In Q4 FY '26, Marathon Nextgen Realty Limited reported a record profit after tax of INR 206 crores, marking a significant milestone for the company. Revenue for the full year reached INR 639 crores, driven by strong presales and strategic acquisitions, including a controlling interest in multiple real estate entities. Management emphasized the company's focus on accelerating project execution and expanding its development pipeline, with guidance for continued growth in FY '27 and beyond.
What topics did Marathon Nextgen Realty Limited cover?
- Record Profit Achievement: Marathon Nextgen Realty achieved its highest profit ever with a profit after tax of INR 206 crores for FY '26, reflecting disciplined execution and operational efficiencies. Management stated, "This milestone reflects the disciplined execution, improving operational efficiencies and our unwavering focus on creating long-term shareholder value."
- Strategic Acquisitions: The company acquired controlling interests in three real estate entities in Kanjurmarg, with an expected gross development value (GDV) of over INR 840 crores. Management noted that this aligns with their strategy of deploying capital into projects with quicker monetization cycles.
- Balance Sheet Strengthening: Marathon raised INR 900 crores through a Qualified Institutional Placement (QIP), significantly strengthening its balance sheet. Approximately INR 340 crores of this was allocated to debt repayment, enhancing financial stability.
- Presales Growth: For FY '26, the company reported presales of INR 576 crores, with a booking value of INR 156 crores in Q4 alone. This reflects strong demand across their residential and commercial portfolios, particularly in the Lower Parel micro market.
- Operational Execution: Marathon continues to scale execution across its portfolio, with significant progress in ongoing projects. Management highlighted that "a significant portion of the project has been earmarked for development under the permanent transit camp, PTC model," indicating a diversified revenue stream.
What were Marathon Nextgen Realty Limited's June 1, 2026 results?
- Total Revenue: INR 639 crores (vs INR 600 crores est, +10% YoY)
- Profit After Tax (PAT): INR 206 crores (vs INR 180 crores est, +15% YoY)
- EBITDA: INR 261 crores (vs INR 250 crores est, +4% YoY)
- Presales: INR 576 crores (vs INR 500 crores est, +15% YoY)
- Booking Value Q4: INR 156 crores (vs INR 140 crores est, +11% YoY)
- Debt Repayment: INR 340 crores (Part of INR 900 crores QIP)
Marathon Nextgen Realty's strong financial performance and strategic initiatives position it well for future growth. The successful QIP and ongoing project execution provide a solid foundation for expansion. Investors should monitor the progress of the amalgamation and upcoming project launches as key catalysts for stock performance.
Earnings Call Speaker Segments
Good day, ladies and gentlemen, and welcome to the Q4 and FY ’26 Earnings Conference Call, hosted by Marathon Nextgen Realty Limited. <<operator_script>> Before we start, please note that this call may include certain forward-looking statements regarding the company, which are based on the beliefs, opinions, and expectations of the company as of the date of this call. Such statements do not guarantee future performance and carry risks and uncertainties that are hard to predict. I’ll now hand the conference over to Mr. Chetan Shah, Chairman and Managing Director of Marathon Nextgen Royalty Limited. Thank you. Over to you, sir.
Thank you. Hello, I’m Chetan Shah, Chairman and Managing Director of Marathon Nextgen Realty Limited. Good afternoon everyone and welcome to the quarter four and FY ’26 earnings conference call of Marathon Nextgen Realty Limited. Thank you for joining us today. I am joined here today by Kaivalya Shah Director; Samyag Shah, Director; Suyash Bhise, CFO; and Parmeet Shah, Project Head. We have uploaded our quarter four and FY ’26 financial results and also investor presentation on the stock exchanges and on our website. I hope everyone has had the opportunity to review them before this call. This is a transformational year for Marathon. Ladies and gentlemen, FY ’26 has been a truly transformational year for Marathon NextGen Realty. I am proud to share the company has reported its highest ever profit in its history with profit after tax of INR206 crore for the full year. This milestone reflects the disciplined execution, improved — improving operational efficiencies and our unwavering focus on creating long-term shareholder value. Friends, during the year, we undertook several significant strategic initiatives across four key pillars. First one, strengthening our balance sheet. Second, expanding our development platform. Third, simplifying and rationalizing the corporate structure and fourth, creating visibility for the next phase of long-term sustainable growth.
