Textron Inc. (TXT) Earnings Call Transcript & Summary
October 29, 2026
What were the key takeaways from Textron Inc.'s October 29, 2026 earnings call?
In the third quarter of 2026, Textron Inc. (TXT:US) reported revenues of $3.8 billion and adjusted EPS of $1.76, reflecting a 4% year-over-year increase in revenue. The company also generated $418 million in manufacturing cash flow before pension contributions, up from $281 million in the same quarter last year. Management raised guidance for full-year adjusted EPS to a range of $6.55 to $6.65, and for manufacturing cash flow to $800 million to $900 million, indicating strong operational performance and positive momentum across segments, particularly in Aviation and Systems.
What topics did Textron Inc. cover?
- Revenue Growth in Aviation: Textron Aviation revenues increased by 14% to $1.7 billion, driven by higher aircraft and aftermarket revenues. Management noted, "We delivered 51 jets and 32 commercial turboprops in the quarter compared to 42 jets and 39 commercial turboprops in last year's third quarter."
- Increased Guidance: Management raised full-year adjusted EPS guidance to $6.55 to $6.65 from $6.40 to $6.60, and manufacturing cash flow guidance to $800 million to $900 million from $700 million to $800 million. This reflects confidence in continued operational strength and cash generation capabilities.
- MV-75 Program Progress: The U.S. Army received congressional approval for $350 million in funding for the MV-75 program, with $300 million obligated in Q3. Management stated, "We look forward to Congress approving a '27 budget...reflecting about $2.3 billion for 2027."
- Supply Chain Improvements: Management highlighted ongoing efforts to enhance supply chain efficiency, noting that they expect to see improvements in parts availability and production output. They stated, "We should start to see progress with that, both at Bell and at Aviation throughout 2027."
- Strong Performance in Systems: Textron Systems achieved 16% revenue growth, driven by increased contract wins and productivity improvements. Management emphasized, "Across the board, I would say, Systems just really hit it out of the park this quarter."
What were Textron Inc.'s October 29, 2026 results?
- Revenue: $3.8 billion (+4% YoY)
- Adjusted EPS: $1.76
- Manufacturing Cash Flow: $418 million
- Textron Aviation Revenue: $1.7 billion (+14% YoY)
Textron's strong quarterly performance, particularly in Aviation and Systems, along with raised guidance, positions the company favorably for the remainder of the fiscal year. However, challenges in the Bell segment and uncertainties surrounding government funding for defense programs warrant close monitoring. Investors should watch for continued improvements in supply chain efficiency and the execution of strategic initiatives as potential catalysts for future growth.
Earnings Call Speaker Segments
Thank you, Rob, and good morning to all of you. Before we get started, I want to note that during today's call we'll be talking about estimates and expectations concerning the future. Various risk factors apply to these forward-looking statements, and those are laid out in our SEC filings as well as in today's press release. Joining us on the call are Lisa Atherton, our Chief Executive Officer, and David Rosenberg, our Chief Financial Officer. You can find our earnings call presentation in the Investor Relations section of our website. With that, I'll hand the call over to Lisa.
Thanks, Scott, and good morning, everyone. Textron posted a solid quarter, with revenues of $3.8 billion and adjusted EPS of $1.76, along with $418 million in manufacturing cash flow before pension contributions. Double-digit revenue growth at both Textron Aviation and Textron Systems came from more jet deliveries at Aviation and program execution at Systems. All quarter long, Bell kept achieving meaningful operational milestones on the MV-75 program. Our separation process for the Industrial segment is moving forward, and we remain on schedule to meet our timeline. Based on how we've performed so far this year and what we expect for the rest of it, we're raising our guidance for adjusted EPS and for manufacturing cash flow. Now I'll walk through the segment details. Bell's main emphasis this quarter was keeping the MV-75 program running smoothly on the operational side. The US Army secured congressional approval for its ATR request tied to the MV-75 Cheyenne program, which addresses the risks we flagged on last quarter's earnings call concerning government fiscal year 2026 funding. On the operational side, the program has achieved considerable headway in building the aircraft. Lately, Bell and Team Cheyenne have hit several key milestones: three wings were completed in Amarillo; the first nacelles arrived; the initial wing and nacelle assembly work wrapped up; the first fuselage was finished at our Wichita assembly center and is expected to be joined to the wing assembly in the fourth quarter; and a number of critical components, among them the first gearboxes, have entered testing. Those gearboxes are part of the complete drive system, which was assembled at Bell's new MV-75 drive system test lab in Grand Prairie, Texas. The program's advances have us excited, as the MV-75 remains a leading priority for the US military. Today's combat zones are becoming faster, more intricate, and deadlier, so maneuvering on the battlefield matters more than ever before. In that kind of setting, the MV-75 is set to transform how the Army moves and delivers combat power. Turning to other parts of Bell's military segment, the company secured an award covering structural and power upgrades for the H-1 fleet through the SPINE program — an important modernization push, since H-1 aircraft are critical to preserving attack, strike, and utility capabilities for the Marine Corps. On the operational side, Bell continues concentrating on efforts to reinforce the supply chain and improve production efficiency and output, which includes ongoing certification of additional suppliers and dual-sourcing of key raw materials