Home / Transcripts / Puravankara Limited (PURVA) · November 10, 2025

Puravankara Limited (PURVA) Earnings Call Transcript

November 10, 2025

National Stock Exchange of India IN Real Estate Real Estate Management and Development earnings 47 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, everyone, and welcome to Puravankara Limited's Q2 and H1 FY 2026 Conference Call, brought to you by Emkay Global Financial Services Limited. Just a reminder that every participant line is in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. If you require assistance at any point during this call, please signal an operator by pressing star then zero on your touchtone phone. Kindly be aware that this conference is being recorded. I'll now hand things over to Mr. Harsh Pathak from Emkay Global Financial Services. Thank you, and over to you.

Harsh Pathak analyst
#2

Okay, thank you, Yashaswi. Good evening, everybody. On behalf of Emkay Global, I'd like to extend a welcome to the management team from Puravankara Limited, and we appreciate this opportunity. Joining us today are Mr. Ashish Puravankara, Managing Director; Mr. Mallanna Sasalu, Chief Executive Officer, South; Mr. Rajat Rastogi, Chief Executive Officer, West and Commercial Assets; and Mr. Niraj Kumar Gautam, Chief Financial Officer. We also want to wish Niraj-ji all the best in his new role as the CFO. At this point I'll turn the call over to the management for their opening remarks. Over to you, gentlemen.

Niraj Kumar Gautam executive
#3

Thank you, Harsh. Good evening, everyone, and thanks for being with us today. In my role as CFO of Puravankara Limited, I'll spend a few moments walking through the key financial and operational highlights from Q2 FY 2026, giving some context on the macroeconomic backdrop, and sharing how we see the rest of the year shaping up. I'll try to stay concise while covering the metrics that matter most to you. Let me begin with the wider macro picture, which keeps supporting the resilience of our sector. India's economic bravery reached a robust 7.8% year-on-year real GDP growth in Q1 FY 2026, reinforcing our standing as the fastest-growing major economy in the world. The IMF projects 6.4% growth for the full year, and the RBI has raised its forecast to 6.8%, driven by strong domestic consumption and a rural rebound. On the monetary side, the RBI has reduced the repo rate by 100 basis points to 5.5%, taking a neutral stance amid healthy liquidity conditions. In residential real estate, demand continues to be strong, particularly in the INR 1 crore to INR 2 crore segment, with price appreciation running from 5% to 17% across major metros such as Bengaluru, Mumbai, NCR and Chennai. These fundamentals leave Puravankara well placed to capture the market momentum now under way.

Niraj Kumar Gautam executive
#4

Now moving on to how we performed financially and operationally. During Q2 FY 2026, pre-sales came in at INR 1,322 crore, which is 4% higher than the INR 1,270 crore we posted in Q2 FY 2025. It is worth noting that sustenance sales alone accounted for this increase, which highlights the lasting confidence customers place in our portfolio as well as the strength of our brand. Average price realization climbed 7% year-on-year, reaching INR 8,814 per square foot, a reflection of continued demand and disciplined pricing on our part. Customer collections stood at INR 1,047 crore, 8% above the prior year, which speaks to solid execution and customers paying on schedule. Across H1 FY 2026, pre-sales came to INR 2,445 crore, a 4% year-on-year rise, while collections reached INR 1,904 crore, up 1% year-on-year, keeping our cash conversion ratio on a firm footing. On the P&L front, revenue for Q2 increased to INR 681 crore, compared with INR 520 crore a year earlier. We posted a loss of INR 42 crore against INR 20 crore in Q2 FY 2025. Let me clarify that. The main reason is the timing of revenue recognition under Ind AS together with our strategic investment in new projects. This does not point to any weakness in the underlying operations. Our cash flows remain robust, with cash generated from operations backing our growth initiatives, and our balance sheet is still strong. Moving to business development, we achieved significant meaningful progress in growing our pipeline through H1 FY 2026, reaching more than 6.36 million sq ft of developable area with a potential GDV of roughly INR 9,100 crore.

Niraj Kumar Gautam executive
#5

Key additions include a 24.6-acre partnership at KIADB Hardware Park in North Bengaluru, plus preferred developer status covering eight societies in Chembur, Mumbai, which adds 1.2 million sq ft. There's also a 5.5-acre joint development in Balagere, East Bengaluru, valued at INR 1,000 crore GDV as well. Then we have the prestigious Malabar Hills redevelopment in Mumbai, contributing 0.7 million sq ft and a GDV of INR 2,700 crore in premium residential space. These moves diversify our exposure across both premium and mid-income segments, enhancing revenue visibility. Our land bank now exceeds 32 million sq ft, giving us a multi-year runway for launches and de-risking our growth trajectory. Looking ahead, our H2 FY 2026 pipeline includes 15.53 million sq ft across Mumbai, Bengaluru, Chennai and Pune. That carries a sales potential of INR 5,000 crore plus, which we expect to accelerate pre-sales momentum. With resilient demand, favorable financing, and our proven execution track record, we're well equipped to deliver on these opportunities and sustain profitability improvements. In summary, Q2 FY 2026 was marked by steady top-line growth, disciplined cash management, and targeted expansion that fortified our long-term value creation. Despite the reported loss, our fundamentals are sound, with healthy collections and a fortified balance sheet in a high-potential pipeline.

