Home / Transcripts / The Williams Companies, Inc. (WMB) · May 5, 2026

The Williams Companies, Inc. (WMB) Earnings Call Transcript & Summary

May 5, 2026

New York Stock Exchange US Energy Oil, Gas and Consumable Fuels earnings 63 min

What were the key takeaways from The Williams Companies, Inc.'s May 5, 2026 earnings call?

In the first quarter of 2026, The Williams Companies, Inc. reported a strong performance with adjusted EBITDA reaching a record $2.25 billion, up 13% year-over-year. Earnings per share increased by 22%, reflecting robust growth across all business segments. Management has raised guidance for full-year EBITDA to the upper half of the original range, indicating confidence in continued momentum driven by new projects and strong demand for natural gas.

What topics did The Williams Companies, Inc. cover?

What were The Williams Companies, Inc.'s May 5, 2026 results?

The strong first quarter results and the announcement of new projects position Williams favorably for continued growth. However, the challenges in permitting and managing leverage present risks that investors should monitor. The focus on natural gas demand and infrastructure development remains a key catalyst for future performance.

Earnings Call Speaker Segments

Danilo Juvane executive
#1

Thanks, Antoine, and hello everybody. We appreciate you being here and for the attention you're giving The Williams Company. Our earnings press release came out yesterday afternoon, along with the presentation that Chad Zamarin, our President and CEO, and John Porter, our Chief Financial Officer, are going to walk through this morning. On today's call we also have Larry Larsen, who serves as our Chief Operating Officer, and Rob Wingo, our Executive Vice President of Corporate Strategic Development. Within our presentation materials, there's a disclaimer about forward-looking statements; that disclaimer matters and is essential to what we're saying, so please take a look at it. The presentation materials likewise contain non-GAAP measures that we reconcile to generally accepted accounting principles, and those reconciliation schedules can be found at the back of today's presentation materials. With that said, I'll hand things over to Chad.

Chad Zamarin executive
#2

Thanks, Danilo, and I appreciate everyone being here today. We've gotten off to a strong beginning in 2026. Our teams turned in yet one more quarter of growth; we moved our key pipe and power projects forward in execution, and we brought 3 new major projects to commercialization while upsizing a fourth. Earnings per share for the first quarter rose 22%, and adjusted EBITDA climbed 13% to reach a record $2.25 billion. That momentum keeps building, which shows how scalable our strategy is, how strong our assets remain and how our expansion projects are contributing more and more. Our teams keep delivering high-return expansions at a consistent pace while bringing new projects into our robust backlog; and through the quarter, we made steady progress on the projects we have in execution. The standout was placing the Naughton Coal Conversion project into service — an important milestone that once again shows how we assist customers in transitioning toward cleaner burning natural gas while keeping both affordability and grid reliability intact. We also began construction on NESE, the Northeast Supply Enhancement project, along with SESE, the Southeast Supply Enhancement project. Getting these large-scale pipeline projects to the construction stage speaks to our team's capacity to work through complicated permitting so we can deliver the infrastructure this country so desperately needs. Another update I'm happy to provide: every turbine at Socrates Plato South has now been placed on its foundation. Beyond that, construction is complete on the first phase of the Aristotle pipeline, which is set to serve as a natural gas energy artery for multiple power innovation projects we're pursuing in Ohio, including Socrates. And we have no intention of easing up. We continue to sign fresh agreements at appealing multiples, which will drive growth past the end of this decade and support our reaching the 10-plus percent earnings CAGR that we presented at Analyst Day. With the robust beginning we've seen this year and our outlook for the months ahead, our current positioning sits in the upper half of the full year EBITDA guidance range, which John will walk through in a moment. As we look to the future, we continue discovering fresh approaches to addressing today's energy demands, among them the enormous electricity requirements of next-generation data centers. We're unveiling 3 significant new projects today that carry our strategy another step forward. The first of these, Neo, marks our fifth behind-the-meter power innovation project to reach commercialization alongside a top-tier hyperscaler partner. Among all power projects Williams has introduced so far, Neo ranks as the biggest, comprising 682 megawatts of installed capacity, a 12.5-year contract and an in-service date in the second half of 2028. Similar to the rest of our power innovation efforts, we anticipate delivering Neo at a favorable 5x build multiple, and roughly $2.3 billion is the anticipated investment for this project. Atlas is our second new endeavor, comprising a gas infrastructure deal to supply as much as 164 million cubic feet per day of pipeline capacity for a sizable investment-grade customer data center located in the Northeast. This project carries a 13-year term, and we expect it to enter service before the current year concludes. Although the CapEx involved is fairly modest, Atlas shows that we can deliver an efficient natural gas solution that supplies backup energy to data centers already in existence, rather than relying on diesel generation. Silver Spur is the third of our new projects — a substantial expansion of the Northwest pipeline system that involves installing compression and building a 90-mile transmission pipeline serving the Idaho market, which will bring an additional 275 million cubic feet per day of natural gas pipeline capacity. Silver Spur constitutes the opening stage of the Rockies Columbia Connector initiative that we've talked about previously, and it ranks as one of the first significant pipeline infrastructure build-outs in the Pacific Northwest in over twenty years; regarding Silver Spur, the target we've set for going into service is early 2030. Beyond those 3 sizable new ventures, we're also disclosing an expansion in scale for Transco's Power Express project, which answers the continuously rising demand for natural gas to fuel data centers together with market expansion in Virginia. Thanks to a new customer coming on and an existing commitment being upsized, Power Express has grown to 750 million cubic feet per day of new Transco capacity, which is set to come online in 2030; and as very strong demand for natural gas keeps producing new projects and an expanding backlog, a supply response is also becoming visible across our footprint. During the first quarter by itself, we sanctioned approximately 700 million cubic feet per day of new expansion projects spanning our gathering and processing portfolio. Taken together, the first quarter results underscore even further where we stand — at the intersection of incredible potential and the energy needed to realize it. We've just completed another quarter that set records, even as we bring major growth initiatives to market and move them further along, so the path we're on is unmistakable. The need for natural gas keeps rising. The backlog of projects we've signed continues to grow, and we stay intensely concentrated on delivering results and building value; together, those things will continue fueling stronger profits and cash flow, which in turn will generate solid returns for our shareholders over the long haul. Having said that, I'll turn the floor over to John, who will walk through the financial details more thoroughly.

