Eversource Energy (ES) Earnings Call Transcript & Summary
May 7, 2026
What were the key takeaways from Eversource Energy's May 7, 2026 earnings call?
In the first quarter of 2026, Eversource Energy reported GAAP earnings per share of $1.61, up from $1.50 in the same quarter last year, while non-GAAP earnings were $1.73. The company adjusted its 2026 non-GAAP EPS guidance to a range of $4.57 to $4.72 due to a reduction in the base transmission ROE from 10.57% to 9.57% by FERC, which is expected to lower after-tax earnings by approximately $70 million. Management reaffirmed a long-term earnings growth rate of 5% to 7% off the midpoint of the revised guidance, indicating a focus on operational stability amid regulatory challenges.
What topics did Eversource Energy cover?
- FERC ROE Decision Impact: The recent FERC decision has reduced the base transmission ROE from 10.57% to 9.57%, which management described as 'arbitrary and capricious.' This decision has led to an adjustment in 2026 non-GAAP EPS guidance and is expected to lower future after-tax earnings by approximately $70 million.
- Operational Performance During Blizzard: Eversource successfully restored power to over 500,000 customers during a severe blizzard, demonstrating 'excellent operational performance' and effective emergency preparedness. Management received positive feedback from customers and local officials, highlighting the benefits of ongoing infrastructure investments.
- Aquarion Sale Update: Management expressed optimism regarding the sale of Aquarion, stating, 'we felt very good about the decision' from PURA, while acknowledging the need to remain vigilant during the appeal period. The transaction is expected to close after the appeal period ends in mid-June.
- Storm Cost Recovery: Eversource is set to recover approximately $2 billion in deferred storm costs through securitization in Connecticut and New Hampshire. This recovery is expected to improve financial metrics and address affordability concerns for customers.
- Regulatory Environment and Future Investments: Management highlighted the need for a stable regulatory environment to attract capital for essential utility investments, emphasizing that 'funding these investments requires a stable predictable regulatory environment.' They remain committed to ongoing infrastructure improvements despite regulatory uncertainties.
What were Eversource Energy's May 7, 2026 results?
- GAAP EPS: $1.61
- Non-GAAP EPS: $1.73 (null)
- After-Tax Charge: $43.9 million (null)
- Long-Term Earnings Growth Rate: 5% to 7% (null)
Eversource Energy's first quarter results reflect strong operational performance but are overshadowed by regulatory challenges, particularly the FERC ROE decision. The adjusted guidance and ongoing regulatory uncertainties may create volatility in the stock. Investors should monitor the resolution of the Aquarion sale and the outcomes of storm cost securitization as potential catalysts for future performance.
Earnings Call Speaker Segments
Hello, everyone, and thanks for being with us on this call covering our results for the first quarter of 2026. Throughout today's discussion, we'll be walking through some slides, and you can find those on our website, investors.eversource.com. If you look at Slide 1, it notes that certain things we say on this investor call could be forward-looking. Such statements reflect what management currently anticipates, and they carry risks and uncertainty that could lead actual results to differ materially from our forecasts and projections; we're not obligated to update or revise any of them. More details on the factors that could make actual results come in differently, along with our explanation of non-GAAP measures and how they reconcile to GAAP results, can be found in our news release, the slides we posted last night, and our most recent 10-Q and 10-K. Joining us to speak today are Joseph R. Nolan, our chairman, president, and chief executive officer, and John M. Moreira, our executive vice president, chief financial officer, and treasurer. We're also joined by Jay Booth, our vice president, controller, and chief accounting officer. Joseph, I'll hand the call over to you now.