required for gearboxes and rotor blades. That handles castings, extrusions for rotor blades, and a range of aerospace steel alloys. We've also made progress on dedicating capacity for the assemblies that give us trouble, so we can take pressure off suppliers and deliver on time. Those involve items such as chemical processing, painting, and complicated assembly work; across all product lines, automation remains a priority for us. Over at Aviation, Brian Rohloff joined us as the business's president and CEO. Brian leads with a proven record — over 29 years of experience with Textron Aviation — and he understands our products, our customers, and the industry deeply. Throughout his tenure with the company, Brian has occupied numerous positions, spanning areas including customer support, sales, supply chain, and quality. Prior to his current role, he led our customer support organization. Turning to the business side, Textron Aviation's revenues increased $201 million, or 14%, compared with the third quarter of last year, propelled by greater revenue across both aircraft and aftermarket. In the quarter, we delivered 51 jets and 32 commercial turboprops, versus 42 jets and 39 commercial turboprops during last year's third quarter. Fleet utilization at Textron Aviation remains strong, which contributed to aftermarket revenue rising 10% compared with the third quarter a year earlier. Both jets and turboprops saw strong demand, and Aviation recorded its best Q3 order intake since 2023; on the operational side at Aviation, our focus stays on raising productivity and converting that healthy customer demand into profitable growth. Looking forward, our priorities are clear as we put investment behind productivity and profitability. Within fabrication, those investments aim at additional capacity so parts availability on our production lines improves. This means adding capacity in areas including machining, sheet metal, and landing gear. In assembly, our investments focus on greater automation and manufacturing technologies. This covers expanding wing cell automation for a number of our light jets. The money we're putting into tooling is going to boost productivity in our workflows and back new programs — the Gen 3s among them — as well as platforms we already have, like the King Air. There's one major project tied to a sizable market opportunity on the King Air: we're speeding up digitization work on that platform, which lets us update tooling and processes so the aircraft gets built more efficiently. That part of the effort has been accelerated quite a bit, putting us in position to realize added benefits sooner. Just like at Bell, we're dual-sourcing and bringing work in-house for suppliers that are difficult, all to raise quality, lift throughput, and counter inflation. Take spars — we're now dual-sourcing them, since they've been a bottleneck in our production. Regarding product development at Aviation, we continue to make headway on the Denali, which has accumulated more than 4,200 flight hours of testing to date. Our three Gen 3 light jet programs are likewise progressing toward certification, with a combined total exceeding 1,200 flight test hours, and the first production CJ4 Gen3 has rolled out as that aircraft moves closer to entry into service. Garmin Emergency Autoland comes standard on each aircraft, and the CJ4 Gen3 additionally offers a substantial avionics upgrade through the Garmin G3000 Prime. Demand for the SkyCourier program remains strong across freight, passenger, combi, and special mission uses, and we have now unveiled the SkyCourier UX concept aircraft, which pairs the proven SkyCourier platform with Merlin's aircraft-agnostic software solution for autonomous aviation. In the quarter, we marked two major Citation milestones: the 500th Citation Latitude—the bestselling midsize business jet in the world—entered service, and we made the 500th delivery in the Citation CJ4 series, as we get ready for that platform's next chapter with the coming CJ4 Gen3. Turning to Systems, the segment kept up its excellent performance for the year, posting 16% revenue growth in the quarter, powered by execution across its programs. During the quarter, we obtained a $230 million contract modification covering two more Ship to Shore Connector craft. Ship to Shore has now hit full-rate production of four craft per year, with considerable runway remaining, since we have delivered 18 units under a 73-unit program of record. ATAC is turning in strong performance as well, driven by fresh contract awards and dependable execution in its fleet exercise and adversary air work. Within our Land business, several platforms are contributing to the segment. The FMS program for the MSFV is accelerating, with 65 units slated for Ukraine across the coming three years. Pre-production development efforts on the Marine Corps' ARV program are growing as we prepare to hand over 16 units in 2028. Meanwhile, the Army's XM30 — a program on which we are teamed with American Rheinmetall — is currently in the midst of delivering 10 prototypes to the US Army. In our Industrial segment, our attention stays on backing customers, team members, and business partners as we continue pursuing a smooth separation of that segment. TSV introduced its third-generation Samsung battery technology this quarter, which demonstrates how the E-Z-GO franchise keeps advancing. Throughout the year, Kautex has pushed its new technologies ahead. At its Windsor, Canada site, a Pentatonic line is now running, and the company is preparing to launch additional lines in Detroit and the Czech Republic in support of new business. Kautex is also increasing output of its Allegro products to support a robotaxi operator's rollout. Taking Textron as a whole, the progress we're achieving leaves me greatly encouraged. Demand fundamentals are still solid, the work we're doing on execution is beginning to show results, and we keep moving forward on strategic programs and technologies that we expect will build value for shareholders over the long run. On that note, I'll turn things over to David.
