Home / Transcripts / Mayville Engineering Company, Inc. (MEC) · August 5, 2026

Mayville Engineering Company, Inc. (MEC) Earnings Call Transcript

August 5, 2026

New York Stock Exchange US Industrials Machinery earnings 57 min

Earnings Call Speaker Segments

Stefan Neely executive
#1

Thanks, operator. Everyone on our team and I want to say welcome to the conference call covering our results for the second quarter of 2026. MEC's President and CEO, Jag Reddy, is here to lead today's call, along with Rachele Lehr, our Chief Financial Officer. During this discussion, we'll make forward-looking statements regarding what we expect for the business and our finances going forward. Because of a range of risks and uncertainties — among them those outlined in the periodic reports we file with the Securities and Exchange Commission — actual results could differ materially from what these forward-looking statements project. Unless the law requires otherwise, we assume no duty to revise any forward-looking statements. Certain non-GAAP financial measures will also be discussed on this call. You can find a reconciliation of those measures to the nearest GAAP measure in our quarterly earnings press release, posted at mecinc.com. Once our prepared remarks are finished, we'll open up the line for your questions. With that, I'll hand things over to Jag.

Jag Reddy executive
#2

Thanks, Stefan, and good morning to all of you. Results for our second quarter show demand that came in stronger than we had anticipated across a number of key end markets; the highlight was ongoing momentum in data center and critical power alongside the early recovery that is underway in our commercial vehicle market. Because of that, top-line performance came in above what we expected and puts us in a good position as we head into the second half of the year. Execution stayed solid throughout the quarter as we scaled up activity on many data center and critical power programs, while we kept investing in the people and equipment required to serve future demand. Those investments serve to expand the capacity we need in order to support profitable growth over the long term. As we had anticipated, higher volumes produced better operating leverage on a sequential basis during the quarter. Because we are moving fast to capture a pipeline of data center and critical power opportunities that is expanding rapidly, we are taking on incremental operating costs before the related revenue arrives. That reflects two deliberate investments tied to timing. First, the capacity and equipment we are putting in place so that program launches go effectively. Second, the added cost of having third parties handle certain parts of the fabrication process, since equipment constraints at our existing facilities currently limit what we can do in-house. We have placed orders for the equipment required to move this work in-house, although the lead time on it runs four to six months. We expect launch costs to carry on through the second half of the year as we back our customers' aggressive program timelines; by design, these investments are front-loaded, and they reflect both the inherent cost of scaling at pace and the profitable growth opportunity we see ahead. Importantly, we still regard these costs as temporary, and we expect them to ease as our newly hired workforce reaches full productivity and we finish our targeted capacity investments; over time, these programs are building toward a meaningful step-up in margins. As these investments come online, production volumes ramp, and utilization improves, we expect strong incremental margins to materialize. Put simply, the programs we are launching today add to the long-term margin profile of the business, and the investments we're making now unlock that expansion in the future. One significant milestone during the quarter was the successful completion of our common stock offering, which brought in roughly $94 million in net proceeds. The offering moves our capital allocation priorities forward by strengthening the balance sheet and enhancing financial flexibility. We applied the proceeds to reduce debt, and we exited the quarter with more than $100 million of available liquidity. With a stronger balance sheet and increased liquidity, we are well-positioned to fund strategic growth initiatives and capitalize on the significant opportunities developing within the data center and critical power market. Just as important was when the offering took place. With demand accelerating beyond what operating cash flow alone could prudently fund, securing capital now gives us the flexibility to invest ahead of demand rather than react to it; this provides us with the financial foundation to pursue profitable growth opportunities with confidence. In putting this capital to work, we'll stay disciplined and put priority on the opportunities with greater value and better margins that we think will deliver the strongest returns and build enduring value for our shareholders. Turning to a few of our important end markets. Commercial vehicle net sales rose about 3% from the prior year in Q2 as North American Class 8 production started to bounce back. Build rates among customers have kept speeding up, and we anticipate this trend carrying into the back half of this year; according to its latest report, ACT's outlook for the full year 2026 calls for a 9.1% gain in Class 8 production, backed by an anticipated 45% rise in output over the rest of the year. That outlook points to a continuing upcycle in order activity and translates into