Good morning, everyone. My name is Ole Hansen, and I serve as CEO of Nekkar. Welcome to this presentation covering the fourth quarter for Nekkar. A bit later, Marianne is going to walk through the financials for the fourth quarter, and then we'll wrap things up with some Q&A following the presentation. Let's begin. Just as a reminder, Nekkar is an industrial company builder with a long-term horizon, concentrating on technology companies tied to the ocean. Five operating companies make up the Nekkar Group. Our portfolio saw no changes over the last year, though at present we have multiple processes underway aimed both at broadening that portfolio and at deepening the investments we already hold. In 2025, you will notice that revenue is spread more evenly across those five operating companies. The companies Nekkar operates in are exposed primarily to four main markets, and defense and maritime are the biggest among them. The target mix of revenue across those four is also reasonably balanced, which gives us solid diversification. Let's turn to a few highlights from the fourth quarter, beginning on the left-hand side. In the fourth quarter, FiiZK successfully wrapped up delivery of two Proteus closed containment systems to Mowi. Those systems are now in place at Mowi's Slottsnes location, where salmon has been put in and is doing well.
At the same time, we were delighted to report in Q4 that FiiZK won a delivery from a Norwegian fish farmer who was not named for four more Proteus closed containment systems. We can now confirm that Mowi was also the customer behind these. This order underscores the trust our customers place in FiiZK, and it also shows the leading part FiiZK plays in the closed containment system market. This morning, we announced the agreement Intellilift signed — the JV between Intellilift and Transocean — for drilling automation solutions on 11 offshore rigs for a rig operator that was not named. Installations are set to begin in the second quarter of this year and will be rolled out across a 30-month period. After installation, the software will sit on a 10-year contract with SaaS elements. In addition, during the fourth quarter, Intellivell landed contracts covering three new rigs. That means SaaS revenue will scale up as these rigs go live with Intellivell software over the first half of 2026. Let's turn to a few of the key financials for the fourth quarter. Revenue at Nekkar came in at close to NOK 200 million, up from NOK 181 million in the same quarter a year ago. Group EBITDA ended at NOK 23 million, which is a little behind last year's figure, yet a solid improvement versus earlier quarters this year.
Net profit came in at negative NOK 11 million. That was affected by FiiZK wrapping up delivery of its market entry projects, and also by Skywalker, where we recorded a non-cash impairment to reflect the low commercial potential of that technology. Nekkar still has a strong balance sheet, with solid cash of NOK 150 million, close to NOK 100 million in treasury shares, and no debt. Order intake for the quarter was NOK 122 million, lifted by announced orders at Syncrolift and Intellilift. Cash flow from business was negative NOK 1 million, driven by working capital factors. Turning to the fourth quarter, revenue is higher than recent levels seen throughout 2025, though it remains low because of the order backlog situation at Syncrolift, while most of the other companies are seeing steady growth. EBITDA is still under our historical track record, but we expect it to keep improving as the legacy projects at Techano are completed. The drag on profitability is still coming from those Techano legacy projects, with added costs. Volume contribution from Syncrolift also remains low as we wait for further awards in the market space. Overall, we keep seeing a positive underlying development across our operating companies for the coming quarter and the year ahead.
But because of what Nekkar does, quarterly swings will occur from how projects are phased, the mix of projects, and other elements. Order intake came to NOK 122 million during the fourth quarter, and that was powered by Syncrolift, where a service contract with the Indian Navy that we had previously communicated took the biggest share of orders, along with rig contracts for Intellivell that were announced in the quarter. At the close of Q4, the order backlog stood at NOK 678 million, which keeps giving us reasonable visibility into the quarters ahead. Syncrolift still accounts for most of that backlog, though more than NOK 150 million comes from other companies. Keep in mind that FiiZK's backlog is not consolidated into Nekkar's order intake, and neither is today's award of the 11-rig contract for Intellilift. Let's turn to a closer look at our operating companies. We'll begin with Syncrolift. As we said earlier, the service contract with the Indian Navy was signed during the fourth quarter. In fact, this is the biggest service scope contract per year we have seen, at NOK 40 million across two years. Tendering activity for newbuild projects is still at a high level and keeps being fueled by rising demand in the defense market, which makes up a substantial portion of that tendering activity.
