Thanks, Elliot. Hello, everyone, and I appreciate your presence on this conference call covering our results for the third quarter of 2025. A live webcast of this session is underway, and a recording can be accessed afterward today. Once we finish our prepared comments, we look forward to answering your questions. Any remarks on this call that may contain ONE Gas expectations or predictions ought to be viewed as forward-looking statements, which fall under the Safe Harbor protections established by the Private Securities Litigation Reform Act of 1995. Also applicable are the Securities Act of 1933 and the Securities and Exchange Act of 1934, both as amended. Outcomes in reality may vary significantly from whatever is anticipated in such forward-looking statements. To review the elements that might lead to actual outcomes varying, kindly consult the documents we file with the SEC. Present with me this morning are Sid McAnnally, our President and Chief Executive Officer, Chris Sighinolfi, our Senior Vice President and Chief Financial Officer, and Curtis Dinan, our Senior Vice President and Chief Operating Officer. I'll now hand things over to Sid.

Sid McAnnally executive
#2

Good morning, everyone. Thank you for taking an interest in ONE Gas, and we're glad to be here with you to go over the highlights and important developments from our third quarter. During August, we lifted our guidance for the full year, thanks to robust financial results so far this year along with the anticipated effect of Texas House Bill 4384. Given how the third quarter turned out and our confidence regarding the remainder of the year, we have likewise narrowed our forecast for 2025 earnings. Our current expectation is earnings per share ranging from $4.34 to $4.40. The three states where we operate form a foundation for the country's energy supply, generating more than 1/3 of U.S. natural gas. Those states are dedicated to economic expansion and actively promote natural gas use in residential and commercial settings alike. This solid base is driving ongoing momentum from our established residential customer base as well as fast-growing segments such as data centers, advanced manufacturing, and utility-scale power generation. We are making the most of these possibilities to fuel growth and put money into our system, while simultaneously honoring our pledge to keep service affordable for customers. A good illustration of our proactive strategy for meeting rising customer demand is the Austin System Reinforcement Project, finished during the third quarter; this initiative increases our available winter peak capacity by roughly 25% and offers greater access to natural gas indexed at the Waha Hub, which generally sells at a discount compared with other supply sources for the Austin metro area. Consequently, our customers gain from better reliability when demand peaks and enhanced affordability, since we can pass along savings from cheaper supply sources. This record capital investment, by far the biggest in ONE Gas history, was completed ahead of schedule, below budget, and with zero lost-time injuries, highlighting our capacity to carry out major projects efficiently. While we address what our residential and commercial customers need today, we are confidently chasing growth opportunities. I'll now hand the call over to Chris for the financial specifics of the quarter. Chris.

Chris Sighinolfi executive
#3

Appreciate that, Sid, and good morning to all of you. As Sid mentioned, we're tightening our 2025 earnings outlook; our expectation now is net income falling somewhere between $262 million and $266 million, while earnings per diluted share should come in somewhere from $4.34 to $4.40. Nothing changed regarding the midpoints for net income and EPS guidance — as we talked about on the second quarter call, those sit above where we first set guidance. Capital expenditures remain on track at roughly $750 million for the full year. Now onto third quarter results: net income came in at $26.5 million, equaling $0.44 per diluted share, versus $19.3 million, or $0.34, during the same quarter a year ago. Revenues in Q3 benefited from new rates adding about $19.2 million along with $1.4 million tied to ongoing customer growth. Operating and maintenance costs for the quarter rose about 4.9% compared to a year earlier, in line with guidance and largely driven by greater labor expenses plus a choice to perform some O&M work sooner than originally scheduled. If you set aside interest tied to KGSS-1 securitized bonds, interest expense net dropped $3.4 million versus the prior-year third quarter, mostly because of reduced rates on commercial paper borrowings; during August, we brought long-term debt to market through a $250 million term loan maturing in 2026. Beyond that, nothing comes due until 2029. As I said on last quarter's call, our 2025 equity requirements are completely taken care of, and we've also addressed part of 2026 via existing forwards — together representing about 40% of the 5-year equity need we've planned. To make this clearer, roughly $200 million in forward shares will be settled in December, while about $25 million gets deferred to a year-end 2026 settlement. The balance sheet stays solid, with adjusted CFO to debt ratio expected near 19%, putting us at the top of the band for our present credit ratings. On top of that, last week we boosted our liquidity by upsizing the revolving credit facility to $1.5 billion and pushing its maturity out to October of 2030. Yesterday, our board approved a quarterly dividend of $0.67 per share, matching the previous quarter. Curtis, over to you.