Thank you, Lisa, and good morning to all of you. If you'll turn with me to slide 11 of the earnings presentation, revenue for the quarter came in at $3.8 billion, which was an increase of 4%, or $149 million, versus the third quarter of last year. Segment profit for the quarter reached $355 million, compared with $360 million in the third quarter of 2025. Adjusted EPS during this year's third quarter came to $1.76 per share, versus $1.55 per share in last year's third quarter. Manufacturing cash flow before pension contributions amounted to $418 million, which was higher than the $281 million recorded in last year's third quarter. In the course of the quarter, we bought back roughly 2.9 million shares, which returned $239 million in cash to shareholders. Let's now walk through how each of the segments contributed, beginning with Textron Aviation. Turning to slide 12, Aviation's revenues came in at $1.7 billion, an increase of 14%, or $201 million, compared with last year's third quarter, reflecting aircraft revenues that were $152 million higher and aftermarket parts and services revenues that were $49 million higher. The rise in aircraft revenues was mainly attributable to higher volume and mix, largely reflecting greater Citation jet volume, partly offset by lower commercial turboprop volume. Higher volume and pricing drove the increase in aftermarket revenues. Segment profit came to $179 million in the third quarter, which was $7 million above a year ago, primarily because of higher aircraft and aftermarket volume and mix, partly offset by an unfavorable impact from manufacturing inefficiencies. Backlog stood at $8 billion at the close of the second quarter. Moving to Bell, revenues of $933 million declined 9%, or $93 million, versus the third quarter of 2025. The quarter's revenue decrease was mainly driven by military revenues that were $59 million lower, largely because of reduced volume on the MV-75 program. Revenues for commercial helicopters, parts, and services fell $34 million relative to the third quarter of 2025, largely because of lower volume and mix. Segment profit of $76 million was $16 million below last year's third quarter, primarily because of lower volume and mix. As Lisa noted, Congress approved, during the quarter, the $350 million ATR request tied to FY '26 funding for the MV-75 program. Following that, roughly $300 million was obligated to the program through contract modifications made during the quarter. All through the third quarter, we kept spending at reduced levels so as to mitigate any funding challenges while we continued moving the program forward. Thanks to the ATR approval, the modifications and contract changes received, and the reduced program spending levels, no related cumulative catch-up adjustments arose during the third quarter. Backlog for the segment finished the quarter at $7.6 billion. At Textron Systems, revenues of $360 million rose 16%, or $50 million, compared with the third quarter of 2025, largely because of higher volume on armored land vehicles and on military training and support services delivered by ATAC. Segment profit came in at $57 million, an increase of $10 million versus the third quarter of 2025. The main driver was higher volume, though that was partly offset by greater selling and administrative expense, which reflected a net $10 million reduction in a gain tied to the early termination of a vendor contract during the third quarter of 2025. At quarter end, backlog for the segment stood at $3.5 billion. Turning to Industrial, revenues reached $765 million, which was up 1%, or $4 million, compared with last year's third quarter. At Textron Specialized Vehicles, revenues rose $26 million, or 9%, on the strength of higher volume and mix along with a favorable pricing impact. Kautex revenues fell $22 million, or 5%, mainly because of lower volume and mix, which was partly offset by higher pricing. Segment profit was $38 million, up $7 million from the third quarter of 2025. In the Finance segment, revenues were $13 million and segment profit was $5 million during the third quarter of 2026, compared with revenues of $26 million and segment profit of $18 million in the third quarter of 2025. The decline in both revenues and segment profit mainly reflects $11 million of gains recognized in the third quarter of 2025 from the disposition of non-captive assets. To wrap up guidance, we are raising our expected full-year adjusted earnings per share to a range of $6.55 to $6.65, up from our prior range of $6.40 to $6.60. We are also lifting our expected full-year manufacturing cash flow before pension contributions to a range of $800 million to $900 million, up from our earlier range of $700 million to $800 million. That concludes our prepared remarks, and we are happy to open the line for questions.
