Home / Transcripts / Técnicas Reunidas, S.A. (TRE) · July 30, 2026

Técnicas Reunidas, S.A. (TRE) Earnings Call Transcript

July 30, 2026

Bolsa de Madrid ES Energy Energy Equipment and Services earnings 41 min

Earnings Call Speaker Segments

Antonio Alonso-Muñoyerro Hernández executive
#1

Good afternoon, everyone, and welcome to TR's first half 2026 results presentation. As usual, our Chairman, Juan Lladó, and our CEO, Eduardo San Miguel, will conduct it. It will run for roughly 25 minutes, and after the final remarks you will have the chance to ask your questions. Now I hand the floor over to our Chairman, Juan Lladó.

Juan Lladó executive
#2

Thank you. Many thanks, Antonio, and good afternoon, everyone. It is a pleasure to have all of you here and to be able to begin with this highly significant second-quarter presentation. Let me now briefly take you through the agenda for today. As usual, I will begin with the main highlights covering these first six months, and after that I will take you through two very significant awards that occurred during the last quarter. Eduardo will then come in to discuss our company TR Power and its impressive first step in North America — our North America momentum, which matters a great deal — along with our services and digitalisations, AI, and robotics. Finally, I will close with a few remarks and our guidance. Let me begin with the key highlights. In this case, the key highlight — I suppose the most significant one — is this second-quarter performance. I would like to keep it very brief. The number that matters here is 73. EBIT of 73 represents 5% of our sales, a decent sales level of 1,478 million and net cash of 344 million, and crucially here, zero provisions. This is the key passage here: the fact that we have decent cash, no provisions, and decent sales levels also demonstrates how the Middle East projects are progressing and gradually returning to normal.

Juan Lladó executive
#3

When we look at the whole semester, both quarters together, we need to compare it against the equivalent stretch a year earlier. So what you're seeing is that sales for the semester rose 12% versus the same semester a year ago, reaching €3,061 million, and net cash, if you set last year beside this year, is up by nearly €100 million. Of course, in this first semester our EBIT stands at €104 million, since we have to carry the €45 million provision. Then a few points that go along with those figures. Execution in the Middle East is returning to normal — that's one point. It is coming back to normal, and that's well understood, because payments from our customers remain unchanged and on time. That's one message. The third point, and this one matters a great deal, is that we're handling a very robust order intake of €6 billion, with a high likelihood of finishing the year at €8 billion-plus. That €8 billion-plus is driven by the investment mood in the Middle East, the Power strategy, and North America. Three places, three businesses that I'd say are very important within our strategy and our future growth. Now let's turn to the two most important awards that have taken place this quarter. That covers part of what I've said before.

Juan Lladó executive
#4

The first item is a major one. It's a $5 billion job that we're handling on our own. This is the Abu Dhabi job. We have two customers, two highly important customers: ADNOC and Exxon. Here, quantity matters, obviously $5 billion matters, but quality matters a great deal. It's very important if we want to be part of this big investment momentum happening in the Middle East. It matters because we need to have — and we do have — the trust of the most important investors, in this case, Exxon and ADNOC. Both of them know our capabilities and they distinguish them well. They understand our engineering capacity and our engineering quality very well. They understand our modularisation capacity and technology extremely well, which is very much needed to bring this job to a safe harbor. They understand very well our capacity and quality to manage construction on islands or very complex sites. The quality and the quantity of the job are both very important, and we're very proud, extremely proud of this job, and we're extremely proud that both customers have entrusted TR as a sole contractor. The next job is different in size, but in terms of our strategy, it's as important as the previous one.

Juan Lladó executive
#5

This is a power job — we're handling the engineering and the procurement. It's in Alberta, in Canada, and the client is EPC Power, and here we're working with Siemens turbines. This project strongly confirms the power strategy we've laid out to you a number of times; it confirms our North America strategy; and it confirms our Power strategy, which is largely fueled by the massive demand coming from the hyperscalers — Meta just happens to be the one in this case. You may be asking yourselves, why TR? We have the strategy, and you should know that Deneb? / DBNA? is a long-standing customer of ours and knows well the quality of TR's services and engineering capabilities. Same with Siemens — this won't be the first, second, or third project we've done together. You're all aware that we're now well positioned not only in the United States but in Canada too. This job is good news, and you should be optimistic — you'll see more coming, there will be more coming. With that, since we're on the subject of Power, I'll hand things over to Eduardo, who will certainly add some color to this.

