Teresa Thuruthiyil executive
#1

Thanks so much. Hello, everyone, and good afternoon or evening depending on where you're listening from. We appreciate you being with us on this call covering Joby Aviation's financial results for the first quarter of 2026. I'm Teresa Thuruthiyil, and I lead Investor Relations here at Joby. Today we'll kick things off with prepared remarks from our Founder and Chief Executive Officer, JoeBen Bevirt, along with our Chief Financial Officer, Rodrigo Brumana. Paul Sciarra, our Executive Chairman, will also be on hand for the Q&A segment of today's call. I want to note that during our discussion, we'll be making statements about future events and financial performance, as well as statements reflecting belief, expectation, and intent. Such forward-looking statements rest on management's current expectations and carry risks and uncertainties that might lead actual results to differ materially from what is expressed or implied. If you'd like a more detailed discussion of those risks and uncertainties, please see our filings with the SEC and the safe harbor disclaimer included in today's shareholder letter. Any forward-looking statements made on this call speak only as of today's date, and the company undertakes no obligation to update or revise them. In addition, we'll be referencing both GAAP and non-GAAP financial measures during the call. A reconciliation of non-GAAP to GAAP measures appears in our Q1 2026 shareholder letter, which is available on our investor relations website, where you'll also find a replay of this call. With that, I'm happy to hand things over to JoeBen.

