Home / Transcripts / Perseus Mining Limited (PRU) · October 26, 2026

Perseus Mining Limited (PRU) Earnings Call Transcript

October 26, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 19 min

Earnings Call Speaker Segments

Craig Jones executive
#1

For the September 2026 quarter, we're presenting our report. With me today is our Chief Financial Officer, Lee-Anne de Bruin. This quarter kicks off the 2027 financial year, and once again our three operating gold mines delivered strongly on operations, generating robust cash while our inorganic growth projects continued to advance. I'll walk you through the operating results first, then hand things to Lee-Anne for the financials. Let me begin with safety. As of the 1st of July, our total recordable injury frequency rate stood at 1 for the quarter, and our lost-time injury frequency rate is still 0. At Nyanzaga, the team has now surpassed 10.9 million hours worked with no lost-time injury — an outstanding outcome for a project at peak construction, with more than 4,200 people on-site. Gold output came to 92,551 ounces, below the prior quarter yet ahead of our plan, reflecting scheduled maintenance shutdowns at each asset as well as the phase positions of our pits. Average production cost was $1,472 per ounce, giving an all-in site cost of $2,035 per ounce. Gold sales across the three operations reached 99,661 ounces at a realized gold price of $3,881 per ounce, producing a notional cash flow of $171 million.

Craig Jones executive
#2

We closed the quarter with $900 million in cash and bullion, no debt at all, plus another $400 million in undrawn debt facilities, and Lee-Anne will walk you through the cash movements shortly. Turning to the individual sites, beginning with Yaouré, the standout milestone for the quarter was the CMA underground reaching commercial production as of the 1st of July. That underground operation did well, with ore mined rising 46% versus the June quarter to 131,000 tonnes at 2.63 grams a tonne. Out of the underground came 9,658 ounces, a 14% increase. Total production at Yaouré came to 36,648 ounces, comprising roughly 27,000 ounces from the open pits along with the 9,658 ounces from underground. Although that was below the June quarter, it matched our plan, since mill run time was reduced by major plant maintenance shutdowns. We expect overall production to rise in the second half of the year as the open pit reaches higher grades and underground output keeps growing, with gains in both tonnes mined and grade. All-in site costs came in at $2,393 per ounce, a touch above plan, driven mainly by better than planned performance in the open pit, which puts us ahead on stripping in the pit.

Craig Jones executive
#3

We sold 40,009 ounces at US$3,845 per ounce, which generated a notional cash flow of $53 million. At Edikan, output came to 35,830 ounces, in line with what we expected. Head grade was below the prior quarter at 0.67 grams a tonne, largely because of pit sequence, and run time was also down owing to scheduled maintenance, partly offset by higher throughput rates achieved in the mill. All-in site costs declined 11% to $1,738 an ounce, driven by lower royalties tied to a softer gold price, along with an over accrual of royalties from the previous quarter. We sold 35,995 ounces at an average price of $3,968 an ounce, and Edikan delivered the group's highest margin at $2,230 an ounce, contributing $80 million in notional cash flow. The Fetish and Esuajah North cutbacks are moving forward as planned. During the quarter we moved 6.7 million tonnes of waste and spent $22.5 million of capital, taking total spend on those cutbacks to date to $27.6 million. Sissingué produced 20,073 ounces, beating plan — another good quarter for Sissingué. Production is lower quarter-on-quarter because of reduced mill run time tied to planned maintenance and a lower head grade, offset by a higher throughput rate and recovery, and this reflects a greater share of oxide material processed from the Antoinette pit.

Craig Jones executive
#4

Our all-in site cost came in at $1,913 per ounce, higher than what we saw in the June quarter. That reflects reduced production volumes, partly offset by lower royalties. We sold 23,657 ounces at $3,811 per ounce, which generated a notional cash flow of $38 million. It's been a solid start to the year, and we're well on track against our production and cost guidance. For the full year, we anticipate group production of between 420 and 480,000 ounces, with an all-in site cost ranging from $1,835 to $2,070 per ounce. Group all-in site cost for the quarter fell within the guidance range — Edikan and Sissingué each sat within their site ranges, while Yaouré came in slightly above for the reasons I laid out earlier, and we do expect grades to improve. The guidance takes in 55,000 ounces from Nyanzaga, which starts producing in January, and our cost guidance is based on a gold price of $4,000 an ounce. One more thing to note: Nyanzaga is not part of our cost guidance, since its operating costs are capitalized until commercial production begins in the June quarter of 2027. I'll now pass things over to Lee-Anne, who will walk through the financial side of the quarter.

