Thanks, Mark, and I'd like to extend my own welcome too. Like Mark basically hinted at, the first quarter came in really strong for us. Normally, Q1 tends to be somewhat tougher, simply due to weather-related complications. And for anybody tracking ski bookings, this has been a fairly dry winter, which has been favorable weather-wise. That's given us the chance to push forward significantly on many of our construction projects at Sky Ranch; so with that said, let me get the presentation underway. Slide one, as always, is our forward-looking statement, covering the point that any statements in this corporation that aren't historical facts and are referenced here qualify as forward-looking statements. I'm sure nearly everyone here knows our forward-looking statements disclaimer. I always like to recognize our management team. Joining me are Marc Spezialy, plus Cyrena Finnegan, who serves as our Controller, in case they can offer input on any particular questions that come up. Still, it's an outstanding group of professionals who keep delivering leadership for the company and truly across every segment of what we do, along with our Board of Directors. Our Board is excellent — quite a heavyweight Board given a company our size — and every member stays involved and adds meaningful value to the company. But I want to recognize our team and let you know about their ongoing backing and involvement. As nearly all of you are aware, this is simply a brief investment snapshot; we've got an ongoing run of profitable quarters. So we're extremely pleased that we keep producing profitability along with shareholder value; we run across all 3 business segments: land development, water utilities and single-family rentals, and each one is performing well. We enjoy solid visibility in land development. We're working hard to keep growing and expanding our recurring revenue base; and then there's our excellent balance sheet — we keep strengthening and reinforcing that strong balance sheet while continuing to put money into our business lines, grow the business and generate shareholder value; so overall it's a genuinely solid diversification of what the company does. Let me move into the quarterly results. And as you can tell on the revenue side, it was a terrific quarter for revenue. Q1, honestly, I believe it set a record for us, purely because of those seasonality factors. And what stands out in the highlights is that we added 2 new homebuilders to our portfolio, and they're deeply involved in Phase 2D, which is the current focus of our work. We finished Phase 2C at the close of our fiscal year last year and are carrying on with Phase 2D, and we'll cover a bit more regarding 2E shortly. But thanks to the weather, we managed to get plenty of the curbs and even asphalt laid during the November, December stretch, which is genuinely unheard of around here. Alright, so on the roads in 2D, we're roughly 80% finished, which puts us around 5 or 6 months ahead of where we planned to be. A big part of that is taking advantage of the weather, and we kept our contractors working on the site, so whenever that good weather showed up, we could make the most of it. Now shifting to profitability — net income and earnings per share — we saw substantial gains in both, and that comes from the progress on Phase 2D. So you're seeing a big jump in each of those. We're really happy to keep delivering those kinds of results and to smooth out our revenues across the year. Normally you'd see a more even pattern in those earnings and revenue streams, but seasonality introduces some variability into the mix. During the first quarter, we hit roughly 1/3 of our fiscal year forecast. So we're running ahead of what our guidance called for. Looking at that strong start, we brought in a little over $9 million in revenue, plus about $6.2 million in gross profit. Just terrific results from our management team, our operators, and the folks out in the field. On a year-to-date basis, net income and earnings per share are likewise ahead of our guidance. We're at about 37% of our full year guidance on that. So it's a great opportunity to keep delivering on that. And then looking ahead to how we're approaching the land development side, we're really positioning ourselves to deliver more results on Phase 2E, continuing to produce those lots for our homebuilder customers. So I'd like to take those results and break them out a bit for everyone, so we can split that into the 3 segments and show you what each one contributes, starting with the water utility segment. As most of you know, we really have 2 revenue sources — 2 classes of customers. There are our domestic customers, where we deliver water and wastewater to residential units; those are customers at Sky Ranch, and at other projects where we provide water service in other areas. Then there are our industrial customers, where we supply water to the oil and gas industry, mainly for fracking wells they're drilling in and around mostly Roble County. We've done wells in other counties too, but the bulk of our activity is centered around Roble County and the Lowry Ranch, which is our service area. And then on those revenues in the water and wastewater side, we kind of have 2 different forms of revenues. There are the recurring monthly revenues, where we do that on a metered basis. On top of that, there's the capital side of things — connections, which basically link our water system to our homebuilder customers, our homes, and businesses, one system connection at a time, and those come as tap fees. Those carry high capital costs, and typically they get rolled into a mortgage or into developing that business. So those are the 2 revenue streams tied to it. When you break that data down, we keep seeing robust growth in recurring revenue customers. That gives us a 22% customer CAGR. So we're quite happy to keep growing that recurring revenue. And although the quarter overall was a record for us, the water segment came in a bit softer than usual, mainly because of the timing around securing building permits, getting some of those tap fees, and also hitting a lull in oil and gas deliveries. Our oil and gas operators were focused on building up a portfolio of well permits, and we expect that to pick up over the remainder of the year. We have a number of wells already drilled and completed, and they're set to begin fracking later this month, with fracking continuing for most of the year. So you'll see a substantial uptick there.