As we said before, the precise timing of those awards depends on things Syncrolift can't control. That said, we didn't lose any bigger contracts during the prior quarter. Turning to the financials: Q4 revenue is still below where it has been historically, mainly because order intake has been weaker over the last 12 to 18 months, though it is higher than the prior quarter in 2025 thanks to solid service activity. EBITDA came in at 28%, roughly in line with last year, since we're seeing positive effects from the service activity just mentioned plus one-off contingency releases on projects that are in their final stages. On the projects currently running, the Syncrolift team keeps delivering steady, solid execution. Syncrolift runs a flexible operating model with outsourced production, and that allows activity levels to scale up going forward. The service business keeps growing steadily, with upgrade work driving favorable development. As you can see on the right-hand side, we're also still including the two operational KPIs for Syncrolift that we introduced last quarter — covering aftermarket revenues and newbuild projects lost or won. As noted, the outlook for Syncrolift remains healthy going forward, with the backlog still at around half a billion NOK. We're also seeing a high level of tendering activity in the newbuild upgrade segment.
The overall tender pipeline sits at roughly NOK 7.5 billion, a bit higher than the previous quarter, and it gives us a solid outlook. Estimating when awards will land has been difficult over the past year, but we have continually refreshed our view based on what we observe and put forward perspectives we consider fair. Even though 2025 did not turn out on the market side the way we anticipated entering the year, we still foresee a good market outlook for Syncrolift over the next couple of years, with NOK 7.5 billion in tenders expected to be awarded in the market. Turning to Intellilift, our provider of industrial software and automation. This morning, Intellivell landed a contract covering 11 rigs in total with a 10-year SaaS commitment. I will come back to that shortly. In addition, 2+1 rigs were contracted with Transocean as the rig customer in the fourth quarter, which lifts the total contracted backlog to five units on contract. It is encouraging to see solid international market interest in the Intellilift and Intellivell products. On the financial side, growth in external orders is driving positive activity development, as fourth quarter revenues rose 62% year-over-year and similarly for the full year of 2025, along with a solid full-year margin of 25% EBITDA.
In Q3, Intellivell brought one new rig online with the Transocean Deepwater Conqueror. It was really exciting this morning to share that we've signed a contract covering 11 rigs on a 10-year duration contract. That's obviously a major milestone for both the Intellilift team and the Intellivell team. Installations on these are slated to begin in the second quarter of this year, with the goal of rolling out one or more rigs each quarter across a total duration of 30 months. For Intellilift, which holds the full scope of this contract, the deal includes a fixed sum for installation plus a Software as a Service fee throughout the contract period, which here is 10 years per rig. So in other words, Intellilift should see continuous growth in recurring revenues, with these 11 rigs joining the contract backlog on top of the existing five rigs contracted in Q4. Turning to the fourth quarter announcements, it was pleasing to see Intellivell secure new orders with Transocean as the customer. Altogether, in the second half of 2025, we managed to get all four of these new rigs onto contracts with Intellivell.
These contracts cover automating tripping and drilling connections, with Intellilift handling the full installation as well as the service and aftermarket work for these rigs. As you can see, the slide shows how the rollout and deployment will happen across these 4 rigs, which of course will drive a ramp-up in recurring revenues for Intellilift. At Globetech, customer activity remains high, and contracted vessels rose by 24 units during the quarter, which will give us a foundation for higher revenues going forward. Quarterly revenues came in at NOK 29 million, about the same as last year. For 2025, full-year revenues climbed 13% to NOK 104 million, with a 22% EBITDA margin delivered. As a reminder, on the right-hand side you'll keep seeing the new KPIs we added starting last quarter to further improve operational transparency. For Globetech in particular, we've added repeat business as a share of revenues for the last 12 months to highlight reoccurring revenues, along with contracted vessels, which offers guidance on future revenue to come. Turning to Techano Oceanlift, our provider of offshore lifting and handling technology. The company keeps bidding on a handful of solid leads across various segments. Our focus is on delivering repeat products with known cost and known risks.
