreciate everyone making time to be with us here today. Thank you for the interest you show in the company and the support you give us. As we always say, feel free to get in touch with us in Houston whenever you have further comments or questions. Otherwise, enjoy the rest of your day. Thanks for being here.
That brings us to the end of this call. We appreciate you joining us for today's presentation, and you're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Epsilon Energy Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Epsilon Energy Ltd. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.