Home / Transcripts / SSR Mining Inc. (SSRM) · November 4, 2025

SSR Mining Inc. (SSRM) Earnings Call Transcript

November 4, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 28 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, everyone, and welcome to the conference call for SSR Mining's third quarter of 2025. This call is being recorded. Right now, to give opening remarks and make introductions, I'd like to hand things over to Alex Hunchak of SSR Mining. Please go ahead.

Alex Hunchak executive
#2

Thanks very much, Operator, and good day to all of you. We appreciate you being on today's conference call, where we'll go over SSR Mining's financial results for the third quarter. Our consolidated financial statements follow US GAAP. Those statements have been filed on EDGAR and SEDAR, and you can also find them on our website. An online webcast goes along with this call, and details on how to access that webcast are in this afternoon's news release as well as on our corporate website. As a reminder, unless we say otherwise, every figure we talk about on the call is in US dollars. Forward-looking statements will be part of today's discussion, so we ask that you read the disclosures and the relevant documents. We'll also be citing non-GAAP financial measures in our discussion and in the slides that accompany it. Information on the comparable GAAP measures is available in our press release. Joining me today are Rod Antal, Executive Chairman, along with Michael Sparks, Chief Financial Officer, and Bill MacNevin, EVP Operations and Sustainability. I'll hand the line over to Rod now.

Rod Antal executive
#3

Thanks, Alex, and good afternoon everyone. With our third-quarter results, we're on course to finish the year in the lower half of our production guidance, and we still anticipate a stronger fourth quarter. Full-year all-in sustaining costs are moving toward the upper end of annual guidance, mainly because high gold prices are affecting royalties and because share price performance so far this year is affecting share-based compensation calculations. Overall, third-quarter results came in as we expected. Before working capital adjustments, free cash flow came to $72 million, and we keep a very healthy cash and liquidity position to support continued investment in growth opportunities throughout the business. We also achieved strong progress on several other initiatives during the quarter. The Cripple Creek and Victor technical report should be published within the next few weeks. It will give our initial assessment of Cripple Creek's potential, and the technical report will include mineral reserves consistent with the Amendment 14 expansion permit that is already underway. At Hod Maden, we have spent $44 million on advancing the project so far this year and remain on track to meet our full-year growth capital guidance of $60-$100 million.

Rod Antal executive
#4

One major milestone for this year's work is going to be the full update that comes with the new technical report. That report will serve as the foundation for the project and construction decision over the next few months. On that note, Hod Maden continues to rank among the most compelling undeveloped copper-gold projects anywhere in the sector, and the work done so far strengthens our confidence in highly attractive returns from this asset. Elsewhere in the portfolio, we've kept up strong momentum on advancing our organic development projects, which include Buffalo Valley at Marigold, Porcupine at Seabee, and Cordaderos at Puna. Results from the summer drill campaigns across all of these targets are looking very encouraging, and we hope to repeat the early success we had in adding the first three years of mine life extension at Puna. Bill will go into more detail on this later in the call. Finally, things continue to move along well at Çöpler, and we remain fully committed to a restart. We're in close contact with the relevant government authorities as we pursue the approvals needed to bring the mine back online. All in all, it was a solid quarter, and as expected, with good progress on a number of initiatives across the portfolio, so at this point I'll hand the call over to Michael to walk you through the quarter three financials, beginning on slide number four.

Michael Sparks executive
#5

Thanks, Rod, and good afternoon, everyone. During Q3 we generated 103,000 gold equivalent ounces, with an all-in sustaining cost of $2,359 per ounce — or $2,114 per ounce once you exclude costs incurred at Çöpler in that quarter. Full-year output of 327,000 gold equivalent ounces matches plan, and we remain on course to land inside our full-year guidance of 410,000 to 480,000 gold equivalent ounces, though in the lower half of that range. As Rod mentioned, royalty costs and share-based compensation came in above forecast, and combined with production sitting in the lower half of guidance, that is driving our AISC toward the top end of our full-year cost guidance range. We closed the quarter financially strong, with $409 million in cash and total liquidity above $900 million. That robust balance sheet gives us the capacity to fund the many growth initiatives throughout the portfolio, including Hod Maden, where we spent a further $17 million of capital in the quarter. We are highly enthusiastic about how Hod Maden is progressing and expect to share an updated life of mine plan along with a construction decision for the project in the months ahead. Turning now to our quarterly financial results on slide five.