On EBITDA, Techano turns in another weak quarter, since the legacy problems tied to the first two newbuilds are dragging on this quarter as well. Here is where those two projects stand: the first crane project has been delivered and installed successfully, and it is now waiting on the final sea test. When that sea test happens is up to the yard. The second crane project wrapped up FAT successfully this week, and installation plus testing should begin in the second quarter. Newly signed projects are now bringing in a bigger portion of revenues. We still anticipate favorable progress over the next quarter as those two first market entry projects mature and the recent awards move forward. Operationally, we have tightened cost control and follow-up across all phases, and a new management team is also strengthening the organization. Moving to FiiZK, our aquaculture investment: announcing the order for four Proteus closed systems from an undisclosed Norwegian fish farmer—which you now know is Mowi—was a genuine milestone. It really confirms the confidence in FiiZK and the Proteus system. The Miljøfleksordning took effect in October, letting farmers located in red zones recover withdrawn biomass by switching to a closed containment system, and that has been a positive trigger for the industry and particularly for FiiZK.
On the financial side, revenue for the fourth quarter reached NOK 24 million, compared with NOK 11 million in the same period a year before, with the completion of the final delivery of the two Proteus units during the quarter driving that increase. FiiZK's profitability continued to be affected by costs tied to market entry projects and by product development work on the new Proteus design, which is now nearing completion. On the operational front, both Proteus systems were installed at the site in the quarter. We have now kicked off the four new projects, all of which carry higher pricing, are repeat projects, and come with less uncertainty as well as better margin expectations. As a reminder, the bottom right still contains the new operational KPIs for FiiZK relating to installed systems. This picture shows the Mowi Slottsnes site, where FiiZK installed the two new Proteus systems during the fourth quarter. You can see them on the left-hand side. In fact, on the right-hand side, you can see two of FiiZK's Ecomerd designs, which are also installed at that site. After installation, Mowi moved biomass into the systems quickly, and performance has been great. For a sense of scale, Proteus measures roughly 50 meters in diameter, and each can hold as many as 1 million fish, or 1,100 tonnes of biomass. It is rewarding to see this project delivered through to the end with no major incidents, which underscores FiiZK's capacity to adapt in closed systems to meet customer needs and to execute.
That chart on the left was first shown at our Capital Markets Day. In my view, it's a strong reminder that closed containment systems are now receiving industry awards faster than they used to, and it also highlights how significant FiiZK's market position is. Many solutions will of course keep appearing in this expanding market, but our belief is that FiiZK will be among the leaders. We take real pride in where we stand in the market, both when it comes to installed base and our recent order history. On that note, it is likewise pleasing to see Mowi still putting its confidence in FiiZK. To date, FiiZK solutions have added 150,000 cubic meters of closed production capacity for Mowi, and that figure will rise to 270,000 cubic meters after the four new orders are installed. That wraps up the update on our operating companies. Marianne, our CFO, will now walk you through the financials.
Good morning. I'm Marianne Voreland Ottosen, Nekkar's CFO, and I'll take you through how we performed financially in the quarter and across the full year. In Q4 we posted record quarterly revenue of NOK 197 million, which was up 9% year-on-year, with the drivers being high activity at Techano Oceanlift and Intellilift. Full-year revenue came in at NOK 571 million, 8% below 2024, primarily because of weaker project activity at Syncrolift, since new project awards have come in more slowly than anticipated. Importantly, Syncrolift service kept growing, with revenue up 21%, which helped offset the reduced project activity. Let me give some detail on the profitability trend. The Q4 EBITDA margin was 11.4%. Solid margins at Syncrolift and Intellilift were offset by NOK 17 million of cost overruns on Techano projects. For the full year, EBITDA was NOK 2 million, reflecting weak Techano performance and lower Syncrolift activity. EBIT includes a NOK 14 million non-cash impairment tied to the Skywalker technology. After reassessing the commercial outlook, we concluded that further development is not economically justified, and we have taken a prudent write-down. Net financial items were negative, mainly because of FiiZK losses and FX effects. All told, this produced a net loss of NOK 11 million in Q4 and NOK 35 million for the year, with EPS of 0.11 and 0.34, respectively.
