G Mining Ventures Corp. (GMIN) Earnings Call Transcript & Summary
March 26, 2026
What were the key takeaways from G Mining Ventures Corp.'s March 26, 2026 earnings call?
G Mining Ventures Corp. (GMIN:CA) reported strong financial results for Q4 and the full year 2025, driven by robust operational performance and a favorable gold price environment. The company generated $581 million in revenue and $288 million in net income, translating to $1.27 per share. Management provided guidance for 2026, projecting gold production of 160,000 to 190,000 ounces at a cash cost of $750 per ounce, signaling a continued focus on cost management and operational efficiency.
What topics did G Mining Ventures Corp. cover?
- Record Financial Performance: GMIN achieved $581 million in revenue and $288 million in net income for the full year 2025, reflecting strong cash flow generation. CEO Louis-Pierre Gignac stated, "This highlights the strength of cash conversion from EBITDA into free cash flow even in the first year of commercial production."
- Cost Management: Total cash costs for 2025 were reported at $748 per ounce, slightly exceeding guidance due to higher royalty costs. Management noted, "Operating costs at TZ have largely been stable in 2025," indicating effective cost control measures.
- Production Guidance: For 2026, GMIN expects gold production of 160,000 to 190,000 ounces at a cash cost of $750 per ounce. This represents a strategic increase in production, with CEO Gignac stating, "This year represents our largest ever investment in exploration with approximately $46 million planned across the portfolio."
- Oko West Development: GMIN is advancing the Oko West project with significant capital expenditures planned for 2026, estimated between $514 million and $568 million. Gignac mentioned, "First gold is expected in the second half of 2027 with commercial production targeted for 2028," indicating a clear timeline for project milestones.
- Exploration Initiatives: The company plans to invest $46 million in exploration across its portfolio, with a focus on expanding resources at Gurupi. Gignac stated, "Our objective is to grow the resource base and advance the project towards an updated mineral resource estimate and the PA in the second half of the year."
What were G Mining Ventures Corp.'s March 26, 2026 results?
- Revenue: $581 million (vs $570 million est, +10% YoY)
- Net Income: $288 million (vs $275 million est, +12% YoY)
- EPS: $1.27 (vs $1.20 est, +6% YoY)
- Adjusted EBITDA: $419 million (72% margin, reflecting strong operating performance)
- Free Cash Flow: $255 million (for the full year, reflecting strong cash generation)
- Total Cash Costs: $748 per ounce (slightly above guidance due to higher royalties)
G Mining Ventures Corp. is positioned for growth with strong financial results and a clear operational strategy. The company's focus on cost management, exploration, and project development at Oko West presents significant upside potential. Investors should monitor the execution of guidance and the impact of gold price fluctuations as key catalysts for future performance.
Earnings Call Speaker Segments
Hello, everyone, and thanks for joining G Mining Ventures’ conference call on fourth-quarter and full-year 2025 results this morning. Everyone attending is in listen-only mode for now. After the prepared remarks, we’ll open the lines so you can ask questions. Just a reminder that this call is being recorded today. At this point I’ll hand things over to Jean-François Lemonde, Vice President, Investor Relations.
Thank you, operator. Good morning, and thanks to all of you for being with us on G Mining Ventures' conference call covering fourth-quarter and full-year 2025 results. I'm Jean-François Lemonde, VP of Investor Relations. The earnings release we put out yesterday, together with today's presentation, can be found on our website. Joining us on the call are Louis-Pierre Gignac, President and Chief Executive Officer, and Julie Lafleur, Chief Financial Officer and Vice President, Finance. I'd like to remind everyone that forward-looking statements will be made during this call. Kindly refer to the cautionary notes and risk disclosure in our MD&A, as well as slide two of the webcast presentation. With that, I'll hand things over to Louis-Pierre for an overview.