Joe Ben Bevirt executive
#2

I appreciate that, Teresa. And thanks to all of you for being here today. It has been fewer than 10 weeks since our last conversation, yet even with that brief gap, I'm happy to share that we've delivered yet another outstanding quarter of advancement throughout every key part of Joby's operations. The standout development this quarter was probably the announcement of which states will take part in the eIPP program, which has backing from the White House. Through this initiative, we can deliver our aircraft and our service straight to communities across the U.S. during this year, prior to receiving FAA type certification. Honestly, we received an ideal set of opportunities; we were chosen through five applications spanning 11 states, among them Texas, New York, and Florida. Every one of the chosen programs is currently working toward completing an OTA agreement alongside the FAA and the Department of Transportation; these arrangements serve as adaptable R&D contracting tools that allow for quicker and less constrained cooperation compared to standard federal contracts. They're going to establish the scope, the roles, and the timelines for whatever comes next. We've already started our efforts. In New York, progress is underway on getting Joby charging equipment set up at both East Side heliports, and a request for proposals went out recently from the Port Authority of New York and New Jersey for a vertiport on the roof of the Terminal C parking garage at LaGuardia Airport. Turning to Texas, our MRO facility is now secured to support operations there; meanwhile, in Florida, we've partnered with Orlando International Airport to develop a purpose-built vertiport for air taxis. In additional states including North Carolina and Utah, we're working out how to begin autonomous cargo operations using our Superpilot technology. Most importantly, we're demonstrating already that the technical and operational maturity required to participate in the program is something we have. Besides flying our first FAA-conforming aircraft for TIA during this quarter, we carried out a set of demonstration flights in the Bay Area and New York. On those flights, we touched down at two major international airports, Oakland and JFK. We flew to three Manhattan heliports. We operated inside Class B airspace, which encircles the country's busiest airports, and we showed our capacity to charge across a variety of different settings. The New York flights especially elevated our demonstrations by linking JFK with the Wall Street Heliport, the West 30th Street Heliport, and the East 34th Street Heliport. We didn't just display actual applications that Blade users are flying right now — we also completed the very first eVTOL trip linking an international airport to a downtown heliport. There's a well-known saying: if you can succeed in New York, success is possible anywhere. Flying over landmarks like the Statue of Liberty or the Golden Gate Bridge demonstrated conclusively that our aircraft, our people, our equipment, and our know-how are all in place to maximize what we get from the eIPP program. That level of maturity wasn't achieved overnight. Way back in 2017, we conducted our initial transition flight with this design. What you're witnessing right now represents the payoff from many years of diligent effort spent designing, testing, and manufacturing mature VTOL-capable aircraft; that maturity is going to be essential for delivering genuine VTOL passenger operations under the eIPP program. Achieving that also requires infrastructure, and I'm happy to share that we're advancing very well on that side as well. Our demonstrations in New York made clear the tremendous worth of the landing sites and lounges that came to us through the Blade acquisition, among them America's three busiest heliports. Down in L.A., we revealed a partnership with the Reuben Brothers aimed at bringing a vertiport to the iconic towers at Century Plaza. In the Bay Area, we shared news of a partnership with the SAP Center to build a vertiport at a prominent San Jose site. Meanwhile, in Dubai, we celebrated finishing the world's first commercial vertiport constructed specifically for this purpose. Located right beside Dubai International Airport, this facility will serve as the operational center for our services in the region. This is just the beginning of many infrastructure projects and collaborations you'll hear about, as our recent demo flights and eIPP possibilities accelerate talks with partners worldwide. Over the last several years, we've set ourselves apart by how mature our aircraft design has become and by the progress we've made through certification. So as we increase output to meet demand from our initial markets and the eIPP program, it's clear that being ahead on the production side will be just as important. What we're learning right now about certifiable manufacturing methods, how efficiently we build, fine-tuning our supply chain, and handling inventory will count every bit as much as the technical and certification advantage we've built up over the past several years. Making more aircraft means we can reach more markets and more customers, and that brings us to lower per-unit costs sooner than our competitors. To give you a sense of the scale of this ramp, we're bringing on a third shift for both our composites layup team and our automated fiber placement team. Every month, we're putting groups of new technicians through training, and the output from our composites group has already reached 2.5 times what it was at the same point last year. Volume isn't the whole story, though — quality matters too, and to some degree, so does speed. Prototype components are no longer what we make. What we're making now are conforming parts for conforming aircraft, and as production scales up, the results we're seeing are incredible. Going from building composite parts for our first conforming aircraft to our fifth conforming aircraft, we've gained the time needed to make parts while at the same time raising quality. At present, parts for our ninth conforming aircraft are what we're producing, and Toyota remains at our side through all of it. We're integrating the know-how and hands-on experience of the Toyota Production System as we move along, and that covers things like Gemba walks, in which you watch the work happening right there on the factory floor, along with Obeya rooms that pull project information into one place so decisions get made faster and teamwork gets stronger; that sort of daily cooperation and exchange of knowledge is enormously valuable while we scale up production, and it's a real privilege to be picking this up straight from an automaker with so much experience. When it comes to certification, our attention stays on stage five, the last one in the type certification effort, and we're advancing well. In the quarter, we got through our SR3 audit with the FAA, something we'd been working toward for years. That audit went over our design for the aircraft and our safety requirements, our test results, and our development standards, and it verified that the results we're generating line up with what the FAA expects for the last phase of certification; this milestone, together with a great deal of what we've covered today, shows the amazing effort our teams have put in across the past five years, and I want to use this moment to thank Didier for everything remarkable he has contributed. He'll stay with us until early July and will keep helping us in an advisory role beyond that. Going forward, we're elevating several of our leaders so that our organization runs more efficiently and moves faster. Zooming out to our product platform as a whole, we also finished full transition flights with our turbine-electric VTOL aircraft in the quarter, among them a 148 mi flight at our maximum takeoff weight of 2,400 kg.

