Seamec Limited (526807) Earnings Call Transcript
November 11, 2025
Earnings Call Speaker Segments
Good day, ladies and gentlemen, and welcome to the Seamec Limited Q2 FY '26 Conference Call, brought to you by Arihant Capital Markets Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Mr. Balasubramanian. Thank you, and the floor is yours, sir.
Thank you. Sasha. Good afternoon, everyone. Speaking for Arihant Capital, I'm pleased to welcome all of you to Seamec Limited's earnings call covering Q2 FY '26. Joining us from management today are Mr. Rajeev Goel, Non-Executive Director; Mr. Vinay Kumar Agarwal, CFO; and Mr. Sunil Gupta, Vice President, Strategy and Investor Relations. We extend a warm welcome to Seamec's management on today's call. I'd now like to invite Mr. Rajeev Goel, Non-Executive Director, to deliver his opening remarks, after which we'll open the floor for Q&A. Over to you, sir.
Good morning, everyone. I'm Rajeev Goel, Non-Executive Director at Seamec, and I'd like to welcome all of you warmly to the Seamec Q2 and H1 FY '26 earnings call. Thank you very much for making the time to be with us today. On this call I'm accompanied by our Chief Financial Officer, Mr. Vinay Agarwal, and our Vice President, Strategy and Investor Relations, Mr. Sunil Gupta — both are veterans in their respective fields with a great deal of experience. I'd like to point out here that India's petroleum and energy sector is going through a transformative expansion and is set to play a defining role in shaping the future of global energy, India's energy journey. And that journey has so far shown remarkable progress, driven by visionary policy, rapid innovation and sustained investments across a range of sectors — refining, biofuel and green energy — all of it undertaken by the Government of India and our Ministry of Petroleum and Natural Gas under the leadership of Mr. Hardeep Singh Puri, our Union Minister. At present, our capacity is approximately 258 million metric tons per annum, and we remain on track to hit 310 million metric tons by 2030, with long-term plans to scale it up further.
To reiterate, this growth will cement India's standing among the world's top 3 refining centers, since roughly 20% of current worldwide refinery capacity could shut down by 2035. Although the global energy market is projected to expand slowly, with numerous refineries across the world shutting down, India emerges as a bright spot, expected to raise its share to almost 33% of worldwide energy demand over the next decade. Turning to Seamec, this quarter proved quite difficult for us, being the monsoon quarter, as we affectionately refer to it. During this stretch, most of our vessels cannot operate owing to weather conditions, and deployment was restricted. On top of that, we encountered certain operational headwinds, particularly concerning our vessel Swordfish. We have talked about Swordfish on earlier investor calls as well. Regrettably, that vessel suffered a technical breakdown in mid-August, after it had been deployed successfully with Aramco, and this hurt its charter hire availability. However, as things stand, those issues have all been properly fixed, and the vessel is now in the field, operating at full capacity. Additionally, I am happy to report that our Barge team at Glorious has signed a firm charter party with L&T covering work in the Mumbai High and Western offshore region for a firm period of 150 days, and that barge has already been mobilized in the field with L&T.
We also completed a charter hire deal valued at INR 6.3 crores with HAL Offshore covering its vessel Goodman. The company entered into a memorandum of understanding with the DG Shipping to put roughly almost INR 1,000 crores into our maritime business. Monsoon seasonality remains a factor for the offshore segment, affecting mobilization as well as chartering activity. That said, with the new contracts we have secured, we expect operations to get better as chartering activity picks up and the monsoon impact trades. The coming few quarters will be very meaningful for us as we capitalize on the up cycle and keep strengthening our foundation for sustainable growth. Thank you for your time and continued trust. I would now hand the floor over to Mr. Vinay Agarwal, our CFO, who will give you a detailed overview of our financial performance for Q2 and H1 FY '26. Thank you very much.