John Porter executive
#3

Thanks for that, Chad. As Chad said, we've gotten off to a strong start in 2026, and first-quarter '26 EBITDA came in at a record level, up 13% over '25. We moved from $1.99 billion reported a year ago to $2.25 billion now, and Transmission and Gulf stay the main engines behind our consolidated results, improving by nearly $150 million, or about 17%. Each business in that segment posted growth in the quarter, so it was a great way to begin. Transco rose about 10% from the prior-year period, aided by higher tariff rates tied to the rate case settlement we reached last year, along with contributions from several expansion projects. Our Deepwater Gulf business climbed more than 60%, reflecting the combined effect of the Gulf expansion projects we finished recently. Natural gas storage operations added a 35% increase as well. Northeast G&P gained $10 million, or 2%, as strong growth in the rich gas areas was offset by weaker volumes in certain dry gas areas. Out West, results were up $56 million, about 16%, driven by our Haynesville investments, including a full quarter of service from the Louisiana Energy Gateway Pipeline. Sequent Marketing had another strong start to the year, generating $227 million in adjusted EBITDA. I want to note that about $15 million of the total $72 million improvement at Sequent came from the Cogentrix investment we acquired in March of '25. Also keep in mind that we expect to divest that Cogentrix investment at some point later this year. Finally, our other segment, which includes the Upstream operations, was down about $20 million, mainly because we sold the upstream Haynesville assets, a transaction that closed in January of '26. Of course, we've removed the roughly $180 million book gain on those assets from all of our recurring financial metrics. So beginning the year with 13% adjusted EBITDA growth is a great result, and it also produced a 22% increase in adjusted earnings per share; now, before I hand things back to Chad, let me offer a few comments on our full-year '26 guidance. As we've stated, given how strong the first quarter was, assuming nothing else changes from plan, we're now trending toward the upper half of the adjusted EBITDA guidance we initially provided. Remember that 2026 is another year in which we expect seasonally softer EBITDA in 2Q, followed by a return to sequential growth through the back half of the year, and that includes the partial startup of the Socrates facility beginning in the third quarter. On CapEx, leverage, and how we intend to fund things: we're excited to add yet another significant power innovation project in Neo. As a result, our growth CapEx midpoint for '26 is rising to $7.3 billion; adding one more power innovation project pushes leverage a bit beyond our 3.5 to 4x target range, to 4.1x, and we'd expect roughly $26 million of associated costs. As we've discussed previously, the main point is that pressure on our balance sheet leverage is largely a matter for 2026 and 2027, before the record earnings expansion we anticipate in 2028 and beyond. Meanwhile, we're preserving multiple options for managing leverage while continuing to advance these projects, together with other opportunities that are emerging. As I noted before, those funding approaches include bringing in partners, and we continue to see robust interest from a broad range of potential counterparties. That said, none of these paths is something we're required to take, and we have a great deal of flexibility depending on timing, market conditions and cost of capital. I expect that we'll finalize our financing plans over the coming couple of months. Overall, we're very encouraged by the strength of our first quarter results, the ongoing solid execution across our project portfolio and the continuing commercialization of new business, and we feel we're well positioned, with the flexibility to fund growth. With that, I'll turn it back to Chad.

Chad Zamarin executive
#4

Thank you, John. Not long ago, I got to stand with a remarkable collection of leaders — Interior Secretary Burgum, Energy Secretary Wright, EPA Administrator Zeldin, and FERC Chairman Swett — as we marked the start of construction on our NESE project. That's the first brand-new gas pipeline serving New York City in more than 10 years, something plenty of people figured could never happen. Scanning the crowd, I saw Williams team members alongside union tradespeople whose jobs on this effort will let them provide for their families and communities, and it drove home how much our work matters to a stronger, more resilient America. That goes beyond pipes and electricity — it's about livelihoods, about the sense of meaning and purpose felt by the men and women performing the vital task of building this country's energy infrastructure; they truly are the heroes of both our energy and our environment. Day in and day out, they deliver affordable power to households and companies, and day in and day out, they protect and improve the quality of life we are fortunate to enjoy, all while pushing sustainability forward and building a better planet for the generations to come. As our gaze turns toward 2026 and the years after, our focus will remain on smart, sustainable growth together with operations that are efficient and dependable. We'll keep pressing for permitting and judicial reform as well, so America can speed up the infrastructure required to boost affordability, strengthen reliability, and unlock economic prosperity along with national energy security. Naturally, none of this effort or progress happens without the investors standing behind Williams. I'm grateful for the backing you give our company and our people. To wrap up, I want to thank our employees for their steadfast dedication to serving our customers and our country safely and dependably. Everyone on the Williams leadership team feels enormous pride working alongside such a gifted group in this thrilling period of growth for our company. With that, let's open the line for your questions.

Jeremy Tonet analyst
#5

Thanks for the background today and the information about that Neo project. I'd like to know if we could explore the power market a little more. Can you share any further details about how much appetite you're currently seeing relative to what it was before? And given this big deal, how do you expect deal formation to play out going forward?

Chad Zamarin executive
#6

Sure. Thanks, Jeremy. And incidentally, great job on your note yesterday. The May the fourth be with you theme was really enjoyable. I'd just say that interest in our projects has remained very strong. We all recognize the hurdles our nation is about to face. For a while now, we've felt how hard it is to get pipeline infrastructure built, and that same difficulty is now obvious when it comes to data centers. Still, I think people increasingly see that delivering customized energy solutions for data center projects is a smart way to reconcile three things: keeping the grid dependable, keeping costs manageable for consumers, and getting these facilities up and running quickly. That's why you've seen the backlog numbers we walked through at Analyst Day. Of everything we've announced so far, Neo stands as the biggest single project. When you run the numbers, you'll probably notice that our projects' expenses and productivity continue to get better too. Because of that, demand stays strong. I'd say the backlog is just as healthy—maybe even healthier—than what we talked about at Analyst Day. And yes, we still anticipate projects rolling in at the pace we've described over the coming years. Honestly, nothing has shifted there. If anything, I'd put it this way: people increasingly understand that you need more than one kind of answer — both hybrid setups located behind the meter and options that work alongside the grid. That need isn't going away soon; it will persist well into the future. The goal is serving data centers while keeping the grid intact and energy bills manageable for everyday customers.

