Good day, everyone, and welcome to the Mindspace Business Parks REIT earnings call covering Q4 FY 2026 financial results. Kindly be aware that every participant line is set to listen-only mode, and once the presentation wraps up, you'll have a chance to pose questions. Also note that this conference is being recorded. With that said, I now hand the call over to Mr. Shravan Kailasa of Mindspace Business Parks REIT. Thank you, and over to you.
Good evening, everyone, and thank you for joining us on the earnings call for Q4 FY 2026 for Mindspace Business Parks REIT. At this point, we'd like to point out that management may make some statements that are forward-looking in nature. Please be advised that actual results could differ materially from those statements. We don't guarantee these statements or results, and we're not obliged to update them at any point of time. I'd now like to welcome our CEO and MD, Mr. Ramesh Nair; CFO, Ms. Preeti Chheda; and Mr. Govardhan Gedela, Head Corporate Finance, who will take you through the business update and the financial performance during the quarter. After that, we will open the call to a round of Q&A. I'll now hand the call over to Ramesh.
Thank you, Shravan. Good evening, everyone. Appreciate you joining us today. Q4 proved to be another robust quarter for us. On gross leasing, we closed 3.5 million sq ft. That momentum shows up clearly in our financials. NOI rose 37.4% year-on-year, reaching INR 742 crores for the quarter. Distribution for the quarter was up 9.7% year-on-year. Keep in mind that Q4 FY 2025 included a one-off tax refund of INR 46 crores. If you set aside that one-off tax refund from Q4 last year, distribution grew 24.5% year-on-year, and DPU rose 17% year-on-year. Across the full year FY 2026, NOI increased 29.2% year-on-year to INR 2,664 crores. Distributions were up 15.6% year-on-year, which produced 9.7% DPU growth. Setting aside the INR 46.6 crores one-off tax refund in Q4 last year, distributions rose 19.8% year-on-year, and DPU by 13.7%. Releasing spreads are still very healthy — 40.3% for the quarter and 31.8% for the full year. Rentals keep trending upward, especially in Madhapur, where we signed a transaction at INR 120 per sq ft. That illustrates the mark-to-market potential across our overall Hyderabad portfolio. We announced two acquisitions in Chennai on the well-established PTR Road: International Tech Park Chennai on Radial Road and Commerzone Pallikaranai on the same road.
The combined acquisition price for us is INR 5,541 crores. I'm glad to share that unitholders have given their approval for the Commerzone Pallikaranai acquisition. Right now, for both of these assets, we are in negotiations on rentals at INR 85 per square foot each month. For context on the pricing: TVS, last year, bought land next to ITP Chennai on Radial Road at INR 50 crores an acre. At present, a U.S. tech company is in an advanced due diligence stage to buy 12 acres along that same road at close to INR 80 crores per acre. In every market where we operate, we are a dominant player, and in Chennai we are cementing our position. Demand for Grade A offices continues to be robust. Our balance sheet is strong. That gives us the agility to act when the right opportunity comes along. Our commitment stays unchanged. Consistent execution, consistent delivery, and reinforcing performance. Now I would like to share highlights from various IBC and other research reports. According to the JLL report, India's office market recorded a quarterly record of 21.5 million sq ft in gross leasing during Q1 2026, which is up 10.2% year-on-year. GCCs grew their footprint 43% year-on-year to 10 million sq ft, accounting for 45% of total leasing activity.
Pan-India vacancy fell to 14.7%, a five-year low. For the quarter, net absorption hit a record 13.7 million sq ft. On city-wise leasing status, Mumbai stood at 20%, Hyderabad at 17%, and Pune at 15%. Within GCCs, tech and BFSI led leasing activity, with manufacturing next. In Q1 2026, firms headquartered globally held a 57% share of India's office leasing landscape. According to the CBRE report, domestic firms make up 43%, American companies 38%, European companies 14%, and APAC companies 5% of leasing. Fortune 500 companies leased 5 million sq ft, a 21% share. Fortune 500 companies account for 48% of GCC leasing. Per CBRE, office stock is expected to surpass 1 billion sq ft in 2026. The Cushman & Wakefield report discussed how Pan-India stock weighted average rents crossed INR 100 per sq ft per month for the first time. I'd also like to highlight an interesting report I came across from CRE Matrix on the Navi Mumbai market. It mentioned that Navi Mumbai has 32.7 million sq ft of Grade A stock, hosting 430 unique IT companies. 12.3 million sq ft is under construction. GCCs make up 25% of the Grade A plus stock in Navi Mumbai.
Our buildings are 33% newer compared with the average age of buildings in Mumbai, and 72% of the Grade A stock carries green certification. Navi Mumbai has also come up as India's top data center hub, as we all know. It has 628 MW of operational IT load and 3,400 MW in the pipeline. As you know, we are the only REIT with data centers in our portfolio. I want to spend a little time on the global headwinds from the Iran war. We are mindful of the macro environment. Oil-driven inflation and rising input costs are real. Steel is up 2%, RMC and cement is up 8%, paints up 15%, tiles up 10%, PVC pipes are up 16%. We observed some slowdown in decision-making on a few deals. Our long-term leases and strong balance sheet make us well-positioned to ride through this cycle. Rupee depreciation has made India definitely more attractive to GCCs. In dollar terms, Indian office rents have effectively held flat, while our infrastructure and talent pool have only strengthened as a country. Global headwinds and travel disruptions may delay some transaction in the near term. We had seen similar slowdowns in decision-making during April last year after the Liberation Day tariffs, and May last year when the India-Pakistan war started.