Michael Sparks executive
#6

During Q3, we sold 105,000 gold equivalent ounces, and the average realized gold price came in above $3,500 per ounce. Net income attributable to SSR Mining shareholders reached $65.4 million, equal to $0.31 per diluted share, and adjusted net income stood at $68.4 million, or $0.32 per diluted share. As the table shows, free cash flow for the quarter was affected by working capital movements — notably inventory movements at Marigold and CC&V, along with prepayments tied to development activities at Hod Maden. So free cash flow before changes in working capital was $72 million, which underscores our strong margins even as we keep investing in growth initiatives across the portfolio. I'll now hand it to Bill for an operations update, beginning on slide six.

Bill MacNevin executive
#7

Thanks, Michael. I'll begin with EHSS. We keep moving forward on efforts designed to make sure our purpose and values show up in all that we do. Let me give you a few examples. We've made strides in the way we apply risk review and mitigation across both planning and field execution. We've also made solid headway on folding progressive closure into our life of mine plans, which could lower costs for the business overall. Moving to slide seven for Marigold. During the third quarter, Marigold turned out 36,000 ounces of gold at an AISC of $1,840 per ounce. Those results came in according to plan, and we still anticipate a strong fourth quarter, though a bit under what we first expected for that period. As mining has moved ahead at Red Dot, phase two, we've found a consistent grade profile that matches our internal models. The ore, though, has contained more fines than anticipated, which means we need extra blending so pad recovery performance holds up. Our technical teams at Marigold and CC&V have collaborated throughout this year to strengthen ore body knowledge, with a focus on processing planning. Thanks to that work, we're refining how we handle ore blending at Marigold so we properly manage the finer ore we're seeing.

Bill MacNevin executive
#8

On the growth side, we're pushing forward with work at the Buffalo Valley deposit, aiming to bring the project fully into the Marigold life of mine plan. That effort is going well thus far, and we anticipate Buffalo Valley will offer a meaningful chance to extend Marigold's mine life and could also add to our mineral reserve growth at New Malani. Moving to slide eight for CC&V. CC&V delivered a solid quarter, generating another 30,000 ounces of gold at an AISC of $1,756 per ounce. Worth noting is that the mine has now produced nearly $115 million in asset-level free cash flow since acquisition — an incredible result considering the $100 million in upfront consideration we paid for the asset earlier this year. The CC&V technical report remains well on track for completion within the fourth quarter, and we're excited to present the initial mineral reserve-only life of mine plan, for which CC&V has clearly established itself as a core operation in our portfolio. We expect this technical report will present a 10-plus year life of mine and also highlight significant mineral resource upside to further extend the mine life. The key bottleneck to converting these mineral resources to reserves is the advancement of permitting for additional heap leach capacity, and our teams are working hard to set us on the right path for success for decades to come.

Bill MacNevin executive
#9

Turning to Seabee now. Seabee experienced a difficult quarter, with output of 9,000 ounces at an AISC of $3,003 per ounce. Those results mirrored the ongoing emphasis we placed on underground development, which we mentioned during quarter two, along with grades that came in below what we had anticipated. We anticipate production will rise incrementally during the fourth quarter, yet our priority stays on underground development through year-end as we seek to enhance available scope inventory going forward. Work continues at the Porcupine targets, and this summer our drill program delivered some encouraging success as we strive to build confidence in the mineral resources already defined at the project and to test additional growth opportunities. We are enthusiastic about what this could offer and anticipate sharing updates with the market next year. Moving to Puna on slide 10. Puna maintained its record of strong results in the third quarter, generating 2.4 million ounces of silver at an AISC of merely $1,354 per ounce. Following the initial extension to Chinchillas' operations that was announced in the third quarter. We are pursuing other opportunities to extend mining at Chinchillas while we also keep assessing the Cordaderos target. We are enthusiastic about the potential here and will share further updates as warranted.

