Ladies and gentlemen, good day, and welcome to the NBCC (India) Limited Q2 FY '21 Earnings Conference Call hosted by Yes Securities (India) Limited. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Alok Deora from Yes Securities. Thank you. And over to you, Mr. Deora.

Alok Deora attendee
#2

Thank you so much. Good afternoon, everyone. I welcome you all to the Q2 FY '21 Earnings Conference Call of NBCC (India) Limited. We have with us today Mr. P. K. Gupta, Chairman and Managing Director; Mr. Rajendra Chaudhari, our Director, Commercial; Mr. Neelesh Kumar Shah, Director, Projects; Mrs. B.K. Sokhey, Director Finance; Mr. Pradeep Sharma, GM Engineering. We will start the call with opening remarks from the management, followed by Q&A. Thank you. And over to you, sir.

P. Gupta executive
#3

Am I audible?

Alok Deora attendee
#4

Yes, sir.

P. Gupta executive
#5

I'm P. K. Gupta, Chairman and Managing Director, and we welcome to all to this investor call for quarter 2 of NBCC. And a very happy Diwali in advance. Just a few opening lines. Our order book in earlier quarters has also been robust. But a big difference that we are now making is that we are placing the orders continuously. So during this financial year, we have placed a contract worth INR 8,500 crore. And contract worth INR 3,000 crore are in pipeline likely to be placed in another period of 2 months or so. We have balanced 4, 4.5 months of this year left, and we want to further add up the -- further contracts. So that is going to improve our delivery, which was a little sluggish due to corona and several reasons. But now it's all part that and we plan to have a very bright future during this year and during the next financial year. Our current contracts, which are in execution are about INR 20,000 crore. All these are running projects, and there is no problem of funding in this, and there's no problem of any site-related issues that kept . So all these works are going on. And the Amrapali has been a major booster for us. Except 2 projects, we have awarded all the contracts of Amrapali, and most of the works have already been started. About 700 houses, we have handed over to home buyers and balance works are going on.

Rajendra Chaudhari executive
#6

Hello? Hello? Hello?

P. Gupta executive
#7

Now Mr. Rajendra Chaudhari, our Director, Commercial, will take over and brief you about the redevelopment projects.

Rajendra Chaudhari executive
#8

Hello. I'm Rajendra Chaudhari. You see as far as redevelopment of the projects are concerned, recently, we secured projects from DTC to redevelop their lands. Initially, they have given us 4 land parcels to redevelop. And we are also in touch with Delhi Transport Board, again, for development of their properties located in Delhi. So these are the new things which has happened in this quarter regarding redevelopment.

Baldev Sokhey executive
#9

It is all from our side now. Now you may please start the question and answers from the investors or analysts side.

Operator operator
#10

[Operator Instructions] The first question is from the line of [ Sunil Bansal ], who's an individual investor.

Unknown Attendee attendee
#11

Sir, I've been following NBCC for a long time, and I see this operation -- operating margins and net profit margin for NBCC is much, much lower. And particularly, excluding the interest component, income from other sources. So do you have any plan of streamlining this operation, cost-cutting measures? Because I can't understand having INR 8,000 crores turnover and net profit margin is 1% or 2% range. This is my first question, sir.

Baldev Sokhey executive
#12

Actually, the main reason for the reduction in the operating margin is lower turnover. And as the situation has improved now in this quarter, and we see the recovery is very fast. And we could be able to achieve the turnover at par with the last year's quarters also this time. We are hopeful that our operating margins will also increase. There is another reason for the lower operating margin is the reduction in the PMC fees margins from all other clients, which were earlier in the range of 7% to 10%, now it is between 5% to 7%. The third reason is the real estate fees, which could not happen much in these quarters, in these 2 quarters, but we are hopeful in the next 2 quarters.

Unknown Attendee attendee
#13

My second question is just for clarification. I understand NBCC has a total bank balance of INR 5,000 crores, including the customer advance. But I do not see this interest component properly in the results declared. Even at 17%, this should have been INR 300 crore something income from this interest. So does it -- you share with the customers' interest or it is with NBCC only, please?