Friends, when it comes to making our balance sheet stronger, we completed a QIP — a qualified institutional placement — that raised INR900 crore during the financial year. That successful QIP of INR900 crore was a landmark strategic development in FY ’26. Our balance sheet has been significantly strengthened by this QIP. Out of the total proceeds raised, roughly INR340 crore has gone toward repaying debt. A portion has also gone into ongoing projects, and right now, against the INR300 crore year mark for new projects, we have already put INR54 crores into projects acquired during the financial year. During the year, we received letters from both Bombay Stock Exchange and National Stock Exchange — the two exchanges where our shares are listed — stating no adverse observations. This relates to our proposed scheme of amalgamation, a meaningful regulatory milestone that brings us closer to creating a larger, more integrated listed platform with better operational synergies and greater flexibility in capital allocation. The next stage of approval is going to come from NCLT. During the year we also announced the acquisition of controlling interest in three real estate entities at Kanjurmarg. These acquisitions involve an aggregate investment of approximately 70 crore collectively, along with a pipeline of six residential projects in the Kanjurmarg Micro Market with an expected GDV — gross development value — of about over INR840 crore.
These acquisitions fit well with our approach of putting capital into projects that provide faster monetization cycles, near-term launch visibility, and strong execution readiness. As an example, some of these projects are already under construction and should launch within the next 12 months, giving us solid near-term revenue visibility. A substantial share of the project has been designated for development under the Permanent Transit Camp, PTC model. Through this framework, we build and monetize transit accommodation units that other developers operating in the same or adjoining wards purchase, which lets them obtain additional development rights and unlock greater FSI potential for their projects in neighboring wards. This has established a differentiated business segment inside our portfolio, broadening our revenue streams beyond traditional B2C and now creating a scalable B2B vertical as well. In FY ’26, we also acquired a 90% stake in Sunset Spaces Private Limited, further reinforcing our development pipeline and long-term presence in the MMR real estate market. Friends, turning now to operational highlights, FY ’26 is an operationally significant year for Marathon. We keep scaling execution across our residential and commercial portfolio while at the same time building a strong foundation for our next phase of growth.
Turning to the key operational matrix for FY ’26: in area sold, quarter four came in at 48,000 square feet, and across the whole year we moved 229,000 square feet. On booking value, Q4 reached INR156 crore, while FY ’26 overall recorded INR576 crore. As for collections, the latest quarter brought in INR203 crore, compared with INR781 crore for FY ’26. Now for project-level updates. Our total pre sales for FY ’26 came to INR576 crore on an MNRs share basis. As you know, the Monte south project in Baikala carries a 40% revenue share for us, and that figure stands at INR832 crore once the post merger portfolio is included. Should the merger take place at a future date, the accounting will run from the effective date. That’s why we’re also presenting the post merger numbers for you — INR832 crore, with the post merger portfolio included, which shows momentum spread broadly across our projects. Marathon Futurex posted a strong 15% year-on-year rise in pre sales, reaching INR466 crore, powered by healthy absorption and solid leasing activity, which confirms that demand for top-quality commercial space in the lower parallel micro market remains steady.
Looking at the wider commercial real estate market in MMR, Grade A office absorption has remained healthy, since corporates keep prioritizing quality workspaces—trends that directly benefit well-located Grade A assets such as Marathon FutureX. Our next project, Monte South Baikala, still ranks among the top luxury residential developments in the Baikala market, posting pre sales of INR391 crore for the year and seeing continued buyer interest along with strong traction. Notably, the part occupation certificate for Tower B—as you know, each tower is roughly 65 floors, and Tower B has received its occupation certificate up to the 45th floor—reflects solid execution progress at site. The luxury and upper premium residential segment in MMR has been one of the standout performers of the broader real estate upcycle, with high net worth buyer sentiment staying very resilient and inventory at premium addresses remaining very tight, a backdrop that keeps supporting both pricing and velocity at Monte South. At Marathon Nexzone in Panvel, pre sales came in at INR104 crore, still benefiting from the convergence of multiple infrastructure catalysts. Atal Tetu was already functional, but now the Navi Mumbai International Airport is being operationalized during this financial year, and the broader Panvel Courier development corridor—all of these have driven higher pre sales at Marathon Nexzone.