Jeremy Tonet analyst
#7

Understood. I was simply wondering — I suppose people in this sector have discussed for quite a while how necessary permitting reform is, and how crucial it is to secure that in order to build out the infrastructure this nation requires; so when you speak with your state senators locally, what do they tell you regarding the chances for that in D.C. at this moment?

Chad Zamarin executive
#8

Yeah. Well, I mean, we're still optimistic. I mentioned this a year ago — the House approved legislation containing quite a few of the provisions we want to see become law. This year, the Senate is working toward moving permitting reform forward. And we're fortunate to have an extremely solid delegation from Oklahoma here, which includes Alan, who was recently chosen to take over Markwayne Mullin's seat. We'll keep pushing for substantive permitting reform. The 2 main items we will stay concentrated on. There are numerous excellent, in my view, enhancements that could be achieved, and the House bill contained plenty of them. But for us, the 2 main ones involve fixing the 401 permitting procedure and ensuring that, that — once you receive a FERC certificate, once you've been through the extremely thorough and demanding environmental permitting process, you hold your federal permit such that one state cannot halt a project via the 401 process; so we haven't requested that, that it be eliminated, but that, that it become part of the federal permitting process. I believe that's fairly sensible; and then additionally, we, as a nation, not only for pipelines, require judicial reform. And so we're pushing for any legislation to include robust judicial reform so that — as I've mentioned previously, we devoted 13 years to litigation on Atlantic Sunrise. We prevailed in every lawsuit throughout that time. The only result was delaying the project and raising costs for consumers. Sadly, that isn't specific to Atlantic Sunrise; it applies to every infrastructure project across our country; it's simply too easy to entangle projects in litigation. So those are the 2 major issues, alongside plenty of other, I believe, enhancements that could be implemented. And we're optimistic the Senate will take action this year; and I'm aware there's considerable positive work happening throughout the Senate, including very recently, Senator, McCormick, from Pennsylvania introduced a bill. We appreciate the work and the leadership on that front; we believe there's additional material we ought to build upon, but we're witnessing many strong efforts from the Senate. We'd like to see something get passed this year.

Julien Dumoulin-Smith analyst
#9

Great job once more — larger and improved. If I could just poke at you a bit regarding how you view the rhythm of that 6-gigawatt backlog. To begin with, has it been refilled at this point, considering Neo coming out of it and shifting ahead? What's your thinking on when some of this actually starts to show up? You mention time to power. I'm really eager to hear what you're observing out there. Many of your competitors are describing quite fast-paced movement. So once more, clearly, congratulations on Neo, and now we're here inquiring about what comes next and its timing. So...

Chad Zamarin executive
#10

Sure, I'll begin. Julien, I'd simply say I wouldn't attempt to concentrate on exactness regarding that 6-gigawatt figure we've mentioned. In terms of magnitude, we continue to observe that kind of strong backlog out there. What matters more, I believe, is that we're deeply concentrated on adding projects in a manner that functions from an execution standpoint, that functions from a stable and foreseeable expansion standpoint, that matches the equipment and supply chain availability we've locked in to back the projects. John discussed this, and I'm certain we'll delve further into the financing and ensuring we remain extremely careful and disciplined concerning the balance sheet. So at present, we observe ample backlog enabling us to properly equilibrate all those elements and accomplish more than we'd anticipate from a growth and performance standpoint. Thus the backlog stays, honestly, strong. And I'd genuinely say the team excels at upgrading the backlog to confirm we possess this abundance of opportunities, yet we stay highly disciplined in confirming the projects truly align with where we hold competitive advantage and strength, and also where it suits well within the growth rhythm we aim to attain. So I wouldn't attempt to calculate the 6 gigawatts so much as to state that I believe that reflects an order of magnitude we still consider more than sufficient for us to work through as we add projects.

Julien Dumoulin-Smith analyst
#11

And if I may continue along those lines, you brought that up. What sorts of inventive funding approaches might be available for PI? Clearly, you've got some room on the balance sheet right now. But what exactly are you looking at? What kinds of structures? As you scale things up even more from here, how are you thinking about the capacity at present? I'll hand it back to you.

John Porter executive
#12

Thank you, Julien. This is John Porter speaking. I appreciate the question. Clearly, leverage is briefly rising somewhat beyond the 3.5 to 4x range we target for the long haul. And naturally, the real driver behind this is the execution we're now doing on 5 of these power innovation projects that are high-quality with fast cycles. So the main point I want to stress is that this is truly a matter of timing, since in '28 we'll experience massive earnings growth that will fully reset the company's leverage capacity. In the interim, though, I'd say we're acting quite deliberately to maintain flexibility in financing. No single lever will be our crutch; we have several well-proven choices at our disposal. For instance, we've genuinely encountered strong interest from some truly excellent prospective partners regarding these power innovation projects. And these structures are appealing. They'd let us recycle capital while keeping our strategic and operational roles in situations where that's appropriate. So on the whole, we stay sharply focused on delivering within our broader capital allocation priorities. Naturally, dividend growth remains unchanged, and we're dedicated to bringing leverage back into our target range eventually. Looking at the bigger picture, we feel quite positive about our position and our capacity to fund this CapEx program efficiently while continuing to expand it. We have several avenues. We aren't tied to just one answer. We anticipate that the business's robust earnings growth trajectory will delever the balance sheet on its own, particularly once the projects become operational in '27 and '28. And as I said before during my prepared remarks, I anticipate sharing more specifics regarding our particular financing plans in the coming couple of months.