Curtis Dinan executive
#4

Thanks, Chris, and good morning to all of you. Regarding regulation, we wrapped up every interim filing for 2025, among them the September approval of a $3.2 million GRIP filing covering the Rio Grande Valley service area. As previously mentioned, Texas Gas Service submitted a rate case seeking a $41.1 million increase and put forward a plan to merge our three service areas under one jurisdiction. That case continues to follow the procedural schedule, with a final decision anticipated to take effect in the first quarter of 2026. Shifting to operations, we keep investing in our people for our company's long-term success. In addition to bringing line locating resources in-house, we intend to do the same for our Watch and Protect program. Although bringing on and training new employees raises costs for now, the benefits over the long haul are obvious. Our teams work more efficiently, perform well, build a pipeline of future talent, and lessen how much we depend on outside contractors. Insourcing line locating has produced meaningful operational gains, with total excavation damages falling 13% year-over-year despite an 8% rise in ticket volumes. Capital execution continues to be strong. Through the third quarter, we have finished roughly $575 million in capital projects, which keeps us on track to hit our $750 million full-year budget; this encompassed the Austin System Reinforcement Project, our largest project so far; that pipeline installation was technically demanding, calling for three complex river bores amid work in a bustling metro area. In the end, we laid approximately 50,000 ft of pipe, bringing in a new supply source and boosting system capacity to support reliability and satisfy rising demand in the Austin area. Completing this big, complicated project ahead of schedule and under budget shows we can effectively execute the many utility-scale generation, advanced manufacturing, and data center opportunities progressing throughout our three states. For many of these large-scale projects, teaming up with us as a local utility makes natural sense. Because we sit close to major natural gas production and existing pipeline infrastructure, we can deliver fast, cost-effective service, whether via new connections, short line extensions, or system upgrades. We can serve these customers within our fully regulated framework and, in most instances, with just modest increases to our forecasted capital budgets, all while keeping natural gas service affordable for our residential customers. To give greater clarity on these opportunities, we are working across all three of our states on significant utility-scale power generation projects totaling approximately 1.5 GW of capacity. Customers are now moving through the mid to late stages of their investment decisions, and we stand ready to execute these projects as they move forward. Other examples include supplying natural gas to a 200 MW fabrication plant and data center and a project announced earlier this year that provides natural gas for on-site power generation and receives renewable natural gas from the customer's facility. We take a careful approach when it comes to these opportunities, putting first those projects that improve our system, set us up for further chances to grow, and deliver advantages to every customer. Once final agreements are settled, we'll share additional specifics. Having said that, I'll hand things back over to Sid.

Sid McAnnally executive
#5

Curtis, thanks. While we go after these sizable new ventures that will bolster the local economy, our dedication to existing ratepayers stays firm — we supply them with natural gas that is safe, dependable, and reasonably priced, so their houses stay heated and their companies keep operating. As the cold season nears, I'd like to express gratitude to every one of our team members, whose hard work makes it possible for us to bring warmth and worth to the 2.3 million people we serve. Serving beside all of them is an honor. Operator, we can take questions now.

Julien Dumoulin-Smith analyst
#6

Morning, everyone. Hope all of you are doing well.

Sid McAnnally executive
#7

Morning, Julien.