Mark Harding executive
#2

If you examine that across comparable quarters over the past 2 years, it really illustrates just how much the oil and gas side can swing. Still, we anticipate an increase for the remainder of the year. Looking at that single industry within oil and gas, it moves around. And as I mentioned, it truly comes down to permits and getting sites built out; they're putting up these big multi-well pad sites, each holding somewhere between 10 and 20 wells. So they concentrate their work on one pad site, and they handle directional drilling at those pad sites. But as you can observe in some of those trends, this is sort of a yearly snapshot of how we approach oil and gas revenues. To illustrate, during 2024, they were spread fairly evenly across the quarters. I believe you'll begin to notice a similar pattern of quarterly distribution over the remaining quarters for us in fiscal 2026. What we prefer to do is give you a sense of capacity — how much water is on hand for our high-volume customers, such as those in oil and gas — along with where we stand on continuing to put money into the company's assets. So we aim to maintain a consistent pace of investment in water and wastewater infrastructure for our customers, while balancing that against the needs of the portfolio. This gives you an idea that we've invested in a considerable amount of capacity. If you looked at just the quarterly figure, we truly didn't utilize very much of it, purely because of that oil and gas variability. So we're actually using only around 3% of our total water portfolio, and when you look at the capacity we hold for annual production, we're able to produce roughly 2,800 acre feet, yet we used only about 150 acre feet of it. So it does give you a feel for the pedal strength within our water portfolio and our water system. Now let's turn to our land development segment. This aerial photo illustrates a high school currently under construction. We're quite happy to see it coming out of the ground, and it will be finished in time for our kids by the fall of 2026; in our land development segment, you've heard us discuss the various phases at length. Phase 2C, which we finished last fiscal year, we're halfway — a bit beyond halfway — through Phase 2D, and we use a percent completion methodology for recognizing revenue on that. We're still protecting lots for Phase 2D, and next we'll move into Phase 2E, which involves roughly another 160 lots, though grading there should get underway at some point during March. We're also glad to have favorable weather, since that lets us keep working on pavement along with curbs and gutters so those lots can be delivered. Looking at lot development revenue, that's truly where the quarter's strength came from, as things ramped into Phase 2D. Phase 2C is finished, and this really underscores some of it if you look at how many homes are going up; that ties directly to conditions in the housing market. I'm aware there's plenty of coverage about housing and its momentum and how rates are affecting it; even so, we continue to see considerable backing for our efforts. I believe that mostly reflects where we sit in the market as an entry-level offering. If you look at homes finished or underway in Phase 2B, which should even out inventory for every one of our builders at the project, roughly 85% of Phase 2B has been fully built. Now consider Phase 2C, the one we just delivered. One of our newer builders is putting up vertical construction across a large share of its portfolio. We also already have one of the builders newly added to the portfolio beginning homes in Phase 2D, and although 2D isn't entirely done, we've finished enough of the infrastructure — much of it — including all water, sewer, storm, curbs and gutters plus access, so they can begin in 2D before every finished lot there is delivered; what that shows is that we used to have yearly lot deliveries for a portfolio of 4 builders, and they aim to manage that inventory so they never carry more than what they expect to produce in a year. As the market eased, we noticed there was room for additional builders. So we expanded our portfolio to 7 national homebuilders involved in it. What that means is we've got a solid set of builders, and every one of them keeps holding inventory at the level they want. Meanwhile, we're able to keep setting the tempo for how the project gets built out, which lets us keep speeding up how quickly the land side turns into cash. This is roughly a picture of it — a visual snapshot, if you will, of all the phases, including the sub-phases starting with Phase 2 here, with some good aerial shots showing certain activities, each of our entry-level segmentations on these, plus plenty of product variety, since we've got a 35-foot lot, a 40-foot lot, and a 45-foot lot on the standard <<inaudible>>, and beyond that we segment into paired product, which is a townhome product — sorry, a duplex product — and then townhome products too, which genuinely deliver a range of price points for this entry-level market. On the land development timeline, this is basically a picture of the way we handle the accounting for it, correct? We deliver lots to our homebuilder customers across 3 basic phases; and that happens at a plaque where you hold a severable title instrument to the individual lot, and on that we usually receive 1/3 of our revenue for the lot payment; after that we do the grading and wet utilities using that money to deliver that progress payment; and then finally, we move into the roads, curbs and gutters to obtain the finished lot payment; so that gives you a sense of the phasing there, and it genuinely shows how we layer the phasing in by quarters. And truly, I believe the key area for us this year was being able to really substantially complete a bunch of finished lots in this Q2, which usually doesn't happen for us simply because of the seasonality. I want to really talk a little bit.