an expected 9.7% gain in 2027. Since our demand activity generally runs about six weeks ahead of Class 8 production, today's activity levels give us encouragement; in construction and access, revenue climbed roughly 15% from a year earlier in the quarter, with performance helped by strength in non-residential activity. In powersports, net sales fell about 6% versus the prior year, mainly because of weakness at legacy ATV, UTV, and motorcycle OEMs stemming from continuing offshoring initiatives; in data center and critical power, we posted organic growth of roughly 173% year-over-year, aided by growth from existing OEM customers and project launches connected to Accu-Fab-related cross-selling opportunities. Demand in this end market is still robust, and our qualified opportunity pipeline keeps surpassing $125 million. Projects slated to launch in 2026 carry a value of about $50 million to $60 million, which includes growth from our current OEM customers. Data center and critical power should account for roughly 20% of total revenue in 2026. As demand for these higher value programs speeds up, we're making disciplined portfolio choices throughout the business. That involves actively assessing pricing and margin profiles across our portfolio one case at a time; over time, this could lead to shifts in mix or capacity allocation; these trends are playing out against a backdrop of constrained manufacturing capacity throughout the U.S., which raises the worth of dependable domestic supply. In response, we're assessing ways for customers to set aside dedicated capacity with us. On the customer side, that offers more certainty of supply. For MEC, it generates revenue that's more predictable and helps margin expansion by steering capacity toward our highest value programs. We'll keep handling capacity and production priorities with care to support growth that is sustainable, diversified, and profitable over the long run. Before I move to capital allocation, I want to call out a few illustrations of the commercial momentum we're seeing throughout the business. In the second quarter, we landed roughly $40 million in new awards with data center and critical power customers. Although those awards aren't anticipated to add meaningfully near term, they give us strong visibility into the future, with production launches and revenue generation expected to start in 2027. Given what we can see right now, we anticipate that total bookings for 2026 across every end market we serve will be more than $150 million, driven by demand that keeps holding up along with a cyclical environment that keeps getting better. In the end markets we've had for a long time, we keep growing our share with important commercial vehicle customers as they get ready for product launches coming up that are connected to the 2027 EPA regulatory changes. We expect these programs to start moving into production late in 2026. Outside of commercial vehicle, we won business thanks to new model introductions at an access customer, and we also picked up additional service business in support of a military customer. In data center and critical power, roughly $40 million in awards booked during the quarter show both new business and ongoing expansion with major customers. Power distribution units, switchgear, and static transfer switches are all part of these programs. Now let me go into capital allocation with more detail. Since our balance sheet has gotten much stronger, we're focused on three priorities: putting money into organic growth, keeping on reducing leverage, and going after selective accretive acquisitions. First, organic growth. Customer demand keeps increasingly running ahead of the capacity we currently have available, and our organic investments are aimed directly at unlocking more of that capacity. Across the next two years, we plan to put in an additional $50 million to grow capacity and back the expanding needs of our data center and critical power customers. Targeted upgrades throughout our existing manufacturing footprint, customer-supported program investments, and the development and equipping of a new production facility are all part of these investments. Taken together, these initiatives should push our revenue capacity past the roughly $850 million figure we've talked about before, with space to grow further from there as time goes on. Rachele will go into more detail later about the written criteria we use for these capital investments. Second, deleveraging. As production volumes rise and profitability gets better, we expect earnings growth and cash generation to play an increasingly important role in driving leverage down. Our long-term net leverage target is still 2.5x, and the steps we took this quarter mark a meaningful move toward hitting that objective. Third, accretive M&A. We'll stay opportunistic, going after acquisitions that make our competitive position stronger, grow capacity, and help create long-term value. With conditions getting better across our legacy end markets, momentum speeding up in data center and critical power, and a much stronger balance sheet, we're well-positioned to deliver profitable growth and create lasting shareholder value. We think we're entering a transformative chapter marked by expanding capacity, accelerating growth, improving profitability, and rising returns on invested capital. The investments we're making now are building a stronger, more competitive company and setting us up for meaningful value creation in the years to come. With that, I'd like to hand the call over to Rachele.

