Home / Transcripts / Hi-Tech Pipes Limited (HITECH) · October 30, 2023

Hi-Tech Pipes Limited (HITECH) Earnings Call Transcript

October 30, 2023

National Stock Exchange of India IN Materials Metals and Mining earnings 35 min

Earnings Call Speaker Segments

Operator operator
#1

Ladies and gentlemen, good day, and welcome to the Hi-Tech Pipes Limited Q2 FY '24 Earnings Conference Call hosted by PhillipCapital India Private Limited. [Operator Instructions] Please note that the conference is being recorded. I now hand the conference over to Mr. Vikash Singh from PhillipCapital India Private Limited. Thank you, and over to you, sir.

Vikash Singh analyst
#2

Good morning, everyone. A warm welcome to Hi-Tech Pipes Limited Q2 FY '24 Earnings Con Call. On behalf of PhillipCapital, I would like to thank management for giving us the opportunity. From the management side, we have with us Mr. Anish Bansal, Whole-Time Director and Promoter; and Mr. Arun Sharma, current Company Secretary. Without taking any much time, I would hand over the call to Mr. Anish for the opening remarks. Over to you, sir.

Anish Bansal executive
#3

Good morning, and welcome, everyone, in our Q2 and H1 results ended 30th September 2023. I'm joined on the call by Mr. Arun Sharma, Company Secretary of the company. I hope everyone has had a chance to go through our results and investor presentation uploaded on the exchange. Now let me take you through our financial highlights. During this quarter, we have recorded ever highest revenue from our operations of INR 746 crores as compared to INR 598 crores in Q2 FY '23, a growth of 25% Y-o-Y. Overall revenue from operations for H1 FY '24 elevated by 25% to INR 1,388 crores from INR 1,115 crores in H1 FY '23. Sales volume increased by 18% year-on-year to 100,475 tonnes in Q2 FY '24 as compared to 85,500 tonnes in Q2 FY '23. Sales volume for H1 FY '24 increased by 19% to 184,964 tonnes versus 155,567 tonnes in H1 FY '23. PAT increased by 143% year-on-year to INR 10.54 crores in Q2 FY '24 as compared to INR 4.34 crores in Q2 FY '23; and 109% in H1 FY '24 to INR 18.48 crores as compared to INR 8.82 crores in H1 FY '23. EBITDA increased by 13% to INR 26.75 crores as against INR 23.57 crores in Q3 FY '22; and 15.83% growth to INR 47.95 crores in H1 FY '24 as compared to INR 41.4 crores in H1 FY '23. Our financial performance surpassed the previous quarter results. We witnessed a steady demand in our key demand drivers in this quarter such as Jal Jeevan Mission, 5G telecom network augmentation, bullet train project, airport and railway upgradation projects, affordable housing, warehousing and solar power energy sector. These sectors are continuously aiding us in maintaining our good momentum. Our key products gained significant traction in the market, and our focus on increasing the market share of value-add products helped us to keep ahead of the competition. Now I would like to take you through the ongoing project developments. Our greenfield facility of large-diameter pipes and solar torque tubes at Sanand, Gujarat, Phase 2, is about to get commissioned. This facility will be capable of providing the complete size range of ERW pipes available in the segment under one roof. The commercial production is expected to start from Q3 FY '24 onwards. This unit will not only enable us to penetrate in large-diameter segments, city gas distribution, green energy, oil and construction centers, but also add significant support to our sales volume and EBITDA in medium to long term. We are confident that our pan-India B2C distribution network, multiple manufacturing plants and strong B2B clientele, we would be achieving excellent reach and regular supply of these products. We remain optimistic on demand front and aim to deliver a strong performance in the rest of the year, thanks to the healthy order book and government focus on Jal Jeevan Mission and other infrastructure projects. So to sum it, we at Hi-Tech remain very positive on India's structured growth story. Now we can open the floor for questions.

Operator operator
#4

[Operator Instructions] The first question is from the line of Jatin Damania from Swan Investment Managers.

Jatin Damania analyst
#5

Sir, just wanted to understand, once we commission our greenfield Phase 2 at Sanand in the next quarter, what will be our capacity and the road map to increase our capacity to 1 million tonnes because we're targeting by FY '26 a 1 million tonne capacity? And secondly, to continue with the same question, what will be the incremental CapEx that we'll be requiring to reach that 1 million tonnes?

