Good day, ladies and gentlemen, and welcome to the KIMS Hospitals Q4 FY 2026 earnings conference call, hosted by IIFL Capital. Please be reminded that every participant line will be in listen-only mode, and an opportunity for you to ask questions will come once the presentation has concluded. If you need assistance during the conference call, please signal an operator by pressing star zero on your touchtone phone. Kindly note that this conference is being recorded. I now hand the conference over to Mr. Rahul Jeewani. Thank you, and over to you, Mr. Jeewani.
Hello, and good morning to all of you. Rahul here, calling from IIFL Capital. It's my pleasure to welcome everyone to the fourth quarter earnings conference call for KIMS Hospitals, which IIFL is hosting. Joining us from KIMS today are Dr. Bhaskar Rao Bollineni, our Founder and Managing Director, Abhinay Bollineni, Executive Director and CEO, and Mr. Sachin Salvi, CFO. Sir, the floor is now yours for your opening comments.
Good morning, and a warm welcome to everyone. Financial year 2026 ended just as the Gulf War now under way began, and its effects are being felt in numerous nations around the globe, India among them. The Prime Minister's recent call for austerity measures highlights how serious the situation is. Let us respond to that appeal from the Prime Minister and make sure resources are used as efficiently as possible until things return to normal. Let us hope and pray that reason will prevail and that the war ends soon. In today's world, a war between any two nations affects many other nations, given how interdependent they are. I know all of you have been waiting eagerly for our financial results. It gives me pleasure to report that KIMS achieved stable growth. Highlights for quarter four of financial year 2026: total revenue came to INR 1,084 crore, up 35.3% year-on-year and up 8.1% quarter-on-quarter. EBIT was INR 216 crore, up 6.8% year-on-year and up 5.9% quarter-on-quarter. The EBITDA margin stood at 19.9%, compared with 25.3% in Q4 FY 2025 and 20.4% in Q3 FY 2026. Cash was INR 33 crores in Q4 FY 2026, against INR 106 crore and INR 52 crore in Q4 FY 2025 and Q3 FY 2026 respectively.
Let me walk through the FY 2026 highlights. We posted total revenue of INR 3,931 crore, which represents 28.2% growth year on year. EBIT came in at INR 828 crore, up 1.6% year on year. Our EBITDA margin stood at 21.1%, compared with 26.6% in FY 2025. Cash was INR 242 crore in FY 2026, versus INR 415 crore in FY 2025. Consolidated earnings per share for FY 2026 were INR 606.03, down 37.2% year on year. Now for the Q4 consolidated financial highlights. Consolidated revenue from operations reached INR 1,075 crore, a rise of 34.8% year on year and 7.7% quarter on quarter. Consolidated EBITDA pre Ind AS was INR 131 crore, a fall of 33.5% year on year and 32.3% quarter on quarter respectively. Turning to operational highlights for quarter four of FY 2026. Average revenue per operating bed increased 13.7% year on year and 1.7% quarter on quarter respectively. Average revenue per patient was up 14% year on year and 3.5% quarter on quarter respectively. IP volumes rose 17.9% year on year and 4% quarter on quarter respectively. OP volumes climbed 30.1% year on year and 4.1% quarter on quarter respectively. On the FY 2026 operational highlights: average revenue per operating bed rose 14% year on year. Average revenue per patient increased 11.4% year on year.
Both IP and OP volumes rose 15.4% and 25.4%, respectively, on a year-on-year basis. So the operational parameters showed a steady upward trend. It's a good sign that new units in Bengaluru, Thane, Kerala, Nashik, and Seethammadhara, Vizag contributed meaningfully to top line growth. The matured units kept up a healthy growth pattern. Expansions by nature require heavy spending and hold back profits in the initial phase. In the same way, the company's profit for the year is affected, though growth remains stable. The new units will also turn right sooner than expected, and the prospects are already visible. 2025, 2026 has been a year of expansions. We opened one more hospital in Hyderabad at Kompally, two in Guntur, two in Maharashtra at Thane and Sangli, two in Bengaluru, Mahadevapura and Electronic City, and one in Kerala at Kollam. We also opened activity centers at Hyderabad and Guntur. Expansion has no meaning without clinical excellence, and excellence is incomplete without empathy. All these new units reflect the above concepts of excellence and empathy and have already started making great imprints in their respective zones. I am happy to state that we have accomplished an important milestone of completing 10,000+ successful brain tumor surgeries at KIMS. An exclusive cancer block was recently inaugurated at KIMS Hospital, Ongole, to meet the medical needs locally without patients running far and wide.