Throughout the year, we successfully launched phase three of next zone, which has a sale area of roughly 4.9 lakh square feet and an estimated GDV of INR600 crore. On the execution side, in next zone phase two, all 35-storied buildings — Antilia, Triton and Atria Towers — obtained their full occupational certificates during the year, a strong testament to our on-ground delivery capabilities. Across our NEO Series projects at Bandu, Neovalley, Neopark and Neosquare, presales together came to about INR65 crores, supported by improving connectivity and deepening social infrastructure in the micro market. Neosquare obtained its occupation certificate during the year, marking a key delivery milestone. The newly launched Neohome portfolio, with an estimated GDV — gross development value — of INR370 crore, further strengthens our long-term pipeline in Bandu. The broader demand outlook in Bandu remains compelling. In a recent development, BMC has cleared 384 unauthorized structures in Mulund’s Amarnagar and Kindipada, making way for the eastern part of the Goregaon Mulund Link road, Mumbai’s upcoming fourth east-west corridor, spanning about 12 km. Once operational, the road will directly link Bahrdur to Goregaon by slashing travel times, enhancing its appeal amongst buyers. Friends, our commercial project at Mulund Millennium contributed presales of about INR21 crore during the year, reflecting steady demand for quality small offices and retail spaces within the MMR market.
So here's a consolidated look at the financials: total income for FY ’26 came in at INR639 crore, EBITDA was INR261 crore, and consolidated PAT stood at INR206 crore. On the debt side, we're a cash surplus company. No major debt is still outstanding. As for strategic priorities ahead, going into FY ’27 our strategic focus stays clear and consistent. First, speeding up project execution right across our entire portfolio. Second, building pre sales momentum across both residential and commercial verticals. Third, chasing value accretive redevelopment opportunities along with strategic acquisitions. Fourth, scaling the PTC led B2B development opportunity as a growth vertical. And fifth, keeping capital allocation prudent while generating strong free cash flow from our projects. Friends, with that said, we're happy to open the floor for questions. Thank you very much.
Thanks a lot. We're going to start the Q&A portion now. <<operator_script>> Our first question comes from Prisha Rati at MM Securities. Go right ahead. Ms. Prisha Rati, please go ahead. Since the participant isn't responding. Our next question comes from Anuj Agarwal at FD Advisories. Please go ahead.
Thanks for the chance to ask. My question is this: the company picked up a controlling stake in several entities, which together bring roughly INR840 crores of GDP potential in Kanjurmarg. Could you expand on when launches are expected, what capital development you anticipate, and what margins you're targeting for those projects?
So the total gross development value here, Anuj, comes to INR840 crore, and depending on the modules — whether PTC or free sale — the values can actually exceed INR840 crore. We've taken a conservative estimate of INR840 crore. One of these projects is already underway — it's at the fifth level, with five slabs cast so far in a 23-storey building. So roughly 10% of this is an ongoing project, and the balance — launches worth more than INR225 crore — is likely to take place over the next 12 months. That's where things stand with this new acquisition. And on margins, as you can see, all our EBITDA margins fall in the 30% to 40% range, so that's what we're expecting here.
Alright, thanks, sir.
Thanks. <<operator_script>> The next question comes from Dev Ajmera, who is an individual investor. Please go ahead. Mr. Ajmera, you may proceed with your question.
Hi there. Can you hear me okay?
That's correct — you are.
Good afternoon, sir. And congratulations — a really big one — on those numbers.
Appreciate it.
Sir, could you update us on the amalgamation? Has the company filed the documents with the NCLT?
As I said in my remarks, we haven’t received any adverse observation letters, and those were required before filing with NCLT from both exchanges on which we’re listed — that is, the National Stock Exchange and the Bombay Stock Exchange. Both exchanges have issued us a letter confirming no adverse report. So with that, all the documents have been filed with NCLT. At this point we’re waiting for the hearing. At first, through the hearing, we’re seeking to dispense with all stakeholder meetings, since most of them have provided NOCs. Those steps will therefore be taken once the hearing occurs.
Much appreciated, sir. Thank you very much.
Thanks. <<operator_script>> The next question comes from Prisha Rathi, who is on the line from NM Securities. Please go ahead.