Anish Bansal executive
#6

Mr. Jatin, thanks a lot. Our Phase 2 at Sanand, the ultimate -- the installed capacity will be 170,000 tonnes. Out of this, we'll be commissioning 120,000 tonnes in Q3 of this current financial year. So there are 5 lines in total, and we have started trial production of 1 line. And we'll be starting 1 line every month from this month onwards. So basically, the incremental CapEx for this entire project was around INR 100 crores, and it has been funded through internal accruals and through some equity infusion.

Jatin Damania analyst
#7

And sir, the road map for 1 million tonnes, because this 1.7 million will take your installed capacity to 7.5 (sic) [0.75] million tonnes. So from 7.5 (sic) [0.75] million tonnes to 1 million tonnes, what is your strategy? And by when can we achieve that 1 million tonne installed capacity?

Anish Bansal executive
#8

So from 7.5 million tonnes -- sorry, from 0.75 million tonnes to 1 million tonnes, we'll be doing it through brownfield expansion in our Khopoli unit and our Bangalore and Sikandrabad. So 3 locations, we'll be ramping up the capacity at these 3 locations through brownfield route. And by FY '25, we are quite optimistic and confident of achieving the same.

Jatin Damania analyst
#9

And the CapEx for the same?

Anish Bansal executive
#10

CapEx will be in the tune of around INR 125 crores to INR 150 crores.

Jatin Damania analyst
#11

And that will be funded through internal accruals or the warrant that we issued the last year, right?

Anish Bansal executive
#12

Yes, mix of both.

Jatin Damania analyst
#13

Okay. Sir, another question. When I look at the profile mix and the product mix, definitely, we have seen a change in the value-added products, which we are increasing on the year-on-year. But if you look at EBITDA per tonne, which is largely hovering around INR 2,500 to INR 2,700, so are we seeing any headwinds where we are not getting an operating leverage? Or when can we see our company achieving the higher numbers in terms of the operating performance?

Anish Bansal executive
#14

So Jatin-ji, so basically, there has been like a lot of steel price volatility in this H1. Steel prices are fluctuating because of the coking coal prices and, of course, due to this Russia and Ukraine war. So coking coal prices have gone up. So the orders -- the Jal Jeevan orders, the Jal Jeevan Mission orders that we are having, so those are on fixed pricing basis. So that takes a bit of toll. But like nevertheless, once this Sanand Phase 2 and our color coated roofing get well established, then this is surely to go up in the next coming quarters. So H2 is one of the best periods for real demand and the opportunities.

Jatin Damania analyst
#15

So I mean, if I'm not wrong, we were guiding somewhere INR 5,000 when our capacity or the value-added products reaches 50%. So are we still maintaining that guidance or probably we would see lower numbers once we reach our 1 million tonne capacity?

Anish Bansal executive
#16

So once this Sanand Phase 2 will be commissioned, so out of this blended, it should be 4,000 tonnes. But then certain SKUs and verticals, we'll be getting INR 5,000 per tonne.

Jatin Damania analyst
#17

Okay. With blended, EBITDA will be INR 4,000?

Anish Bansal executive
#18

Yes, sir.

Jatin Damania analyst
#19

And last question from my side. Sir, we were also working on the API-grade pipelines. Even in the last interaction, you said that the line was supposed to start in Q3. So have we got any approval? What is the status on these API-grade pipelines?

Anish Bansal executive
#20

So as I said, 120,000, so remaining 50,000 will come from API pipes. The trials -- we have started trial production of water and structural pipes of this line. So we will be getting the approvals, the BIS licenses and the other approvals in the current quarter. And we are optimistic in like 6 to 9 months' period, we'll be venturing into the API pipes. So that is the next step.

Jatin Damania analyst
#21

So largely, we'll see a benefit of the API coming in FY '25, that is also second half of FY '25?

Anish Bansal executive
#22

Absolutely. Absolutely.

Jatin Damania analyst
#23

And sir, last question, can you help us in terms of the volume guidance for '24, '25 and '26 since you are clear with the road map to a 1 million tonne capacity?