Lee-Anne de Bruin executive
#5

Thanks, Craig, and good morning, everyone. Our sites keep performing well, and with the gold price staying strong, we've been able to make our balance sheet even stronger. At the close of the quarter, our net cash and bullion position stood at US$900 million, and that came after we kept investing in growth projects right across the business. The liquidity position of the business is $1.3 billion, including our undrawn debt facility of US$400 million. That liquidity figure leaves out $338 million of liquid investments tied to our investments in PDI Gold and in Aurum. Turning to returning capital to shareholders, the strength of our balance sheet has let us keep giving capital back to shareholders. During the quarter, as you know, the board approved an on-market buyback of up to A$350 million. By the end of September, we had bought back just over 1 million shares for roughly A$6.6 million, and that reflects the fact that we had 1 month of non-trading because of trading blockouts. Perseus is also proposing a $100 million special distribution, which works out to about 7.54 cents per share, and it will be funded from the funds we received on the sale of the Sudan project. The notice of meeting released last Thursday seeks approval for a capital reduction of up to A$70 million, or 5.28 cents a share, with the balance paid as a special dividend.

Lee-Anne de Bruin executive
#6

Shareholders will cast their votes at the AGM on 30 November; the record date is 18 December, and payment follows on 29 December. We have lodged an application with the ATO for a class ruling concerning how much will be treated as a capital reduction and how much as a special dividend. Turning to quarterly cash and bullion movements, looking first at cash flows and then at capital allocation for the September quarter: the closing balance of $900 million came after operational cash flows of $187 million and roughly $155 million of capital investment in our growth projects during the quarter, of which $110 million went toward advancing the Nyanzaga Gold Project as our teams work furiously and safely to move it toward gold pour in January 2027. A further $3.1 million was spent on infrastructure elements of the CMA underground project, with commercial production declared for that project on 1 July 2026. As Craig alluded to, $22.5 million went toward progressing the Edikan cutbacks. We will be spending $70 to $80 million on exploration this year. This quarter was one of setup and progressing drilling contracts, and we spent about $5 million on ongoing exploration drilling at the assets, which will ramp up over the next 9 months.

Lee-Anne de Bruin executive
#7

We also kept giving back to the countries where we operate — during the quarter, government dividends totaled $56 million, along with $27 million in corporate income taxes and withholding taxes. And, as I mentioned earlier, shareholder returns continued as well, with $5 million going toward the buyback in the September quarter. Now, if we look at how our all-in site costs reconcile to our all-in sustaining cost, the chart in front of you lays out that reconciliation: Perseus-based all-in site costs, which are somewhat more cash-based, came in at $2,035 per ounce, compared with the World Gold Council's all-in sustaining cost disclosure of $1,855 per ounce. The main differences behind this reconciliation come from using produced versus sold as the metric, or basis, for the calculation, and from accelerated mining at Yaouré, which led to lower-grade stockpiles building up and being taken to inventory. I'll now hand it back to Craig, who will walk everyone through the update on the Nyanzaga project.

Craig Jones executive
#8

Thanks, Lee-Anne. Things are going well at our Nyanzaga project, and it's moving quickly toward production starting January next year. The project stands at 88% complete and is still on budget and on schedule for first gold in January. We've spent $407 million, which is 84% of the $483 million budget, plus $33 million in capitalized pre-production costs. All major procurement is finished, and every site installation contract has been awarded. We made some important progress this quarter: the commissioning team has been mobilized to begin commissioning in the coming period, and operational personnel are getting ready for ramp-up. Construction of the front end of the processing plant is almost finished, and we expect ore through the primary crusher to the coarse ore stockpile in the coming period. On the process plant side, the ring gears and motors are installed on both mills, the CIL tanks are complete, and top of tank steelwork is moving forward. The 220 kV grid connection is coming along well, with the control building almost complete and line stringing underway, and the backup power station has all 28 generators installed, foundations are nearly done, and electrical installation is progressing. The tailings dam construction is still ahead of schedule, with all three embankments complete. HDPE liner installation reached 88% complete as of the end of June, and the drainage works are almost finished.