Good afternoon, everyone, and thank you, Rajeev-ji. I'd like to extend a warm welcome to all of you joining us on today's Q2 and H1 FY '26 earnings call. Let me take you through the financial performance on both a stand-alone and consolidated basis for the second quarter and the first half of FY '26. Consolidated top line for the quarter came in at INR 108 crores, versus INR 110 crores in Q2 FY '25, which works out to a 3% decline on a year-on-year basis. On a stand-alone basis, revenue was INR 91 crores, against INR 102 crores in the same period a year earlier. For H1 FY '26, our revenue at the consol level was INR 338 crores, compared with INR 333 crores in H1 FY '25, a rise of 2%. At the stand-alone level, H1 FY '26 delivered revenue of INR 314 crores, versus INR 320 crores in the first half of last year, a decline of 3%. EBITDA for the quarter at the consol level came to INR 18 crores in Q2 FY '26, against INR 38 crores in Q4 FY '25. Stand-alone EBITDA was INR 9 crores in Q2 FY '26, compared to INR 37 crores in Q2 FY '25. Consolidated EBITDA for H1 FY '26 was INR 135 crores, versus INR 119 crores in H1 FY '25.
On a stand-alone basis, EBITDA came in at INR 125 crores for H1 '26, versus INR 123 crores in H1 FY '25. The weaker performance stemmed primarily from an unscheduled breakdown of our vessel Seamec Swordfish during the quarter just ended, which is now projecting fine and operating in the field. As a result, on a consolidated basis, we posted a loss of INR 26 crores, compared with a profit of INR 22 crores in the corresponding quarter a year earlier. Stand-alone, the loss was INR 26 crores in Q2 FY '26, against a profit of INR 3 crores in Q2 FY '25. H1 FY '26 produced a PAT of INR 50 crores, the same as H1 FY '25 at the consolidated level. PAT on a stand-alone basis was INR 54 crores in H1 FY '26, against INR 55 crores in H1 FY '25. ROCE and ROE both came in at 8% at the consolidated level. Thank you for your continued support. With our entire fleet now up and running, we are confident about getting back on track in the coming quarter. I would now like to open the floor for questions and answers. Thank you.
<<operator_script>> Our first question is from Abu Rafe, who is an individual investor.
I have a handful of questions. Over the last few quarters, it seems like ships are breaking down more often. Can you walk us through what management is doing and what the action plan is to reduce how frequently these breakdowns happen and to make sure they get fixed faster when they do occur?
Do you have additional questions, or should we take them one at a time?
For me, sir, it would work better if we did that one at a time.
Yes, certainly. As we’ve been telling investors, a number of our vessels are already fairly old, right? And given their age, breakdowns can very well happen. Bringing newer vessels into the fleet is one answer. Second, we’re placing greater emphasis on preventive maintenance. And third, we’re also making sure to hold certain spares, which can assist in cutting downtime. I hope that responds to your question.
All right, sir. My next question is this: on your earlier conference calls, you said there's plenty of work out there in the market, yet we lack sufficient vessels to satisfy that demand. So what I'd like to understand is, couldn't we simply lease vessels from another company and get the work completed? Isn't that something we could do?
Rajeev-ji, I'd like to give the answer on that.
Thanks for asking that. Let me address it directly. Taking vessels on lease from another firm, layering my services on top of that asset, and then passing it along to the customer simply doesn't work from a financial standpoint, because — please keep in mind — this is a CapEx-driven business. Once you decide to charter in a vessel, a great many conditions come attached, particularly the ones you just raised about breakdowns and upkeep of the unit, correct? So we need to make sure we secure a genuinely solid vessel with a strong record of operating in the field, and the lease rates must be financially workable. What we've seen in our own experience is that each time we've attempted this, once the contract wraps up and after every contingency and all the rest has been factored in, the returns come out unattractive — not enough to justify the effort such contracts demand from us. As things stand right now, I'm glad to report that practically the whole fleet is deployed in the field and fully operational. And yes, we continue to explore ways of growing our fleet, given the demand opportunities available to us.
There's one more point to add, as Rajeev-ji mentioned. Look, roughly 2 or 3 years ago we had already carried out a CapEx of about INR 500 crores, right? This year, we've committed INR 800 crores once again toward expanding our fleet. So this is a continuing journey, and we'll make sure that the cash flows and the opportunities stay aligned in such a way that we don't miss out on opportunities.
All right, okay. Sir, I have one final question before I rejoin the queue. Sir, when should we expect delivery of Anant?