Anish Bansal executive
#24

So this year, the total volume should be between 4.25 to 4.5 lakh tonnes. And next year, FY '25, definitely, with the higher capacity, we'll be targeting like 5 lakh tonnes plus to give a very conservative figure.

Operator operator
#25

The next question is from the line of Aadesh from Motilal AMC.

Aadesh Mehta analyst
#26

Congratulations on the ramp-up. On the previous question, when it comes to EBITDA per tonne, sir, are you confident of INR 4,000 EBITDA per tonne this month onwards, but you' know that's an expectation for next 12 months. So what kind of quarterly run rate EBITDA per tonne can we see as we ramp up?

Anish Bansal executive
#27

[indiscernible]

Aadesh Mehta analyst
#28

Okay. And then this is possible, sir, by 4Q?

Anish Bansal executive
#29

Q4 onwards.

Operator operator
#30

The next question is from the line of Darshit from RoboCapital.

Darshit Vora analyst
#31

So congrats on the good results. I just wanted an idea about you've given the target for volume, but say, realization, what do you think of the realization going forward? Are they going to stabilize where they are? Or are they going to increase?

Anish Bansal executive
#32

So sir, realization is a function of like our normal prices. Steel prices are fluctuating a lot in the last like 5 to 6 months. But going forward, I think the prices should settle down, and the sales utilization will go as our value-added share that goes up. So that will happen gradually. So definitely, the sales realization will be moving forward, but we'll have to see once these steel prices get settled on an annual basis.

Darshit Vora analyst
#33

Right. But as you say that VAP is going to increase, so margins are to increase gradually, right?

Anish Bansal executive
#34

Yes, sir. Yes, that will happen gradually quarter-over-quarter.

Darshit Vora analyst
#35

Quarter-over-quarter, all right. And you specified about CapEx, but are we like planning to do it all internally accrued? Or are we going to take some debt?

Anish Bansal executive
#36

Those are internal accruals. All the CapEx has been funded through internal accruals and the equity infusion.

Operator operator
#37

[Operator Instructions] The next question is from the line of CA Garvit Goyal from Nvest Analytics.

CA Garvit Goyal analyst
#38

Congrats for a good set of numbers. You mentioned to the earlier participant regarding the guidelines for FY '25. That seems to be very conservative. So is there any kind of headwind that you are expecting in FY '25 or how the situation is likely to be?

Anish Bansal executive
#39

Sir, the volume growth will be almost 25% from last year. So -- and the kind of capacity we are currently having, I think because that is the most -- the ideal case situation. So once this new capacity at Sanand Phase 2 does get commissioned in this quarter, we'll have a good headroom for the next financial year. So right now, all the plants are almost at their peak utilization levels.

CA Garvit Goyal analyst
#40

That thing, I'm getting, but the thing is you mentioned the volume should be 5 lakh tonnes -- around 5 lakh tonnes in FY '25. So that's why I was asking, are you expecting any kind of headwinds in that year because if the capacity of 170,000 gets commissioned by H1 FY '25, then we are having a good way to grow, right? We are also...

Anish Bansal executive
#41

We will have 7 lakh tonnes in our hand, and I take 75% -- or 70% as our utilization rate on an annualized level. So that will be approximately 5 lakh tonnes.

CA Garvit Goyal analyst
#42

Okay. And the 70% utilization is our peak utilization, right?

Anish Bansal executive
#43

Yes. Yes, absolutely. For the entire sector, yes.

CA Garvit Goyal analyst
#44

And can you please give a revised -- give an indication on the EBITDA per tonne guidance for HY -- H2 FY '24?

Anish Bansal executive
#45

So basically, we are still like waiting for steel prices to stabilize because there's a lot of fluctuation that has happened in the last 6 months. And we are still careful here for the next 1 or 2 months because internationally, the prices are still volatile. So once this is settled, like we are targeting a INR 4,000 per tonne EBITDA, but this steel price only has to be stable. So that is all.

Operator operator
#46

The next question is from the line of Aadesh from Motilal AMC.

Aadesh Mehta analyst
#47

Just a simple bookkeeping question. Sir, what could be our EBITDA per tonne run rate in September? And since October is already over, any sense on what EBITDA per tonne you're doing in October?