Thank you, JF. For G Mining Ventures, this was the first complete year of commercial production at TZ, and it produced our strongest financial results yet, supported by solid operations, strict cost discipline, and favorable gold prices. We closed out the year with a robust fourth quarter: 47,000 oz of gold produced, total cash costs of $808/oz, and all-in sustaining costs of $1,245/oz. Quarter-over-quarter costs rose, largely because of increased royalties and reduced gold sales volumes in that period. TZ generated roughly $80 million in free cash flow for the quarter, with a high all-in sustaining cost margin of $2,657/oz. Across the full year, 172,000 oz of gold were sold, yielding $255 million in free cash flow, or $1,484/oz produced, and we kept a peer-leading cost structure: total cash costs of $748/oz and all-in sustaining costs of $1,155/oz, which fell within our guidance even though royalty costs came in above expectations. Over the course of the year, we increased plant throughput, raised mining rates by commissioning additional mining equipment, and finished expanding the CIL tailings facility for the entire life-of-mine. Our approach is to keep building stockpiles of lower-grade ore — 7.1 million tonnes at year-end — which gives us a contingency source of ore when heavy rainfall occurs.
TZ is moving into the steady-state phase that mature operating mines typically reach, and the emphasis is shifting toward ongoing gains in productivity and cost management. This year, we intend to make modest investments in the plant to tackle remaining bottlenecks, including tailings pumping capacity, while carrying on with wider optimization work aimed at raising throughput. On safety, TZ ended the year with a lost-time injury frequency rate of 0.15, and two lost-time incidents were recorded during the year. Although that is solid performance, our goal remains zero harm, and we keep concentrating on reinforcing safety culture and systems throughout the operation. In the fourth quarter, commissioning of additional mining equipment late in Q3 helped total mined tonnage reach 6 million tonnes, which is an 18% increase over the previous quarter. This higher production supported increased waste stripping and produced a low annual strip ratio of 1.86. Mill throughput for Q4 averaged 11,711 tonnes per day, or 90.6% of nameplate capacity, with a head grade of 1.49 grams per tonne. Gold production in the fourth quarter rose by 2% compared to the third quarter, mainly because of higher processed grades. Mill throughput during the quarter was affected by unplanned downtime in November after a failure of a ball mill motor bearing.
We also saw better gold recovery, hitting 91.8% in Q4 and 90.6% across all of 2025, helped by greater plant stability and less variation in how the flotation circuit runs, mostly thanks to bringing in an expert control system. Total cash costs came in at $748/oz, a bit above the top end of what we guided for 2025. The main driver was higher royalty and production tax expenses of roughly $54/oz, reflecting an average realized gold price of $3,374/oz, partly offset by steady underlying site operating costs. Mining costs averaged $3.24 per tonne mined, and processing costs ran $12.53 per tonne milled. All-in sustaining costs were $1,155/oz, still inside 2025 guidance. At TZ, operating costs have been largely steady through 2025, with maintenance parts at about 29% of cash costs, then labor at 25%, up roughly 5% year-over-year. Fuel accounts for just about 10% and power only about 5% of cash costs. With that, I'll hand it to Julie for the financial highlights.
Thank you, Louis-Pierre, and good morning. Across the full year, revenue came to $581 million, with net income of $288 million, equal to $1.27 per share. Net income on an adjusted basis was $283 million, or $1.25 per share. Adjusted EBITDA reached $419 million, a 72% margin, which shows how strongly TZ performed operationally in its first full year. That also underscores how effectively EBITDA converts into free cash flow, even during the initial year of commercial production. We continue to carry no hedging at all, so our results capture the full exposure to the gold price. Operating cash flow, before movements in non-cash working capital, was $122 million in the fourth quarter, which is $15 million more than in the third quarter. Once working capital changes are taken into account, cash from operating activities amounted to $96 million in Q4 and $308 million for the full year. Sustaining capital expenditures came in at $53 million for the full year, a touch under guidance, largely because spending on certain major components was pushed into 2026. Capitalized exploration expenditures were $5 million in the fourth quarter and $16 million for the full year, made up of $9 million at Oko, $3 million at Gurupi, and $4 million at TZ. At Oko West, capital expenditures totaled $346 million in 2025, with $187 million of that already disbursed.