Julien Dumoulin-Smith analyst
#8

Hey there, thanks for fitting me in. Maybe to start at the highest level, what are your thoughts on that 4%-6% longer term, taking into account both the clear lift from the legislation and some of the Fed cuts we've seen lately? And Chris, specifically, I'd really like to hear how you see things regarding what's included in guidance and, more importantly, what this says about expectations going forward following the Fed's latest actions.

Chris Sighinolfi executive
#9

Yeah, thanks, Julien, and good morning. Maybe I'll take those in reverse order. On interest rates, just to remind everyone, we depend on commercial paper to fund the upfront investments we make in rate base before they're recovered through regulatory outcomes and formally placed in rate base, plus to carry our gas in storage investments past the amounts recovered. Averaged over the year, at today's scale, that comes to about $800 million of carried CP. A few years ago, we explained that when the Fed policy rate was 5.5% and our CP rate ran 5.6%-5.7%, we set out a model in our financial forecast that included 10 to 25 basis points of rate cuts by the end of 2027; with last week's Fed cut, six of those 10 cuts have now happened; each came earlier than we expected; and that 10 cut in total got us to a rate we considered normalized versus what the Federal Reserve calls its own normalized policy rate; so we still expect four additional cuts over the next couple of years, in line with the Fed's normalization forecast. Also worth noting, each 25 basis point reduction, if it holds for the full year, translates to roughly $0.025 of EPS pickup. When you look at the 4%-6% EPS guidance range and recall that this year we talked about landing at the high end of that range, after strong performance year to date and then the signing of the Texas House Bill in June, we updated our forecast in September's investor relations deck to show we'd be above the high end of that range because of those items. So that's about all I think we'll say for now. As a reminder, we'll provide a refreshed 5-year outlook and a more detailed 2026 outlook on our usual cadence before utility week in December.

Julien Dumoulin-Smith analyst
#10

Absolutely. Great. Thank you, Chris. Thank you, Steve. If I may build on that — and I really don't want to split hairs — is there anything you can share about why the 2025 guidance range got narrower? You removed $0.02 from the upper end. I'm not trying to split hairs, but I'd love to hear how that squares with what you said just a moment ago.

Chris Sighinolfi executive
#11

Julien, as you'll see if you look at what I said in my prepared remarks, that's a fair question. I pointed out that part of the O&M we saw this year came from completing certain activities sooner than we'd originally intended; take certain environmental remediation projects, for instance, where the permits to proceed arrived sooner than we'd anticipated, which means roughly a couple of million dollars in extra O&M that we expect to carry this year and that hadn't been part of the initial forecast.

Julien Dumoulin-Smith analyst
#12

Understood. It sounds as though the situation comes down more to timing than to anything else.

Chris Sighinolfi executive
#13

Exactly right.

Julien Dumoulin-Smith analyst
#14

Great, folks. That's just right. Okay, I'll stop right there. I'll allow quite a bit of the crew to come aboard. Many thanks. All right, stay well. Good to have this wrapped up; we'll talk again in 2 months or so.

Sid McAnnally executive
#15

Yes, appreciate it. Thank you for asking those, Julien.

David Arcaro analyst
#16

Hey, thank you. Good morning.

Sid McAnnally executive
#17

Good morning, David.

David Arcaro analyst
#18

On the growth rate you mentioned — above 6% throughout this plan — I'm curious whether you'd view that as a structurally stronger growth outlook for the business's core, and whether that might hold over a longer horizon. Might growth keep going at that pace, or does 4%-6% remain the appropriate figure? It may just come down to which year you start from. That's how I'd frame the question.

Chris Sighinolfi executive
#19

Hello, David. This is Chris once more. Yes, my belief is that it's structural by nature. That's the reason we laid it out that way. To repeat, 4%-6% — the top of that range at first — and then, given certain shifts in the environmental backdrop, we indicated in our September investor relations materials that we'd sit above that range's high end across the entire 5-year period. As your question presumes, I think those component items can be seen as structural by nature, carrying forward an effect we consider durable.

David Arcaro analyst
#20

Great. Yeah, that's useful, and I'm grateful for the details you provided regarding the big load activity you're observing. I was curious whether you might offer any further insight into where that 1.5 GW is showing up, and how potential investment possibilities could shape up if some of those new large load projects end up being finalized?