Thanks, Rima, and good morning to all of you, and I appreciate you being with us today for the earnings call covering our first quarter of 2026. Starting on Slide 4, we're kicking off this year with solid operational momentum and a well-defined approach for executing our core strategic priorities in a disciplined manner: safety and reliability, making the balance sheet stronger, and reducing risk in our business profile. On Slide 5, you'll see that our team turned in outstanding operational results, particularly through the intense blizzard that hit us in February. That nor'easter brought snowfall exceeding 40 inches along with wind gusts surpassing 70 miles per hour, making it among the harshest blizzards to strike the Northeast, especially Massachusetts, in the last several years. We carried out a major, well-coordinated restoration push, bringing in thousands of line crews, tapping into mutual aid, and employing remote switching along with pre-positioned materials to bring service back fast while always prioritizing safety-critical facilities. Our people collaborated closely with local and state agencies to put life safety first, speed up restoration work, and assist the communities that were hit. All told, we handled more than 2 thousand fire, police, and safety incidents and brought power back for over 500 thousand customers. Those efforts and our successful restoration demonstrate what we gain from the infrastructure investments we've been making in our electric grid and in emergency readiness; we're extremely thankful for the backing and encouraging responses we received from many state and local policymakers, first responders, and our customers. Most customers who responded to our post-blizzard survey indicated they really valued how fast their service came back. Turning to Slide 6. Looking ahead at this year, we know there are still some matters we must settle in order to keep reinforcing our balance sheet and lowering the risk in our business profile. To start, regarding the Aquarion sale, we obtained final approval from PURA in March. PURA turned down an appeal brought by certain parties. At this point we're awaiting the completion of another appeal window in mid-June 2026 prior to being able to finalize the deal. Next, on Revolution Wind, as Ørsted shared recently, that project has reached roughly 95% completion. The commercial operation date is still anticipated to fall within the second half of this year, and we're eager for this greatly needed generation source for the New England region. Based on the newest construction updates and cost projections, we feel the present contingent liability balance owed to GIP continues to be suitable. Last, the recent FERC rulings concerning the New England transmission owners' base ROE, which came from an effort to resolve a complaint that has lasted 15 years, are unsound. In our view, this FERC decision strays from the statutory boundaries established by the Federal Power Act as well as long-standing judicial precedent that requires FERC to establish rates of return that are just and reasonable and adequate to draw the capital necessary for vital utility investment. While priorities have shifted across various administrations and commissioners at FERC, a single thing has stayed unchanged: New England requires new energy supply resources in order to tackle affordability, guarantee reliability, and bolster economic development. No matter what source generates the power, hitting these targets demands a transmission network that is up to date and better able to withstand stress. Over the years, the money we have put into transmission has produced billions of dollars in customer savings by removing substantial congestion expenses for the region and simultaneously strengthening grid resilience. To finance such investments, the regulatory landscape must stay steady and foreseeable so that long-term capital can be drawn in at the most favorable cost achievable. For over 10 years, investor confidence has been tested by uncertainty arising from FERC taking no action after the U.S. Court of Appeals threw out FERC's earlier order in the case in April 2017. Regrettably, this FERC ruling erodes even further the capacity of utilities to obtain the capital required to back state and federal policies and mandates, to construct and improve grid infrastructure, and to keep operations safe and reliability top-tier for customers. As some of our recent moves have shown, we have challenged this ruling and lodged a motion for stay in the courts. In addition, we made a section 205 filing that follows precisely the FERC methodology applied in their March 19, 2026 order, though using refreshed data. The figures FERC relied on to calculate the 9.57% ROE are more than 10 years old. When the data is refreshed to reflect today's market conditions, the ROE reaches 11.39%. One important element of this filing is the possibility of settlement. Our hope is that every party in this proceeding can join together and arrive at a result that serves customers well while also offering sensible financial backing for New England transmission owners to keep improving and constructing the greatly needed transmission network for future load growth. Following the FERC ROE ruling, which cut our transmission base ROE to 9.57%, we did revise our guidance for 2026, and John will restate that shortly. We are reaffirming our long-term earnings growth rate of 5% to 7% measured from the midpoint of our updated 2026 