Good day, everyone, and welcome to the Q2 and H1 FY '26 earnings conference call, which is being hosted by Suraj Estate Developers Limited. <<operator_script>> At this point, I'll turn the conference over to Mr. Rahul Thomas, Whole-Time Director at Suraj Estate Developers Limited. Thank you, and the floor is yours, sir.
Thanks very much. Good afternoon to all of you, and welcome to our Q2 and H1 FY '26 Earnings Conference Call. Joining me are our CFO, Mr. Shreepal Shah; Mr. Ashish Samal, who handles Internal IR for us; and SGA, our Investor Relations advisers. I trust everyone has reviewed the investor presentation we uploaded on the stock exchange and on our company website. Significant growth opportunities keep emerging in the Mumbai real estate market, especially within the redevelopment segment. South and Central Mumbai stand out as the most attractive micro markets within that space, marked by strong end user demand, premium pricing and limited supply. Even with the inherent challenges of fragmented ownership and legacy tenancies, steady traction continues in these markets, since demand for high-quality residential products remains robust. This environment sets a favorable backdrop for well-located luxury and value luxury projects, where established developers with a credible brand and a strong execution track record are best positioned to capture growth. At Suraj Estate, our deep presence, brand recall and execution capability across South and Central Mumbai let us leverage this opportunity effectively. Because we focus on value luxury and luxury residential developments, we can capture premium realizations while keeping strong sales momentum even in a competitive market.
We're happy to share results for a robust quarter, backed by dependable operational execution and the successful debut of 2 major residential developments, Suraj Aureva Prabhadevi and Suraj Parkview 1 at Dadar West. Those launches played a key role in generating presales momentum and strengthening our leadership position in the South Central Mumbai market. Situated in the Prabhadevi micro-market, Suraj Aureva is a 21-storey tower in the value luxury segment, providing 1, 2 and 3 BHK residences spanning 450 to 800 RERA carpet area, with pricing beginning at INR 2.47 Cr. This project, which has a saleable area of 0.24 lakh square feet and an estimated GDV of INR 120 crores, recorded 39% sales at launch — a reflection of very strong buyer confidence. Located at Shivaji Park, Dadar, Suraj Parkview is an upscale value luxury tower delivering a mix of heritage sea-facing views and contemporary design. Boasting a saleable area of 0.53 lakh square feet and an estimated GDV of INR 250 crores, this project notched 42% sales during launch, fueled by robust demand and its outstanding connectivity to the Dadar Metro, BKC, the coastal road and Bandra-Worli sea link. In addition to these launches, Suraj Estate continues to hold a solid pipeline of roughly 13.6 lakh square feet spanning 17 projects, focused on South and Central Mumbai.
They cover a balanced blend of residential and commercial projects across both the luxury and value luxury segments. Looking at residential, the portfolio features marquee developments like Lumiere in Dadar, the Bandra 1, 2, 3 Project, and Marinagar Phase 2 & 3 in Mahim, while on the commercial side we have SURAJ One Business Bay along with the Marinagar Commercial at Mahim West. Our ongoing projects keep performing strongly, with total area of 4.89 lakh square feet and an average realization of INR 45,409 per square foot. Cumulative collections have reached INR 1,363 crores, with balance receivable of INR 881 crores, plus an estimated GDV of INR 285 crores from unsold inventory, which adds up to combined visibility of roughly INR 1,166 crores as on September 25. That strong cash flow visibility reflects our solid financial footing and supports the growth momentum for quarters ahead. In the quarter, we also closed the acquisition of a prime 644-square-meter land parcel in Lower Parel for INR 6.44 crores, including stamp duty and registration charges. This parcel will be merged with an adjacent existing project called Ambavat Bhavan & RK Mansion, forming a combined land area of 1,310 square meters with salable area of 0.32 lakh square feet and an estimated GDV of INR 130 crores.
