Operator operator
#1

Good afternoon, everyone, and thank you for joining Rheinmetall's third-quarter call. I'm Jousf, your Chorus Call operator. <<operator_script>> Please note that this conference is being recorded. <<operator_script>> Recording for publication or broadcast is not permitted. At this point, I'm happy to introduce CFO Klaus Neumann. Sir, the floor is yours. Good afternoon, ladies and gentlemen, and welcome to Rheinmetall's Third Quarter Conference Call. Before I begin, please take a moment to review the disclaimer displayed here. As you likely know, yesterday we adjusted our full year 2026 guidance. I will return to that later in our outlook section. Our third quarter 2026 once again produced very satisfactory financials. Our top line grew year-on-year by 36% to more than EUR 3.1 billion. The operating result increased by 62%, resulting from our positive operating leverage effect. The operating result margin in the third quarter even exceeded that of the second quarter and came in at 17.5%. That is a very impressive improvement of 270 basis points year-on-year. Our operating free cash flow improved significantly compared to the second quarter and was only marginally negative at minus EUR 82 million. Unfortunately, we did not receive some of the advanced payments for the Romanian package until early October that would have pushed cash flow into the positive range.

Operator operator
#2

By the close of September, Rheinmetall’s backlog stood at EUR 78 billion, roughly matching where it was at the end of our second quarter. I’ll go into more detail on that shortly. Capital expenditure came in at 7.1% of sales, consistent with the adjusted figure we communicated during Q2. Our expansion strategy continues, along with key projects such as the U.K. Gunhall and the Albaete medium-caliber production facility that recently opened. On the hiring front, we keep seeing very strong interest in the job market. Through the end of September, we received over 250,000 CVs from around the world. That demonstrates the defense industry — and Rheinmetall specifically — is viewed as a highly attractive employer. As a result, we’re very confident in our ability to bring on all the talent required to deliver on our ambitious growth path ahead. Let me now take you through some operational highlights on Page 4. Looking at what took place during the third quarter, a few projects really stood out. We’ll begin with the United States. We successfully started delivering the first of 8 XM30 prototypes to the U.S. Army. These vehicles will go through rigorous customer testing, with a formal decision or a clear indication anticipated in 2027.

Operator operator
#3

Given the encouraging responses we’ve gotten so far, we’re still optimistic about our prospects of securing this tender for 3,000 Infinity fire vehicles, with the overall program worth roughly $45 billion. In addition, we deepened our collaboration with the U.S. Armed Forces. The U.S. Marine Corps chose our autonomous Mission Master SP platform for testing. Under that contract, we have delivered 12 of these unmanned ground vehicles successfully. Although the initial value is modest—just over $7 million—this deployment provides an extremely valuable operational reference and highlights the promising acceleration in demand we expect going forward for our autonomous systems in key allied markets. Moving on, Germany and the Netherlands exercised an option for 69 additional <<inaudible>> fighting vehicles, on top of the existing contract for 222 placed in 2025. Turning to space, we began production of the first SAR satellites alongside ICEYE at our converted facilities in Neuss. The intended production rate is several dozen satellites annually, as we keep seeing robust demand for SAR technology. Beyond that, by achieving initial operational capability, we hit a significant milestone in October in the new SPOC 1 satellite program for the German Army.

Operator operator
#4

On ammunition, we signed a sizable 155-millimeter contract with an international buyer, valued in the low triple-digit million euro range. Our Weapon and Ammunition capacity expansions remain fully on schedule. As recently as last month, our subsidiary, Daimeruck Expert Amunitions, brought our new highly automated medium-caliber production facility in Alberberetes, Spain, successfully into commission. Designed to reach an annual capacity of approximately 3 million components — projectiles and cartridge cases spanning 20 millimeters to 35 millimeters — this plant represents yet another key milestone within our group-wide firepower project. From both a financial and operational standpoint, the project reflects our disciplined capital allocation. We put in roughly EUR 20 million with a fast time-to-market execution, while growing the local workforce by close to 1/3, from 210 to 300 employees. It gives direct support to our long-term targets of achieving 4 million rounds of medium-caliber capacity by 2030. Moving to our Naval Systems division. We continue to see strong momentum and customer trust, highlighted by recent high-level announcements. At the key laying ceremony for the third type 4 to 4 class fleet service vessel at our Pen shipyard in Volgast, the German Defense Minister, Forstistorios, announced the government's intention to order a four signals intelligence vessel before the close of the year. That prospective order strengthens our long-term partnership with the German Navy and offers good visibility into future order intake and backlog within our naval portfolio.

