Home / Transcripts / GDS Holdings Limited (GDS) · March 17, 2026

GDS Holdings Limited (GDS) Earnings Call Transcript

March 17, 2026

NASDAQ US Information Technology IT Services earnings 44 min

Earnings Call Speaker Segments

Laura Chen executive
#1

Thanks. Hi, everybody, and welcome to the earnings conference call for GDS Holdings Limited covering the fourth quarter and the full year 2025. Earlier today, the company's results went out through Newswire services, and they're available online. There's a summary presentation we'll be referencing during this call, and you can view or download it from our IR website, investors.gdservices.com. Mr. William Huang, GDS Founder, Chairman and CEO, is leading today's call, and he'll give an overview of our business strategy and performance. After that, Mr. Dan Newman, GDS CFO, will review the financial and operating results. Before we go further, please be aware that today's discussion will include forward-looking statements made under the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements carry inherent risks and uncertainties. Because of that, the company's results could differ materially from the views expressed today. Additional information about these and other risks and uncertainties appears in the company's prospectus as filed with the U.S. SEC. The company assumes no obligation to update any forward-looking statements, except as required under applicable law. Please also be aware that GDS earnings press release and this conference call include discussions of unaudited GAAP financial information as well as unaudited non-GAAP financial measures. GDS press release contains a reconciliation of the unaudited non-GAAP measures to the unaudited most directly comparable GAAP measures. I'll now hand the call over to GDS Founder, Chairman and CEO, William Huang. Please go ahead, William.

William Huang executive
#2

Thanks. Good day, everyone. William here. I appreciate you all taking part in the call today. Where performance is concerned, 2025 proved to be an excellent year for GDS. Revenue and adjusted EBITDA each grew by 11%. We surpassed the upper bound of the guidance we had given for adjusted EBITDA. And thanks to what asset monetization contributed, our free cash flow came in positive. In China, AI has genuinely accelerated. Greater availability of high-performance chips made domestically is an essential enabler. Every one of our major customers is putting money into hyperscale computing infrastructure as a way to support AI adoption. Consequently, we observe a strong rebound in demand for data centers, in newly entered markets as well as those already established. Being a data center company is thrilling once more. To capture this opportunity, we are scaling up both our resources and our funding. Where resources are concerned, we are developing a pipeline of 3 gigawatts made up of large clusters in new growth markets. That will supplement the 700 megawatts of powered land that we keep on hand for development later in established low-latency markets. On the funding front, we have grown our cash reserves past USD 2.8 billion, which includes money from the recent sell-down of our DayOne stake along with the new CPS issue. On top of that, having successfully opened up channels for asset monetization last year gives us an edge when it comes to obtaining equity onshore. In 4Q '25, gross additional area utilization that was utilized came to roughly 23,000 square meters. Across the whole year, gross move-in exceeded 86,000 square meters — the highest figure we have ever reached. Our move-in goal for 2026 is comparable to what we saw last year. That said, since our bookings rise over the course of this year, move-in will be higher 1 year out. In 4Q '25, gross additional area committed came to more than 21,000 square meters. For the entire year, new bookings exceeded 96,000 square meters, or more than 300 megawatts — 3x what the previous 3 years delivered. During 2026, we are targeting over 500 megawatts in gross new bookings, which is yet another significant jump beyond last year. We anticipate that 60% to 70% of new business will originate from AI. Thus far in the current year, we have already locked in 200 megawatts of fresh orders, along with more than 500 megawatts of MOUs, which serve as a solid signal of commitments to come. This 700 megawatts of overall demand stems primarily from 3 of our biggest customers. It is a strong beginning toward the sales goal we set for the full year. Now that domestic chip supply is more predictable, we are acting quickly to lock down multi-gigawatts of extra powered land in new markets capable of supporting large cluster deployments. Our attention is on the 3 locations: Horinger in Inner Mongolia, Zhongwei in Ningxia province and Shaoguan in Guangdong province. For these locations, we have already obtained more than 400 megawatts of new orders and MOUs. These new growth markets — every one an official national hub — mesh nicely with the platform we already have, letting us meet the varied needs of our diversified customer base. We're genuinely enthusiastic about the possibilities ahead, and we anticipate expanding alongside the advancement of AI in China. At this point, I'll hand things over to Dan for the review of financials and operations.