Anish Bansal executive
#48

Sir, the October month, we have maintained INR 3,000 plus. But like since we have this -- this is still going on. So on a quarter basis, we'll be knowing in November, December like what it's exactly. But we will -- definitely, we will be moving the -- it is going ahead.

Aadesh Mehta analyst
#49

Right. And September, what was the number, sir?

Anish Bansal executive
#50

Sir, that was in the similar price band, INR 3,000.

Aadesh Mehta analyst
#51

Okay. So September ended at INR 3,000 and even October was at INR 3,000. It was the first 2 months which actually led to some EBITDA dip, EBITDA per tonne. Okay. So going forward, it should at least -- it should sustain if there is no volatility in HR coal prices?

Anish Bansal executive
#52

Absolutely, sir. Absolutely.

Operator operator
#53

The next question is from the line of Dhyey Desai from Niveshaay Investment.

Dhyey Desai analyst
#54

Congratulations on a good set of numbers. I just wanted to ask that you talked about that when we increase our share of value-added goods, our realization will go up. So when we talk about value-added goods, are we talking in terms of the pipes or the sectors we cater to?

Anish Bansal executive
#55

Mr. Desai, so basically, when I refer to value-added products, so it will be mainly our products, which are pipes and roofing and, going forward, special SKUs and black tubes, DFT pipes. So all those will contribute to our value-added products.

Dhyey Desai analyst
#56

Okay. And apart from the government contracts, like we are seeing a huge CapEx on the government side. So apart from that, are we seeing any further CapEx to be initiated by the private sector as well? Or it is just the government that we'll be catering to?

Anish Bansal executive
#57

Sir, private sector is also contributing. Like 5G network augmentation is all private. The solar is all private. The affordable housing and the warehousing is all private. Bullet train project, again, is semi-private because the contract has been given to L&T. And all the metro rail projects is also like semi-private. NHAI projects are also -- like the projects are going to the EPC players, and they are buying from us. So private sector is also contributing a lot. But you are right, there is a good scope for private sector in the future. They will also raise their volumes and their demand.

Dhyey Desai analyst
#58

Correct. And is there any price escalation clause in like for the private sector? Or the clause is same for the government as well as private sector?

Anish Bansal executive
#59

Sir, it depends on the pricing. But where there's a mix of both in some and if it's a long project going to from 3 months to 6 months, then there is a price escalation. But if the supply period is less than 3 months, then the prices are generally fixed.

Operator operator
#60

The next question is from the line of Varun Arora from Safe Enterprises.

Varun Arora analyst
#61

Just one question. Could you talk about the cost initiatives that you are taking to drive the EBITDA per tonne? It could be in terms of your procurement of raw materials, what cost initiatives are being taken? And also if there are any levers to improve working capital post our Sanand facility kind of stabilizes?

Anish Bansal executive
#62

Mr. Varun, thanks for your questions. So the cost initiatives, they're on a continuous basis. You are right, the raw material, since it is the biggest portion, so as the volumes, they go up gradually. So definitely, there's a raw material price -- there's an optimization on the raw material price cost. Apart from that, like on the operational front, we are utilizing like solar power. So we have reduced almost -- like we saved almost around INR 2 crores per year on the account of solar power sector. And all the new machines and the new plants that have been set up, they have been set up with the world-class machineries, which give us the best deal in the industry. And working capital, like we are focusing there. So currently, the net working capital cycle days is around 40, 45 days. So we are -- our target is to bring it to 30 days. But there are a lot of other factors that come into play. So I think that should happen gradually once the channel finance factoring that takes place.

Varun Arora analyst
#63

And would we be in better position to get the channel financing in place once our volumes increase post Sanand facility?

Anish Bansal executive
#64

Yes, sir, we are quite hopeful for that.

Varun Arora analyst
#65

Sure. Just one bookkeeping question. What was the impact of inventory loss this quarter?

Anish Bansal executive
#66

Sir, this -- I think I can talk to you after the results to assess the exact impact of this.

Operator operator
#67

The next question is from the line of Rahil Shah from Crown Capital.