Once that pent-up demand lets loose, we're in position to seize it. There's a GCC client in Hyderabad, 200,000 sq ft, and we were in negotiations with them at an INR 120 rental, but they put their requirement on hold owing to the war. We ended up leasing that same space at 130 to a different GCC within 15 days. Now let's turn to artificial intelligence and what the impact looks like from what we've observed so far. Right now I'd like to take a glass half full view on AI. A lot of you have been asking about AI and how it affects office. One interesting aspect: many of the Magnificent Seven companies took a good amount of office space in India last year for AI-related work. We've also seen many large IT services companies that gave up space during COVID because of work from home come back and take more space with us. That could be due to flight to quality, or it could be that they're no longer looking at owned campus strategies. Taking a glass half full view, we believe plenty of evidence backs it up. PC, internet, cloud computing — each was supposed to reduce employment. None did. Spreadsheets eliminated bookkeeping clerks, but created financial analysts.
Online shopping shook up retail employment, yet it generated positions in warehousing, logistics, and delivery. The way technology alters work is much greater than the way it removes work. Let's turn to the numbers now. Over the past three years, the AI story has been unfolding. During that stretch, office demand rose 18%, 16%, and 15% year on year, and in this quarter, 7%. GCCs, technology consulting, and BFSI clients — the heaviest, largest adopters of AI — are all bringing people on at scale. Nothing suggests mass vacancy increases. As a matter of fact, the very AI firms accused of killing offices are themselves leasing new office space in certain regions of the country. These are high-value occupiers looking for Grade A, top-quality spaces. AI is additionally spawning wholly new roles: ML engineers, prompt specialists, AI product managers, data governance teams, cybersecurity experts. The reasoning is fairly simple. AI lifts productivity. Productivity propels company growth. Growth requires talent, and talent requires space. Job displacement will clearly occur in some functions. Job creation and role evolution will occur alongside that as well. My sense is that the workforce will be augmented, not replaced. India holds many structural advantages in this regard: a young, tech-trained workforce, strong AI hiring growth, and rising AI skills density.
That makes India more appealing, not less. There's a qualitative shift too. Once AI takes over repetitive tasks, human work turns more collaborative, more strategic, and more driven by judgment — and all of that needs office space. In regulated sectors such as healthcare, legal, and pharma, human oversight isn't optional. Client-facing work still counts. R&D can't run remotely. Breakthrough ideas will emerge from hallway conversations nobody planned. The future isn't no office — it's better office. My view is that AI will speed up the flight to quality. Companies will look for upgraded spaces, stronger amenities, and better sustainability credentials. I also think offices are moving away from rows of desks toward collaboration hubs. Workplaces today express corporate identity. Attractive spaces stay key to winning talent. For a portfolio like ours — Grade A, low-rise, business park-focused, sustainability-led — this shift works firmly in our favor. Let's turn to the REIT performance update. Let's go through some of the operating and growth highlights. A quick update on annual performance for the 12 months as we close FY 2026. Gross leasing for the year came in at 7.1 million sq ft, the second highest since listing. Last year, we did 7.6 million sq ft. Committed occupancy hit 95.7%, the highest we have ever reported since listing, up from 93% in FY 2025.
We also posted solid NOI of INR 2,664 crores — that's our strongest year-on-year increase since listing, rising 29.2% year-on-year. This mirrors the compounding effect of better occupancy, firmer rents, and disciplined operations. Distributions came to INR 1,516 crores, a gain of 15.6% year-on-year. DPU for the year rose 9.7% year-on-year, and 13.7% once you exclude the one-off tax refund I mentioned earlier. Thanks to our rent increases, the figure has climbed past INR 80, up from INR 71 a year ago. Now for our Q4 FY 2026 performance highlights. Gross leasing reached 3.5 million sq ft — the second highest quarter since listing — up from 2.8 million sq ft in Q4 FY 2025. Every leasing metric sits at or near a record. NOI came in at INR 742 crores, our highest year-on-year growth rate since listing at 37.4% year-on-year. We delivered INR 431 crores in distributions, up 9.7% year-on-year. We set a new record with the highest ever quarterly DPU at INR 6.64 per unit. DPU grew 3.1% year-on-year. DPU is 17% excluding one-off tax refund. NAV closed at INR 527 per unit, up 9% from INR 483.7 as of September 25. Our unit holders are seeing both income and capital appreciation working together. Let's look at some of the other business highlights. We have pre-leased 2 million sq ft across B8 and B18 in Hyderabad.
During the quarter, we signed 1.5 million sq ft in B8 and 0.53 million sq ft in B18. We pre-leased 0.8 million sq ft to a healthcare GCC at INR 110 per sq ft. Another 0.7 million sq ft was pre-leased to an Indian MMC that will build, operate, and transfer the premises to a BFSI GCC at INR 121 per sq ft. Rental traction is only building from here. Committed occupancy at Mindspace Madhapur touched 99%, the highest ever. Mindspace Airoli West reached nearly 99%, also the highest ever. Some of you may remember that around 2 years back, we used to be at 72%. The largest assets in our portfolio are essentially full. JV has increased to INR 47,600 crores, and NAV now stands at INR 527 per unit. This shows the steady growth and the strong quality of the portfolio over time. Currently, dry runs are underway at the Pearl Club at Mindspace Madhapur, and we are scheduled to go live in this quarter, which will be India's best club. The under-construction pipeline today stands at 5.4 million sq ft, well on track. Out of which, please don't forget that 4.5 million sq ft out of this 5.4 million sq ft is already pre-let.