Dan Newman executive
#3

Thanks, William. Moving to Slide 17 now. For FY '25, our revenue and adjusted EBITDA both rose 10.8% compared with the prior year. Over the course of that year, we closed 2 asset monetization deals — an ABS in 1Q '25 and the C-REIT IPO in 3Q '25 — and after that we deconsolidated the data center project companies underneath them. Adding back the revenue and EBITDA from those deconsolidated entities, the pro forma growth rates come to 13.2% for revenue and 14.2% for adjusted EBITDA. Now on Slide 20. Our MSR per square meter has kept coming down, driven by a mix of a lower market selling price and a shift in location mix toward more edge of town sites and, going forward, new growth markets. If you compare 4Q '25 against 4Q '24, the drop was 2.4%. We've likewise seen a similar decline in unit development costs. Because of that, the overall yield on our portfolio — measured as adjusted gross profit divided by gross PP&E, excluding construction in progress — has held steady at roughly 11%. Looking ahead, we anticipate a further MSR reduction of 3% to 4% by the end of 2026, from that same mix of factors. That said, the yield on our new investments, in both established and new markets, is still running in the 10% to 11% range. Now to Slide 23. In 2025, organic CapEx came to RMB 4.7 billion, consistent with our guidance. After netting off RMB 2.3 billion in cash proceeds from asset monetization, our CapEx stood at about RMB 2.4 billion. As Slide 24 shows, operating cash flow for the full year was roughly RMB 3.4 billion. That big year-on-year improvement was aided by AR days falling from 109 in 4Q '24 to 82 days in 4Q '25, thanks to our tight control of collections. Once asset monetization proceeds are taken into account, we generated positive cash flow prefinancing of RMB 1 billion. For 2026, we're guiding to organic CapEx of approximately RMB 9 billion, which lines up with our 500-megawatt plus sales target. This year's CapEx will feed next year's growth. We've begun work on a follow-on asset injection into our C-REIT. We've picked an asset that's bigger than the seed asset used for the IPO. Our aim is to finish the asset injection in the second half of 2026, if possible. That said, we haven't baked any assumed proceeds into our CapEx guidance. Now on Slide 25. In the first quarter of 2026, we raised $385 million by partially selling down our stake in DayOne. Following that sell-down, what remains of our stake is worth $2.2 billion, or $11 per GDS ADS benchmarked to DayOne's Series C new issue price. We also issued $300 million of convertible preferred shares to Huatai Capital Investment. So as a result, we're now sitting on close to RMB 20 billion, or $2.8 billion, in cash. That's an ideal position to be in as we get ready for a new growth phase. Over to Slide 26 and 27. Taking our net debt against the annualized adjusted EBITDA from the prior quarter, that figure moved down from 6.8x at the close of 2024 to 5.8x at the close of 2025. What drove that decline was largely three things working together: positive cash flow prefinancing, the removal of project company debt from our books through deconsolidation following the sales to the ABS and C-REIT, and money raised through the equity capital raise we completed in 2Q '25. When we add back the time deposit purchases — which show up inside our reported investment cash flow — along with the capital recycling proceeds and the new issue in 1Q '26, the net debt-to-EBITDA ratio comes down to 4.8x. Back at the start of 2023, we established a goal of reaching positive cash flow prefinancing along with a net debt-to-EBITDA under 5x inside 3 years. In hindsight, that goal was aggressive, yet I'm happy to report we hit it. Now moving to Slide 29. During FY '25, we landed at the midpoint of our revenue guidance while exceeding the top end of our adjusted EBITDA guidance. Looking at 2026, total revenues should land somewhere between RMB 12.4 billion and RMB 12.9 billion, which works out to a year-on-year rise of roughly 8.5% to 12.8%. On adjusted EBITDA, our expectation sits between RMB 5.75 billion and RMB 6 billion, translating to a year-on-year rise of roughly 6.4% to 11%. Because of the asset monetizations that took place during 2025, those year-on-year growth rates can't be compared directly. Adding back the forecast revenue and adjusted EBITDA tied to the data center project companies sold to the ABS and C-REIT, the implied growth rate for our pro forma revenue and adjusted EBITDA guidance comes out roughly 1.6 percentage points higher. You can see this on Slide 30; at this point we'd like to take questions. Operator, please?