We opened KIMS Cuddles, a mother and child unit at Nellore. A World Cancer Day program was held on 4th February 2026 to promote awareness. Megastar Padma Vibhushan Chiranjeevi attended as chief guest. To mark World Lupus Day, KIMS Hospital, Secunderabad, organized a unique ramp walk featuring lupus warriors on 11th May, with family members and healthcare professionals from across the city attending. This is the 5th such lupus ramp walk initiative in Asia. Yesterday, that is 7th May, was World Hypertension Day. Hypertension, or elevated blood pressure, is a common condition with a prevalence of one in three adult Indians. This condition is dangerous but silent and causes a huge disease burden in the forms of heart disease, brain stroke, renal failure, eye disease, and peripheral vascular disease. The danger is greater since it often produces no symptoms by itself until target organ damage is already established, and so it is appropriately called a silent killer. Large studies have shown that early detection and appropriate management can prevent the adverse effects of this disease. Early detection relies on screening programs across the populations and education to follow healthy lifestyle. Thus, high blood pressure is the gateway for mental health, many health issues, and timely action will enable mitigate many problems.
Given how much this matters, we asked every unit head throughout the group to arrange BP checkups on a huge scale — 1 lakh of them, at random locations such as railway stations, bus stands, offices, and so on. Despite the short notice, all the units answered that call right away, and in a resounding way, reaching 2 lakh 4,000 — more than twice what we had expected — thanks to vigorous campaigning. Beyond the numbers, it worked well to build awareness on a wide scale. Our firm belief is that prevention beats cure, and this initiative shows our philosophy. As a healthcare professional, I felt it appropriate to also tell you on this occasion about the harmful effects of hypertension. In the end, it is said that medicine brings no happiness and that nothing is medicine like happiness. I thank you for your continued support and trust. Thank you very much.
We’re able to open it now, sir.
Can we go ahead and take questions from the callers now?
Yeah, correct — right now.
Thank you. We're now going to start the question-and-answer portion. To ask a question, you can press star and one on your touchtone phone. Should you want to take yourself out of the queue, press star and two. We ask that participants use their handsets when posing a question. Ladies and gentlemen, we'll pause briefly while the queue is put together. Our first question is from Balakrishnan at AUM Asset Management. Please go ahead.
Good morning, sir. My first question concerns the segregation and the changes in presentation. Previously we had a lot of additions in Andhra Pradesh, which are not available now. Also, Telangana, Kondapur has been changed and elevated. Are there any changes in plans — and timelines are not available either. How should we view this now?
Yeah. Hi, Balakrishnan, Vikas here. The only reason for the change is that we're coming up on — we're planning a QIP in a month or two. What happened is that, to align with the councils, the prospectus and all of that, this time we've given only the information that's being informed to the exchanges and so on. The earlier plan is on track, and we'll update the presentation next quarter.
All right, thanks. Second, and this, in 2025, 2026, we've launched quite a few new assets. How much do the registered assets contribute to current revenue, and what's the EBITDA range? For the most part we're EBITDA negative. What would the approximate EBITDA percentage be?
On a quarter-over-quarter basis, looking at it, our mature unit is still holding steady at roughly 30% EBITDA. As for the newer units — the ones that came on recently, specifically the PES Hospital in Karnataka — there's an initial drag, you know, and that alone is what's pulling the EBITDA down.
Sachin here.
Alright.
On the numbers, Arjun, if that's what you're after: total revenue came to roughly INR 1,085 crore, and matured units contributed close to INR 862 crore of revenue this quarter. The remaining revenue, about INR 224 crore, comes from the newer units. By newer units, we mean those that have been in operation for under one year as of the financial statement date. As for EBITDA, we reported almost INR 216 crore this quarter, and out of that, INR 250 odd crore comes from the matured unit. Put another way, we continue to hold an EBITDA margin of almost 29% — 28.5% or 29% — from the matured unit. For the newer units in the current quarter, EBITDA earned is to the tune of about INR 32 crores. That is roughly — that is accurately, in terms of numbers, for the current quarters.
Thanks, Sachin, and I really appreciate that explanation. Last thing: when do you figure — and when might we return to the earlier EBITDA figures once these effects have played out? When could we reach those numbers, perhaps further out, in 1 year or 2 years? Since we're growing fast each year, will EBITDA margins simply land in this range over the coming 3 or 4 years?
Regarding the units that have reached maturity.
Yes, go right ahead, Dr. Abhinay Bollineni.
All right. A better lens here is comparing one cluster against another. For each cluster, we're now sharing what the EBITDA margin is. Since we're putting in a great deal of bed capacity across various clusters, EBITDA figures will see some pressure. Provided we can expand that quarter over quarter, that's the way we ought to view it. That's the guidance we want to provide.
