Good day, everyone, and thank you for joining the call and live webcast for the Full Year Figures 2024 and Annual Report 2024 publication. This is Moritz speaking, your Chorus Call operator. Just a reminder that everyone attending is in listen-only mode and that this conference is being recorded. After the presentation, there will be a question-and-answer session. <<operator_script>> Right now, I'm happy to pass things over to Christoph Nanke, SVP, Head of Finance at IR. The floor is yours, sir.

Christoph Nanke executive
#2

Thanks, Moritz, and a warm welcome from me as well. Stefan Schulte, our CEO, is here with me in the room, along with Matthias Zieschang, our CFO. I realize you have plenty of questions, but before we get to those, we're going to begin the presentation at this moment. Stefan, over to you.

Stefan Schulte executive
#3

Yes. Christoph, many thanks. Good afternoon, ladies and gentlemen, and a warm welcome from me as well. I'd like to begin my presentation today with a positive message. Even with a challenging environment, we hit our financial and operational targets over the past fiscal year. So we delivered an EBITDA in the middle of our guidance range and a net result in the upper area of expectations. Furthermore, despite heavy investments, we kept a stable leverage ratio, which is still quite — there's no question about it — but at least as expected. What have been the main challenges we're facing? First, our main customer in Frankfurt, Lufthansa, is still awaiting its new wide body aircrafts; currently more than 40 long-haul planes are induced which were already meant to be replaced by new modern aircrafts, with a focus on last year alone Lufthansa expected the delivery of 15 new Boeing 787. As of today, none of these planes are flying Frankfurt or have even been delivered. In addition, maintenance of the Pratt & Whitney engine exposed shortfall aircraft cut our Frankfurt capacity by about 3% to 4% last year and probably likewise this year. But there are some positive signals that the 787, 10 to 15 could achieve could come to Frankfurt somewhere in the second half of this year.

Stefan Schulte executive
#4

As for the new 777, my expectation is that it won't arrive this year, and even judging by where we stand today, probably not in 2026 either. On top of that, from a political standpoint, we dealt with a difficult situation in May of last year. Germany's aviation tax went up yet again, which puts the country among the priciest places in the world to run an operation. In the current year, the German state has pushed up even more the security costs that carriers must bear, along with air navigation fees. Beyond those expense lines, 2025 is also the first year in which the mandatory SAF quota — that's sustainable aviation fuel — applies across the European Union. That isn't really the issue, though. The issue is an extra power-to-liquid levy that is compulsory for flights leaving Germany — what people call gold plating, once again in Germany. Ladies and gentlemen, these burdens are extremely heavy. As a result, the German aviation sector is missing the pace of rebound that other nations have shown. The BDL, which is the German Aviation Association, for instance, reckons that carriers operating in Germany will need to shell out roughly EUR1.2 billion more in state-related charges this year, for 2025, or about EUR11 per departing passenger on average. When you look at airline margins, that is a very large added load.

Stefan Schulte executive
#5

I’m firmly of the view that Germany needs to become competitive again, and we are making that point to the new government — or likely incoming government — very, very plainly. So there is a degree of opportunity here, a degree of optimism, and I hope we’ll be in a position to update you on how things are developing on the next call. Even with these significant headwinds, we’re pleased with the results we reported this morning: an all-time high EBITDA of EUR1.3 billion and a group result above EUR500 million, close to the record level of 2018. More financial detail will come later from Matthias, who will also take you through our segments. Turning to our operational performance in 2024, I’m on Slide 4. The traffic figures show very clearly what I just described. Frankfurt is affected by external factors — everything I mentioned a moment ago — and it isn’t only Frankfurt, it’s Germany as a whole. So our recovery rate stands at 87%, an increase of plus 3.7%. We’re seeing better traffic performance in our international portfolio: the group airports outside Frankfurt have by now recovered fully to the 2019 level on average. That is even more impressive given the temporary closure of Porto Alegre Airport because of the heavy flooding in mines.

Stefan Schulte executive
#6

The main factor behind passenger growth across our whole group was the 120% increase in our investment. Properties did significantly better than 2019 and added a further 6% on top of the already elevated prior-year base. So that's a very strong trend, and we anticipate it carrying into this year — perhaps at a somewhat lower level, we'll have to see, but demand for Greece remains very, very positive. After the political unrest at the start of 2023, Lima Airport made up for the traffic it had lost during 2024. With 104%, passenger figures at Lima surpassed the 2019 benchmark, and we do expect 2025 to be another solid year of robust growth in Peru. Remaining in LatAm, Fraport Brasil, by contrast, showed mixed development, while Fortaleza posted passenger growth year on year. Porto Alegre was hit hard by the airport's temporary closure caused by the heavy flooding in May. In Q4, though, the airport reopened fully, and we do expect a few months to pass before the airlines restore their capacities.

Wizz Air Fleet unknown
#7

Turning to Slide 5, let's look ahead to the coming summer season in Frankfurt. Although high location costs remain a challenge and aircraft supply is still low, we anticipate a turning point in Frankfurt's traffic momentum. January and February of this year were still relatively weak at the start, but from March onward, and then further through the year, we expect to see some traffic momentum. The main driver of that traffic momentum will be Condor, our second biggest customer in Frankfurt. Since Lufthansa has altered the feeder agreement between the two carriers, Condor needs to strengthen its feeder networks of preliminary short haul routes. The chart shows the result of these changes. This summer, we expect traffic growth in the area of 4% to 5% seat capacity, mainly driven by Condor. Beyond Condor, EasyJet will also bring new capacities and traffic to Frankfurt. As you know, EasyJet is a remedy taker, and correspondingly with the Lufthansa ITA transaction, Lufthansa needs to support competition between Frankfurt and Italy and granted to daily services from Frankfurt to Rome and to daily services from Frankfurt to Milano Linate to EasyJet. As for Lufthansa, we don't expect the Pratt & Whitney engine issue to be solved this year, nor do we expect a positive effect on the potential certification of the Boeing Dreamliner this summer.

Wizz Air Fleet unknown
#8

With that said, the 4% to 5% capacity growth is largely achieved without Lufthansa. We do, though, anticipate Lufthansa returning to growth mode this winter — at the latest in summer 2026, when the fixing of the Pratt & Whitney engines concludes and the Dreamliners are finally fully in service. Now, turning back to our own homework on Slide number 6, we consider ourselves on track with our major expansion programs. Let me begin with the new terminal at Lima Airport. As you know, the opening of the new terminal was postponed yesterday. Exactly this night, we are working closely with the local authorities to clear the remaining steps and to determine a new opening date. We will provide you with an update shortly. To be precise, there is nothing wrong with the new terminal, which is almost 100% completed. So the new terminal is a very fine infrastructure with modern state-of-the-art retail outlets — the retail outlets are finished as well. It's a wide terminal with lots of space for passengers. And as mentioned with our Q3 publication already, our IR team will provide you a deep dive on the new terminal and walk you through the highlights after the terminal opening.

Wizz Air Fleet unknown
#9

All I can really tell you is that the issues behind this latest postponement appear to involve landside access matters that fall under state responsibility, and possibly also some civil disturbance we saw today following the killing of a singer in Lima — a singer in a region under a state of emergency. Once we have more detail on what is happening there, we will update you, since the terminal itself is completely finished and could begin operations right away. If, however, the opening ends up being pushed back by a few weeks, that call belongs to the Peruvian government. Turning to Antalya: across the last three years, the team has achieved enormous progress in delivering the investment required under the concession contract. Now, in the middle of April, we will inaugurate the new terminal — most likely around April 12th — and from that point we will have the ability to serve as many as 65 million passengers, a huge amount of capacity that will put Ontario among Europe's top 10 airports. Even with this substantial increase in capacity, last year will show that we were correct. As I said earlier, Antalya served roughly 38 million passengers, a record high. Notwithstanding that excellent outcome, the airport is still short by around 4 million to 5 million passengers from Russia and Ukraine relative to 2019.