guidance. Now let me point out several important state policy developments throughout our territory. Turning to Slide 7, in Massachusetts, during March 2026, Governor Healey signed an executive order aimed at securing Massachusetts' energy future, setting up a thorough strategy to bolster the Commonwealth's energy reliability, affordability, and independence. The order answers severely unfavorable changes in federal policy, growing electricity demand, unstable fossil fuel prices, and worldwide energy supply disruptions by instructing state agencies to quickly grow energy resources and update the distribution and transmission systems. This executive order acknowledges that Massachusetts' energy supply needs are expanding. It references ISO New England projections that electricity consumption might climb by almost 15% by 2035 and by almost 50% by 2045, while peak demand rises at an even quicker pace. The order further stresses the necessity of prompt action to capture the greatest possible federal tax credits for clean energy projects before they lapse under faster timetables set by recent federal law. We value Governor Healey's understanding that tackling regional supply constraints via an all-of-the-above strategy is vital for attaining energy affordability. Our company delivers energy, and we stay committed to upkeep and improvements of our infrastructure so that new energy resources can be integrated, reliability can be boosted, and customer costs can be kept in check. We anticipate ongoing teamwork with the administration, the legislature, and other stakeholders to push forward solutions bringing durable reliability and affordability advantages. In Connecticut, like we said during the prior quarter, we will kick off our initial rate review for CL&P in roughly 8 years. To us, that's a tremendous chance to demonstrate how greatly we've enhanced reliability and that such investments hold value for customers. Later this month, we plan to submit a letter of intent to PURA regarding the CL&P rate case. We know this will be a substantial request, and just as we do elsewhere, we'll work alongside PURA and other essential stakeholders to file a rate case that is constructive, responsible, and crafted to safeguard customer interests. Our filing will tackle customers' need for dependable electric service, affordability, and rates that are stable and predictable. Recovery of storm costs is another major matter for us. We anticipate a final ruling from PURA on our Connecticut storm cost prudency review in July 2026, which would let us start the legislative-backed securitization process. Crucially, securitization permits prompt cash collection, boosting our FFO-to-debt metrics while also tackling affordability worries for our customers. In New Hampshire, Governor Ayotte signed House Bill 1539, legislation permitting securitization of storm costs, offering an affordable route to recover our outstanding storm costs, which the PUC is currently reviewing. We appreciate the Governor and the General Assembly's backing in passing this vital legislation. As we've said previously, 2026 is going to be a genuinely transformational year for us. While we function amid a shifting regulatory environment and handle affordability concerns, we'll keep communication transparent with every stakeholder and take firm steps to reduce possible risk. I'll now hand the call to John so he can go over our financial results. Thank you.
Appreciate that introduction, Joseph, and greetings everyone. During this call, I'll take you through what we reported for Q1 of 2026, bring you up to speed on regulatory developments such as the recent FERC ROE, and afterward discuss our balance sheet position together with how we intend to handle financing. Starting off with the quarter one figures, which you'll find on Slide 9. GAAP EPS for the period landed at $1.61, compared with $1.50 per share on a GAAP basis during 2025. This quarter's GAAP figures include a $43.9 million after-tax charge — equal to $0.12 per share — related to the FERC ROE ruling, reflecting refunds for the initial 15-month complaint period. Excluding that item, non-GAAP earnings for the quarter came to $1.73 per share, versus GAAP and non-GAAP earnings of $1.50 per share in 2025. The $0.23 per share gain year over year is primarily attributable to the gas segment, which contributed $0.18 per share of the increase, thanks to rate base growth in Massachusetts and the Yankee Gas rate case taking effect in Connecticut. Our electric transmission results came in $0.06 per share ahead, driven mostly by ongoing capital put into the network. We also saw gains in electric and water distribution, thanks mainly to rate hikes and disciplined expense management. Offsetting those positives, Parent and Other posted $0.05 per share in larger losses, chiefly tied to a bigger effective tax rate along with increased interest expense. All told, the first quarter came in right where we thought it would. Now let's move to Slide 10. In a ruling dated March 19, 2026, FERC took the base transmission ROE and reduced it without justification, from 10.57% to 9.57%. That slide illustrates how this proceeding has stretched on for close to 15 years, going back to when the initial complaint was submitted on October 1, 2011. On October 16, 2014, that 10.57% figure was put in place. Even after the D.C. Circuit's U.S. Court of Appeals struck down FERC's order in April 2017 — which would have allowed billing customers at the initial 