Great, thank you very much.
Thank you. Our next question is from Aman Goyal at IIFL Capital. As a reminder, please press star and 1 to ask a question. Go ahead.
Yes. Thanks, sir. I appreciate the chance to ask. My question concerns how losses at the new units are trending. Could you give us some detail on the quarter-on-quarter losses at Nashik, Thane, and the newer Karnataka units?
In Nashik, the Q4 loss came to roughly INR 1 crore. Thane posted a loss of about INR 5 crore for Q4. The remaining losses stem from Karnataka. I believe the Maharashtra losses have now shrunk to only INR 6 to 7 crores across both of the new entities. In Karnataka, since PES was just commissioned in January, there are some losses — sorry, PES was commissioned in December. With ramp-up now underway at PES, perhaps by the end of the year the losses at PES should also come down. As for Mahadevapura, the losses there fall in a range similar to Thane, and those too will shrink once we bring on more and more insurance sides.
Yes. Thank you, sir. Thank you, sir. My following question concerns Karnataka. As you mentioned, we are newcomers there, and several larger hospital groups operate in that area, such as Apollo and Manipal. How would you view that market relative to our main cluster of Telangana and Andhra?
Naturally, this is a brand-new market for us, and we're quite pleased with how the ramp-up at Mahadevapura has gone. At this point it's eight months old — eight, nine months old. On average we're generating INR 17 crores per month in patient throughflow. We have very clear visibility into how that will reach INR 25 to 30 crores over the coming 12 months. We don't anticipate any difference from how ramp-ups would have played out in a city such as Hyderabad or in Bengaluru. The only thing is that the timing for both hospitals had a gap, and that's why the hospital expanded. Commissioning PES took us a bit longer. The one difficulty lately has been the insurance entitlement. Once that is resolved, I think it's a growth trajectory, and we're pretty confident across all the hospitals we commission.
Yes. Thank you, sir. I'll wrap things up at this point.
Thanks. Just a reminder for everyone on the call: to ask a question, you need to press star and one. Our next question is from Nancy Jacob at Edelweiss. Go ahead, please.
Hello, sir, and thank you for the chance to speak. Once more, I have one question regarding the new units. So that I can work out margins, could you possibly share the revenue and the EBITDA for Q4 for Mahadevapura, E-City and Thane?
Regarding Mahadevapura —
You mentioned Mahadevapura is close to INR 17 crores per month. Does that work out to roughly INR 51 crores?
No — for Q4, Mahadevapura comes in at INR 49 crores.
Alright.
Next up is INR 17 crores. For Thane, it's INR 47 crores.
Alright. Sir, could you also provide the individual loss figures for Mahadevapura and Electronic City?
Mahadevapura comes in at 14, Electronic City at 25, Thane at five, and Nashik at one.
All right. Sir, revenue at Electronic City stands at INR 17 crores. Apologies, I'm not certain I heard that right.
Yes, for the quarter.
Alright, certainly. Appreciate it. That covers everything I needed.
Thanks. Our next question is from Alankar Garude at Kotak Institutional Equities. Go ahead.
Morning, everyone. Sir, on the third quarter call you said debt had peaked and that with no fresh expansion plans it ought to come down. Then, just a month later, you announce the QIP. Could you help us understand what's behind the planned INR 1,500 crore QIP? I mean, does this mean you've settled on some new expansion plans?
On expansion plans, Alankar, we're still looking into that. It fits within the broader strategy. The thinking is that with debt now at its peak — roughly INR 3,000+ crores — we retire some of it and direct the cash flow toward more greenfield projects, which will take 3 to 4 years anyway before commissioning. There are one or two small acquisition opportunities that could potentially arise over the coming two quarters, though they aren't significantly big. Combined, they're around 400, 500 beds. The thinking is to retire — a large amount of this will go toward retiring debt and using the cash flow to fund greenfield expansion, which will take 3 to 5 years anyway before commissioning.
Abhinay Bollineni, which markets are you referring to — for the organic expansion and for the acquisitions alike?
Every one of those locations falls within our core markets — Karnataka, Kerala, Andhra Pradesh, and Telangana — with the bulk sitting in those four states.
So essentially, you're going to pay down debt first, and then at some point later take on the greenfield. Since the cash flow needs for the greenfield will be weighted more toward the back end, paying down debt is something the QIP makes feasible. Is that how we should read this?
That is right.
All right, all right, that's fair. On the second question, in qualitative terms, especially regarding insurance empanelment, could you bring us up to date on how things are going at the four relatively new hospitals — Nashik, Thane, and the two in Bengaluru? Compared with what you originally expected, it would help if you could just point out how each of those units has done. Thank you.