Baldev Sokhey executive
#14

Actually, we have been now showing the net of interest in our books of account. Whatever interest is to be passed on to the client has already been passed on separately, and that is shown, which is the NBCC's account. And out of the total cash and bank balances, we are having the INR 4,000 crores of client deposits. And the balance amount, around INR 750 crores, is our own funds on a consolidated basis.

Operator operator
#15

[Operator Instructions] The next question is from the line of Pankaj Kumar from Kotak Securities.

Pankaj Kumar analyst
#16

Yes. I would like to know about the current order backlog and the status of the Nauroji Nagar project.

P. Gupta executive
#17

Yes. We have a total order book of INR 72,000 crores. And the Nauroji Nagar construction has picked up. Now we have almost 2,200 labor there, and we need to increase to 3,000. So as far as [Technical Difficulty]

Pankaj Kumar analyst
#18

Hello?

Operator operator
#19

We seem to have lost the line from the management. Please stay connected. I'll reconnect the management line.

Pankaj Kumar analyst
#20

Yes.

Operator operator
#21

Participants, thank you for patiently holding the lines. We have the line for the management reconnected. Over to you, please.

Pankaj Kumar analyst
#22

Yes, sir. On the Nauroji Nagar, you were giving the update?

P. Gupta executive
#23

Yes. Nauroji Nagar, almost all the sites of NBCC have picked up. Nauroji Nagar has also picked up. We have 2,200 labors. And in the meantime, we could sell also something around INR 700 crores in Nauroji Nagar. So during COVID period also, we have been -- we have sold around INR 700 crores. So we hope that next 2 quarters will be as good as previous years' quarter.

Pankaj Kumar analyst
#24

And in terms of awarding, what is the value of project we awarded in these 3 projects?

P. Gupta executive
#25

We have awarded INR 1,950 crores.

Pankaj Kumar analyst
#26

Sorry. How much?

P. Gupta executive
#27

INR 1,950 crores awarded. You are talking about Nauroji Nagar or you are talking about...

Pankaj Kumar analyst
#28

Nauroji Nagar and other 2 colonies as well, Sarojini Nagar and...

P. Gupta executive
#29

Sarojini Nagar and Netaji Nagar, we are in the process of tendering.

Pankaj Kumar analyst
#30

Okay. And sir...

P. Gupta executive
#31

And overall, we -- so far this year, we have awarded to a value of INR 8,500 crores.

Pankaj Kumar analyst
#32

Okay. So current contracts under execution is INR 20,000 crores, which includes your INR 8,500 crore awarded project as well?

Rajendra Chaudhari executive
#33

So currently, it was INR 20,000 crores, INR 20,000, not INR 30,000.

P. Gupta executive
#34

Yes. Yes. Correct. Yes. Correct. INR 18,000 crore is running value of the contract, INR 18,000 crore.

Pankaj Kumar analyst
#35

INR 18,000 crore.

P. Gupta executive
#36

Yes.

Pankaj Kumar analyst
#37

And what is the value of the project that you plan to award in, say, next 6 months, say, by the end of the year?

P. Gupta executive
#38

We are -- in pipeline, there are INR 3,000 crores worth. In total, it will be around INR 12,000 crores we'll be awarding this year.

Rajendra Chaudhari executive
#39

And maybe even more than that.

Pankaj Kumar analyst
#40

And any revenue guidance you would like to give for the year?

P. Gupta executive
#41

We are estimating INR 6,000 crores.

Operator operator
#42

[Operator Instructions] The next question is from Parvez Akhtar from Edelweiss Securities.

Parvez Qazi analyst
#43

Yes. A couple of questions from my side. Sir, in our INR 72,000 crore order book, what would be the quantum of redevelopment or what we call the self-revenue generation projects?

P. Gupta executive
#44

INR 37,000 crores is for redevelopment.

Unknown Executive executive
#45

out of

P. Gupta executive
#46

Out of INR 72,000 redevelopment on self-sustainable basis is INR 37,000 crore.

Parvez Qazi analyst
#47

Okay. And sir, if you could help us with the status of Netaji Nagar and Sarojini Nagar. What is the progress? You said that we are looking to award contract. Have we done all clearances, et cetera? I mean is all that process complete?

P. Gupta executive
#48

See, in one of the projects, we have done the part for its clearance. And we are in the process of getting the balanced clearances. But in order to save time, we are finally going with tendering activities. The work will only be started once all the approvals are in place.