Mark Harding executive
#3

We managed to grow and modify the interchange access permit we hold with CDOT, and that truly secured an additional phase for us. A number of these subphases have been under discussion for 2, which began at roughly 850 lots. I believe we have room to add approximately 180 more lots there. So Phase 2E comes to around 159 lots. Here's an aerial showing what it will look like; it sits directly across the street from that school. We'll begin grading this spring, and you'll begin noticing somewhat more overlap in the chart we showed earlier regarding how we hand those lots over to our homebuilder customers. As I said, the key milestone was kicking off production at the high school; that means we now have a complete K-12 campus on site, which is very — it's a major advantage. In the feedback most of our homebuilder customers receive from their buyers, the school ranks among the main factors pulling people toward Sky Ranch, simply because it's a neighborhood school and walkable for everyone. It's a fantastic asset for us. What we enjoy pointing out are some of the primary places where the Denver metropolitan area is expanding, which gives you a sense of things. I believe this is a graphic lots of you have seen previously, but it illustrates the fact that we truly grow in one direction, correct? We cannot grow west, purely because of the mountains, and we end up in what is genuinely the most appealing submarket of the Denver metropolitan area, situated along the I-70 corridor. If you look at the map on the right side of this illustration, that black line near the top is interstate I-70, showing you where Sky Ranch sits along it. Then the pink section is essentially our service area, the Lowry Ranch. What you're observing is ever more development taking place around the edges of the Lowry Ranch. So we're eager to keep growing our operations out of the Lowry property while the State of Colorado decides what they are seeking and how they want to monetize that asset for the school trust. I'd like to provide an update on the single-family rental segment. We now have 19 homes finished and fully rented. That segment keeps generating recurring revenues. We have an additional 40 units under contract. What we're attempting to do is stagger how those actually reach the market. Our plan is to bring roughly four or five units into service every month, kicking off in May, and then continue adding them so we can get them leased and keep providing a chance for people who want a home but keep hitting affordability roadblocks; affordability remains one of the biggest problems in the housing market. Looking at how some of the individual pieces are doing, rentals keep growing. That comes from bringing more units into service plus appreciation in the value of those assets; for us it's a segment with very favorable tax treatment since we hold onto the equity in the lot and the water service connections, and those homes keep rising in value as we keep adding value to the community as a whole. A bit on the phasing of how we intend to bring these units into service across each of the different phases, from the first Phase 1, finished several years back, through what we're targeting in 2E; that means bringing about 100 units into service. I'll spend a little time on our capital allocation and how we're generating that ongoing shareholder value. I really want to stress each of these segments, the water segment, where we're growing assets across each of these segments by investing in them, whether that's investing in the brick-and-mortar of the land segment, whether that's investing in pumps and pipes and diversion structures for our water segment, and then building our home inventory for single-family liquidity. We keep growing the balance sheet across all 3 of these segments. and then really look at protecting and preserving the balance sheet so we can maintain that liquidity to keep investing in each business segment and deliver recurring revenues for our customers. What does that look like? We generate shareholder returns through those recurring revenues in water, single-family units and a diversified mix of revenue ranging from tap fees to industrial water fees. We have oil and gas royalties, which were substantially — they were very strong last year; we keep building our earnings; and really, each of these segments builds value from each other. So there's vertical integration in some of those segments that gives us a situation where value to one means we're adding value to all. Shareholder value restates our fiscal year guidance as well as gives you some interim and build-out forecast revenues for our asset growth. So when you look at the segment of the revenues, the water recurring revenues as well as single-family rental revenues, it gives you a snapshot of how we're building that through the portfolio as well as what that asset growth is. We've already spent a lot of time discussing how we bring that asset value over from Sky Ranch, and how we finish out the remaining residential projects along with the commercial ones. So those are big opportunities, and we keep moving forward on them. Trending; this next part illustrates where profitability is heading, along with our fiscal year guidance and the near-term picture. So once again, our goal is to keep that pace. We posted a strong quarter, delivering ahead of schedule and ahead of results for fiscal 2026. And then this gives you a sense of how, once that interchange gets built, we expect to open things up and release the remaining portfolio value. Valuation and sensitivities. Our guidance for the fiscal year sat in the $26 million to $30 million range. Earnings per share, $0.43 to $0.52 per share, plus the potential upside from faster timing on delivering some of those lots and how we might sustain that trend. We keep reinvesting in ourselves through our share buyback program while managing the company's liquidity needs, and weighing how we put money into each of our land assets against what we still see as an undervaluation of the company's current trading price. Another thing I wanted to do is a somewhat new slide this quarter, really to illustrate — you've heard us discuss the interchange, why it matters and how it's phasing — and what we're aiming to do is get that permit finalized with the county and CDOT sometime in the early half of this year, then really examine the bonding opportunities involving some mill levies we've reserved at the project, and begin construction on that in 2027.