From our side, I think what we didn’t fully anticipate was how long insurance empanelments now take compared with how they used to work. That has created some delay in the ramp-up. Apart from that, overall, all 4 hospitals are doing well and we’re very pleased with how we’ve been able to build clinical traction. If we had secured empanelments the way we could previously, the ramp-up would have been significantly stronger than it is today. Even so, we’re fairly pleased with the revenue growth trajectory at most of these hospitals. On the empanelment side, in Nashik we still need to get STAR, Medi Assist, and GIPSA. In Thane, we finally obtained GIPSA and Medi Assist, and STAR is almost through. That covers at least 70% of insurance volume. We still need to get the empanelment, but at least the negotiations are more or less complete. In Bengaluru, it will take 3 or 4 more months before we can get the empanelments done.
I just have one quick follow-up. You brought up the delays in insurance empanelment. Was that tied more specifically to FY 2026 and the standoff that occurred with insurance providers across the industry, or is this something we should expect to keep continuing going forward?
There's also a new council, GIC, that came in during that same financial year, as I recall. That has created a fair amount of confusion over which body empanels hospitals. Is it GIC that handles it? Or do companies do that directly? That muddle also caused a substantial delay in getting hospitals empaneled. Eventually, I think we'll need to find some way to smooth this out and ensure that once a new hospital is commissioned, we can get empanelment completed within six months, nine months.
Understood — that’s quite useful. Many thanks.
Thanks. Our next question is from Akshay Thakur at Helios Capital. Go ahead.
Good morning, sir, and thank you for taking my question. My question concerns the capital raise. I'd like to hear your strategic assessment, and let's split it into two parts. For instance, one would be raising it from the market — that could be debt, or it could be a QIP, or any other source. The second would be the doctors' participation model that we used to have earlier. Could you explain what the strategic evaluation is between these two ways of raising capital from these two sources?
At present, our debt stands at just over INR 3,000 crores. Our plan is to apply the capital raised through the QIP toward paying that down. For most of the projects we undertake at the project level, we contribute equity equal to 40% of project cost, while 60%-65% comes from debt. Doctor participation, meanwhile, tends to be quite small indeed—at most it comes to just 3%-5%.
Understood. In terms of the expansion plans you have right now, are you also assessing this — the doctor practice participation model — when it comes to future expansion?
The doctor participation model is always available. Doctors can invest whenever they wish.
Understood, sir. That was the sole thing I wanted to ask. Thanks.
Thanks. Our next question is from Karan Vora at Goldman Sachs. You're up.
Thanks for taking my question. My first question concerns the Kondapur expansion. I notice the bed count has gone up. Any thoughts on what kind of CapEx we're planning and what the timelines look like? When should those beds come online? If they're coming in phases, which is what we understand, then what will phase I, II, and III be? What are the timelines and the CapEx for that?
We're going to move into the new Kondapur facility beginning the first week of June. That new hospital is going to have 800 beds in total. As for the old hospital, we will shut it down completely. The transition will happen over one month, though we may keep running the old facility for two, three months even after we've transitioned. And then we'll shut it down. The new hospital will have 800 beds, and in phase I—since we're already at an occupancy of 200 beds and we need the headroom for growth—we will commission at least 400 to 500 beds in phase I. The remaining 300 beds, we will commission as and when occupancy increases.
Understood. What's the CapEx we've taken on across the entire project?
Yeah — apart from, I'd put it at roughly INR 50 crore to INR 75 crore, and that spend won't land in FY 2027; it comes in FY 2028 and after. That money is for finishing two more floors, and we don't need those right now.
Did you say INR 50 to 70 crores?
That's between INR 50 and 75 crores. For FY 2027, we don't require it. Depending on how the ramp-up unfolds, we may need it in FY 2028 or 2029.
The second question concerns the Andhra Pradesh and Bangalore ARPOBs. Bangalore ARPOBs appear to have increased quite substantially. Even the full-year figure shows something like INR 85,000 on the deck, if I'm not mistaken. What has happened, and is this the new base, or is it merely a one-off where the mix was simply too good and you return to the 70s number that was originally envisaged? Likewise for Andhra Pradesh, what is the right run rate? Is INR 28,000+ the new run rate, or is INR 24,000 to 26,000 the one we should regard as a normal run rate?