Eduardo San Miguel executive
#6

Thank you. Good morning, everyone, and definitely, as Juan says, many other power projects are to come. Let me first elaborate about TR and the power generation business. During the first half of this year, we successfully completed the spin-off of TR Power, our power unit. This was a critical milestone that provided TR Power with a dedicated and focused structure to capture a huge opportunity of growth. Because the key message I would like to emphasize today is the size of the opportunity ahead of us. Historically, our power business generated a few hundred million euros of revenues per year. More recently, at our Investor Day held in Madrid last October, we were targeting this business could deliver around €1 billion of annual revenues. Today, however, the outlook is significantly stronger. If we continue securing awards at the pace we are currently doing, €2 billion revenues per year should not be a great challenge. In other words, we are potentially looking at a business that could double the size we forecasted only a year ago. This is why we are investing heavily in capabilities and talent. We are going to double our power workforce by the end of the year, ensuring that we have the engineering resources required to support this growth.

Eduardo San Miguel executive
#7

By the end of June 30th, TR Power's backlog was roughly €2.2 billion. On top of that, we have solid visibility into projects that haven't yet been added to the backlog. The first is a €1.1 billion power project in the Emirates, where early works are already underway and we anticipate the final notice to proceed will come by October. The second involves the three combined cycles awarded to us by RWE in Germany, worth about €1.5 billion. We hope to receive the final notice to proceed at some point over the next 12 months. Artificial intelligence in the US, electrification in Europe, and industrialisation in the Middle East — those are the three drivers behind the enormous growth cycle we are already confronting. You can be sure we are more than prepared to be among the leading players seizing this momentum. Let's turn now to North America. North America is increasingly one of the most strategic growth regions for Técnicas Reunidas. During 2025, we landed roughly €70 million in early engineering services awards. In just the first half of 2026, we have already hit €52 million. What matters more to me is seeing how the projects we won a year ago are already moving from the pre-FEED and FEED stage into the engineering stage.

Eduardo San Miguel executive
#8

We anticipate a number of these projects moving into the EPC phase shortly as well. As a matter of fact, if all goes according to plan, a first project will be converted into an EPCM prior to year-end. The contract value should come to roughly €200 million. I want to stress that this is an engineering, procurement management, and construction management project, since our approach is to keep construction risk in America to a minimum. Additional early engineering services currently underway could grow into EPCM awards of about €8 billion across 2027 and 2028, which clearly gives us solid visibility on future growth. Finally, I'd like to highlight the robust ties we are establishing with many of the clients you see on this slide — clients that let us seize opportunities in the US and also in numerous other countries throughout America. The US, alongside the Middle East, is the biggest investor in tomorrow's energy infrastructure. We genuinely think we've managed to establish a franchise in the United States that remains small yet is very solid. We're confident the US will be the region where TR achieves the greatest growth over the years ahead. Let's move on now to services, digitalisation, artificial intelligence, and robotics.

Eduardo San Miguel executive
#9

When it comes to services, digitalisation, robotics, and AI, these are instruments that help raise our efficiency and profitability, and they also help sharpen our market positioning, because they deepen the ties we hold with the top management of our clients. Taking engineering services first, the momentum is still very strong. Across the first half of the year, we booked €130 million in awards, and we expect to end 2026 at roughly €375 million. A meaningful share of that number will originate in North America, as we laid out on the previous slide. This result leaves us more confident about reaching our goal of €500 million in annual revenues by 2028, while keeping gross margins near 30%. As for digitalisation, artificial intelligence, and robotics, we are likewise advancing considerably. Our view is that digitalisation and robotics will transform our industry, yet in the interim they represent an endless well of productivity gains and cost efficiencies that can potentially be turned into a competitive edge or improved margins. Two years ago, we set our target for cost savings at 1.5% of our revenues, and based on what we understand today, that is not a major challenge at all. That is why we plan to invest about €40 million in 2026 and grow the dedicated workforce to as many as 400 professionals by year-end.