Niraj Kumar Gautam executive
#6

As we move through the second half, we're focused on getting costs as efficient as possible, improving how effectively we operate, and delivering returns to shareholders. We appreciate your ongoing backing. At this point, I'll turn things over for questions. Thank you.

Operator operator
#7

Thanks a lot. We're moving on to the Q&A portion now. If you'd like to pose a question, just hit star and one on your touchtone phone. Should you want to drop out of the queue, press star and two. We ask that participants use handsets when asking questions. Ladies and gentlemen, we'll pause briefly while the queue fills up. Our first question comes from Deepak Purswani at Svan Investments. Please go ahead.

Deepak Purswani analyst
#8

Good evening, sir, and thanks for the chance to speak. Sir, my first question concerns the Mumbai pipeline, particularly the Andheri project and the Miami By Purva launch. It looks like that launch has slipped by another three, four months. If you could give us a broader sense, how should we view this, and what reasons are behind the delays compared with the other players? That is my first question on Mumbai. Could you please explain this?

Niraj Kumar Gautam executive
#9

I'd like my colleague, Mr. Rajat Rastogi, to respond to this question. He's on the call.

Rajat Rastogi executive
#10

Yes, I’m on the line. Hello, Deepak-ji. First, to address what you asked about the Andheri launch: for Andheri, every approval we need has come through, MoEF included. A vacation notice has already been issued to the society. As we speak, members are moving out of the society. We’re fully in a position to launch in January. In fact, work on our sales office and everything else has also begun. As for the Miami By Purva launch, approvals are already underway. We said earlier that Miami By Purva would launch either in Q4 or at the start of Q1 of the next financial year. Given how the approvals are moving, most likely we’ll have it in March or in April or May next year. So we appear to be on track. Right now we face no regulatory issues. Our approval is on track, and we’re probably securing approvals at one of the fastest rates in the industry.

Ashish Puravankara executive
#11

Rajat, perhaps you could also bring them up to speed on your approvals for Bandra and for Thane.

Rajat Rastogi executive
#12

Sure, and just so you're aware, we're also moving forward on the Thane approvals. We're actively pursuing those approvals. We expect to have every approval we need by the end of December. Everything looks set for a launch in quarter four of this financial year. We should be able to secure close to around 6 lakh sq ft of inventory in Thane. In Bandra, we've also received the concession plan. We anticipate the IOD arriving within a week's time, and after that we'll serve the vacation notice for the society. Just to update you on Bandra as well, we're aiming to obtain all the approvals, including the environment approval, by end of December. After that, I think we'll begin working on the launch timeline. On Bandra too, we're very positive that we should be able to launch in quarter four of this financial year.

Deepak Purswani analyst
#13

Is it fair to say that at least three of the four projects should see launches in Q4 for the Mumbai project?

Rajat Rastogi executive
#14

You're exactly right about that.

Deepak Purswani analyst
#15

All right. Now let's talk about the Bengaluru market overall. I mean, over there too, if I look at a few of the major projects we intended to launch in Q3, those have now shifted to Q4 FY 2026 — for instance Bellandur, Westend, and certain other projects that have slipped into Q4. Particularly given the situation now, with elections for the Bengaluru Municipal Corporation also likely to be held before long. Against that backdrop, how should we view the launch pipeline for our core market?

Mallanna Sasalu executive
#16

Okay, this is Mallanna speaking, and I'll do my best to address your question. As for the launches from Hebbagodi and KIADB, those are arriving within this quarter. In other words, the EOI program — I believe we're already past the starting point on those. The only hold-up is that single MoEF approval; the committee meeting kept getting pushed back over the past three weeks or four weeks, which has cost us some time. The remaining projects sit in Q4, all right? A few of them might slip into the first quarter of next year. Still, by and large — I'm glancing at the investment proposal, the ICP that we circulated, and reading from it — Mallasandra, Kanakapura, Westend, Hennur Road, plus Hebbagodi and KIADB: none of those worry me. Bellandur is touch and go. City Spire could be touch and go, and Grand Hills could be touch and go as well. So those three projects may land in the first quarter of next year. Apart from that, we remain on schedule for the launches as planned. For context, we absorbed a large number of regulatory shifts that arrived, beginning with e-Khata and then registrations — since once e-Khata came in, the registration department needed its software to work in sync with the revenue department.

