Home / Transcripts / Microchip Technology Incorporated (MCHP) · November 5, 2026

Microchip Technology Incorporated (MCHP) Earnings Call Transcript & Summary

November 5, 2026

NASDAQ US Information Technology Semiconductors and Semiconductor Equipment earnings 78 min

What were the key takeaways from Microchip Technology Incorporated's November 5, 2026 earnings call?

In the second quarter of fiscal year 2027, Microchip Technology reported net sales of $1.622 billion, reflecting a 42.2% year-over-year increase, significantly driven by strong demand in industrial and data center markets. Non-GAAP earnings per diluted share reached $0.97, exceeding the midpoint of management's guidance by $0.04. However, management provided cautious guidance for the upcoming December quarter, forecasting net sales to decline by 3% to increase by 1%, primarily due to the absence of one-time revenue items that positively impacted the September quarter.

What topics did Microchip Technology Incorporated cover?

What were Microchip Technology Incorporated's November 5, 2026 results?

Microchip's strong performance in the September quarter highlights robust demand in key markets, but the cautious guidance for December reflects potential headwinds from inventory constraints and the absence of one-time revenue items. Investors should monitor the company's ability to navigate supply chain challenges and the impact of acquisitions on future growth, while also keeping an eye on the evolving dynamics in the data center market.

Earnings Call Speaker Segments

Operator operator
#1

Good evening, and welcome to the Microchip's Q2 Fiscal Year '27 Financial Results Conference Call. [Operator Instructions] As a reminder, this conference is being recorded. I'll now turn the conference over to Eric Bjornholt, Senior Vice President and CFO. Thank you, Eric. You may begin.

J. Bjornholt executive
#2

All right. Thank you, and good afternoon, everyone. During the course of this conference call, we will be making projections and other forward-looking statements regarding future events or the future financial performance of the company. We wish to caution you that such statements are predictions and that actual events or results may differ materially. We refer you to our press releases of today as well as our recent filings with the SEC that identify important risk factors that may impact Microchip's business and results of operations. In attendance with me today are Steve Sanghi, Microchip's President and CEO; and Sajid Daudi, Microchip's Head of Investor Relations. I will comment on our second quarter fiscal year 2027 financial performance. and then Steve will provide commentary on our results and discuss the current business environment as well as our guidance. We will then be available to respond to specific investor and analyst questions. We are including information in our press release and on this conference call on various GAAP and non-GAAP measures. We have posted a full GAAP to non-GAAP reconciliation on the Investor Relations page of our website at www.microchip.com, and included reconciliation information in our earnings press release, which we believe you will find useful when comparing our GAAP and non-GAAP results. We have also posted a summary of our outstanding debt and leverage metrics on our website. I will now go through some of the operating results, including net sales, gross margin and operating expenses. Other than net sales, I will be referring to these results on a non-GAAP basis, which is based on expenses prior to the effect of our acquisition activities share-based compensation and certain other adjustments as described in our earnings press release and in the reconciliations on our website. Our non-GAAP financial results met or exceeded the guidance we provided on August 6, 2026. Net sales in the September quarter were $1.622 billion, which was up 9.2% sequentially and up 42.2% from the September 2025 quarter. We had several infrequent items that positively impacted net sales by about $53 million in the September quarter that we do not expect to repeat in the December quarter. These items were all at 100% gross margin and included approximately $21 million impact of our pricing change on inventory in the distribution channel. $22 million in licensing revenue from patent licensing transactions in excess of what we expect in the December quarter and a $10 million benefit from a long-term contract with the customer. We have posted a summary of our net sales by product line and geography on our website for your reference. On a non-GAAP basis, gross margins were 66.5% and including capacity underutilization charges of $26.6 million. Non-GAAP gross margins were positively impacted by higher licensing revenue in the quarter as well as the impact of our pricing change that was implemented in the September quarter. Non-GAAP operating expenses were at 27% of sales and operating income was 39.5% of sales. Non-GAAP net income was $559.2 million and non-GAAP earnings per diluted share were $0.97, which was $0.04 above the midpoint of our guidance. On a GAAP basis in the September quarter, gross margins were 65.9%, total operating expenses were $603.5 million and included acquisition intangible amortization of $90.2 million, special charges of $7.9 million, which was primarily driven by our activities associated with our closure of Fab 2 and acquisition-related expenses. Share-based compensation of $62.2 million and $5.3 million of other expenses. The GAAP net income attributable to common shareholders was $373.6 million or $0.68 per share and included a tax benefit of $0.13 per share related to a valuation allowance release on tax attributes. Our non-GAAP cash tax rate was 5.7% in the September quarter, and we expect to have a tax rate of about 6.5% for fiscal year 2027. Our tax rate is down from our previous forecast for a variety of reasons, including the impacts of a reduction in inventory reserves and a higher percentage of our taxable income being in jurisdictions with lower tax rates. Our inventory balance at September 30, 2026, was $1.117 billion. We had 184 days of inventory at the end of the September quarter, which was up 9 days from the end of the June quarter. Inventory increased in the quarter as we received some high dollar value wafers from our foundry partners in anticipation of future growth and build some finished goods inventory. Included in our September quarter ending inventory was 12 days of long life cycle, high-margin products whose manufacturing capacity has been end-of-life by our supply chain partners. Inventory at our distributors in the September quarter was at 25 days, which was flat compared to the June quarter and at the lower end of what we have experienced historically. Our cash flow from operating activities was $419.2 million in the September quarter. Our adjusted free cash flow was $377.1 million in the September quarter. As of September 30, our consolidated cash and total investment position was $457 million. Our net debt decreased by $31.7 million during the September quarter, and this is after funding the acquisition of Hailo. Our adjusted EBITDA in the September quarter was $705.4 million and 43.5% of net sales. Our trailing 12-month adjusted EBITDA was $2.162 billion, our net debt to adjusted EBITDA was 2.36% at September 30, 2026. We expect our net debt to adjusted EBITDA to continue to reduce as we progress through fiscal year 2027. Capital expenditures were $23.1 million in the September quarter, and we expect capital expenditures for fiscal year 2027 to be about $100 million. Depreciation expense in the September quarter was $36 million. I will now turn it over to Steve, who will provide some additional commentary on our September quarter results and our guidance for the December quarter. Steve?