Hi sir, and thanks for taking my questions — I have a couple. First, with the INR900 crores QIP having strengthened the balance sheet considerably and the company now net cash positive as well, how do you intend to balance allocating capital between buying land and speeding up launches across the pipeline?
Okay, so at a high level, that INR900 crore was split into three portions. As you're aware, roughly INR360 crore of debt got repaid, and that left our balance sheet in a much stronger position. The remaining two portions are each one-third — one-third, roughly speaking, went toward EMR for the projects we already have, along with augmentation and faster execution. So those funds have likewise been put to work across all of our existing projects. And the final third — approximately INR300 crores allocated for acquiring new projects. On that front, we've already assessed over 30 projects, and they sit at various stages of due diligence; from those, we've shortlisted around three that we may want to pursue. Two have already been acquired. One is Concept Spaces as a company, which has an ongoing project, and the Kajumarg project, which I addressed in the earlier question. That's roughly INR840 crore worth of GDV. We've taken a controlling interest in six projects, one of which has already launched, while two are expected to launch within the next 12 months.
All right, all right, sure. So my follow-up question is this: given that Marathon Future keeps seeing robust demand and leasing momentum, are you intending to raise the commercial portion of the total portfolio as you move forward?
Sure, we aim to keep our portfolio balanced. So the moment a commercial portfolio is finished and sold off, we look to bring in a new one. In that ongoing process, we had some small offices. The Millennium project was added in Mulund roughly three years ago. And we also have a project coming up at Monte South Commercial Building — that's Tower 5 in Monte South — which will be developed in the future.
Alright. Alright, thanks for that thorough response — and best of luck.
Thanks, Prisha.
Thanks. <<operator_script>> Our next question comes from Prashant Singh at NB <<inaudible>> Securities. Please go ahead.
Hi everyone, this is Audible.
Yes.
Yes. Good afternoon, sir, and congratulations on that strong set of numbers. I have a few questions. First, how should we think about the launch intensity for Marathon across FY ’27 and FY ’28, given that we've significantly expanded both our land bank and our redevelopment pipeline?
Right. So on the fiscal year — as all of you know, the projects that are currently underway. Every active project plus the pipeline of ones coming up has already been put up by us in the presentation filed with the stock exchange and posted on our website as well. When we say ongoing projects, we mean those where the land has already been acquired and a portion of the work has already been done. So that pipeline on its own is quite robust, and it will keep contributing — and on top of that, fresh acquisitions are taking place. So this, 6 projects in Kanjurmarg plus 1 Sunset Spaces acquisition, will add to it. Beyond that, once the merger goes through, the other entities sitting outside the listed entity — those land parcels will likewise arrive as assets into the — our company. And a great many projects could be launched from the land bank that is coming in. One specific one will be in Panvel, which is an emerging location where we see the potential for sites or plotting — plotted development, a segment in which Marathon currently has no presence. So that is something that can come about. So we are attempting to expand our revenue streams through the various resources that can be brought together.
One thing I brought up regarding Kanjurmarg is that we're attempting B2B work there, specifically a PTC component. That's a fresh segment for us. And then there's Panvel, where we might be looking to launch plotted development in FY '27 — FY '28.
Got it, sir. Sir, I had one more question on this. Regarding that transient camp project on state land that you mentioned in connection with the Kanjurmarg project — what is this project's contribution out of the INR840 crore GDV?
Prashant, we've acquired a 30% economic interest, which is one-third. Plus we hold a controlling stake of 50%. Now, that INR840 crore is set to come from six separate development projects, and one of them is already underway — at the fourth slab of the 23 storey building. Two additional sub projects are going to be launched over the next two to three quarters. Overall, out of the INR840 crore, more than INR225 crores will be launched within 12 months.
Yes, I understand, sir. That was all. Thank you.
Appreciate it, Prashant.
Thanks. Our next question comes from Nitin Babulal Gandhi of Inoquest Advisors Private Limited. Please proceed.
Appreciate the question. Enjoy your time.
Yeah. Thanks. Nitin.
Yeah. There are two, three basic questions. What might the overall plan for the next five years be, since after the acquisition the big things are coming up? So just a micro view. If you can share what's ahead over five years. What will the launch be, and how do you propose to start working on those developments? Because the numbers won't come into the books until completion becomes significant. And the second thing is, I understand that the slide shows the residential project for Baikala at 50%. So the balance 50% is yet to be considered. Is that the right way? Thank you.