Joe Ben Bevirt executive
#3

Just to remind everyone, this plane is based on our standard electric S4 platform and adds a gas turbine so it can fly farther and carry more. Pulling off transition ranks among the toughest engineering hurdles this technology has ever presented. Because we leveraged the platform we already had, our own core technologies, and a seasoned team, we managed to get it done faster than anyone thought possible; that let us show off its maneuverability and endurance to the U.S. Army just last month together with our partner, L3Harris. Right now there are live contract opportunities in this area, with obvious capability gaps and robust demand for a system like this. That same operational experience and aircraft maturity underpins the partnership we announced last month with ASI, or Airspace Intelligence. ASI has quietly earned a reputation as a genuine leader in airspace modernization thanks to their high-fidelity, 4D modeling and AI tools, and they're among three companies currently vying to supply the software foundation for the FAA's brand-new air traffic control system. Our aircraft was engineered to work comfortably inside the current system, but we've long held that there are superior ways to deliver higher volume eVTOL operations, and we're thrilled about the ongoing modernization of air traffic control being led by Secretary Duffy. Together with ASI, we intend to run real-life demonstrations later this year showing how scaled operations can be safely integrated into complex, high-traffic airspace; this effort also marks a significant step toward fully autonomous eVTOL operations. Thanks to our Superpilot stack, we already possess the technology to achieve this. What we've lacked is an airspace management system enabling fully digital deconfliction of the airspace. Our collaboration with ASI ought to help clear the path for this crucial next step, and should it succeed, it ought to deliver safer, cheaper aerial transportation for eVTOL and every other aircraft using U.S. airspace. We finish the first quarter with a very strong balance sheet, amazing progress throughout every part of our business, and the clearest route we've ever had to launching passenger operations; with our recent New York and San Francisco demos now behind us and the eIPP program still ahead, communities all over America aren't merely reading about the future of flight or hearing about it on calls like these anymore. They're watching it in the skies over their own cities. As I told our team when we rang the opening bell at the New York Stock Exchange last week, only half a mile from where our aircraft touched down one hour afterward, we are literally ringing in the next golden age of flight. Rodrigo, over to you.

Rodrigo Brumana executive
#4

Thanks, JoeBen, and good evening to all of you. As JoeBen explained, the first quarter represented a period of consistent advancement. Last week in New York, I was fortunate enough to meet a large number of you face to face, among them investors and analysts who have joined today's call. Together, we saw something extraordinary. Flights completed successfully, linking Wall Street in Midtown with JFK in a matter of minutes. Actual aircraft operating actual routes, everything enabled by our Blade infrastructure alongside the FAA, local government, and essential infrastructure partners. It was a peek at what lies ahead, and my enthusiasm about being on this team could not be greater. Such moments are never accidental. They come from years of intentional investment and rigorous execution. On the finance side, my responsibility is to keep that going by financing certification, expanding manufacturing, and backing commercial launch, all while maintaining the financial flexibility needed to deliver. What you observed in New York last week, and in the Bay Area the month prior, represents the culmination of intentional investment and rigorous execution, generating concrete momentum in the market. Allow me to take you through the details of our first quarter financial results. We began 2026 with considerable momentum on the balance sheet. The first quarter closed with roughly $2.5 billion in cash equivalents and short-term investments, which includes $1.3 billion in net proceeds generated during the quarter from our equity and convertible offerings along with warrants exercised by Delta Air Lines. Our Q1 usage of cash equivalents and short-term investments, leaving out net proceeds from Q1 capital raises, came to approximately $195 million; that figure includes $32 million of net purchase cost for our new Ohio manufacturing facility after financing. The gross purchase price stood at $62 million. We financed about half of it on attractive terms, which brought the net cash impact for the quarter to $32 million. We excluded that one-time purchase, consistent with the way we communicated our first half guidance. Q1 cash use reached $163 million, versus $157 million in Q4. More detail can be found in our Q1 shareholder letter. Total property and equipment investment during the quarter came to approximately $78 million. Within that, $62 million reflects the gross Ohio purchase, while the remaining $16 million went toward facility build-out, tooling, and production equipment for our manufacturing ramp. On the whole, Q1 spend aligns with our first half 2026 guidance of $340 million-$370 million, excluding the one-time Ohio purchase, exactly as we previewed. We continue to be on track within that range. Take a step back for a moment. The capital deployment visible this quarter reflects a decision to lead rather than follow. We are simultaneously running a multi-year manufacturing ramp, an active type certification program, a global operations build-out, and integration of Blade. Few companies in our industry can execute all four at the same time. We are able to because of years of foundational investment. We're able to do this in a sustainable way thanks to how strong our balance sheet is; looking at GAAP, our Q1 net loss came in at $110 million, which is a $12 million gain versus the $122 million net loss posted in Q4. That quarter-over-quarter gain came from a $33 million favorable non-cash swing in the fair value of warrants and earnout shares, plus $4 million more in interest income, partly offset by a $27 million larger loss from operations. Keep in mind that revaluing warrants and earnout shares at fair value mainly tracks movements in our share price, so it can bring sizable non-cash swings from one quarter to the next. Q1 revenue reached $24 million, nearly all of it from Blade. Revenue fell $7 million versus Q4, which mirrors the fact that Q4 included one-time revenue from the flight demonstrations in Japan that didn't repeat. Blade had a strong Q1, and we're now entering the seasonal ramp, where Q2 usually builds as the weather gets better on the way to a Q3 peak. Service levels and customer demand are holding steady, and Q1 keeps us on a solid path toward our full-year revenue guidance of $105 million-$115 million. Q1 total operating expenses came to $258 million, up from $238 million in Q4. That $20 million rise largely came from ongoing investment behind certification, manufacturing ramp, and commercial readiness. Adjusted EBITDA, a non-GAAP measure we reconcile to net income in our shareholder letter, showed a loss of $179 million in Q1 versus a loss of $154 million in Q4. That $24 million sequential shift mirrors the revenue and expense dynamics I just walked through. All together, the capital we put to work in Q1 represents deliberate investment in the capabilities that make Joby stand out. Moving certification forward, scaling manufacturing in California and Ohio, and laying the groundwork for commercial launch. Q1 was a quarter of steady execution, and as the flights in New York and in the Bay Area showed, our progress is becoming more and more visible, not only along the certification path, but in the skies over our biggest cities. We have the balance sheet to lead and the discipline to do it well. Thank you for your continued support. Operator, please open the call for questions.