Operator operator
#5

Riding this momentum and widening our international maritime presence, I can also share some good news: Rheinmetall, working alongside our partner MSC, has come out on top in the bid to take over the Mangalia Shipyard in Romania. The joint purchase price came to EUR 138 million, and this strategic move gives us a solid dual-use production hub for civil and military shipbuilding in Southeast Europe. On top of growing our industrial capacity, the Mangalia site will carry a pivotal execution role, directly supporting delivery of 4 naval vessels recently commissioned for the Romanian government, among them offshore, petrol and dive support vessels, while laying a scalable foundation for future defense programs in the region. All in all, Q3 showed meaningful operational progress along with our disciplined performance and execution. Ladies and gentlemen, let me dive into the financials. Taking a look at how our 5 segments performed, we are seeing very strong operating leverage across every segment, with air defense and weapon and ammunition leading the way. Vehicle Systems sales rose by 9.6% to nearly EUR 1.5 billion. The main driver behind this increase was a high sales share of logistical vehicles to the German customer. Beyond that, our service business and sales from technical vehicles made a positive contribution.

Operator operator
#6

The operating result margin rose to 13.0% compared with a year earlier, helped by more favorable effects from the product mix. Within the Weapon and Ammunition segment, demand has stayed strong and revenue grew robustly by 37%. The operating profit margin held at a high level of 22.9%. The key factor there was a shift in the product mix, driven by significantly stronger growth in the Direct Fire segment, together with the anticipated ramp-up costs for expanding our new plants and headwinds from currency and derivatives. In the Air Defense segment, operational performance was excellent, with turnover up significantly by around EUR 100 million. Sales to the MENA region and Western Europe were the main drivers of that growth. Earnings got a boost from public funding for research and development. The segment has shown strong scalability while keeping cost management disciplined. Digital Systems sales rose by 39% to EUR 509 million. The main contributors here were Tavan and the further ramp-up of F-35 fuselage production, which pushed the operating margin to 10.7%, an increase of 1.5 percentage points. Naval Systems sales came in at EUR 345 million. The main drivers here were the contracts with Germany on a fleet service vessel, the <<inaudible>> K130, as well as the repair and service business.

Operator operator
#7

Our operating result came in at EUR 38 million, giving us an operating margin of 11.1%. To finish up with the segment view, sales in the non-divisional consolidation line rose from minus EUR 243 million to minus EUR 374 million, as intersegment sales picked up. The operating result for the non-divisional consolidation line improved to minus EUR 8 million, thanks to the positive contribution from equity investments. Let's move on to Page 7. Looking at our Rheinmetall nomination in Q3, there's a slight decline versus prior year. The main reason is that, just as in previous years, we expect the bulk of our orders to come in during the final quarter of the year. Rheinmetall nomination for the third quarter stood at EUR 2.9 billion. One thing that really stood out was that the lion's share of the Rheinmetall nomination figure came from fixed order intakes. The key orders were the previously mentioned <<inaudible>> for Germany and the Netherlands, the GCAP modular camp for the German brigade in Lithuania, and an artillery ammunition order for an international customer. At the end of September, the Rheinmetall backlog was up 38% year on year, reaching EUR 78 billion, with a 70% fixed order share, up from 58%.

Operator operator
#8

That number mirrors the EUR 2.1 billion F126 contract adjustment we already discussed on our Q2 call. Now let's turn to Page 8, where we'll examine cash flow and working capital in more detail. What you see in operating free cash flow and working capital reflects how we're gearing up for a strong rally at year-end. Working capital kept climbing, reaching almost EUR 2.2 billion by the close of Q3. Within that, Weapon and Ammunition along with Air Defense drive the bulk of the working capital increase. As order and delivery momentum builds, we anticipate a reversal of this in Q4. Operating free cash flow for Q3 registered minus EUR 82 million. That figure encompassed customer prepayments tied to orders signed during the second quarter. Regrettably, a portion of the advanced payments on the remaining package only reached us in early October. If that advanced payment had been recognized in Q3, cash flow would have come out positive. In line with our CapEx plan for 2026, Q3 CapEx stands at the prior year's level in absolute terms. Moving on to Page 9. We renewed our syndicated credit facility successfully and ahead of schedule, doubling it from EUR 750 million to EUR 1.5 billion.

Operator operator
#9

That extra financial room helps us keep growing and makes our balance sheet even stronger after the bond issue we completed successfully in May of this year. At September's close, net financial position came in at minus EUR 2.9 billion, while the equity ratio stood at 28.3%. As we mentioned earlier, we have revised the full year guidance for 2026. Before, we had been looking for sales in a range of EUR 13.7 billion to EUR 14.2 billion. Given probable delays to the signing of the <<inaudible>> Boxer project and to an acceptance test for 155 millimeter ammunition, we now anticipate sales of roughly EUR 13.2 billion. As a result, our operating margin should move by 50 basis points to 18.5%, matching the prior year level and still the highest among the European primes. Turning to cash flow, we now guide to positive operating free cash flow, whereas before we had expected a cash flow conversion rate of at least 40%. No prepayments from the Amenience program are included in this updated guidance. Ladies and gentlemen, that brings my presentation for today to a close. Thank you very much for your kind attention. I will now open the floor for our Q&A session.

Operator operator
#10

<<operator_script>> Alessandro Pozzi from Mediobanca has our first question.