Rachele Lehr executive
#3

Appreciate that, Jag, and hello everyone. Sales for Q2 totaled $163 million, which marks a 23.2% increase compared with the same quarter last year. Excluding what the Accu-Fab acquisition contributed, organic net sales climbed 9.2% over the prior-year period. Manufacturing margin for Q2 of 2026 landed at 10.9%, improving from 10.3% a year ago. Two things drove that gain in manufacturing margin: a larger share of higher-margin sales coming from the Accu-Fab deal, plus improved capacity utilization as end markets for commercial vehicle and construction access started to bounce back. Working against that, we had $2.1 million of costs tied to launching data center and critical power projects. In the second quarter of 2026, our other SG&A costs came to $9.3 million, which works out to 5.7% of net sales. A year earlier, that figure stood at $10.3 million, or 7.8% of net sales. What's driving this decrease? Largely one-time charges tied to executive turnover along with costs from the Accu-Fab acquisition that we booked in the comparable prior-year stretch. Those savings were partially eaten into by added SG&A tied to that same acquisition. As for adjusted EBITDA margin, it landed at 8.1% this quarter versus 10.3% a year ago. That drop comes from $2.1 million in costs tied to launching projects, along with larger gain sharing accruals driven by how the company is currently performing and growth in our headcount. Those factors were partially offset by gains from buying Accu-Fab and by stronger volumes in legacy end markets. As Jag noted, our launch expenses for data center and critical power ran a bit higher than we had projected, because we needed to hit our customers' program timelines, while equipment limitations at our current sites cap what we can handle internally. We anticipate recording another $2 million to $3 million in outsourcing costs during the back half of the year. Looking ahead, we anticipate that as operations pick up speed, programs hit full-scale output, and we put our focused Capital Expenditures to work, these expenses should settle into a more typical range. That will let us capture operating leverage throughout our footprint, put us in a stronger spot to bring new pipeline programs online with greater efficiency, and help drive the margin growth we're expecting down the road. For the second quarter of 2026, interest expense came in at $3.5 million, up from $1.4 million during the same period a year earlier. The rise stemmed from higher average borrowings along with the interest rate tied to the company's revolving credit facility, plus the timing around repaying debt. Keep in mind that money raised through our equity offering in May went toward paying down debt during the quarter. Based on the terms in our credit agreement, the lower borrowing rate we'll see from the step-down won't actually kick in until August. Now let's look at cash flow and the balance sheet. In the second quarter of 2026, free cash flow came in as a use of $6.6 million, whereas the same period a year earlier provided $12.5 million. That drop compared with last year was mainly the result of weaker operating cash flow, which reflects both lower profitability and investments in working capital tied to launching our Data Center and Critical Power Programs. Capital Expenditures also climbed by $5.6 million, largely because of spending on equipment that supports the rollout of those new programs. At the end of Q2, our net debt was $134.7 million, compared with $71.8 million when the second quarter of 2025 ended. That debt pushed our bank covenant net leverage ratio to 2.9 x as of June 30th. Let's now look at our expectations for Q3 and the full year. For Q3 2026, our current guidance is net sales between $160 million and $170 million, with adjusted EBITDA between $15.5 million and $18.5 million. Our Q3 outlook assumes continued improvement in our commercial vehicle and construction access end markets, plus the ongoing ramp of the Data Center and Critical Power Programs. We've factored in $1 million-$1.5 million for launch-related costs and another $1 million-$1.5 million for outsourcing. For the full year, we raised our net sales guidance and brought our free cash flow guidance down. Net sales should now land between $620 million-$650 million. Adjusted EBITDA remains projected at $52 million-$60 million, and free cash flow at $7 million-$15 million. This outlook assumes a full year of Accu-Fab ownership, $50 million-$60 million in incremental cross-selling revenue, and ongoing gains in legacy end market demand as commercial vehicle recovers and construction access keeps delivering steady performance. When we look at the entire year, our forecast accounts for somewhere between $5 million and $6 million tied to launch activities, plus another $2 million to $3 million for outsourcing. Beyond that, I want to share more specifics regarding how we intend to allocate capital. Jag noted earlier that roughly $40 million in additional Capital Expenditures is expected to go into the business across the coming two years, and on top of that there's another $10 million for leased equipment, which shows up under financing cash flow. Within our revised guidance for the whole of 2026, about $25 million of that planned investment is included, while the remainder is anticipated mainly during 2027 and, to a smaller degree, in 2028. On a separate note, none of those figures account for spending on a brand-new production plant. Right now we're looking closely at a number of possible locations across the Southeastern U.S. Our expectation is that a project like this would probably require somewhere between $25 million and $30 million, and it would enable roughly $50 million to $60 million in additional revenue. Generally speaking, we're aiming to make a final call toward the end of 2026, and as our thinking develops, we'll share updates. Sitting beneath all of this is a careful, disciplined philosophy toward putting capital to work. We align our investments in organic growth tightly with what customers actually need, and we subject any fresh capital to strict hurdle rates — we look for a payback window of two to three years along with an IRR of no less than 15%. To wrap up, the second quarter saw revenue come in significantly higher than we had projected. Although expenses tied to launches and outside vendors are weighing on profits right now, the money we're putting into these efforts is backing initiatives that will drive lasting gains in both sales and earnings down the road. As we move through the back half of this year, we'll remain focused on growing our data center and critical power programs the right way, improving our operational efficiency, and converting the opportunities in our commercial pipeline into profitable growth. Thanks to a healthier balance sheet, plenty of liquidity, and a rigorous approach to investment, we feel we're set up nicely to seize the demand conditions before us and keep delivering long-term value to shareholders; so then, operator, let's begin taking questions from the line.