Mallanna Sasalu executive
#17

That process took a while. After that came the formation of GBA. Since that involved 5 separate corporations, the files had to be shifted from one location to another. Despite all of that, I think our confidence remains that we will proceed with the launches. I would also say we are near the tail end of this entire transition over the long term, and that could turn out quite well for Bengaluru. However, this caused our approvals to be delayed somewhat.

Deepak Purswani analyst
#18

All right. If I turn to the cash flow statement, interest expenses have risen sharply over this period as well. They've climbed to INR 177 crore. Could you give us some sense of why interest expenses jumped so sharply during this time?

Niraj Kumar Gautam executive
#19

Cash flow. One minute. I wouldn't call it a sharp jump. The prior quarter was roughly INR 160 odd crore, and now it stands at INR 176. This interest payment relates to the debt line we carry and some of the HDFC loan facilities we've taken, which are payable and available in nature. Even so, we opt to pay them on schedule rather than letting that interest accrue, and it gets paid once the projects are finished. So the interest, as and when a project performs well and serves the applicable interest IRR, that's why it has risen marginally. Apart from that, on the cost side for the quarter, it's about INR 168.58 crore for the quarter. Looking at the quarter right before, it was INR 160.90 crore. Against the year end, it was INR 140 crore.

Mallanna Sasalu executive
#20

To add to that, we had this payable and available structure of INR 1,150 crore at 16%, 17% money. Then it took this long — almost a year of 15 minutes — for the projects to throw the cash flows out. From those cash flows, we are now servicing that debt. Because of the higher debt cost that it has, it looks like we have paid the debt higher. In fact, what's going to happen is that at some point of time, because of healthy cash flows, we may even look at reducing our debt position at higher cost and moving towards the lower debt cost. So it's a good thing that is happening. Before the good thing that's happening, you're seeing a little bit of more-

Niraj Kumar Gautam executive
#21

On the payout side—since the payout gets accrued today—in this facility, we're paid 100% on the IRR. Nothing on interest is accrued in the books and left unpaid; it's 100% paid. So across the tenor of the facility, we'll wind up paying less interest, because we're paying ahead of time. Regarding cost, as I said again, if you look at the profit and loss statement, on the cost side, which runs through the P&L, it's INR 168 crore. Compared with the immediately preceding quarter, it was INR 160 crore. So it isn't a substantial increase—only a marginal rise in interest.

Deepak Purswani analyst
#22

So looking at the cash flow statement, for the whole of FY 2026, how should we think about collections this year and the outflow for construction?

Niraj Kumar Gautam executive
#23

When you look at our collections, we've brought in INR 1,900 crore on a half-year basis. Since construction is moving ahead quickly, collections have been strong, and we expect them to improve going forward. That's because, first, the money that will come in from my ongoing projects, where construction is proceeding at a fast pace, plus the launch guidance that both of you just mentioned. As soon as we launch this project, that incremental collection will come in, and so it will strengthen from here on.

Mallanna Sasalu executive
#24

We've completed pure construction worth INR 1,000 crore, and INR 1,950 crore is the amount we've collected. As you can see, it's shaping up in almost a 2x kind of position. In the third and fourth quarter, the next half year, I don't see that changing from the ongoing projects where construction is underway and collections are happening — that should stay the same. Any additional collections we make from the launches will simply add to the cash flows we already have.

Deepak Purswani analyst
#25

Alright. And lastly, could you provide an update on the HDFC platform side? To date, how much capital has been deployed on that platform? Also, any views regarding the Pune launch and business development activity in Pune? If you could share your thinking on that, it would be very helpful. That's all from my side.

Niraj Kumar Gautam executive
#26

Regarding HDFC Capital, out of the INR 1,150 crore, INR 700 crore has already been deployed. Just to add, from that INR 700 crore deployed, roughly INR 110 crore has also been repaid as of today while we speak. For the remaining INR 450 crore, we have given them a utilization plan. A few land parcels have already been identified, due diligence is underway, and we expect to utilize that money within the next three to six months as well to fund our growth. On Pune, we have launched Purva Atmosphere recently. I would request Mr. Rajat to share some additional thoughts on our Pune plans.