Alessandro Pozzi analyst
#11

First off, on guidance more broadly: all of us recognize you’re expanding far more quickly than nearly any other company your size, and giving exact revenue guidance will always be tough, particularly because some of your revenue is lumpy. Still, looking back at 2026, you’ve now revised guidance twice. Do you see that as purely one-offs, or do you believe there’s a case for being somewhat more cautious with guidance from here on? I’m wondering about when you eventually come out with 2027 and whether you’ll need more contingencies built in there, or whether it’s simply how the business works that makes revenue less predictable. And then, if possible, could you update us on where things stand regarding any backlog target and the timing of the Boxer contract as well—when do you expect that to be finalized, whether it will happen in the first part of Q1 or later on next year?

Klaus Neumann executive
#12

Yes. Thanks for your questions. We'll begin with the guidance. The adjustment we announced in July of this year was clearly a one-time event. A customer essentially walking away from one of the largest naval programs in its history is a highly unusual occurrence, and that is something we certainly did not anticipate. The situation now, at the end of 2026, looks somewhat different. We have the delay, or the probable delay, in signing the minus contract. I'll return to that situation a bit later. And then there's the matter of essentially the final approval and acceptance of ammunition lots that have already been produced. As of today, we don't expect all of this to still occur in 2026. And because of that, we were forced to revise the 2026 guidance. It remains the case that we have produced, that we hold the orders — it's simply that, from today's vantage point, we won't be able to deliver and recognize the revenue tied to them. As for the update going forward, I'll need to ask for your patience. We will share more guidance on 2027 and the years beyond at our Capital Markets Day later this year. Today isn't the moment to get more specific about those years.

Klaus Neumann executive
#13

On the Aminus contract, our team is right now in the last stages of negotiation with that customer. The customer has chosen to run a round of price audits and to challenge the calculation in detail. That may take — and is likely to take — more time than would permit an approval by the Dorm Bundespark before this year is out. As of today, we expect it will slip into the fourth quarter.

Alessandro Pozzi analyst
#14

Into the first quarter of?

Klaus Neumann executive
#15

The first quarter of 2027.

Alessandro Pozzi analyst
#16

Regarding the first quarter of 2027, yes. And my first question about the guidance was that I wasn't really seeking the '27 guidance, but rather whether there might be a shift in how you're approaching guidance and perhaps you'll offer guidance with more contingencies built in, to reflect the fact that some revenues can slip between quarters and between years as well.

Klaus Neumann executive
#17

For 2026, the guidance we're giving reflects our best estimate as of today of what we can deliver this year. On basic general adjustment, I wouldn't characterize it as differing in any way from guidance we've given previously. What we're essentially aiming to do is, whenever we observe that circumstances have shifted significantly relative to prior guidance, get an update out to the market as quickly as we can.

Benjamin Heelan analyst
#18

Regarding Q4 revenues, is there anything that potentially could move into Q1 under the new guidance?

Klaus Neumann executive
#19

We've gone through everything — and you're right to point out that we're dealing with some lumpy businesses and some deliveries right now. Our guidance has essentially taken into account every risk and opportunity still ahead of us for the rest of the year, and it reflects the best midpoint we have at this point.

Operator operator
#20

Our following question is from Sam Burgess at Goldman Sachs.

Samuel Burgess analyst
#21

Could you help us break down the EUR 500 million cut to the Weapons and Ammunition sales guidance — how much comes from that artillery acceptance delay, how much from destiness, and how much from any other factors? Just give us a sense of the moving parts there. And regarding the artillery ammunition acceptance, just so it's clear for investors: is this an existing contract that has run into a timing issue, rather than a delay to a government call off? That would be very helpful to know.

Klaus Neumann executive
#22

Yes. No, thank you for asking. I'll take the second question first. This has nothing to do with any delay in call-offs. It relates entirely to contracts that already exist. What's going on — and I think this may be worth explaining — is that we're constructing new facilities and ramping production at multiple sites. That also affects how we essentially structure our supply chain. The customer has now requested that we conduct more rigorous testing, depending on how each individual supply chain is structured going into a single lot. So that is now taking longer than expected and is also somewhat constrained because the customer has limited availability to perform this kind of testing. So it really is just a timing matter, and production of the products has already taken place, but acceptance and final approval from the customer are what remain pending. And we now assume that for a significant amount — in the 3-digit range for Aterian ammunition — this will be pushed into future periods. So this is also part of the answer to your first question. <<inaudible>>, we did anticipate revenues in the lower 3-digit range as a potential.

Klaus Neumann executive
#23

And as of right now, that is definitely not going to happen in 2026 either, since the talks haven't gotten to a point where we can basically take orders and execute them. On top of that, there are other issues we would otherwise have been able to offset, but when you put all those different elements together, they forced us to lower the guidance for 2026.

Samuel Burgess analyst
#24

All right, that's really useful. If I could just squeeze in one quick follow-up about the ammunition timing issue. I mean, does this tougher threshold for government certification or acceptance carry any implications for next year or the year after? Or is that something you figure you'll be able to handle?