Unknown Analyst analyst
#68

So given the general scenario in the market, can you tell us how have you seen quarter 3 pan out so far in terms of the demand environment and other factors and how they're likely to go on for the rest of H2 FY '24? And also for the next year, if you can give a general outlook. And based on that, do you see the similar kind of growth rate continue, which you see in quarters ahead year-on-year basis, and also for the next year, a general idea?

Anish Bansal executive
#69

So sir, Q3 and Q4 are generally one of the best quarters for the entire year. So after this facility, then we see a strong pull in demand because of the favorable climatic conditions. So I'm quite hopeful that Q3 and Q4 will give us more volumes compared to H1.

Unknown Analyst analyst
#70

So from a revenue and margin perspective, what we have seen historically, like if not way back, just like in the past year or so, how H2 has always been more favorable in terms of revenue, so the kind of 18% to 20% growth, can you...

Anish Bansal executive
#71

Yes, we should be also in the same range.

Unknown Analyst analyst
#72

On a year-on-year basis, correct, for the quarter?

Anish Bansal executive
#73

Yes, yes. Yes, that's right.

Unknown Analyst analyst
#74

Right, right. And margins, you are comfortable at these levels? Or like...

Anish Bansal executive
#75

Yes, our conversion margins are intact. But the normal prices, since they are fluctuating a lot, that is taking a toll. But let's see like how this war situation and the commodity prices shape up.

Unknown Analyst analyst
#76

But other than that, these are sustainable, 4%...

Anish Bansal executive
#77

Yes, absolutely. Absolutely.

Operator operator
#78

The next question is from the line of Akshada Deo from Vivog Commercial Limited.

Akshada Deo analyst
#79

I just wanted to know a couple of things. Number one, what's the percentage of value-added products so far that you have done in H1 from revenues?

Anish Bansal executive
#80

So in H1, our share of value-added products is around 29%.

Akshada Deo analyst
#81

Okay. And what are you aiming for the percentage of value-added products to be by the end of commissioning of the Sanand plant?

Anish Bansal executive
#82

So our FY '25 target is -- will be hovering between 40% to 42% for FY '25.

Akshada Deo analyst
#83

Okay. And so I would just like to know how -- or how are you having the confidence and what is the strategy that you're looking forward to increasing the value-added products?

Anish Bansal executive
#84

So we are adding new special SKUs. We have installed one like hot-dip galvanizing facility in Sikandrabad. We'll be venturing into large-diameter pipes through Sanand Phase 2. We'll be coming in like solar torque tubes in a big way. So all these things are new applications, new products, the downstream facilities like galvanizing. So these will aid our higher share of value-add products.

Akshada Deo analyst
#85

Okay. So have you received any specific orders or any intent of orders for the same, the new SKUs?

Anish Bansal executive
#86

Yes, absolutely. Like as I said, solar torque tubes is a -- there's a lot of excitement building around this area because traditionally, they were using like open sections. But now with the solar trackers, the requirement for torque tubes is rising day by day. So that is -- that works in our favor. And the Sanand facility is designed in such a way that it can deal with any kind of demand from solar torque tubes from domestic and international markets both. So this is one example, and there are similar cases in other products as well.

Akshada Deo analyst
#87

Okay. And secondly, what I wanted to know that is the contract like on Jal Jeevan prices, where it is difficult for you to -- because it's in a fixed base and you cannot pass on the cost, is that the reason that your EBITDA per tonne is lower than your peers?

Anish Bansal executive
#88

So in Q2, we had like quite a sizable order book from JJM. And the pricing -- the raw material prices, that played a spoilsport for us.

Akshada Deo analyst
#89

Okay. So you believe your margins should probably go up if the JJM size is not continuing...

Anish Bansal executive
#90

Yes, yes, now the prices seem to have rationalized and stable. And going forward, we are sure to see this going up.

Akshada Deo analyst
#91

So in your annual guidance, sir, do you expect a couple of quarters to have sizable JJM, so maybe going forward if the contract continues, maybe there will be a couple of quarters with a dip? Is that possible?

Anish Bansal executive
#92

Yes, that is quite possible because the order traction is there and the prices have also stabilized, as I said and let's see.

Operator operator
#93

The next question is from the line of Anand Gulani, an individual investor.