Steve Sanghi executive
#3

Thank you, Eric, and good afternoon, everyone. I will reflect a bit on our performance in the September quarter. The September quarter was an excellent quarter for Microchip with broad-based growth as we beat the high end of our guidance in net sales and our non-GAAP financial metrics like gross margin percentage, operating expense percentage, operating profit percentage and earnings per share all met or beat our guidance. Our industrial and data center end markets were the 2 biggest drivers of our growth across our end markets, new design wins are increasingly supporting that growth. Our end market split for the September quarter as a percentage of net sales, excluding licensing revenue, was industrial at 34.6% and data center at 16.7%, aerospace and defense at 16.1%, Automotive at 14.2% and communication at 8.2%; consumer appliances at 7.3% and compute at 2.9%. From the September quarter 2025 to the September quarter 2026, net sales from industrial grew 50.3% and Data center grew 55.7%. Aerospace and Defense grew 41%, automotive grew 19.3% and Communication grew 43.5%, Consumer appliances grew 26.7% and compute declined 1.6%. Net sales from our data center business unit was over $250 million in the September quarter and is well on its way to be $1 billion in calendar year 2026. For calendar 2026, about half of our data center business comes from our standard products and about half comes from our Data Center Solutions business unit. On the standard product side, design wins are building across many products. In power, our digital power controllers are winning across AI, data center, power applications, from server power supplies to battery backup units. In system management, we offer the parts that sense, control and connect a server or rack and our gigabit Ethernet switches and USB hubs are gaining design win momentum in management networks. With respect to our Gen6 PCIe switch and retimer products, we had 19 design wins at the end of September quarter, up from 12 design wins at the end of June quarter. As of today, we now have 24 total design wins. These incremental wins will begin to ramp net sales next year and help position us across a growing range of next-generation data center platforms. As these deployments scale so does our opportunity across the broader data center portfolio, including timing, security and networking. I would like to give one more organizational update. As you know, after my return to Microchip as CEO 2 years ago, I reorganized the company into 5 pillars. These pillars were microcontrollers, analog and power, networking and connectivity, high-performance compute and AI on the edge. There is a Senior Vice President heading up each of these pillars, our Data Center Solutions business unit reports into the networking and connectivity pillar. Because of our focus on our Data Center Solutions business unit called the DCS, I have decided to pull up the DCS business unit to report directly to me at the executive staff level. The head of that business unit is Brian McCarson, who has spoken at these earnings calls before and will now report directly to me. Our design wins are not limited to data centers in aerospace and defense, we're winning designs across regions, products and applications from satellite communications and laser terminals to unmanned systems by adapting our commercial technologies for Space and Defense. In one recent case, a defense technology company selected our radiation-tolerant secured FPGA over its incumbent supplier for 2 space avionics programs. As defense production rates ramp so does our opportunity. Security requirements are also growing across our markets from data centers to defense to the edge. At the edge, a leading enterprise network provider, recently selected our security solution to protect its wireless networks with quantum resistant encryption became a requirement. Together, data center, aerospace and defense, industrial, robotics, automotive and the intelligent edge are the secular trends we see driving growth over the long-term. I will now talk about our business environment and the guidance going forward. Our bookings were very strong in the September quarter, and our book-to-bill ratio remained well above 1. We started the December quarter with a higher backlog compared to when we entered the September quarter. The September quarter saw a pivot in the business environment with customers completing their inventory digestion to shortages appearing in certain areas because of lengthening lead times at foundries, set suppliers and in our own fabs. Lead times for the majority of our standard products historically have been 4 to 8 weeks. But now with our die inventory substantially reduced and foundry and OSAT capacity constraints, we are seeing lead times broadly stretch out on many of our products. Our customer requests for expedited shipments have increased significantly from a few quarters ago. We are receiving many orders for requests inside the lead time and they're going unsupported in the quarter. We are advising our customers to give us longer-term backlog to help better match our new lead times which ready a lot across our product lines. Our new lead times are anywhere from 6 weeks to 32 weeks. Eric just explained the 3 infrequent items in the last quarter. First, it was an unusually strong quarter in our licensing group with a couple of large deals closing in the September quarter. Our licensing business is usually lumpy. The second item was the onetime effect of our recent price increases, which raised the value of our distribution inventory. The third was a revenue recognition from a long-term customer contract -- those infrequent items are not present in the December quarter, our December quarter is also our weakest quarter seasonally because there are a lot of holidays in the quarter. Therefore, the guidance for December quarter should be viewed in that context. Our December quarter also includes the impact of 2 small acquisitions that we completed. Hailo in the AI on the Edge space in Vorago in the A&D space, we expect that Hailo will add about $4 million to our sales in the December quarter and Vodago will add about $6 million to our net sales in the December quarter. Taking all of these factors into account, we expect our net sales in the December quarter to be between down 3% and up 1% with the midpoint of minus 1%. At the midpoint, this would be up 35.4% from the year ago quarter. December quarter is usually seasonally down 3% to 5%. This seasonal effect, combined with the infrequent items we experienced in the September quarter puts our December quarter guidance about 5% to 7% above normal seasonality. We expect our non-GAAP gross margin to be between 64% to 65% of net sales. This is because of several reasons. First, the 3 infrequent items in the September quarter were all at 100% gross margin. Secondly, our net sales guidance is lower than what we would have expected a quarter ago. Thirdly, we have substantial unsupported backlog on high-margin products that our supply chain cannot fulfill. And finally, we are running lower level of utilization internally than what we were planning a quarter ago. All these factors are impacting our gross margin guidance. We expect our non-GAAP operating expenses to be between 26.5% and 27% of sales. We expect our non-GAAP operating profit to be between 37% and 38.5% of sales. We expect our non-GAAP diluted earnings per share to be between $0.87 and $0.95 per share. At the midpoint, non-GAAP earnings per share would be up 107% over a year ago quarter. Regarding our long-term model, we maintain our long-term model on a non-GAAP basis to be 65% gross margin, 25% operating expense and 40% operating profit. With that, operator, will you please poll for questions?