Yang Liu analyst
#4

To start, nice work on the really robust bookings we've seen so far this year. There are 2 things I'd like to ask. My first one concerns how an MOU becomes a contract. What kind of schedule governs that process? Or what kind of risk might be involved in that process? Or what would we have to do, or what would our customers have to do, for that process to happen? That's my first one. My second one relates to rivalry in the newly emphasized regions such as Inner Mongolia, Zhongwei and Shaoguan. We're aware GDS has held a commanding lead in the Tier 1 market. But what about those newly emphasized regions? Are there more rivals or fewer rivals in those locations? And what edge does GDS have there?

William Huang executive
#5

Okay. Regarding the first one, my view is there's a high certainty of it turning into our order; that's point one. As for when, my view is it happens inside 2 quarters. My view is there's a strong likelihood of it turning into an actual contract. So we feel very confident about that, point one. Point two, my view is that regarding the new market, right, new market, my view is that in the market as it stands before we enter, my view is there's already some data center — a data center operator already present. But it's never too late, since at present the government has erected a very tall barrier. Point one, they will measure — I mean, they will measure the standards by which they pick a partner who can obtain the land, and they have several standards. Point one, they will carefully examine the company's track record. Second, they will verify you have the customer commitment behind you. And point third, they will also examine your financial capability too. So that's how the government at present views a partner, a potential partner. So my view is that if that's the situation, which it is, a tall barrier has already been erected. And we believe we will still be able to hold the leading position.

Jon Atkin analyst
#6

You mentioned that a large portion of your orders and current interest is focused on AI. Could you discuss the non-AI side a bit — the traditional cloud, and even enterprise workloads — and what demand trends you're observing in those areas? Also, any additional detail on the kinds of AI workloads? And would you mainly tie that to large foundation models, or inference, or something else?

William Huang executive
#7

I'd say most of it — the demand is coming from something very evident: AI, specifically GPU-based data center demand. Naturally, traditional cloud is still expanding, and it's tied more closely to AI demand. That's roughly the picture. It isn't the case anymore that traditional cloud accounts for 100% of the driving force. Today cloud continues to grow, but it's linked more to AI — that's a modest shift in what's driving things. So, what was your next question?

Laura Chen executive
#8

Which category of AI use case is it?

William Huang executive
#9

It would be either machine learning or inference — that's the kind of workload involved.

Laura Chen executive
#10

What about the AI workload?

William Huang executive
#11

Sure — training is still going on, no question. China remains a couple of years behind the U.S., and it's narrowing that gap now. So training appears to remain a major force behind data center demand. At the same time, though, the owners of large language models have begun to — I'd say a great deal of demand is now coming from inferencing as well; that explains why our Tier 1, the traditional market as we call it, still achieved growth over the last year. And on top of that, we also project that this year will bring very robust demand from AI, from inference, and from cloud alike.

Jon Atkin analyst
#12

Next, I'd like to ask whether you might briefly address how things look on the competition side — it likely differs somewhat depending on where you are and which market you're in, among other factors. But when it comes to the other projects your peers are working on, how would you describe the rivalry that's stepping up to serve that demand? And does any of that differ at all from what you shared with us the previous time you updated us?