Right. For Bengaluru, INR 75,000 is a healthy figure to use. If you look at Q3, Q4 and the full year, the ALOS keeps shifting. And as ALOS shifts, ARPOB moves up and down accordingly. It's fair to assume, across all models, that INR 75,000 is a good base to work from. It will take time for the hospital to settle, since many new programs are being added. Transplants are being done in a very aggressive manner. For modeling purposes, just assume INR 75,000 in Q4.
Understood. What about Andhra ARPOBs?
In the same way, Andhra is also at INR 26,000, INR 27,000 in Q3, and Q4 stays the same as well.
All right, understood. That’s the base—that’s the standard base.
Right.
Understood — one final quick question. For Maharashtra, what did Q4 occupancy come in at? When I calculate the implied figure, it seems pretty high — around 60%, maybe 65% or more — in order to get to that 52.1% for the full year, correct? Is that a reasonable number, or is something off?
For Q4, Maharashtra comes in at 60.5% occupancy.
All right, all right, understood. So again, is that something that can hold up? It seems like a huge jump, going from 35% in Q1 up to more than 60% by Q4. Should we treat something like 60%, that sort of figure, as the new baseline for Maharashtra occupancy?
That's the new base for Q4.
Alright.
Regarding March.
All right, understood. That's useful. Yes. Thanks.
Thanks. Our next question is from Abhishek Gupta at ChrysCapital. Go right ahead. Mr. Gupta, the floor is yours for your question.
Hey, good morning, and thanks for taking the question. In Telangana and Hyderabad specifically — which, as we know, is a more mature market — IP volumes went up 2%, while the overall revenue mix rose by 12%+, right? Most of that is driven by value. How do we see this playing out over the next year or two?
Apologies, Abhishek — would you mind repeating that? Could you go over it once more?
You mean compared with the same period a year earlier? Yeah, yeah. In Hyderabad — a mature market when it comes to the broader healthcare space — we saw IP volumes go up 2%, right?
Alright.
Value accounted for the remainder of that.
Got it.
How should we think about that figure trending over the coming year or two?
I think that's because, as a cluster, Telangana now has fully added — which was commissioned two months ago — the new Kondapur. Elect commission, now. Over the next 18 months, expansion in Hyderabad is going to take place. Once those expansions are done, growth is going to be largely volume-driven for the next four, five years.
Right. Got it. I’m finished.
Thanks. Just a quick reminder for everyone — as you're aware, hit star and one if you'd like to ask something. Our next question is from Damayanti Kerai at HSBC. Go ahead, please.
Hello, and good morning — thanks for having me. I’ve got two questions that are more industry-wide in nature. To start with, what have you noticed when it comes to competition for doctors in a few of your main markets — Bengaluru, for instance? Is it getting more competitive, or is that not really a concern for you? If you could speak to that, I’d appreciate it.
In my view, among all the markets where we operate, Hyderabad stands out as the most competitive. Over the past 12 months alone, no fewer than 4 or 5 hospitals were brought into service within Hyderabad itself. We haven't experienced any meaningful loss of doctors. A couple of doctors did leave, yet there's nothing significant that concerns us or that suggests we're facing rivalry on that front. Actually, we're likewise expanding our capacity further, and we're quite confident that we can attract physicians away from competitors in order to fill out that added capacity.
In your view, what does help mean? Sorry, yes. Go ahead and finish.
So the same pattern holds in every other market as well — Karnataka, Kerala — where we're seeing strong traction from all doctors. Whatever department they're interested in entering, we're able to fill it. Yeah. And we aren't really encountering any notable pushback from doctors about joining us.
So, in your view, which main initiatives or main incentives on KIMS's side are keeping the key doctors? Across markets, what we've observed is that whenever new hospitals open up, I'd guess there's some meaningful attrition from the incumbents, and so on. What do you think is helping you hold on to the talent that your hospitals have?
I suppose they feel quite at ease at our hospital and are glad to keep working here. They don't perceive any added benefit they'd gain from leaving this hospital.
Alright. My second question really follows on from what we discussed earlier regarding insurance empanelment. If you could explain it once more, I think — I didn't quite follow it well. What are the dynamics that have actually shifted and led to the empanelment being delayed? You brought up the GIC involvement and so on. And then we keep hearing about the common empanelment initiatives and similar things. It feels as though many changes or conversations are taking place in that area. I'd just like to hear what you think or what you've observed there.
I mean, look, GIC has launched an initiative — GIC — under which empanelments need to be done in common. That's where we ended up losing a lot of time, trying to figure out which model should be used for empaneling hospitals. It's an initiative taken by all the insurance companies. It's going to keep going. It will get stronger as we move ahead. Since this is a new initiative this year, there has been some confusion around how things ought to proceed. And also, given that we have commissioned so many hospitals across different micro markets in different cities, and, you know, when we approach insurance companies asking for 10 empanelments at one time, while at the same time we're also discussing renewals, that has kind of resulted in, you know, a delayed response from their side as well. It's not that they aren't working on it — given all the things they have to handle from a single company, that's where we had to, you know, give each hospital the time and space to be completed first, and only then move on to the other hospitals.