Rajat Rastogi executive
#27

Yeah. Thank you, Niraj. In Pune, we're pushing ahead with aggressive expansion. We see significantly more opportunities there, mainly on Pune's western side, where at the moment we're in what you could call advanced talks for at least a couple of land parcels in the west of Pune. Beyond that, we've begun exploring redevelopment opportunities in Pune, given how well we've performed in the Mumbai market. We're seeing a lot of encouragement from Pune societies when it comes to Puravankara as a redevelopment partner. That's another segment we're focused on. We're quite hopeful that within the next quarter or two quarters, we should be able to close at least a couple of land parcels in Pune. That said, we still have plenty of inventory at present across our four ongoing projects in Pune, amounting to close to around INR 4,000 crore. The brand is playing a very strong role at the moment. I think we're doing very well with the Atmosphere launch as well, and the project too. We're pretty, I think, optimistic about the Pune market.

Deepak Purswani analyst
#28

All right. Thanks, and I wish each of you the very best.

Operator operator
#29

Thanks. Ladies and gentlemen, if you'd like to ask a question, please press star and one on your phone. Those who want to pose a question should press star and one on their phone at this time. We have a question from Harsh Pathak of Emkay Global Financial Services Limited on the line. Please go ahead.

Harsh Pathak analyst
#30

Yeah, thanks for the chance to ask. My question concerns the Thane project. From what we can see, inventory at that location remains elevated. At Purva Panorama it stands at roughly 73%, while the first phase is also at 59%. So how are things looking there? What sort of demand are you witnessing, and what measures are being taken to drive sales at this project?

Rajat Rastogi executive
#31

Yeah. Just to walk you through the Thane project and the existing towers — we haven't opened those for sale. We're finishing up the existing towers. We expect the OC to come in quarter four for those existing towers, and that's when we'll open them up for sale. From the existing inventory, at the moment, we're looking at launching two towers. One is a completed tower and the other is a new tower, the one that we had launched. Hopefully in quarter four — as I just said, we're looking at the launch of that tower. And that's when we're going to see a lot more inventory being sold. Right now, on the overall market positioning side, we're very well positioned. At the moment, we're getting good pricing in the market. Our current realization is close to around INR 20,000 a square feet. From the launch perspective, we're quite hopeful that we'll have a very successful launch in quarter four.

Ashish Puravankara executive
#32

To give you a sense of it, when we took on this project, there was already a building standing there with sales concluded. The strategic decision was: today, let's finish that front building. As Rajat mentioned, we'll have that building completed in the next quarter. Our belief is simply that we'll realize greater value. That inventory was never put up for sale; the focus is on finishing it and securing a higher value for a completed product. On the towers we have opened up, sales have been extremely good. At this point we're waiting for additional approvals to come through, and then we'll launch those phases. Where Thane is concerned, there is absolutely no concern when it comes to sales or velocity.

Harsh Pathak analyst
#33

Sure, got it. About the commercial side — Purva Zentech, ever since we launched it for sale, there too, I mean, the inventory this quarter, we've sold roughly 2% of that inventory, since it went from 95% down to 93%. What sort of response are we seeing over there? And if you could also share some update on the Purva Aerocity project, please.

Rajat Rastogi executive
#34

Sure. Regarding Purva Zentech, we've sold close to 60,000 sq ft of space so far. We've also leased out — and we'll be announcing this very soon — a significant area to one of the big retail players. I believe we'll be announcing it shortly, and it's approximately 80,000-odd sq ft. The response has been very encouraging. At present, we're in talks to carry out a couple of sizable leasing-cum-sales transactions. Purva Zentech is drawing solid demand from the micro market, and that's exactly what we're positioned to capitalize on. We're hopeful that by the end of this year, we'll be able to achieve a substantial volume of sales at Purva Zentech. Coming back to Purva Zentech once more, we're aiming to obtain the OC for the asset by February of the financial year. Hopefully, in quarter four we'll secure the OC for Purva Zentech, and that's when we'd expect sales to become even stronger. On Purva Aerocity, at the moment, we're responding to a lot of RFPs. Many large players have expressed interest in Purva Aerocity. We're hoping to receive the OC for Purva Aerocity in January, which is close to 1.2 million this year, and that's when I think leasing at that asset will pick up momentum.

Rajat Rastogi executive
#35

Regarding the AOP item as well as the plan item, it looks like we're where we should be on those two assets from a commercial standpoint.

Harsh Pathak analyst
#36

Could you elaborate a bit more on the Purva Aerocity project — perhaps share some color on the kind of interest we're seeing? I believe it's roughly 2 million sq ft in area. What sort of interest have we seen, and what rates are we targeting? If you could give some color on that with respect to vicinity rates, something along those lines, please.

Rajat Rastogi executive
#37

Sure. To give you a sense of where things stand, we're currently obtaining OC for the first 1.2 million sq ft. The remaining 9 lakh-odd square feet will be built in Phase II, and concrete pouring there begins in the next financial year. On the rental front, the micro market today is quoting roughly INR 55 to INR 60 per sq ft on leasable area. Most of the interest we're seeing comes from big IT players who have been evaluating spaces of the 3 lakh to 4 lakh square feet variety. I'd say most of these deals will materialize as we get nearer to OC. As things stand, quite a few site visits are taking place. We're quite optimistic about closing a sizable transaction at Purva Aerocity shortly.