Parvez Qazi analyst
#49

And in terms of labor availability, where exactly we are? I mean as a percentage of pre-COVID levels, where will we be today?

P. Gupta executive
#50

We are at 66%. We need something around 60,000 labor. We are having almost 40,000 labor.

Parvez Qazi analyst
#51

Sure. And lastly, for FY '22, I mean, obviously, this year has seen a lot of disruption. But when we look at, let's say, FY '22 and assuming everything gets normalized, what is the kind of margins that we can think about?

Baldev Sokhey executive
#52

The margins now at this moment, it is slightly difficult to exactly tell you the margin guidance. But definitely, it will improve a lot. And we will draw the current percentage from less than 1% to at least 1% to 2% operating margin.

Operator operator
#53

The next question is from the line of Rohit Natarajan from Antique Stockbroking.

Rohit Natarajan analyst
#54

Sir, I believe that you yourself signed the value. So what is the criteria for excellence? What is the revenue target over there?

Baldev Sokhey executive
#55

Actually, the revenue targets are around INR 6,000 crores. And with the operating margin -- INR 6,000 crores.

Unknown Executive executive
#56

Excellence?

Baldev Sokhey executive
#57

In the excellent, it is INR 6,500, yes, and with the operating margins of 1.205.

Rohit Natarajan analyst
#58

Okay. So this is for stand-alone?

Baldev Sokhey executive
#59

This is a stand-alone. Yes.

Rohit Natarajan analyst
#60

Okay. And in terms of the remaining order backlog, madam, we have like one we said INR 37,000 crore, which is the self-generating model. And INR 35,000 crore that you have roughly is actually your -- where funds are already tied up in place. So in that model, why the orders haven't been awarded to contractors or why there is a slow-moving phase in terms of execution?

P. Gupta executive
#61

You are talking about redevelopment projects or...

Rohit Natarajan analyst
#62

No. The non-redevelopment portion in your order backlog.

P. Gupta executive
#63

Out of order book of INR 72,000 crore, PMC is INR 37,000 crore, right? Participation is almost similar in the redevelopment. Out of that, INR 17,000 crore is ongoing work. And we have been able to award works of INR 8,700 crores so far, and we are expecting in pipeline is INR 3,000 crores. But we may tender more and award more beyond INR 3,000 crore also. So this is something around INR 17,000 plus INR 12,000 will work out INR 29,000 crore.

Rohit Natarajan analyst
#64

Okay. You still have INR 8,000 crore left, sir?

P. Gupta executive
#65

Yes. You see every project has got some decision thing with the local approvals across India. That takes some time. And without having proper statutory clearances to go ahead every time for tendering, it becomes a little bit difficult cumbersome.

Rohit Natarajan analyst
#66

Sir, this INR 8,200 crore that works you have awarded so far, what is Amrapali's portion in that?

Unknown Executive executive
#67

Amrapali's part is .

P. Gupta executive
#68

INR 6,000 crores.

Rohit Natarajan analyst
#69

So Amrapali, you don't consider that as a part of your self-generating model. It's actually...

P. Gupta executive
#70

No. No. It is no self-generating model. It is PMC on -- we are able -- it's PMC on behalf of Supreme Court of India at 8%. So the money -- the fund arrangement is being done by the learned court receiver who has been appointed by Supreme Court.

Rohit Natarajan analyst
#71

Okay. Okay. Sir, regarding Jaypee, what is the situation over there? When do you expect the...

P. Gupta executive
#72

Final hearing of Jaypee has happened in the Supreme Court. Order is to come. That's all.

Rohit Natarajan analyst
#73

Sir, if I look at -- I have gone through the Jaypee resolution plan. You have articulated the portion of close to INR 20 billion of debt to be raised. And there are some land banks to be sold. Can you walk us through that model exactly how the land bank will be carved out? How -- what exactly the bankers will have? What is the debt will be in the demerged entity?

P. Gupta executive
#74

See, we have -- you people and we have waited up to this time. Let the segment come out, then we will tell all the modalities.

Operator operator
#75

[Operator Instructions] The next question is from Binod Modi from Reliance Securities.