Praneeth Satish analyst
#13

Chad, earlier you mentioned that expenses and performance for the power projects are getting better. Given that, perhaps you could give us an update on what amount of spare capacity you believe makes sense going forward for these power projects, and what approach you're taking with Neo? Has that changed compared to Socrates? From what I understand, Socrates is being constructed with roughly 50% spare capacity. So, I'm wondering, are you noticing that percentage declining as newer projects come along, or are you holding off to observe how Socrates does before adjusting anything there?

Chad Zamarin executive
#14

Yeah. Appreciate it, Praneeth. I'd frame it as partly each. We keep finding a more effective mix of equipment to satisfy what the customer requires; however, I'd also note that right now we're essentially midway through kicking off the commissioning — or rather, we're midway through commissioning the initial phase of Socrates. And I believe we'll gain considerable insight from that. Once Socrates is up and running, we anticipate being able to establish even more effective ways of operating and generate additional capacity as we, I believe, demonstrate that we have ample redundancy. Still, it's been — I believe it's been a mix of the two. I'd add that the team is performing excellently even while we've been constructing Socrates and afterward our subsequent projects, Aquila, Apollo, we keep applying what we've learned from every one of those efforts to the newer ones; therefore we keep observing that boost in efficiency. And my expectation is that it mirrors what we observe across many other domains. Consider how the efficiency trajectory looks for an upstream producer. It's quite comparable. I mean, these are still the initial stages. We must keep in mind, it's only about 1 year into this initiative and we're already announcing our fifth project. Consequently, I believe we'll keep witnessing rather striking efficiency improvements as time goes on.

Praneeth Satish analyst
#15

Understood. Now, perhaps switching over to the transmission area. Could you discuss what opportunities you see in the Rockies, and whether the Silver Spur expansion announced today might be just the initial one among additional projects on Northwest? I believe you conducted a number of open seasons during the prior year. So any insight regarding customer interest arising from that process, and how — and should we expect further expansions there?

Larry Larsen executive
#16

Yeah, Praneeth, it's Larry Larsen here. That question falls to me. And indeed, your recollection is correct. We first launched the Rockies Columbia Connector expansion open season in the previous year. And as we sort of noted during the prepared remarks, the Silver Spur is truly the initial stage once we began examining both the market requirements inside Idaho and also throughout the Pacific Northwest in Washington, Oregon. The Idaho market was obviously mature and prepared to proceed. I mean, it's difficult to accept that Idaho ranks as the nation's second fastest-growing state when it comes to population. And what they lacked was extra infrastructure; therefore we're thrilled to have this initial stage of what was initially the Rockies Columbia Connector project reach commercialization, and we will keep advancing that project. But indeed, we continue to observe interest over the longer term in Idaho, yet we're likewise still making headway in talks with our major customers across Washington and Oregon. And with luck, we'll witness some advancement on that expansion project's second stage during this year.

Ameet Thakkar analyst
#17

If I could, just a few additional follow-ups regarding Neo. For this specific project, is the counterparty essentially the same one you have for Socrates the Younger and Socrates?

Chad Zamarin executive
#18

Correct. What I'd say is that at this point in the project, purely for reasons of confidentiality, we remain unable to reveal who the counterparty is. The moment we're in a position to do so, we will certainly make that known.

Ameet Thakkar analyst
#19

Then, when it comes to the other projects — from the angle of air permitting, and any regulatory approvals the Public Utility Commission of Ohio might have to grant — how does that project compare with the rest?

Larry Larsen executive
#20

Sorry, which project are you talking about?

Ameet Thakkar analyst
#21

Neo.

Larry Larsen executive
#22

Yeah. Basically, we're still at the beginning stages of this. Now that commercialization has happened, we'll submit the applications for those permits sometime later in this year as we keep moving ahead.

Brandon Bingham analyst
#23

I was hoping to dig a bit deeper into the financing angle, maybe approaching it from a different direction. A few transactions involving gas pipeline assets have been announced lately, and word on the street is that the valuations came in pretty strong. Historically, you've tried to capitalize on that kind of gap between where private markets are pricing things. So I'm just wondering whether these deals and the possible funding requirements have you thinking about doing something similar once more.

John Porter executive
#24

Brandon, John here again. What I'd say is that at this moment, our main emphasis is on figuring out what kinds of partnerships might be achievable for the power innovation projects. Given how strong the opportunity is and who the customers are, those projects have proven, I'd say, very appealing to a number of these prospective partners. We've held some highly productive management presentations with, once again, some truly excellent partners. The range of possibilities there has us quite enthusiastic. I believe a few of those partners might even open the door to expanding what we can pursue in that space too. So from our standpoint, that appears to be a fairly rich area — one where we could act at scale, at a very appealing cost of capital, with proper governance in place and, once again, possibly even grow the set of opportunities available to us there. So that, I'd say, is where our attention is mainly directed at present. That said, as I mentioned before, there are plenty of other avenues we could pursue. Much of it simply comes down to the pace at which these projects arrive and their size. The Treasurer and I are still working to remain a step ahead of the commercial teams, and there's no shortage of activity out there.

Chad Zamarin executive
#25

Right, and Brandon, I'd say that fits thematically with the direction you were headed. We're seeing a huge level of interest from parties wanting to put money in alongside us on these projects, and in a manner that we believe will meaningfully improve our economics when it comes to cost of capital.

Brandon Bingham analyst
#26

All right. That's quite useful; and perhaps if we could briefly turn to the Haynesville. Curious what the newest and most notable things are that you're picking up from the producer customers operating in that play, particularly given that Henry Hub is resting quite easily under $3 at the moment, while also keeping in mind the fast arrival of the Gulf Coast LNG build-out.