Okay, so what do you think about a shared empanelment effort? Is that something you'd look at, or what are the main reasons you'd push back on that?
My view is that if IRDAI chooses to take action, our only option is to comply with whatever regulations they establish.
Okay. Some of the bigger companies in your space, I believe, have said this doesn’t apply legally. There are, I think, a few worries about pricing and so on. That’s the reason I wanted to get your perspective.
I’m not sure. I don’t believe it makes sense to say anything about that at this point. At present, we are working on, we’re carrying out our empanelments with each, with insurance companies.
Alright. Thanks. I'll rejoin.
Thanks. Our next question is from Ankush at Sanctum. Go ahead.
Thank you, sir, for the chance to speak. If he has taken the earlier calls, then during that earlier call it was stated that. The December quarter is the period in which we are seeing that the new units have begun, and it ranks among the lowest margins for the December quarter. There is a certain normal improvement in the business's margins. Just try to get your sense on that. How do you view the ramp-up in margins now over the coming quarters?
As I mentioned, the right way to view this is cluster by cluster. Looking at it company-wide is hard, since many new hospitals are being commissioned across different clusters. On a cluster basis, margins expand every quarter in nearly all clusters, the mature ones included. In Andhra as well, we're seeing margin expansion. In Telangana, we're seeing some margin expansion at both of the new builds.
Appreciate it, sir. That covers everything on my end. Thanks, sir.
Thanks. Just a quick reminder for everyone: you need to star one if you'd like to ask a question. Our next question is from Satyam Kumar at AAA Holding Trust. Go ahead, please.
Hello, and thank you for the chance to speak. I actually have a few questions. My first one concerns Bengaluru ARPOB. From what I can see, the combined Bengaluru hospital has posted an ARPOB of roughly INR 85,000. Do you expect that figure to hold up going forward? And on occupancy, as I understand it, some hospitals were brought into service quite recently, so occupancy sits very low, at about 20-odd %. How do you expect occupancy and ARPOB to interact? That is my first question.
ARPOB, as I mentioned, was INR 85,000 for the whole year, in the final quarter, and the ALOS has been shifting. Since this is a new facility and many new departments are being added, stabilizing the length of stay will take time. Practically speaking, we should take an ARPOB of INR 75,000 and model the ramp-up on that basis. Over time, as the hospitals mature, the ARPOB will naturally grow. Regarding occupancy — sorry.
Mm-hmm. Go ahead, please.
On the occupancy front, we've seen solid quarter-over-quarter improvement. Our visibility suggests the ramp-up will remain quite robust even into the next financial year. By the end of the year, we expect to reach roughly 35%-40% occupancy across the full bed capacity.
Okay, got it. So how are you planning to add beds at both hospitals in Bengaluru? At the moment, the number of operational beds is on the lower side, which makes sense. How do you increase it — at what occupancy level do you usually raise the count of operational beds at the Bengaluru hospitals?
With occupancy sitting at 60% on the beds we're running right now, we'll bring the remaining beds into service. Bringing those other beds into service simply means adding more manpower. We'll determine how to bring those beds into service based on what the need on the ground turns out to be, since the CapEx for all of these beds is already complete.
Got it. One final question, this one a bit more long-term in nature. A couple of years back, as I recall, you announced a plan for expansion. From what I understand, the bulk of that expansion is already done. Going forward, then, how do you view expansion over, say, the coming 3 to 4 years, especially since you're also doing a QIP? What type of expansion are you looking at, and also what sort of top line and EBITDA growth, from a growth post perspective—more medium-term—what target do you have, if you're willing to share?
I believe that growth is going to keep going. On a year-on-year basis, we'll continue adding additional beds. Over the coming 12 to 24 months, much of the consolidation of the existing hospitals is going to take place, and that will also lower — that will also widen margin for us so we can strengthen those current hospitals. By that point the debt level will also decline, despite the QIP level, to a significantly low figure. We'll also spend the coming 24, 36 months getting the greenfield projects underway. Naturally, we have plans for expansion in Karnataka and in Kerala. In Tamil Nadu, we're going to add one hospital, and of course we'll keep expanding in Andhra and Telangana. A similar expansion phase will take place, but since all of these are greenfield projects, they will once again get bundled together, after three or four years.