Mike Shlisky analyst
#4

Yes, hello, and thank you for fielding my questions today. I had one thing I wanted to ask, plus a couple of follow-ups, Jag, regarding what you said about the possibility of customers reserving capacity for upcoming periods. I'd just like a bit more clarity on that. Did that remark apply only to data centers, or does it span the majority of end markets? Does it require them to put down a deposit in order to hold that space? Or will it work more like a reserve take-or-pay arrangement? Or might it simply involve keeping space available for a modest fee, with the precise quantities and amounts worked out afterward?

Jag Reddy executive
#5

Hey, good morning, Mike. Fair question. We're looking at a range of possibilities, especially with data center customers, since the need for capacity keeps growing there. There's a limitation within U.S. manufacturing capacity when it comes to serving all the demand that both we and they are witnessing in the data center build-out. We've held quite a few discussions with a large number of our data center customers. They were evaluating a variety of models. We developed an upfront fee structure; we've also talked about volume commitments. We keep examining these possibilities, despite the fact that we haven't yet signed any specific customer to such a contract. There's interest out there, and we'll keep looking into those possibilities alongside our data center customers.

Mike Shlisky analyst
#6

Thanks. For my next question, I was hoping you could give us a bit more color on what you said about trucks. With trucks ramping up fairly quickly, does that alter any of your capacity plans for data centers or the other groups, or will that continue to operate in its own space? Also, could you say whether, as the truck market grows, you picked up any notable new business wins during the last quarter or thereabouts?

Jag Reddy executive
#7

Sure. We keep seeing a meaningful increase in the pace at which commercial vehicles are being built out. As we understand it right now, the majority of 2026 build slots are already taken. Customers have only just started making their 2027 build slots available. That is definitely a quicker rise than what we expected in Q1; we remain supportive of our customers — all 3 major customers we work with today — as they expand their build-outs and build rates. Meanwhile, we keep seeing solid market share gains, especially tied to the 2027 EPA emissions change. We mentioned in our prepared remarks a few wins in the commercial vehicle space; we keep seeing solid activity with the OEMs that are bringing out new models for 2027. During earlier quarters, we discussed our major wins for the 2027 model truck, especially with a couple of the customers. Those programs remain on track, with some revenue possibly appearing in late Q4. Without question, the ramp for those vehicle programs will come in 2027.

Mike Shlisky analyst
#8

Okay, that's great. I appreciate you giving me the time. I'll hand it over to the next person.

Jag Reddy executive
#9

Morning, Vlad.

Vlad Bystricky analyst
#10

Hi there, good morning. Hello, Jag and Rachele. I appreciate you letting me join. My question is about the revenue and adjusted EBITDA guidance for the third quarter and the second half of the year — could you walk me through what pushes things toward the bottom versus the top of those ranges? And are those ranges driven more by when customers decide to act and general uncertainty, or more by how well you can keep increasing DCP volumes and shipments?

Rachele Lehr executive
#11

Thanks, Vlad. Sure — when we look at the bottom and the top, the main factor really is how quickly CV comes back. As Jag said, we're seeing a big uptick there, and the speed of that will determine whether we land low or high. Then there's the timing and execution around DCP volume; we keep seeing that volume, this market keeps shifting and changing, and at times customers delay things or move them up, which can have an effect. And then how fast can we work through those launch and outsourcing costs? Those outsourcing costs are very much tied to when our capital equipment purchases arrive. The earlier they show up and the earlier we can get them running at full speed, the earlier we can bring those costs down; those are roughly the three things that decide which end of the range we fall on.

Vlad Bystricky analyst
#12

Vlad, glad that was useful, and thanks for the kind words, Rachele. To build on that, could you share some detail about what kinds of DCP program awards you've been securing over roughly the last 12 months? Are they mostly extra programs for customers you already have? Are new customers also coming in as wins? And then, related to that, when you look at the additional DCP cross-selling revenue shown on slide 11, how much certainty should we assign to that revenue, and what risks might affect producing those sales within the timelines shown on that slide?