11.14% rate — Eversource Energy and the remaining New England transmission owners continued charging at that same rate. Between 2011 and the arbitrary and capricious ruling issued on March 19, 2026, FERC went through 22 commissioners and 13 chairs, all nominated across five different presidential administrations. That ruling relied on evidence more than ten years old, covering a refund period exceeding what the Federal Power Act allows. Following that ruling, Eversource Energy, together with the remaining transmission owners, has moved on multiple fronts to safeguard its entitlement to a reasonable return on capital invested. We submitted a request to FERC on April 2, 2026, asking the commission to hold the order's refund requirements in abeyance so that a proper legal examination could take place. Then, on April 14, 2026, a comparable submission was made to the U.S. Court of Appeals for the D.C. Circuit. We also sought more time for the refund cutoff by filing a motion on that same April 2, 2026 date. Absent that extension, the order from FERC would have mandated refunds be issued inside 30 days, disregarding the required work of coordinating with ISO New England and the region’s load-serving entities. FERC granted this extension, which pushes the deadline out to May 2027. We submitted a rehearing request at FERC on April 20, 2026, aiming to address the several legal shortcomings in that decision. Then, on April 30, 2026, we completed a section 205 filing with FERC aimed at setting a new base ROE grounded in present market data, rather than data more than a decade old. Applying FERC’s own approach from its recent ruling alongside current market data, we calculated a just and reasonable transmission base ROE of 11.39%. We expect the updated rate to go into force around the close of this year, pending possible refunds. The filing additionally seeks to change the allowed return on equity ceiling for transmission projects, raising that limit to 12.89%. We are unhappy with how FERC has handled this case, and while we intend to continue asserting our right to an appropriate return on the capital we've invested, we put out two disclosures during the quarter in response to FERC's March 19, 2026 ruling. The first was a revision to our 2026 non-GAAP EPS guidance, which we described in the 8-Ks we filed on March 31, 2026. We expect the base ROE modification to lower Eversource Energy's after-tax earnings overall by about $70 million in 2026, and on top of that we made an adjustment reflecting a potential Aquarion divestiture if PURA gives its approval. Taken together, those factors led us to revise our 2026 non-GAAP earnings guidance to a range of $4.57 to $4.72 per share. In our second disclosure, we recorded an after-tax charge of $43.9 million, equal to $0.12 per share, related to the FERC ruling I referenced earlier. Now I'll move to a handful of state regulatory developments. Rather than repeat all the details Joseph provided, I'll just call out several items. Let's begin with Aquarion. Should the deal not go through, our plan is to proceed with the rate case already submitted to PURA, in which we seek an $88 million increase in distribution rates. Completion of that case is expected around the end of the year, and it would strengthen Aquarion's ability to continue putting money into its infrastructure while providing reliable service to customers. The decision from PURA granting approval of the sale is something we appreciate; nonetheless, should the deal not go through, we are prepared to bring in other alternative financing solutions to replace the sale proceeds if that proves necessary. Additionally, in Connecticut, I'd like to acknowledge the RAM decision that came out on April 22, 2026. Two extremely important matters are addressed by that decision. To start, PURA gave the green light to set aside $100 million to cover storm restoration expenses. Next, the ruling uses forecast data as the basis for setting rates that are linked to TPAs. Depending on forecast data represents a change we've pushed for over a long period. It also allows rates to be adjusted faster, which stops big over-recoveries or under-recoveries from happening. Thanks to these two changes, customers end up with more stable rates, and at the same time Eversource Energy gets operating cash flows that are steadier and simpler to predict; on top of that, PURA's decision achieves all this while actually lowering customer rates. We're grateful for PURA's thoughtful and constructive ruling. And last, when it comes to New Hampshire, Joseph mentioned the new legislation on securitizing storm costs. So what that boils down to is that, in Connecticut and New Hampshire combined right now, Eversource Energy should recover about $2 billion of deferred storm costs plus carrying charges through those securitization deals over the next 12 to 18 months. If you go to Slide 11, we'll cover a financing update. In February 2026 we issued our first-ever junior subordinated notes, which was one of the latest moves we've made as part of trying to keep making the balance sheet more stable. Demand for that offering came in at more than five times what was available, and it continues to trade at or above par — which made us very happy. That gives us confidence that our strategy has the market behind it if we decide to issue something similar later on. Let me stress that our approach to financing has not changed since what we shared on our fourth quarter earnings call.