Wizz Air Fleet unknown
#10

And naturally, everyone is hoping for peace in that region, and Antalya is currently in a very strong position, so we anticipate that traffic growth there will keep being solid. After Lima and Antalya, the terminal construction in Frankfurt is set to be finished during this year's second half — in October, in all likelihood. Through these three investments, our major CapEx program will be wrapped up this year, the one we kicked off with the groundbreaking ceremony in Frankfurt precisely 10 years earlier, so at some point after Easter 2026. Moving to Slide 7, our Frankfurt Airport. There, our real emphasis is on customer satisfaction, via projects like rolling out new CT security scanners in Terminal 1 and new automated check-in counters. Beyond that, we are pursuing AI initiatives aimed at raising the efficiency of our operational processes, with a clear emphasis on punctuality, and also at strengthening our financial performance. Several projects — for instance AI supported turnaround processes and the intelligent dispatching agent — are also well advanced and will be rolled out by the end of this year. It is fascinating to watch how AI can assist us in our daily business, and we are very much looking forward to putting it to use.

Wizz Air Fleet unknown
#11

Separately, we chose to halt certain standalone projects — for example, the security relocation at Terminal 1, Concourse B — following the review process. Even so, we will install CT scanners at Terminal 1, Concourse B on the East Side, which means processes there will also become considerably faster, delivering better customer satisfaction, and that is being achieved much sooner through the broader relocation of security lanes. In addition, we lengthened the planning phase for the Terminal 2 modernization in this way. As a result, we have clearly lowered near-term CapEx requirements over the next two years, we have a strong gain in free cash flow, and we will return free cash flow to a clearly positive three-digit million EU figure. We also made headway on tendering the new Terminals 3 retail areas, shown on Slide number 8. The good news is, first, that every retail slot has been awarded within a short span of time. As a result, we'll expand the Frankfurt retail areas as expected by roughly 12,000 square meters when Terminal 3 opens. The new marketplace in the Nanjing area sits at the heart of the Terminal 3 retail area. It has been laid out to fit all of our customers' needs, from kid stores to fine dining options.

Wizz Air Fleet unknown
#12

At the heart of the marketplace sits a really attractive bar, with plenty of places to sit, mingle, and take in the lively atmosphere, and we'll also have seating areas with an apron view. Alongside the new modern concepts, the central security lane positioned in front of the marketplace in particular will give our customers a better experience than they get in Terminal 2, where decentralized security checks are what we currently use in the Nanjing area. So what does this new retail offering mean for our financials? On Slide number nine, versus the present setup in Terminal 2, we expect retail revenues to rise by roughly 50% compared to Terminal 2 by 2027, the first full year in which Terminal 3 operates. Please bear in mind that Terminal 3 overall has the potential to bring in even more retail revenues. In 2027, we don't expect terminal capacities to be fully utilized, so Terminal 3 retail sales will keep growing over time. On the slide, you can see a rough split of the terminal capacity. Over the long run, Terminal 2 will return to operation and begin generating retail revenues once more, but Terminal 3 will also provide additional capacities on its modular peers — though that's quite long-term from today's perspective.

Wizz Air Fleet unknown
#13

On the transition phase next year, we're also keeping in mind that we expect Terminus 3 to open after the Easter holidays. So 2027 will be the first quarter with Terminal 3 fully operating, and airlines will be moved over from Terminal 2 in a staggered approach. Before we talk too much about 2026, let's take a look at what we expect for the current fiscal year 2025. I'm on my last slide. For Frankfurt passengers, we expect growth this year, but we'll stay below 64 million. In percentage terms, that's a growth rate below 4%. And that depends very much on the question of when which aircraft are coming in and whether they're adding capacity or replacing other aircraft. So it could be in a range between 2% to 3% maximum up to 4%, but more 2% to 3%. As discussed earlier, in particular, the phase-in of the new Boeing terminals Lufthansa remains a factor that we can't fully assess at the moment. In addition, we continue to be impacted by missing Pratt & Whitney engine aircraft. On financial performance, we're facing additional unknown parameters, in particular, the new collective labor agreement for the majority of our Frankfurt staff has not yet been agreed upon.

Wizz Air Fleet unknown
#14

Financially speaking, what we're discussing is a substantial cost item, close to EUR1 billion — a big cost bill of roughly EUR1 billion. So it matters whether we're looking at a 3%, 5%, or even 7% wage settlement, or perhaps an even larger figure as the unions are demanding; that's why we gave you a relatively wide guidance range and anticipate a moderate EBITDA increase in the single-digit percentage area. For the group results, we expect them to be flat to down this year. To be precise: last year we booked extra gains exceeding EUR40 million from selling our remaining shares in St. Petersburg. Those gains are nonrecurring. Once adjusted for the St. Petersburg divestment, our group result will be more flat this year. As Matthias will discuss shortly, the net debt to EBITDA ratio should improve thanks to the positive EBITDA outlook and stable net debt. On the dividend, at present we expect no dividend payment for the 2025 financial year to be distributed in 2027, and we want to focus on reducing our leverage first. That could only change if we faced a lot of headwind — really a lot of headwind — from positive governmental decisions on state costs such as <<inaudible>> aviation tax, and if a lot of new aircraft would come into service, but from today's point of view that's not very probable.

Wizz Air Fleet unknown
#15

So let's see if we get all of these headwinds, and then perhaps the picture shifts somewhat. That said, I want to thank you for your attention, and now over to Matthias with more on the financials.

Matthias Zieschang executive
#16

Absolutely. Thanks, Stefan, and hello everyone from my end as well. The opening chart in my presentation illustrates how passenger traffic at Frankfurt and group EBITDA have evolved over the long term. Slide 12 shows how things developed across the past year — that is, from 2014 through 2024. When we look at both the operational and the financial results, what becomes clear is that our financial metrics and our operational metrics have decoupled. Frankfurt passenger figures rose only modestly relative to 2014, yet group EBITDA posted a robust gain of 65% over 2014. That increase, of course, came largely from what we do beyond Frankfurt — namely our International Activity segment. Within it, most of the EBITDA growth stemmed from new investments such as Fraport Greece and Fraport Brazil, though airports already in our portfolio back in 2014, including Lima Airport and Ljubljana, also delivered organic earnings growth. At the same time, our Frankfurt operations likewise achieved an EBITDA increase versus 2014. Even with passenger volumes broadly flat, the aviation segment, for instance, delivered substantial EBITDA growth of almost 60%, or EUR137 million. So although Frankfurt Airport has not yet returned to its pre-COVID passenger levels, the group has made solid financial progress overall in recent years and today reached an all-time high operational result.