Bill MacNevin executive
#10

Moving to slide 11. Finally, at Hod Maden, we invested $17 million during the quarter in engineering and site establishment work. So far this year, $44 million has gone toward advancing pre-construction activities at the project, and we remain on track with our full-year guidance range of $60-$100 million in growth capital. Our technical teams have kept moving forward and updating the project's technical report as we approach the construction decision in the coming months, and the results keep showing an incredibly compelling project that, once in production, could stand as one of the highest margin projects in the sector. We look forward to sharing more detail on these initiatives with the market in the coming months. Now we'll turn things back to Rod for closing remarks.

Rod Antal executive
#11

Thank you, Michael, and thank you, Bill. We delivered solid progress on many fronts this quarter, and we are positioned well to finish the year strongly, with consolidated production in line with our full-year guidance. We are advancing nicely at key projects throughout the portfolio, and with updated technical reports coming for Cripple Creek and Victor and for Hod Maden, we are eager to highlight a bright future for each of those assets and the upside potential they hold. And naturally, with ongoing work toward a restart at Çöpler, we remain firmly convinced that SSR Mining continues to offer a compelling value proposition going forward. With that said, I will hand the call to the operator for questions.

Operator operator
#12

Thanks, Mr. Antal. Now we'll move into the Q&A portion. If you'd like to get into the queue for questions, just hit star followed by one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, lift your handset first before you press any keys. If you want to take your question back, press star then two. Our first question is from Ovais Habib at Scotiabank. Go ahead, please.

Ovais Habib analyst
#13

Hi, Rod and team, and congratulations on a pretty good quarter. I have a couple of questions. First, starting with what you expect for Q4. As you guys said, Q4 is expected to be a strong quarter. Is that strength basically coming from Marigold and CC&V? And then a follow-up to that. Regarding Marigold and the fines you are encountering at Red Dot, based on how much you can blend, could some of that production expected in Q4 spill into Q1 of next year?

Rod Antal executive
#14

Sure, Ovais — thanks. I'll take a few of these questions, and Bill and Michael can jump in and add any further color if they'd like. On your first question, about quarter four — yes, that's correct. The main driver there was Marigold. As we've discussed previously, a stronger fourth quarter was always structured that way, and that was intended to be the chief distinction from quarter three. As for Cripple Creek, I think it will look more like what you've already seen. Then, on your question about the fines: yes, it definitely means we have to manage them differently when it comes to where they're placed and having more durable material on hand for blending. So that's what we're currently working through — how to get the best outcome for Marigold in the final quarter by managing ore placement. In cases where we lack durable ore, we'll put that ore on the higher sections of the leach pad, but wherever we do have it, we're clearly placing it on the new leach cell that Bill mentioned we finished last quarter. That will be the key to a strong finish for Marigold in quarter four.

Ovais Habib analyst
#15

All right, and I appreciate the added detail there. Then, specifically at Seabee, the grade obviously ended up below what was anticipated. So again, was that a matter of a negative reconciliation problem, or did you fail to reach the stope or stopes you had planned to take material from during Q3? I was somewhat — the reasoning behind that weaker grade didn't really come through clearly to me.

Rod Antal executive
#16

Bill will take it from here.