Our expectation remains that across the upcoming five-year forecast horizon, equity requirements will land somewhere between $800 million and $1.1 billion. As we've said before, this financing approach builds in flexibility tied to how the Aquarion transaction ultimately resolves. Now, moving to Slide 12, I'd like to walk through the most recent confirmation of our strategy — namely, that our FFO-to-debt metrics are still solid. The newest figures stand at 14.2% for S&P and 14.5% for Moody's. In line with our guidance, both of those sit more than 100 basis points above the levels that would trigger a downgrade; beyond that, on April 10, 2026, after the FERC ROE ruling, S&P once again affirmed its ratings and stable outlook for Eversource Energy along with our subsidiaries. These objective measurements demonstrate that we've successfully carried out the strategy we previously laid out. Moving on, let me restate our $26.5 billion five-year capital plan, which you can see on Slide 13; it captures our utility infrastructure investments over five years, broken out by segment, running through 2030, and we've gotten off to a solid start with CapEx of almost $800 million through March 2026, against our 2026 forecast of $5.1 billion. As this slide shows, Connecticut AMI isn't part of our plan. We're eager for what comes next on that opportunity after the constructive hearings PURA held recently earlier this year. As we said in the briefs filed in March 2026, our aim is to provide customers with the greatest benefit at the least possible expense. Now on to Slide 14. We still anticipate a significant inflection in our earnings growth, powered by better regulatory outcomes. That covers recovering storm costs via securitization in Connecticut as well as New Hampshire; it also covers finishing up alternative financing opportunities and distribution rate adjustments, among them the outcome of our CL&P rate request in 2027. Finally, on Slide 15, we stay confident in our capacity to produce earnings growth reaching the upper half of our long-term 5% to 7% target by 2028. And to be clear, that would be measured from the midpoint of our revised 2026 non-GAAP EPS range; with that, I'll hand the call back to the operator for Q&A.
Morning. I really appreciate you taking my questions. Perhaps to begin with Aquarion — as you noted, we're still roughly five weeks away from when the new appeal window shuts. Could you share your most recent view on whether more appeals might get filed during that process, and where your temperature sits on this moving toward a close?
Yeah. The PURA decision made us happy. In my view it was quite clear, and I believe they addressed the matters that the appeals centered on, and I felt really good about how it came out. We stay watchful. As you're aware, it wasn't only the parties that appealed; other folks are involved too, so we remain vigilant. But like we've said before, nobody is holding a gun to our head any longer. We do plan to get the transaction closed, yet should it fail to close, that won't be the end of the world.
Understood, that's useful. Now, regarding the FERC ROE ruling — you're coming at it from multiple directions — but with the 205 filing, you brought up the possibility of getting to a settlement there. Could you describe how the timeline might shape up if a settlement is available, compared with having to go through the entire process?
Certainly. Like I mentioned in my prepared comments, our expectation is that a new rate gets put in place near the close of the year. To address precisely what you asked, Carly, the initial step once FERC responds within 60 days from when we file is to assign a settlement judge to the matter in order to get the parties negotiating. With luck, we can reach agreement on the rate going forward and also tackle the legal inefficiencies in the FERC order through that settlement conference. That ought to take place later this year.
Excellent — I really appreciate it.
Thanks, Carly.
Marcella here, filling in for Shahriar — thanks for taking our questions.
Hey there, Marcella. Morning to you.
Morning. Turning to the FERC ruling, how confident are you about that 15-month refund window? And which milestones ought investors track to get clarity on whether that reading holds up in court? For instance, is the MISO proceeding something we should watch as a possible read-through? And what's your thinking on the timeline for that case?
Sure. Should we run the whole process without reaching a settlement with the parties, then yes, I'd say the MISO decision will be an important data point for us. As for the 15-month window, we understand we're bound by a 15-month refund period, so we accrued for it in the first quarter, as I noted. So the 15-month refund period is the law, and we acknowledge that; but choosing a retroactive refund date arbitrarily is, in our view, where FERC failed to follow the letter of the law.
That's a big help. Moving on to the securitization of storm costs in New Hampshire — how large a portion do you plan to go after, does that figure account for carrying costs, and when do you expect that filing to happen?