Dan Newman executive
#13

Broadly speaking — the landscape when it comes to rivals in emerging markets, rivalry...

William Huang executive
#14

Yeah, I believe that when GDS makes a serious move into a new market, we're going to end up on top there. That's just how we see things. It's how we operate, correct? If that weren't the case, we wouldn't enter at all, right? We make sure we're fully prepared before we go in and deliver. As time goes on, I expect we'll hold the clear number one position across this region. So my view is that rivalry in AI within China, and competition among data centers in China, is only the beginning for AI. That makes this a favorable moment to enter, particularly when you've got ample financial strength, since that makes winning the fight that much simpler, right?

Xinyi Wang analyst
#15

Nice work once more on those strong new bookings. There are two things I'd like to ask. First, about supply. I recall that early last year, management was quite rational and careful about accepting fresh orders, since at that point there was uncertainty regarding chips. But with such robust order and MOU momentum so far this year, does that suggest chip supply has gotten significantly better? Put differently, on the supply side, is anything holding back project delivery? That's question one. Question two: I saw that GDS powered land reservation went up from 900 megawatts in the prior quarter to 3.7 gigawatts in this one. Where are the new resources mainly located? And how do returns on projects in this new area compare with those of our current projects?

William Huang executive
#16

Yes, our perspective may differ, correct? We constantly examine the industry at greater depth; that's why we also. What that means is we're extremely disciplined regarding CapEx investment. Last year we were a bit conservative, as chip supplies remained somewhat uncertain; this year, that certainty has grown, correct? Regarding changes in U.S. export policy and domestic chips closing the gap as well. If you remember, several quarters back, when this topic came up, we stayed very — we'd always say let's wait and see, correct? That approach was right for being more disciplined about CapEx investment; at present we feel far more at ease, since the entire environment has shifted toward something more favorable and more certain. So I believe — we believe now is the right moment to enter, and to do so on a large scale, correct? Land bank, regarding land bank, I mentioned it in my script, correct? There's Horinger in Inner Mongolia, Zhongwei in Ningxia province, and Shaoguan, which sits in Guangdong province. All of those are national hub data center hubs, correct? The locations should serve us well going forward and are well recognized by every one of our existing customers.

Xinyi Wang analyst
#17

how ought we to consider the returns on the project?

Dan Newman executive
#18

Sara, like I mentioned in the script, we can still produce a simple cash-on-cash yield of 10% to 11%, regardless of whether we're bringing on new business in established markets or in new markets; and given our business model — develop, ramp up, hold through the qualification period, then monetize — that yield is enough for us to achieve a return on equity exceeding 20%.

Gokul Hariharan analyst
#19

Let me start with the 200-megawatt order you've already locked in. Given how AI demand appears to be speeding up, could you say a bit about how urgent these projects are? When should we expect delivery to customers? Is the timeline also compressed, similar to the 150-megawatt order from last year? That's my first question. Second, I'm trying to get a handle on realized MSR trends. Earlier, our expectation was that MSR would begin to level off somewhat in 2027. But clearly our location mix is likely shifting somewhat now because of certain new demand patterns. So Dan, perhaps you could walk us through how MSR will probably look, say, 1 or 2 years from today, the realized MSR given the contracts being signed at present?

Dan Newman executive
#20

Sure, Gokul. For the 200-megawatt new orders, you can use as a forecasting assumption that delivery will take us 4 quarters on average. After that, there will be a 4-quarter ramp-up. That's quicker than in the past, when we handled the more traditional cloud business, and it aligns with our parameters for choosing new business. On the MSR decrease, that will keep going past next year. In 2028, I'd say it's 3% to 4% once more. However, the offset from greater volume growth will raise our overall growth rate; regarding 2026, I believe William mentioned that our move-in should be comparable to last year, which falls in the roughly 80,000 to 90,000 square meter range. Yet if everything proceeds as planned on hitting our sales target this year, we'd be looking at a move-in that might be around double that next year. So those 2 factors together will push our growth higher.