This project is going to be built under Regulation 337 of the DCPR, and it will offer premium 1 and 2 BHK apartments featuring optimized layouts, wider frontage, and better parking amenities. Sitting strategically in Lower Parel, the development gives residents excellent connectivity to the Western and Central railway lines, the monorail, and the coastal road, plus close proximity to major commercial, retail, and lifestyle hubs. Through this acquisition, our footprint in the high-value South Central corridor grows, and it fits with our strategy of going deeper in premium predevelopment markets. Our flagship Mahim commercial project is also moving along nicely, planned on a combined land parcel of roughly 3,000 square meters. That development will provide a salable area of 2.09 lakh square feet, with an estimated GDV of INR 1,200 crores. We have secured most regulatory approvals, and RERA registration is expected by the end of November, which is the following month. After launch, this project will act as a key growth driver for Suraj Estate, expanding our commercial portfolio and reinforcing our position in the Mahim submarket. Taken together, these launches, acquisitions, and ongoing developments strengthen our presence across South and Central Mumbai, positioning us to capture sustained demand for high-quality housing and commercial assets in one of India's most premium real estate markets.
So with that, I'd like to turn things over to Shreepal Shah, our CFO, who will walk you through the financial highlights.
Thanks, Rahul. I'll walk you through the key financials for the quarter and the six months that closed in September 2025. Looking at H1 FY 2026, total income rose 14% year-on-year, reaching INR 278.6 crores, up from INR 244.3 crores in H1 FY 2025. EBITDA came in at INR 115.9 crores in H1 FY '26, against INR 128.2 crores in H1 FY '25. PAT for the half year ended September 2026 was INR 54.4 crores. Turning to the quarter, total income was up 32.6% year-on-year at INR 145.4 crores in quarter 2 FY '26, compared with INR 109.6 crores in quarter 2 FY '25. EBITDA rose to INR 65.6 crores from INR 64 crores in quarter 2 FY '25. PAT came to INR 33.1 crores in quarter 2 FY '26, versus INR 31.8 crores in quarter 2 FY '25, helped by operating leverage in the quarter. On operations, presales climbed 88.8% quarter-on-quarter and 42.4% year-on-year, hitting INR 152.9 crores in quarter 2 FY '26. Presales for H1 FY '26 were INR 233.9 crores, with realizations of INR 43,850 per square feet in quarter 2 and INR 45,515 per square feet in H1 FY '26, which stayed moderate given the larger contribution from the value luxury segment this quarter.
Collections came in at INR 71.2 crores for quarter 2 FY '26, and INR 185.9 crores for H1 FY '26 — mainly reflecting weaker cash flows from new bookings that closed toward the end of the quarter. As of September 2025, gross debt for the company was INR 545.8 crores, versus INR 456.3 crores as of March 2025, and net debt rose to INR 497.6 crores from INR 414.2 crores across that same span. Higher debt levels were driven mostly by expenses, including construction, approval and preconstruction costs on 2 of our projects, Parkview 1 and Suraj Aureva. On top of that, we drew additional debt for approval-related payments on our upcoming commercial project at Mahim, which added marginally to the rise in gross debt. Taken together, the increase reflects continued investment by the company in growth and expansion of the project pipeline. With that, I'd like to open the floor for questions. Thank you.
<<operator_script>> Our initial query comes from Sucrit Patil, calling in on behalf of Eyesight Fintrade Private Limited.
I've got 2 questions specifically. To start with, I'd like to direct something to Mr. Shah. As you look forward, which internal practices or financial levers would you regard as the most important ones for keeping discipline when project time lines differ and market cycles shift?
Basically, our main focus will be putting money into the pipeline of projects ahead, and we make sure financial closure happens by drawing on debt, while also keeping collections in good shape, so the projects get the fuel for growth that lets us finish them on time. And needless to say, we also want to keep the debt-to-equity ratio very healthy as we grow our project base.
My last question goes to Mr. Thomas. About one of your properties, Ocean Star — I think many other projects that were underway in that area have wrapped up. Yet this one is still being built, or at least it's taking a great deal of time. So, sir, could you please explain why it's taking so long? And what are the delays due to?
Regarding delays, Sucrit, I think it's important to recognize that we remain well inside the RERA timeline. For the Ocean Star project, the RERA date is June 2026. We're therefore confident that handover of that project will take place within the RERA date.