Operator operator
#4

[Operator Instructions] Our first question comes from the line of Timothy Arcuri with UBS.

Timothy Arcuri analyst
#5

Steve, I was wondering if you could help unpack a lot of these puts and takes. It seems like you said that December revenue was a little lower than what you would have thought 3 months ago and Fab utilization is also a little lower, yet bookings are stronger. Is this due to constraints that are downstream from you? And maybe -- does that give you more visibility into March. So you could maybe give us a sense, maybe normal seasonal, I think in March is up like 3%. So it sounds like maybe you feel a little bit better about March as a result of all this. If you can just unpack that for us, that would be great.

Steve Sanghi executive
#6

Yes. So I think if you look at the last quarter, it was kind of noisy. The 3 items that we talked about were in our guidance, the licensing deals were in our guidance, the recognition of $10 million of customer contract was in our guidance and so was the price increase. So the upside last quarter came from product sales, so we did very well. Now when you look at the current quarter, lead times have stretched out and a lot of the high-margin bookings we received on a lot of advanced products in pretty much every business segment cannot be fulfilled in this quarter. So they -- some of them are scheduled for next quarter. So as a result, I think we're guiding the December quarter to be -- it had lower than we would have thought about a quarter ago. The backlog for March quarter today is much better than December quarter was at the same point in time. So currently, we're optimistic. We're not giving any guidance for the March quarter. But I think some of the constraints we are talking about are now scheduled into March quarter. So we are hopeful that March quarter will be a stronger quarter.

Timothy Arcuri analyst
#7

And then maybe just as a quick follow-up. So on the PCIe Gen6 wins, I think, Steve, you said 14 design wins coming out of June and it's now up to sounds like you're building some high-value inventory for that stuff, too. So when does that start to become really big revenue? And if you can kind of size what the incremental could be from those wins, if possible, that would be great.

Steve Sanghi executive
#8

So we -- we're unable to dollarize the wins. The part went into production last quarter and we have a small amount of shipments in the current quarter, and they will increase every quarter from here on. Actually, there is a sizable shipment this quarter and they start increasing then from the next quarter on, the design wins are very strong and they're turning on at various times next year. So by the start of the 2028 you can expect almost all 24 designs to be in production, and we're winning essentially design a recall.

J. Bjornholt executive
#9

Yes. Just one clarification to the way Tim asked that question as he said PCIe Gen6 and the 24 design wins is both PCIe and the retimers. So I just wanted to clarify that.

Steve Sanghi executive
#10

That is correct. I think we are basically keeping them together. They're very much in the same application, many times, retimer goes with the PCIe, we don't always win the both, in some cases, customer doesn't need the retimer, they only need the PCI switch, but they're pretty much products are in sync. In the past, we have broken out how many on PCI Gen6 and how many in retimers. And I don't have that today, but we have no problem in breaking that out.

Timothy Arcuri analyst
#11

Okay, Steve.

Operator operator
#12

Our next question comes from the line of Matthew Prisco with Cantor Fitzgerald.

Matthew Prisco analyst
#13

I guess to start, if you could maybe discuss order linearity in the quarter and maybe what you've seen through October and November thus far? And any color you can offer on those booking trends across end markets would be appreciated.

J. Bjornholt executive
#14

So I think bookings were quite strong all the way through September. So nothing really to point out there. And then October was another good month of bookings where backlog -- overall backlog continued to grow. November has just been a few days, but nothing odd to report.

Steve Sanghi executive
#15

Yes. So bookings have continued well. The backlog has continued to build. The best way to look at our December quarter is to take the $53 million out of the September quarter, which were the 3 infrequent items. And if you do that, then our December quarter is up about 2.3% from our September quarter versus normal seasonality for December quarter is down 3% to 5%. So therefore, I think we got no issues in how the quarter is how the product chip backlog is, how the bookings are, all that continues well. But the 2 licensing deals, a unique customer program that added $10 million of revenue recognition last quarter. And this strange effect of when you ship the inventory to distributor you assume there's a certain line of [ disti ] price protection on that. And then the rest of it, you recognize as revenue, when you increase the price then that [ disti ] price protection becomes less, and you have to capture that as a onetime revenue in the quarter. And that was about $21 million. So those items made it very noisy. But if you feel through all that, and we're giving you complete visibility, if you take those out, then the quarter is up $2.3 million -- 2.3%. Now in that 2.3%, there's $10 million from 2 acquisitions, $4 million from Hailo and $6 million from Vorago. We broke that out too. So take that out to July and they will -- the 2.3% will go down to maybe 1.5% or something versus down 4% at the midpoint. So there's no problem in how the business is doing and we remain optimistic for the next quarter. Backlog is good, bookings are coming in. That's how you should view the quarter in that context.

Matthew Prisco analyst
#16

Very helpful. And then maybe you can offer some more color on what you're seeing in terms of those constraints today? How those foundry OSAT constraints change over the last 90 days. And I believe you added internal constraints this quarter. So how are you responding to these constraints overall? And how do you expect that situation to evolve as we look into 2027?

Steve Sanghi executive
#17

So incrementally, we have additional capacity allocation every quarter, which will continue to provide growth, but we could use more than that. So on various different nodes, we have more capacity the following quarter. Therefore, some of the orders from this quarter are scheduled into next quarter. And I believe some of the orders from the next quarter will move into the June quarter, where we have more capacity. We're not unique. I think the entire industry is seeing it. Demand is stronger than the capacity available with whatever is happening in the market right now with data center, AI infrastructure concerns whether they will all be built or not built I think there's a silver lining in it. The whole thing it was just too much hot air. And if some air comes out and capacity becomes available at OSATs and foundries for broad-based business. I think there is silver lining in it.