Gokul Hariharan analyst
#21

Got it. I just have one more question regarding those sites. We're bringing on some of these additional, somewhat more out-of-the-way places, though clearly they're the country's new data center hubs. In certain of these newly added spots, is there a heavy reliance on a few customers? Earlier, back when we pursued build-to-suit, my impression is things turned out quite tailored to particular clients. What's the right way to view customer concentration at some of these fresh sites, such as Shaoguan, Inner Mongolia, and so on?

William Huang executive
#22

Right. My take is that worldwide, the perspective is the same everywhere — each data center firm these days is becoming more concentrated when it comes to customers. Possibly on a global basis — within China, perhaps the leading 3; that's the direction things are going, correct? From a worldwide standpoint, I'd say it's 4 or 5 businesses, right, everyone is following that pattern. If your positioning is that of a hyperscale data center operator, a dev ops center operator, right? That isn't a conventional colo. When you examine the colo sector, it appears more varied, right? Yet this is how things actually are.

Dan Newman executive
#23

I would simply note that, for this type of business, the duration of the agreements tends to sit at the longer extreme—or beyond what we have generally seen in the past. As a result, we frequently encounter deals running 10 years, which in my view reduces the risk attached to the investments made in these projects.

William Huang executive
#24

Yeah. When you look at it from the standpoint of how many customers there are, GDS was already at 1,000, correct? So naturally, what's fueling this fresh demand is mostly those top 3 AI players in China, right?

Rob Palmisano analyst
#25

Rob here, filling in for Frank. If we look at demand and bookings, how much growth are you seeing year-over-year from your Chinese customers who aren't domestic? And going forward, how would you describe the outlook for that?

Dan Newman executive
#26

Rob, it's essentially all from Chinese customers when it comes to demand. Roughly 3 gigawatts per annum is what I'd put the market opportunity at, and as William said, it's concentrated among the very largest customers. So when we mention a 500-megawatt sales target, that should be seen against an addressable market of that scale.

Timothy Zhao analyst
#27

I've got a couple of things to ask. First, regarding the capacity growth you brought up — that 3 gigawatts pipeline moving into a new growth market. I'm curious: among the 3 key hubs you named, Inner Mongolia, Ningxia and Guangdong, how do those regions differ or resemble each other when it comes to what customers want, the IT workload, pricing, and so on? And tied to that, how does that 3 gigawatts pipeline break down regionally across those 3 key hubs — or across the 500 megawatts of MOUs you've disclosed year-to-date? My second question concerns CapEx. Since your sales momentum year-to-date is very strong, and converting that 500 megawatts into contract likely takes around 2 quarters, do you see any chance of revising the CapEx guidance upward again for this year?

William Huang executive
#28

I'd say there are 3 new markets, and the work involved is comparable. The bulk of the workload remains training, with inference making up part of it, correct? At the same time, as we just noted, in the traditional market — the low latency one — we've also received plenty of orders from our large language model customer, since they've begun deploying inference workloads. So things are fairly balanced, I'd say. Broadly speaking, perhaps 65% to 70% goes toward the new market, while 30% to 40% still goes to the traditional market — what we've historically referred to as the Tier 1 market. That's roughly where the workload difference lies.

Dan Newman executive
#29

Tim, about what you asked on CapEx — like I said before, you ought to figure on a 4-quarter construction timeline, since often what we're dealing with is a brand-new build at a location where we've never had any footprint. So if we broke ground in 1Q '26, that's meant to reach the customer in 1Q '27. As we land new business over the course of this year, then, that's going to produce additional starts. Still, I'd say the RMB 9 billion CapEx guidance is sufficient. I wouldn't anticipate revising it.