<<operator_script>> The next question comes from Himanshu Dugar of Stylus Holdings. Mr. Himanshu Dugar, you may go ahead with your question. As we are not getting a response from Himanshu, we will proceed to the following one, Mr. Raghvendra Singh.
I had 3 follow-up questions about the Bandra projects. I mean, the investor presentation shows 3 projects in that area. So what could the GDV be for all 3 projects put together? What's the launch timeline? And on financing, are we relying on cash flows from our commercial project launch to fund that? Or will we also pursue a preferential share issue, since there's a motion for one?
Appreciate the question. So, looking at the investor presentation, the overall square footage we have available for sale comes to roughly 2.76 lakh square feet. The pricing across Mount Mary spans a broad band, from INR 1 lakh up to INR 1.50 lakh. Even at a potential of INR 1 lakh, that works out to around INR 2,760 crores. So you can take a figure of about INR 3,000 crores as the top line, roughly speaking. As for funding needs, ideally we want to rely on our internal accruals at this point, though there could be a chance that we raise some funds, at minimum to kickstart the project at its initial level.
<<operator_script>> Our following question comes from Maitri Shah with Sapphire Capital.
Hi, can everyone hear me?
Indeed, ma'am, that’s correct.
Yes, and first off, well done on the two launches. You're aiming to launch roughly INR 2,000 crores of GDV in FY '26, so what kind of presales targets do we have lined up for the first half of the year?
We’re aiming for — fingers crossed — strong momentum on our new launches so far. And we’re fairly confident that, because we’re also in a commercial bull run, we’ll gain good traction once our commercial launch happens, which is scheduled for November. So I feel — and I strongly believe — that we can at minimum hit INR 600 crores in presales this year.
That's great. And what kind of guidance could you offer on revenue and margins for the next 2 years, FY '26 and FY '27?
On margins, if you look at it broadly, they're ranging from 30% to 35%. So I think that can be taken as an average.
And anything on presales guidance, or the guidance for the FY '27 launch.
Could you say that once more, please?
On the FY '27 launch guidance, do we have any figure for that?
My view is that it's premature for us to concentrate on getting the launches in place. And I believe — I believe this year is very critical, since we have a lot of launches. We may come back to you next year, but I think this year is what we are focusing on.
And did you bring up the revenue guidance for FY '26?
On revenue guidance, no — we use the percentage completion method, so giving you an exact figure at this point isn't really possible. That said, presales is the measure that, I believe, everyone finds quite easy to grasp.
<<operator_script>> Our following question comes from Bhavin Modi with Anand Rathi Wealth Management.
Sir, could you go over the presales guidance for this year once more? What does the guidance say?
Hi Bhavin, so the guidance we're expecting, including the commercial piece, comes to INR 600 crores.
And sir, the second thing I'd like to ask is, what's the approval cost expenditure for this quarter on the commercial project in Mahim? How much have we spent on the approvals?
We've put somewhere in the range of INR 20 crores to INR 25 crores into this project.
And regarding the Bandra project, did we spend anything on the approvals?
No, there's nothing to report on the approval, Bhavin.
Up next, we have a question from Tushar Sarda, who is calling in from Athena Investment.
My question was about — you have roughly 13 lakh, 14 lakh square feet that you describe as estimated available for sale. So with the commercial you're launching this year, what's the timeline for the other projects?
Tushar, as I mentioned, on the bigger project — the commercial one — we're expecting the RERA in November, as I said. That's the point at which we can formally launch it. That said, Mount Mary is another thing we're focused on as a group. Again, you need a substantial amount of capital infused into it, because given the size it is, a lot of capital is required upfront. So an exact timeline we can give you perhaps a bit later — maybe after 1 quarter, on the Bandra land parcel, since we're just wrapping up some loose ends there. But the commercial project is one where we're highly confident that a November launch will happen.
Beyond those 2, we also have 8, 10 other projects that are smaller as well. So do you have any timelines on those? Because it looks like you've now sold out of inventory almost entirely — nearly 90% is gone.