Binod Modi analyst
#76

My questions pertain to, firstly, your revenue part. Sir, you are guiding INR 6,000 crore of revenue at a stand-alone, right? But if I look at overall first half performance, that has been around INR 1,400 crore or something, we have booked revenue. So it means in second half, we have to do around more than INR 4,500 crore kind of revenue. And given the fact still we have almost 66% kind of labor availability, how comfortable you are to meet the INR 6,000 crore of revenue, sir? That is my question one.

P. Gupta executive
#77

Yes. So shall I reply your question one, first question?

Binod Modi analyst
#78

Yes. Yes. Yes. Yes. Please, sir.

P. Gupta executive
#79

See what has happened, actually, recently, we have awarded work of more than INR 3,000 crores. It is recently, it is awarded actually. So we expect to generate the revenue of 20% from INR 3,000 crores which is awarded recently. So that will boost up our, I mean, turnover. Second thing now, the labor position is further improving. And in some places, some project, it is almost -- we have attained almost 80%, 85%. So overall, it is 66%. So it will improve. And if you see our track record actually also, we have been achieving more turnover in third and quarter.

Binod Modi analyst
#80

Yes, that I understand, sir. The 60%, 65% comes in the second half. But still, even if I consider 30%, 35% in first half, it looks to be a very daunting task for second half.

P. Gupta executive
#81

So what happened actually, this time, scenario is a little bit different because the labor position will improve now. And second thing, recently, we awarded some new ones, big ones, big projects. So these are all big building projects. So definitely, we will achieve. Because the turnover depends on the number of projects, value of the project. So this time, all work, which has been awarded, is more than INR 300, INR 400 crores value of each project. So we'll be able to achieve the target activity.

Binod Modi analyst
#82

Okay. And my second question pertains to Amrapali project, sir. I remember there are total 25 projects under Amrapali, right? And the balance I think after delivering some of the projects, the balance was around 23 something. Out of 23 last quarter, previous quarter, I think we had awarded almost 17 projects of that. So what is the status as of now? We have awarded all projects, sir, from this Amrapali thing?

P. Gupta executive
#83

Except 2, we have awarded all the projects. And these 2 projects also, the decision of court receiver came just I mean 15, 20 days back or maybe a month back. Otherwise, we have awarded all. Thank you.

Binod Modi analyst
#84

And, sir, from the same project, how much amount we are supposed to receive as of now from the existing home buyers? And how much we have already received?

P. Gupta executive
#85

We are supposed to receive something around INR 4,000 crores from home buyers.

Unknown Executive executive
#86

[ I have to check ].

P. Gupta executive
#87

And what was your next question?

Binod Modi analyst
#88

My next question, did we receive any amount so far?

P. Gupta executive
#89

You see this money, INR 409 crore has come. And this money is regularly coming in the forms of -- related to Supreme Court and court receiver. We are not directly receiving this money.

Binod Modi analyst
#90

Okay. Great. And last, sir, you said about this park clearance for this -- forest clearance part for this Netaji Nagar and Sarojini Nagar. So this park clearance will be obtained for both these projects or...

P. Gupta executive
#91

You see, we -- after it -- the decision bodies took a long time because Delhi government was in the process of formulation of -- a law for forest. Now they have formulated and they started I mean giving clearances. So in order to start in phase-wise manner, we have gone to Delhi government to give us a wise policy, which they have given us, and it will continue like this.

Binod Modi analyst
#92

So essentially, I mean in coming months, at least, we can, I mean, award some sort of projects out of these 2 programs.

P. Gupta executive
#93

Definitely.

Operator operator
#94

[Operator Instructions] The next question is from the line of Rohit Natarajan from Antique.

Rohit Natarajan analyst
#95

Sir, can you just elaborate more on the current position that we have on Hindustan Steelworks Construction? What is the order backlog? How much is the execution over there? What margins are they booking and even at HSCC?

P. Gupta executive
#96

You see, the order book is something around INR 3,000 crores. We recently got...

Rohit Natarajan analyst
#97

Is this for service, sir, Hindustan Steelwork?

P. Gupta executive
#98

The HS Steel, yes. You are talking about HS Steel now?

Rohit Natarajan analyst
#99

I guess I'm talking about Hindustan Steelwork.