Unknown Attendee attendee
#94

Anish, congratulations.

Anish Bansal executive
#95

Thank you, Anand-ji.

Unknown Attendee attendee
#96

Anish, just a quick question for you. When we do channel checks and speaks for ideas across, everybody is discussing the pipe sector, especially the one that you're operating in Hi-Tech. And assuming the demand is too high, there is definitely not much capacity in the system, which we have found from channel checks. And if your capacity commissioning doesn't go slow, hopefully, it's on schedule, then is it fair that your guidance is on a very conservative side of like INR 3,000 to INR 4,000 per EBITDA tonne?

Anish Bansal executive
#97

So Anand-ji, so like the last 1, 1.5 years, we've seen extreme volatility in the prices, in the raw material prices. So like our conversion margins are there, but then like the price, the inventory, the deterioration in the inventories and having like good orders, but then like prices go up. So all these -- so I want to be very safe and very like practical, considering the current situation in real prices. Regular coking coal prices, nobody thought from $260 or $250, it will go to $370, $380. This was totally unexpected. But...

Unknown Attendee attendee
#98

So one thing , Anish, you don't expect any slowdown in the commissioning of the capacity ramp-up?

Anish Bansal executive
#99

No, no. No, absolutely not. Absolutely not. We are on track. 1 million tonnes by FY '25, we are very confident.

Unknown Attendee attendee
#100

And just one last question. And you have done INR 18.5 crores in the first half, correct? Or INR 18 crores, am I right, in the first 2 quarters?

Anish Bansal executive
#101

Yes, sir.

Unknown Attendee attendee
#102

So Q3 being very -- for the sector, Q3, Q4 is rock-star for the sector, we can expect like a good, like, I don't know, the ballpark growth number from first half? Or any I guess...

Anish Bansal executive
#103

Yes sir, I'm quite optimistic like Q3 and Q4, especially, like I think Q4 will be the actual, as you said, like the blockbuster quarter will be Q4. Once this festive season gets over, I think then like mid-November onwards is actually like the work on ground that takes place.

Operator operator
#104

The next question is from the line of Jatin Damania from Swan Investment Managers.

Jatin Damania analyst
#105

Sir, just wanted to understand, you were saying that you are getting a stronger volume in H2 and you are largely focusing on the Q4. So are we seeing any headwinds in the Q3 or probably October numbers? I mean, how are the things...

Anish Bansal executive
#106

Generally, like Q3, until festive season, it's normal. But then after festive season, it's actually when the distribution trade demand that, that pulls up.

Jatin Damania analyst
#107

Is it fair to assume that the 45 days of this quarter, which is Q3, is largely subdued as compared to what we did in the last quarter?

Anish Bansal executive
#108

Q3 is always better than Q2, but Q4 is exceptionally well.

Jatin Damania analyst
#109

Okay. And sir, last question. I mean we had signed an MOU with the UP government. So I mean, you were supposed to give an update during the Q2. So what -- any progress that we are making in the state?

Anish Bansal executive
#110

Sir, we are -- the government has identified a few land parcels for us. And we are doing the due diligence of the railway connectivity for these land parcels. So that is going on, and let's wait for the ideal outcome from this. So we'll be updating on the exchange once this land deal is done.

Jatin Damania analyst
#111

Okay. Sir, what is our current order book and the proportion of the Jal Jeevan Mission in the total order book?

Anish Bansal executive
#112

The current order book is in excess of around INR 250 crores. And the Jal Jeevan Mission will be almost, say, INR 75 crores to INR 80 crores out of this.

Jatin Damania analyst
#113

Okay. So largely -- so a large percent of the Jal Jeevan is already executed?

Anish Bansal executive
#114

Yes, sir. Sure. But these are like recurring orders. So once we supply that, then we get like repeat top-up orders.

Jatin Damania analyst
#115

Yes. But JJM order comes with a lower margin, right? So if that execution happens, then definitely our EBITDA per tonne tends to be, again, in the same level of INR 2,500, INR 2,700.

Anish Bansal executive
#116

Yes, sir. But if steel prices do not go up, then the EBITDA from this sector is also quite healthy.

Operator operator
#117

The next question is from the line of Udit Gajiwala from Yes Securities.