Klaus Neumann executive
#25

No — at this point it's actually a fairly intense process, since we're launching new production sites with new methods of manufacturing. That means customer testing is stricter right now than it will be later on, once production has settled down.

Operator operator
#26

Sebastian Growe from BNP Paribas has the next question.

Sebastian Growe analyst
#27

Starting with a quick follow-up on the sales guidance question. First, regarding artillery ammunition: based on the earlier comments, is it fair for me to assume that we can add that slippage back to '27? And similarly, for the Aminius-related POC revenue delays, is there any risk of a spillover into outer years? Then I have one more question on free cash flow, please.

Klaus Neumann executive
#28

I won’t speak specifically about 2027. That’s something we’ll discuss later this month. But the key point is that, on the artillery side, these are contracts we already hold and are currently executing. Regarding <<inaudible>>, the situation is that we essentially preordered and began production or preparatory work for the program, relying—as we have in the past with some limited contracts—on the customer placing the order. So yes, technically that will become revenue in 2027. But as for giving a total number for 2027 and future years, I’ll have to ask you to be patient until our Capital Markets Day.

Sebastian Growe analyst
#29

All right, let's turn to free cash flow next. You're still expecting parent free cash flow to be positive in '26. That means EUR 10 billion or more would be needed in the fourth quarter. And at the same time, as was mentioned earlier, you're not giving an order intake bridge anymore. So with down payments being so important to hitting that target, I was hoping you could give at least a little more detail on what's baked into that bridge. What working capital tailwinds would you assume there? And how should we think about order wins and CapEx specifically for the fourth quarter, please?

Klaus Neumann executive
#30

The cash flow figure we give excludes the Aaminius contract — meaning any prepayment tied to it. That point is fairly evident, I believe. We are indeed seeing a substantial volume of payments arriving from contracts that are already being executed. So there is a fairly large amount of payment for contracts we already hold. We expect roughly an overall higher 3-digit number from contracts we anticipate signing in the fourth quarter. As noted before, we have already received a meaningful prepayment from the Romanian package, approximately EUR 150 million, which is not part of the cash flow as of the end of September. And in terms <<inaudible>>, we did not offer more detailed guidance or information for the close of the year, since pinpointing it precisely to year-end will be difficult. Some information on the contracts we still expect to come toward the end of the year, whether or not prepayments are involved: we are very optimistic about the signal intelligence boat, which basically the German Defense Minister himself wants to push through this year, as he has said publicly. We are working on an additional order for trucks and some <<inaudible>> programs for European countries.

Klaus Neumann executive
#31

There are several bigger programs out there, sure — but for the most part, our cash flow isn't reliant on landing new contracts.

Sebastian Growe analyst
#32

Alright, got it. And one last thing — could you briefly comment on CapEx and how we should be thinking about it, especially as it relates to quarter 4?

Klaus Neumann executive
#33

During our Q2 call back in July, we refreshed the guidance we give on cash flow. As things stand right now, we aren't seeing anything that would alter that guidance, so it remains above EUR 1 billion for the full year.

Operator operator
#34

Our following question is from <<inaudible>> at UBS.

Analyst analyst
#35

I've got 2 questions, if I may, and I'll take them one by one. The first one returns to Destinos. Clearly, the company has now also partnered with <<inaudible>>. So I was wondering how you view what lies ahead for the Destinos joint venture. Does that remain a going concern? Or should we sort of stop assuming that this JV will proceed any longer?

Klaus Neumann executive
#36

Yeah, you're 100% right about that. Destin has now put arrangements in place with <<inaudible>>. That's one of the reasons the negotiation — or really the conversation — we're still having with Destin hasn't produced any concrete agreement. Those discussions are ongoing. Obviously, given this situation, we can be less certain that it will come to fruition than before, but where it's going hasn't been finally decided.

Analyst analyst
#37

My other question is really just going back to that first one about how you set guidance, correct? Since I suppose by now we've witnessed over a good number of years that delays keep happening, and they're largely driven by customers, with certain unforeseen events as well. I mean, isn't that something you've learned regarding the way you generally approach guidance, so that you build in a larger sort of safety cushion when you guide? And I mean, on the 2030 targets, right now you have a point target of EUR 45 billion organic. Wouldn't it make sense to have something like a range, and also, for suppliers, with the building blocks behind this guidance, what do you need in terms of projects to reach it? Should we be expecting something along those lines from the CMD?

Klaus Neumann executive
#38

Absolutely, for the CMD. And on that — yes, we have — this feedback has come up multiple times, and I completely get it. It's going to be a key element of the presentation to lay out not only what the figure is but how we intend to reach it. So really those building blocks that you referenced. As for 2026, all I can say is I don't want another profit warning this year or in early next year. So these really are the best assumptions we have right now, given all the opportunities and risks we see.

Analyst analyst
#39

Yeah, since you'd likely also concur that issues on the ammunition front can crop up at any time without that carrying any bigger implication about whether Germany still intends to purchase or not. That said, my guess is that if contingencies get built in right from the start, then I suppose we won't have to have this conversation.