Bill MacNevin executive
#17

Yes. Ovais, Seabee turned in a solid quarter this time, ramping up development work, which is what we're focused on. As a result, we've got additional stope material available. That said, a larger share of the material came from the gap hanging wall, and part of it delivered grades beneath our expectations. That does happen occasionally, but those factors were the main drivers.

Ovais Habib analyst
#18

Given all the work you've completed, you're clearly anticipating a stronger Q4 and a clearer grasp of the stopes you currently have as you head into Q26?

Bill MacNevin executive
#19

Yes, there’s still plenty of development work in front of us for Q4 too. We’ll keep working hard at both Gap Hanging Wall and Santoy so that we get as much as possible out of the ore body. What we found held no surprises, as you might say.

Ovais Habib analyst
#20

Alright, thank you for that. So my final question, I suppose, concerns Çöpler. Rod, you said you’re in talks with the regulators, and it sounds like things are moving forward. Again, is the emphasis more on remediation or on restarting? And clearly, I’d imagine you’re pushing quite hard on the restart front. But what I’m also trying to get at is whether you’re receiving any community backing at present. That is, say, pressing the regulators toward some kind of decision. As we head into 2026?

Rod Antal executive
#21

Yes. Ovais, it’s really not so much about the final portion of what you asked. I believe that if you kind of pull back a bit. From the time of the incident onward, the initial efforts were focused on — and I’ll repeat this since it matters — securing the site and bringing the people who were lost back to their families. We then shifted into remediation, which was chiefly about clearing out the Sabrali Valley, and that was finished and completed. Then, thinking back over the past six months, the work has centered on giving regulators every technical element they need to approve the storage facility and the final closure of the heap leach pad. So it has really been the usual order of steps that you would anticipate going through. We have stayed in ongoing dialogue with the regulators. This is not something new. It has continued from the very first day of the incident itself. But we are wrapping up some of those technical items so the regulators can approve them. That will be essential to securing the approval needed to begin operations. As has happened more recently, and in particular as you have seen reported in the press, so it is nothing that is not already public.

Rod Antal executive
#22

Public backing for reopening has clearly grown stronger. There have been all sorts of marches. Plenty of prominent people from the local area have been advocating for a reopening in newspapers, on television, and across the media in general. That rise has come about more organically, really, because the community — especially the local community — is suffering when it comes to economic activity now that the mine is shut. The timing is likely just a coincidence, and it truly has no influence on the matter. It's helpful, sure, but it isn't what's pushing the government to grant us the approval.

Ovais Habib analyst
#23

That covers everything from my side, Rod. Appreciate you fielding my questions.

Rod Antal executive
#24

Perfect. Thank you, Ovais.

Operator operator
#25

If you'd like to ask something, just hit star and then 1 once more. Don DeMarco from National Bank Financial has the following question. You're up.

Don DeMarco analyst
#26

Thank you, Operator. Rod and the team, I appreciate you taking my call. First of all, yes, it's encouraging to hear what you just said regarding the strong level of public backing for the reopening. But for my first question, I think I'll direct it to Hod Maden. Of course, as you noted, a go-forward decision is pending over the next few months. Looking at the guidance, you've reiterated it, but it seems you might be tracking toward the low end of that range. Are there any items that may have been within this year's scope that will be carried over into 2026?

Rod Antal executive
#27

Are you referring specifically to the amount being spent at Hod Maden?

Don DeMarco analyst
#28

Correct. Year to date you're sitting at $44 million. Guidance, as I understand it, is $60 million to $100 million. So it looks like your current pace has you tracking toward the bottom of that range.

Rod Antal executive
#29

Yeah, look, I think — sorry, Michael was about to say something, but I'll jump in. He paused for a second there. We'll actually probably land closer to the midpoint of that guidance range. Yeah, it's kind of a ramp-up, a normal sort of — as you'd expect, there's a ramp-up in spend. But the committed spend that we have for the work we wanted to get through this year is well advanced. So we're on track to spend what we had allocated to the project. Yeah, it just comes down to the timing of the cash going out the door.