Mark Harding executive
#4

Yet this is roughly what it will look like, and how it will align with the broader development. We're — the interchange that exists today is going to be removed. We'll shift it to follow the section line and provide what amounts to diamond interchange capacity at this spot. So clearly this matters a great deal for us to keep building into Phase 3, along with activating the commercial possibilities for it. Let's take a somewhat longer-term view. Those commercial parcels genuinely deliver much of the high-value land as well as much of the AV. That assessed value is truly the source of strength for the public improvement reimbursables, meaning we don't have to put those funds out first and then wait to be paid back. My understanding is that our receivable there sits at approximately $50 million. So when you combine the assessed value — Colorado is what we call a sales tax incentive state — we receive, quite literally, 4x the tax revenues off commercial assessed value compared with what residential assessed value generates. And then in this specific instance, we also collect public improvement fees on it, which amount to a sales tax receipt on that. So those 2 represent major revenue drivers; and this sort of gives you a sense of some of the land planning underway there, with certain grocery anchors, and then looking at a flex building structure of this kind, where we're considering perhaps presenting chances for us to team up with parties that could be high water users. Regarding some of what's happening now, we've brought on local realtor — real estate — commercial industrial real estate brokers who are quite active in data centers, and we have a truly distinctive opening here at Sky Ranch, and alongside PureCycle, because we have such plentiful water availability, so we can genuinely set ourselves apart for these high water use and high water-intensive kinds of users. So we'll watch how that unfolds across the coming few months, year or so. With that, those are our prepared remarks; and perhaps what we can do is open things up for some questions and offer a bit of color if you'd like on how matters are progressing; so if your line is muted or if it isn't muted and you've stayed silent, thank you; and simply go ahead and speak up. And should you have a question, we'll do our best to provide you with some detail.

Elliot Knight analyst
#5

Mark?

Mark Harding executive
#6

Yes, Elliot.

Elliot Knight analyst
#7

It's quite intriguing that you've shared those earnings projections. One gap stood out clearly — fiscal '27. Regarding an anticipated earnings range for fiscal '27, what ought we to have in mind?

Mark Harding executive
#8

That's a fair question. A big portion of Phase 2E will fall in '27, and beyond that we'll see how things progress with certain interstate construction work plus a few other segments. My sense is it will resemble what we've seen over the recent pair of years quite closely. We won't see a genuine breakout during 2027, though our belief is that the real breakout arrives more once the interchange is finished, that commercial comes online, and development gets underway. There are chances with non-high-traffic commercial users whom we are currently marketing to. Still, as traffic keeps expanding, we carry that duty to more or less keep constructing that infrastructure.

Elliot Knight analyst
#9

Alright. So what I'm taking away is that for fiscal '27, $0.75 per share is likely too high.