Jag Reddy executive
#13

Vlad, the DCP end market wins consist of both current accounts raising their volumes on Accu-Fab programs that already exist. They also include new programs coming from DCP customers we already serve, plus several new customers we've managed to bring online since the deal shut in July of last year. Since the Accu-Fab acquisition closed, we've brought a substantial number of new customer programs into the mix. We mentioned, for instance, one specific customer that's new to both MEC and Accu-Fab and has so far granted a little over $55 million in programs in 2024 by itself; they keep considering more programs to give to MEC. I'd put it this way: of the $90 million in bookings across the two quarters this year, it's easy to say $55 million of that comes from a single brand-new customer that came online once the acquisition was done. Meanwhile, the full $135 million in bookings since the deal closed is a blend of new programs from current customers and added volume from existing programs that came with the acquisition. On timing, we feel quite confident about when these incremental cross-selling revenues will arrive, as we've set out on slide 11. We have a clear line of sight to 2026 revenue in particular, and we're also seeing solid movement toward the 2027 revenues.

Vlad Bystricky analyst
#14

Understood. Thanks for all the detail, Jag. I'll rejoin the queue.

Greg Palm analyst
#15

Thank you.

Jag Reddy executive
#16

Hi there, Greg.

Greg Palm analyst
#17

Yes, hello Jag and Rachele. I'd like to expand on those capacity reservations you mentioned. For context, do these inquiries come straight from the customers themselves, and what gets these discussions going in the first place? Just so it's clear, are they only with the customers you already have, or are you also talking with businesses you don't currently serve?

Jag Reddy executive
#18

Greg, I'd say the majority of these discussions involve a mix of current and prospective customers within the DCP market. Like I said before, that's a fresh business model we're looking into. When it comes to our legacy end markets — construction, CV, or ag — that isn't a structure those buyers are accustomed to. We've had some initial talks with legacy customers, sure, but those volumes are already under contract, we've already secured those programs, so returning to those customers is somewhat difficult. The new customers we're onboarding, definitely, those are the talks taking place. Let me add as well, while we're working on identifying our Southeast facility, that gives us one more chance to present something to the DCP customers, telling them, "At some point we'll have a new facility in the Southeast, and this is your chance to lock in some capacity." Correct? That, I'd say, is another intriguing avenue for us to chase that structure.

Greg Palm analyst
#19

So with that situation, do you adjust the way you evaluate fresh pipeline prospects at all? Are you getting pickier so you can keep certain slots open for bigger capacity bookings?

Jag Reddy executive
#20

Yes, we are. Honestly, even though our sales group can't stand it, correct? Certain smaller programs have been turned down by us; certain chances have been turned down by us; at this moment, over the coming 12 months, as we forecast our capacity use, as we forecast where we'll stand around the middle to latter part of next year, decisions are already being made by us regarding which programs to abandon, which programs must be dropped, correct? That involves plenty of study and plenty of discussions inside the company. Indeed, certain decisions are being forced on us. My hope is that in the end those decisions will assist us in bettering our mix, bettering our profitability, and keep raising what we expect from our margin profile.

Greg Palm analyst
#21

All right, thank you.

Ross Sparenblek analyst
#22

Hi there, good morning.

Jag Reddy executive
#23

Good morning, Ross.

Ross Sparenblek analyst
#24

Hey. Staying on the subject of the recent wins. Could you give us some idea of how revenue composition might shift down the road, when you consider bespoke programs compared with the higher quality, longer duration programs you're bidding on selectively?

Jag Reddy executive
#25

Yeah; we definitely give priority to growing volume from programs we already have. To put it another way, when a DCP customer already runs a program that we manufacture at one of our facilities, there have been situations where they come to us and say, "I'd like to double what I'm buying, I'd like to triple it, I'd like to quadruple it." Naturally, those efforts rank higher for us, since we understand that product line thoroughly. The systems and processes are already in place, which makes expanding those efforts simpler. Those get priority from us. That said, whenever we bring in equipment, spend CapEx, or incur new incremental costs, we return to them seeking a higher price, including on those programs that already exist. That will lift both our mix and our margin going forward. Meanwhile, we're examining where our unused capacity can be used up. We're being quite choosy about repurposing our tube plants in Michigan, especially one facility and possibly a second, so they can handle fabrication of DCP products. I'd describe this as a very difficult transition, yet the team has performed remarkably in turning one of our two facilities into a fab plant, which has created substantial opportunities for us to pick up DCP product lines. That would be our second opportunity. Once more, we discussed powersports customers moving many of our programs offshore. Although that's a near-term headwind, we intend to use that capacity and repurpose it for DCP too. That's a second priority we're pursuing; and finally, scale, right? When we consider taking on a $10 million, $20 million program, we'd give it priority over several $2 million-$3 million programs; that's our approach to scaling up and improving mix going forward.