Matthias Zieschang executive
#17

Now to what I consider the key slide on today's agenda — our outlook for cash flow and net debt in '25. As we always do, we begin by treating our EBITDA guidance as a stand-in for operating cash flow, which means an inflow above EUR1.3 billion this year. From there, we subtract the CapEx of approximately EUR1.1 billion that we've discussed over the last couple of quarters. I'd point out that this figure is still weighed down by the big CapEx programs in Frankfurt and in Lima, both of which we'll complete this year. So our CapEx burden will clearly come down over the next couple of years. After CapEx, we take off a further EUR400 million for net cash interest payments and cash taxes. In addition, we anticipate fixed concession payments plus IFRS 16 lease payments totaling around EUR100 million. On the inflow side, we look for additional positive cash contributions from our associated companies and from movements in net working capital amounting, in aggregate, to over EUR100 million this year. Putting all of those individual pieces together gives us free cash flow for this year that lands very close to breakeven. One thing to keep in mind here: this figure excludes the EUR100 million of inflows from the daily stake divestment, which came in two weeks ago.

Matthias Zieschang executive
#18

Because of the free cash flow outlook, we expect group net debt to stay roughly flat versus last year's level. A look at cash flow and indebtedness over the past year appears on Slide number 14. Operating cash flow delivered a very strong performance. At EUR1.18 billion, operating cash flow rose by 37% versus the prior year. Sound operating development and good working capital management both drove the increase. All else equal, operating cash flow alone would have been enough to deliver strong positive free cash flow of EUR560 million, excluding the expansion CapEx in Frankfurt and Lima Airport. Once those heavy expansion works are included, free cash flow came in negative at minus EUR675 million, and therefore in line with what we expected for the year. Correspondingly, group net debt stood just under EUR8.4 billion, and our leverage ratio stayed at 6.4 times. Both indicators were in line with our guidance. Our current maturity profile appears on Slide number 15. Even with negative free cash flow, our liquidity position stayed at a high level of more than EUR3.9 billion, or EUR4.5 billion including unused project finance and committed credit lines.

Matthias Zieschang executive
#19

On the other side, gross debt came to EUR12.3 billion, a slight increase versus the third quarter results. The average cost of debt stayed unchanged at 3.2% in the second half of 2024. Going forward, we expect to refinance the majority of the Frankfurt maturities during this year. Beyond that, we will draw fully on the Lima project finance this year, given the terminal completion. Because of the higher cost of debt in Peru plus the Frankfurt refinance, we expect the average cost of debt to rise modestly this year, reaching a maximum level of 3.5%. Turning to our segment reporting, beginning with Aviation on Slide number 16. This segment delivered an overall strong earnings development, driven by the higher passenger number, but especially by the 9.5% increase in Aviation charges. Security revenues likewise rose by roughly 10%, although the offsetting cost was more or less the same amount. On the bottom line, the segment posted a strong EBITDA increase of more than 21%, reaching an all-time high of EUR374 million. Even with higher D&A stemming from the write down of the security relocation project, EBIT rose nicely to $203 million. Looking ahead, we expect continued headwinds from OpEx inflation this year.

Matthias Zieschang executive
#20

Price increases will also help drive segment earnings. As a result, we anticipate modest EBITDA and EBIT growth during the present financial year. Now turning to Slide number 17, our retail and real estate segment. Revenue rose by almost $40 million, reaching $537 million. Every business area — retail, real estate, and parking — added to the strong gain in segment revenues. Retail revenues per passenger came in at EUR3.35, which was also a solid result even with continuing closures on the land side at the Frankfurt terminal. Three main factors drove that healthy retail momentum: first, robust advertising revenues, helped along by the European Soccer Championship in June and July; second, a better passenger mix, thanks to the China recovery; and third, longer dwell time resulting from smooth, fast security processes. Parking and real estate revenues likewise posted nice growth, helped by price effects among other things. On the OPEC side, maintenance service costs on ongoing projects — including a refurbishment of the parking houses — came in above what we had initially expected. Because of that, segment EBITDA rose only slightly, to EUR375 million. Looking to the year ahead, we expect passenger volume growth in the retail and parking divisions to support revenue.

Matthias Zieschang executive
#21

When it comes to costs, we anticipate that the OpEx trend from the last financial year will carry on. Because of that, we look for segment EBITDA to stay roughly at the 2024 level, or perhaps a bit higher. Turning to our Ground Handling segment on Slide number 19. Q4 did not mark a turning point for this segment. With passenger numbers flat, revenue growth in the fourth quarter came entirely from price effects. In addition to the operational development and increased labor cost, we recorded an EUR8 million staff related provision aimed at cutting headcount in the subdivision of the segment. As a result, EBITDA in the fourth quarter was clearly negative and pushed the full year results under the prior year. Over the coming year, we have to restore financial stability. To that end, we have already increased the central infrastructure charges by close to 8% and will cut the number of external staff further. Consequently, we anticipate an improvement in segment EBITDA, yet still expect to stay in the negative area in fiscal year 2025. The main headwind for the segment continues to be a loss making Lufthansa contract, which we will need to renew open exploration within the next 12 to 24 months.

Matthias Zieschang executive
#22

Now turning to our last division, International Activities and Services, which is doing noticeably better. I'm on Slide 20 at this point. Once again, this International segment delivered solid momentum in underlying earnings. Even with Porto Alegre Airport having closed and then gradually reopened, both revenues and EBITDA posted strong growth on a full year basis. The main factors behind the revenue gain were the investments we made in Fraport Greece, Fraport USA and Lima airport. At the EBITDA level, we achieved very good results, especially when you bear the following effects in mind. During '23, Fraport USA booked compensation for the early termination of the Pittsburgh master lease concession totaling roughly EUR11 million. On top of that, Fraport Greece benefited from COVID compensations amounting to about EUR34 million in the year '23, whereas in '24 Fraport Greece recorded COVID compensation of only EUR28 million — a minus of EUR6 million versus the prior year. In addition, the closure of Porto Alegre Airport together with lower compensation payments resulted in a reduced EBITDA for Fraport Brasil of roughly EUR16 million. Going forward, we are confident that the International segment will keep growing this year as well and will further raise its EBITDA and EBIT. Ladies and gentlemen, allow me to summarize our disclosure today.

Matthias Zieschang executive
#23

Frankfurt and International both delivered solid earnings growth compared with last year. Even with the tough conditions, every group target we had set for the past year was met. Group EBITDA came in clearly above where it stood before COVID, even though traffic in Frankfurt is still well and substantially under 2019 levels. International airports will keep growing volumes in '25, and in Frankfurt we see positive momentum starting this month or at the end of this month. Our big CapEx programs are winding down, and we signed a major agreement on airport charges in Frankfurt that gives visibility on how our revenue side will develop over the next four years, or for the next four years. New CapEx projects have been either halted or pushed back. So we are continuing consistently on our path to turn around free cash flow. This year will mark a first big step, since we guide free cash flow at very close to breakeven or even breakeven — our breakeven target here excludes any extra gains from divestments. For next year, we are confident of achieving a clearly positive free cash flow. With that, ladies and gentlemen, thank you for your attention, and we can begin the Q&A session now.

Operator operator
#24

Ladies and gentlemen, we’re going to start the question-and-answer session now. <<operator_script>> Our first question is from Ruxandra Haradau-Doser at HSBC. Please go ahead.

Ruxandra Haradau-Döser analyst
#25

Good afternoon, and thanks so much for taking my questions. Matthias, it's great to hear you'll be staying on through 2028 — that makes a lot of sense for Fraport. My first question concerns retail. Are any retail contracts at Terminal 2 expiring this year? And do you expect that contract to be extended until T2 shuts down next year? Second, back in November you said CapEx would exceed EUR1.5 billion in '24. And on CapEx for FY'25, Matthias, I'm quoting you: we're working on a figure under EUR1.1 billion in group CapEx for 2025. CapEx in '24 came to EUR1.7 billion, and guidance for this year is EUR1.1 billion of CapEx, and investors today have plenty of questions about a possible overrun. So could you perhaps provide some detail on those higher numbers I referenced in November? Third, please could you bring us up to date on Piers G? Will it begin operations at the same time as the rest of T3? And have the retail spaces in Piers G already been leased? And my last question: the new EU Commission has held office for a few months now. Do you already have signals, Stefan, and what do you expect regarding the aviation priorities of the EU Commission over this legislative term?