Turning to how the portfolio has expanded. Growing the portfolio is still a key strategic aim for us. And we've followed through on that. Across the last 12 months, we added more than 2 million sq ft to our completed portfolio. Most of that came via inorganic growth. We picked up three prime CBD assets in Mumbai and Pune. We also added 0.8 million sq ft from our external third-party asset, The Square, 110 Financial District — formerly known as Q-City — and we consolidated 50,000 sq ft inside our existing parks. As you know, we've just announced two more acquisitions in Chennai; that process is underway and should close within the next 10 days. We've built a strong platform, we operate in clear markets, and we have an active pipeline. High-quality assets will remain our focus, and we'll act decisively whenever the right opportunities come along. Now to the redevelopment update. At Mindspace Airoli East, committed occupancy has climbed to 83%. After the success of Mindspace Fusion, our F&B hub, we're looking at expanding the F&B offerings inside the business park. Upgrade work across buildings B1, 9, 10, 11, 12 has advanced considerably and will wrap up within the next couple of months. The lobbies now look far more sophisticated, functional, and fitting for a best-in-class park.
What clients tell us has also influenced the infrastructure we're planning. We're putting up covered walkways throughout the park so the experience is more comfortable and better connected. At Mindspace Airoli West, at the time the demarcation was announced, committed occupancy was 72%. It stood at 96% last quarter. This quarter, it's 99%. That's a clear sign of just how well the leasing team has done. Across our 5.4 million park, total vacancy has fallen to only 72,000 sq ft. This progress gives us more confidence in Navi Mumbai's growth and in our long-term plan for the micro market. Rentals have moved as well. Recent deals in Airoli have been signed at INR 74 per sq ft, a clear signal of where the micro market is headed. As you know, Mindspace is the only Indian REIT with a data center portfolio. 2 data centers are already operational. 3 more are in various stages of development. Once complete, our data center portfolio will span approximately 1.7 million sq ft. Our confidence in Navi Mumbai's long-term trajectory has never been higher. In Mindspace Madhapur, we have 10 million sq ft with 99% occupancy. Just over 100,000 sq ft of vacancy remaining. Madhapur is for all practical purposes, full. Rentals have demonstrated marked improvement. A large American bank in GCC has taken up space at INR 125.
A major American healthcare GCC has leased space at INR 110. We're also redeveloping 8 assets so the park stays modern, competitive, and ready for tenants over the coming decade. At Commerzone Yerwada, we're moving into an exciting phase. A comprehensive phase one upgrade is currently in progress. Refurbishment of the entrance is already under way. Building B1 now features a new food court, set to be finished within the next few weeks. Lobby and kiosk extension, facade improvements, terrace amenities, and a revitalized central garden are all planned. Ascent, the new building we acquired in Worli. At the time we acquired Ascent Worli, occupancy was 86%. As of today, it stands at 97%, with just 15,000 sq ft sitting vacant. Average rents in Worli are at INR 306, and we've just signed a fresh deal at INR 345. Once again, the rental trajectory here is firmly upward. Let's turn to what we're doing on the customer centricity side. We also build sustainability into every one of our offerings. Nearly 50% of electricity today comes from green energy. Our Edge 23 program, which offers a true hospitality-led experience, has also picked up pace with 23 focused items designed to bring a more premium hospitality-led feel across our parks. Infrastructure and amenity upgrades are another area of focus.
Our lifecycle assessment study has shaped the MEP upgrades we've undertaken, and this year we're putting substantial capital into improving our MEP. We split the budget between front of house and back of house. Client satisfaction gets a direct boost from front-of-house operations, while back of house guarantees uptime, compliance, safety, and efficiency. CapEx goes first toward modernizing assets, which drives tenant stickiness and sustainable rental growth. The second edition of Mindspace EcoRun attracted 8,200 participants across Airoli and Madhapur, reinforcing our standing as a community-first business park operator. One question sits at the start of every decision we make: What do our tenants need? Survey feedback, audits, and daily engagement all feed straight into how we operate and enhance our parks. The playbook is straightforward: build, lease, upgrade, repeat. Simple and compounding. Modernized assets create stickiness, stickiness creates renewals, and renewals create rental growth. We aren't merely constructing parks; we're constructing ecosystems where businesses grow and people belong. Turning to valuation, GAV climbs to INR 47,600 crores. NAV increases to 527 per unit. In Madhapur, leases were signed at 85 to 90 only a year back. This quarter, as I said, we signed at 121 per square foot.