Ross Sparenblek analyst
#26

Right, no, that does help, and it's more or less the thing I'm attempting to size up here. Some of the markets you sell into are cyclical by their very nature. That isn't something you can truly repair, but what you're doing is going back and putting new prices on the business you already have-

Jag Reddy executive
#27

Yep

Ross Sparenblek analyst
#28

Given how strong demand is, I'm just attempting to—how ought we to frame what comes from, say, better-quality, longer-duration, more recurring-type revenue, meaning the portfolio's steadiness, apart from the fact that clearly we'll see additional DCPs, possibly more defense. Broadly put, is that roughly 30%-

Jag Reddy executive
#29

Yeah

Ross Sparenblek analyst
#30

when you get up to 20%, is that basically custom work, sort of one-time projects that come and go in cycles?

Jag Reddy executive
#31

Exactly.

Ross Sparenblek analyst
#32

It's not-

Jag Reddy executive
#33

In the past-

Ross Sparenblek analyst
#34

Ross, we might need real figures for this. That's okay.

Jag Reddy executive
#35

Sure. Ross, previously we discussed bringing our total CV mix down to slightly below 25%. My sense is we're advancing well — not through leaving CV programs behind, but by growing our presence in DCP programs. That's the first point; we can see a path toward DCP product lines accounting for a 20% revenue mix by the close of this year. While no long-term targets for our DCP mix are being provided, over time I could envision something in the range of 25%-30% of total revenues — MEC revenues — tied to DCP, since our assessment is that this is at minimum a three to five-year cycle; those are the two factors I'd point to that lower exposure to a lower margin end market while raising exposure to higher margin DCP over time.

Ross Sparenblek analyst
#36

All right, got it. So perhaps just a single additional very brief question regarding that new facility that's set to come online. Pardon me, but did you provide any sort of indication about the scale in terms of square footage when we consider the revenue runway that you provided to us?

Jag Reddy executive
#37

No, we haven't. We're still looking into those possibilities. We feel fairly confident that we can locate and finalize a plant at some point during this year. Our aim is a plant possessing certain existing infrastructure that might ultimately produce somewhere from $50 million to $60 million in revenue after it's completely capitalized, meaning installing capital equipment and bringing on new staff, training them, and expanding that operation.

Ross Sparenblek analyst
#38

All right, I'll make sure that gets shared. Thanks.

Jag Reddy executive
#39

Thanks, Ross.

Ted Jackson analyst
#40

Thank you so much. Rachele, the first thing I wanted to ask was really just to clear something up. You said something about what you figured this plant you're looking to set up in the Southwest could run us, so I just wanted to nail that down quickly.

Rachele Lehr executive
#41

What we've said is that it might run somewhere between $25 million and $30 million. Acquiring a facility would take up $10 million to $15 million of that, and then we'd be investing an additional $10 million to $15 million of capital into it.

Ted Jackson analyst
#42

Regarding that $50 million in extra CapEx you're aiming to deploy across roughly a 2-year span, half comes from this Both building plus the machinery needed to turn it into a factory. The remaining half involves growing capability and capacity inside what you already have. Is that how we should interpret it?

Rachele Lehr executive
#43

Yes, that's right. We mentioned that within our current sites, roughly $10 million-$15 million in additional spending is going toward marginal areas where we already operate. Looking ahead as we expand, we've set a comparable goal.

Ted Jackson analyst
#44

If we push this a bit further, looking at what your capacity can generate in revenue, that figure would move past $900 million. My understanding is that you currently see $850 million, and within your current plant you plan to bring on an additional $50 million-$60 million-plus of capability. So we're discussing a range of $900 million to $1 billion in revenue that this expansion could support.

Rachele Lehr executive
#45

Correct; we have said publicly that across our current facilities, we believe capacity stands at $850 million. Once you put that $50 million-$60 million in, the total goes beyond $900.