P. Gupta executive
#100

Yes. So we have an order book of INR 3,000 -- around INR 3,000 crores. And this, we got recently NCLAT and some [ ROVs ], which is and signed MoUs in Sport Authority of India. This is the order book. And there also, because of COVID, the turnover could not pick up in the first 2 quarters. But in the last year -- in the year, we came into operational profit after many years. So I hope this trend will continue.

Rohit Natarajan analyst
#101

What is the execution in this year expected to be?

P. Gupta executive
#102

We are expecting execution of something around INR 700 crores.

Rohit Natarajan analyst
#103

Okay. And with the operating profit?

P. Gupta executive
#104

With operating profit, yes, margin-wise.

Rohit Natarajan analyst
#105

And, sir, the other subsidiary, HSCC, what is the order backlog over there? And what is the revenue and operating profit?

Baldev Sokhey executive
#106

The [ difference ] is currently not available with us, and we will share with you through e-mail. [ Krishna ] will forward it, right?

Rohit Natarajan analyst
#107

Sure. Sure. Sure. And apart from that, is there any other railway station development projects? What is the situation over there that we are already working at?

P. Gupta executive
#108

See, recently, we signed MoU with Delhi government for development of Delhi Transport Corporation properties in Delhi.

Rohit Natarajan analyst
#109

Okay.

P. Gupta executive
#110

So initially, they have referred 4 of their properties. And now we are in process of the redevelopment of properties of Delhi Transport.

Rohit Natarajan analyst
#111

Okay. So what is the cumulative order opportunities over here, sir?

P. Gupta executive
#112

The order opportunity, it will be something around, you can say, INR 10,000 crores.

Rohit Natarajan analyst
#113

INR 10,000 crores is Delhi opportunity side. This is development only?

P. Gupta executive
#114

Not -- both. INR 4,000 crore from the DTC and INR 6,000 crores from Delhi Board.

Rohit Natarajan analyst
#115

Both are again on a development model -- self-generating model.

P. Gupta executive
#116

Self-generating model.

Rohit Natarajan analyst
#117

Okay. I guess is there an MoU that you signed in the first place that is prescribing what is the time line to be done in those projects? Because even the current development projects that we have in hand, we haven't come to that construction phase despite billing is 3 years back. So will there be an MoU that will prescribe some timeliness for these orders?

P. Gupta executive
#118

I mean we have to do these in 3 years. And you see as a -- so far as this Sarojini Nagar, Netaji Nagar and Nauroji Nagar is concerned, it is unfortunate that the state -- the court got vacated after the lot of arguments. So had it been -- had there been no mistake, it would have been much, much better for NBCC as well as redevelopment projects.

Rohit Natarajan analyst
#119

Okay, sir. And for the redevelopment opportunity that within the order backlog that we have of INR 35,000 crore, what is the monetization til date, cumulative monetization?

P. Gupta executive
#120

We have seen that we have overmonetized -- started monetization of Nauroji Nagar. It is something around INR 2,700 crores.

Rohit Natarajan analyst
#121

So til date, all 4 projects put together, you have INR 27 billion as of now?

P. Gupta executive
#122

INR 27,000 -- INR 2,700 crore, sorry.

Rohit Natarajan analyst
#123

Sir, again, INR 2,700 crores.

P. Gupta executive
#124

Yes.

Rohit Natarajan analyst
#125

Okay. And what is the time line that you expect this number to be completely done?

P. Gupta executive
#126

These numbers?

Rohit Natarajan analyst
#127

INR 35,000 crore overall?

P. Gupta executive
#128

Yes. It will take at least 3 to 4 years.

Rohit Natarajan analyst
#129

Okay.

P. Gupta executive
#130

And this money, we don't require incentives from them. We require for the construction only because it is self generating. So we -- at any given point of time, we require the money, whatever has been spent on construction. So milestone basis.

Operator operator
#131

[Operator Instructions] The next question is from the line of [ Himanshu Shah ] from [ Potentialities Unlimited ].

Unknown Analyst analyst
#132

This is Himanshu. Hello?

P. Gupta executive
#133

Yes. Yes.

Unknown Analyst analyst
#134

Yes. So I just wanted to know what is the status of AIIMS Delhi because there was a INR 5,000 crore project and coming from government contract.

P. Gupta executive
#135

Your voice is not clear.