Eduardo San Miguel executive
#10

Before we get into the financial figures, let me share one final point about our operations. We recognize that the Middle East, power generation, and America present a distinctive chance for expansion. Growing merely for growth's sake is not our intention. Our commitment to boosting profitability stands. Services and digitalisation will certainly help enhance both our margins and our efficiency. Our conventional EPC business will stay focused on delivering strong margins. Now, turning to the financial results. Juan covered revenues right at the start of the presentation, so I'd like to concentrate on margins at this point. This chart shows one of our most significant accomplishments across the past 18 months: steady profitability gains each successive quarter. I also want to stress that this progress has consistently been entirely in line with our guidance. Better margins stem from a structural enhancement in business quality, propelled by stricter project screening throughout commercial phases, delivery of our SALTA strategy, and disciplined execution with rising operational efficiency. Against that backdrop, we are managing the fallout from the Middle East conflict. During the first quarter we carried out a thorough analysis, and we determined that the €45 million provision represented our best estimate of the war's impact, and we communicated that impact to the market transparently.

Eduardo San Miguel executive
#11

During the past week, we revisited our analysis, and assuming the conflict concludes in this third quarter, we believe the €45 million provision remains appropriate, so there is no reason to change that figure. Now let me conclude with one of the clearest KPIs of TR's transformation over the last two years: the strength of our balance sheet. Our financial figures continue to improve. TR net cash hit €344 million in the first half of 2026, versus €332 million a year earlier. Equity has tracked the same positive path, rising from €564 million to €622 million, the highest level ever reached in TR's history. Finally, as we announced in previous quarters, we remain committed to our 30% payout policy. The first dividend will be paid from our 2026 results, and the payment date will be communicated after summer. Now, Juan, I hand the floor back to you.

Juan Lladó executive
#12

Thank you. Thanks, Eduardo. I'll give a quick summary. In this short wrap-up, the points I think we've tried to make clear during these presentations: €8 billion in awards for 2026 isn't a challenge — that's one message. Another message is that Middle East projects are progressing, and we've been executing well. Third, profitability relies heavily on the service division, and digitalisations is extremely well focused. Those have been important messages. As we run the business, there's a key message I'd like to convey here to investors and analysts. That message is that we are extremely well positioned — very well positioned — in three very important business cycles, extraordinary business cycles: well positioned in the Middle East investments that are taking place; very well positioned in the power investment cycle — Europe, Middle East, and most important, North America; and very well positioned, extremely well positioned, better than expected when we began two years ago, in North America overall. That message matters, and I wanted to make it very clear in my closing remarks. On guidance, I believe this quarter's results and keeping the 2026 underline — and let me underline the underline — guidance demonstrate that we're delivering a good performance.

Juan Lladó executive
#13

Naturally, this strong result has to be seen alongside an adjustment, just as we did in the first quarter, through the €45 million provision we booked three months ago. That is the key point: our guidance stays unchanged, and I want to wrap up on an upbeat note, since there is more to come — and now I'll open the floor to whatever questions you'd like to raise.

Operator operator
#14

Thank you. Ladies and gentlemen, we are now going to start the question and answer portion. If you have a question, kindly press star then the one on your touchtone phone. A prompt will sound telling you that your hand has been raised. If you would like to withdraw from the polling process, please press star then the two. In case you are on a speakerphone, please pick up the handset before you press any keys. Our first question is from Mick Pickup with Barclays. Your line is now open.

Mick Pickup analyst
#15

Good evening, gentlemen. Strong results. I have a couple of questions, if I may. First, on the power side, you mention doubling head count. What kind of numbers does that involve for power, and what scale are we looking at? Second, clearly big awards this year. You mention €8 billion of EPCM across the next two years, plus the Middle East moving in the right direction, plus Europe. Thinking back to your medium-term guidance, the EPC target was only 4.5 billion for 2028. We must already be further along in hand than that, aren't we?

Eduardo San Miguel executive
#16

Thanks, Mick, for those questions. On power, we’ve got roughly 800 people in that business right now, and we need to double that—get to nearly 1,500 people. That’s the scale of the operation. You might be asking where we intend to find all those people, since clearly we don’t have enough resources here at home, and the answer is straightforward: India. We’re recruiting right now, specifically people with expertise in that business. As for the second question, yes, that number is completely out of date. We need to revisit the 2028 guidance, and probably by the end of this year, once we have full visibility into what’s coming, we can likely give you the right figure—but obviously it won’t be 4.5.

Mick Pickup analyst
#17

On that point, it's obvious the lower-margin portion of the mix is expanding relative to the services component. Do you remain confident about that 8% margin over the medium term?