Right, so I’ll just walk you through the launch pipeline for this year. First, there’s the commercial project, at roughly INR 1,210 crores. Then we have another project, Gudekar House — F.P. No. 280 — with a top line of INR 150 crore. That one is also expected in H2 of FY ’26. There’s a third project, which we talked about in Lower Parel, called Ambavat Bhavan; that too is slated for launch in H2. We also have a project in Mahim named Lobo Villa, with a top line of INR 180 crores, again planned for H2, plus a smaller project in Shivaji Park with a top line of INR 80 crores, also planned for H2. So technically, we have 5 new launches coming up, including the commercial, planned for H2.
That's helpful, since the presentation doesn't cover it, so I was curious about what the plan is. And on the commercial side, how will you finance it? Will it be a sale model? Or will you lease it? What's the plan?
No — it comes down to the sale model.
The sale model, all right.
<<operator_script>> We now take a question from Himanshu Dugar, who is calling in from Stylus Holdings.
Hello, can everyone hear me clearly?
Yes.
I’ve just got a couple of questions, and one is that a new project is going to launch in November. So is there any expected date for that launch?
As I mentioned, we expect RERA in November. Look, an exact date isn't something we can provide, because ultimately a RERA certificate is required, and that process itself takes time. So I can't give you a precise date, but you can count on it happening within the month of November. We're confident that we'll obtain the RERA certificate.
And is there any kind of regulatory delay on any projects, like the upcoming ones — did you notice that?
No, there haven't been any regulatory delays. Like I mentioned, a few projects are set to launch in H2 and they need certain IOD and CC. So that work is ongoing right now. And we're confident we'll secure the launch pipeline that we've committed.
<<operator_script>> We now take a question from Tanya Desai, who is calling in from DS Securities.
I had a few things I wanted to ask about. The first one is whether you've noticed any shift in how buyers are behaving — for instance, in payment timelines or in references — during this quarter versus the same period a year earlier?
It's not something that's very alarming. What we're seeing is the same as previously. The only change we're noticing relates to value luxury, which we launched, and we've gotten a good response. So I think ticket size matters a lot for the masses as well. And I think that's a good position for us, since we cater to a broader audience.
All right, thank you. Sir, my follow-up question is this: are there any notable cost overruns, or any sort of project delays, on any of the major projects that investors ought to know about?
Like the previous speaker mentioned, we barely have any unsold inventory left, and basically none from the sites currently underway. That makes launching the new projects really important. So that's why we feel very confident that once the commercial comes in, we'll have plenty of inventory to sell. We've seen a good response on our new — the 2 new projects we launched recently. So I'd say we're excited about this commercial launch, which is expected in November.
<<operator_script>> We now take a question from Tushar Sarda, who is calling in from Athena Investment.
Turning to the commercial side, what sort of investment will you have to put in? After all, even under a sale model, the money you receive is tied to construction progress, correct? Selling also takes time. So what level of investment would be required? And how do you intend to finance it?
Regarding the investment, some approval will be needed for additional payments in this particular quarter. After that — I mean, once sales are completed — we'll be fine with cash flows as soon as. Typically, we collect 20% at our launch. Then, as the milestone-linked construction plan, we provide further. So sufficient financial closure will also be there, in terms of — we already hold a sanction limit of INR 250 crores for the said project. So I think the initial investment may be to the extent of INR 15 crores to INR 20 crores, which will be required. And after that, we see good collections coming in once sales kick in.
So there's no need for you to take on any debt tied to construction for this project?
<<inaudible>> would only be needed in the event of a shortfall. So, based on the sales we achieve, measured against what is required, we will step in to close whatever gap exists in construction. That said, cash flows from the project will supplement this, and this will happen as and when sales occur.
No, no, I get that. I'm just asking whether there's any plan for peak debt on this project. What do you figure is the funding you'd have to put in, and so borrow that amount?
Then perhaps this project could need an additional INR 50 crores to INR 100 crores.
And then, regarding the Bandra project....
The RERA projection applies up to plinth level. So once we're past plinth level, we won't need that much collection -- or debt -- to fund construction.
Regarding the Bandra project, given how large it is, I’m not sure whether you intend to launch it in phase or all at once, but the approval cost is going to be substantial. So will you bring in a partner there, or do you plan to handle it entirely on your own at 100%?