Harsh Pathak analyst
#38

Got it. Is there any news on the Hebbal land?

Rajat Rastogi executive
#39

On the Hebbal land, we are working on it. I think there is work in progress, so a lot of work has been done over the last few months. We should be able to conclude the sale agreement by end of December and start putting it in for approval. I think we should be able to get the approvals in the next six months, and then we will start pouring concrete.

Harsh Pathak analyst
#40

Okay. Do you have any plans to bring in additional commercial assets? Is there some pipeline in place, or are we looking at potential projects? We keep hearing that a growing number of developers are moving into the commercial side. Beyond the assets we already hold, is there anything else we intend to add?

Rajat Rastogi executive
#41

Sure, absolutely. Commercial has been a solid growth area for us, I'd say, particularly in terms of building a large annuity income. As of now, Purva Aerocity and Hebbal will contribute to our annuity income by 2030. We're also exploring opportunities to expand in strong markets such as Pune, where we're pursuing business development activities for commercial. Yeah, from a business standpoint, we're fairly optimistic about this segment, and if the right opportunity arises, we'll consider investing in it.

Harsh Pathak analyst
#42

Sure. Turning to the debt side, it’s worth acknowledging that even with the project additions, which as I understand are mostly satellite in nature, debt has stayed broadly stable despite those additions. I understand you did touch on the collections piece, so how should we view debt by year-end, or perhaps you could provide some target for FY 2027, 2028.

Niraj Kumar Gautam executive
#43

If you turn to slide number 22 in our presentation, assuming I do nothing, then debt will come down by INR 800 crore over the next 12 months. That is the scheduled repayment. Then in the second year after that, it will fall by INR 1,646 crore. So we have laid out the debt repayment schedule — how over the next four years, if I assume no new debt is added, it will automatically go to zero. That said, business is built on leverage. As things stand today, there are more opportunities in the marketplace and we are in a growth phase, so we will keep utilizing the capital available to us to acquire land and fund our growth. At the same time, we are mindful about debt, and some of it will be repaid through scheduled repayment as in 10 statute during the sometime back. The HDFC first platform, which we signed about a year back — out of that, 12 months was the lock-in period. Once the lock-in period was over, the first tranche of repayment was done, by INR 100 crore. And we will progress as we launch projects, and we keep paying down the debt. And continuously we monitor leverage versus growth, and we will keep continuously balancing the two.

Harsh Pathak analyst
#44

Got it. So building on that, regarding the additions to the project side, I know Rajat mentioned the Pune area. Beyond that, how does the pipeline shape up when it comes to new projects, particularly in Mumbai and the southern region? And what sort of additions should we expect? Would those lean more toward outright acquisitions, or does the emphasis stay on the asset model?

Mallanna Sasalu executive
#45

I'll speak for South, Mallanna here.

Harsh Pathak analyst
#46

Alright.

Mallanna Sasalu executive
#47

I'll talk about the South region. The pipeline there is pretty robust, honestly. We're chasing a fair number of opportunities right in this quarter. You saw that we closed another one in the South — the KIADB Hardware Park and Balagere. Out West, Rajat will cover Chembur and Malabar Hills. Back to the pipeline we have, I won't go into too many specifics, since the final signatures haven't come through yet. From HDFC, roughly INR 400 crores is set to come in for investment. It's very much in our interest to put that money to work as fast as we can. To address your question about whether we'll pursue a joint development type of arrangement or-

Harsh Pathak analyst
#48

Alright.

Mallanna Sasalu executive
#49

Absolutely. It always comes down to an evaluation, plus what the landlord prefers. If money is available to us at 17% payable, when we're able, and the landlord stands to make 25% based on the land's current valuation, then yes, we'd definitely want to do it. We're willing to take on that risk, purchase the land parcel, and move forward with it. It's simply that calculation. And naturally, the capital investment and the risk weighed against it will be assessed, after which decisions get made. So it goes one way or the other. It isn't really about how much capital we wish to put in, and there's no target. Any capital meant for growth will be invested. That's how things work on the investment side.