Regarding Anant, we’ve at last received shareholder approval for the RPT transaction—the e-voting wrapped up on 31st of October. With that in place, we can now move ahead with the next round of approvals from DG Shipping and ONGC. As things stand, we intend to mobilize it by 1st of Feb, which is also reflected in our financial budget, and we’re aiming to hit those timelines.
Manhar Rao from Orbit Capital has the next question on the line.
Yes. So my question is this, sir: Seamec Swordfish was in service for roughly 75 days during this quarter. And Seamec Paladin was also in service for nearly the whole quarter. So if I simply take the revenue from these 2 vessels on a stand-alone basis, that should have come to INR 80 crores. Beyond that, I had Princess, Diamond, and even Seamec II was in service for part of the period. So how is it that we have generated just INR 82 crores on a stand-alone basis this quarter? Because based on those 2 ships alone, Swordfish and Paladin ought to have been enough to bring in the revenue we have posted this quarter?
I’ll ask Vinay-ji to respond to that.
Regardless of what you're saying, sir, that applies to both Swordfish and Paladin. With Paladin, we worked the entire quarter, but with Swordfish, we only worked 21, 22-odd days. So the revenue isn't sufficient, no matter what you're saying. What we've reported follows the deployment chart for our vessel. And you're correct to say that if we had deployed this vessel for the whole quarter, revenue would have been much better. But Swordfish was deployed for just 22 days, and Paladin...
Apologies for jumping in here. The thing is, we simply received a notice that Swordfish wasn’t deployed from August 28 through 12 September. So how does it end up at just 22 days, sir, when even if I take out 28 August to 12 September — roughly 15 days — from 90 days, by my math that leaves around 75 days.
No, no. Just one thing I'd like to add. During this quarter, our deployment of Swordfish got underway around 14th or 15th of August. It stayed on hire for 3, 4 days, then came off hire because of a breakdown, and then it was redeployed again around 10th or 12th September and worked through to quarter end. So effectively, given that Swordfish has worked 22, there may be a calculation error on your side, but that's how things went.
Understood, sir. One quick follow-up on this: the Seamec Swordfish contract was meant to begin in May of 2022, and it runs for 730 days. So, sir, just so I understand, is that a continuous contract? Because why did we only deploy it starting in August? I mean...
You're correct that this Swordfish was meant to be deployed starting effectively April 2025 — May, really — because of certain visa issues, and we already notified the exchanges about that and told all the investors on our investors call. Due to certain visa restrictions from the Saudi government, we couldn't deploy it for quite a while, say until July. Then after that there were certain operational issues — there are a few lineup of Gita, Seetah. Then finally, we deployed our vessel effective August 2025, and it's a long-term contract of 2 years with Safeen, and it will work for 2 years effective — we will need to complete the 2-year period of 730-odd days. So we will continue and we will complete that contract.
Understood. Sir, my second question is about last year — the Barge day rate was nearly USD 75,000, and this time it's almost USD 22,000 per day. I'm not quoting the exact price, but it's almost 1/3 of what we contracted last year, the Seamec Glorious, okay? So why did this happen, sir? Why such a big drop?
Sir, regarding Glorious, what you're saying is only partially accurate. During this year, we've contracted our Glorious solely on a charter day rate basis and haven't included any additional services. Previously, when we worked with ONGC, that arrangement also covered driving services, which came with substantial cost. Therefore, the two contracts simply can't be compared. Under this contract that we've signed with L&T, we're supplying only the Barge together with...
Alright.
That means there’s a distinction.
Understood. One final question from me, sir, before I join the queue. If I look on a year-on basis and compare the first half of this year with the first half of last year, our employee cost has risen by 25%. And even in this quarter, on an operational cost basis, we have taken on a lot of cost. So what I just wanted to understand is why, despite revenue being almost flat, employee cost is climbing at such a rapid pace — an increase of almost 25% when we compare H1 of this year to H1 of last year?
Sir, when you examine the figures, what we call employee cost here also takes in crew cost. Our crew gets deployed according to the vessel. So this quarter, if you've brought Seamec Swordfish into our fleet — previously it wasn't there, yet crew were deployed on that vessel even though it wasn't generating revenue — then when you compare revenue, there's no growth in revenue, but from a crew standpoint it's certainly up and running, so we've incurred crew cost and the overall cost has risen.