Klaus Neumann executive
#40

Yes — the guidance we gave earlier this year also rested on production programs and schedules, on contracts already booked plus some we expected to sign during the year. Unfortunately, for 2026, 2 extremely large programs either failed to materialize, like F126, or now look likely to slip, as <<inaudible>>, and that creates an impact we hadn't planned for. Perhaps going forward, that's worth considering — how to handle such major events when it comes to guidance as well — but that is what happened this year. And as of today, the information we're providing reflects our best knowledge.

Analyst analyst
#41

Right. I suppose the client’s staffing shortfall was also something that occurred on the truck side. So it appears that the Germ customer isn’t expanding on the staffing side as quickly as you folks are.

Klaus Neumann executive
#42

That's also one thing that pushed production up and pushed more deliveries out to customers, and it's also running into limits on the customer acceptance side. I think for trucks, this remains an ongoing issue. As I said earlier, it stems from the one-time ramp-up of new production facilities, which also bring a broader supply chain than we had before. And all of it is happening within a short span of time. I think that sort of issue won't show up again in future years.

Operator operator
#43

Moving on, our following question is from George Mcwhirter at Berenberg.

George McWhirter analyst
#44

I have 2 questions, if I could. I might have missed this. Could you please describe what you're anticipating for the ammunition contracts in Q4 — for example, medium caliber smart ammunition and artillery ammunition? My second question concerns the newer areas of your business. Could you give a general outline of how those are progressing more broadly, aside from Destin — for instance, the joint venture and the space partnerships?

Klaus Neumann executive
#45

Yes. Regarding ammunition, I believe you're asking about order intake. Discussions remain ongoing, and we've submitted proposals to the German customer as well as to other nations covering every kind of ammunition type — smart, medium-caliber and <<inaudible>> included — though we won't elaborate further on the size, scale or timing of those contracts. That said, these contracts have not yet been signed, so they do not significantly affect any result for 2026. On Rocket, Lockheed — the cooperation with Lockheed Martin — as I explained regarding destininess, talks are continuing but have not produced either a go or a no-go final decision. Where Lockheed Martin is concerned, discussions are likewise moving forward and continuing, but we aren't at the stage where we can make any more detailed announcements.

Operator operator
#46

Our following question is from Sash Tusa at Agency Partners.

Sash Tusa analyst
#47

I'd like to ask a follow-up about those artillery lots that were delayed, just so we're clear on this. Has it been the case that you're blending supplies from various vendors — perhaps powder, explosives, or fuses — into the same lots that go out to your customers? Or is the bigger concern on the customer side that a quality escape has occurred and they aren't able to...

Klaus Neumann executive
#48

Sure, I can walk you through that. We haven’t been combining lots, but at this point we’re essentially turning out a greater number of lots from that same facility since — as you pointed out — we’re drawing on material from various sites that ends up in the finished product. So no, those products aren’t being blended together into one lot, yet we’ve now got additional lots emerging from that same facility, and that means additional work on the acceptance side.

Operator operator
#49

Our following question is from Marie-Ange Riggio at Morgan Stanley.

Marie-Ange Riggio analyst
#50

Starting with Boxer: you said roughly EUR 100 million was cut this year in connection with that contract, since you expect percentage-of-completion revenue to be recognized once it's signed in December 2026. Doing a quick bit of math — and I realize it isn't perfect — is it fair to assume something like EUR 100 million of revenue per month as a run rate for '27? Or, to frame it differently and take a bearish view, what would each month of delay cost from here? That's my first question, on Boxer. My second is about your '26 backlog target, because so far it remains above EUR 100 billion. Yet looking at order intake for the 9 months, it would imply Q4 above EUR 25 billion. So how confident are you of getting there? And which major contracts do you expect to close the gap to the target?

Klaus Neumann executive
#51

Okay. As the final target, I don’t believe we’ll get to a EUR 100 billion order backlog by year-end unless the <<inaudible>> contract is suddenly signed, or, contrary to what we currently assume, it still gets signed in 2026. I said earlier that we have certain orders that, for the German council as well, may also struggle to make it onto the agenda for approval this year. That’s the reason we aren’t giving more specific guidance. We’re seeing strong interest in our products. We have many discussions that are reaching the final stages. But unless Ameniu is suddenly signed, or still signed in 2026, we won’t reach EUR 100 billion.

Marie-Ange Riggio analyst
#52

Okay, just a quick note on this before we get to the Boxer contract. The EUR 100 billion figure included <<inaudible>>, so setting that aside, should we think of guidance as somewhere between EUR 85 billion — or EUR 80 billion, $25 billion?

Klaus Neumann executive
#53

Right. That always covered a portion of the <<inaudible>> contract. On the Boxer, yes — the rate you mentioned — from a scale standpoint, it's logical, since we're in the ramp-up stage. We began buying and sourcing products, and we also started preparatory work so we could meet the deadlines and timelines the customer continues to request, and we would have been able, upon signing the contract, to really start moving this into production and then hit a lower 3-digit million revenue before year-end. But obviously that depends on whether a contract gets signed or doesn't get signed on the final day — at least a few weeks ahead of year-end — and that now looks unlikely to occur.