Eduardo San Miguel executive
#18

No, that margin needs another look. What we communicated to the market was 10% from EPCs and around 30% from services. Should EPC growth run higher while service volume growth lags, then plainly the average margin comes out smaller. We remain committed to the 10% target out of EPCs and roughly 30% out of services. The total number — the net global absolute margin — is certainly going to be considerably larger. That goes without saying.

Mick Pickup analyst
#19

Thanks.

Operator operator
#20

Kevin Roger from Kepler Cheuvreux has the next question. Your line is now open.

Kévin Roger analyst
#21

Yes, good evening, and thanks for making the time. I have three questions, if I may. The first concerns an interesting remark you just made — that if things in the Middle East normalized in Q3, the €45 million provision would be sufficient. As a sort of sensitivity analysis, since some of your peers such as Technip and Saipem issued guidance assuming the situation lasts through the end of the year, if we put ourselves in that scenario, situation until the end of the year, what additional provision should we assume? The €45 million, the €45 million figure you took, does that assume Q2 and Q3 split by two, or can you give any color on the potential extra costs that would, in a way, arise from the Middle East? That would be the first question. The second question relates to the possible sequential improvement you expect on the top line in H2 versus H1, because we are still near €1.5 billion-something of revenue in Q2. Is there any pick-up we should expect in H2? The third one relates to working capital. Working capital has been quite negative in H1, a triple-digit number.

Kévin Roger analyst
#22

How do you see the second half shaping up? Thanks a lot.

Eduardo San Miguel executive
#23

Hi, Kevin. Thanks for those three questions. On the topic of when the Middle East conflict will end — my answer is that one month ago, all of us believed the war had finished. Analyzing that is very difficult for me. I don't know how my peers are able to claim the war will last six months rather than three, or rather than nine. Unfortunately, I believe none of us has that knowledge. As I mentioned to you earlier, we have always tried to be very transparent and very accurate. We have made our numbers for the next three months. We have seen which extra costs are to come. We have seen how we can recover that from the client. We have analyzed the disputes with our suppliers, with our clients. We have analyzed everything to come in the forthcoming three months, and our estimation has been that this 45 is correct and enough. Frankly speaking, if I give you any kind of guidance about what could be the impact of the remaining three months of the year, I have to guess it, because the job we have done is exhaustive, is accurate, is a thorough analysis. It's what happens in the next three months.

Eduardo San Miguel executive
#24

I really can't provide anything further on what that impact might be if the war goes on for another three months. As for the second half of the year, the guidance is there for you. Our plan is to land at roughly €6.5 billion in revenues. That's where we stand, and it's just arithmetic — not an opinion, a fact. We feel confident that €3.5 billion is the correct number for the second half. On working capital — I don't want to come across as naive today — but working capital as of today, meaning the 30th of June, or the 1st of July, isn't my primary worry, and here's why. We anticipate at least another €2 billion in awards. We still need to gather the down payments on every project awarded during the second quarter of this year. A great deal of cash is going to come in from my clients. What worries me most is how to deploy that cash as wisely as possible, since I've always said the best thing I can do is hand this money to my suppliers to push them to speed up. Right at the start of a project's life, handing that money over isn't so simple, but we'll attempt it if we're able.

Eduardo San Miguel executive
#25

When it comes to cash, the one thing I can say is that the final figure at year-end is going to be far better than the current figure — by a wide margin.

Kévin Roger analyst
#26

Got it. Thanks very much.

Operator operator
#27

Ladies and gentlemen, a quick reminder — if you’d like to ask a question, just press star one. Our next question is from Alvaro Bernal at Alantra Equities. Your line is open now.

Álvaro Bernal analyst
#28

Hello, and thanks for taking my question. My apologies for returning to the provision topic. I just want clarity on what has shifted relative to your earlier assumption of €45 million, given that the war was expected to last until June and now continues into Q3. Is it because cost recovery with clients has turned out better than you first anticipated? If you could provide some detail there, that would help. Also, some color on how much cash this provision has used to date would be very useful. My second question is simply how you feel negotiations with clients are progressing broadly across the Middle Eastern region. Is it more a matter of some clients struggling, or of certain countries suffering more, so that clients there are not fully passing through the cost recovery? If you could shed some light on that, it would also be very helpful.