All right, so the staff are in place, but the deployment piece wasn’t there, and because of that, the cost has risen.
Understood.
Did I get that right, sir?
Crew was aboard the vessel for the fleet, but it wasn't able to perform. So your point is correct.
Understood. Sir, my apologies — just one final point on Q1: we had no revenue at all from Swordfish. That's my understanding, correct. In the first quarter of this financial year, there was zero revenue from Swordfish, since, as you're saying, it was deployed starting in August.
Sir, in the first part of May we had a modest amount of revenue. There was mobilization revenue, plus roughly 10-odd days of revenue in May, so we did have revenue coming through.
Tejas, an individual investor, has the next question.
I just have a single question: given that these breakups and breakdowns on the site are part of a contract, is there also some penalty built in? Or do we simply have to incur a loss of revenue?
Mr. Tejas, thanks for that question. So whenever we prepare and put together budgets for a given charter hire contract, we do factor in the maintenance budget. And of course, if the vessel isn't operating, we lose that particular stretch of charter hire from the customer. With ONGC, if there's a breakdown, there's a clause stating that additional penalties apply, and if those breakdowns stem from the vessel or from outside services, they get recorded accordingly as a portion in the books of accounts. So yes, penalties do exist. But correspondingly, the <<inaudible>> also form part of our budget. The only problem we truly encounter is when those breakdowns are unplanned, or there's an accident or something of that sort — that's exactly where we actually take a loss.
So from what I understand, sir, these penalties aren't included in every contract, right? They'll vary depending on the contract. Is that a more accurate way to see it?
Yeah. It really varies from one contract to the next. So the main thing is the revenue you lose while the vessel isn't working. But with ONGC, the contract calls for applying the current...
And roughly what share of that penalty would that be, sir — just your very...
So when we work out the breakdown, we do it on an hourly basis, correct? So within 24 hours, if the vessel isn't working for even 6 hours, and what kind of breakdown it is. Depending on that, the penalty ranges from, let's say, 20% of charter hire up to nearly 2.5x the charter hire. So there are flat, there's detailed information on what breakdown counts as a major breakdown, a minor breakdown, or a vessel that isn't fully operational. All of those form part of the confidential agreement we've made with ONGC, but we're also accounting for it.
All right, sir, my final question is this: you had a doubtful allowance within that INR 140 crores. Is there any update on it? Are we getting it? Are we taking any steps regarding it? Is it resolved, or does it remain pending, sir?
Vinay, could you please take that one?
Sir, that's the roughly INR 140 crores you mean, correct?
You've got it right. INR 140 crores, INR 138 crores, yes, sir.
Sir, this relates to years '15 and '16 and it concerns Swiber — we've already made full provision. Also, the chances of deploying anything further are slim. That said, no additional impact is going to show up in our financials. Full provision has been made.
Keshav Garg from Counter Cycle PMS has the next question on the line.
I'd like to get some clarity here. If you look back before COVID, our margin was under 20% — I'm referring to the 2014 to '18 period. Yet after COVID, margins have sat above 30%, roughly 35%. So what's driving that? Has it come from rates rising, from charter rates going up? Is that the cause, or is there another factor at play?
Keshav, two factors are at play here. First, charter rates have risen. Second, the business mix has shifted as well. So we operate two kinds of business. One is EPC contracts, and the other is IMR contracts. The share of IMR contracts is increasing, and that is the higher-margin business — which is also our strategic focus.
We've also made our fleet younger. So we purchased 4 ships that are relatively young next to the ones we had in service between 2015 and 2018. And since younger ships need less repair and maintenance work than older ones, that's another factor that has played a part in this.
Okay, so to the degree that margins have risen because charter rates are higher — sir, when charter rates are elevated, I'd assume the cost of a new vessel would be higher as well, and the reverse holds too. Sir, the best moment to grow the fleet is when charter hire rates are quite low, since then the capital cost is low too and the acquisition cost is low, and vice versa. Sir, but given that charter rates are high right now and I'm assuming we have to pay a premium to acquire new vessels, sir, how sound is that strategy? And sir, moving forward, because everything is cyclical, then the next time charter rates fall, sir, won't we be left stuck with high-cost assets?