Ruxandra Haradau-Döser analyst
#26

I appreciate it.

Matthias Zieschang executive
#27

Thanks for your questions. Let's begin with CapEx. What you said is absolutely correct — we guided EUR1.5 billion and ended up at EUR1.73 billion. So that is an overrun. The cause of the overrun was the EUR200 million that we always viewed as a risk related to T3. And as of today, we have to say that this overrun has materialized. So that is not good, but on the other hand, it is behind us now. So going forward, we do not anticipate any further cost overrun when it comes to T3. So everything is fine. We will open after the Easter holidays in 2026, and the remainder of the CapEx is in line with what was guided years ago. So that is behind us. Looking ahead, looking ahead means now in '25 — you mentioned it, we now guide EUR1.1 billion, and I said it will be below EUR1.1 billion. Let me put it this way: we have a discrepancy of perhaps EUR50 million, and you can believe us, or I think you are convinced that we are doing everything to end up with a number that is shortly below EUR1.1 billion. But at the end of the day, controlling the CapEx outflow really depends on what happens in the final two weeks of the year.

Matthias Zieschang executive
#28

Looking back at what took place in December '24, there was an outflow in a three-digit amount area. But ultimately, we need to determine whether it comes in at EUR1.1 billion or somewhat lower. Our goal is always to achieve a figure below EUR1.1 billion. Regarding all retail contracts — there was a question about retail contracts — they are not expiring. So everything has been awarded and will carry on in Terminal 1. Correct. Even I'm wrong.

Stefan Schulte executive
#29

Terminal 3. For Terminal 2, the retail contracts will be signed off at the close of the second quarter, since the airlines are going to shift from Terminal 2 over to Terminal 3 in a staggered way — likely in three or four waves — during the second quarter of next year. After that, Terminal 2 will cease operating. We've got arrangements in place with the concessionaires there. That poses no issue; there's no additional penalty or anything of that kind to pay, and every contract concerning Terminal 3 has been awarded, and they are getting ready to take it over by April next year at the latest. So that's the work underway on Terminal 3. As for Piers G, yes, we'll begin operations at the same time as Terminal 3, though it will mostly involve the check-in side, the land side. As things stand today, no operations on the piers themselves, because we have sufficient capacity at the first stage in Piers A — also known as Piers H — and Piers J. On the priorities concerning the EU Commission, carbon leakage remains the top priority. Many professional advisors are offering solutions to the EU Commission. Yesterday, I heard about a study from Ernst & Young that would be very helpful, and that's a top priority on our side.

Stefan Schulte executive
#30

One more priority, naturally, is the matter of how things proceed regarding the airport and airline package — covering ground handling, charges, and slots; those, I believe, are the 3 packages. Right now, the EU Commission is simply looking into whether it should open up those packages or not. We anticipate some further signal from the EU Commission, likely around summer or late summer, but from our standpoint these are the 2 top priorities.

Ruxandra Haradau-Döser analyst
#31

Thank you.

Stefan Schulte executive
#32

Thanks.

Operator operator
#33

And our next question is from Cristian Nedelcu at UBS. Go right ahead.

Cristian Nedelcu analyst
#34

Hello, and many thanks for taking my questions. First, could you provide some initial guidance regarding CapEx and free cash flow for 2026? Second, focusing on Fraport at Frankfurt, the midterm maintenance CapEx — so '26-'27 was approximately that midterm maintenance CapEx. Third, regarding when Terminal 3 will open, could you give us a ballpark figure for the incremental OpEx you'll incur from Terminal 3 compared with Terminal 2 across a full year of operation? And the last one, if I may, just on capital allocation, what's the pecking order over the midterm — deleveraging, dividend, acquisition? Any color on that? Thank you.

Matthias Zieschang executive
#35

On free cash flow — again, the goal this year: '25 is breakeven, and '26 delivers clear and significant positive free cash flow. The driver here is CapEx, since — let me put it this way — the EBITDA increase will be there, but it isn't a big step up. That's also clear given the current traffic momentum in Frankfurt. So looking now, assuming the 1.1, or as Ms. Haradau-Doser said perhaps 1.05 — we'll have to see at the end of the day. So that's a starting point for further considerations in '26. And you have to see that in '26 the second expansion phase of Lima is also over. So there's a further drop of the Lima CapEx, a significant drop, as well as a further drop regarding CapEx for T3, because we are going to open after Easter holidays in '26, and then, of course, we have a delay of some payments. But these are the two drivers determining the free cash flow generation in '26. The exact CapEx indication — it's too early, but let me say in the second half of this year, then we come for our guidance for '26 when we clearly see what will be the final outcome in 2025.

Matthias Zieschang executive
#36

On the long-term sustainable CapEx side, if you look at the figures in the presentation — I’m not sure which slide number it is where I show the bridge from net debt ’23 to net debt in ’24 — you have, let me say, a proven track record when you look at CapEx for Brazil and Greece. Across 16 airports, we’re spending EUR50 million on maintenance. That’s a good number. And when you look at the other CapEx, mostly Frankfurt, the EUR449 million — if you put it all together, we’re talking about $500 million, which is a good indication, also bearing in mind that within these $449 million we’re talking about investments in infrastructure in Frankfurt, and we’re also talking about investments in some investments in cars, equipment, et cetera. And when I mention equipment, this is also equipment for Terminal 3, such as office furniture, et cetera, IT equipment, which is more or less a one-off. So the CapEx for Germany we say <<foreign_lang>> but I don’t know the English translation. For equipment, it is at the moment higher than it will be in the future. So from today’s perspective, I would say the EUR500 million is a very conservative indication for all including maintenance CapEx for all group airports looking forward.

Matthias Zieschang executive
#37

And should you subtract the EUR1.2 billion for T3 as well as for Lima CapEx, using only the figures from '24 — as you can already see, that's robust free cash flow generation in a year when EBITDA sits at a level of EUR1.3 billion, which, as you know, is also our long-term target. So that, then, is the leverage needed to reach a free cash flow generation that comes in above what we would already have shown in '24 absent expansion CapEx.

Stefan Schulte executive
#38

There have been more questions about the extra operating costs at Terminal 3. Since we're now a year out from next year, Terminal 2 will still be open for at least half a year, and Terminal 3 needs to be ready already, because we already have to bring some staff on board now. Broadly speaking, across all segments, I'd put it at about 200 people we need to hire — for the fire brigade, for operations, for IT — and that doesn't mean we'll need those 200 people over the long term, but at least for the interim period; long-term it's probably 100 more people. On the other hand, we're getting very good results from tenders on the maintenance side, which we handle with outside companies. So yes, probably once we've opened the terminals, we can give you a better estimate of what the long-term aspects look like on the other side of the world, where we also have higher retail earnings. So there are some additional costs in for next year, that's correct. And we're hiring those people already now. On the other hand, that's already baked into the guidance we provided. So there's no major downturn. As for the long-term ratio — you asked about debt to equity — what's our focus?