No. We won’t bring in any partner for that. We definitely intend to handle this ourselves. But as we mentioned, it’s a big investment. So right now we’re concentrating on our existing sites and on sales, so that we can generate enough cash flow internally to help get that project started.
So would it be fair to say Bandra won’t be finished until a year or 2 years from now — only once this commercial piece is wrapped up? Is that how the plan works?
Yeah, I’d put it at a minimum of 1 year. Given that this is a bigger layout than what we’ve done before, and we still need to secure approvals, I figure roughly 1 year is a reasonable time line. Commercial demand also looks buoyant right now, so we’re fairly confident that commercial sales will come in strong as well.
So there’s no kind of private equity involvement in that, then?
Not at this point, no.
Thanks. We'll take our next question from Rajendra Passi, who is an individual investor.
I’d like to ask Mr. Thomas something. Back around May, after the Q4 results, we talked about fundraising. At that time, you said there were no plans for it. So what has changed over these 4 months that we’re now looking to raise around INR 500 crores again? If you could shed some light on that.
Could you say that again? I’m sorry, but I didn’t catch the question.
Sure. So my question is similar to what I asked Mr. Thomas after the Q4 results in May, when I asked whether there were any plans to pursue any additional fundraise, basically. And at that point, you said there were no plans as of now. So my question is what has changed in the 4 months that we're now looking to do another one — are we doing it for business development? Or is it mainly to reduce our debt and complete the current...
Yes. So the provision we've put in place is an enabling one, so that we could secure shareholder approval. That said, we're not saying we won't raise any funds. We may raise — for example, if we've launched our Bandra project, which needs a lot of capital upfront, we would need a fundraise right now if we have to bring that project to light immediately over the next 6 to 8 months. So that investment is required. So there would be, of course, if we're looking at it strategically, whether we — if we do a fundraise, whether we can kickstart Bandra at a faster pace. So that's why there was a decision to take an enabling provision. And subject to market conditions, we will decide whether we can go for a fundraise or not.
So at this point it's not, like, 100% certain — it's still in the pipeline?
Yeah, depending on how the market looks, there's a chance we could move forward with the fundraise.
And is that entire fundraise going to be for the Bandra project? Or are we considering something else <<inaudible>>.
We have 2 major sites that are our main focus right now. One sits in Mahim, and the other is for Bandra. So the main purpose will be to get both of these projects started.
Thank you. <<operator_script>> We'll now take our next question from Rahul Jain, who's calling in from Agarwal Securities.
I have just a couple of questions. First, I'd like to get a better sense of the mix we're aiming for between luxury and mid-segment housing as we move forward. And second, how do you expect demand to develop in the Mumbai micro market where we operate?
So, Mr. Rahul, all our new inventory and every new launch is being concentrated entirely on the value luxury concept, since that is where we're seeing traction, and I believe that's the way forward — at least as one part of our strategy. That said, commercial, again, as I said earlier, will follow a sale model rather than a lease model. And touch wood, commercial is performing well. For Bandra, though, when we begin — as and when we begin Bandra, it will sit in the luxury segment, because the per square foot rate there starts at INR 1 lakh. So pursuing value luxury there wouldn't make sense. That, then, would be the sole project in the luxury segment. But predominantly, every one of the new launches will be in value luxury.
That's useful. My next question: given that we're dealing with increasing costs and a tight contractor market, what's our plan for locking in the vendor contracts? Also, do our contracts include any cost escalation clause? Or are we <<inaudible>>.
Could you say that again? My apologies — I didn’t catch it. Would you mind repeating that once more?
Yes. So my question is this: given costs going up and the contractor market being tight, what's our plan for locking in those vendor contracts? And do we pass that along via a cost escalation clause, or do we secure the cost escalations ourselves?
When we issue contracts, clearly—the contracts include basic rates. So we provide materials, since that's what the bigger contractors do. That said, regarding the basic rates, even for the contractors, if there's an inflation rate for steel or concrete, there are always basic rates stated in the contract. So that would clearly come at some—depending on how much it rises, some portion will have to be borne by us, but a range is specified in the contract. So we somewhat included at least the current market prices with a bit of inflation in our contract to ensure that we don't exceed our contract value.