Thanks so much. Good morning.
Morning, Rob.
Lisa, perhaps we could begin with Aviation. I'm curious whether you've noticed any shift in how your customers are buying, given the rise in interest rates or some of these other geopolitical matters?
No, thank you, Rob — we haven't observed any shift there at all; actually, as we mentioned in the remarks, we've recorded our strongest order bookings in nearly three years. Support for our products remains robust across every segment. Part of that, I believe, comes from the investments we've made to boost the aircraft's capabilities, along with people simply wanting this demand. Flying hours are in high demand, and we keep seeing solid backing for the product.
That's excellent. So only a quick follow-up question, regarding the defense side and the MV-75 — since this funding has now been approved, Dave, I'd like to hear you describe what the program's financial profile will look like going forward. Thanks.
Like we discussed, the ATR was approved in Q3, and that covered the funding requirements for what we put into the program during Q3. Looking ahead, we are clearly in a CR situation right now for at minimum the short and medium term. We'd anticipate something like a steady state in Q4, which has already been broadly reflected in the guidance we've given you. After that, moving into 2027, we'll simply wait and see how the funding profile shapes up as we go from a CR to what we expect will eventually be an approved defense budget.
So do we essentially need to wait for FY '27 appropriations before the picture becomes any clearer?
Correct, Rob. My sense is that continuing resolutions have sort of turned into standard practice, which is what we've witnessed across the last several years, and we're coordinating closely with the Army around the funds they currently have. This CR runs out on December 11th, and we're hoping Congress will pass a '27 budget. As you've seen reflected before, that budget is quite strong for the program, coming in at roughly $2.3 billion for 2027 and backed across all four subcommittees. I believe we're looking forward to their approval of that budget and to keeping the MV-75 moving ahead.
That's great. Thank you very much.
Thank you.
Thank you. Good morning. David, regarding the increased free cash flow guidance, could you talk through what's driving that? And separately, on the MV-75, were there reserves from earlier periods where you'd been more conservative that you ultimately reversed, or did the EAC not change at all?
Let me address the second question first. Nothing from prior periods was reversed. It really comes down to timing as we move from the ATR approval into the contract mod phase, and we'll keep evaluating that as things progress. From an overall cash flow standpoint, the largest factor behind the increase was lower anticipated CapEx this year, roughly $100 million less. Broadly, as Lisa said earlier, we saw genuinely strong order activity at Aviation in Q3, with matching deposits, and we anticipate continued solid cash flow performance in Q4. Those factors together are what took us to the $100 million increase, bringing it to $800 million to $900 million.
All right. Lisa, could you give us any update on the industrial sales spin process? Thanks.
Myles, what I would say is that we're happy with the way things are progressing. We remain on the timeline we discussed back in April, and once we make some progress there, we'll be sure to announce it.
Thank you.
Thanks.
Thanks. Good morning.
Morning, Gavin.
I was hoping you could expand a bit more on the supply chain specifics; the detail on all the internal initiatives has been really useful, and I'd like a little more on where things stand externally, and then what timeline we should expect for seeing improvement from vertical integration and multi-sourcing on those efforts like spars that you've mentioned. When should that start to unlock higher deliveries?
Sure. I think I'll take the spars item specifically. A second supplier has been qualified by us. We're beginning to see those start to factor in during the upcoming quarter, and after that we expect it to genuinely shift into progress as we head into FY '27. On a discrete basis, as we're putting in all of those efforts across the various supply chain insourcing areas, as I'd call them, we should begin to see that progress at both Bell and at Aviation over the course of 2027. Looking at parts available on the factory floor, we're back to roughly where we stood around the 2021 timeframe. We're not at the 2019 level, but we're getting nearer to that parts availability we had several years back. What's holding us up is probably three or four critical supply problems, and it's mostly engines, extrusions, spars, and GPUs. We're applying a focused target to those four so that we can be sure to bring them in and get the aircraft out the door. Where I'd say we've achieved a great deal across the many thousands of suppliers we have throughout the business, those four have received a severe focus from us in order to get them in the door. I would say, roughly speaking, I feel very good about the progress we're making on the supply chain.