Stefan Schulte executive
#39

If I understood your question right, then yes — right now our leverage sits at 160% net debt to equity. We've been quite explicit that we intend to reduce that. That's one piece of guidance. There isn't a single number, but we did give you the indication that over the long term, net debt to EBITDA ought to be closer to five; at present it stands at 6.4. On the other side, that also means net debt to equity should land in the range of, say, 80% to 120%. It hinges heavily on what macro conditions look like. One thing is certain for the coming years — and I'd say at minimum the next three, four years — there's no big appetite, no big appetite for external growth through external acquisitions. If anything at all, those would be smaller projects or structural projects. And as Matthias already said, we are very strict when it comes to CapEx and try to hold it down as much as we can.

Cristian Nedelcu analyst
#40

Thanks a lot. Sorry to jump in — before you reach that 80% to 120% debt-to-equity, will you be paying any dividends?

Stefan Schulte executive
#41

Yes, that’s a clear answer. Yes, we will. But we need to get much closer. Let me take that from the other direction. First, we must be free cash flow positive. And as I said earlier, the likelihood of paying in 2026 for 2025 is a low one, but it does exist, if there are a lot of tailwinds, so a lot of tailwinds for the business. There would be very good growth if we come out of this year with very good results. And if we see that the business is really moving, especially also in Frankfurt, the international business, I’m quite optimistic on, but especially on Frankfurt, that’s growth rates are really going up, that’s new aircrafts are coming in and are operated in addition and not just replacing the old ones, that’s a Lufthansa topic, then there could be that we even pay a dividend in ’26, but it would be a low dividend compared to the range of 40%, 60%, which is a normal one. For ’27 in ’27 for the year 2026, I’m absolutely convinced that we will pay a dividend, but that has to be decided at that time in two years from now. So we will have discussions on this.

Stefan Schulte executive
#42

We've already talked about this, and we'll see how the business performs this year. But we aren't holding out until we finally hit 5% or 100% or 120% or anything like that.

Operator operator
#43

Up next, we have a question from Elodie Rall at JPMorgan. The line is yours.

Elodie Rall analyst
#44

Hello, and good afternoon. Thank you for taking my questions. I have two. The first concerns the traffic outlook. You provided some detail on Lufthansa's capacity problems and also the restrictions the German government imposes through tax and regulation, which are damaging the aviation sector. So I wanted to ask, first, whether you are holding any discussions with anyone in the new government — though I realize things are still very much in flux there — and whether they take a more constructive stance toward aviation in Germany, and whether traffic in 2026 therefore looks more positive. And when do you believe you could return to the 2019 level? That is my first question. The second question concerns ground handling. Obviously, it was disappointing once more and is still expected to be negative in '25. Do you think it could turn positive starting in 2026? Thanks.

Stefan Schulte executive
#45

Thank you for your questions. Regarding Lufthansa's capacity issues, your question focused more on government relations. We are all united on this — whether it's Lufthansa, whether it's us, whether it's the German Association on airports, on airlines, or on aviation in general. We all share the same position, and we've had good discussions with the two parties who will probably form the next government, meaning the CDU and the SPD, and they all understand the issue. They understand that the tax — the aviation tax — plus the other components, especially on ATC, of course, the sharp increase there, that this is too high and that they would have to resolve it. So the signals are very good, but on the other hand, I also have to say, it's not signed, it's not a done deal. They are now in the coalition discussions and the coalition contract negotiations. So we have to stay on this topic, and we can give you an update then probably on the May call for the first quarter to see whether it's in the coalition contract, because there we have to get it in — that's most important. And it's not just because of Frankfurt Airport or because of Lufthansa, it's in general, also the competitiveness of the aviation market, Germany for the German export oriented companies and so on, because we are losing more and more direct connections into the world.

Stefan Schulte executive
#46

And that really matters a lot for German industry overall. So yes, I'm somewhat optimistic, and I'd put it at more than a 50% probability that I'd say yes, something will happen—but it's not guaranteed. That's completely clear. Right now we're 22% worse, or negative, versus other European markets in terms of recovery compared with 2019. So Frankfurt sits at 87%, while the German average is at 83%. As for getting back to the 2019 pre-Corona levels, that won't be feasible within one or two years, since we also have to manage that growth, which hopefully arrives by then, but reaching those levels will take at minimum three, four years. Still, I'm fairly optimistic that there's a chance if the German aviation tax is removed, if it's canceled, if we receive positive signals—and sorry to say it, but the greens are not certain, no longer a member of the next coalitions, which for us in this industry is positive. The SPD and the CDU are far more positive toward aviation, they recognize this point. So that's at least plenty of positive tailwinds. And it's a new aircraft—I mentioned the signals you also got from Lufthansa's press conference that they're coming at least on the 787.

Stefan Schulte executive
#47

A few of those moved to the second half. That is encouraging as well, and with luck we will push it over the line. So we do see certain encouraging indicators that point to a markedly stronger 2026 and '27, with faster growth rates. Regarding ground handling, right now our focus there is on productivity metrics. We are collaborating with the company on productivity matters, on programs and on projects, yet in ground handling above all, what matters most is the negotiation of the new contract with Lufthansa, and you will not see that reflected in the figures until 2027. All right.

Elodie Rall analyst
#48

Thanks a lot — that’s great.

Operator operator
#49

Following that, we’ll take the next question from Carlos Caburrasi at Kepler Cheuvreux. You have the floor.

Carlos Caburrasi analyst
#50

Hi, everyone. Thanks for the presentation and for taking my questions. I have two quick ones. First, I'm looking at the restructure investments program. Could you give us some indication of what CapEx per annum will be for the rest of the decade? And the second, which ties to the first, do you expect the lower near-term CapEx to have a meaningful impact on your 2030 free cash flow target? I'll leave it there. Thank you.

Stefan Schulte executive
#51

Like I said, there are two steps we're looking at going forward. For this year, 1.1, or perhaps even less in '26 — a number that's clearly lower than what we saw in '25. Then, during the back half of this year, we'll provide clearer guidance on precisely what CapEx will look like in '26. Looking ahead, you've got maintenance CapEx — I've already covered the EUR500 million figure at group level, and that's a solid indication covering all 30 assets we hold today. That, let me say, sets the long-term base CapEx. Right now we have no plans to pursue large acquisitions. I'd call this the best guidance available as of today regarding what happens in 2030. Honestly, giving you an exact guidance today for 2030 — that wouldn't be serious.

Carlos Caburrasi analyst
#52

Got it. Thanks.

Operator operator
#53

Our following question is from Andrew Lobbenberg at Barclays. You have the floor.

Andrew Lobbenberg analyst
#54

Quick question on Brazil: why has the ramp-up in Porto Alegre been so sluggish? January’s figures looked very weak, and capacity there seems to be moving quite slowly, while Florianopolis for the Swiss is still performing strongly. So why hasn’t traffic returned to Porto Alegre faster? Also, I recall that earlier last year you sounded very confident about receiving full compensation for the impact of the Porto Alegre closure, yet that still isn’t entirely clear to me. Is there additional compensation still to come during '25 related to the Porto Alegre closure in '24? And then my other question is about the ground handling market and the competitor: did Swissport finally get up and running? Are they operating smoothly? Previously you said that, given the challenges in the ground handling market—and notwithstanding the clearly uneconomic contract with Lufti from your standpoint—you were quite keen to hand contracts over to the competitor in order to reduce your exposure to ground handling. Has anything happened that has caused you to lose other contracts besides Lufti?