Larry Larsen executive
#27

Sure. Larry Larsen here. I'll handle that question. I suppose the sort of remarks we've brought up before indicate that the producer is clearly careful when it comes to the sort of price movements at present. Even so, I'd argue the fundamentals remain quite robust; and I think, as you've observed, we've put out news about certain expansion projects for our gathering system over in the Haynesville, and the point of that is really to begin preparing for a possible ramp tied to the demand that's taking shape; and thus I think they're careful at the moment and will be balancing things around wherever they perceive pricing to be in the near term, while acknowledging that an enormous demand pull exists that keeps ramping up across the next few years. I believe we're optimistic that we'll keep watching that pull from the Haynesville keep building up alongside our producer customers. Still, I'd say most of them are somewhat careful in the near term, yet eager to be set for that growth that's arriving here fast over the next year or 2.

Chad Zamarin executive
#28

Yeah. I mean, Larry, when you take a look at rig counts in the Haynesville, they've risen, and DUCs are accumulating. The gas curve, I mean, remains in contango. That's true of natural gas fundamentals as well. I mean, the volume of demand growth that we're — the obvious demand growth that we're witnessing, I believe, is being acknowledged. So to satisfy the ramping LNG demand, the Haynesville is going to be the most responsive gas basin in the U.S. And we do anticipate another strong — actually, last summer our power load was comparatively modest, but given how supply and storage are shaping up going into the summer, we anticipate pretty robust power demand this summer. And so I think producers understand that the Haynesville is going to be unbelievably important and needs to be positioned to satisfy this rising demand.

Spiro Dounis analyst
#29

I'd like to revisit the growth trajectory. Thinking back to the Analyst Day, you mentioned that 8% of that 10% CAGR was already locked in. I'm just wondering where things stand on that now. Do additional projects from this point push you past 10%? It feels like these announcements keep arriving more quickly than anticipated, so I wanted to get a clear baseline on that Analyst Day guidance.

John Porter executive
#30

Thank you, Spiro. Yes, we genuinely feel very positive about our progress relative to the long-term growth objectives we laid out back in February. To repeat, 10% plus CAGRs for EBITDA and EPS covering 2025 through 2030 is our target; and as you noted, back in February, I stated that our existing book of contracted business underpinned roughly an 8% CAGR, and I'd say that with the new projects we've announced today, that underlying growth rate has clearly reached approximately 9% at this point; so these projects have lifted it by a point; and overall, I'd just say we feel really good about the 3 areas of focus we're concentrating on to fuel this industry-leading growth rate; and first, executing on the projects we presently have underway. Project execution has been proceeding excellently for Socrates and the other projects we're currently engaged in, including Southeast Supply Enhancement, along with other significant transmission projects. Second, we feel very positive about our ability to keep securing new opportunities given what we're observing in the commercial backlog. And then third, our teams are strongly focused on extracting additional value from the Legacy businesses too. I touched on this somewhat at Analyst Day — that we stayed, I felt reasonably conservative regarding volumes and margins throughout the Legacy businesses, and our teams are highly focused on that element as well. But — so all in all, I believe we're around 9% at present and feel that remains a fairly conservative view of that figure.

Spiro Dounis analyst
#31

For my second question, let's return to the behind-the-meter approach. Chad, you mentioned this somewhat, but we're observing the landscape change somewhat now. On the data center side, there's some nimbyism emerging. And I believe we're also perhaps seeing a movement toward bring your own power, which differs somewhat from behind-the-meter. I'm simply wondering how you're evaluating that evolving landscape regarding how data centers get powered, your capacity to perhaps even shift toward a bring your own power approach and possibly even build a CCGT eventually?

Chad Zamarin executive
#32

Yes. Our focus remains on developing inventive infrastructure approaches. We've operated in certain of the toughest infrastructure environments out there, so having to remain thoughtful, imaginative, disciplined and tenacious while pushing through tough infrastructure work is nothing new for us. That, in my view, actually leaves us in a strong position to help hyperscaler clients figure out where to locate, how to engineer and how to construct their projects. And because of that, I do think we've consistently said something like: don't think of us as only a behind-the-meter provider. Our goal, put simply, is figuring out how to provide infrastructure solutions that open up the grid by working alongside our utility customers, while at the same time creating a wider footprint where projects could be placed by unlocking the natural gas grid so it can serve as a backbone for projects too. That is genuinely where our attention sits. So if achieving that requires faster movement to market, then we offer bring-your-own-power options that either bridge to grid power or supplement it, or eventually grow through bigger units by incorporating steam turbines and other approaches. All I can really add is that our team has done an outstanding job developing the ability to pursue every one of those paths. Our goal is to be seen as a company that delivers infrastructure solutions. So when we have a distinctive toolkit to offer, we won't box ourselves into a single approach. Our genuine aim is to apply what we know about constructing large, complicated infrastructure in tough locations—doing so in a manner that satisfies what customers require while also benefiting the community and earning backing from the communities where we work. So yes, that remains what we'll concentrate on. Basically, that's my roundabout way of confirming that we're looking into this and ready to offer broader options should the situation call for it.

Keith Stanley analyst
#33

To start with, the Neo deal ran 12.5 years, and that's encouraging. What's the status of efforts to push contract length even higher? What can realistically be done? And how open are buyers to that?

Chad Zamarin executive
#34

Sure. My view is that opportunities for extended contracts remain plentiful. We've witnessed that 12.5-year term get extended, and talks are already underway on arrangements stretching past 15 to 20 years too. So we keep observing, I'd say, widening acknowledgment that solutions built for the long haul will be necessary as well. So yes, I'd tell you to stay tuned, though we keep seeing what I'd call momentum building toward commitments of greater length.

Keith Stanley analyst
#35

Okay, and for the second one — what remains to be done regarding Constitution before it can advance? Which items are mainly holding it up, and what kind of schedule might we expect?