Over in Navi Mumbai, rents have gone up from 65 to 70, and the top deal there came in at 81 per square foot in Airoli West. Rental income and occupancy are doing more real work when it comes to creating value. Turning to ESG credentials, ours aren't merely solid — they're acknowledged around the world. I'm very pleased to share that Mindspace REIT holds the number 3 spot globally in GRESB, including the number 1 global rank for environmental performance. With a score of 73 out of 100, we're the highest-rated REIT in India. We're also the sole Indian organization in our sector to earn industry distinction in the S&P Global Sustainability Yearbook 2026. At The Asset Triple A Sustainable Finance Awards 2026 in Hong Kong, we were recognized for leadership in weaving sustainability into our financial framework. We also introduced our Green Mind Ideathon. That initiative placed sustainability ideas in the hands of the people who matter most — our tenants and employees. Once again, our ESG commitments reach past our parks into the surrounding communities. Together with Navi Mumbai Municipal Corporation and NGO Project Mumbai, our recyclathon for plastic and e-waste is delivering tangible progress. FY 2026 has been a landmark year, and the numbers speak for themselves. To wrap up: record committed occupancy of 95.7%, NOI growth of 29.2% year-on-year — the highest since listing — and distribution growth of nearly 16%, or 20% excluding last year's one-off.
Let me walk through some of the headline annual performance figures. At the beginning of FY 2026, committed occupancy was 93%. By the time we finished the year, it had reached 95.7%. Vacancy was 2 million sq ft when the year began. Following all the acquisitions, it is now 1.35 million sq ft. In-place rents went from INR 71 to INR 80 per sq ft. GAV rose from INR 36,647 crores to INR 47,635 crores. NAV climbed from INR 432 to INR 527 per unit. Our portfolio has grown from 37.1 million sq ft to 39.3 million sq ft. Since listing, we have added roughly 9.1 million sq ft to the portfolio through accretive acquisitions worth INR 10,600 crores, including the recently announced ITPC and Commerzone Pallikaranai and Chennai. Our unit price has risen 63% since IPO. Unit holder count has passed 1 lakh. At the time of listing, there were 8,000 unit holders. The investor base is broadening and deepening. GCCs now make up 52% of our tenant base. Hyderabad, our largest market, has become India's most sought-after GCC destination. In FY 2026, we leased 3.4 million sq ft to IT services, despite the slowdown in IT services. Geopolitical risks and commodity cost inflation are real, but they are manageable as well.
Our portfolio is anchored at home, our leases run long, and our tenant base is deep. As of today, our LTV is 24.3%. The cost of debt sits at 7.41%, among the lowest levels seen in several quarters, and it is now comfortably under our cap rates. Regulatory tailwinds regarding equity classification and bank lending to REITs will deepen our access to capital further over time. Past FY 2026, our growth agenda is clearly defined. Data centers at Airoli West are moving forward. Redevelopment of 5A and 5B in Madhapur will begin soon. The Pearl Club and Ascent Residences open this year. Our acquisition pipeline stays active across core markets. Every one of these is a distinct value driver, and all are advancing in parallel. Taking a step back, FY 2026 produced record results, showed resilience through cycles, and confirmed each pillar of our growth strategy. As we move into FY 2027, we do so from the strongest position we have held since listing. Our proposition is unchanged and stronger. High-quality occupiers, disciplined growth, sustainability leadership, stable growing returns. We keep maximizing value and building loved workspaces and portfolios that investors trust. Thank you for your continued confidence in Mindspace REIT. I will now hand it over to Preeti for further financial updates of the quarter.
Thank you, Ramesh, and good evening to all of you. It's my pleasure to walk you through the financial results covering both the quarter and the financial year that closed on 31st March 2026. We posted a quarter of highly robust operating and financial performance. Ramesh has already covered the operating side of things. Turning to the financials, our NOI for Q4 FY 2026 rose a healthy 37% year-on-year, reaching INR 740 crore, and across the full financial year it was up 29% to INR 2,660 crore. Revenue from operations in Q4 2026 climbed 31% YOY to INR 888 crore, while revenue for the full year was higher by 26% at INR 3,200 crore. If you set aside the one-off tax refund that Ramesh alluded to, distribution growth came in at 19.8% for FY 2026 and roughly 25% for Q4 FY 2026. Taken together, during FY 2026 we distributed approximately INR 24 per unit to unitholders. The Gross Asset Value of our portfolio rose by about 16% between September 2025 and INR 47,600 crore. The acquisitions in Chennai will contribute a further INR 4,200 crore to the GAV. NAV of our portfolio likewise posted a healthy 9% increase, moving from INR 484 per unit at September 2025 to INR 527 per unit at March 2026. That strong growth came mainly from, 1, rental increases across our micro-markets, in particular Madhapur, Hyderabad and Navi Mumbai.
Second, occupancy is climbing throughout our portfolio, and the valuer has factored in cap rate compression of roughly 25 basis points on a number of our projects. As of March 2026, our loan-to-value stood at approximately 24.3%. With the 2 acquisitions we completed in Chennai, that LTV would rise to 28.7%. Our cost of debt was essentially unchanged from the prior quarter at 7.4% p.a., and it came in almost 75 basis points below the year-earlier figure. Given the geopolitical challenges, we anticipate financing costs will stay near these levels or edge up slightly. On operations, as Ramesh has already mentioned, occupancy gains at Airoli have been quite encouraging. Rents in all of our markets have been trending upward. Beyond that, the development pipeline already embedded in the portfolio and the third-party acquisition, should we proceed with it, will each contribute to NOI and DPU growth down the road. With that, I'll turn the call over to the operator to open the floor for questions. Thank you.
Thanks a lot. Ladies and gentlemen, we're now going to start the question-and-answer portion. If you'd like to pose a question, just click the Raise Hand icon located in the Participants tab on your screen. We'll hold for a few minutes while the queue of questions builds up. Our first participant is Mr. Karan Khanna from Ambit Capital. Kindly proceed with your question.