Udit Gajiwala analyst
#118

Just a follow-up from the previous participant on Jal Jeevan Mission. Sir, do you expect the order book -- the orders to slow down from next year given that it's an election year and the majority of the work will be...

Anish Bansal executive
#119

So sir, for FY '24, for next 5 to 6 months that we are having, so the order book is strong until March. So for next financial year, we'll have to wait for how the results and everything pans out. But I can give you guidance until March. So until March, I don't think any slowdown in Jal Jeevan Mission until March.

Udit Gajiwala analyst
#120

Right. So sir, in case of any slowdown from this specific segment, does it impact your next 3 to 5 years road map in terms of your guidance that you have given?

Anish Bansal executive
#121

So sir, there should not be any change in the guidance because there are many other sectors that will be opening up. So we don't see any challenge -- the volume challenge per se.

Operator operator
#122

The next question is from the line of Hetal Gada from Max Life Insurance.

Hetal Gada analyst
#123

Sir, congratulations for the good set of numbers. Sir, just 2 questions from my side. Firstly, you were talking about targeting 40% to 42% of value-added products in the next year. Can you just provide some breakup on what will be the like -- what will be the order book like in terms of structure and also solar torque tubes and all? Can you have a -- please share some rough idea on it, the product mix, so what you're targeting?

Anish Bansal executive
#124

Yes. So Hetal, there'll be new segments that will be opening up for us in FY '25. Solar torque tubes will be one of them. The special SKUs like DFT pipes from Sanand Phase 2, that will be additional value-add product for us. The galvanized pipes, as we have increased capacity at our Sikandrabad unit for galvanizing, so that will be one of those. The roofing volume is also going to grow higher. So we'll see share of VAPs in the roofing segment also to go up.

Hetal Gada analyst
#125

So within this, sir, which is the most profitable or the highest margins in the entire mix? Or all the -- are all these better-margin products as compared to the commodity grades?

Anish Bansal executive
#126

No. So these products, they fetch us EBITDA per tonne in the range of INR 4,000 to INR 5,000 per tonne.

Hetal Gada analyst
#127

Okay. Of course, all these products.

Anish Bansal executive
#128

Yes. Yes, yes, yes.

Hetal Gada analyst
#129

Okay. And sir, given that we also are on State government contracts and all, so how are we planning to manage our working capital? And what are we thinking to -- what is your target working capital in terms of days because these projects will anyways require higher debtor days, but managing inventory and all, any targets that you have in mind?

Anish Bansal executive
#130

So current, our total net working capital days is around 40 days. And we are targeting to bring down to 30 days through channel financing, dealer finance and all that in all of those.

Hetal Gada analyst
#131

Okay. Sir, at per your peer, APL Apollo, like they have completely shifted to zero financing and actually have just on-cash models. Any plans to model that, especially for your structural pipe segment and not on the project ones, but on the structural side?

Anish Bansal executive
#132

Yes. So as I said, the dealer finance is one area that we are working on. And once the list gets materializes, I'm sure like we'll be in quite competitive range.

Hetal Gada analyst
#133

Okay. And what is -- just may I ask how much is our B2C share in the overall mix?

Anish Bansal executive
#134

It's close to 70%.

Hetal Gada analyst
#135

And what are we targeting to get it to?

Anish Bansal executive
#136

So like our B2B segment is also going up and B2C is also going up. So I think the mix will remain more or less the same.

Operator operator
#137

The next question is from the line of Dheeresh Pathak from WhiteOak.

Dheeresh Pathak analyst
#138

Sir, in 1H...

Operator operator
#139

Sorry for the interruption. Your voice is very low, sir.

Dheeresh Pathak analyst
#140

Is it better now?

Operator operator
#141

Yes.

Dheeresh Pathak analyst
#142

Am I audible?

Anish Bansal executive
#143

Yes. Yes, you are.

Dheeresh Pathak analyst
#144

Sir, 1H volumes, how much would be from Jal Jeevan Mission...

Operator operator
#145

Sorry for the interruption, Dheeresh. Sir, your voice is very low.

Dheeresh Pathak analyst
#146

Hello? Am I audible now?

Operator operator
#147

Yes, sir. Can you repeat the question?