Rajat Rastogi executive
#50

Building on what Mallanna mentioned, we keep seeking solid opportunities in Mumbai and Pune. At this point we're clearly the preferred player in Mumbai's redevelopment market. We continue adding mark assets such as Malabar and in Chembur. Even now, as we speak, we are assessing leading redevelopment opportunities. On business momentum, as Mallanna I think also noted, we stay agnostic regarding the type of opportunity that comes. Our evaluation rests on internal parameters, and whether it's a land buyout, a JDA, or a redevelopment, we examine the opportunity and then decide if we want to pursue it. But to answer your question directly, I'd say we are very hopeful and very positive. The market, I think, is performing quite well, and we'll keep adding good assets to our portfolio. As things stand, we're in advanced discussions on a couple of assets, and we hope to close them during the next half of the financial year.

Harsh Pathak analyst
#51

Sir, could you tell us the total GDV we currently have under active discussions, or where talks with landlords are at an advanced stage?

Niraj Kumar Gautam executive
#52

What I'd say, Harsh, is that for whichever asset we've acquired — since one of them, GDV, is valued at INR 9,100 crore, which we've already published, as I mentioned too. As for the remainder, like Mr. Mallanna and Mr. Rajat said, until we put pen to the final document, we won't be revealing it, nor would it be proper for us to reveal the GDV, the area, the location, and so on. Once the deal is concluded, we'll keep updating and announcing those particulars.

Harsh Pathak analyst
#53

Got it. One final question from me. Regarding the Malabar Hills project, what type of profitability have we factored in? At the project level, what EBITDA margin are we aiming for?

Niraj Kumar Gautam executive
#54

I'd like Mr. Rajat to handle this question, please.

Rajat Rastogi executive
#55

Sure. Without getting into the exact EBITDA figure, I'd say the margins look quite healthy. Malabar Hills, of course, is Mumbai's most premium area — and naturally one of India's most premium areas too. So margins there are quite strong and healthy, and I'd add that they're also satisfying the internal requirements we've set. As for the EBITDA margins, what I can tell you is that they're roughly upwards of 30%.

Harsh Pathak analyst
#56

Absolutely. That covers it. Many thanks for taking my questions.

Operator operator
#57

Thanks. Our next question comes from Deepak Purswani at Svan Investments, on the line. Go right ahead.

Deepak Purswani analyst
#58

Yes, thanks for the chance to follow up, sir. Sir, first, I wanted to check on this. During the first half of last year, we recorded pre-sales of INR 5,000 crore. This time around, in the first half, on a sustainment basis, we achieved pre-sales of approximately INR 2,400 and something crore. So if you could share your broader thinking, how should we view pre-sales for FY 2026 and 2027, given our launch pipeline, and also how do you see demand conditions right now in each of the micro markets?

Mallanna Sasalu executive
#59

Trying to project into FY 2027 and beyond is probably reaching a bit. Anything that slips out of this year—the second half, as you correctly noted—we do roughly INR 1,250 to INR 1,300 crore of sustenance. And our expectation is that sustenance figures will stay in that neighborhood, more or less. That leaves us with a further INR 2,600 crore. As we mentioned, we have approximately INR 12,000 crore of launches in the pipeline. Even if you manage to launch about 80% of that, that's INR 9,000 crore or INR 10,000 crore. We sell somewhere between 30% and 50%. So I'd rather not pin down a number. I'll leave the math to you. One project might do 20%, another might do 40%. So it's anyone's guess. But getting the product to market is our responsibility, and that will likely happen up to roughly INR 9,000 crore to INR 10,000 crore.

Rajat Rastogi executive
#60

On the demand side, I'd say demand looks quite robust for top branded players such as Puravankara. Across every micro market we're active in at the moment, we remain among the top leaders there, both when it comes to pricing and on velocity. With these launches coming in, we're clearly very positive. And I'm sure we'll be able to showcase Puravankara's brands and the kinds of products Puravankara offers, particularly in markets like Mumbai where we've brought in something new, such as Andheri Lokhandwala or perhaps the Pali Hill product we've built there. We remain very positive on the market. The trend in the market right now is very encouraging, so we don't see any challenges out there.

Deepak Purswani analyst
#61

All right, carrying on from the launch pipeline we talked about — we'd be looking at launching something like INR 12,000 crore of inventory in H2. Sir, I just wanted to check on that. Is that a whole project, or what portion of the inventory value out of that would actually get launched?

Mallanna Sasalu executive
#62

On South, if you actually look at roughly eleven projects, that's nine in Bengaluru, plus one in Coimbatore and one in Cochin. Of those, the KIADB project and the Cochin one — that's Provident Winworth — are the two big ones. Those will essentially take longer to complete. As for the remaining projects, they now sit at 700,000 sq ft, 600,000 sq ft, 440,000 sq ft, and 520,000 sq ft. Our view is that none of these will be phased. Each is a single-phase development and a single-phase launch. Given the demand we're seeing in KIADB, even though it will exceed 2,800 units, my belief is that it will be a single launch. What I mean is that we sell tower by tower, but the launch itself will be one launch. That probably addresses your question, since it's fairly spread out. I don't foresee an issue with all of them coming in a single launch.