Yeah, hi, thanks team. I've got a couple of questions from my end. Ramesh, first off, GCCs, data centers, and to a certain degree flex workspaces were major demand drivers in FY 2026 for commercial RE markets broadly and for Mindspace assets — what demand driver categories should we be watching as we head into FY 2027? Will things mostly stay the same as FY 2026, or are there new demand drivers you'd like to flag?
We'll certainly examine whether additional data center deals can be pursued inside our portfolio, since we have those 100 acres. Should any solid redevelopment opportunities arise, data centers are something we'll definitely consider. As I said, within today's portfolio, GCCs account for roughly 52%, foreign MNCs about 20%, and Indian domestics make up the remaining 28%. Looking at our top clients, there's a healthy blend of R&D, energy, IT services, GCC banking, some flex space, Indian BFSI, and large Indian domestic firms. It's global telecom, global energy once more. I was just reviewing the roster of our top 10, 15 clients. Global banking. I believe this will certainly carry on going forward. Flex currently represents 8.4% of our portfolio, and inside that 8.4%, the bulk of the space has in fact been taken by enterprise clients, including names such as IBM, Prudential, Nationwide, Telstra, Apple, Fujitsu, L'Oréal, Mastercard. We clearly examine who the enterprise clients of these flex operators are. I was reviewing our top five, top six exposures to flex operators again, and again, we work with the top six players. Four of them are listed. Two of them intend to list. That's our roster of six players.
Looking at this, I still don’t detect any major shift in the tenancy profile. If I examine the RFPs, Hyderabad appears to have the highest count of them anywhere in the country. Enormous RFPs, for example a 2.5 million sq ft RFP from a global bank. There’s a 1.2 million sq ft RFP from a global tech player. A 1.2 million sq ft RFP comes from a bank. Another bank, 800,000 sq ft. Pharma, 500,000 sq ft. Big Four, 500,000 sq ft. Pharma, 200,000 sq ft. Another pharma. That is, like, massive. A great many RFPs are taking place. We are tracking all of it closely. It’s a mix of current, I don’t see that trend changing.
Sure. On the portfolio occupancy side, since you're already near 95%, what peak occupancy would you realistically expect the portfolio to hit? With 1.8 million and 1.9 million sq ft of expiries in FY 2027 and 2028, could you share any early discussions on re-leasing and the re-leasing spreads you expect across those assets? And a follow-up to that.
So, starting from—
Sure. Go ahead, Ramesh.
Looking at re-leasing spreads across the portfolio, we still see 20% of potential MTM sitting in there. And given how rentals have moved in some of these markets — Hyderabad in particular — I definitely expect that figure to rise. Of the expiries, we've already re-leased roughly 73% of the 3.6 million sq ft that came up. One piece of good news: among all the new deals we signed, 71% came from tenants already in our India portfolio — which tells us those tenants are pleased with what we're delivering. Our asset management teams are performing well. That was another interesting data point, again. FY 2027 expiries are smaller by comparison. This year, FY 2026, expiries totaled 3.6 million. For FY 2027, the numbers show 1.8 million sq ft. The main focus, obviously, will be making sure we fill up the new parks we've acquired in Chennai, and bringing down vacancy at Airoli East.
Okay, thanks. Final question, Preeti. Regarding the board’s approval to raise as much as INR 157 billion — when you mention a cap of 33%, what does that figure work out to, and how much room does it give you compared with the current net debt of INR 115 billion?
So from a capital standpoint, the Board continues to approve things periodically. Whenever we spot opportunities we want to put money into, and if more debt headroom is needed for that, we go to the Board and get approval. That isn't a problem, in my view. As we've consistently stated, we'd maintain our LTV at roughly 30%-35%, and that's our stated position. Right now, with these two acquisitions, we're at about 28.7%, so we still have sufficient headroom for growth. To repeat what I said, 35%, 30%, 35% is the level we'd be comfortable with. I believe we have sufficient headroom at present. As I mentioned on the previous call as well, should opportunities arise that call for us to raise capital, we'll do so at the right moment.
Absolutely. That helps. Thanks — and best of luck to you.
Thanks a lot. We’ll go on to the next person on the line. Joining us is Puneet Gulati from HSBC. Puneet, please unmute your mic.
Yeah. Thanks a lot, and congrats on the strong results. My first question has to do with the development CapEx that you laid out. Could you kind of break down how much you plan to put toward upgrades, and how much you plan to put toward adding new area during this year?
So for this year, base build CapEx stands at INR 1,434 crore, while upgrades come to INR 203 crore. Then there's balanced CapEx of INR 4,075 crore, and that covers completing B1, B8, the three data centers, B15, B17, and B18. Taken all together, we have a further INR 4,075 crore of balanced CapEx.
All right. Compared with that INR 1,600 crore you intend to spend in 2027, how much was spent in 2026?
For 2026, I believe it was INR 1,000 plus INR 200. I think the CapEx came to INR 1,200 crores.
Alright, I've got it.
We're raising that total CapEx.
Okay, got it. And then, second thing — could you also address the difference at Mindspace Airoli East between committed occupancy and the actual figure? It hasn't improved for three quarters now. Should we be expecting that gap to close in the near term, or is there still additional fit-out and finishing work that has to happen at that property?
Regarding Airoli occupancy, the gap versus committed occupancy that we're observing stems purely from the timing difference between an LOI and a lease deed.