Mark Harding executive
#10

Right. I wouldn't put it that way — that would be solid, straightforward guidance. Still, once we consider that commercial piece and start it up around the 2028 time frame, things genuinely accelerate, since what lies ahead is delivery of lots on the residential side, and beyond that, we expect to double that revenue stream through delivering lots on the commercial side.

Elliot Knight analyst
#11

All right, let me make sure I have this straight. Regarding taps that are sold, is the pretax margin 50% or 60%? Which one applies?

Mark Harding executive
#12

Good question. On an aggregate basis, when you consider the build-out of what will eventually be 60,000 units, our view is that margin comes to roughly 50%, since we still need to keep building that system. Over a shorter horizon, though, I'd say we're realizing considerably more margin on those, because we've stayed ahead in terms of developing capacity for that; so when we compare year-over-year across the last couple of years and the next couple of years, those margins could be somewhat greater. However, on an average build-out basis, if you apply $40,000 to 60,000 taps at $2.4 billion in revenue potential, it typically comes to about — building that system out will run us roughly $1.2 billion. Still, I'd say in the near term, since we have that excess capacity, the margins we actually realize will exceed that 50%.

Elliot Knight analyst
#13

All right. So previously, whenever you've mentioned that we'll need to invest $1 billion, that $1 billion — does amortization factor into the cost when — is that 50% pretax margin calculated after factoring in amortization of the $1 billion you refer to?

Executive executive
#14

Yes, that's part of it.

Mark Harding executive
#15

Yes.

Elliot Knight analyst
#16

Okay.

Executive executive
#17

It is included.

Tucker Andersen analyst
#18

Tucker Andersen here, Mark — am I coming through okay?

Mark Harding executive
#19

Yes, Tucker, I've got you. Good to hear from you.

Tucker Andersen analyst
#20

To start, I want to grab a moment — since you folks were kind enough to give us the time — to say hi to an old buddy of mine, Elliot Knight. So, a few questions. Number one, what opportunities do you currently see when it comes to acquiring water? Like you've mentioned before, you're constantly looking to grow your water acquisitions and find ways to put that water to use. Could you speak to that in a broad sense?

Mark Harding executive
#21

Absolutely. I'd say our water portfolio is really strong at the moment; and whenever we evaluate water acquisitions — which we're always doing, and it's one of those things where people keep coming to us with projects — I think we're happy with the portfolio as it stands today. And really, any acquisitions we make will be strategic, meaning they sit next to what we already own, correct? That's where you get the greatest efficiencies from expanding it and the synergies tied to where our investments currently are. So I'd put it this way: our appetite for buying water comes down to it needing to be the right water right; it needs to be in the right spot; and so — I'd say we're more careful about water acquisitions than we'd probably be in some other categories, like land. Right now we'd be more aggressive buying land than buying water, simply because we want a bigger portfolio that vertically integrates that value, since wherever we purchase land, we have water available to serve it; we have infrastructure in place to serve it, and then feeding that into the land portfolio and afterward the single-family rental portfolio — that really drives all 3 segments, whereas a water acquisition would be good and valuable since we can't create more of it. And as a matter of fact, things keep getting drier and drier. So the water rights already in hand keep demonstrating their worth; but it's a little — we already hold a deep portfolio there; so Tucker, I'd say it has to be the right water right in the right location.

Tucker Andersen analyst
#22

Alright, you've kind of moved right into the following item on my list of questions, which concerns what is taking place with respect to buying land, because there's a bit of friction since homebuilding has decelerated quite a bit, yet you're still located in an area expanding at a pretty quick pace where, as you mentioned, there are only so many ways you can grow. And so, when it comes to your opportunities for acquiring land, would you say you're feeling more hopeful, less hopeful, or roughly unchanged?

Mark Harding executive
#23

More hopeful is where I'd land. What I'd tell you is that the discussions we have had over the years with the people who own the land, both where things stood back then and where they stand now, have become far more engaging and far more dynamic. So regarding how that positions us to grow our portfolio and genuinely demonstrate a longer path beyond the $600 million, $700 million we expect to monetize from Sky Ranch, I'd tell you I'm more optimistic.

Tucker Andersen analyst
#24

I'm eager for that, even though, as you're aware, the yardstick I always use is how appealing Sky Ranch is, and at this stage I don't anticipate you acquiring anything nearly that appealing.