Curtis Dinan executive
#21

Hi, David, Curtis here. Like I said during my prepared comments, we're observing this throughout all three states: chances to serve various entities that are considering a far bigger scale than what we may have handled previously, and that has been developed within and near our networks. The final portion of that response matters a great deal, the within and near our networks part. We're attempting to make use of our current network, our current team, and all that contributes to maintaining it in order to address these customer questions. There is definitely additional activity out there, and we can read about it daily, but we remain highly disciplined regarding which projects we choose to go after, for those reasons, they require less capital. Infrastructure is already in place. Personnel are already in place, and we can address them extremely fast. And that's what those customers need in many instances, is that speedy reply; so I believe we're ideally situated to accomplish that; we'll keep examining various possibilities as they arise, but once again, it's a rather narrow set of standards we apply to assess them before we commit substantial resources to pursue them. So my statements about not a lot of, or not a major effect on our capital forecast really connects back to that. We're taking advantage of our network that already exists. It's collaborating with our upstream providers, the connections we've built there to be able to address these requests; and I believe that renders us extremely efficient at doing so.

David Arcaro analyst
#22

Alright, that's great. Thanks for the details. I appreciate it.

Sid McAnnally executive
#23

Thanks, David.

Gabe Moreen analyst
#24

Hi there, good morning to all of you. I'd like to inquire about what I believe is the extra spending on moving certain work internally. Do you expect that to have an effect on O&M at the outset? I'm aware you've had a lot of success with line locating, and perhaps it simply meant somewhat greater costs early on in exchange for later savings. Would this follow roughly that same pattern, and how significant would it be?

Curtis Dinan executive
#25

Gabe, Curtis here. One of the things Chris mentioned before, regarding certain items we've accelerated, represents a carrying forward of those efforts. We act opportunistically whenever we pursue this, considering a few factors: what we've learned previously, our current position, and how ready those people who've come aboard are — they've grown and earned the certifications needed to deliver full service — and then we also examine what the market offers. There have been plenty of chances to bring on truly high-caliber people, and the strong experience of those we've added has let us move ahead. Some advantages have come to us sooner, which has made us confident enough to act a bit earlier and bring more of those activities in-house. So the timing is somewhat uneven when it comes to those bigger groups arriving and us working through that cycle, yet as you noted, early on the outlay is somewhat larger, though it delivers very solid returns, and we still anticipate additional gains over the longer haul.

Sid McAnnally executive
#26

So Gabe, that's the reason it makes sense to draw a parallel with line locating. A few years back, we told you we saw an advantage in bringing line locating in-house — both from how well it executes and from creating extra capacity we could put to use whenever there was no line locating work on the schedule. And across the past 3 or 4 years, we've genuinely demonstrated that; the value added has shown up, it's been accretive, and the quality of the work has shown up too. So Watch and Protect is simply one more move along those same lines, and we wanted to be upfront about it. But we think that since we laid out a theory, put it to the test, and confirmed it, we can now proceed with a fairly high degree of confidence and apply that same playbook to Watch and Protect. As for your question on materiality, Watch and Protect's scale is far smaller than line locate, so the effect will be smaller — though you're correct that there is an upfront cost tied to getting people up to speed and delivering the training early on.

Gabe Moreen analyst
#27

Understood. Thanks, Curtis. Then perhaps I could follow up regarding 2026 CapEx. From what I gather, your rate base growth in 2025 came in a bit below what you'd planned. You also wrapped up that large Austin Project. Is it fair, though, to expect some kind of pickup in 2026? And are there specific other projects you'd single out in connection with the 2026 CapEx plans?

Chris Sighinolfi executive
#28

Hi, Gabe, this is Chris. Given what Curtis said about activity across the territory, I believe you're correct to picture capital expenditure on an upward-sloping path, and there could be a sharper step up in the coming year. As for the complete specifics on that, I'd ask you to stay patient until we release them officially in roughly one month. The way you're considering the component items matches how I would think about them myself.