Yeah.
A lot of deals were closed by us during March. That is where the gap comes from. For Airoli West there is barely any gap. I believe the gap is just about 2%. When it comes to Airoli East, I think it is roughly 9%. All of this should be completed within the coming quarter or thereabouts. It will progress toward signing and toward committed occupancy.
Apologies — regarding next quarter, you mentioned that gap?
The next few months.
Turning to the next few months. And finally, could you address your approach to acquisitions? Preeti mentioned being comfortable with 35% LTV versus the current 28.7%. Would you prefer to finance acquisitions more through debt now rather than equity, or is it probably going to look like what you've done previously?
Prior to Preeti covering the debt-equity component, we remain dedicated to purchasing additional assets. As I mentioned, we have completed 9 million sq ft already, amounting to INR 1,600 crores. Following the visibility of our latest acquisitions, numerous deals throughout the country are suddenly emerging. Naturally, it ought to be accretive for everyone. We are examining several strategies. During our acquisitions, you have observed that we have carried out core plus, value add, opportunistic — every kind of acquisition has been undertaken by us. Preeti, would you like to address the debt-equity component?
Yeah, Puneet. From our perspective, every sponsor acquisition that's likely to occur—as we've observed previously—I anticipate will happen through a swap. That essentially means we wouldn't have to undertake any form of debt raise. When it comes to third-party acquisitions, those will almost entirely be cash exits by the sellers. We'll finance those through debt. Like I mentioned, if we approach 35, which we've consistently described as our comfort level, then at the right moment, we'll raise equity. Regarding sponsors, as I said, we truly don't need to. For third-party acquisitions outside the sponsor group, we'll evaluate it at the appropriate time whether debt suffices for us to complete those deals. If we determine equity needs to be raised, then at that juncture we'll consider it.
Looking at that next one-year pipeline you might have, does it lean more toward sponsors or more toward third parties?
It's early to say at this point, Puneet. We've just completed 2 large acquisitions. Through this, with the acquisitions we move from 24.5% up to 29%.
Right.
My guess is that it will once again be a combination of sponsor and third party.
Alright. Thanks a lot. And one last thing from me — if you have any views at all on the data center approach. You already lease some space out. Are you thinking about starting to take on a little more MEP-type work for data centers, or would you mostly keep yourselves to core and shell?
We're going to keep moving forward with the strategy we've been pursuing up to now. We're specialists in real estate. We're evaluating one data center possibility inside our park, and with luck, in the next few months we'll have something positive and substantial to announce from a data center standpoint.
Alright, that covers everything I had. Thanks very much — best of luck.
Thanks. Our next question comes from Deep Shah at 360 ONE Capital. Deep, go ahead and unmute your mic. Yes.
Yeah. Hi there. Thanks for giving me the chance. I have a couple of questions. First one: next year roughly 3.2 million sq ft goes live in Madhapur. Of the 5.5 that we currently have under construction, more than half should be completed. I believe we also have fresh construction in Chennai. On that gap between NOI and NBCF growth, should we expect it to ease beginning in 2028, or even in FY 2028 do we expect NOI growth to come in above our NBCF growth? That's my first question. My second one concerns debt repayment. Looking at our debt schedule, I see that about 85% of the debt coming up for repayment next year carries coupons of 7.7% or higher. As a matter of fact, most of it sits at 7.9% and 8%. Would it be fair to assume that our cost of debt can still stay within this range or perhaps decline a little? Would that be a fair assumption? Yeah, that's all from my side. Thank you.
I’ll let Preeti take the debt question. Turning to the rent commencement dates: B1 is 100% leased, and that’s 15 lakh sq ft. B8 — your 17 lakh sq ft — has 15 lakh sq ft already absorbed. The remaining 2 lakh sq ft will be completed this month, within the next 15 to 30 days; that will also be finished. As for RCDs on some of these, we have a large client’s RCD beginning in December 2027. We have one beginning in September 2028. We have one beginning in March 2028. We have one beginning in February 2029. It’s spread out. These large clients also ask for sizable rent-free periods. So it’s a mix. On rentals, for most of these deals, the actual rentals will begin kicking in next financial year. From that point onward, things will start rising.
Alright.
There are just a couple of things I'd like to mention here. In Hyderabad, our rental revenues rose by close to INR 110 crore during the last financial year, simply because we were able to lease out most of the vacant space, and also because rentals went up. Then again, at Gigaplex, our rentals increased by INR 80 crore. In Yerwada, since we succeeded in leasing some of those spaces, rentals rose by INR 40 crore. We are examining every 20,000 to 30,000, 50,000 sq ft that sits vacant in order to boost our cash inflow. I'll hand it over to Preeti to discuss the debt side.
Yeah. Regarding the financing cost, as I mentioned, we're at 7.4% today. We have roughly INR 2,700 crore of refinancing in FY 2027. Based on our discussions with lenders and debt investors, I expect that the funding we have for the rest of the year will maybe be around these levels, because we really don't know how long it'll take for these interest rates to actually stabilize. With that in mind, I think overall for FY 2027, either we will stay at these levels. I don't see us actually going below this, and if anything, it could be a marginal 5, 10 basis points increase, but I really am not seeing a reduction from here. Either we'll remain around the same or maybe a marginal increase.