Ellie Jiang analyst
#30

There's just a single thing I'd like to ask, and it concerns a further-out timeframe. A moment ago, management mentioned that demand from data centers in China is only starting to recover. Over the coming 3 to 5 years, would it be reasonable for us to expect something resembling a narrowing toward the U.S. path — particularly regarding the way big hyperscalers keep speeding up how quickly they deploy CapEx? Also, are you seeing comparable commitments from your major customers? And finally, in that path, how do you actually view the longer-term market size along with the positioning?

William Huang executive
#31

Yes. Based on our estimate, I'd say China's demand will follow a growth trajectory closer to that of the U.S., since it trails by a couple of years, correct? That is taking place at this moment; so if the — during last year, we simply — we noted that the demand already exists. The only issue is really the supply of chips, right? At present it appears things are becoming significantly better, more favorable now, with greater certainty regarding chip supply; therefore it will move — it will match a similar tempo to the U.S., right? So I believe CapEx, if you examine the past 2 years, every major AI company and tech company keeps lifting its CapEx guidance, exactly as occurred in the U.S.

Ellie Jiang analyst
#32

Understood. And pardon me if I may — carrying on down that path, might it become possible at some stage, since management has just mentioned that the MSR is still going to slip a bit right through 2028 — might it become possible at some stage, given that we're still seeing extremely strong demand really ramping up, particularly considering the way the open clause, or all of these agentic integrations, appear to be pushing token usage up by 10x or perhaps even 20x — then at some stage, might it become possible for us to witness pricing power that is even more robust further out?

William Huang executive
#33

Yes, that's a possibility. I believe it could be. I think if you examine, say, the U.S. price and how adoption has shaped up over the last 5 years — if you go back 5 years, the U.S. price was as low as USD 60 per kW, correct? Today it stands at 3x on average, correct? So 2x or 3x on average. So that's the pattern, and I think there's a strong likelihood that it will be that way, correct? Let me give you a sense of the whole — I mean, in western China, the total power capacity right now — as of right now, merely 30 megawatts — gigawatts available to serve future growth. Broadly speaking, it remains constrained, correct?

Huiqun Li analyst
#34

Congratulations on the impressive orders we've seen so far this year, and on the MOU. First, I'd like to ask about that 500-megawatt MOU. Could management walk us through whether this is primarily aimed at 2026 — apologies, 2027? And over how many years — what sort of time horizon or period might this cover? Would it be something like a 1- or 2-year arrangement, or perhaps a 3-year contract — potential contracts? My second question concerns CapEx and the financing update. With the RMB 9 billion CapEx, how should we think about the financing and what's needed, especially since we currently have strong cash on hand?

Dan Newman executive
#35

Yes. Sorry...

Laura Chen executive
#36

Regarding that 500-megawatt MOU, what about the timing for delivery?

Dan Newman executive
#37

As I said earlier, delivery takes 4 quarters. That means business we secure during this year's first quarter will start contributing to move-ins next year. Logically, if we hit our 500-megawatt sales goal, then move-ins next year might land at roughly twice this year's level. That's how it would carry through. On contract duration, my sense is it's considerably longer than the figure you gave. We're talking 7 to 10 years, with most landing at the 10-year mark. As for financing, in China last year we funded ourselves. That worked when CapEx stood at RMB 5 billion, and we managed to finish 2 asset monetizations during the year through ABS and the C-REIT. Now, though, CapEx has climbed to RMB 9 billion, and while nothing is certain, we have an asset monetization plan we're aiming to wrap up during the second half of the year. Whether we'll self-fund in China, I can't say. Suppose CapEx is RMB 9 billion, operating cash flow is RMB 3 billion, and perhaps there are some proceeds from asset monetization. Should anything remain, financing it the traditional way through project debt would be quite straightforward for us.

Laura Chen executive
#38

Appreciate everyone being here with us once more, and we'll catch you on the next call. Take care.

Operator operator
#39

That wraps up the conference call for today. We appreciate everyone joining in. You're free to disconnect at this point. Speakers, kindly remain on the line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete GDS Holdings Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to GDS Holdings Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.