Mark Harding executive
#25

You've got that right; and I wouldn't want to witness the kind of economy that would bring us to how it would appear — how it appeared back when Sky Ranch came into my hands, but...

Tucker Andersen analyst
#26

Number three, regarding the — I thought the remark about data centers was intriguing. Which spots inside your territory might work for data center sites — for data centers? And how does that roughly align with the region you serve?

Mark Harding executive
#27

Excellent question. And we've devoted a fair amount of effort to these data center possibilities. There is a great deal — a great deal — of capital parked, waiting for sites that are ready to go. And honestly — there are 3 metrics for a data center. Where the property sits, whether power is available, and whether water is available; and I would say we hold — the edge we hold comes on the water side. And many of these cities and municipalities truly don't want that kind of user simply because it doesn't expand their AV quickly enough. They could wind up committing water equivalent to 5,700 homes to a single user, and that user won't deliver the same tax base that 700 homes' worth would. And so we can supply that water to them. We're long. It's a solid allocation for us. The siting aspect matters less. They can relocate, but they must be near water. They must be near power. And given Sky Ranch's location, it genuinely satisfies all of those requirements. And so we've held discussions with particular users. We've engaged with Cushman and they rank among the biggest brokers handling sites for data centers. So we're quite optimistic that this could produce a terrific opportunity for us.

Tucker Andersen analyst
#28

Then finally, I'd like to know what's going on with overall price gains for existing homes in Denver, which is your market. Also, have your first phase — or perhaps your first two phases — been around long enough that resales are beginning to appear, and how do those resales stack up against what the owner originally paid?

Mark Harding executive
#29

Yeah; resales at Sky Ranch are showing terrific appreciation, and I believe the reason is that when we entered the market, our lot value was extremely appealing, letting our homebuilders offer a very appealing home price. As a result, certain Phase 1 home prices have risen by as much as 30%, 40% from when they were constructed, and that's wonderful for the community. It's wonderful for those homeowners. Nationally, home appreciation averages somewhere between 4% and 5%. At Sky Ranch, I'd say performance is a bit stronger than that, since you get additional amenities, you get schools, you get a community that's more mature, and inventory at this price point is scarcer; so should you have purchased a house for $430,000, that appreciation will — there are still no homes listed below $500,000. That means there's considerable room for those homes under $500,000 to appreciate.

Tucker Andersen analyst
#30

So that means Sky Ranch is then — that's really one of the big draws for the builders you already have, basically?

Mark Harding executive
#31

Yes. Yes. I would say that explains why, even with the market fairly soft, and you can look at certain local news outlets where plenty of homebuilders are abandoning quite a few developments in and near the metro area, we are still bringing new homebuilders into the project we already have.

Tucker Andersen analyst
#32

Appreciate it, Mark. Continue the strong performance.

Joakim By analyst
#33

I'm calling in from Circulus Asset Management, located in Stockholm, Sweden. I've got two inquiries for you. The initial one concerns the guidance range. It would be valuable to get a bit more detail from you regarding the two distinct — the results spanned a fairly wide spectrum...

Mark Harding executive
#34

Could you repeat that...

Joakim By analyst
#35

When it comes to the guidance range you laid out there, what it really boils down to is how much oil and gas ends up flowing through that channel.

Mark Harding executive
#36

The way it works is they compensate us to remain on standby for them, correct? They pay us quite a lot — a premium rate — for supplying raw water, and their demand for water is enormous, yet it can swing from 0 all the way to 100 within a matter of days, correct? So at times it hinges on rig availability, and how — one thing I can say for certain is that all of their permits are already secured and their pad sites have been built, so everything comes down to keeping that rig in place. As I understand it, they completed 10 wells on a single pad site. Right now they're drilling, I believe, another dozen wells on a different pad site. So we can anticipate somewhere in the neighborhood of — somewhere between 20 and 35 wells on that project; and that essentially defines — that represents the range, since for us this is an opportunity with high margins.

Joakim By analyst
#37

My next question concerns water assets. Have you noticed water prices beginning to edge upward? I believe that's the broader direction. Also, how are water assets priced at present? And if you were to mark it to market, so to speak, what would the water's value roughly be?