<<operator_script>> The following question comes from Anand Mundra, who is calling in from Mytemple Capital.
Sir, once a launch happens, how much time passes before that project begins adding to revenue?
Typically, it takes a quarter.
There's a quarter lag involved. So if you go ahead and launch the Mahim project — the commercial one — in November, then revenue contribution ought to begin right in the March quarter.
The size of the project matters as well. When a project is extremely large -- when the size is really big -- then it could also take 2 quarters.
Understood, sir. And regarding whatever launch projects we currently have, for those already launched and ongoing, what would their approximate cost to complete be?
For those ongoing projects, it'll come to roughly INR 650-odd crores.
And the amount we've sold against that, plus receivables still unsold, comes to roughly INR 1,100 crores or INR 1,200 crores.
Yes, INR 1,166 crores.
What portion of that figure, sir?
My apologies.
What figure do you get when you combine the sold receivables with the unsold ones?
We recorded INR 1,166 crores.
<<operator_script>> Ishita Lodha from SVAN Investment has our next question.
What's the worth of that unsold inventory sitting in ready-to-move-in projects?
In ready-to-move projects, we have zero unsold inventory—everything has been sold.
Could you also spell out what the initial funding requirement is for the Mahim and Bandra project before it gets launched?
Which Mahim project are you referring to?
For the Mahim commercial project and the Bandra project—those two big ones—what amount of funding will be needed before they're launched?
So at this point, we'd need somewhere between INR 15 crores and INR 20 crores for the approval side of things, since we're fairly far along in getting CC, and once that comes through, an initial mobilization advance will be needed. Then roughly INR 25 crores to INR 30 crores goes toward approvals along with other spending and preconstruction costs.
And how do — so collections this quarter were a little below par, since the sale happened near the quarter's end. But what's your view on how that goes from here?
Collections are gaining really solid traction. Given the strong sales we've delivered, that will carry through this quarter—it's just a quarterly shift, since 1 quarter, or 1—it's a spillover effect. So we're confident collections will be very strong this quarter.
And the response we got on the 2 launch projects this quarter was really good. So how are you planning sales for the inventory that's left in those 2 projects? Like, if demand is there, do you sell it now, or do you hold off and let realization grow before selling later...
So we won't really be carrying that inventory, since our goal is to produce additional pieces and also bring new sites online. Clearly, we don't plan to hold it, though that's subject to certain pricing in line with what our management expects. Apart from that, we aren't keeping any inventory at all.
<<operator_script>> The next question comes from Raghvendra Singh, an individual investor.
Regarding the Bandra project — you said the launch could come after 1 year. So if you're talking about top line of INR 2,500 crores or INR 3,000 crores across those 3 projects combined, isn't it somewhat premature to provide margin guidance on that project?
It's a little early for us to get into that discussion.
Also, when it comes to the cash flow generated by the commercial project, will that factor into how you decide about raising capital to launch Bandra, or is a fundraise definitely needed for that?
No, I believe it hinges on the amount. Naturally, raising capital will be necessary, but the size of that raise will be set by what happens with the commercial sale.
And, Mahim, when I check comparables, there isn't much commercial property on the market. So would you call it a solid submarket for commercial office space? I mean, the folks who live in that area or nearby?
We’re seeing connectivity in that area undergo a sea change. A direct corridor is coming that links BKC Western Express Highway to Senapati Bapat, where our specific project sits. As a result, we’ll have seamless, very good connectivity to the coastal road, plus links to the operating Aqua line — that is, the metro and the railway. So I think we’re quite confident, and we’re seeing solid demand for offices like these.
<<operator_script>> Since no participants have any more questions, I'll now pass the conference back to management for closing remarks. Thank you, and the floor is yours, sir.
We appreciate all of you joining our conference call. And we thank you, and we're glad to take any questions you may have. For any further details, you can contact our Investor Relations advisers. Thank you very much.
Thank you, sir. That brings this conference to a close on behalf of Suraj Estate Developers Limited. We appreciate your participation, and you're welcome to disconnect your lines at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Suraj Estate Developers Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Suraj Estate Developers Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.