Kristine Liwag analyst
#5

Thanks. Afternoon, everybody. JoeBen, Paul, Rodrigo, and Teresa. Seeing the Joby aircraft touch down right in front of me at the West 30th Street vertiport last week was genuinely inspiring. I appreciate that. So, given how clearly Joby is advancing with eIPP, could you describe the sorts of discussions you're having with new customers? As all of you mentioned during your prepared remarks, the future has arrived. Everything you've worked toward for so many years is truly paying off, and these capabilities are happening right now. Now that things are solidifying and people can grasp what this mission really is, can you speak to those customer discussions and how fast do you believe those possible orders might come together?

Joe Ben Bevirt executive
#6

Thanks, Kristine. To start, I believe what people experienced in New York was quite telling, and that enthusiasm was quite telling about how much progress we're making and the opportunities that lie ahead. A great many Blade customers are genuinely thrilled about starting to use our service. What you're pointing to next, I believe, is aircraft sales. As Paul has mentioned on several occasions, that's definitely a lever we're able to pull whenever we want. Demand is enormous across numerous international markets. Depending on the market, we may, you know, adjust that. The third area where we're truly seeing momentum and a chance to build on the demonstrations we've been conducting and the energy surrounding eIPP, I believe, is infrastructure. I think genuinely speeding up those infrastructure discussions and getting additional takeoff and landing locations constructed is a significant opportunity. I'd just return to your question regarding aircraft sales. I may hand it to Paul to address the opportunities on the defense side.

Paul Sciarra executive
#7

Absolutely, and I appreciate that question, Kristine. As we've discussed before, there's a fairly substantial set of possible aircraft sales prospects for us beyond the United States. We've mentioned Saudi Arabia in particular, and Japan as well, where we have our partnership. Everyone in those places is essentially seeking what we managed to show in New York: a mature aircraft capable of fulfilling the mission, backed up by maintenance and pilot training so the planes are genuinely usable in their markets. The effort we put in in New York definitely helps build the momentum we're seeing when it comes to sales.

James Kirby analyst
#8

Hi there, good afternoon, everyone. I appreciate you making room for me. Regarding the eIPP, what's your thinking on the order in which you'll roll out the first aircraft for this program, considering both geography and type of operation? Does a decision tree drive that, perhaps tied to where revenue potential is greatest, or possibly to locations where infrastructure already exists? Does regulation play into it too? I'm just after your early thinking, I realize it's still soon, on the way you intend to scale into the eIPP.

Joe Ben Bevirt executive
#9

James, many thanks. My view is that it comes down to both of those factors. Infrastructure matters — certain states are advancing extremely quickly when it comes to putting more infrastructure in place, and that has us very excited. Then there are situations such as New York, where infrastructure is already there and so is a customer base, and where we can introduce the acoustic signature — that truly extraordinary acoustic signature our aircraft has — into areas presently dealing with a lot of helicopter noise, which strikes us as an enormous opportunity. Across these eIPP markets, we're seeing considerable demand, and we're eager to increase our manufacturing output as fast as we possibly can so we can capture that opportunity.