Mark Harding executive
#38

Yes. Excellent question. Two benchmarks exist for this. Strength and appreciation in tap fees keep showing up. Over roughly the last 3 or 4 years, our tap fees have risen approximately 6%, 7% each year. So in our water and wastewater connections, we're now above about $42,000 a year. Then, looking simply at cost per acre foot, we acquired some water in a strategic location. Roughly 4 years ago — 4 or 5 years ago — we purchased our first farm there. For that, we paid roughly $9,700 per acre foot. Recent transactions exceed $20,000 per acre foot. That provides you with 2 distinct benchmarks: real acre foot purchases, plus the strength of our service model and how we deliver service across those 60,000 connections.

Executive executive
#39

Perhaps I should take a moment as well. I realize you had — I'm not sure whether your question was aimed particularly at our fiscal 2028 guidance and sort of the reasoning behind it. But much of what we anticipate following the 2027 interchange is being able to sell a portion of that commercial together with Phase 3. So once we bring additional capacity online at Sky Ranch, our lot revenue should genuinely be in a position to grow provided the market sustains it, with certain commercial lots coming on top of some home lots; therefore during 2025 and 2026, we are only selling residential lots across subphases and 2, basically to remain inside the capacity constraints of the interchange. What we more or less envision for 2028 and afterward is being able to pursue residential plus commercial. I'm not certain whether that was precisely what your question concerned. Yet that truly is the major shift visible in certain pieces of the guidance we anticipate going forward. So I don't know whether you'd like to weigh in on that.

Mark Harding executive
#40

Yeah, that clears things up nicely.

Elliot Knight analyst
#41

So while we're waiting, if there are no questions, Mark, could you share a bit about the situation at Lowry Ranch? Your remarks implied once more that construction is right at its edge. I realize you're not representing the landlord and have no desire to; but do you have any inkling whatsoever whether they're considering beginning commercial development of that property, since we hold an exclusive there, and it's 20x Sky Ranch's size.

Mark Harding executive
#42

Those figures are accurate. So you're correct. We still think of it as our single most valuable asset, correct? How do you turn water into money? Purchasing a water right is fine, but monetizing water rights is quite difficult unless you're delivering service. And with our service model, we put money into infrastructure. At the Lowry Ranch we hold a franchise service area. Among properties nationwide, it's among the most unusual, right? Nothing else compares to owning 27,000 acres of contiguous land sitting adjacent to a metro area. And when we entered this 30 years ago — and I see my good friend Dick Guido on the call, one of our — it goes back to 1990. And Elliot, you were present in 1990, as presumably was Tucker shortly afterward. But back then it was such a distance from the Denver area, right? If you consider how the Denver area migrated across that span of time, surrounding Lowry, and where the landlord was seeking to monetize and produce revenue from those assets back in 1990, and where that opportunity stands 30 years later, the value is simply enormous. And truly it's an asset for public education, the K-12 public education system in this state. It's — I can't stop feeling enthusiastic about all the activity around it and really the major opportunities the state has with it. But that asset belongs to them. They view it as a whole and say we want to do all we can and everything feasible with it, that portions of those lands will be conserved. Portions of those lands will serve a multi-revenue use purpose. Portions of those lands will be developed. And so for them the scale of the challenge there is really just determining the best way to use it; and it's tough when you're considering how am I going to eat this elephant. And it's one bite at a time. You can't view it as a whole. It's 27,000 acres, you have to scale it back and consider what am I going to — what opportunities exist with some of the most in-demand parcels and how do we approach that and how do we wish to keep participating with that. One thing we've accomplished while growing our portfolio is gaining the capability to assist them in developing it. Three decades back, by contrast, our focus was solely on the water utility aspect. These days, though, what our portfolio offers is the capacity to help with land development, infrastructure development, open space development, recreational use development. A great many things we're able to develop would satisfy every requirement they have on that front. So then the question becomes how we align those with what they need, what they want, and their schedule. We're quite active on that; at the same time, we aren't attempting to race ahead of them on it. Being partners is what we want. We aim to serve as a catalyst in it, and beyond that, we want to ensure we're a powerful advocate for their wishes and desires regarding the property.

Analyst analyst
#43

Mark, can you hear me?

Mark Harding executive
#44

I can.

Analyst analyst
#45

That slide featuring commercial development caught my attention — that was the first occasion for it, right, if I'm not mistaken?

Mark Harding executive
#46

Correct. Correct. I simply wanted to offer you two points, since that interchange comes up in our discussions constantly, and to provide a sense of how significant it is compared with the project as a whole.