Absolutely. Our hope is that the timing comes together quickly, allowing us to sit down with the PUC and the Department of Energy in New Hampshire. The amount, I believe, falls somewhere between $400 million and $470 million, inclusive of the carrying charge that keeps building up. The upside really goes to customers — the faster we wrap up securitization, the more our customers gain through a reduction in the final cost being securitized; our hope is to close that transaction within a sensible window, by late 2027.
Great. Thanks.
Thank you.
Morning, everyone. Hi there, Joe and John — how's it going?
Morning to you, Steve. Doing great.
Regarding the FERC matters, as we consider which additional counterparties you could reach settlements with, which entities are involved in this proceeding before FERC? Would that be your state advocates? Or is it transmission customers?
A wide array of stakeholders would be part of it. As you're aware, since this tariff covers New England, all six transmission owners across the New England states are affected. You should anticipate that each consumer advocate from those states, along with the Attorneys General from the six New England states, will be at the table, and we are ready to hold those conversations with all of them.
So from what you're saying, it seems like you could put this in place with refunds contingent on a specific date. But is there a cutoff by which they're required to make a ruling?
From what I understand, FERC gets 60 days starting when the filing happens to inform us of the point at which the rate may go into effect, and the rate can be suspended by FERC for as long as five months. So when you add those 60 days to that five months, we'd anticipate the rate being implemented within seven months of the filing date, as I said, with refunds subject to later determination.
So about Aquarion — at this stage, what exactly are we holding out for before we make the call on closing or walking away? They turned down the reconsideration, so where does that leave things?
What we're holding out for is the appeal period running its course. The second appeal period runs out on June 14, 2026.
Question from the analyst: is that happening at the commission level or at the court level?
it's at the commission.
Got it. Thank you.
Thank you, Steve.
Morning, and thanks for taking my questions. Given the uncertainty surrounding the FERC process and the Aquarion situation while you're waiting out the appeal window, how are you approaching the timing of equity capital? Does it make sense to issue what you need at this point, or would you rather wait and see how these pieces come together before you right-size the offering? What's your thinking?
Sure, Sophie. Let me restate our guidance: from now through 2030, we expect to issue somewhere in a range of $800 million to $1.1 billion. That's a very nominal number across the next five-year period. And as a reminder, in February 2026, we completed our first junior subordinated notes offering, which brought in $1.5 billion of cash. At this moment, we're watching how the other items play out. Over the next 12 to 18 months, we would expect roughly $2 billion of incremental cash coming in through the Connecticut and New Hampshire storm securitization proceeds. We'll be very thoughtful and mindful about these significant interactions and transactions that could impact our equity needs. We have no urgency to go to market right now. We'll keep a close eye on how these transactions ultimately materialize.
Thanks. Now for my second question: considering New England's power supply picture alongside Millstone's possibility of recontracting, plus forward pricing in that region amid what's happening with oil and gas worldwide, how are you observing policy reactions throughout your service areas to the possible consequences of energy prices climbing?
That has left me feeling quite positive; into this region we're adding 2.6 thousand megawatts of fresh electricity, and that should assist in softening the clearing price at ISO New England. When compared with PJM, ISO New England's market isn't especially volatile. Considering Clean Energy Connect putting 1.1 thousand megawatts into our grid, Revolution Wind contributing 704 megawatts, plus extra wind totaling more than 800 megawatts, pricing across the region is being meaningfully affected. My level of encouragement is high. Add to that our stance against heavy data center demand — data centers locating here genuinely doesn't appeal to me; for our residential ratepayers there's no benefit, and it would merely push energy costs higher — these are among the priorities we're pursuing. Over in Massachusetts, the executive order is examining every possible action; they gave the green light to a natural gas pipeline upgrade with Enbridge, and through that partnership we'll deliver extra gas capacity to the area. In addition, from Constellation we bought a 26-acre site, enabling us to put as much as 2.4 thousand megawatts of power into the region. It's my view that our position is strong for assisting customers in controlling energy expenses and pushing the clearing price lower, all while maintaining a dependable, steady grid. The volume of interconnection requests for clean energy resources — be it hydro or offshore wind — gives me encouragement. During winter months, exactly when it's needed most, offshore wind delivers roughly a 50% capacity factor. My worry isn't excessive. Additional generation would be welcome, combined-cycle plants included, yet our positioning is solid, and the volatility plaguing certain other markets won't be something we experience.