Chad Zamarin executive
#36

Sure, thanks. As you know, we launched NESE, and I view that as a strong indicator that New York and other markets we may have assumed were closed to business, or perhaps reopening to it. Similarly, Silver Spur and the headway we're making in extending that toward Oregon and Washington signal that the markets understand natural gas is the most cost-effective answer we have. Consequently, we must welcome and construct additional natural gas infrastructure serving those markets where, honestly, energy costs run very high; therefore with Constitution, I believe there's widening acknowledgment that New England and New York require additional gas infrastructure. Consider that gas demand has risen 50% across the past 10 years. Meanwhile, no pipeline infrastructure has been added into New York and New England. That explains why they're now experiencing the nation's steepest utility prices during many portions of the year; consequently, we're witnessing robust backing from the New England states. The difficulty with Constitution, I'd note, is that NESE involved essentially one customer and one state, whereas Constitution involves multiple. None among those states is big enough on its own to carry a project. As a result, we must gather sufficient critical mass before the project can proceed. So we keep working. Our team is working Constitution very aggressively. What's frustrating, I'd say, is that this isn't due to any shortage of need or, honestly, desire from the market. Rather, it's the tangled politics and the sheer split and fragmentation within that market that make assembling it tougher. So it amounts to herding cats on a large scale; even so, we remain — ultimately, we fully understand that this market requires energy and natural gas infrastructure. Therefore we'll persist. That said, yes, that's genuinely the difficulty with Constitution: it's simply a far more fragmented market, with numerous distinct constituencies that must align. So ultimately, we are on file with FERC. That proceeding continues to advance and will, in my view, conclude successfully via the FERC process. However, for — we must demonstrate customer commitments for the project. That's the final gating item. Larry, I'm not sure whether you'd like to add anything there?

Larry Larsen executive
#37

No. What I’d say is you captured that pretty much perfectly. And there are plenty of really productive conversations happening with the utilities. There’s a clear acknowledgement. I think when you go through Winter Storm Fern and see just how fragile that market is, that really brought it into focus. So I think every one of the utilities is simply attempting to determine how they secure the proper backing through their states, along with the extra infrastructure they’re looking to add on their systems, so they can help strengthen robustness in the market area too. So the talks are moving along nicely. It’s only that, like Chad said, we’re just attempting to get all the various parties together so we can land on something we can commercialize and move ahead with.

Jean Ann Salisbury analyst
#38

Does the growth of the Marcellus gathering system stem in any way from integration and pull-through tied to one of your pipeline ventures or behind-the-meter ventures? Then for my follow-up, thinking a bit wider, clearly you hold some quite significant competitive edges in Ohio and Utah that have allowed you to land the behind-the-meter ventures. Could you talk about where you believe you hold comparable competitive edges in other regions?

Larry Larsen executive
#39

Yeah, Larry Larsen here. On the gathering expansion in the Northeast, I'll address that. Our power ventures aren't connected to it in a direct way. It's simply growth, since our producer customers keep moving into various portions of our network, which gives us a chance to deliver added compression plus gathering pipeline infrastructure so they can reach the market. So there's no direct tie to it. Still, I believe that as you watch us build an increasing amount of demand linked back to that region, that will let us offer additional solutions so we can expand the gathering side as well as the processing side of the business. So on that front I'd say we're in a strong position, though it doesn't correlate directly with the ventures we've made public.

Chad Zamarin executive
#40

Yeah, and I'll kick things off, and maybe Rob can jump in too, regarding those power innovation efforts — clearly Ohio and Utah stand out. But beyond that, what I'd highlight is how we're stacking both our geographic reach and what we're capable of doing, plus focusing on locations where infrastructure can be constructed cost-effectively. So when you picture that reach, consider it running along Transco and definitely heading out toward the West, and also — Rob can chime in here since he brought this up during our Analyst Day — the phenomenal reach that Sequent creates spanning the whole country, and even more crucially, stacking that alongside, in my view, regions where construction of infrastructure remains feasible. That means Louisiana, the Southeast, Mid-Atlantic, and if you think about Ohio, Pennsylvania, then moving further West, Utah. Rob, anything you'd like to add?

Robert Wingo executive
#41

Jean Ann, this is Rob here. What I mean is, I frequently bring up the subject of our virtual footprint. Take Sequent, which is our marketing platform — what I'm saying is, we hold capacity positions along each of the major pipelines nationwide. That explains how we've managed to deliver projects into areas lacking a physical footprint of ours, yet still able to construct connections to interconnecting pipelines close to pipelines whenever that's needed. So if you examine the data center hubs — what I mean is, within our earnings presentation there's a slide displaying essentially all of the data center hubs throughout both our virtual and our physical footprint. And what you'll notice is that we can essentially reach any data center hub in the country. Our opportunity backlog has, in a sense, mirrored that. You've watched us complete projects in locations where a physical footprint exists for us, as well as in locations where we could utilize and take advantage of our Sequent marketing platform.

Chad Zamarin executive
#42

Absolutely. Another point worth adding — I brought this up during the prepared remarks — concerns the Aristotle pipeline, which is in the process of being commissioned right now. Natural gas has been brought in, and everything is set for gas delivery to Plato South. Essentially, though, the team engineered an artery that now runs through the Columbus New Albany region, an area that has served as an extremely sizable data center corridor. As a result, we built that pipeline's capacity beyond what was needed so that it could not only serve Socrates but also function as an energy artery supporting the creation of additional projects. And I believe you'll keep witnessing that type of strategy unfold — in Utah, for instance, we're constructing the pipeline intended to serve the Aquila project. That region is growing, both purely in demographic terms and also with plenty of technology, power, and data center activity. So those are places where I think we'll keep seeing development occur. Yet, as Rob pointed out, Slide 17 in our materials offers a solid picture of how we genuinely can reach virtually any location; however, I'd add that sadly there will be winners and losers. I brought up the absence of gas infrastructure and, honestly, any infrastructure at all in New England and New York — 20% of the nation's population lives in New England and New York, yet they'll experience under 2% of economic development during the next year. Consequently, that — certain parts of our country, frankly, will find it difficult to get projects developed even when demand exists.

John Mackay analyst
#43

I'd like to remain on the behind-the-meter topic, I guess. We're observing additional participants coming into this area, especially on the services side, but pretty much everywhere. Could you take a minute or 2 — and you've already addressed many of these points — but take a minute or 2 to discuss how you see your comparative competitive edge. And we'd really like to hear more about, specifically, the balance of plant and why this amounts to more than just, "Hey, we've gotten our hands on a turbine." Maybe walk us through that a bit, if you would.