Analyst analyst
#47

Looking at it practically, does the commercial development hinge on that new interchange?

Mark Harding executive
#48

Yes, it does.

Analyst analyst
#49

And when should we expect the interchange work to actually happen?

Mark Harding executive
#50

So, regarding that — for the past 3 years, we've been working with the county and CDOT on that permit, and we're getting fairly close to submitting it. The submittal itself is going to run about 2,000 pages covering, well, everything — engineering, rights of ways, designs, permitting, traffic control, all of it. At each stage over these last 3 years, they've reviewed it, given comments, and sort of established the parameters. So we'll get it to them around this spring. They'll go through it for completeness. After that, we move to final design at the same time, along with the bonding, later in the year. Then we're looking at going to bid for the interchange around the end of the year and having a construction contract in 2027. Building it should only take about 6, 9 months — probably 9 months. It's not, as you saw, a particularly complex one, and we can use the existing on, off-ramps. So really, we're just building a new bridge — a wider bridge, with longer ramps to the new one.

Analyst analyst
#51

So assuming everything unfolded the way that plan lays out, construction would wrap up at the start of calendar 2028?

Mark Harding executive
#52

Yes, yes.

Analyst analyst
#53

All right. There was no discussion — you didn't bring up public comments, or the chance for people to push back or halt things. Will that become a problem?

Mark Harding executive
#54

Fair question. I don't know that a comment period applies here, since all we're doing is swapping out an interchange that's already there. If this were a brand-new interchange, the process could look somewhat different, but in our case we're simply replacing and upgrading one that exists.

Analyst analyst
#55

Mark, yeah, so my question is about what's possible with data centers. Many individuals aren't keen on residing close to data centers; so what's your thinking regarding the placement of this facility inside Sky Ranch? And then, clearly, it's a solid method to free up some of that water capacity, but could you sell it at a price comparable to a single-family home? So if the data center equals 500 single-family homes, might you bill them at a comparable rate for that?

Mark Harding executive
#56

Both are solid inquiries. Regarding the first, placement, we're somewhat discussing — if we examine the location we're presently assessing, it would be nestled into that upper corner of the commercial parcel. Thus, no one would be residing adjacent to it. Adjacent being a flexible phrase, what counts as adjacent is — adjacent means a few hundred feet, adjacent means 0.25 of a mile. So that's roughly the gap we'd anticipate between that land use and our residential land use; so I believe we have decent spacing and a solid buffering chance for that. We aren't only examining that single location. We're examining other locations that will be further away where we could supply water to them on a more distant basis and perhaps it's where electricity is more reachable in a more distant spot. These data centers aren't tied to a specific site; and frankly, being beside the interstate isn't what they'd otherwise require. They don't require that sort of access; that we possess that site, that site is zoned, permitted, ready to go with all of the water out there is extremely appealing, correct? So many of these are — what's the availability? What's your time line? Can we get into a site sooner rather than later? And so all those things are appealing for Sky Ranch because it's already ready to go. Concerning what that water supply might look like, that's somewhat — there are many nuances there because they don't require fully potable water, correct? They don't require that same level of service that — they won't be consuming that water supply. So we've had discussions with them about water quality, raw water service that might have a bit of a price incentive for them where we don't have the same level of cost. We don't have the same level of water quality monitoring, those sorts of things. So that one is TBD. We certainly aim to make the most of what our water supply is worth, yet at the same time we recognize that we hold a very lengthy position in water supply, and perhaps there's an agreement covering supply with them across a stretch of time that might be viewed in one manner, and perhaps we could recover that water through a different route, providing them with certain incentives, so that we avoid sacrificing capacity equal to 60,000 units, while in the meantime we're still putting that water to use. So that kind of customer opens up all those possibilities. Alright, should nothing else come to mind regarding the quarter, please don't hold back if you're hearing this through a rebroadcast, or your technology failed you, or you got pulled away and had to chase after something else — feel free to say hello to me. We keep pushing hard to speed the company up, and we're quite enthusiastic about our current position. We're enthusiastic about our execution, and we're enthusiastic about what the upcoming quarters and upcoming years will bring. So thank you everyone for the support you keep giving, and we wish you the very best as the new year begins.

Analyst analyst
#57

Thank you, Mark.

Mark Harding executive
#58

Thanks all.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pure Cycle Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Pure Cycle Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.