That's excellent. Dave provided quite a bit of detail on the possible margin impact last quarter, but maybe just your thoughts on what causes the 4Q margin step-up? I think it still has to be pretty large to reach your guidance range.
On Aviation, I'd say it's going to be mostly on the turboprop side, which you could kind of see as a volume mix. We'll probably see a fairly similar profile on jet deliveries, and those are kind of the main drivers that get us to the higher margin performance overall in Q4, which gets us, as we discussed before, to the low end of the guidance range of 11% to 12% for the total year.
That's the same, low end there.
Yep, correct.
Okay. Thank you.
Yep.
Thanks. Good morning, guys.
Morning.
I was hoping you might go into more detail about the accounting details around the MV-75, since if I remember correctly, in the prior quarter you took a negative EAC tied to the funding delay. It didn't seem like you reversed that this quarter, so I wanted to ask about it. Also, is there any learning curve that's been lost because of what has already happened? And when the LRIP 1 contract gets ordered, do you still expect a negative charge of $60 million to $110 million, or has that figure changed at all? Thanks.
Let me handle the last part first; with the fiscal year beginning under a CR, we would anticipate a possible delay in the timing of the LRIP award. Before, our expectation was Q4 into Q1 of next year. If it slips past that, then essentially, given how program accounting works, that range would likely grow, probably rising to $110 million to $150 million, assuming, as we expect, that the award moves into next year. On your other question, we did not reverse any of the charges we recorded in our Q2 earnings tied to the MV-75. Regarding the ATR process, Congress approved the ATR, and then portions of it are converted over time into contract mods. As that occurs, we recognize it. The important thing is that in Q3, we were able to recognize what our costs were in Q3 and cover them, and as time goes on and the remaining contract mods are made, we will then be in a position to review prior charges.
Understood. Thanks a lot.
Morning, everyone, and many thanks. Hey, Lisa, how's it going? Really solid execution this quarter. Aviation made strong progress with 50 jet deliveries, and margins held fairly steady at 10.7%. You've touched on this a bit already, but could you walk us through your current thinking on recovering some of those inefficiencies and the investments you're making in supply chain and labor as we look ahead toward '27?
Sure. This has been our theme all year long—we keep putting investment down on the factory floor, making sure we're looking at where jig locks exist or where, I'd say, basic blocking and tackling is needed, where engineers need to be on the floor alongside the team so we can unlock some of the efficiencies we've lost. We're seeing solid progress on several lines. There are still a couple of areas we want to make sure we focus on, mainly in the turboprop space. What we've seen are requests for capital that you'll see us begin investing in over the coming year, which will improve the production tooling we have out on the factory floor; that's our next big push—getting some good capital tooling out on the floor so the work instructions are more commensurate with what this workforce wants to see. Where we have our newer models, with better work instructions and better tooling, we get better efficiency and better production; we believe that's a good model, and we're going to keep pushing that back into our older models. We also saw improved learning on some of our new block points introduced earlier in the year. As those keep progressing and as we've worked through the new block points coming out next year with the Gen 3s, we're going to work to get ahead of that to ensure good learnings and learning curves on those platforms through 2027.
That's really useful. So perhaps I could ask about Systems specifically — that breakout quarter with 16% growth, I don't believe I've ever seen that business grow 16%, and the margins were excellent too. Could you spell out what was behind that performance and how we ought to expect it to carry on as we move through the rest of this year and into the next one?
Absolutely. Look, Ship to Shore Connector is a big piece of it; that program has been difficult for many years, as you all are well aware. To make a bit of a pun, that one is now up on plane. We're beginning to see solid progress and solid productivity. The hours required to build across the different stations have fallen, and we're starting to get consistency from the government when it comes to their order activity. For the first time, we're beginning to see our capacity to forecast out a number of years within the FYDP, and that gives us better leverage with suppliers, and when we go out to order materials, we can achieve better costing across the supply base. Ship to Shore is something that carries us into, I'd say, solid growth and productivity there. On the land side, we referenced it in the script, filling up the factory floor with the Ukraine MSFVs, 65 vehicles there, 10 prototypes on the XM30, and then the 16 prototypes for the ARV — that's a great deal of really strong work and productivity that the team has going on. Those two in particular have genuinely driven good growth in the quarter. ATAC keeps performing well on their service side, and we're also seeing growth in our service, fee-for-service, both still on the Aerosonde and then in our unmanned surface vehicles, on the C-SLAM and awards in our CUSVs. Look, across the board, I'd say Systems truly knocked it out of the park this quarter; we have plenty of things out there for awards in the years ahead, and I expect that we'll keep seeing good growth.