Andres Sheppard analyst
#10

Hi, everybody. Afternoon to you all. We really appreciate you fielding our questions, and congrats on every bit of the terrific headway. I share the sentiments expressed previously. Seeing the aircraft out in an actual operating setting was truly thrilling. Joe, my query, I suppose, continuing from the prior one, concerns the eIPP. I'm interested in hearing your outlook regarding how you foresee this initiative kicking off and then scaling from that point. As we're all aware, it's set to last 3 years. We're aware it begins this summer; a number of the projects are already chosen. Perhaps a handful more could be added, though that's not confirmed — that's roughly how I understand the launch will go. Will every project happen simultaneously, several aircraft concurrently, or more of a rotating approach? I'm just interested in your perspective on how the program gets underway and then expands, developing and maturing across those 3 years. Many thanks.

Joe Ben Bevirt executive
#11

Our finest forecast at this point, I'd say, is that signing — or rather, agreements beginning to get signed — happens during Q3, and then, entering the latter portion of the year, operations get underway. My expectation is operations involving both our eVTOL aircraft and our autonomous platforms. Regarding eVTOL, as I said earlier, we're pushing manufacturing ahead as hard as possible so we can deploy the maximum number of aircraft into eIPP markets. Looking toward the latter half of this year plus the opening half of next year, our strong desire is to have those fleets fully established in New York, Florida, and Texas.

Savi Syth analyst
#12

Afternoon, everyone. I understand you've begun flying the initial conforming aircraft. I was wondering when you expect to begin full credit testing on the aircraft, and what has to happen to reach that point?

Joe Ben Bevirt executive
#13

Savi, many thanks; having that aircraft airborne is something we're very excited about. As a quick reminder, constructing this aircraft was an enormous undertaking, with FAA DARs and DARs deeply engaged throughout. That aircraft being in the air is truly wonderful; that's one element. The second element is that every conforming test article must be completed, then tested, and afterward a large number of those test reports need to be written and submitted. Those represent two concurrent work streams we're pursuing. For the FAA, or rather for our initial conforming aircraft, the following stage is Joby pilots starting to conduct testing. Alongside that, bringing FAA pilots into the simulator so they can be trained. You can really view this as three concurrent work streams. First, the components and parts undergoing testing. Second, Joby pilots operating the conforming aircraft and completing all test points ahead of the FAA pilots doing the same. Third, the FAA pilots receiving simulator training.

Chris Pierce analyst
#14

Chris, thanks for circling back on the eIPP and production. It does look like the states' partners are progressing about as quickly as anyone could wish. I'd just like to understand whether you foresee any constraints on your end—things like manufacturing, raw materials, production, or even the pilots that must be ready at those sites. I'm trying to get a feel for what you're doing to prevent every possible bottleneck so the greatest number of aircraft can be deployed. JoeBen, over to you.

Joe Ben Bevirt executive
#15

Thanks a lot, Chris. Excellent question. I want to add my own praise for the states, the FAA, and the DOT for the truly outstanding effort they are putting into this program. We're pushing extremely hard on each of the 3 items you listed. First, the supply chain; second, scaling up manufacturing; third, we invested quite early in our flight simulator. Getting it in place now and readying it so we can start instructing FAA pilots really says a lot about the Joby team and their remarkable vision. Let me remind everyone, we constructed that alongside CAE. CAE leads the world in flight simulators. Joby creates all the flight dynamics and flight controls operating on it, while CAE supplied the hardware. That partnership was terrific, and we can't wait to begin training pilots with it.

Austin Moeller analyst
#16

Hello, and good afternoon. Let me start with my first question. Where do things stand regarding the timeline for production activity in Ohio? Are there plans to gradually introduce additional shifts at that location too?

Joe Ben Bevirt executive
#17

Austin, thank you very much. Things are progressing extremely well when it comes to growing the team in Ohio. For everyone's benefit, propeller blade manufacturing takes place at that site, and the way that facility has come online makes us very happy. It was the initial site we acquired in Ohio; we're now introducing more components and systems that are beginning to be produced at that first location. Also, for everyone's benefit, we acquired another 730,000 sq ft site located across the street. Build-out work is now starting at that site, getting it ready so we can begin installing production processes inside it. These are two work streams running in parallel. First, growing the workforce and continually adding capabilities for our Ohio team. Second, completing construction of that bigger site. The momentum and the maturity we're observing from the Ohio team truly please us.