Thank you. Appreciate the response.
Thanks, Sophie.
Hello, and good morning to all of you. I appreciate you taking my question. I have one more regarding the transmission ROEs. I follow your explanation concerning the 205 process and the way you're able to put it in place subject to refund. On a forward-looking basis, what would you record when it comes to earnings — let's say 2027 and afterward? Would you go with the 11.39% until either FERC or a court signals that you shouldn't? Would the 11.39% serve as the foundation for future guidance, or would it be the 9.57% base ROE?
Above all, the guidance we have right now, which we restated and refreshed through our 8-Ks dated March 31, 2026, took the present rate of 9.57% as its assumption. We're going to hold off and observe how the 205 finally plays out before this year is over. As things stand under the existing procedure, our expectation is that FERC will decide the point at which we may put the newly proposed rate into effect on a subject-to-refund basis. Whatever rate we're able to charge customers is what we'll incorporate when we deliver guidance on the fourth quarter call in February 2027, after this matter has been settled.
Here's hoping the timeline holds. Moving to my second question, about those refunds totaling roughly $880 million. I understand the window for refunds got pushed out to May 2027. On the books, have any reserves been set aside, or will they need to be, or does that just hang over you while the challenges and appeals work their way through?
How this unfolds remains to be seen, though given the legal strength of the case we've brought — working alongside FERC counsel and our own in-house lawyers — our sense is that we hold a solid legal footing, which is why we haven't recorded anything further and won't until there's more resolution and clarity regarding the retroactive portion dating back to 2014. To put it plainly, we acknowledge that under the Federal Power Act, the 15-month refund window applies to us, which explains the booking we made this quarter. It was also encouraging that FERC threw out complaints two, three, and four.
That's great, thanks a lot.
Thanks.
Morning, and thanks. With FERC's uncertainty looming over the coming year, how much flexibility do you actually have when it comes to your transmission investments and your CapEx? Could you potentially shift some CapEx around if a ruling lands against you, or is there even any need to shift CapEx at all?
We're definitely going to examine that. I don't want to get too far ahead of things, but it's something we can assess. Like we said during our formal remarks, this harsh decision from FERC caught us off guard, since, as Joseph noted, we require additional supply, and transmission owners ought to be given incentives to pursue investment opportunities that lower overall costs for customers. Ten years back, New England dealt with enormous congestion pressure. By removing that price differential via transmission investments, we delivered billions of dollars in savings to customers throughout New England.
That's everything from my side. Thanks for sharing all that information.
We appreciate you being with us today.
Morning. The majority of what I wanted to ask has already been covered. Regarding the Connecticut PBR, will we be sitting around for another decade waiting on something there? Just kidding — but where does that stand?
Paul, you're aware that we've been sorting out quite a bit in that area. At PURA, the shift has been quite favorable. The decisions coming our way are solid and equitable; having PBR would be wonderful if we're talking about priorities, yet right now our focus is on establishing a predictable regulatory framework in which to function and on handling several other items on our list, rather than stirring things up over PBR.
So it's more of a let's see how things play out approach?
That's right.
Is there any insight into why FERC suddenly issued this ruling after such a long period with no apparent warning?
Our best guess is that this was a difficult matter that sat unresolved for a number of years. In our view, the signal to transmission owners in New England is that the courts should settle this proceeding, which explains the legal step we outlined today.
Understood. Thanks so much.
Thank you.
Thanks once more for being here today. There’s still a window to hop onto David Campbell’s call — we allotted 15 minutes for that. Over the last year, our teams have come through plenty of rough weather, and we provided best-in-class reliability to our customers. We’re bringing huge momentum as we head into 2026, with sharp attention on lowering risk across our business profile, closing out the important outstanding matters in front of us, and setting the company up for durable growth over the long term. Many thanks.
We appreciate everyone joining us for this call today, and with that, our session has come to an end. You're free to leave the line now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Eversource Energy transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Eversource Energy earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.