What growth outlook do you have in mind — what sort of top line or bottom line are you targeting? Is there anything you want to share right now?
As for the forward-looking figures, those aren't something we can provide, but I think it ought to look comparable to what, you know, we've managed to achieve previously.
Alright, I've got it. I've got it. Appreciate it.
Thanks. Our next question is from Karan Vora at Goldman Sachs. Please go ahead.
Thanks for the follow-up. I’m just trying to get a sense of what the key — sort of one key — challenge is for each of our geographies. If you could highlight that, it would be helpful. Just one biggest concern top of mind for management in each of the five states where you’re present.
At this moment, the sole issue I can identify is that first impact. You know, everything we've picked up in Pune, Bengaluru, and Nashik — all those clusters — doesn't really appear any different from the way things stand in A.P. and Telangana. Drawing in talent, constructing hospitals, ramping up — these are quite alike. Our experience has been much the same. The one difficulty we encountered during ramp up was that initial impact.
Understood — that really only applies to the new hospitals we’re in the process of bringing online, not the ones already running. And no, there aren’t any challenges at all in the existing hospitals.
We've become a promoter now.
All right, the second question concerns physician compensation and our approach in markets where we already operate compared with new ones. Do we follow somewhat different playbooks in newer locations such as Bengaluru, Kerala, or Thane versus what we do in Andhra Pradesh and Telangana? Are we paying more? Where exactly do we sit on doctor pay — top quartile, or merely a bit above average? Any insight into the strategy and the pay ranges would be useful.
We're doing exactly the same thing in AP and Telangana. That same model has been carried over into Maharashtra, Karnataka, and Kerala. Nothing has been altered.
Right, understood. On compensation compared with bigger peers, would you say we're in the top quartile, better than average? Any detail on that?
Our compensation is based on what we believe the teams are capable of achieving. I’m not sure how to fit them into the sort of category you’ve been asking about, but I think, yeah, we’ve been paying quite well whatever we consider sufficient to support the hospital’s ramp-up. That’s the way we see it.
Understood. Understood. Just one small housekeeping item: any figure, whether qualitative or quantitative, or a range for the Kondapur margin in FY 2027 would be useful.
So I believe when we did the Sunshine movement previously, the figure was somewhere around INR 15 crore to INR 20 crore, or perhaps an INR 25 crore kind of number, at the time Sunshine shifted from its old hospital into the new facility. Since this facility is considerably larger, we should view it along similar lines, or perhaps a bit more.
Alright, that's clear, and it helps. Appreciate it.
Thanks. Just a reminder for everyone on the call: you need to star one if you'd like to ask a question. Our next question is from Harith Ahamed at Covenant Industries Group.
Morning, Dr. Abhinay Bollineni. Could you give us some detail on the Palakkad acquisition — what the revenue and EBITDA profile looks like, what potential you see there, and whether we'll be consolidating it in our P&L.
We're going to consolidate this in our P&L, Harith. It's similar to what we have in Kollam. That's a 250-bed hospital. Sorry — a 300-bed hospital. Over time, the revenue potential would be roughly INR 12 crores to INR 15 crores each month. Right now, this month — May, the month of May — we should be doing about INR 6.5 crores to INR 7 crores, with maybe -5% EBITDA. Next month, we should reach break-even at that facility. By June, July.
Understood. To follow up on what you said about lowering net debt after the QIP: post the QIP, we're at a net debt level of roughly INR 3,000 crore. Could you give us some broad indication of where that might go by the end of FY 2027, once we factor in part of the CapEx plans we have for the year as well as the ramp-up we expect at certain hospitals that are currently loss-making?
My guess is that we should pay down debt to the extent of roughly INR 1,000 crores, and the remaining amount will go toward losses and further CapEx at the current facilities — CapEx that is required in order to finish up at a few of the existing facilities we've already commissioned.
Okay. And finally, regarding the Telangana cluster — since it contributes so heavily to our total profits, and the Kondapur expansion is a fairly big one, should we be expecting growth for the cluster overall in FY 2027, or will it track our recent trends, or will it be a soft year for the cluster as a whole?
Regarding the cluster, I believe there ought to be a solid growth rate. For the Telangana cluster, we should probably expect EBITDA growth of roughly 10%-12%. In the past it has come in higher, but considering Kondapur and Kompally, which were only just commissioned, it ought to land in that range.
Alright. I appreciate you taking my questions.
Thank you. As a reminder to everyone on the call, you need to press star one if you'd like to ask a question. Our next question is from Rahul Jeewani at IIFL Capital. Please proceed.
Yeah, Sachin, could you go ahead and give us the EBITDA loss from the new units for the full year, plus the base business EBITDA, the same way you did it for the fourth quarter?