So let me respond to that by noting that the kind of ships we upgrade go by the name Multi-Support Vessels, correct? And these represent extremely specialized equipment, with a very small number of them existing worldwide. So, just to provide some broad context here. In India, I am the sole owner of multi-support vessels with a fleet, and the largest such fleet across Asia Pacific. That means it isn't within my control whether these ships can be bought readily on the market. But if I decide to build a vessel, the shortest period a yard requires is roughly 2.5 to 3 years to deliver a fully constructed, brand-new MSV. So this charter hire cycle itself does not hinge entirely on oil prices, since it relates to the cost of extracting oil, which is an ongoing activity. The only thing is that when oil prices rise, yes, charter rates do go up. And when oil prices fall, they do come down, though not by the same proportion. That impact is very minimal. What matters more is the range of services we are able to deliver using the vessels we currently hold. So what we have done, as I mentioned, is that we have acquired a younger vessel.
We've also changed the mix of services we deliver as a provider to our customers. And all of these efforts have truly led to higher charter rates. And we firmly believe that charter rates of this kind will hold for the next 4, 5 years as well. And perhaps, if we can keep adding more and more to what we offer, we can certainly also aim at rates that are even higher.
Okay, so let's suppose oil prices keep falling — and there's a decent chance of that, say down to around $50. ONGC may not reduce its CapEx right away, but worldwide, the private companies engaged in offshore work could scale back at least the exploration side — offshore exploration. And all of that spare support vessel capacity might begin competing for ONGC tenders, which would push charter hire rates lower. So is that a possibility?
No, sir. Because when we discuss oil exploration, we're talking about rigs. When we talk about supplying services to an oil field that is already pulling oil out of the ground, then we mean diving support vessels, offshore supply vessels, and all the rest of it. So there's a huge difference between the kinds of vessels employed in oil exploration and those employed in serving an oil field that is already producing oil. And once an oil field is operational, what matters at that point is the cost of getting that oil out, correct? So whatever the oil price happens to be, you don't halt extraction. As far as we're concerned, yes, we are fully booked with ONGC and with the limited assets we hold. Only one of our assets is deployed with Aramco. Again, Aramco is such a large company that assuming they will stop extracting oil when oil prices fall is not possible.
Sir, so one last question. Sir, what's our approach when it comes to deploying a new vessel? Sir, how do we go about setting the price that I'm paying for this new vessel? Sir, so essentially, what IRR are you looking for when you purchase a new vessel?
So whenever we plan a new vessel, the age of the vessel as per as shipping norms is 25 years. In case of MSVs, it is even higher, right? So it has to be a match between the proposed charter where we are going to deploy the vessel, the time period of the charter versus the cost of acquisition. And suppose I get a charter of 3 years or 5 years and I put that I am able almost that 50% of the total CapEx as a payback during this charter period then I know that the value of the vessel left at the end of the contract with its remaining life is a very lucrative proposition. And that is how in this industry, we all plan our CapEx.
Sir, if we were to sell our current fleet on the market, what would it cost to replace it?
If we look at replacement cost at this moment, we have at minimum 3 vessels that are fairly aged. A standard new MSV, even though it's significantly better equipped, with improved gear and performance capability reaching roughly 1.5x that of those older units — but at present, the market is pricing a new vessel at close to $100 million.
Sir, given that our vessels are old, sir, how do we stack them up against new ones? Sir, we should — sir, what I'm asking is this: if we sold all 7 of our vessels today in the market, sir, what tentative price could we get for them on an as-is, where-is basis in their current state, rather than for a new vessel of equivalent capacity?
Rajeev-ji, may I respond to that?
Yeah, absolutely — go right ahead.
Sir, that's a rather theoretical question, so let me address it. You may recall a period when SEBI put a question to every mutual fund: if you had to sell off your portfolio, how long would liquidation take? The answers came back as 5 days, 10 days, 15 days. But just think — if every mutual fund showed up at once and began offloading stocks, would they really manage to liquidate within 5, 7, 10, 15 days? As Rajeev-ji pointed out, a new vessel costs roughly $100 million, correct? If you look at our situation now, the theoretical value of the whole fleet would fall somewhere between 1,500 and 1,800. But could I dispose of that entire fleet in one shot? That isn't possible. Right now we are purchasing fleet, not selling it.