Deepak Purswani analyst
#63

Let me explain why I'm bringing that up. Take, for instance, when I'm looking at the presentation.

Mallanna Sasalu executive
#64

I'm aware of that.

Deepak Purswani analyst
#65

Regarding the Deccan project — that one has 0.36 million sq ft of saleable area. From that total, we're looking to launch just 60,000 sq ft.

Rajat Rastogi executive
#66

Yes, I'd like to build on what Mallanna mentioned. Out in the West, the projects tend to be quite sizable, both in value terms and at times in terms of area as well. Take Thane — that's a very big project, so we'll be launching it in tranches, and the same goes for Andheri Lokhandwala, where the launches will happen across two phases. Naturally, we're looking at INR 1,000 crore worth of inventory in Andheri Lokhandwala, and close to INR 1,000 crore worth of inventory in Thane. For Pali Hill too, I believe we'd prefer to do it at 60,000 sq ft, 70,000 sq ft of area in tranches, since this is, I think, a very high-end, top-of-the-line project, and we'd like to first showcase it to the market, launch a small inventory, and then probably follow up with a larger launch. That's the plan.

Niraj Kumar Gautam executive
#67

If I could assist with the math there. On our presentation, if you turn to slide 19, what we're indicating is that our launches, per guidance, total 15.46 million sq ft. From that figure, we'll bring 9.28 million sq ft to market. Take a look at the final row on that slide. So if I were to value that 9.28 million sq ft today at an average rate spanning Mumbai, Bengaluru, and Pune — let's say INR 11,000 per sq ft — it works out to roughly INR 10,000 crore in value. And that's exactly what Mallanna mentioned during his remarks: we'll be bringing inventory to market, around INR 12,000 crore worth of inventory. I hope that clears it up.

Deepak Purswani analyst
#68

Right, that answers my question. Thanks. And for the second part, could you also give us a sense of project completion and the delivery timeline? I believe we completed roughly 1,300 units in the first half. How should we look at deliveries in H2, and how should we think about revenue recognition in H2? Will it grow exponentially as any other significant project gets completed and starts hitting revenues? Or how should we view it from the P&L perspective in H2 of FY 2026?

Niraj Kumar Gautam executive
#69

Okay, so on slide 34 of our ICP deck, you'll see that we've got 2.97 million sq ft of ready inventory for which OC has been received — that's 2,352 units. On top of that, we expect to obtain more OCs during this period, in the second half of the period. There were also some problems around possession and handover in Bangalore due to the e-Khata matter and the registration matter, as you'd have seen in the newspaper. That's where two of our big projects — we weren't able to hand over possession. But our teams are engaging with the government, and there's also a census underway in the state government, so government officials are somewhat occupied. Now I believe things are coming together, and we're fairly confident that we can hand over a significant portion of it in the second half of the period. And for the year overall, our numbers are going to be considerably better than what we've reported so far.

Deepak Purswani analyst
#70

So, the original plan was to deliver 3,000 plus 100 units this year — are we still on track for that?

Niraj Kumar Gautam executive
#71

We are completely on schedule.

Mallanna Sasalu executive
#72

To wrap things up, the figure we had in mind was essentially 4.3 million sq ft. We issued guidance on what we intend to deliver. So at this point we've delivered roughly 1.3 million sq ft. A further 3 million sq ft simply needs to be registered. This has nothing to do with construction delivery. Construction is finished. OC has been obtained for more than 2,000 units. The snags have already been fixed. Customers have come and accepted. The question here is that absent registration, handing over to the customer is difficult. We have not handed over. Without registration, we cannot recognize them as sold units. That is why we are waiting for it. And in fact, you will see from this quarter and the next quarter that across the five months left in this second half of the year, we should perform well.

Deepak Purswani analyst
#73

Alright, I’d like an update on the four project additions we’ve recently completed. Could you share where each of those projects stands right now, how we should think about each one, and roughly what timeline you’re looking at for launching them? For instance, North Bengaluru, Chembur, Mumbai, then East Bengaluru and Malabar Hills.

Mallanna Sasalu executive
#74

Let me cover the two Bengaluru projects — the 24.59 acres at Hardware Park. That gives roughly 3.48 million sq ft of developable space. I believe we signed that agreement about seven months ago, six and a half to seven months back, and the launch of this project will probably happen in January or February. The approvals are largely in place already; only a bit of the MoEF and PCB clearances remain outstanding, and apart from that everything is ready, so I am confident it will take place in January–February. The same applies to Balagere. Again, that was signed six months ago. It too is at an advanced stage with approvals. That one is a joint development in East Bengaluru, which is how we refer to it. So I think both should come through this year.