Net capitalized development cost came in at nil for Q4, since soft funding covered development spend. For the full year, capex reached NOK 9 million, compared with NOK 23 million in 2024. On this slide you can see the key financial metrics for the operating companies. As Ole also said, segment information in more detail can be found in the quarterly Excel appendix that we publish on our website. Now let's turn to the balance sheet. Intangible assets went down because of the non-cash impairment of the Skywalker technology that was mentioned. Financial assets are mostly tied to the FiiZK investment, which was NOK 56 million at quarter-end. Working capital finished at NOK 34 million, higher than last quarter, which reflects normal project phasing. Cash stood at NOK 150 million, affected by working capital movements and share buybacks. We keep a NOK 200 million undrawn credit facility in place. Nekkar stayed debt-free, with equity of NOK 368 million and a solid equity ratio of 49%. Let's move to the cash flow for the quarter. Cash flow from business was slightly negative, at NOK 1 million, largely because of working capital movements. In the quarter, we used NOK 23 million for share buybacks, and overall that gave a net cash outflow of NOK 20 million for Q4. Across the full year, cash flow from business was positive, at NOK 10 million, helped by working capital improvements and net financial items.
Throughout the year, share buybacks accounted for NOK 64 million of our spending, and we paid NOK 6 million in dividends to minority shareholders in Globetech. All told, that produced a net cash outflow of NOK 55 million for 2025. In summary, Nekkar's financial foundation is strong: at the close of the fourth quarter it comprised NOK 150 million in cash, 9.2 million treasury shares carried at a book value of NOK 98 million, and NOK 200 million in an untapped credit facility.
Let's go over the quarter. We think Nekkar keeps moving its operating companies toward the 2027 ambition, and it's well-equipped with a solid balance sheet to also navigate inorganic opportunities. Among the key highlights this quarter is the successful FiiZK installation of the two Proteus system, plus the award that followed for four more units to Mowi, which will give a favorable outlook supported by market headwinds in the aquaculture business. In addition, Intellilift, with its rig automating systems, has seen a breakthrough over the last months, with three new rigs signed up to SaaS contracts, and of course today's announcement of the groundbreaking 11 award after the quarter-end. Syncrolift remains well-positioned to capitalize on growing defense spending in the coming horizon as we await awards in the market. Thank you all for listening, and let's move on to some Q&A for the quarter. Okay. We have a few questions on the line. First, can you elaborate a little on the Skywalker impairment taken during the fourth quarter? I think I can provide some comments on the market. Of course, Skywalker has been a development project started back in 2018, 2019 in Nekkar and, of course, relating to the development of offshore wind.
I think it's reasonable to say that over the past 12 to 24 months, there has been an obvious shift in sentiment regarding how interested wind-industry partners are in investing and becoming partners in developing and commercializing a Skywalker machine, which is essentially a tool for improving and lowering the cost of offshore wind parks. As of today, we have no key leads or contacts that would allow us to complete this, and we believe making the write-down is prudent. Naturally, we still own the technology. We still retain the IP. Should the market change in some way down the road, we are in a position to capitalize on it. Thank you. The next question concerns Globetech. The vessel count appears to be up 55 year-on-year. How should we think about a flattish revenue development over that same period? I think revenue for '25 grew by about 13%. As you mentioned, the number of contracted vessels rose by more than that figure, of course. I think contracted vessels are, of course, a leading indicator for future quarters and future years ahead, whereby a contracted vessel will be taken over by Globetech, it will be placed on the Globetech operational agreement, and of course it will, on various occasions, be fitted with new and upgraded hardware.
I'd say the contracted vessel is a solid signal for how things develop over the long term. That said, there could be quarters with fluctuations, or quarters where revenue doesn't ramp up, because of seasonality effects of that kind. Thank you. Turning to Intellilift: is there any capacity concern when it comes to installing equipment on offshore rigs, and can you take on additional contracts in the near term and install more than one rig per quarter? I'd say, naturally, we've now spent some years both proving the technology, developing it and fine-tuning it, and also installing it on a few rigs. That is, naturally, a key competence and a key benefit as we now scale up with less time needed per rig to install. Naturally, it's a massive task for the Intellilift team to take on these new rigs. Still, we believe that with the experience gained from the previous rigs and with the team, we can do this very efficiently. I'd say that for the coming quarters, we naturally have full focus on delivering on existing commitments, but we remain in the market space to discuss and potentially sign new contracts when we feel there is relevant capacity to install.
When it comes to the rollouts, the unit count in the quarter is one or more, and naturally that also ties into the rig managers' plan for how these rigs get mobilized once they're contracted. Thank you. Still on Intellilift, is there anything you can share regarding the size of every SaaS contract, or alternatively the overall financial impact you expect Nekkar to see from this contract as a whole?
We’re not going to comment on the specific rates for these contracts, but it’s fair to say that, for Intellilift going forward, we will see the SaaS revenue rise sharply and gradually.