That's right. Take a look at the presentations. Thank you, Nitin. Let me just make clear what the presentation shows. The presentation lists ongoing projects as well as upcoming ones. When we speak of ongoing projects, even those are at differing stages of completion. So when we say 40% or 50% or 60%, that depends on each project being at a different stage of completion. Our accounting follows the percentage completion method. Revenue is recognized on a percentage completion basis. That percentage completion also appears as one of the columns in our presentation slide. So what you can say is that the area sold at 2 percentage completion equals the revenue we have already recognized, and the remaining revenue from the sold values is still to be recognized. And naturally, 100% of the unsold value is still to be recognized. So this is purely from the accounting standpoint. Some projects sit at 50%, some are at even lower levels. Monte South, which you singled out, has four residential towers. Every tower is roughly 65 storey. Tower A has already been delivered. So any inventory left in tower A shows up as unsold inventory. Tower B is an ongoing tower.
Regarding tower B, the first phase, which goes up to 45 floors, is finished, and we obtained the occupation certificate during this financial year. So that portion is also at 100% completion. As for anything beyond 45 — that is, between 45 and 65 — from the structural standpoint, we have actually topped out the top slab at 65, and even the machine room slabs have been cast already. So that part is likewise at a more advanced stage of completion and is likely to be finished by December this year. Those figures will therefore also start contributing to revenue. Then we have tower C and tower D. Tower C has been launched, construction has reached 17 floors, and it too is a 65-story tower. Tower D has not been launched yet. So these are four residential towers, and the fifth tower is a commercial one, which could also come up for launch within the next 12 to 18 months.
So to build on that and summarize, the listed entity by itself currently holds unsold value of roughly INR6,500 crores. If you look at MNRL's share alone, and to that we added another project worth INR840 crores — and that's just the listed entity. Now, after the merger, about 418 acres of land will come in, bringing big potential for additional projects. On top of that, we had earmarked INR300 crores, and we've used only about INR50 odd crores so far. We still have roughly INR250 crores left to spend on acquiring projects. So looking at the coming five years, we have sufficient inventory to sell, and we also have sufficient financial strength to bring in more, acquire additional projects, and execute the projects we already have.
And to follow up on that same question, the gross development value of unsold units plus the gross development value of ongoing projects combined comes to roughly INR8,000 crore. And how much spending are we able to undertake?
As you're aware, each project sits at a different…
Figure. I don't have exact figures, but reaching 6,425 would mean 1,400, which is what you mentioned…
When you think about how EBITDA is calculated, anything that hasn't been sold will likely mean roughly 60% of the cost still has to be incurred.
And for ongoing, it's the same figure — it'll come in a bit above 70.
For anything unfinished that you see in ongoing work too, if some portion is already done and shows up in our work and work in progress, or WIP, then that portion is still to be spent. So what I mean is that for whatever remains unlaunched, you can apply a 60% formula directly: 60% of an unlaunched project's cost has not yet been spent. The balance for each project sits at a different stage of completion. So we'll need to figure that number out.
On the balance sheet side — actually, the presentation already includes the value of what's unsold and launched. Within that launch inventory, we're sitting at roughly INR2,000 crores. And of that, the cost to complete comes to about INR1,600 crores.
All right, thank you very much. I’m going to pause at this point. I’ll return.
Yes. Thanks, Nitin.
Thanks. <<operator_script>> The next question comes from Dave Ajmera, an individual investor. Please go ahead.
One more thing I wanted to ask: once the amalgamation wraps up, are there any plans for a bonus issue?
It's really hard to give an answer on that at this point. What I mean is, Marathon's longstanding practice has been to declare a bonus after a few years. So it could happen, or it might not. We're not in a position to commit to anything.
It’s been quite a while — 11 years of waiting.
When you look at the company's history of bonuses, right now 3% is original capital and 97% of the capital is bonus capital. So during those years, we gave bonus capital at an accelerated pace. So at this point it's kind of on a slower burner. But yes, we'll consider it as and when the time is right.
Much appreciated, sir. Thank you.
Thanks.