Marie-Ange Riggio analyst
#54

Just to confirm, then — you mentioned that the scale of, basically, the lower triple digit per month is a pretty fast option?

Klaus Neumann executive
#55

Yeah. On the rough side, that makes sense, since deliveries — actual final deliveries at scale — wouldn't begin until 2028.

Marie-Ange Riggio analyst
#56

Yes. But looking ahead to 2027 — yes, alright. So for 2027, if we assume lower triple-digit revenue per month, that's probably a reasonable assumption, just to check that I've got it right.

Klaus Neumann executive
#57

Right. We never actually gave more detail on that, but if you think about how to model it, it's not too far off.

Operator operator
#58

Afonso Osorio from Barclays has the next question.

Adrien Rabier analyst
#59

Could I ask a quick follow-up about that margin guidance? When we look at what’s implied for Q4, it seems like the vehicles margin is down both sequentially and compared with a year ago. And if you look at how things have gone recently, margins have risen quarter over quarter and year over year in every quarter this year. So I’m just wondering whether there’s a specific reason behind that Q4 decline. Then my second quick question is also about margin in aero defense. Were there any one-off benefits in Q3 that we ought to be aware of? I believe the new guidance implies defense margin will again be lower year over year. So I think that’s pretty unlikely. So I’d just be curious to hear what you think.

Klaus Neumann executive
#60

Right. Let's begin with Air Defense. We raised the revenue guidance for Air Defense, though not the profitability guidance yet. We'll see whether there's some potential to land more toward the upper end of the implied range. In Q3, we saw support from R&D programs we signed with the Italian government, which gave an extra benefit to profitability. That program isn't consistent over time. So whether it delivers the same benefit in Q4, we don't know for certain yet.

Afonso Osório analyst
#61

All right, and if you’re still on the line, I’ve got one quick follow-up.

Klaus Neumann executive
#62

Right. I'd say the more helpful figure probably falls around EUR 10 million.

Afonso Osório analyst
#63

All right, that's really useful. And if I could, one last question from me. I realize it's still tied to the price talks and is still working its way through for the Boxer next year. But could you speak more generally about the press articles mentioning a EUR 20 billion fixed price for this Boxer contract at the outset, of which roughly EUR 10 billion would come to you — that's lower than what you stated before. So is there anything you can share with us on that right now?

Klaus Neumann executive
#64

Yes. What I can say is that the EUR 20 billion isn’t divided equally between KNDS and Rheinmetall — our portion would be bigger.

Operator operator
#65

Up next, we have a question from Christoph Laskawi at Deutsche Bank.

Christoph Laskawi analyst
#66

Just two quick follow-ups, really. First, back to the lot acceptance test — apologies for returning to it. Does it involve several customers, or is it essentially just one? I ask because if only one is affected, then once that's sorted, you could clearly bring in the revenues fairly fast, whereas if several are involved, it might stretch across a couple of quarters. Then, on your remark that Germany has basically shifted toward more detailed price analysis or pricing checks on the Boxer: do you view that as the customer's general behavior on other contracts too, which slows down approval and signing? Or is it mainly because this could be the largest contract they will ever sign — or at least the largest to date — and so it's more specific to this one contract?

Klaus Neumann executive
#67

Yes. I'll address the second question first. The key factor here is that this is essentially the biggest contract the Army has ever awarded. So there's more scrutiny, and we always anticipated that these contracts would receive greater scrutiny. What you're also seeing — and whether it matters in this case, we don't know — is that the customer is now focusing more on value for money, and he wants to be sure he's getting a good product at the right price. So that's what's going on. But I think the primary driver is definitely that this is the largest program currently being negotiated. And the other point regarding the loss: it's mostly one customer, but as I explained earlier, it's several losses due essentially to different supply chain structures feeding into the final product. And that essentially requires several acceptance tests even if it's only one customer.

Christoph Laskawi analyst
#68

And is it possible to complete those fairly close together in time? Or would more groundwork typically be needed before the second one can follow the first?

Klaus Neumann executive
#69

It really comes down to whether shooting ranges, staff, and people on the customer side are available to be there and sign off on the testing. So there's a bit of — it's not as if you can get everything done in a single day, even with that same customer.

Operator operator
#70

David Perry from JPMorgan has our next question.

David Perry analyst
#71

I have 3 questions. If you'd rather not answer all of them, feel free to pick which one to skip. All of them are somewhat philosophical. Starting with the first one, I'm just curious about the broader relationship with the German government. It's a single customer, a large one, but with many separate contracts. So I was wondering, philosophically, whether each contract gets negotiated on its own? What I'm really getting at is whether the conversation ever goes something like: give us a price, we'll pay this amount for the Boxer, but we'd like you to charge us less on the ammunition? Or do those discussions always stay separate? That's question one. The second...