Craig Jones executive
#9

At the end of September, the mining pre-strip hit the FID budgeted goal of 4.6 million BCMs, and first ore has been mined and stockpiled. Mining is still on track to reach the pre-production target of 7 to 8 million BCMs by January that we announced previously. Turning to sustainability performance, I want to begin with safety, since it underpins everything we do. Across the group, we continue to record zero lost-time injuries, and our total recordable injury frequency rate for the quarter came in at 1. These are solid results. Even so, we keep our focused attention on fatality risk management, safety leadership, and culture throughout our operations. On social performance, we distributed $407 million in economic value to our host countries this quarter, including $244 million in local procurement and $109 million in government payments. Our $1.2 million invested in community initiatives concentrated on strengthening local capabilities and creating pathways to economic opportunity, with particular emphasis on youth employment, entrepreneurship, and enabling local businesses to take part in wider supply chains. In summary, it was a solid quarter for Perseus. The CMA underground is in commercial production, Nyanzaga remains on track for first gold in January, and our balance sheet is strong and debt-free, which funds our growth and continuing shareholder returns through the buyback and special distributions.

Craig Jones executive
#10

As production ramps up in the back half and Nyanzaga begins operations, FY '27 looks poised to be a transformative year for Perseus, and I want to express gratitude to our employees and contractors at all our sites for everything they've done. Thanks to everyone for being with us today; at this point I'll turn things over for questions.

Operator operator
#11

Thanks. One quick reminder — if you'd like to pose a question to the company, kindly use Zoom's raise hand feature. Our first question is from Regan Burrows at Macquarie. Go ahead, Regan. Just unmute yourself there, Regan.

Regan Burrows analyst
#12

All right, there we are. Morning to you, Craig and Lee-Anne. Appreciate you taking my questions, and well done on a solid quarter. Staying on the CMA underground ramp-up, first off, I suppose, are grades broadly lining up with the plan you've laid out for that operation? As for those gains across the rest of the financial year, how much of that will come from grade as opposed to volume?

Craig Jones executive
#13

Appreciate that, Regan. It's a mix of the two — we keep increasing tonnages as the year goes on, working toward full production rates, and the grade gets better too once we move into the higher-grade stopes later in the year. So it's both factors together.

Regan Burrows analyst
#14

Thanks. My other question concerned the timing of the Edikan cutback and the capital spending on it. I noticed you spent roughly $22 million in this quarter. Should we simply take it that, from a spending standpoint, this is spread evenly across what's left of the financial year?

Craig Jones executive
#15

For that, we've provided cost guidance of roughly $140 million for this year's cutbacks. Right now we're in the relatively easy free-dig upper section of the pits; as we go deeper, your costs will rise because of haul distances, and also once we bring in the drill and blast activities. That should give you some sense of how we anticipate the spend will play out.

Regan Burrows analyst
#16

Appreciate it. That’s all from me.

Craig Jones executive
#17

Thank you, Regan.

Operator operator
#18

The following question is from Branko Skocic with JP.

Branko Skocic analyst
#19

Morgan.

Operator operator
#20

Go right ahead.

Branko Skocic analyst
#21

Good morning, everyone. I appreciate you making time for this. I have a quick question about Nyanzaga—specifically regarding the mining contractor, I'm curious how far along those discussions stand for once you ultimately reach production, and also, I suppose, when should we look for an update on that matter?

Craig Jones executive
#22

Appreciate that, Branko. I believe once matters are finalized there, we'll provide you with an update. Talks are moving along nicely, and really it comes down to wrapping up the commercial details of it, and as soon as we reach that stage, you'll hear from us. Right now, we're in fact shifting all the dirt that has to be shifted on-site, and everything remains on track.

Branko Skocic analyst
#23

That's clear. My remaining question concerns the M&A outlook — how are you viewing the potential landscape for deals, and, I suppose, what your longer-term ambitions are for the portfolio more broadly, if you could address that too, please?

Craig Jones executive
#24

Absolutely, Branko. M&A is always a tricky topic to address. Obviously, like everyone else, we're keeping an eye on opportunities and evaluating what's available out there. That's where things stand right now, and I'd say nothing is on the cards at this point, but we'll keep watching to see whether anything emerges that fits our business from a strategy standpoint and so on. There isn't a great deal more to add on that subject right now.

Branko Skocic analyst
#25

Everything looks fine. Thanks for setting aside the time—much appreciated.

Craig Jones executive
#26

Appreciate it, Branko.

Operator operator
#27

Thanks. At this point we don't have any more questions, so I'll turn things back over to Craig for some closing comments.

Craig Jones executive
#28

Okay, thank you, Nathan, and thank you all for joining us. As I mentioned before, I'd call this a strong beginning to the year for Perseus. There are some thrilling developments taking place as our CMA underground continues to ramp up and has now hit commercial production, and Nyanzaga is genuinely entering an exciting period for us, and we look forward to bringing it into production starting in January. So, thank you all for being with us today.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.