Jag Reddy executive
#46

One thing I should flag, Ted: that figure relates to capacity. That said, a number of the end markets we serve can be quite cyclical. Once that additional capacity comes online, we simply have to keep in mind that certain legacy end markets of ours might slip back into a downturn; we should be somewhat careful rather than simply piling one number onto another.

Ted Jackson analyst
#47

No, I'm simply attempting to get a handle on how your investments are behaving and what the implications are.

Jag Reddy executive
#48

Right.

Ted Jackson analyst
#49

To put it simply, I get that this isn't a revenue figure, but basically, at some point when we're either leaving 2027 behind or during 2028, the company on a fundamental level ought to possess the infrastructure capable of backing that level of revenue and that level of market.

Jag Reddy executive
#50

Correct. Precisely correct. Yeah.

Ted Jackson analyst
#51

There were a couple of additional items I wanted to check in on. First, I'm simply wondering — which functions are the ones you're required to contract out? Regarding the equipment you have to get installed, you mentioned lead times of four to six months. My assumption is that those equipment orders have already been placed by you. I suppose what I'm really asking is: what's the function, and when exactly do we expect that bottleneck to be resolved? Would that fall in early 2027?

Jag Reddy executive
#52

Yep

Ted Jackson analyst
#53

Will that be in place prior to the conclusion of this year?

Jag Reddy executive
#54

Yes. Among the primary items being handled by outside partners, the first involves laser capability, which is purely about taking sizable metal sheets and slicing them into forms; we've placed orders for a considerable quantity of laser equipment. A portion is currently being set up, a portion is in transit, and a portion should arrive near the close of this year. Across the whole company, we're bringing in many laser-cutting units. As we launch new programs, a share of that production is going to outside suppliers. Second, we're also sending out some brake press capability. Yes, we've got equipment ordered. Even more significant is the workforce shortage at several of our critical plants. In the Defiance, Ohio region, the jobless figure stands at 2.3%. In the Mayville, Wisconsin region, that figure is 2.9%. We're making strong efforts to staff those roles. During the period when we're staffing them and getting these new machine operators trained, a portion of that output is also going to outside suppliers. Finally, paint capability. Throughout this industry, there's a scarcity of paint and powder coat capability nationwide; we're likewise considering moving a portion of that production into our Wisconsin paint sites. Simultaneously, at times it's simply more cost-effective to send some paint production out to nearby paint suppliers in certain of these areas. That too is being outsourced. Those represent, I'd say, 3 of the tasks we presently send to outside partners, and we anticipate bringing some, perhaps all, of it back internally by the start of next year, at minimum for these programs. That's why there are somewhat higher transitional expenses during the latter half of this year.

Ted Jackson analyst
#55

Mm-hmm. All right. So that's a mix of machinery plus people. Honestly, staffing was the thing I planned to ask about next — you've already set this expansion in motion, and previously you've talked about how much you've hired, what your recruiting requirements look like, and frankly, how hard it is to keep workers when it's truly an employee's market right now for manufacturers. When it comes to the expense of bringing all this additional capacity online from a staffing perspective, how do you see it — both in terms of sheer headcount and perhaps dollars per employee — and how does that stack up against the demand ramp? What I'm really driving at, as we frame this, and I realize you aren't providing 2027 guidance, but when we consider 2027 and much of this capacity gets switched on, my guess is you'll need to make some investment ahead of certain staffing costs, operating costs, SG&A, that will land before that. Do you follow what I'm getting at? How should we think about that, once we reach 2027 and you genuinely begin to see, at least on the top line, the payoff from your investments plus the investments you'll need to keep making to push toward what ought to be excellent margins by the time you hit 2028? That's my final question. I hope it wasn't.

Jag Reddy executive
#56

Yeah

Ted Jackson analyst
#57

Going through the bullets.

Jag Reddy executive
#58

Absolutely. I'll have Rachele walk through portions of what our hiring looks like, what we plan to do, and what those costs involve. Broadly speaking, though, we aren't alone in running into limits on labor. There are a few moves we're making. First, when labor expenses go up — whether that's short term or in specific geographies — we adjust what we charge for our programs so those higher costs are reflected. That's the first thing. Second, where the added expense is temporary in nature, we're going to our customers and asking them to cover it, whether it shows up as more overtime, more outsourcing, or something along those lines. Those discussions are happening with our customers. And finally, we're evaluating geographies where strong labor supply is available, such as the Detroit area. Clearly, our Hazel Park site is in the process of being expanded. In the same way, hiring is possible for us in Raleigh, North Carolina. Hiring is also possible for us in the Chicago area. As we decide which locations get some of the bigger programs, we're putting labor pool access near the top of the list.