Okay, sir. And sir, one final question, sir: as of 31st March 2026, what amount of debt would appear on our balance sheet?
By 31st March '26, net debt should come in at approximately INR 300 crores to INR 400 crores.
Our following question is from Khushi Jain with Trident Asset Management.
Sir, my first question is this: you've taken delivery of something like Agastya. Is that vessel already focused on growth commencing from December '25, and basically, what are the daily and constant contract duration for its initial deployment?
Regarding our Agastya proposal, the vessel is set to be deployed starting December '25, and with the contract secured, it will serve ONGC for the following 4 years via HAL Offshore, and the day rate stands at USD 25,000.
And sir, how do the acquisition cost and the expected return on that portfolio compare with the recent Seamec Swordfish acquisition?
The price we paid for the acquisition came to $23 million, roughly INR 200 crores. And the vessel has a life of at least 8 years minimum. That's only the 8-year figure — in practice, the life will be considerably longer, and we expect the IRR to exceed 20%.
Alright, understood. Sir, moving to my next question: that MOU involving General Shipping and INR 1,000 crores in CapEx represents a significant commitment. Could you tell us how that capital is specifically allocated, sir?
Thank you. Thanks, Vinay. As everyone is aware, the Government of India recently held a Maritime Conference in Mumbai, and virtually the whole industry took part in it. Given the different incentives the government has announced lately for the yards — the shipbuilding yards — and for the shipping industry overall, investing in new vessels has become very attractive for us too now. So perhaps we are considering a fleet of MSVs, but we are also now open to examining options for other vessels that could deliver a comparable payback. That is the reason we took part in this Maritime Conference. And we told the government we are prepared to invest. We made a kind of commitment to put in nearly INR 1,000 crores of CapEx across the coming few years. And we have also provided — all of us together have also provided a memorandum outlining what further expectations we have from the ministry. And we are fairly hopeful that, just as the government is responding so positively to the industry overall across many sectors, this shipping industry will likewise be a major beneficiary.
Alright. Sir, what savings should we expect on that spend over the years ahead, and how is it going to be funded?
At this point, what we've completed with the Government of India is an MOU. As for the schedules, how the funding will be structured, precisely how many vessels we're considering, and which kinds of vessels we're considering — we're still at the preparation stage. We'll put the entire project together and then present it to the government, and as things stand, that work is in progress.
Understood. One final question from me, sir. Given that these ships are completely depreciated and carry a low cash cost breakeven, do you have any plan to retire older vessels across the coming 5 years?
No, that approach is permanent, since right now our fleet consists of roughly 10 to 11 vessels. Across the last 4 years, 4 new vessels have been purchased by us. Nearly one old vessel has been retired. Over the coming 5 years, certainly, should we manage to get our hands on new vessels, we would certainly want to improve the fleet's age profile, because that is precisely where higher revenues, better margins and all those things begin. It becomes -- and that is basically how you grow. So such plans are always in place. They remain constantly monitored, constantly worked on, so that any time an opportunity arises to buy a new vessel, we will certainly examine it.
Alright, sir, in what way would you model the path from assets that are fully depreciated or carry a high margin, given an engine's high OpEx availability?
No. Basically, in India that leverage isn’t something we can use, because age norms exist. And DG Shipping is very firm on those age norms: once the vessel passes its age, it can’t keep operating in Indian waters. So our entire working stays within the parameters of the various rules and regulations set by DG Shipping, particularly where age is concerned. So if my vessel, these old vessels, passes that particular age, then I can’t operate to that trade-off between buying a new vessel and a lesser OpEx versus a vessel that is fully depreciated and a high OpEx — that is actually not available to us.
<<operator_script>> Our following question is from Aditya of Sarthak Securities.
Sir, I notice that the accumulated losses from our overseas operations have gone from INR 66 crores up to INR 98 crores. So what plan has management approved to get these subsidiaries to breakeven or even into profit? Could you give us any milestones or a timeline for that?
As you can see, we've been saying on several earlier calls with investors that we remain constantly focused on making sure losses come down and on opportunities that turn a profit. This year, our view is that from INR 28 crores last year, it ought to be barely INR 5 crores, INR 7 crores. And perhaps starting next year, it should move from breakeven to positive.