Chad Zamarin executive
#44

Yes. Thanks, John. I genuinely believe what we offer is rather distinctive. I mean Rob mentioned the Sequent footprint. We clearly have a very strong Gathering and Processing business. So we engage with every producer in the country; we have our Transmission business. We engage with essentially every major utility in the country. That puts us in a great position to assemble those components and deliver full value chain solutions for customers. And so I believe the capability for — we aren't merely a company that turns up with a turbine or a site that we're attempting to develop. I mean our approach is to deliver energy infrastructure solutions for American consumers and companies. And so we want to ensure that if a hyperscaler wants to develop a project, we can help find a way to handle all of the needs upstream of the project. And so I think that's a rather distinctive at scale solution. Look, this is a very large market, and I think there are plenty of opportunities for many players to help solve these problems; but along our footprint across natural gas infrastructure at scale, a company that can deliver projects, I think Williams is rather distinctive. I mean we've been the most focused natural gas infrastructure company in our space. And so I think that serves us well; and truly, our aim is to ensure that our customers can depend on us to handle all the complexities of getting energy to their facility. Whether that today is mainly behind-the-meter solutions or over time, working to be in complement with the grid or other solutions that come to bear. You brought up the balance of plant just on site. I mean not only are we doing power generation with turbines. Those are turbines of varying size and scale. We're also offering battery storage solutions. We're working with customers on load following and understanding AI loads so that we can not only protect energy systems that are on site, but over time, protect the grid. Our Atlas project, relatively small from a capital perspective, but that's a significant project that demonstrates the ability to move data centers away from diesel backup generation to natural gas generation. Natural gas infrastructure functions as an enormous, adaptable storage network. Because of that, using natural gas gives us a far greener, cheaper, and more efficient way to provide backup for data centers that already exist; our aim is to deliver thorough, imaginative options. That is genuinely where our attention sits. I'd say this sets us apart quite a bit, since we're able to deliver it at scale throughout the entire value chain.

John Mackay analyst
#45

That sounds excellent. You mentioned it briefly, but my follow-up was going to focus on Atlas, and I believe you've already addressed it, though for the sake of clarity, would you confirm that what you're doing is essentially collaborating with the customer to replace their diesel backup at a data center with gas? Also, if you wouldn't mind clarifying, it appears the CapEx involved is fairly low, but I wanted to verify that.

Chad Zamarin executive
#46

Sure, I'll have Larry cover anything I miss. Essentially, the answer is yes. What we have here is pipeline infrastructure that enables the customer to switch their backup generation over to natural gas, and it takes advantage of how compressible gas is within the pipeline network, essentially functioning as a storage option as well as a backup generation option, all without needing diesel onsite and without having to burn diesel. Larry, I'm not sure whether you'd like to add anything regarding the scope of that.

Larry Larsen executive
#47

Yeah. I'd say you've pretty much nailed it. And looking at it from a scope perspective, you're correct — as CapEx goes, that figure isn't big; it likely comes in a touch below $50 million, yet it lets us deliver lateral interconnection facilities plus plenty of redundancy, which means they won't need to burn diesel fuel and can instead lean on the Transco system and the versatility it offers. So ultimately I'd call it an excellent answer for that customer, since we can give them a solution with lower emissions along with really solid reliability.

Chad Zamarin executive
#48

Once more, I want to give the team credit. I believe this is demonstrating what I hope for and anticipate will be something we can offer at other facilities. There was a belief that compressed natural gas, or liquefied gas stored on site, was necessary as a storage answer. What we are demonstrating, I think, is that due to gas being compressible, pipelines actually hold an enormous amount of storage. We have storage throughout the natural gas footprint. So yes, this is essentially confirming that we can depend on natural gas as a dependable backup option.

Manav Gupta analyst
#49

There are 2 things I'd like to ask, and I'll put them both out there at once. First, during your Analyst Day, you pointed out that in addition to transmission and power, you're evaluating several nat gas storage possibilities. Could you expand a bit on where those decisions stand and on how customers view nat gas storage in the U.S. when it comes to reliability? Then, briefly, could you address the increase in size of the Power Express project?

Larry Larsen executive
#50

Manav, Larry here. I'll handle that. Appreciate the questions; and yes, interest in the storage space is unquestionably very strong from what we're seeing. I'd point to the volatility witnessed during some of the winter storms, but also to rising demand, particularly along the Gulf Coast. Our Pine Prairie project is moving through permitting; we also have an additional expansion at some of our Gulf facilities underway. Right now we're working hard to complete commercialization. With luck, we'll be able to share some announcements about that over the coming quarters. Beyond that, we have projects out west involving some of our Mountain West facilities that are in the works. So interest is clearly strong. I believe we'll make some headway on a couple of projects later this year, and I expect we'll keep evaluating others. Our footprint across the Gulf is fairly large, spanning all the various facilities, and we're eager to see some of them commercialized.

Chad Zamarin executive
#51

Now let's talk about Power Express.

Larry Larsen executive
#52

Right, Power Express — that one's a strong example. As we've pointed out before, Transco's advantage is that you can adjust project sizes to match what customers actually require. You've watched us shift the boundaries of this particular effort, and we keep engaging with buyers over in Virginia. One of those customers locked in what they finally needed, and it turned out there was extra room. On top of that, a different buyer stepped forward whose requirements lined up well with what that effort covered, so we could hold returns and size at a level we could handle without pushing back when the whole thing wraps up. That really shows what the Transco network brings — we're able to tweak the dimensions of growth work in small ways and bend to serve what customers want. Our commercial group did a fantastic job remaining plugged into those markets and locating opportunities to keep expanding capacity wherever that's sensible.

Sunil Sibal analyst
#53

I'd like to ask about the chance in LNG. Given everything geopolitical going on right now, it appears the U.S. is getting more attention as a supplier of LNG. You clearly hold a stake in one LNG project, so I was wondering whether you might bring us up to date on how that market looks.