Okay, that helps. If I may fit in just one more question — sorry about that. At the start of this year, looking at our FY 2025 presentation for Madhapur, roughly INR 0.4 million of expiries had been anticipated. Could you help us get a picture of what the expiries actually turned out to be? Let me give the context. Over the coming three years, under 10% of space comes up for expiry in Madhapur, and that is, naturally, our strongest asset when it comes to the MTM opportunities available to us. If you could perhaps share two or three years of data, that would be quite helpful. Or even just the FY 2025 data — is there an argument to be made that actual expiries generally run higher than what was expected? Is that a pattern you have observed historically, or would that be a rather optimistic assumption?
You're right about that, Deep. When we put together those estimates for expiries or exits, it comes from what our clients are telling us today, and most of them have 6 months to give notice. Plenty of those folks may return. At the start of this year, we were discussing 2.5 million sq ft of expiries. The year wrapped up at 3.6 million sq ft of enquiries. As things stand in the market right now, we aren't complaining about tenants leaving, because it hands us a massive upside. If that weren't the case, we wouldn't be hitting the 40% mark to market that we achieved this quarter. It's hard to pin down an exact figure at this point, with the six months' notice periods that clients have.
Right. At this point, really the only thing we can see from the contracts is which expirations are coming up. There are also occasions when a client might prepay — since rentals are rising, they want to lock in the rent. Sometimes they'll do early renewals too. Even if their expiry is, say, sometime in the next year, they'd still like to lock in, so they prepay on those renewals and they sign a lease well ahead of time. That also, in a sense, shifts the expiry forward.
Correct. That's helpful. Thank you, everyone, and best wishes.
Appreciate that, Deep.
Thanks. Our next question comes from Mohit Agrawal at IIFL. Mohit, go ahead and unmute your mic. Yes, please proceed.
Okay, good evening everybody, and thank you for the chance to speak. First off, I'd like to ask about what we can expect for rental growth in Hyderabad. Last year, market rents rose by roughly 20 to 25%. You've recently been closing transactions at INR 120. What's your view on how things will trend this year? Should we anticipate a comparable rise? If you could elaborate — you mentioned RFPs are quite robust. It would also help if you touched on what additional supply, besides ours, is arriving in that micro market. I'm simply trying to get a sense of where rents might land over the coming 1 to 2 years.
Sure, in the next 1 year we do expect rentals to rise, though not at the 25% pace seen last year, since companies will obviously be working under budget constraints as well. As for the Hyderabad market, we wish we had more space available to offer. Everything has been taken up. As I mentioned, B 18 is gone, B 1 is gone, B 8 is gone. We simply don't have space. Perhaps we could consider some of the sponsor acquisitions, though those would come much later. It's a good position to be in. Quite surprisingly, we were discussing redevelopment in Hyderabad, which will only be ready after approvals come through, after design work, after the building is completed, all of that. Already 2 inquiries have come in for something that may only materialize 4 years from now. That's how hot the market is. I'm sure some of you have read that 46% of the GCCs that came to India last year chose Hyderabad, versus 30%-33% that went to Bangalore. We've been major beneficiaries of that.
All right. So in-place rentals are still increasing at roughly high single-digits, correct? And given that you've got low expiries coming up over the next couple of years, would that be a reasonable assumption to make?
On-site rentals are clearly rising, though everything hinges on the timing of when certain clients will depart.
Our compound annual growth rate for in-place rents since we listed has come in at roughly 7%, a bit above 7%. Leases coming up for expiry now are delivering better re-leasing spreads than they did in earlier years, and Hyderabad is the main factor behind that. In the past, we were getting somewhere in the range of 20%–25% on re-leasing spreads. Over the last couple of quarters, we've hit 30%, and this quarter we've reached 40%. That is also pushing up the pace at which our in-place rents are growing.
Sure. Preeti, on this year, we've achieved DPU growth of nearly 10%. If you could share a few thoughts — I know you don't provide guidance — but could you comment on roughly what DPU growth trajectory we should expect for FY 2027? Would it be comparable, or stronger? Because obviously NOI will jump considerably thanks to the acquisitions and all, but how does that flow through to DPU? That's also bearing in mind your interest costs are expected to stay stable, correct? How are you thinking about DPU next year?
Okay. You answered part of what I asked — that we don’t provide guidance. The exact figure isn’t something I can give you, but what I can say is that NOI growth, as Ramesh already mentioned, will be driven by several factors next year. NOI growth will stay healthy. Interest costs, as I said, will stay steady at these levels. With that, all I can tell you is that you should keep seeing healthy DPU growth. I’ll leave it there.
Alright. Alright, I gave it a shot. Thanks so much for your time.
I appreciate that.
Yeah.
I appreciate that.
Look, one thing Mohit used to bring up—actually, some of the analysts would ask us about this—was slow distribution growth. Across the past four quarters, we've posted growth of 18%, 16%, 20%, and 10%. I think that's all double-digits. That was a concern before. These days, not many people raise the distribution growth question with us.
Yes, Mohit, go right ahead.
No, that's all from me. Thanks. Thanks.
Thanks. Next up is Parvez Qazi from Nuvama Group. Parvez, go ahead and unmute your mic. Yeah, please proceed. Parvez, go ahead with your question.
Hi there.
Yes.
Nice work on those results. I have two questions. Outside of the assets we just picked up in Chennai, the only remaining space we really have is perhaps in Airoli East and the financial district. What's our view on leasing at those two properties? Say, 12 months from now, what occupancy level could we reach there? That's my first one. Second, regarding the share of GCCs in our leasing, for FY 2026, would it be fair to say that about 50% of the space we leased went to GCCs?