Niraj Kumar Gautam executive
#75

Also, two additional projects came in during the first half — a society at Chembur and one at Malabar Hills. That's another redevelopment effort. I'd like to ask Mr. Rajat to shed some light on those, on our launch plans for these two projects.

Rajat Rastogi executive
#76

Right. I'd say both of these are redevelopment projects, and each one falls under that DCR 33(9) scheme. As you know, redevelopment work like this usually takes more time, given the society's involvement and the DA process, among other things. To put it in terms of timing, we expect to be in a position to launch both of them by Q3 or Q4 of the next financial year.

Deepak Purswani analyst
#77

All right. For these two redevelopment projects, what sort of area sharing—or broad sharing—has been arranged with the tenant, or how should we view each of them from a profitability standpoint?

Rajat Rastogi executive
#78

In terms of location, both projects are really — Chembur, I think, is one of the hottest property markets in MMR right now. What we're doing in Chembur is close to a 5-acre land parcel, and in Malabar Hills it's probably one of the biggest land parcels we're doing. Both of these projects are truly among the best land parcels available in the micro market. On the profitability side, I think both will deliver better than the current market gate terms, because of the size of the project, one, and also the location they're in. As I said earlier as well, we're very, very positive about both these assets, and we're working very hard to finalize the due diligence and keep these launches on track.

Deepak Purswani analyst
#79

Alright. Thanks, and I hope everything goes well for all of you.

Mallanna Sasalu executive
#80

Thanks.

Niraj Kumar Gautam executive
#81

Thanks.

Operator operator
#82

Thanks. Everyone, if you'd like to ask something, just hit star and one on your handset. Our next question comes from Chintan Mehta at Puniska Family Office. Your line is open.

Chintan Mehta analyst
#83

I appreciate the chance to ask. Sir, I’d like some clarity on the debt side: what peak debt are we aiming for, even when looked at per square foot? And once we monetize and rental yield begins coming in, can we expect commercial debt per square foot to start coming down? Thank you.

Niraj Kumar Gautam executive
#84

Chintan, looking at where we stand right now at quarter-end, net debt came in at INR 2,894 crore. On a per-square-foot basis, residential debt worked out to INR 1,111. Blended debt stood at that level, and broken out, residential was INR 859 per sq ft while commercial was INR 252 per sq ft. The commercial debt is made up of borrowings on two of our commercial projects. The first is Purva Zentech, where we've already sold roughly 50,000 sq ft. Once it's finished, we intend to sell that project, and as the sale goes through, the debt gets repaid. The other commercial project, Purva Aerocity, is one we plan to hold and lease. After we lease this asset — we've taken an SBI loan for construction finance — there will be further drawdowns to finish the asset. When the asset is done, we'll convert that loan into an LRD facility. Those terms, including the construction finance itself, have already been approved by SBI. So in the case of Purva Aerocity, the debt will rise a bit to fund the remaining construction first.

Niraj Kumar Gautam executive
#85

However, after the project is finished and leased out, and after this loan is converted into an LRD facility, that figure will drop, both on a per-square-foot basis and in overall terms as well.

Chintan Mehta analyst
#86

Alright. Sir, those two big projects should both be finished by next year in terms of rental yield. Are there any other commercial projects we're aiming at over the next two financial years — could you shed some light on that?

Niraj Kumar Gautam executive
#87

For these 2 assets, as Mr. Rajat Rastogi mentioned when he spoke, we expect to finish them or secure the OC for both on or before March 31. Purva Zentech — the first asset I referred to — has already been partly sold, and leasing is also underway. During the coming financial year, we will aim to sell a substantial portion of this asset. Regarding the second asset, since it is completing, plenty of inquiries are coming in. Our leasing target is 1.2 million sq ft. Once leasing begins, then, as Mr. Rajat Rastogi said, we will aim to start construction on the remaining area in the next financial year.

Chintan Mehta analyst
#88

Alright. Thanks. Thanks a lot. Best of luck.

Operator operator
#89

Thanks. Ladies and gentlemen, if you'd like to ask a question, please press star and one on your phone. We ask participants to press star and one to pose a question. Ladies and gentlemen, please press star and one on your phone now if you have a question. Since no more questions remain, I'll now turn the call over to management for closing remarks. Over to you, sir.

Niraj Kumar Gautam executive
#90

Thanks. Thanks to everyone for being on this call. Should you have any additional questions or need anything clarified, just send us a note. My team and I are always around to answer all of your questions and clarifications. Thanks again so much.

Operator operator
#91

Thank you. That brings this conference to a close on behalf of Emkay Global Financial Services Limited. We appreciate your participation, and you're free to disconnect your lines at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Puravankara Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Puravankara Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.