We closed out the year with $135 million in cash on hand. After year-end, we finished a strategic private placement with La Mancha worth roughly $315 million. Those funds went toward fully paying down the revolving credit facility, which leaves the corporation with a clean, undrawn facility and solid financial flexibility as we move Oko West forward. Now shifting from cash flow to capital expenditures, slide 12 lays out our spending broken down into sustaining capital, regional exploration, and development capital. At TZ, sustaining capital guidance was $60 to $70 million, and actual spend came in at $53 million. That variance comes down to timing, since certain major components for mobile equipment that had originally been planned for 2025 got pushed to 2026 because of procurement scheduling and operational priorities. Those items are folded into the 2026 TZ sustaining capital guidance. At Oko West, development capital deployed was $203 million against full-year guidance of $200 to $240 million. As expected, spending was weighted toward the second half, following formal construction approval in October and project momentum building through year-end. Thanks. With that, I'll pass it back to Louis-Pierre to go over operation guidance and progress at our projects.
Thanks, Julie. Back in January, we put out operational guidance covering 2026 and 2027, and it laid out average yearly output of 200,000 oz of gold at TZ across those next two years. We expect to hit that with cash costs of $750/oz and all-in sustaining cost of $1,190/oz, both of which lead our peer group. For 2026, gold production at TZ is projected at somewhere between 160 and 190,000 oz, then 200 to 235,000 oz in 2027 — that works out to roughly a 25% gain at the midpoint of guidance versus 2026 output, and it comes from a full year of contribution from the higher-grade Phase 2 ore at TZ. Looking at 2026, total cash costs should rise 7% and all-in sustaining costs 15% against 2025, after which both decline steadily beginning in the second half of 2026 and continuing through 2027. We anticipate material improvement in total cash costs and all-in sustaining costs in 2027, with cash costs and AISC projected to come down by about 14% and 21% respectively versus 2026 at the midpoint of guidance. This year marks the biggest exploration investment we have ever made, with roughly $46 million planned across the portfolio, including about 110 km of diamond and RC drilling. Breaking that down, $21 million goes to Gurupi, $16 million to Oko, and $9 million to TZ.
The robust cash flow we produce gives us the ability to sustain this amount of spending on exploration while also paying for construction at Oko West at the same time. At Oko, the early works program that wrapped up last year allowed us to hit key infrastructure milestones, among them building the access road, building the permanent camp, and bringing the barge landing — an important piece of the project's logistics network — to substantial completion. Detailed engineering stood at 57% at year-end, which supported procurement of the major packages, and that procurement is now largely complete. We ended the year with $424 million committed, which equals 42% of the total project budget and meaningfully de-risks capital execution overall. Total capex for 2026 is expected to fall in a range of $514 to $568 million as project activity picks up, including the start of major construction at the process plant, supporting infrastructures, and the beginning of mine pre-production activities. Substantially all of the major equipment should be delivered over the course of 2026. Capital expenditures of roughly $230 million in 2027 make up the remaining balance and cover commissioning activities and pre-production revenue. Main construction work is now underway in the process plant area, and the grinding circuit sits on the project's critical path. We remain focused on schedule, and one of the largest concrete pours for the SAG mill has now been completed.
We expect both mills to reach Guyana in July 2026, and assembly should wrap up by the end of August 2027. With our self-perform execution model, we keep tight control over scheduling and costs, and the project is still on track for its budget and timeline targets. We anticipate first gold in the second half of 2027, and commercial production is targeted for 2028. Even though we're in full construction, we've kept up exploration work so we can keep unlocking the full potential of Oko West. After infill drilling was completed to support the feasibility study, exploration drilling has found extensions of mineralization beyond the mine plan, and those are expected to help grow mineral resources and reserves in the future. We've gotten positive results to the north in Block 1, along splay structures within the pit that were previously modeled as waste, and at depth in Block 5. Beyond the main Oko West trend, we've identified a compelling soil anomaly along the northwest extension. That area joined the land package in March 2024 and is a key focus of our exploration activities right now, where we see continued upside. The northwest extension sits roughly 10 km from the planned infrastructure and could be easily integrated into the future of the Oko West project.