Ovais Habib analyst
#30

Got it. All right — anything more to add there?

Rod Antal executive
#31

No, look, the work has actually progressed quite nicely. Everything we did this year was based on applying that data toward the full revamp of the technical report, and it's all pulling together now. That really forms the foundation we'd rely on when deciding whether to approve the project and proceed. So in those respects, things are proceeding as planned, and I'm genuinely happy with what's been accomplished at the site.

Don DeMarco analyst
#32

Alright, thanks. So we’re eager to hear that go-forward decision. Will a mine plan be released around the same time? And does that go-forward decision have any link to Çöpler? Do you want to see the Çöpler mine back in operation first before you commit to constructing a second mine in the country? So that question has two parts — one about the report and one about a possible tie to Çöpler.

Rod Antal executive
#33

Yeah, well, look — it’s going to be a full refresh of the technical report, Don, and we will publish it.

Don DeMarco analyst
#34

I appreciate that.

Rod Antal executive
#35

Think back to when we bought that asset. At that point, a technical report was on hand. Even so, we made clear our intention to carry out the work needed to confirm that whatever it described is a project we can genuinely execute. So from the moment of acquisition, the effort has involved reviewing every technical element — the flow sheets, the process flow sheets, all the met models, the geomet models. Then there's the geotechnical effort at the site, which is complex from that standpoint. After that, we moved ahead with the early-stage earthworks and civil works now under way. The aim is that when we examine the critical-path tasks required to launch the project and keep it on schedule once the new schedule is finally issued, we will already have a head start. So, as I said, all of this feeds into the update, along with the market-side work of going out to market and securing fresh pricing for the project in today's dollars. As I mentioned, everything is progressing well. Regarding the dependency, I suppose, surrounding the project decision itself at Çöpler, I have consistently said this.

Rod Antal executive
#36

From that point on, we're viewing them as mutually exclusive. It's a completely separate project, located in a totally different part of Türkiye. The stakeholder groups involved are entirely different. As you'll recall, the project holds all its permits, and that matters a great deal. So no permits are pending on our side. Alongside the project development itself, work on the ground to secure solid community relations and strong social support has been proceeding, since those are a wholly distinct group. Therefore, we aren't tying the Hod Maden decision to any dependency on Çöpler.

Don DeMarco analyst
#37

All right, thanks for that. And as a last question, if we step back for a moment and ask about your strategy: certainly there are plenty of organic opportunities inside the portfolio, and beyond that there are possible additional growth levers when it comes to M&A. Could you share any bias, either toward potential growth or regarding how your strategy looks over the coming, say, 5 years or so?

Rod Antal executive
#38

Honestly, nothing has changed there, Don. I believe we've consistently been pretty open about the standards we apply when it comes to M&A. And M&A spans a whole range—anything from strategic moves to bolt-on deals such as the one we did with Cripple Creek & Victor. There are various criteria we evaluate. For something to be a strategic fit, it has to satisfy those criteria. We've remained very faithful to that approach, and we will keep doing so, since I believe it instills discipline in how we assess the business. So, no change whatsoever. Expanding within the core jurisdictions we hold, and growing the platforms we already have in Canada, U.S. Argentina, and Türkiye—that's a first-order priority for us. After that, we look for value-accretive opportunities that may come along from time to time. So look, we'll remain faithful to that. I think it's sound practice. And it means that whenever we bring something to market that we like, you can be sure it has been through a pretty rigorous due diligence process and that it aligns with strategy.

Don DeMarco analyst
#39

Alright. Alright, well, that's great. Thanks so much. I'm finished with my questions, and thanks once more for answering them — best of luck in Q4.

Rod Antal executive
#40

Thanks, Don — that’s great, and I appreciate it.

Operator operator
#41

That brings the Q&A portion and today’s conference call to a close. You’re welcome to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete SSR Mining Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to SSR Mining Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.