Gabe Moreen analyst
#29

Understood — thanks, Chris. We will keep watching for updates.

Curtis Dinan executive
#30

There's another factor worth considering, which relates to certain capital projects as well. Based on what kind of contract is involved and how long a customer wants service to last, it's possible that they are the party funding the capital in those cases. That way, to reduce risk for us and for everyone else we serve over a longer horizon, it could keep capital somewhat constrained relative to what you'd expect based on how much activity there is.

Gabe Moreen analyst
#31

Understood. All right, we'll keep watching for that. Thanks.

Sid McAnnally executive
#32

Thanks, Gabe.

Bill Appicelli analyst
#33

Hey, good morning.

Sid McAnnally executive
#34

Good morning, Bill.

Bill Appicelli analyst
#35

Sure. Yeah, that's great. I've got a question about what Texas's legislation has done for us. Can you put a number on how much that's helped so far this year, and possibly what it'd look like across a whole year?

Chris Sighinolfi executive
#36

Yes, Bill — I'd send you back to what we said during the prior quarter's call. Really, our aim there was to frame things using what we've learned from the safety-linked 8.209 regulatory framework that Texas has had for quite some time. Since the accounting approach in that setting now applies to every bit of capital, we offered a way to think about scaling that up over twelve months; and regarding 8.209, our point was that it delivered a $4 million-$5 million boost to operating income for roughly 25% of the capital we deployed, which would now extend to 100% of what we deploy in Texas. One caveat worth mentioning: capital deployment isn't consistent. The same dollar amount doesn't go out the door each day of the year. Clearly, projects closing in January pack more of a punch than those closing in December. So I'm somewhat hesitant to tie this to any specific quarter or anything like that. I wouldn't want you looking at, say, the third quarter and concluding it represents every quarter. Swings are going to happen. Still, I believe going back to what we shared on the second quarter call gives you the best picture I'm able to provide.

Bill Appicelli analyst
#37

All right, and so does that shape how you're thinking about the capital plan going forward — whether projects get sequenced differently, or whether the investment level changes, given this mechanism? I suppose I'm just contrasting it with — I'm not sure how much of that was factored in when the initial guidance came out at this point last year, and the target for where you expect to land inside the earnings range. I realize we'll be hearing an update on all of that in the coming weeks, but any detail on how you folks are — is that now a meaningful instrument in the toolbox that drives capital allocation choices, or is it more of a — I don't want to overstate what it is?

Sid McAnnally executive
#38

Yes, Bill, that's reasonable. Your point that the landscape has shifted since we provided 2025 guidance is correct, and that will show up when we deliver our guidance in only a few weeks. As for what the Texas legislation means for our planning ahead, we direct our system integrity spending according to what the system requires. There's no effort to take advantage of anything outside. It's genuinely about examining what the system requires and where investment is needed to keep running a system that is safe and reliable. On the growth front, like Curtis mentioned, we've stayed quite disciplined in how we evaluate projects that come to us, and we consider not just where we can find a chance to support economic development throughout our footprint, but also where this aligns with our future plans for our system overall, so Texas is seeing tremendous growth, yet we also observe growth in Oklahoma as the Dallas area keeps expanding northward. Plenty of opportunities exist for us. I suppose the most cautious way for me to put it is that we appreciate the Texas legislation, but it won't distort our spending when it comes to system integrity or growth. We'll chase opportunities following the same strategy we've used previously. We simply have more opportunities, and they're at a larger scale.

Bill Appicelli analyst
#39

Okay, that's helpful context. Thanks.

Sid McAnnally executive
#40

Yes, thanks.

Selman Akyol analyst
#41

Thanks. Morning, everyone. I appreciate the remarks and the results you're achieving with locating lines and moving that work internally, and I understood you very clearly that the Watch and Protect program is somewhat smaller, but I'm just wondering, looking further out, do you see additional opportunities past those two?