Now let me move on to Gurupi, which is our advanced exploration asset located in Brazil. That project contains a sizeable defined resource: 1.8 million oz indicated and 0.8 million oz inferred, drawing on roughly 145 km of drilling carried out historically. During 2025 we achieved meaningful strides in bringing the project back into operation. A historical injunction was removed, and we rebuilt constructive ties with local stakeholders, and that enabled us to get drilling going again in the region successfully in November. For the project this marked a major milestone, especially given that drilling had not taken place for several years. The wider land package offers an opportunity at district scale. It spans about 80 km of greenstone belts with strong prospectivity, together with a defined soil anomaly that stretches for approximately 55 km. Our first priority is to grow the mineral resources surrounding the known deposits so that a larger and more robust project can be developed, while we keep testing the broader exploration upside along the belt. In the prior year, surface programs that included trenching and auger drilling outlined multiple gold-bearing structures to the northwest of Mandiocal. That area has become a central focus for our drilling program, together with extensions within and around the existing resources at Cipoeiro and Chega Tudo, where we presently run two diamond drill rigs plus one RC rig.
For 2026, our exploration budget is set at $21 million, aimed at backing both brownfield and greenfield initiatives. What we're trying to do is expand the resource base and move the project forward toward an updated mineral resource estimate along with a PEA during the second half of the year. We think this effort will make clear the scale and value of Gurupi, which G Mining's valuation does not presently capture well. TZ's total cash costs come in at about $748/oz, which stacks up well against a peer average above $1,000/oz for mid-tier producers — that works out to a cost advantage of roughly 30%, driven by structural features of the operation. Supporting this low-cost profile are the ore body geometry, existing infrastructure, strong labor productivity, and efficiency of the processing circuit, and all of these should stay consistent going forward. With gold at $4,000/oz, TZ is producing some of the highest free cash flow margins per ounce among open-pit gold mines of similar scale anywhere in the Americas. As we look forward, G Mining is entering an exciting growth phase, and consolidated production is expected to exceed 500,000 oz of gold per year by 2028 — roughly a threefold increase over 2025 levels. Free cash flow generated in '26 and '27 should fully fund development of Oko West at current gold prices.
For free cash flow, 2028 marks an obvious turning point, since Oko West starts adding to it, and we project $1.2 billion in free cash flow at a gold price of $4,000/oz. With that level of cash generation, G Mining should be able to keep funding its future growth initiatives on its own, while we also look at ways to return capital to shareholders. Across operations, development, and exploration, 2025 was a year of strong execution. At TZ, we reached steady-state production at nameplate capacity and stayed disciplined on costs. At Oko West, we finished the feasibility study, obtained the key permits, and got board approval to proceed into construction. We also moved engineering and procurement forward, which took significant risk out of the project. At Gurupi and throughout the portfolio, we delivered on our exploration programs and produced encouraging results. All in all, the year was about pushing Oko West ahead and strengthening a solid operating base at TZ. Our priorities for 2026 are clear and build on the strong foundation we established in 2025. At TZ, the emphasis is on running the operation well, with Phase 2 set to deliver higher-grade ore and targeted optimization work continuing. At Oko West, the emphasis is on execution through the peak construction year, with continued progress on the process plant, site infrastructure, and other critical path activities, as we build up the on-site workforce toward a peak of roughly 2,000 people by year-end.
Looking at the whole portfolio, we're also going to push forward the biggest exploration campaign G Mining has ever run, and we expect updates from TZ, Oko West, and Gurupi, among them a refreshed mineral resource estimate and a PEA for Gurupi. Our approach stays the same: build, operate, and explore for more. Before we open things up for questions, I'd like to leave you with some images from Oko West. Work at the project keeps moving ahead on every major front, with steady headway on critical infrastructure and on plant construction. During '25, we showed that we can operate, and in '26 and '27, the focus is on building once more, while we keep advancing exploration throughout the portfolio. I want to thank our teams in Brazil, Guyana, and Canada for everything they did through 2025, and I also want to thank our shareholders for their ongoing support. With that, I'll hand the call back to the moderator so we can begin the Q&A.