Operator operator
#18

Our next question comes from the line of Joe Quatrochi with Wells Fargo.

Joseph Quatrochi analyst
#19

You saw a nice acceleration in industrial demand. this quarter. I was wondering if you could just talk about what you're seeing there? And maybe just on that last line, you said how do we think about your exposure to just everything around the data center infrastructure build like maybe outside of the data all.

Steve Sanghi executive
#20

So I think when it comes to industrial, industrial is the broadest market segment there is. I mean what is industrial. It's not a narrow set of things. Industrial is factories, cities, hotels, lighting, robotics, medical, industrial is very, very broad, and we're seeing opportunities in industrial. Some of it got driven by industrial was sort of the last one to recover, I think, 2 or 3 quarters ago. So it's seeing substantial recovery from that point and a lot of new design wins in every single area, robotics, medical, process control, factories, farming, equipment appliances, everything is growing. So it's very, very difficult to kind of explain industrial beyond that because it's so broad. The second point of your question is on the data center. So we are early in the data center penetration because we didn't have a lot of Gen5 switch revenue, and you've known from past that we were very late to market on it, and therefore, we lost the Gen5 business. So our -- with Gen6, we are regaining a lot of the market share and a lot of it is not in our revenue. So for us, it's all upside, where if it slows down, it could be a downside for the people who have a lot of that business. In terms of other half of our data center exposure, which is through microcontroller, analog, power, switches, security, USB, Ethernet, these are very broad-based products where data center is really a small portion of the overall shipments to all the end markets. And if certainly, data centers won't get built, a lot of that upside is not in our forecast.

Joseph Quatrochi analyst
#21

As a follow-up, as we're thinking about just kind of the gross margin puts and takes into the December quarter, how should we think about this underutilization charges is a nice improvement this quarter -- do you keep thinking that's somewhat linear as we move forward?

J. Bjornholt executive
#22

So it will not be linear. This quarter, we do not -- we are not anticipating any sort of big improvement. We actually built finished goods last quarter and don't really want to do that again this quarter. So we're slowing down some of the assembly and test operations. We're still doing the ramp in our wafer fabs where Steve had mentioned in his prepared remarks, the die inventory is getting low in certain cases. So it's a balance, but you will not see the large reduction in utilization or underutilization charges this quarter that you saw last quarter. But that's still upside in front of us in future quarters.

Steve Sanghi executive
#23

December quarter historically is kind of weak. So we took the ramp cautiously, but it will accelerate again next quarter because then we go into a good March quarter, followed by 2 strong September and -- June and September quarters before we get the -- another week December quarter next year. So utilization should start to improve, but not linearly.

Operator operator
#24

Your next question comes from the line of Chris Caso with Wolfe Research.

Christopher Caso analyst
#25

Yes. The question is on pricing. And the impact on the December quarter from some of the pricing actions that you took previously, what was the magnitude of that in December quarter? And I seem to recall from last quarter, that was one of the factors you had expected to be an offset because, again, as you said, you knew some of those 3 items that would not recur in the December quarter. I seem to recall that pricing was going to be one of the offsets for the December quarter.

Steve Sanghi executive
#26

So you are correct. We expected that to be offset. And the remaining pricing is being effective this quarter because pricing change was done in the middle of the last quarter. However, because of what we described before, some of the fairly large dollar item products with very high margin supply chain cannot fulfill this quarter, which is kind of offsetting the improvement we would have seen.

Christopher Caso analyst
#27

Right. Okay. So -- and I guess then going forward, would it be right to assume that as you -- as supply improves, as you get the ability to supply some of these higher-margin products perhaps some of the products where the price has gone up, but you can't ship it right now that you would see some of that benefit as you go into calendar '27? Is that the right way to think about it?

Steve Sanghi executive
#28

Are you talking about benefit in revenue or benefit in something else?

Christopher Caso analyst
#29

Well, I guess, benefit in revenue from obviously being able to ship the product and the higher price. And then, I guess, more importantly, from the margin side because I think I understand what you're saying is that you didn't see as much of the pricing benefit that you had expected in the December quarter because you couldn't ship those products. So therefore, as you finally are able to ship those products, do you get that margin benefit?

Steve Sanghi executive
#30

We suddenly get the revenue benefit and we get some of the margin benefit, but the pricing in the industry is from our suppliers is continuing to go up. There's another round of price increase across the industry starting basically in January from most major foundries and OSATs. So some of that will -- because some of that we counted in our price increase when we did the price increase, so that's why you're seeing a very good gross margin for the September quarter and pretty good gross margin in December quarter. If you're expecting it to go back to [ 66.5 ] we're currently not projecting that our long-term target is [ 65 ]. And we think we're going to have to fight that price increase with the suppliers and figure out how we deal with it, whether whether there is a check on our gross margin or we pass it on to the customers further, we haven't figured out that out yet.

Operator operator
#31

Our next question comes from the line of Vivek Arya with Bank of America Securities.

Vivek Arya analyst
#32

Steve, I wanted to start with more of a macro question based on your industry experience. When you look at all these -- the volatility in semiconductor stocks, do you think that signals to you there are earnings cuts coming? Are we at peak demand? Just kind of what is your crystal ball telling you in terms of where we are in the cycle? And do you think all these worries are justified based on what you are seeing on the ground?

Steve Sanghi executive
#33

Well, Vivek, I think there is data center and non-data centers. There is nothing to worry about in the nondata center. Industrial is doing fine. Automotive is continuing to recover, its unit count is not growing as much low single digit, but the content is growing significantly and we're winning across new car architecture across the board, and we are doing very well. Aerospace and defense is doing well. Industrial is doing well. Automotive is doing well. communication is doing well. The issue is in data center. It was all that just -- I've been kind of saying it, it could not be true. It's just -- the demand was explosive. You can't just have that large of a percentage of economy, the rate, everybody expected it to grow. So I think some of that is coming in check, whether -- it comes in check that the real estate of data centers can't be built or the power can't be supplied or the new Congress wouldn't let it happen or circular financing finally -- you can't do it anymore. It's not cost effective or people can't monetize. Whatever the reason is or a combination of reason is, the second derivative on data center has to come down substantially. And I think you see market working on it. To me, it's not new. I think it was predictable.