Curtis Dinan executive
#42

Yes. Hey, Selman, Curtis here. Good morning; and you're exactly right. There are additional items we're evaluating. Beyond Watch and Protect, we still have further to go in what we aim to reach in the line locating process. So I believe that chance will keep going for a few more years alongside Watch and Protect. There are other areas where we've been utilizing more of our own crews to finish work around some of our construction projects. So we've been expanding our capabilities in that respect, both from an engineering perspective and in our field execution; so we've leaned on those internal resources more, and we've grown those crews so we can respond to it; so much like our thinking around line locating and Watch and Protect, we'll keep seeking those kinds of opportunities where it makes sense for us and where we can gain more value from moving those in-house and, again, simultaneously, expand our capabilities as a company. So it's a really good position to be in, continuing to invest and grow in that respect; and we've demonstrated we can do it, and we're realizing the benefits of having taken those actions.

Selman Akyol analyst
#43

Got it. Appreciate the answer. Now, my next item is basically a two-part question about large load and data centers. What I'd like to know is whether the conversations you're having concern 2026, 2027, or whether they extend as far as 2030, in terms of when those folks would want to be placed in service? And then — I'm really thinking about your growth profile here — does this set of opportunities move that higher? Related to that, is all of what you're describing taking place inside the regulatory framework, or might there be a chance to earn better returns outside of it?

Curtis Dinan executive
#44

Yeah. Your question has several components, so let me take them one at a time. First, on how long some of these will run: many of the larger projects will end up involving multiple trains, based on the number of generators I'd expect them to bring online gradually. That means they'll play out over several years and grow into larger opportunities. The same holds for certain advanced manufacturing facilities we're in discussions with. They start with an initial project load, yet they intend to keep expanding it across the coming 4 or 5 years. From that angle, it does produce a growth trajectory. Beyond those, there are smaller projects as well, like the one I mentioned during my prepared remarks. Earlier in the year, we made the announcement. Come the fourth quarter, that project is going to be up and running. So obviously, the span between signing the agreements and finishing up is far shorter. I believe that shows how we go after opportunities located in and around our network; serving that customer and getting gas to them from our system didn't require any major construction. Then, when they generate RNG, that gas can flow back into our network, letting them capture the worth of the RNG credits they're able to produce; so. I realize that response might come across as somewhat general, yet the reality is that it's genuinely spread across the map — regarding both how large these projects are and when they'll keep moving forward. As for our regulated framework, or attempting to build something beyond it, we aren't pursuing anything that sits outside the regulated model. In my view, this represents a strong chance to keep providing service to the customers we already have. Take something like the Austin System Reinforcement Project — as its name suggests, that initiative was about strengthening our system in the Austin region; however, since we're delivering more supply into that area, it also creates an opening for us to accommodate further growth. Additional initiatives are going to accomplish the very same objective, which is to strengthen the power resources we're bringing into the communities we already serve, and to match those resources up with chances to grow—whether that means generation, whether that means data centers, or whatever else is required. Our view is simply that we're capable of operating far more efficiently if we evaluate a number of different possibilities side by side, and by resolving the issues of multiple customers at once, we'll generate greater value for those customers and keep expanding this business. The resulting upside for the customers we already have is a more dependable supply. That's exactly what we laid out with the Austin Project. So plenty of positive developments are taking place there, and we clearly see a genuine benefit in being able to pull that off inside the regulated structure we operate under.

Selman Akyol analyst
#45

Understood. I'm grateful for all those specifics. Thanks.

Sid McAnnally executive
#46

Thanks, Selman.

Erin Dailey executive
#47

We appreciate everyone once more for your attention to ONE Gas. We can't wait to meet plenty of you at events in New York during December's second week. Once we finish closing our books in early January, our quiet period for the fourth quarter begins, and it runs through our earnings release in mid to late February. Details for the conference call will come at a later date. Enjoy your day.

Operator operator
#48

This concludes the ONE Gas third quarter earnings conference call. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ONE Gas, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to ONE Gas, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.