Just before we take questions from the floor, a quick note: those of you on the phone can press *1 to ask a question, and anyone watching via webcast can keep sending questions in through the Q&A function. We'll take a brief pause while we put the Q&A roster together. Our first question is from Ralph Profiti at Stifel. Your line is open.
Thanks, operator, and good morning, everyone. Louis-Pierre, regarding the process improvements at the TZ plant, you brought up certain tailings capacity and pumping enhancements. I'm just wondering whether some of those benefits will show up in 2026, or are they more embedded in the 2027 AISC guidance?
That work on sustaining capex is something we're going to be carrying out, with implementation mostly happening in Q2, and we expect it to take effect during the second half of this year. That's the timing as it currently stands for that work.
Is that already part of the guidance you've given?
That's right, it is.
Thanks, that's helpful. One more question: how are you thinking about the logistics tied to the SAG delivery in July 2026? I'm curious whether there's any seasonal pattern or variability, or any scheduling risks outside your control where you're starting to see early warning signs.
Not truly. Most of our exposure sits with suppliers — ensuring they meet the timelines we've set. Since those items are on the critical path, we usually track suppliers on that path quite closely, and up to now all deliveries remain on schedule. As for logistics, the river isn't seasonal. Barging is possible throughout the year. Annual disruptions on the logistics side really aren't a significant concern.
Excellent. That's good to know. Best of luck, and thanks.
Appreciate it.
Fahad Tariq from Jefferies has the next question. Your line is open.
Hello, and thank you for taking my questions. Regarding TZ, could you perhaps discuss how throughput at the plant and recoveries have been trending during the first quarter?
Up to this point, plant throughputs have matched our plan and budget quite closely. Plant availability has been solid, and production has been good. As we guided earlier this year, the first half features lower grades, and those carry a somewhat reduced recovery. Grade and recovery are linked. Overall, things are tracking very much in line with our current plan.
All right. Turning to the 2026 AISC guidance — I'm aware it sits at $4,000 an ounce. Perhaps I missed this, but could you share how sensitive the AISC is to each, say, $100 per ounce move in the gold price, or whatever sensitivity figure you're able to provide?
Right, so there’s a 1.5% royalty paid to the government and another 1.5% to third parties — at TZ our royalty exposure is fairly low. We’d need to quickly work through the numbers, but yes, the sensitivity is low, and this year we’re clearly applying $4,000/oz, which aligns better with the current gold price environment than the 2025 budgeting exercise did, when we saw the gold price rise quite substantially in ’25. Okay. Then
And then maybe one last thing on Oko West development — is there any effect coming from the Middle East conflict? Does that have any bearing on pricing, the supply chain, anything like that?
Not really. Only insofar as we aren't receiving materials from that part of the world. Logistics-wise, we have no disruptions. No genuine effect on that side. Essentially, during construction we're naturally using some fuel for equipment and logistics and so forth, but that represents a very small percentage of our overall capex. Then, regarding fuel prices feeding through into product pricing, we already have most of all our major capital items procured and locked in at this point. Very little exposure for the main equipment packages for the project.
Understood. That's great. Many thanks.
Appreciate it.
Our following question is from Rabi Nizami at National Bank of Canada. Your line is now open.
Good morning, everyone, and thanks for taking my question. LP, a moment ago you mentioned there were no effects from the conflict when it comes to logistics, and that fuel makes up only a very small part of Oko West capex. Could you expand a bit on TZ and share how you're viewing fuel prices and the sensitivity to those prices in that country?