Vivek Arya analyst
#34

Right. So what do you think that means for Microchip? Because I think in your commentary, you used the phrase that you thought September was a pivot, right? And you're seeing lead times get stretched out. Do you think a lot of that demand is coming because there's a crowding out from the data center? Or do you think there's kind of real kind of demand upturn. So more specifically, if you look at the next several quarters of Microchip, do you think there is still the possibility of above senior growth?

Steve Sanghi executive
#35

Yes. I think, yes. Like I said, there is data center and non-data center, the nondata center demand is normal. It's doing well. Data center demand has been explosive. If that comes down, it's affecting us would be very small because we're very much in the early stage. We're not doing billions of dollars of revenue in the data center and all of our rest of the markets are growing and data center is 16.7% of our business, not 100% like many of the other companies. Where the crowding out is not in demand, the crowding out is in capacity. Data center has been crowding out capacity for trailing edge nodes because of power requirements and analog requirements and all these other things, microcontrollers and others. So data center has been crowding out capacity at the OSAT and in many cases, we have lost capacity, where some of it we have to bring it inside, some of it we have to move it elsewhere. And it takes time to requalify -- and therefore, the backlog could not be served and will be served some in the next quarter or some in the quarter after. So I think a deceleration on the data center will probably have a positive effect on our business because some of that capacity frees up.

Operator operator
#36

Our next question comes from the line of Vijay Rak with Mizuho Securities.

Vijay Rakesh analyst
#37

Just a quick question on the aerospace defense side. It's kind of grown in line with Microsoft's overall growth. When we actually see aerospace defense orders start to come back? Like, are these long need dollars where you have good visibility, and a quick follow-up.

Steve Sanghi executive
#38

Well, so aerospace and defense grew 41% September over September. So we think it's growing very well. The demand for aerospace and defense is very strong at the primes, but primes have to build up capacity, some starting from real estate. Some of them are being asked to increase the missile production by 5x or 4x. Well, they don't have the floor space to ramp the production to 4x. So they're adding capacity, building and machinery and all that, and we're starting to get the orders, but they're scheduled out when they need it. So I think it's -- aerospace and defense is not a data centric kind of business $10 million today and $200 million tomorrow, it will grow consistently, but it's not a hockey stick because the industrial complex cannot grow at that rate.

Vijay Rakesh analyst
#39

Got it. And then on the price increases you mentioned, foundry or set price increases. How much flexibility do you have to kind of pass through or how much world are you anticipating in terms of the impact of those as you look at 27% in terms of margin or -- marginal any headwinds there?

Steve Sanghi executive
#40

Well, we consider our gross margins very healthy. I mean our last quarter because of some infrequent items was higher than target, otherwise, it's pretty close to target within 100 basis points of that. And we don't want to take a second price increase to our customers so quickly when we just did a price increase in the middle of August. So just like we did that last time, we absorbed it for a while. And if the costs kept going up, then we cast the price increase, I mean we're kind of doing similar. Right now, we're planning to not do a price increase and absorb it. And at these kind of gross margins, we don't feel that our gross margins are low.

Operator operator
#41

Our next question comes from the line of Harlan Sur with JPMorgan.

Harlan Sur analyst
#42

Book-to-bill is strongly above 1, our backlog even now continues to grow. And I assume that this strong demand profile is across not just advanced foundry based products, but across our internally manufactured products as well, right? Your overall lead times are extending. So your front-end utilizations, I would have expected to move higher this quarter, especially with your commentary on low-dibank inventories as well. So why wouldn't front-end utilization charges continue to decrease this quarter? I understand back-end utilization might be stepping down a bit, but why aren't front-end utilizations continue to increase during December and therefore, lower underutilization charges.

J. Bjornholt executive
#43

So Harlan, the front end is reducing in the current quarter, but the back end is not going to be as fully utilized as it was the quarter before. So it's the combination of those things, and we don't expect a material change in the overall underutilization charge in the quarter.

Steve Sanghi executive
#44

I think one other point is that, there's a perception that on in-house build products, there should be no constraint and there should be no lead time issues. The problem is the inside-produced wafers also go through the OSAT. Some of it goes through an internal factory. But some of the packages we don't do, it goes to use. So it sees the same constraints at our foundry wafer. See, and in a lot of cases, some of the capacity at our major OSAT suppliers has been displaced. AI companies which ones came in and took over the whole factory and they pushed everybody out. We brought some in, we brought it some to other OSAT manufacturers, but that is the crowding lot of AI. It's affecting processing of inside wafers as well as outside wafers in assembly and test. And we are rapidly improving that situation ordinarily, we do inside versus outside analysis when there's a payback to do inside. Not everything we can do cheaper inside. Sometimes, we cannot keep the tool fully busy because we could not fully utilize the tools. So therefore, we keep it outside. But when we get displaced outside, we can't produce it a very good margin product, then cost doesn't matter, and we want to bring it in and produce it. So we're making those moves, but those moves take 6 months. And some of this displacement only happened just a couple of months ago. So those are the things we are struggling with. And that's why I said that some deceleration of the AI demand actually would be quite positive early on.

Harlan Sur analyst
#45

Got it. Okay. I appreciate that. And then as my follow-up, Steve, we are seeing a lot more adoption overall of integration of machine learning and AI capabilities into all of these sort of embedded applications across industrial, automotive, even consumer, right? And for many of these applications, you don't need a stand-alone MTU like your acquired product family from Hailo, but you could leverage embedded NPU accelerators, right? Can you just remind us your 32-bit MCU product lines, do you have product families with embedded MPU and are you seeing accelerated adoption of NPU-based MCUs for these types of embedded like machine learning AI applications?