Okay, I’ll do that. For the full financial year, revenue from the matured units comes to INR 3,335 crore exactly, out of the INR 3,931 crore in revenue we reported. EBITDA generated by those matured units is roughly INR 956 crore, out of the INR 327 crore in EBITDA we reported. That means for the newer units—those operating for under one year—we recorded INR 597 crore in revenue overall, and EBITDA erosion for the whole year was around INR 128 crore. That also indicates that on the matured-unit side we’re still running at about a 20.5% EBITDA margin. On the total base revenue, which we keep producing for these mature units as in the past.
Absolutely, absolutely, thank you. Could you also restate what you mentioned on the prior call regarding the monthly break-evens for these new units? On a monthly basis, has Thane already reached EBITDA break-even? And what do you expect in terms of timing for when both Bengaluru hospitals should get to break-even?
At the March exit — yeah, go ahead, Abhinay Bollineni, if you would.
No, Rahul, regarding Thane, we were EBITDA neutral at the March exit. In April we were also EBITDA neutral, and we've added some doctors again in May, so there could be a bit of drag there. Things are moving in the right direction. We're seeing month-on-month growth. The only obstacle to that growth right now is the empanelments. Once those are through, I think growth will pick up more traction. As for Bengaluru, as you mentioned, Mahadevapura within 12 months of commissioning. We commissioned it in October. 12 months from then we should break even. There was one month when we were EBITDA positive in Mahadevapura. EBITDA neutral, not positive. I think before October we should turn EBITDA positive, yeah, single digit positive in Mahadevapura. On special, again, we're quite confident about the trajectory. By the end of the financial year we should reach an EBITDA positive kind of number.
That brings us to the close of the fiscal year, which for Electronic City is March 27.
Yes.
Okay, Abhinay Bollineni. Obviously, this year Kondapur will have some effect, but all those other new units ought to ramp up. That whole EBITDA loss you carried for the year — roughly INR 120 crore of drag coming from these new units — what sort of expectation do you have regarding, say, the combined losses from these new hospitals as we head into FY 2027 and 2028?
At this moment, Rahul, putting a number on it is hard. All you're doing is waiting for those empanelments to finish, and after that the ramp-ups are able to move ahead more quickly.
Absolutely.
That number's going to come in below 50%.
Alright. Alright. Of course. Of course. Of course. Of course. Alright. I'll connect the dots. Thank you, Abhinay Bollineni.
Thanks. The next question is from Aditya Jha at Incred Asset Management. Go ahead, please.
Appreciate the question. I'd like to get management's view on how you weigh the present expense of debt against the expense of equity we're aiming to raise. What's your take on the capital structure, and how do you see the ideal blend for that structure and for the fundraise?
No, I think — you see, based on what most of our investors have told us, you know, all of them believe a healthy net debt EBITDA ratio ought to be 1:2. Since it's now a bit above 1 — it's around 1:3 — we wanted to get it down to that healthy figure, and that's why we're doing this QIP. It will also free up some cash flow for us when we want to carry out the new greenfield expansion.
Understood, sir. Thank you.
Thank you. A quick reminder for everyone on the line: you can hit star and one whenever you'd like to pose a question. So once more, for all participants, pressing star and one is how you get in the queue to ask something. Ladies and gentlemen, since nothing further has come in, that brings our question and answer portion to a close. At this point I'll pass the conference back to management for their closing remarks.
Thanks so much for all those pertinent questions. As we’ve already ramped up, and knowing that our whole objective is to make sure that whatever we achieved over the last five years — I keep saying that in the coming few years, over the next five years as well, we’ll aim for that same growth. That’s why we’re pursuing these expansions — greenfield, brownfield, and the QIP. The reason is, and we’ve also said all along, that our debt to EBITDA should not go beyond 1:2, along with the asset ratios, and while keeping all of that in mind, the PAT this quarter and the EPS and all of this have naturally come down. We recognize that, we know that, when this financial year it will exceed whatever expectations around all these things. That’s why we’re raising these funds, so as to keep the company healthy and at the same time carry out steady expansion plans. With that, I think whatever losses we have been accruing — nearly INR 120 EBITDA each year — that too comes down next year. Going forward, I think this won’t be much.
We think the company can, and we expect it will, move forward on a healthy note over the next 3 to 5 years. Thanks again for all the questions.
Thank you. This conference has now concluded on behalf of KIMS Hospital and IIFL Capital. We appreciate your participation. Your lines may be disconnected at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Krishna Institute of Medical Sciences Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Krishna Institute of Medical Sciences Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.