Eduardo San Miguel executive
#29

Hi, Alvaro. Thanks for those two questions. The provision—I'm not sure quite how to put this—is a living, breathing animal. Fresh costs keep arriving, and we're attempting to trim some of them by shifting people out of certain countries into other geographies. We're also recovering money from clients. The fact is that this provision is simply the net result of all those additional costs minus the money we expect to get back from clients. That's the thinking behind the provision. You're right. There are more costs than the ones we estimated three months ago, but we're recovering more money than we first expected, and that's why we think this is the correct figure. On the cash side, it's a little hard for me to give you an answer, because the idea is not that there's a cost of €40 million or €45 million and there will be a cash outflow of €45 million, because that isn't the case. We will collect money from clients, we will pay our suppliers, and what's clear to me is that, well, give or take, most of this extra cost and most of these extra collections will need to happen within this year.

Eduardo San Miguel executive
#30

That's my sense of it, though it's really just common sense. The issues with clients and with suppliers have to be resolved, and resolved right away. I'm sorry, I can't offer more color. And honestly, I don't want to hand out more tips to my clients and suppliers while I'm negotiating with them, so I can't go into a deeper analysis. When it comes to how clients in the Middle East are feeling, we haven't called it a super cycle, but we are talking about a huge volume of investments coming into the Middle East. That means our clients are trying to be supportive. I think that's the global message. Obviously, there are many different clients. The richest clients tend to help us as much as they can. The ones with smaller money, obviously they aren't that generous, it's a fact. The overall feeling is those guys want to invest. Here in Europe, everyone is talking about reconstruction, destruction, and when we travel to Saudi, to Emirates, yes, obviously we have to reconstruct something, but the main message is we want to invest and we want to do it as fast as possible.

Eduardo San Miguel executive
#31

That's what we're hearing from them. As for the near-term effects, as I mentioned earlier, our sense is that clients have been supportive at this point. The large, key clients.

Álvaro Bernal analyst
#32

Got it. Thanks.

Eduardo San Miguel executive
#33

Happy to help.

Operator operator
#34

The next question is from Robert Jackson at Banco Santander. Your line is now open.

Robert Jackson analyst
#35

Hello there, and good afternoon, gentlemen. I was hoping you might provide a bit more detail on how your project exposure in the Middle East breaks down, along with the execution status of the three or four major projects you have there, so we can better grasp where some of the risks might sit in the second half of this year. I'm not sure whether you're in a position to share those details. Thank you very much. That was my only question.

Eduardo San Miguel executive
#36

I need to watch what I say here. Once again, I want to give you a solid answer, but I'd rather not go too deep into specifics if I can avoid it. There's a reason the provision is capped around that €45 million figure — it comes down largely to the fact that the bulk of our Middle East projects are either at a very early stage, at the very tail end of construction, or else in final negotiations. Projects still in engineering or still procuring equipment, along with those where all the equipment has already reached the site and the sole remaining task is construction, aren't meaningfully impacted by the conflict. Honestly, just two projects, located in two separate countries, sit at a stage where we still need to bring major equipment into those countries. The Strait of Hormuz is closed — that's simply the reality. What we're doing, jointly with our clients, is figuring out how to get this equipment in via alternative routes. I'm not able to share further specifics, but only two major projects are impacted, and together with the client we're working out how to overcome the logistical hurdles involved in bringing that equipment into the countries.

Eduardo San Miguel executive
#37

That's the really major issue we're up against in that situation.

Robert Jackson analyst
#38

Thanks a lot, Eduardo — that’s clear.

Eduardo San Miguel executive
#39

Glad to have you with us.

Operator operator
#40

That brings us to the end of the question-and-answer session. At this point, I'll hand things back to management so they can offer their closing comments.

Juan Lladó executive
#41

That wraps it up. Thanks so much to everyone for tuning in to this second-quarter presentation. If some of you are able to take a few holidays, go ahead and do it, since it's about time. We'll speak with you, I believe, at the third quarter, which falls in the second week of November, if I'm right? Once again, many thanks, and please, should you have any additional questions, feel free to call Antonio. Okay. Bye-bye. Thank you.

Operator operator
#42

Ladies and gentlemen, that brings today's conference call to an end. We appreciate your participation and request that you disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Técnicas Reunidas, S.A. transcript - plus 133,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Técnicas Reunidas, S.A. earnings transcripts and 133,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.