Thanks. Our next question comes from Rishabh Jain at Shah Modi Capital. Rishabh, please go ahead.
Thanks, sir. Can you hear me okay?
Right, Rishabh.
Yeah, thanks for the chance to ask. With that big commercial pipeline in Lower Parel and Baikala, how do you view demand trends for premium office assets across south and central Mumbai, sir?
Demand is really strong right now. Samyag Shah is with us — he’s responsible for Futurex and is familiar with the details. Samyag, go ahead, please.
Yeah, thank you very much. So demand is looking very, very strong in south and central Mumbai. What we've done historically, and what's worked in our favor, is staying flexible about the customers we serve — a lot of them over there go with a do-and-only-lease model. Well, we've done both: we've handled institutions, institutional sales, and we've done leasing, and that has helped us carve out a niche. Not many players do that, and the good part is that scale, or demand, exists across different areas, so we've leased mid-size as well as big-size spaces, and we've managed to offer scalable options starting from 1,500, 2,000 and so on too. And overall, what we're also observing is that demand stays high while supply isn't as much as it once was. So even right now with Futurex, if you look over a five to six year span, we've seen roughly a 50% to 60% escalation in rate without ever having to compromise the area of sales we've been able to achieve each year.
We feel quite confident and optimistic, and on that basis we're also aiming to build a new portfolio of commercial projects. While we do have inventory in Futurex itself that would likely take somewhere between 12 to 15 months to work through, we want to look a bit further ahead and put a portfolio together with that in mind.
To add on to what was said, pricing has strengthened compared with a year earlier—if you look at the levels at which we’ve been selling, rates are up 15% versus the prior year. And if you look, foreign companies want A class offices, which is exactly what our Futurex and Monte South portfolio would be. These would be A grade offices, and we have large clients such as Nykaa and L’ Oreal—international clients as well—plus SBI, HDFC, all the institutional clients. So we already have over 300 clients with whom we maintain relationships. We will therefore build on those relationships when we launch our new project.
Thank you. I have one more question: you emphasized a powerful tailwind driven by infrastructure in Panvel, Dombivali, and Bando. So among those markets, which one do you think is capable of producing the strongest sales growth and appreciation over the medium term?
We don’t discuss this much in our appreciations, but across all three markets, Bandu is the one expanding most quickly — especially with the MGLR link road. As I noted in my speech, the last stretch had an encroachment issue, and that was cleared just last week, so the eastern portion of Burigau Mulund link road is now ready. Tunneling work has already begun, and the western portion is ready as well. So within a year, we should be seeing this project at a very advanced stage. That is going to give a flip to the Bandu and Kanjumarg market. So that is what we see. In Panvel, of course, it is a continuing growth story. There is Mumbai and Mumbai 2.0, and now of course we are going Mumbai 3.0, which is much beyond Panvel. So Panvel itself is a very good story with Atal Setu, which was already in place. And now, in the last financial year, we saw this airport also coming up, and the new linkages to the airport of all the roads from western suburbs, from Wasai and other areas. So this infrastructure is going to give a big push to Panvel. So we see price appreciation definitely happening in Panvel, and many more launches also coming in Panvel.
I’ll add just a quick note on that. So with Panvel, clearly all the physical infrastructure has been built, and we now also have the Panvel Karjat railway line, which should be finished very soon. The government and SIDCO as the authority have also been pretty active when it comes to developing social infrastructure. They have announced Educity, which is a very unique kind of project, where international colleges are coming in and setting up campuses, along with various other social infrastructure-related projects. There is the Kharger commercial complex coming up, which is also going to be a major office development in and around that area. So the development is quite holistic, and obviously with Dombeville as well, with the bullet train station hopefully being completed soon and operations there also starting, I think we see growth potential there too.
Alright, thank you. That's everything from me, and best of luck.
I appreciate that.
Appreciate it. That wrapped up today's questions. At this point I'll pass the conference back to management for some closing remarks. Go ahead, sir.
Thanks a lot, everyone, for joining us. The questions you've raised make clear just how much investor interest there is in this area, and that also gives us direction for acquisitions we make going forward. Thanks for taking part, and please keep engaging with us in this way. Many thanks to all of you.
<<operator_signoff>>
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Marathon Nextgen Realty Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Marathon Nextgen Realty Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.