Klaus Neumann executive
#72

Sure, from everything I understand, a lot of those contracts get negotiated by various departments over at the procurement agency. That said, if you're looking for more detail, the folks who are actually hands-on with sales could answer that better — I'm not really in a position to offer anything more specific there.

David Perry analyst
#73

Alright. On the second question, I might have missed a few, but going by everything you've announced, I believe there have been 21 JVs since October '24. I was just wondering, roughly how many of those JVs are actually up and running at this point? How many do you figure may never get to fruition? And do they make a meaningful contribution to the guidance you gave us at the CMD last year?

Klaus Neumann executive
#74

At the moment I don’t have the precise figure, but those 2 joint ventures you brought up involve a mixture of several cooperation types. In some cases, we’re in a fully consolidated working relationship in which the previous owner remains a minority shareholder; other cases are genuine joint ventures that already exist; and still others are essentially being put into operation right now. On the whole, one that contributes more substantially is the <<inaudible>> acquisition, where a joint venture partner is still with us and we only took over the majority earlier this year. That one is already adding a meaningful amount. We acquired Docking, for instance, this summer. It remains a joint venture company that is now beginning to deliver revenue in the lower million numbers, yet we see strong potential because of what they can do in the autonomous vehicle area. So there is no — the largest contribution by far comes from Blacknet. The rest are areas where they are either still in buildup mode. For example, the joint venture with ICEYE, too, is only now starting to produce meaningful contributions, but they will supply technology and essentially a foundation for growth in the years ahead.

David Perry analyst
#75

All right. Perhaps you can bring us up to date on that at the same time. My final question, if I may, concerns this year with the updated guidance: excluding the naval acquisition, your organic growth comes to roughly 22%, whereas a year ago it was 25%. Once companies grow larger, most of them find it hard to keep growth rates accelerating. That's simply difficult. Yet you continue to guide to 25% to 35% organic growth out through 2030. Given that customers will always need to inspect things, and that you're expanding while supply chains grow more complex, do you remain at ease with that framework of 25% to 35% organic growth across 5 years?

Klaus Neumann executive
#76

That’s not something I’m going to comment on. And I’d also ask for your patience ahead of the upcoming CMD, where we’ll give you more clarity regarding what we expect in the years ahead.

Operator operator
#77

Our following question is from Benjamin Heelan at Bank of America.

Benjamin Heelan analyst
#78

I just have a couple of follow-ups. First, on Armenius: there have been some remarks — I believe Armenius itself commented over the past couple of months about changes to the contract's scope — and there have obviously been some news articles pointing to lower pricing for Armenius. So could you give us a bit of an update on where you're seeing the scope of the contract? And is that potentially one of the things that has caused the decision to be pushed to the right? That's the first one. Then the second one, on this artillery slowdown: you've mentioned these increased supplier investigations. But similar to the comments you made on Armenius, where the customer is looking for more value for money — the question I have is, is the customer starting to look at artillery and discuss more value for money, and is that part of what the supplier investigations assessments are about as well? And then I — sorry...

Klaus Neumann executive
#79

May I address that briefly? The artillery pricing really rests on audited and agreed prices for long-term frame contracts, and the customer has consistently sought essentially a structure ensuring he receives a favorable price. So the delay we mentioned has nothing whatsoever to do with scrutiny, or any new scrutiny, of prices. It really comes down essentially to the mechanics of completing the required testing, and that simply takes longer than we anticipated.

Alessandro Pozzi analyst
#80

And my apologies — please continue; I’ll follow up.

Klaus Neumann executive
#81

Yeah. On the Amino contract talks, as far as the scope goes—<<inaudible>> largely to do with how the options and extra packages get structured, which form part of the negotiations and aren't tied to the main package, meaning the fixed contract. Over the last months, that scope has shifted only very slightly. There was a bit of fine-tuning around pricing, and as for the audit—whether any findings come up and whether certain elements end up adjusting the final price—that's something we'll have to wait on until these negotiations wrap up.

Benjamin Heelan analyst
#82

Alright. Alright. Let me take one quick follow-up, and then I'll get to my third question. Going back to artillery, order momentum has decelerated significantly over the last 12 months. Could you speak a bit about how you view the artillery pipeline? And what sort of opportunity set do you see at present? Then my last question returns to something similar to what David just raised. My take on the JVs when they were announced at the time was that this is a means for companies such as Destin or Lockheed, et cetera, to use Rheinmetall as a route into Germany, and that's what many of the joint ventures were kind of designed around. Do you think part of the reason some of these joint ventures are taking considerably longer to materialize, or to begin materializing at all, is that companies are getting chances to simply sell to the German customer independently on a stand-alone basis? So I was just wondering whether you could comment on that angle.

Klaus Neumann executive
#83

Right. Let's begin with the joint ventures. In my view, this isn't a factor behind the delays. And on top of that, when it comes to the discussions, it isn't simply that we are the ones bringing people into the German market and merely opening the door. What we bring to this setup is that, yes, the partner supplies technology, and we provide not only the presence and the access, but likewise the ability to manufacture and expand production in Germany, together with the existing manufacturing and technological capabilities we already possess. So we don't believe it makes sense — in many cases — to essentially say, okay, I'll go straight to the German customer and sell; for most of these arrangements, that doesn't strike me as a workable alternative.