Chad Zamarin executive
#54

Sure, I'll kick things off, and Rob might want to add something. The first point I'd make is that the Woodside LNG project is moving along nicely. We've assumed control and are now the main owner of Line 200, which runs from Transco, plus our Louisiana Energy Gateway system, and it's going to be the leading way gas gets delivered to the Woodside LNG terminal. I'd say we're happy with where we stand and with how big it is when it comes to LNG. So at this point, on that project, the main thing we're concentrated on is getting it built and running. On a wider level, I mean, clearly, what's going on around the globe these days only strengthens the case for the U.S. being a dependable LNG supplier to the market. That said, we generate 40% more natural gas in the U.S. than we use at home. And should anybody have worried that sending gas abroad as LNG would hurt domestic prices, I'd say we've really shown that when you overproduce gas, when you overproduce a commodity, you shield yourself from price shocks worldwide, and we've definitely witnessed that. You can look at natural gas right now, far cheaper than its price before the conflict in the Middle East began, whereas with liquid fuel, we only make roughly 3% more than we use at home; and as you can tell, we've experienced far bigger price shocks with oil and liquid fuel and other areas; so we feel quite confident about the fundamentals that will drive really robust LNG growth, and we'll keep exploring options to take part. And Rob, I'm not sure whether there's anything you'd like to add.

Robert Wingo executive
#55

Right, so the one point I'd make there is that first LNG is still several years away for us. Woodside remains on schedule to deliver an initial cargo in 2029. So that's still some years off. That said, we hold 1.5 MTPA. Keeping that is our option, not something we're required to do. And we've been in discussions with producers, exploring how to leverage it to draw additional volumes into our Haynesville system and round out the wellhead-to-water approach we've been pursuing.

Sunil Sibal analyst
#56

All right, we'll keep watching for news on that 1.5 MTPA. Moving to another subject. I believe a few remarks appeared in the press regarding a power trading opportunity for Williams. What I wanted — I was hoping you might shed some light on how you view that opportunity in relation to your current assets or those you are developing?

Chad Zamarin executive
#57

Yes. What I'd say is, at this moment, the key point to keep in mind is that we are constructing an extremely substantial power operation along with a rather extensive collection of varied power assets. Yet our main emphasis will be placed on taking care of the customer, and after that on optimizing the electricity we generate. So I'd say keep watching on that subject; however, as of today, we are not a — as we are — as we would put it with Sequent, we are not a speculative trader. We have no intention of establishing any sort of speculative Power Trading operation. Still, we want to ensure we can deliver the most efficient, optimized answer to the customer; and that is truly the heart of the capability we are aiming to expand, so that we can remain as flexible and optimized as we can be for the customers, given that we have a rather sizable fleet of power generation set to come online across the next couple of years.

Craig Shere analyst
#58

To start off, I'd like to walk through what the equity partner opportunity looks like in power innovation. There appear to be three possible drivers behind it, yet it sounds like you're giving more weight to one than the rest. The way I see it, that one is remaining inside near-term leverage targets and capturing carried interest upside on a deal-by-deal basis. Yet you've brought up again and again the idea of recycling capital into a potentially broader set of projects. Then during Q&A, John raised the possibility of strategic relationships that might open up even more project opportunities. So would you care to share a bit more on whether speeding up growth in this area is the main priority?

John Porter executive
#59

Craig, John here. My view is that what matters most is ensuring, from a treasury financing standpoint, that once again we remain ahead of the fantastic book of business that we see the commercial teams going over with us, and that nothing catches us curtailing our capacity to keep growing and to capture that business because of some kind of financing problem. Our commitment is to the 3.5x to 4x leverage target. That isn't — that leaves us plenty of breathing room compared with where our ratings sit today. So this isn't something the ratings agencies are pushing. It's really an internal goal that the Board and we have settled on, and all of us are at ease with it — for this business, it's a sound leverage range. On top of that, we want to keep raising our dividend. So all in all, I'd say we're simply looking for ways to fund the CapEx as efficiently as possible, in a manner that genuinely delivers value for our shareholders over the long haul. And from what these meetings with prospective partners have shown us, I find it quite encouraging on many fronts, among them every one you listed. So there are plenty of strong arguments for why that could turn out to be the solution. Even so, yes, we do have many different options available, and we'll keep examining the whole portfolio as well. There might even be assets we'd choose to divest down the road. So there are various moves open to us. What we're working to avoid is getting stuck on a single path. Still, I'm genuinely optimistic that before long we'll be able to announce a very appealing financing solution for shareholders.

Craig Shere analyst
#60

And the final question comes from me. Chad, when you replied to John, I think the topic of energy storage came up. My understanding is that played a big part in a few earlier project expansions your team had made public. I'd like to ask how the BESS element has developed within power innovation solutions. And what do customers actually want from this? Is it greater responsiveness on a second-by-second basis? Or are more of them seeking backup capability that lasts longer?

Chad Zamarin executive
#61

Yeah. Thank you. My sense is that the main thing is how quickly it reacts when power loads at the facilities shift, correct. And this mirrors the same challenge you'd observe across our grid. I mean, on our grid, our projects are, of course, mostly powered by rotating equipment, and rapid demand load shifts occurring in milliseconds don't get handled well by those. So the chief purpose here is to act as a way of handling dynamic AI loads. That's why we keep examining projects through a power efficiency lens using batteries, yet for the ones we've made public, the battery system's main job is essentially to serve as a buffer separating the rotating equipment from the data center so those swift load changes get addressed.

Chad Zamarin executive
#62

Okay. Well, we appreciate the consistently lively question-and-answer session, and thanks for the interest you've shown in Williams. We're looking forward to talking with all of you again before long. And until then, best of luck to everyone. Thank you.

Operator operator
#63

We appreciate everyone joining us for this call. That brings the session to an end. Please go ahead and hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete The Williams Companies, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to The Williams Companies, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.