Stefan Schulte executive
#55

I'll begin with Porto Alegre. The signals coming from the market, and also from our product company in Brazil, are really encouraging regarding Porto Alegre, though it's still a bit slower — we're at the start now, at the beginning of this year, next month. That's simply because the airlines need to rebuild capacity and swap aircraft that are flying in from other destinations back to Porto Alegre. They have to promote those efforts, but they will come, and the signals we're aware of are very positive, even backed by the state of Rio Grande do Sul. So on that front I'm fairly optimistic. Full compensation — yes, we do receive full compensation; probably what we should have covered in more detail is that there were restructurings on faults that were already known in the infrastructure, EUR10 million, EUR15 million I believe that was the figure, which aren't caused by the flooding, which were known before and that we had to carry out, which we've now done within that large program together, and on which, naturally, we receive no compensation. But that was a smaller amount, and we obtained compensation of more than EUR80 million, I believe, something along those lines, I think that's the figure we invested, including those considerations.

Stefan Schulte executive
#56

We were aware this needed to be carried out across the coming years, and we have now done so—the whole program came to roughly EUR100 million, or EUR95, or thereabouts. When it comes to ground handling here in Frankfurt, handling it under a third license as a tenant was never our assignment at all, yet we cannot avoid it if a growing number of airlines wanted Fraport Ground Services to handle them. As a result, market share actually rose somewhat thanks to the subcontracting arrangement—something we would not have preferred to do this way, but that is how it stands for the remaining months and for the next month in this year. After that, we will have to watch how market share develops; increasing market share was not our assignment—it was an issue raised by the airline, which wanted Fraport, or Fraport Ground Services, to handle them on one side, while Swissport on the other side was unable to handle them. So it could be an interim arrangement, and we will have to see how things proceed from there.

Andrew Lobbenberg analyst
#57

All right, thank you.

Operator operator
#58

Dario Maglione from BNP Paribas has the next question. You have the floor.

Dario Maglione analyst
#59

Hi there. I have three questions for you. The first one concerns free cash flow for 2025. You said it would be near breakeven — just how near is that? My second question is about CapEx for Frankfurt. Earlier you noted that maintenance CapEx for the group sits at EUR500 million. I also believe you previously said that, specifically for Frankfurt, maintenance CapEx would come to roughly EUR350 million each year. Yet your 2025 guidance now puts it at EUR400 million. So my question is: what is the maintenance CapEx for Frankfurt specifically? And my final question is on ground handling. Broadly speaking, it has lost money for five years, and it will not reach breakeven at the EBITDA level next year. So why not exit this business, or divest it? Thank you.

Matthias Zieschang executive
#60

Let's begin with CapEx, and let's turn to Slide number 13, where you can also see the calculation metrics for '25. What's a given, and what are the variables? The net interest elements are a given, since gross debt is given, interest rates are given, and taxes are more or less given. So the minus EUR400 million is a given and isn't a variable. The IFRS 16 items are also given, as are fixed concession payments. So we have minus EUR400 million, which isn't variable, we have minus EUR100 million, which isn't variable, and also the inflow of dividends of about EUR100 million of cost depends on operational success or performance, but I think there's a very high probability that we're going to receive EUR100 million. So three elements on the picture aren't variable. What is variable? A little bit on the EBITDA side, depending on traffic, whether it's a little bit better and lower. Second, it's always extremely difficult to have a precise calculation of what the outflow for CapEx is. So EUR50 million plus or minus is always a natural, let me say, white noise, so to say, and can be a little bit higher and a little lower.

Matthias Zieschang executive
#61

Once more, the goal we've set is to land on a figure that sits under EUR1.1 billion. You'll also notice net working capital changes on the slide. That's not mainly hope. We already know certain items at this point — what are they — VAT refunds, et cetera, outside Germany. So we're aware that a few elements are working in our favor, which means net working capital turns positive, and we've factored that in. Still, you always see, on CapEx, plus or minus EUR50 million; on net working capital changes, plus or minus EUR30 million; and always on the final EBITDA number — which passenger numbers drive and generate — a degree of uncertainty. But as the picture shows, it's very close. At the end of the day, with some tailwind, it could even reach breakeven, which would be our favorite outcome, though it's also possible that we land in double-digit territory below breakeven. What matters, though, is looking ahead: we're extremely close to breakeven or will even touch it. And very important, in '26, the year after, we'll deliver positive free cash flow, as we guided already since years ago when looking ahead. On maintenance CapEx, again, as I told you and explained, the EUR500 million also covers CapEx for IT, for equipment, et cetera.

Matthias Zieschang executive
#62

There's always a certain amount of volatility underlying this figure. You can't claim that we're discussing 30 assets in our portfolio, and no one anywhere can state with the exact EUR483 million maintenance CapEx, since things always crop up overnight or other items fail to materialize or get pushed back. Yet in your metrics, in your calculation, in your excel sheets, if you use a EUR500 million figure looking forward, you have a very solid base number.

Stefan Schulte executive
#63

On ground handling, the key problem is the contract signed back in 2018 — I believe it was 2018 — a long-term agreement with Lufthansa and Lufthansa Group. It does contain certain price escalations, but those are quite modest, and then the growth after Corona and so forth shifted things: staff costs have risen far more sharply than the price uplift built into that contract, and that is the primary driver of the losses in this segment. Add to that a peak structure already exceeding the 2019 threshold — the 2019 traffic structure — so you get very pronounced peaks, which breeds some unproductivity, and on top of that come the issues we are all facing together: ATC capacity constraints in Europe — not in Germany, but across Europe generally, Germany included — produce significant delays caused by ATC, since many slots are regulated, and as a result the ground handling crews stay on the aircraft longer than they ought to. All of this combines into the situation we are locked into under this Lufthansa contract. Naturally, one could argue otherwise, but voicing such a thing now would be poorly timed. We have noted previously that we must enter into negotiations, because the Lufthansa contract expires in 2026, and we will begin that negotiation at some point within the coming 12 months, I am fairly confident.

Stefan Schulte executive
#64

And after that, you can consider the topic, but even at that point you should factor in — and this is why we are involved in ground handling. I'm not referring to that back share, but we are in the ground handling business since transfer passengers make up a very, very high proportion for us, much higher than at other airports. And we require strong stability in ground operations, and that is running extremely well. From a stabilization standpoint, that is absolutely fine. So ground handling no longer causes delays — that is not the problem. But our second key point is to bring out the financial spec, and for that we must hold some negotiations with Lufthansa, and after that we can take questions such as yours, but for the next two, three years that would not be a solution on that side.

Dario Maglione analyst
#65

Thanks.

Operator operator
#66

And our following question is from Christian Cohrs at Warburg Research. Go right ahead.

Christian Cohrs analyst
#67

Yes, hello there. Good afternoon, and thanks for taking my questions. I'm sorry to return to the ground handling topic, but when I look at your financial history, the performance of that division was subdued even prior to 2018. So is there any possibility, or do you foresee any possibility, of a lasting improvement that would let the Fraport asset earn a return above the WACC? As far as I can trace your financial record, that has never happened. And yes, are there any ways you could strengthen your pricing power in that particular business area? My second question concerns St. Petersburg. If I recall correctly, your investment there included an equity stake, but I believe you also extended some loans. So now that you have sold your stake, are those loans still outstanding? And is there any chance they could recover? Thank you.