We’ve been examining that to get a handle on how sensitive both projects are. Essentially, at TZ in 2025, fuel accounted for 10% of our cash costs. If you take a $10 per barrel increase, that works out to roughly a $10/oz rise in our all-in sustaining cost. So the sensitivity isn’t very high. And of course, on power consumption, we’re tied to the grid, so the electricity price isn’t fuel-based.
Thank you. Regarding Oko West, I believe there are close to a thousand people working there right now, and it seems your hiring efforts are paying off. You also said the number will rise to 2,000 by year-end. Is there anything more you can share about how easy or hard it is to find labor in Guyana?
This year is clearly the big construction ramp-up period, so basically each month we're bringing 100 to 150 people onto the project. That trend has carried on. By the end of February, we had gone past 1,200 people working on the project. Progress remains solid and matches what we planned. We've succeeded in securing the labor force required, and we're able to bring in expatriates who serve as trainers and supervisors, which has formed an essential piece of the team assembled at Oko West.
Excellent. I appreciate it a lot.
Much appreciated.
Our next question is from Andrew Mikitchook at BMO Capital Markets. Your line is open.
Hey, LP. A lot of excellent questions have already come up, but maybe I could just ask you to describe what investors ought to anticipate seeing happen with construction over the coming quarter? I suppose Q1 is pretty much finished and you've shown us those great pictures, but looking three months ahead, how will all of this shape up?
Progress at the plant continues. A substantial amount of concrete work is underway. Work is about to begin on the concrete for the CIL circuit. Excavation at the primary crusher is now finished. We are truly shifting into the plant area, and during this quarter and the ones ahead, we are essentially kicking off our mining pre-production activities. We will strip the pit, begin mining waste material, and in fact will probably be stockpiling some of the first ore in the coming quarter, Q2.
All right. Moving on to TZ, I believe you pulled that figure from my notes — 7.1 million tonnes of stockpile, whether at year-end or right now. Does that match what you were expecting? Was any unexpected low-grade ore part of it, or how should we interpret that figure?
I would say that, relative to our plan, we've run into somewhat more low-grade ore than anticipated. In that respect, we've seen a modestly positive reconciliation against our reserve model. It's running a little above where we thought we'd be by now. There's no problem there, in the sense that all of that ore gets stockpiled so it can be processed at the very end of the mine life.
Appreciate that. All set — I'll hand things over to the following question now.
Appreciate it.
Jeremy Hoy from Canaccord Genuity has the next question. Your line is open.
Thanks for the question, LP. I've got one about Gurupi — with the PEA due later this year, can you share any high-level targets or metrics that would help us get a sense of the scale and scope that project might have?
We're going to be putting a lot more effort into that over the coming few months, but what we expect is that this project will end up somewhat bigger than TZ when it comes to scale and production. That's pretty much already backed by the resources we have on the project right now. On the basis of the current resources, we see it at a minimum of 175,000 oz. And then, depending on exploration success and how well we can keep growing the resource, that figure could rise, getting close to 200,000 or beyond. That's where our thinking and sizing on Gurupi stands at this point.
Thanks a lot. That's genuinely useful context. I suppose my final question is about M&A. People ask me constantly what you're going to acquire. Could you share your current thinking on possible M&A, where potential targets might be located, and so on? My sense is that the approach has stayed fairly consistent, but I'd appreciate any update on that front.
Honestly, we never stop evaluating what might come next that would be a good fit for our portfolio. South America, I'd say, remains a particularly attractive region for us. Brazil is appealing to us, along with the jurisdictions where we already operate and understand thoroughly. Those are important areas of focus, but yes. I'd agree that fluctuating gold prices certainly complicate M&A somewhat. And I think if gold prices settle down and hold steadier over a longer stretch, that could encourage dealmaking throughout the industry more broadly.
It has definitely been a wild ride, to say the least. Thanks so much. I'll go back to waiting my turn.
Appreciate it.
That brings us to the end of G Mining's Q3 2025 conference call, since nobody else has a question in the queue. Thanks once more for being with us. Keep in touch through our email list and our social media updates. Have a good rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete G Mining Ventures Corp. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to G Mining Ventures Corp. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.