Understood. And moving on, the revenue from Seamec U.K. investments is meant to tap into North Sea opportunities. So if a project like this has a lifespan of nearly 10 years, 15 years, what ROIC does the venture currently expect? And how does that stack up against the company's overall ROCE target of about 11%?
Could you say that question again? I couldn’t hear it clearly.
Right, so the reason behind the Seamec U.K. investments is to gain access to the North Sea opportunity, correct. So, as with <<inaudible>>, it's been pushed back by roughly 10 years and 3 months. So what's the return on invested capital currently expected from this? And how does that stack up against the company's overall ROCE target of 11%?
Regarding the specific investment we made in the U.K., as things stand right now, our plan is to get this office up and running. The original plan had been for that office to become operational by June 2026. What we're seeing at present is that we should be able to have it operational by September 2026. This office will serve as our liaison office for the Northern Europe offshore market, because sitting here in India with the assets in our hands — although they are fully deployed — we see that the Northern Europe offshore market is a highly lucrative one when it comes to flatter hire rates. In our plan, we had earlier ventured into Latin America, into the U.S., and into the Middle East. This is one market where we are very keen and eager, because we are fully qualified. So by September 2026, we hope this office will be operational. Not much of the major CapEx is required right now for this project, because of the total planned CapEx, we are almost over with 80% of the CapEx commitment and investment. The balance 20% as well — at the end, the way we might be able to say something out of it — but that all depends on the pace of the work.
So we are fully committed to bringing you good news in the years ahead.
Our following question is from Mohit Chandani at Value Wise Advisors.
Could you go over the dry dock days for the ship again — specifically which ones are coming in next year, and then which ones are taking place in FY '27 and '28?
For '26, dry dock is scheduled for both Seamec III and Seamec Princess. As for Seamec Paladin, we had originally planned a dry dock around August 2025, but we subsequently received a 6-month extension, and that vessel will now go for dry dock at the end of January 2026. So those are the 3 vessels slated for dry dock in 2026. For '27 and '28, we're looking at a dry dock for Seamec II, and for Seamec Anant, since it's a new vessel, we're looking at a very minimal dry dock. We're also looking at a dry dock for Swordfish and Nusantara. Nusantara will only come in 2028; '27 is the <<inaudible>>. This dry dock takes place after 2.5 years and is typically a 90-day exercise.
Got it, sir. And would you mind repeating what the day rate is for Nusantara and for Anant?
For Nusantara, we’re using a day rate of USD 25,000, and Anant, that one stands at close to USD 45,000. Both of those contracts run for the full year with ONGC.
Got it, sir. And Seamec II's contract ends in January this year, correct?
The Seamec II contract was extended in July 2025. However, due to some dry dock days and off hire days, it was renewed through Feb '26, but under the new DG the remaining days will be finished by August or September 2026. So it will operate until August or September '26.
And after that, sir, will this vessel be offered for hire, or is it not available because it's such an old vessel?
We haven’t firmly made a decision on that yet. The reason is that, from what we understand now, after 2026 the situation is expected to involve heavy shipping activity, which would let this vessel remain in service through ’28. So once the contract ends, we’ll need to make a call by looking at the vessel’s operating condition and asking whether it makes sense to spend a certain amount on dry docking and then send it out on charter again, or whether we should scrap it. That decision is still pending. Internally, we’re discussing it and looking into a range of options.
Understood. And when it comes to new vessels, are you looking to buy?
Yeah, we're looking at every option out there for bringing in new vessels, and older ones too — whatever fits best with what's available in the market. We're hoping for execution.
And when should we expect announcements about new vessels?
It all hinges on timing—specifically, when a solid chance arises within the buying fleet. As soon as an attractive acquisition opportunity presents itself, we'll inform the market.
Ladies and gentlemen, given how much time we have, that brings us to the final question. At this point, I'd like to pass the conference back to Mr. Balasubramanian, who will offer some closing remarks.
Much appreciated. Thanks to everyone who joined. That brings the call to a close. Have a good day.
Arihant Capital Markets speaking here: that brings this conference to a close. We appreciate everyone joining us, and at this point you're free to disconnect your lines. Thanks again.
Thanks, everybody.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Seamec Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Seamec Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.