Stefan Schulte executive
#68

Yes. Thanks for both of those questions, Christian. You're entirely right about ground handling — whether we exceed the WACC is, of course, an ambitious question. But even if Lufthansa is in that call, I don't know. I can be perfectly clear: our ambition is to write black numbers. And we are preparing for this, and that's not in question at all. We have to write black numbers. So we have to make a profit in ground handling, and that's not in question at all. And yes, if I sometimes get a signal — somebody asked me today that Lufthansa is on the way to preparing themselves for safe handling, fine, then they should do it. I'm absolutely fine with this. I can just tell you, we go for black numbers and we go for profit. And sorry, I understand that the top customer has to survive and so on. They have to do their business. We have to do our business. That's absolutely fine. And we bring very good quality. And so, yes, the negotiations will be difficult, but it's our responsibility to be prepared for those negotiations, and we will be prepared for these negotiations.

Matthias Zieschang executive
#69

Lufthansa isn't the only piece here — the segment also includes the central infrastructure, which accounts for 50% of revenues. And this year, we're raising prices by 7.8%, and there's headroom for '26 to do the same or perhaps slightly more. So this isn't, let's say, compensation for Lufthansa; it's one segment covering 50% of revenue, more than EUR300 million, with a price impact already this year of 7.8%. And next year, if it's, say, 9.5%, you can see we're talking about EUR30 million from price increases alone on 50% of the segment's total revenue.

Stefan Schulte executive
#70

To add a bit on ground handling: we have 90 airlines in Frankfurt, and with all the other 89 carriers — or yes, we do need to count Lufthansa as a group — but with every airline outside the Lufthansa Group, we actually secured very substantial price increases, since costs on the staffing side are running so high, and those increases with those airlines came in well above 10% — well above, considerably higher. And that is working, and they understand it. And I am quite confident that Lufthansa likewise understands the quality it receives and that it will pay for that. On St. Petersburg, everything on that side is sold — equity and loans. So nothing else was coming in. And the return on the St. Petersburg exposure has been a single-digit return CRG number, so roughly around 5%, 6% in total across the years.

Christian Cohrs analyst
#71

Alright, thanks.

Operator operator
#72

After that, the following question is from Marcin Wojtal at Bank of America. Go ahead, please.

Marcin Wojtal analyst
#73

Yes. Good afternoon, and thanks very much for taking my questions. If you don't mind, I have a couple of questions about Terminal 2. First, could you remind us where things stand right now on the upgrade and refurbishment of the Terminal? How much CapEx in total will be assigned to it? And just to clarify, when you referred to EUR500 million of group CapEx over the medium term, does that figure already include the refurbishment of Terminal 2? My second question: can you confirm that Terminal 2 will stay within your regulated asset base while the refurbishment is carried out? Thank you.

Matthias Zieschang executive
#74

To start with a straightforward response: T2 is going to remain part of the regulated asset base, since we will bring it back into operation down the road. Once T3 opens under a staggered approach and through all of our processes, then during the second half of '26, we will shut Terminal 2 on a temporary basis. We are entering a lengthy planning phase so that we can be very precise about what should be done across the full refurbishment of the Terminal. Time is on our side because we have this T3, which gives us more or less twice the capacity that Terminal 2 has. And we still have to determine when we will begin refurbishing Terminal 2. But looking ahead, we have plenty of time. Then, too, once the planning phase is done, we will have a precise figure for how much will be invested. That spending will be spread over, I would say, 10 years, up to 10 years. Of course, this will not be significant — though in some individual year, it can exceed the EUR500 million. That much is certain. But taken overall, it is not a number that alters this baseline.

Marcin Wojtal analyst
#75

Alright. Thanks.

Operator operator
#76

And then we'll take the next question from Jose Manuel Arroyas at Santander. Your line is open.

José Arroyas analyst
#77

Thanks. Good afternoon. I have 3 questions. Regarding Terminal 3, you mentioned earlier that there was always a certain danger of CapEx overrun, and that came to pass in 2024. Could you tell us what happened this year? And what makes you confident that nothing of that kind will occur in the years ahead? My second question concerns the Terminal 1 Concourse B project. I missed your explanation for why you halted it. Could you also tell us what Fraport loses by not having this project ready? And my last question is about Slide 9, where you provide guidance on the uplift to retail revenues that Terminal 3 will deliver. You mentioned EUR30 million of incremental revenues coming from Terminal 3 compared to Terminal 2. But on the slide, you mentioned that this figure also includes your expectation that traffic will be higher. Could you isolate that uplift assuming traffic stays constant? Thank you.

Stefan Schulte executive
#78

Okay, let me begin with Terminal 1 — and yes, your point is correct, and we did bring this up: we halted the security relocation, and it leaned more toward the land side, since that project carries a very high price tag. Completing it requires a number of years. What that would have meant is that in Terminal 1, across the coming period of at least 5 years, we'd have faced nonstop construction work. Given that, our view at present is that the payoff isn't large enough. Our emphasis should shift more toward CT scanners and the most efficient processes. That's the central item. A few other items exist around processes — how processes would have been altered and how lengthy the routes would have become, had we gone ahead and delivered this at this point. So our position is: no, we're giving this more time. That explains why, for the time being, we have put that Terminal 1 project on hold. Even so, we remain strongly focused on the customer, and that is why, within the current setup there, we will bring in CT scanners, with capacity that is far greater. Regarding Terminal 3, the primary factor is — yes, the cost overrun, which we already flagged and which Matthias referred to, will land more on the EUR200 million side. Yet every bit of CapEx has been completed, and every tender has been completed.

Stefan Schulte executive
#79

Like I said, the build phase is complete and all work on that front has wrapped up. At this point we're genuinely on the last tasks involving interior measurements, cabling and that sort of thing. Naturally, there may still be some minor speed-up items or similar. From a CapEx standpoint, though, there really shouldn't be any major issue left. On a project of this size, we never debate whether it's an extra EUR10 million or EUR20 million. Basically, we're finished there, and that's why we feel confident we know what the final figure will come to. On Terminal 2, and when it comes to Terminal 3, we don't disclose spend per passenger for each terminal. What we can say is that we have 50% more floors and certainly more square meters, and certainly more spend on Terminal 3 when I compare it directly with Terminal 2, but that doesn't really help you much, I realize, since we aren't providing any spend per passenger figure for Terminal 2, for Terminal 3, or for Terminal 1. I can only say that the placement of retail and gastro food and beverage is far better with a centralized marketplace in Terminal 3, and we anticipate a substantial upgrade uplift there as well on that spend, which will be smaller, of course, when viewed in total group numbers, but with the plus 50% we expect for Terminal 3 versus Terminal 3 across a full year in 2027, you'll also notice a rise in the average figure overall.

Operator operator
#80

After that, the following question is from Graham Hunt at Jefferies. Go right ahead.

Graham Hunt analyst
#81

Thanks. Actually, only one question from me. I'd like to return to the topic of the dividend. How are you viewing that as we look toward 2026 or 2027, whenever it ends up happening? I believe you mentioned the payout policy from a historical standpoint earlier. But with CapEx stepping down and free cash flow rising significantly, and if no dividend were paid in 2026, wouldn't there be room for a meaningful increase in the payout policy compared with what you've done in the past? I just wanted to hear your thinking on that for when you do begin paying a dividend. Thanks.