Unknown Analyst analyst
#136

Yes. So I just want to know what is the status of AIIMS Delhi, which was INR 5,000 crores project?

Unknown Executive executive
#137

AIIMS Delhi project.

P. Gupta executive
#138

Yes. AIIMS Delhi projects are concerned, we have 2 projects in Delhi for AIIMS. So both the projects, now we have awarded work for both the projects. And the main achievement in the last quarter is that these projects will step up in the approval on the state government for tree cutting. So those approval now we have obtained, the projects are clear. Environment clearance is also obtained for both the projects. And we have awarded work, and contractors are mobilizing on both the projects. They have already mobilized, and we have I mean some projects under construction. So we hope in next 1 or 2 months, the construction will start in for both the AIIMS project.

Unknown Analyst analyst
#139

Okay. So what is the kind of revenue potential per year that you are looking at from this one?

P. Gupta executive
#140

Yes. Revenue potential, it is about INR 4,000 crores from both the projects. INR 4,000 crores.

Unknown Analyst analyst
#141

And it will be completed in 3 to 4 years or more?

P. Gupta executive
#142

No. It will be completed in 2.5 years.

Unknown Analyst analyst
#143

2.5 years. Okay. And this is not based on the...

P. Gupta executive
#144

It is held, actually, in 2 phases. First phase will be completed in 2.5 years. And then next phase will again take 2 years. So total, it is 4.5 years.

Unknown Analyst analyst
#145

So money for this will not have to be generated, right, by selling or something?

P. Gupta executive
#146

Yes. No money is to be generated from the sale of the commercial portion of the project. Thank you.

Unknown Analyst analyst
#147

So -- but sir, the challenge is we are mainly a PMC and a constructing organization. We are not into selling. So I think -- do you think that's a weak part of ?

P. Gupta executive
#148

No. No. No. You're [Technical Difficulty] because we are in real estate the last 20, 25 years, and we have sold a lot of inventories in real estate projects. So we have our own marketing division. And for -- even for the Nauroji Nagar, whatever we have sold about INR 2,700 crore, it is sold by NBCC only, our marketing division only.

Unknown Analyst analyst
#149

Sir, we are only focusing on PSU companies and all. We are -- we have never ventured out into targeting foreign companies or corporate India or even foreign consulate for this Nauroji Nagar thing.

P. Gupta executive
#150

So earlier, we focused on the real estate, actually, only for the Netaji Nagar project. But now for Nauroji Nagar, it was reworked, and it was open for all. So many corporates, they have purchased the -- enough property there in Nauroji Nagar.

Unknown Analyst analyst
#151

Sir, do you think tie ups with people like Blackstone or -- I mean Brookfield and others will help us?

P. Gupta executive
#152

We are open to it. We are open to it. There is no issue in the past. We have tried also. And we have our own system for the marketing of the real estate properties. So we are open to it. And in past also, we had discussion with the firms like Blackstone. So we get approval of our Board as for the -- depending on the circumstances and new market positions.

Unknown Analyst analyst
#153

Sir, last, the Nauroji Nagar, we have received capital of INR 1,000 crore. I think even INR 200 crores we have with AIIMS Delhi. What kind of total seed money that we have given out to the projects altogether, which is our money earning some interest?

Baldev Sokhey executive
#154

Total money so far has been given to the 7 key development alone, approximately INR 1,100 crores. No seed money has so far been given to the AIIMS projects.

Unknown Analyst analyst
#155

Got you. So this INR 1,100 is all the money that we have given.

Baldev Sokhey executive
#156

Yes. Yes. It is.

Unknown Analyst analyst
#157

Last quarter, you said we have -- our cash balance is about INR 350 crores. Today, I heard it was about INR 750 crores. The labor ministry money?

Baldev Sokhey executive
#158

No. No. It's not labor ministry money. Actually, it is a consolidated cash and bank balance on the books of all our subsidiary company as well as the holding company. Our [ SSCL ] is having more money on their book. And HSCC is also having their own fund. So overall, we have received more funds from the clients as well as we have generated our own funds also.

Unknown Analyst analyst
#159

So the interest that is accrued on the seed money, is that money received every year or it is just accruing?