The contracts are kind of at our levels in terms of where we've secured contracts for this type of business in previous quarters. Thank you. Last one on Intellilift. How does the Transocean-Valaris merger affect potential new contracts for Intelliwell, and do you see a need for Intelliwell systems on jackups as well, or only on deepwater rigs? Intellilift's software and automation skills are just as relevant for a jackup and also other rigs, whether that's land rigs and other opportunities. Of course, it's definitely a technology used across different rig types. Transocean is our partner in the JV, and of course, as you saw in the fourth quarter and during the second half of last year, four new rigs were contracted with Transocean. Of course, we are positive when Transocean are growing their installed base and of course hoping for new contracts for a larger fleet in the future. Thank you. Moving on to Syncrolift. The Syncrolift tender pipeline for 2027+ seems to be up 500 million NOK. Should we read this as more projects or growth in scope per project? As I mentioned, it's a smaller adjustment to the tender pipeline from the last quarter. Of course, bear in mind that there are some, yeah, pluses and minuses adding into this in terms of the pipeline.
Regarding '27, I think one or two new projects have been added, which is essentially what brings in the 500 million that was asked about. Thank you. Still on Syncrolift, a few questions have been combined here. Since actual orders have lagged relative to the tender pipeline shown each quarter, could you shed some light on how you arrive at this tender pipeline estimate, and what needs to be in it? The tender pipeline is constructed from tenders that we know are out there in the market, and those get included at 100% of estimated contract value — so no adjustment for our win rate or for any probability of going ahead. That said, we exclude projects that we judge to lack secured financing or that are speculative in nature, and those are therefore left out. I think the main uncertainty factor, as we all saw over the past year, comes from the timing of the award and the timing of the tender process itself on some of these projects. Thank you. One last thing on Syncrolift: any news on the Asmar option? The Asmar option remains valid, and we are working alongside the client to ensure we are ready to execute it once they place the orders for construction of the new facility, in which Syncrolift is the contractor for the shiplift, and they will award a contract to a civil works construction partner that will carry out development of the yard facility.
Thank you. We've had a few questions about Techano. What actions are you taking to tackle the performance problems at Techano, and how should we view this moving forward? As we said, naturally, we're disappointed by both the development and the numbers. We made changes to the team last year, with a new CEO joining. Throughout the past year, we've of course strengthened control and follow-up across the organization as a whole. I believe those first two contracts need to be completed and delivered so that we can essentially remove the risk. Delivering new products for the first time has, of course, been quite challenging within the Techano business. That is, of course, why we're looking forward to the first two contracts being completed, along with the two subsequent repeat projects, and hopefully fresh orders of repeat business will become the main driver in the Techano business. Thank you. On M&A, at the Capital Markets Day in November, you said M&A activities were ongoing. Could you offer any further comment on the pipeline and the work ahead? As all of you know, a key focus of our 2027 ambition and also of the Nekkar strategy is to pursue M&A both to deepen our existing operating companies and to broaden our investments into ocean-based technologies.
We're constantly evaluating and participating in M&A processes, and right now we have multiple such processes underway at various stages, which I don't think it's appropriate to elaborate on any further. Thank you. Last question concerns your 2027 strategic ambition. With the 2025 full-year results in hand, how do you view Nekkar's progress toward the 2027 goal of organic revenues of roughly 1.5 billion NOK? Looking at the total 2025 figures, including FiiZK, we grew by about 8% from last year. The main offset to our strategic plan for 2025 is, naturally, Syncrolift, whose revenue last year came in much lower than anticipated because of where our order intake stood. That said, regarding Syncrolift, we consider the 2027 ambition more than realistic, since new orders will be booked and we can ramp up production and, naturally, grow revenue with a very high scaling factor during that period. On that one, we're confident. As for the other operating companies, we see favorable revenue development across all of them, and each is on track to be able to meet the 2027 ambition — which is why we're sticking with our 2027 target.
Thank you. Regarding the final question that came in about the Syncrolift pipeline: 500 million has been pushed from 2026 to 2027. Could you elaborate on this? I think that's kind of the uncertainty factor which I commented upon, whereby a couple of projects has been moved from '26 to '27 from the last presentation. Thank you. That concludes the questions on the line. Okay. Thank you all for listening, and have a nice day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Nekkar ASA transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Nekkar ASA earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.