That's where the figure stands right now. Overall, we're at 52. In this quarter, the GCC split comes to 54%. That percentage has been held steady. Parvez, regarding Chennai leasing, across the two parks combined we hold 14 lakh sq ft of completed space that has occupancy certificates. Leasing out those 14 lakh sq ft is what we'll concentrate on over the coming 12 months. Airoli remains a priority. Word is there isn't a great deal of competing supply there either. At present we have roughly 9 lakh sq ft, somewhere in the 8 to 9 lakh sq ft range, in Airoli East. The aim is to bring that down to at least something like a 5 lakh sq ft figure. With luck, we ought to move the 95.7% occupancy we currently have up to perhaps early 97 to mid-97 by the close of this year. That will be where the emphasis goes. As I said in my remarks, at the start of the year we had 20 lakh sq ft. As of today, vacant space stands at 13 lakh sq ft.
On a related note, I mean, when you look at Madhapur as a market overall, there isn't really much room there, whether for you or for anyone else. What are your thoughts on the Financial District market and on the asset we hold there?
Absolutely. We’ve been witnessing substantial demand for Financial District simply because there is no space to be had. A lot of companies are watching costs closely as well. That’s the reason our rentals in Financial District, when we took them on, were roughly INR 55, INR 66, and at this point we’re already closing deals at about INR 62, which can only rise. We also have some ideas for alternative uses inside the Q-City park that we acquired. In the coming few months, you’ll get to hear about some solid deals in that park at improved rentals.
Thanks, and I wish you the very best going forward.
Thanks, Parvez.
Thank you. Our next question comes from Yashas Gilganchi at BoB Capital Markets Limited. Yashas, the line is yours — go ahead. Yes.
Good evening, everyone, and thanks for taking my questions. You've significantly expanded your presence in Chennai, so please give us some insight into the opportunity you see in that city. More specifically, how do you expect in-place rents to trend over, say, the next two or three years? What growth are you expecting?
Yashas, the approach we took was really straightforward. We noticed the market where vacancy was lowest. Vacancy in India stands at 15%. In Chennai it was 7%. When we examined institutional supply along PTR Road, there was none — barely any institutional supply at all. We then looked at OMR One, a superior market with higher rentals. For the coming 2 years, absolutely no institutional supply is arriving. Those were the factors behind our decision to acquire the Chennai assets, where supply can be controlled by us. Now we hold the supply there, in the two finest micro markets. Combining OMR One and PTR, across these two markets, we more or less control the supply. Chennai domination was the strategy itself. It would be nice if you could take a look at some pictures of this asset. This is genuinely an institutional trophy, a trophy IT park asset for the country. It has the best low carbon that anyone has ever built. The asset is new. It carries the advantages of OMR, PTR, and GST Road — all three. Chennai's widest road. Metro is arriving over the next 1.5 to 2 years. Our closest competing supply, such as DLF, today I heard from the IPCs, is quoting INR 150.
Sattva really has a strong project here. And again, when I spoke with the IPCs, their quotes are coming in at INR 130. We've already begun closing transactions at INR 85, so my expectation is those numbers will rise. There are multiple advantages. Airport hotels situated near the airport. Residential catchments. Plenty of a nice mall. Phoenix isn't too far away. Solid senior executive housing. Room to scale. Now that we hold two parks, clients are able to expand. We're already receiving an inquiry from someone who told us, "I'm taking this park, but give me scalability in the next park." Large floor plates — the best-sized floor plates in the city. 98% of CapitaLand is actually multinational clients, all GCCs. Low rise. Since it's an airport zone, it remains low rise. An over-specced asset. Assets of this kind have the eventual potential to turn into a front office. What we observed in, today, when you asked the IPCs which is the CBD in Hyderabad, they would say Madhapur, which has already turned into a front office destination. This is the sort of asset with front office potential. Chennai market, approximately, 6 million sq ft, net absorption market, and we ought to capture some share. As I said, the focus is 14 lakh sq ft of vacant space that we need to lease across both these buildings, which we hope to lease over the next 12 months.
Got it — so you're anticipating a slight rise in your cost of debt over the next year. As you refinance debt that's coming due in the next few years, do you plan to fix a larger share of your outstanding debt at fixed rates? I'm just trying to get a sense of what the strategy is for keeping your cost of debt stable.
As you can see, during the past couple of years, we have in fact been shifting a significant portion of our variable cost debt — which sits essentially at the SPV level — into fixed cost at the REIT level. We have already reached close to 70% in fixed form. I think 70%, 75% is the level we're aiming for on the fixed side. We would also like to keep some LRDs at the SPV level. I would say that since almost 75% is going to be fixed, to that extent it delivers a lot of stability. You know, I also mentioned on the previous earnings call that we are now attempting some long-term bonds so that, you know, we can have better, I would say, stability on interest rates as well. Of course, these past two months have not been the right time. As we move forward, we would like to actually lock ourselves in for long-term debt. In terms of interest rate, stability is much better than what it is today.
Understood — thanks a lot.
Thank you. On behalf of Mindspace Business Parks REIT, that brings today's conference call to a close, ladies and gentlemen. We appreciate everyone joining us. Thanks to each of you for taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Mindspace Business Parks REIT transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Mindspace Business Parks REIT earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.