Steve Sanghi executive
#46

So our in-house microcontroller and microprocessor product lines did not have AI acceleration in them no hardware acceleration. We had some software acceleration. We did have some hardware acceleration available on our FPGAs and our Data Center Solutions business unit. But not on our microcontroller business units and the microprocessor business unit, we did not. When we bought Halo in our microprocessor business unit, we were developing products. The first of those products was going to be available in about 2.5, 3 years. And the second of them are going to be available in about 4, 4.5 years because they were serial in nature. The product line that Hailo brought to us accelerates the road map by 5 years. So therefore, we have canceled the 2 products that we were developing in the NPU business unit because they have been replaced by Hailo. In fact, I have merged the Hailo and MPU business unit together and we are advancing the Hailo road map, and we have canceled our NPU road map in the microprocessor business unit. That's how important halo has been for us.

Harlan Sur analyst
#47

I see. Okay. That makes a lot of sense.

Operator operator
#48

Our next question comes from the line of Jim Schneider with Goldman Sachs.

James Schneider analyst
#49

I was wondering if you could maybe broadly characterize the customer willingness to build the OEM customer willingness to build inventory on the balance sheet at this point, given the extending lead times. Is that something that some customers and some verticals are willing to do? Or is it more broad-based than that? And maybe just give us a sense about are they even able to do that given the supply constraints you talked about.

Steve Sanghi executive
#50

I mean, right now, in a broad base of customers, we do not see a desire by them to build inventory. We can hardly get them to place orders with our new lead time. It seems like #1 lead times are moving rapidly. Secondly, semiconductor manufacturers are always telling their customers. I want more backlog, I want more backlog. It kind of becomes a broken record, like the wolf is coming, the wolf is coming, and they don't respond to it. They don't. And they don't respond to it until they get in trouble, where lead times rapidly go out. They don't have the product, they try to expedite it. We cannot serve it. The lines are down for 8 weeks, and that's when that's when there is a fire behind them and they start to place orders, we are not seeing that yet.

James Schneider analyst
#51

That's helpful color. And then just as a follow-up, just going back to the gross margin question. It seems like previously, you talked about some of the higher-margin products, what you thought would benefit you in the December quarter, you talked about the reasons why those are constrained. Just wanted to make sure that I understand, is the new piece of information that those higher margin products will come back into the mix over the next couple of quarters, but perhaps the input cost increases are not going to be offset on the broader base of products, drive that right?

Steve Sanghi executive
#52

Yes. I think I think our assessment last quarter that we can keep the gross margin in the 66% range by more high-margin products coming in, the rest of the price increase kicking in and completely offsetting the higher licensing revenue and a couple of other infrequent items. I think that was -- that turned out to be more aggressive than the reality has turned out. So we have backed off from that assumption. Now we still told you always that our long-term gross margin was 65%, and there'll be times in the good times and able to go over there'll be times and the bad times and then will go under. But we didn't guide you to a higher than 65% gross margin, but we did say that we could maintain it in the December quarter. Now various things have happened partially driven by some of the high-margin products, pushing out because of constraints, we can't quite get there. Question is and why we're not getting there in March or June because some of the further price increases from our suppliers is kicking in, whether we're able to offset or not, we're not able to model it today. So that's why we're basically resetting that and saying, think of 65% as a long-term gross margin, and we will work very hard to get there and maintain it, but not any higher than that.

Operator operator
#53

Our next question comes from the line of Blayne Curtis with Jefferies.

Blayne Curtis analyst
#54

I wanted to ask on the trigger to pull back the utilization. Is there a certain level of inventory do you don't want to grow it on an absolute basis or a certain number of days you're targeting? Just trying to understand that trigger. I think most people -- I know the stock market is terrible lately, but expect to continue to recovery. So I'm just trying to understand how you're thinking about managing that.

Steve Sanghi executive
#55

I think the equation is very, very complex. We build hundreds of thousands of SKUs, our product, including internal fabs and outside foundries come from almost 40 different factories around the world. And it's a very complex equation on some nodes. We have plenty of capacity on other nodes, we are heavily constrained, some of the nodes where we have enough capacity, it's a kind of product goes into our packages like DGA and others where the capacity is constrained. And in some cases, we cannot get the substrate. In some other cases, we don't have the assembly capacity. In those cases, our test capacity has been confiscated by the AI cloud. So it's a very, very complex equation. And despite that, I think we're growing our business is up nicely, will be up again next year. We're solving these problems, bringing some insight, some moving it from foundry to foundry. It's noisy. I get it. I'm frustrated by 2 and with the kind of questions you guys are asking, I get it. The only thing that's going to help is AI decelerating.

Blayne Curtis analyst
#56

And then I wanted to ask on the auto channel. I think there's some hope that maybe that could be better. I'm kind of curious what you're seeing, any evidence of restocking in any areas of strength in auto?

Steve Sanghi executive
#57

So I mean our auto business was up 19.3% year-over-year. I mean for auto, that's very good. For auto, that's excellent. Auto is never going to grow 100%, 50%, 40%. The auto unit volume grows 2%, 3% best case, and -- and our auto was up 19.3%. We're getting lots of auto design wins and when you get a design win and goes to production in 3 years. So we are harvesting, some of that was designed 2, 3 years ago, and there's a good amount of growth coming in with future designs next year and year after. But don't expect any more out of auto. It grew 19.3%. In fact, that's more than entitlement in auto.

Operator operator
#58

Our next question comes from the line of William Stein with Tourist Securities.

William Stein analyst
#59

First quick one is I'm wondering if there's any meaningful influence of the 2 acquisitions on either cost of goods or OpEx in the near term?