Matthias Zieschang executive
#82

What we indicated to you is that for 2025, we're expecting free cash flow breakeven, possibly a bit negative, but roughly around breakeven. So that means if a dividend were paid in 2026 for the full year 2025, it would be funded out of debt. That would mean that, if we did pay one at all, it would be a smaller dividend, not within the 40% to 60% range. And that hasn't been decided, and it hinges very much on whether we get a lot of tailwinds at that point. Whether we see genuinely new aircraft arriving, whether the aviation tax is removed, and whether we see business really picking up, also in Frankfurt, and in Germany overall being viewed much more positively than it is these days. If we begin paying in 2027 for the year 2026, my expectation would be that the dividend payment would fall within the range, the historical range, of 40% to 60%. But also, to be absolutely clear, that's ultimately a decision we have to make at that time, and it's made by the Supervisory Board and then ultimately by the annual meeting, but that would probably be our recommendation from today's point of view, let's see how the world looks then.

Graham Hunt analyst
#83

Alright, thank you.

Matthias Zieschang executive
#84

Appreciate it.

Operator operator
#85

Nicolas Mora from Morgan Stanley has the next question. Go ahead, please.

Nicolas Mora analyst
#86

Good afternoon, and thanks — I've just got two quick questions. First, you said you don't really expect much EBITDA growth as we go into 2026. That caught me a little off guard, since I believe you've already guided to roughly 4% traffic growth for that year. On top of that, there's the tariff increase, ground handling is improving, and you should get at least half a year of some uplift from retail. Is it fair to say higher costs absorb most of that? Is that the point you're flagging? That's my first question. Second, going back to the retail upside at Terminal 3 — like Jose Manuel, I'm somewhat taken aback. On earlier conference calls, I think you said T2 was about EUR2 per pax. What you're describing is a 50% increase on that, so EUR3 per pax of spending at T3, which is still under the average. That seems remarkably low. So I just wanted to ask whether you could shed a bit more light on that. Thank you.

Matthias Zieschang executive
#87

To start with, our guidance isn’t modest. We described it as a moderate single-digit rise. So there’s a great deal of fantasy about what it could be, and that really hinges on the tailwind we get from traffic. Still, single digits applied to EUR1.3 billion — the fantasy is large. That’s one side. On the other side, there’s an elephant in the room, so to speak: a variable beyond our control, namely a wage increase. Right now negotiations are underway with the unions, Verdi, concerning the <<inaudible>> — that wage agreement is entirely open, and the outcome is unknown to us. We are not the ones negotiating. Responsibility lies with the Ministry of Inner Affairs, working together with the federal states in Germany. Just to give you a figure: a 1% wage increase equals EUR10 million on our P&L. That’s what makes it so hard to hand you a precise guidance for the year '25. If you tell me the result of the wage increase, I will tell you exactly what our EBITDA result is. So is it 4%, 5%, 6%? Nobody knows. And again you see a variance of EUR 10 million for each 1% increase.

Matthias Zieschang executive
#88

So that's precisely why giving a precise outlook is so tough, and why we describe a single-digit increase as possibly high, possibly low, more or less, depending on passenger growth on one side — something we can't control in Frankfurt — and, second, on how the wage negotiations turn out. Right now, let me say, that's between Verdi on one side and the federal states and the Ministry of Inner Affairs on the other. And retail too — I think a 50% increase is the same story. We'll be telling you the increase will be 50%, and that's a good number, but nobody knows exactly. We have more space. We have nice restaurants. We have fantastic shops. But whether it's 50%, 60%, 40% or even 70%, we have to see. Still, I think it's a good indication, and there's no point promising a high number that at the end of the day we can't control — it comes down to spending behavior and whether passengers have deep pockets or not.

Nicolas Mora analyst
#89

Appreciate it. If I could just jump in — that EBITDA remark really applied more to 2026. I believe it was Matthias who suggested, when discussing breakeven free cash flow, that significant EBITDA growth wasn't anticipated in that year. So my question was simply, what were the offsets? Yes.

Stefan Schulte executive
#90

In 2026, that is the year when Terminal 2 ceases operations. Terminal 3 begins operations, and that extra cost, as I already said, stems from additional OpEx and so forth. And as Matthias mentioned, from what we saw yesterday regarding the wage agreement coming out of the negotiations, the employees — the Ministry put 5.5% on the table. I'm not sure if that applies over 12 months or over whatever period, and they were unable to reach agreement. So it's in a stalled situation. The outcome will therefore be above 5.5%, but ideally then covering a longer period. And in 2026, we'll feel the full impact of that. After that, it comes down to whether we achieve stronger traffic growth, yes or no. So the additional aircraft are then really in — is Pratt & Whitney getting that issue somewhat reduced. And these are the components that are a bit too early at the moment, which is why we said, yes, probably it's more moderate growth — whatever moderate means, I'm absolutely aligned with Matthias, whatever you discussed, between 2% to 5% counts as moderate to me. But 5% or 1.3% or 1.4% is already a lot.

Nicolas Mora analyst
#91

Okay, thanks.

Operator operator
#92

And we have a follow-up question coming from Cristian Nedelcu at UBS. Please go ahead.

Cristian Nedelcu analyst
#93

Thanks a lot for letting me jump in. On the remaining CapEx for Terminal 3, the table in your appendix is really useful. Could you remind us — you've already given guidance for '25, but could you share a bit on '26 and '27 as well, specifically what CapEx is still left there, just so we can confirm? Second, your annual report mentions a possible CapEx risk of EUR300 million tied to draining the runway in Frankfurt. I believe at one point you assign a probability of 25% to 50% that this could materialize. So if the water authority company were to trigger that CapEx, would it come on top of the EUR500 million run rate you mentioned earlier, or is it already baked into that run rate? Any additional detail would be helpful. Thank you.

Stefan Schulte executive
#94

I’ll start with the second answer, since that second question is really addressed first. That possible risk is something you’ll already see discussed in our annual report going back 5 to 10 years—and I’d say perhaps even longer than that. Yes, at times we do have to address some smaller problems. So EUR300 million is the gross total. If it were to occur, my best estimate is that it would play out across several years. That amount would therefore be part of that figure. It isn’t a one-off sum you’d have to spend within a single year. It would be a long-term investment, distributed across many years. So that isn’t a concern for you, but those risks do need to be mentioned by us. It could happen. That depends heavily on the conditions on the water and on all the winter fluids present—the water’s composition and so forth, de-icing and similar factors. Right now, things are improving. So the risk is certainly lower, but we’ll have to see what the coming winters bring.

Matthias Zieschang executive
#95

As for your question about additional outflows tied to Terminal 3, '25 — as you can see in the presentation — comes to roughly EUR400 million at most this year. Then in '26, the final figure is what it is in '25. As of today, though, I'd put it at around EUR250 million, with a very small amount left over in '27. When you add everything up, including what has accumulated from earlier, you land at EUR4.2 billion, EUR4.3 billion at the maximum. That matches the guidance we gave years ago: EUR4 billion plus a EUR200 million cost overrun, which at this point is a given. And we will land at exactly that, the EUR200 million cost overrun included.

Cristian Nedelcu analyst
#96

Much appreciated. Thanks.

Operator operator
#97

Ladies and gentlemen, that brings us to the final question. At this point, I'd like to hand the conference back to Christoph Nanke so he can offer any closing remarks.

Christoph Nanke executive
#98

Thanks, and I appreciate everyone joining and asking such thoughtful questions. On the Investor Relations side, we’re eager to keep the conversations going over the coming days and weeks—through calls, meetings, and conferences. Enjoy the rest of your day. And yes, I hope to see you soon. Bye.

Operator operator
#99

Ladies and gentlemen, that brings the conference to a close, so you’re free to disconnect. We appreciate your choosing Chorus Call, and thanks for taking part in the conference. At this point you can disconnect your lines. Goodbye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Fraport AG transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Fraport AG earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.