Baldev Sokhey executive
#160

Currently, it is not being received, but -- because there is no sale going on. As soon as our sales will happen, we are expected that we will receive this adjustment. Actually, we are currently focusing on the project execution. So that's why NBCC is not interesting -- projects interest part to be withdrawn from that funds because we are not having that much of funds availability in that.

Unknown Analyst analyst
#161

No. But you are saying tax of it, right? We are already paying tax on the accrued money?

Baldev Sokhey executive
#162

Yes. Yes. Yes. We are paying tax. Like, you see, what happened due to the COVID situation, all these things have been deferred, right, [ less seed ]. And this situation has arrived to this level. Otherwise, in the Nauroji Nagar project, you are all aware that we received back our money within 4 months along with the interest. So we are hopeful now the situation is improving, and we are hopeful of getting this.

Unknown Analyst analyst
#163

Ma'am, but in such a revenue-generating project, if we keep selling INR 1,000 crore every year, don't you think it will take 30 years to complete the project?

Baldev Sokhey executive
#164

Sorry? I -- your voice is...

Unknown Analyst analyst
#165

Sir, the size of the project is INR 30,000 crores plus.

P. Gupta executive
#166

You see, now we have sold INR 5,000 crore at Nauroji Nagar in 6 months to 1 year. So because of the scenarios, you have -- you also know that real estate is at the rock bottom, not just COVID. We expect that it will definitely, at some point of time, it will pick up maybe at a very low rate. But then again, estimating 30 years is a very -- I mean...

Unknown Analyst analyst
#167

Sir, the total sales that we expected is how much? INR 6,000 crores, you said only in Gomti Nagar.

P. Gupta executive
#168

Gomti Nagar, yes it was INR 5,200-something crore.

Unknown Analyst analyst
#169

Okay. Okay. Okay. Fair enough. So we are in the -- okay, we are at the bottom of the cycle, and that's why it's looking like that. Okay. Okay. Sir, okay. Fine. I mean that's all from my side.

Operator operator
#170

[Operator Instructions] The next question is from Rohit Natarajan from Antique.

Rohit Natarajan analyst
#171

Madam, what is that other income -- seed money that you would generate in the total other income every quarter or maybe every year you want to put it?

Baldev Sokhey executive
#172

Every quarter, we are getting approximately INR 40 crores from our seed money which we have invested.

Rohit Natarajan analyst
#173

That is on consolidated number?

Baldev Sokhey executive
#174

No. No. On stand-alone basis.

Rohit Natarajan analyst
#175

Okay. INR 40 crores is the other income that you book as seed money every quarter.

Baldev Sokhey executive
#176

Yes.

Rohit Natarajan analyst
#177

And as the current situation is, it is not actually a cash, it's basically an accounting item.

Baldev Sokhey executive
#178

Yes.

Operator operator
#179

That was the last question in queue. I would now like to hand the conference back to the management team for closing comments.

Unknown Executive executive
#180

No last question?

Unknown Attendee attendee
#181

Hello?

P. Gupta executive
#182

Yes?

Unknown Executive executive
#183

Sir, is this CMD again?

P. Gupta executive
#184

We hope for a very bright future with the kind of contracts awarded and contracted pipeline and corona finally getting away. So we hope for a better future both from PMC projects and redevelopment projects. Hello?

Alok Deora attendee
#185

Yes, sir. You may go ahead.

P. Gupta executive
#186

So hopefully that we'll be wiping out our [indiscernible] order book very quickly. So with that, I close my comments.

Alok Deora attendee
#187

Thank you very much. On behalf of YES Securities, that concludes the conference.

P. Gupta executive
#188

Thank you. Thank you, everybody, and a very, very happy Diwali again.

Rajendra Chaudhari executive
#189

Yes. Thank you to all and happy Diwali from NBCC side as well.

Alok Deora attendee
#190

Thank you. Participants, if you have any other questions, you may contact the Investor Relations team. On behalf of YES Securities, that concludes the conference. Thank you for joining us. You may now disconnect your lines.

P. Gupta executive
#191

Thank you.

Baldev Sokhey executive
#192

Thanks.

Rajendra Chaudhari executive
#193

Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete NBCC (India) Limited transcript - plus 251,000+ transcripts from 12,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to NBCC (India) Limited earnings transcripts and 251,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $105 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.