J. Bjornholt executive
#60

So there is. I mean, there's OpEx that come along with both of these acquisitions. -- we aren't going to break out profitability for either of these small acquisitions. But Halo is investing pretty significantly in their R&D efforts, and we are definitely doubling down on that. And the arago products are good products in aerospace and defense with high gross margins, and we're excited about the opportunity on that. But there absolutely is an impact on OpEx in the current quarter by having a full quarter of halo and almost a full quarter of arago in the numbers, and that's obviously built into our guidance.

Steve Sanghi executive
#61

I think we can give you a little more color. Verado gross margin is higher than Microchip. But with $6 million revenue contribution, it isn't more the needle in the current quarter. Hailo margins are lower than Microchip -- but with $4 million in revenue, that doesn't move the needle either. In the area of OpEx, arago OpEx is small, and gross margins are very high. So Verado is actually very profitable. So that's doing very well. But with such a small revenue, it doesn't move the needle. Hailo doesn't make money yet. They have very high R&D and small matter revenue, and we're seeing huge opportunity. There is a multi-hundred million dollar funnel on it already in a very quick period of time. So we will do very well in Hailo over time. But short term, we're having to absorb it higher OpEx.

William Stein analyst
#62

Yes, that's very helpful. Steve, I wanted to follow up on another question you answered earlier. You didn't quite say that, hey, we've been an AI bubbled, but effectively, what one might infer from what you said about all the various challenges with data center. And when you responded about how to think about the influence on your business no...

Steve Sanghi executive
#63

[indiscernible]

William Stein analyst
#64

Okay.

Steve Sanghi executive
#65

I'm sorry. Go ahead.

William Stein analyst
#66

No, no. Okay. That's good. I appreciate that. But in terms of how to interpret how to think about the go-forward model, you encouraged us to think about data center versus not, and you talked about the silver lining. But I wonder if you consider or if you think your business may be influenced from a couple of other factors. For example, data center drives some industrial demand probably for your business. probably it's certainly responsible for some of the price inflation we've seen. And by the way, there's a similar dynamic in aerospace and defense, if you consider a lot of the lot of what's going on now with the unwind potentially related to lower spending in aerospace defense to which your highly exposed. So if we were in a bubble in AI data center, couldn't this be more broadly problematic for your business?

Steve Sanghi executive
#67

No, I don't think so. Data center is 16.7% of our business and half of that 16.7% is broad-based products and half of that are the data center business -- solutions business unit. The data center solutions business unit is in the retooling phase having lost a Gen5, regaining market share from with Gen6. So there, there's all upside and the broad-based business that we have, there would be roughly 8% of our business out of the 100. So I think this is the time, if the data center were to correct our broad-based exposure in industrial and automotive and aerospace and defense, in appliances and consumer and computing would be very, very helpful. And Microchip should outperform in that, that kind of environment compared to the companies that are kind of all data center?

William Stein analyst
#68

Got it.

Steve Sanghi executive
#69

And yes, if I didn't say it, I'll say it again. I've been saying it that data center is in the bubble.

William Stein analyst
#70

We have it.

Operator operator
#71

Our next question comes from the line of Joshua Buchalter with TD Cowen.

Joshua Buchalter analyst
#72

I guess Steve, you mentioned sort of a reluctance to raise pricing so close to the previous increase. In the spring, you were also mentioning given some of the relationships you're trying to rebuild after PSP that reluctance. I guess big picture, you are seeing pressure from input costs rising? Like how are you philosophically thinking about pricing from a high level? Like how should we expect you from a competitive standpoint to react as a lot of your competitors are raising prices?

Steve Sanghi executive
#73

So I think we were very careful in raising prices. We immediately didn't jump on it back in January, February. We were in the process of repeating our relationships, which we have done it very successfully. That's delivering 40% growth year-over-year. And when we became comfortable that our relationship was such that we can handle a price increase. We implemented it very carefully. It was small in nature, and we've been successful. We haven't lost customers. And now we're in the same mode. I think we don't want to push the luck so much. We're not greedy. We are comfortable and happy with the gross margins we have. The other point I would make is our operating margins are higher than some of our competitors' gross margin. I mean look at ST Micro. So it's not that our product prices is low. We are a premium price company. We make very good product, high quality. We fight for every cent. And our margins are very high, which means -- I don't know if our costs are lower than those companies. Actual costs are very hard to compare. We don't really know. But if the costs were to be equivalent, prices are very good. Our operating margin is higher than ST Micro's gross margin. You got to give us some credit for that.

Joshua Buchalter analyst
#74

No, I hear you on that. Maybe for Eric, your leverage is down at below 2.4x. How should we be thinking about when is the right time when you'll be able to start returning cash to investors or raising the dividend and repurchases again?

J. Bjornholt executive
#75

Yes, it's a good question. We get a lot, and it is a discussion in the boardroom. But the Board definitely wants us to continue to take leverage down. We had a pretty big scare during the last downturn and leverage went way, way too high. And so, I think we're going to take a cautious approach, keep the dividend where it's at for now and probably evaluate this. As we move into next fiscal year, have a good discussion with the board and keep investors abreast of our thought. But next couple of quarters for sure, continue to get the leverage metrics down.

Operator operator
#76

Our next question comes from the line of Christopher Rolland with Susquehanna.

Christopher Rolland analyst
#77

So Steve, you're always good with insights like on the cycle. This one seems hot and maybe getting hotter, but if you could probably talk about how you see or when you see the cycle perhaps ending. It doesn't seem like we have inventory build and safety stock building and stuff like that, that we had in COVID. So probably, we have some to go. And maybe adding in there, if this -- if the AI data center bubble does slow here in your words, is that going to be enough to prolong this cycle?