Amit Dayal analyst
#18

Thanks a lot, everyone. Congratulations on everything you've accomplished, and it's great to see the flights beginning to happen now. Regarding passenger flights, you mentioned that these might happen by the end of this year. My understanding is that earlier expectations had them possibly launching in the Middle East, but given what's going on there, do you think those flights could now happen here in the U.S.?

Joe Ben Bevirt executive
#19

Thanks very much, Amit. It's really exciting that we now have two opportunities for passenger flights this year — in Dubai and also across our various eIPP markets. I believe it looks quite promising that passenger flights will occur later this year; to me, that's a dream come true. This is something I've been anticipating for an extremely long time.

Teresa Thuruthiyil executive
#20

Thanks, Irene, and I appreciate all the analysts who joined us with questions today. At the start of this week, we asked people in our Reddit community to send in questions. A lot of varied questions came in regarding eIPP, upcoming stops on our Electric Skies Tour, and conforming aircraft. Let's dive into a few of those. The first one asks, what's the status of the remaining FAA-conforming aircraft currently being built? How many of them are in production? What's the expected timeline for FAA pilot testing? JoeBen, would you like to walk us through that?

Joe Ben Bevirt executive
#21

To start, regarding how many are in production — like I mentioned during my prepared remarks — right now we've got components for 9 aircraft that have started to be assembled; there are 5 aircraft we'll use for TIA flight testing, and every one of them is moving along nicely within our manufacturing process. That shows you the ramp we're on. As I noted, we've brought up our 3rd shift for the composites side, and honestly the momentum feels fantastic. To be really precise about it, we're increasing output as quickly as possible, though quality stays the priority. Our goal is pushing NCRs — that means non-conformances — down to 0. Wherever possible, we want to produce our parts with no defects at all. What matters most in aviation manufacturing is building parts with amazing consistency and quality, and it's wonderful having the Toyota team alongside us, given their deep expertise and culture rooted in quality. The Toyota Production System has a global reputation for the outstanding quality and efficiency it brings into manufacturing operations, and having Toyota working side by side with us has been truly extraordinary.

Teresa Thuruthiyil executive
#22

Great, thanks. Regarding eIPP, the person asking wanted to know: its aim is to let AAM companies, cities, and regulators get helpful information sooner in the development process than used to be feasible. Could you tell us anything useful that Joby or regulators have picked up from Joby's tours in New York City and the SF area, such as any surprising responses from the public?

Joe Ben Bevirt executive
#23

Appreciate it. The main takeaways here — this truly highlighted and expanded upon the strong ties we've established, be it with the EDC and the Port Authority in New York, or be it with the FAA and the DOT. The Joby team simply hit it out of the park. Operations ran without a single hitch, and we feel such gratitude — I feel such gratitude — toward the Joby team, toward the connections we've formed, and toward the maturity of our processes and our standing with the regulators. What I believe stood out most to me, and what I think was genuinely extraordinary regarding those flights, was folks hearing our aircraft for the very first time — and more specifically, not hearing our aircraft as it passes overhead. New York has a large number of helicopters in operation, and the gap in the acoustic profile between a helicopter, which you're able to hear from far off, and our aircraft, which can fly right above you and you can't even hear it in a city like New York, is genuinely thrilling. We can hardly wait to bring our aircraft to New York, to Florida, to Texas. We feel such gratitude toward the DOT and the FAA for the extraordinary work they've accomplished on the eIPP, and we're very grateful to the states for their incredible execution on this program.

Teresa Thuruthiyil executive
#24

Great. Yeah, having the community participate so much in those flights we ran last week in New York City was genuinely a pleasure. I want to thank all of you for being with us today. Your support means a lot to us. Operator, I'll hand it over to you.

Operator operator
#25

Appreciate it. That wraps up the call for today, and thanks for being with us. You're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Joby Aviation, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Joby Aviation, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.