Benjamin Heelan analyst
#84

And then regarding the...

Klaus Neumann executive
#85

My apologies.

Benjamin Heelan analyst
#86

What about the artillery pipeline, then?

Klaus Neumann executive
#87

Regarding the artillery pipeline, we hold long-term contracts or framework agreements for ancillary with numerous customers across Germany and Europe. That said, it's accurate that we'd prefer to see the current frameworks drawn down more quickly. We're emphasizing this point to our German customer, since the requirement to essentially restock or procure the product remains. It might not be at the same level as perhaps 2 years back, but there's still a strong need to restock and replenish inventory with the product that continues to be used.

Operator operator
#88

Our following question is from Joe Orchard with Rochhield & Co.

Joe Orchard analyst
#89

I have a question regarding the Romanian shipyard acquisition. It appears that <<inaudible>> is contesting the sale process, and a court hearing on that is scheduled for December. So my first question is whether that's accurate. And then, as a follow-up, I suppose I'd ask why you chose to make the acquisition public at a point when this legal process still has to run its course?

Klaus Neumann executive
#90

Yes, I can. There have been a few challenges — whether they’ll actually go anywhere is a separate question. We don’t believe they have any grounds, though that’s something for the Romanian legal authorities to determine. We didn’t — in fact, we weren’t the first party to make the result public. We essentially bought or essentially received the award through an auction, and the firm that conducted that auction published the outcome on that same day. So we essentially came afterward to clarify to the market the reason we joined the process, the reason we purchased the business, and what we plan to do with it alongside our partner?

Operator operator
#91

Roy Smith from Oxcap has the next question.

Rory Smith analyst
#92

Roy here, from Oxcap. Just one question, please, and it ties to what David asked about the JVs. What I'd like to understand better is the sorts of processes and controls that are actually in place when you head out to conduct diligence on some of these JVs and partnerships. The reason I ask is that I've visited a fair number of defense tech companies, and to put it bluntly, all of them are rather immature when it comes to — or at least some certainly are, regarding their own internal processes, manufacturing capabilities, et cetera, et cetera. So is there anything you can share from the insights — things that aren't visible to us — that gives us a bit more confidence about the outlook for that JV partnership piece, on maturity, I suppose? That would be really helpful.

Klaus Neumann executive
#93

Okay, so every acquisition or joint venture we consider gets put through our diligence process. We examine every angle—legal, production, technology, tax, all of those areas—prior to signing any contract. In certain situations, yes, you're correct, the maturity level of the organization isn't yet at the point where we'd want our final entities to be, but those entities might possess technology or production capabilities and ideas that could be of benefit to us. So because of that, we build the expense of raising the organization up to our standard into the business case in every instance before making a decision.

Operator operator
#94

Sven Bayer from UBS has a follow-up, and that will be the final question on today's call.

Analyst analyst
#95

Yes. Sorry, only a quick follow-up regarding the Boxer, actually. I was just curious, since on the truck side, right, when we experienced those delays, I believe you were still building the trucks even before you had, like, the official call-off. I mean, could we imagine that you'd do the same with the Boxer, right — that even before the official decision gets made, you'd begin production? Or would you definitely hold off until you have the final order?

Klaus Neumann executive
#96

When it comes to vehicle contracts, we typically don't begin before the contract is actually in production. What we do on occasion is start procuring products if we're essentially in the final stages of negotiations, and we need to order products—or components—that can also be used for other programs. With the <<inaudible>> contract, because of the timeline the customer wanted, we went further than we would for any other customer. That's why we were essentially in a position to really make progress right after signing a contract for—in 2026. Now that the signature is likely to be delayed, we won't be able to generate revenue from the preparatory work we've essentially started.

Analyst analyst
#97

And there's more work ahead from this point. So I suppose the revenue figure you produce once the contract gets signed ends up larger than what you would have had in 2026. Is that correct?

Klaus Neumann executive
#98

We’ve been clear with the customer that there’s a cap on what we’ll take on absent that contract. And yes, the work we’ve only just begun—or the prep work—would essentially be additive to the revenue we’d generate on a run rate otherwise.

Operator operator
#99

Ladies and gentlemen, that brings us to the end of the Q&A. At this point, I'd like to hand the conference back to our CFO, Klaus Neumann, so he can offer some closing remarks.

Klaus Neumann executive
#100

Thanks very much, everyone, for being with us on today's Q3 earnings call. Should you have additional questions or comments, please reach out to Dirk and his team. Have a wonderful day, and I'm hoping plenty of you will join us at our Capital Markets Day in Hamburg later this month. Take care, and goodbye.

Operator operator
#101

Ladies and gentlemen, that brings us to the end of the conference. We appreciate your choice of Chorus Call, and we thank you for taking part in the conference. You can now disconnect your lines. Goodbye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Rheinmetall AG transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Rheinmetall AG earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.