Steve Sanghi executive
#78

So I will go back to data center and nondata center. I do not see any issues in non-data center. Like I said, even our current quarter on a product basis, is sequentially up 2.3% with seasonality is down 3% to 5%. So I don't see any issues and we have a very good March backlog. I think cycle continues on the non-data centers. On the data center side, no, like I said, on our solutions business unit, Data Center Solutions business unit is in the retooling phase. I mean they are winning lots of designs. If we had those designs all on Gen5, and we're rewinning them on Gen6, we will not be incrementally as positive, but we would have gotten revenue before it would be a lot higher. But we lost them 2 years ago. And now we are winning it. We have won 24 designs on Gen6. So for us, I think it's incrementally positive. And if the cycle decelerates much of that upside in bubble is not in our numbers it's in everybody else's numbers, it's not in our numbers.

Christopher Rolland analyst
#79

Understood. So given the constraints that you guys have and the expanding lead times, it does seem like this is external manufacturing as opposed to internal. Does any of this give you reconsideration on the mix of external versus internal and it was a long time ago that you were potentially considering a 300-millimeter fab, but would you consider even at the front and perhaps planning for a new fab.

Steve Sanghi executive
#80

I mean, we are an IDM integrated device manufacturer. Our bias always is what we can produce inside, we produce inside. But let's take package first, and I'll take the fab. We largely do packages where we do not have enough volume to do it cost effectively inside. In some cases, the volume as such, we can even keep 1 set of tools, 1 pilot line busy. And if you can't, then your utilization will be very low and the cost will be higher. So those are the ones that we do outside. We never had an issue with it. This is sort of the first time where AI is crowding it out and having us think through, even bringing some things inside, which may be slightly higher cost, where at least will be -- will have the capacity. Now if you come on the fab side, when we were considering a 300-millimeter fab during the post-COVID years, our plan was to do it under a license with a major foundry, because all our wafers than in the foundry and the foundry was saying they will not add any trailing edge capacity. And therefore, they were agreeing to give us a license at 300-millimeter to bring those processes in size. When the COVID cycle busted and they had enough capacity, then we didn't want to spend a couple of billion dollars or more of CapEx, nor did they want to give the license, so that program went away. So today, the problems are not as big, and they're not as severe and they're not multiyear problems where we have to go back and build a few billion dollars of capital to build a 300-millimeter fab and seek a license again. We're not thinking that because we don't think the problem is that long. It's just a short-term issue.

J. Bjornholt executive
#81

Yes. I just want to add one piece of clarification to the way you the question. We are -- we do have capacity constraints with some of our internal production also, right? There are certain products where we're behind. We can't meet customers' lead times, and we're working as hard as we can to bring on capacity. And as Steve mentioned before, even when we bring on that capacity, sometimes if it's outsourced for assembly test we've got capacity constraints even when it comes out of our fabs. So it's -- these constraints have grown beyond just being an outside foundry issue for us.

Operator operator
#82

Our last question comes from the line of Tore Svanberg, with Stifel.

Tore Svanberg analyst
#83

Yes. So Steve, I had a question on the OSAT capacity, the external capacity that's impacting your front-end capacity. How much visibility do you have there? I mean, is it a matter of just being on allocation and waiting to get the allocation? Or do you have a fairly good feel for when that's going to open up so that you can actually start ramping your own front-end utilization.

Steve Sanghi executive
#84

There are multiple answers to that question. In some cases, our allocation at that OSAT is not increasing, so we are qualifying a different OSAT in a different country, and some of that is scheduled to be in production in the middle of next quarter. So we'll get some incremental for half the quarter, and then have more even in the June quarter. In some other cases, the current OSAT is asking us to load it with a minimum batch size because when the batch sizes are smaller, it takes more capacity, less efficient for the manufacturer. So they're asking us to do minimum batch sizes our volume on those packages is small, and we cannot meet the minimum that size. So therefore, either you pay the extra price for breaking the bet size or you load it infrequently once every 2 weeks, so you can bundle up and meet the minimum that size, which again then pushes some revenue outside the quarter because you can't meet the bed size. In some other cases, we're tooling up that capacity inside and several different programs, and some are in production next quarter some will even take a quarter longer. So it's like all over the place, but more capacity becomes available next quarter, June quarter and from there on.

Tore Svanberg analyst
#85

That's very helpful. And as my follow-up and maybe back to the sort of AI bubble and rebalancing of data center across your 7 segments. Is there anything that you could give us confidence that if data center does slow down I understand that it won't impact you as much as others. But what about, let's say, the 24 design wins you have in PCIe Gen6, are they still going to go to production? Any sort of color you could share with us there to give us that confidence?

Steve Sanghi executive
#86

Yes. So 24 design wins will go to production. But its volume could be slightly lower than the bubble were to continue, we don't always know the customer who we have design wins with when they go to production, are they shipping into a data center which already exists or they're shipping into a data center in Ohio that the local governor is going to put on hold. We don't know that, right? It's all over the place, but it's a much smaller portion of our business -- so the impact on us from that slowdown would be a section of what it would be compared to somebody who's 100% businesses in data center.

Tore Svanberg analyst
#87

Yes.

Steve Sanghi executive
#88

And the fact that on many of the products like the Gen6 Switch and retimer, it's largely all upside for us because we have no business in it. The other comment I'm going to make is if you conservatively model fiscal year '28, that begins on April 1, a with whatever assumptions you have I -- even in the extreme conservative case, I come up with over $4 of running -- the stock is at I tell you, I'm tempted to bite myself. And Mike.

Operator operator
#89

Thank you. That concludes today's question-and-answer session. I would like to turn the floor back over to Mr. Sanghi for closing comments.

Steve Sanghi executive
#90

So thank you for attending our conference call. I think next conference we go to will be UBS?

J. Bjornholt executive
#91

Sanghi is at a conference next week. But yes, the -- we'll have a large Microchip presence at UBS with a larger group of executives.

Steve Sanghi executive
#92

So we'll see you -- some of you there. Thank you very much.

J. Bjornholt executive
#93

Thanks, everyone.

Operator operator
#94

This concludes today's teleconference. You may disconnect your lines at this time. Thank you for your participation.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Microchip Technology Incorporated transcript - plus 260,000+ transcripts from 13,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Microchip Technology Incorporated earnings transcripts and 260,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $145 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.