Rachele Lehr executive
#59

I'd like to build on that. Beyond pinpointing strategically where programs should go, we are examining every one of our locations in a truly holistic way. Attraction, retention, the complete employee experience—those are what matter. On the attraction side, absolutely, our plans require adding several hundred people before the year ends. To address your point, Ted, our aim is to have those employees ramped up prior to reaching 2027, allowing us to achieve the 2027 production rather than postponing hiring until 2027 begins; all of that is already incorporated into our current plans. We are in fact using some third-party resources to assist us with this as well. As Jag mentioned, in a number of markets where unemployment is extremely low, our teams have already exhausted everything available in our tool chest, but now let's turn to others. Using whatever resources we require doesn't scare us, though we do so prudently. Every item passes through me along with the business case, so I get to ensure we're making the correct choice for our financials, and all of it is already reflected in our second half guidance at this moment; furthermore, on the retention side, since some of those outside resources are assisting us with attraction, our teams on location will be able to concentrate more on what's occurring in the facilities, with the employees, with the management, to ensure we stay focused, together, naturally, with the usual retention programs and similar things you establish to keep our employees. We're examining this holistically to ensure we aren't merely bringing people in and repeatedly cycling them out. We bring them in so they remain and can assist us in contributing to revenue and growth in future years.

Ted Jackson analyst
#60

All right, I appreciate the responses, and congratulations on the quarter. I'm excited about the next few.

Greg Palm analyst
#61

Thanks for sticking around for a few follow-ups. From where we sit on the outside, it's difficult to grasp how much these short-term cost pressures really add up to. I'm trying to get a sense of what visibility you have going into 2027, since my assumption is that you'll keep landing additional business and new programs will be launching. This kind of ongoing effect will always be there, but is the answer simply that revenue needs to grow to a level where absorbing it becomes easier? Let me just make sure I've got this right — it seems like a portion of that outsourcing work basically disappears on its own once the equipment is in place and you bring it in-house. I only wanted to verify that.

Rachele Lehr executive
#62

Yes, so on the outsourcing piece first, that's exactly correct. After the capital equipment is installed, outsourcing won't be necessary anymore, at minimum for the programs we already have. And like you said about new business wins, sure, some of that could still happen, but the margins would come in higher. That would be factored in. We'd have that understanding. At the moment, the $1 million to $1.5 million we've been reviewing every quarter relates to getting more facilities operating at full capacity. Jag noted that two additional facilities are now under consideration. Those are the expenses we're dealing with at present. Certainly, if we end up launching the Southeast facility, we're aware there will be ramp costs involved there. A great deal of what we're seeing is tied specifically to facilities. That pattern will persist, and on top of it, as you mentioned, we'll gain the improved margin from absorption as well.

Jag Reddy executive
#63

To build on what was just said, Greg, eventually there will be no more footprint left for us; even after all these additions, capacity will be exhausted. When exactly does that happen? Clearly, no guidance is being offered right now. Could it be 2028? Could it be late 2027? Those are among the calculations feeding into our planning for next year, I believe. When the right moment comes, near the end of this year or the start of next year, we should have greater internal clarity, and we should also be in a position to share more of those specifics with our shareholders and our stakeholders.

Greg Palm analyst
#64

All right. I suppose there's just a single additional question regarding the capacity reservation topic, and it sort of ties into perhaps the new facility you mentioned. Would you anticipate setting that aside for one particular customer, and how likely is it that a portion of that CapEx need might in fact be paid for by a customer themselves? The same goes for dedicating that reserved capacity. Are there particular launch or ramp-up expenses that the customer could in fact bear in that scenario instead of you?

Jag Reddy executive
#65

That could happen. Every one of those possibilities is being looked into by our commercial team alongside our customers.

Greg Palm analyst
#66

Okay. I'll leave it there. Thanks.

Jag Reddy executive
#67

Thanks, Greg.

Jag Reddy executive
#68

As we wrap up, I'd like to express gratitude to our team members for the strong dedication and performance they keep showing, as well as to our investors for the backing they continue to provide. Our confidence stays firm regarding the strides we are taking to place MEC for lasting expansion, improved margins, and substantial growth in upcoming years. We're eager to update you on how that momentum continues. Thanks for being with us today.

Operator operator
#69

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Mayville Engineering Company, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Mayville Engineering Company, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.