Dheeresh Pathak analyst
#148

Yes. My question is, sir, in 1H volumes, what would be the contribution of volumes from Jal Jeevan Mission?

Anish Bansal executive
#149

In H1, the total contribution was around 25,000 tonnes from Jal Jeevan Mission.

Dheeresh Pathak analyst
#150

25,000 tonnes, okay. So would you have the numbers for FY '23 also handy, sir?

Anish Bansal executive
#151

FY '23, sir, like to give you a rough estimate, I think the annualized volume was around 40,000 tonnes.

Dheeresh Pathak analyst
#152

40,000 tonnes, okay. Understood. So value-added products, you said you made INR 4,000 to INR 5,000 EBITDA per tonne. But what is the trade-off like? Do you have to invest more capital to make these value-added products?

Anish Bansal executive
#153

So Dheeresh-ji, galvanizing, we have to do coating on the bare black tubes and pipes. So that is one area. But Sanand Phase 2 is entirely focused towards value-added products. So these special SKUs, DFT pipes, large-diameter pipes, API pipes, solar torque tubes, so all these will come from Sanand. So Sanand Phase 2 is primarily focused towards value-added products only.

Dheeresh Pathak analyst
#154

Sir, that I understand. So let's say, you need to invest INR 100 in normal products in CapEx to make a plant which is 100% value-added products...

Anish Bansal executive
#155

Oh, yes. There is a substantial difference between the normal, and we're almost 2x, you can say, for normal versus value-added products in the CapEx cost.

Dheeresh Pathak analyst
#156

Sir, EBITDA goes up by less than 2x, but capital goes up by 2x, right?

Anish Bansal executive
#157

Yes, yes, yes.

Dheeresh Pathak analyst
#158

Okay, understood. Sir, in your working capital, when you are -- right now, is there any NBFC or bank which is providing financing to your dealers?

Anish Bansal executive
#159

Yes, sir, we have just started -- we are testing it, it is INR 25 crores currently. And so we'll see how this goes, and we can build up on this.

Dheeresh Pathak analyst
#160

So only INR 25 crores -- the NBFC, which is providing finances to your dealer network has a book of only INR 25 crores right now?

Anish Bansal executive
#161

Currently, yes.

Dheeresh Pathak analyst
#162

Okay. So what cash discount do you give to your dealers? And what is the typical receivable days without the cash discount?

Anish Bansal executive
#163

Sir, typically, it is in the range of 1% to 1.5%.

Dheeresh Pathak analyst
#164

1% to 1.5%, okay. And what is the credit without the cash discount days?

Anish Bansal executive
#165

30 days.

Dheeresh Pathak analyst
#166

30 days, okay. And the NBFC, which is having a book of INR 25 crores, at what rate do they lend to your dealers?

Anish Bansal executive
#167

Currently, it is in the range of 9.5% to 10%.

Dheeresh Pathak analyst
#168

9.5% to 10%. Can you name this NBFC?

Anish Bansal executive
#169

[indiscernible] for that please.

Operator operator
#170

Ladies and gentlemen, that was the last question for today. I now hand the conference over to Mr. Vikash Singh for closing comments.

Vikash Singh analyst
#171

Thank you, operator. On behalf of PhillipCapital, we again like to thank Hi-Tech management for giving us the opportunity to host them. Over to you, sir, for any closing comment.

Anish Bansal executive
#172

Thank you so much, everyone, for sparing time to attend our earnings conference call. To sum it up and going forward, I would like to say that the steel demand has started ramping up now. Government mega CapEx towards infrastructure, railways, telecom and various other prestigious projects are big demand drivers for our products over the next 4 to 5 years, and we remain very positive and bullish about the India's structural growth story. The company is well poised to cater any kind of demand that comes from any geography or any sector. With all these things, it is quite positive for the company in H2 and coming years. That is all from my side. Wishing everyone a very happy and prosperous Diwali. Thank you.

Operator operator
#173

Thank you. On behalf of PhillipCapital India Private Limited, that concludes the conference call. Thank you for joining us, and you may now disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hi-Tech Pipes Limited transcript - plus 251,000+ transcripts from 12,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Hi-Tech Pipes Limited earnings transcripts and 251,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $105 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.