Awesome. Thank you.
Thanks.
Oh, hey, good morning, everyone. Jamie here, filling in for Seth today.
Good morning, Jamie.
Good morning, and thank you for taking the question. I'd like to raise a brief point concerning MV-75, the ATR, just to gain some clarity. I understand you said the $350 million had been approved, as I recall, yet only the $300 was obligated during the third quarter. Would it make sense to expect the remaining $50 million to be obligated in the fourth quarter, or does the situation involve more nuance?
If I may, the $350 was the request contained in the estimate of what the government anticipated we would require across the third quarter. At the time those figures were put together, we had not yet finished actuals. During the quarter, as we reached those actual figures, we coordinated closely with the government after they got their approvals. Once they received them, the government moved quickly to put a contract mod in place for the $300 to cover the actuals that we and our suppliers had accrued. Now we're going through the process—they've finished those mods, and we're working through invoicing. As supplier invoices keep trickling in this month and next month, we'll continue to obligate against that. Yes, the government has additional funds at their discretion, up to the full ATR, and as those are needed to cover that '26 spend, they'll be able to use them. Right now, the amount we've managed to pinpoint and discuss with them is that $300.
And I'd like to build on that point — as we keep working through that timing process the way Lisa outlined, that's when we'll be able to revisit the prior cumulative catch we recorded in Q2 of 2026; it really is simply a timing process that we're moving through.
That's right.
Understood. That is really useful. Thanks. So perhaps just regarding the Aviation segment, clearly, robust growth versus last year and quarter over quarter for the aftermarket. I realize you folks have somewhat less exposure to the big fleet operators, which usually run at higher utilization. I was simply curious, given that impressive aftermarket result, whether there are any distinctions or factors across customer types or operator types that are kind of fueling that aftermarket growth, or whether it's more widespread?
I'd say it's more widespread. We're simply observing elevated utilization everywhere among fleet operators, and on the retail side too. I think we just witness strong — and honestly, our team's service and support — people want to come back to us, so we're seeing additional folks return to our service and support team so that their aircraft get managed and handled. I think it's simply been a matter of greater hours flown and people rewarding the fact that we're great partners to them in the aftermarket space.
Right, great. Thanks so much.
Yep.
Hey, good morning, everyone.
Morning, Noah.
Should we count on the Aviation segment delivering its usual incremental margin in the coming year, or will the extra investments and the sort of operational volatility we're still seeing in the first half keep that from happening?
Lisa, I believe, laid out all the initiatives we have underway; in my view this will be a 12-month journey. Over the course of next year, improvement should become visible as the year progresses. Clearly we aren't in a position yet to provide guidance for 2027, but I believe this is a 12-month path of improvement as we move ahead through Q4 and then through the first half of next year.
All right. Coming back to that Systems margin, is there any one-time element in it, or is it clean, and what does that imply for the segment's forward profitability?
There is a single one-time item; it's tied, in fact, to Q3 of 2025 — we had a one-time, well, really a two-time benefit, connected to exiting a lease. A benefit showed up in Q3 of '25. A benefit also shows up in Q3 of '26. Now, comparing those two years, it's actually a headwind, but it did lift the margin somewhat in Q3 of 2026, roughly $9 million if you want to view that from a comparison standpoint. Still very comfortably within the margin range for Textron Systems that we had provided in guidance for the year.
Understood. Many thanks.
Hi there, thanks. Morning, Lisa. Dave, Scott, solid results. Dave, perhaps a fast one — a clarification regarding MV-75. Thinking about your fourth quarter, it's always usually quite strong where cash flow is concerned. What is assumed for any collections there, or are we still waiting on budgets being firmed up?
Naturally, the collection assumptions we use sit within our guidance. Q3 did present specific cash flow challenges tied to the timing of the ATR, which clearly wasn't approved until the quarter's end. Bear in mind — and the whole team deserves credit for this — we saw that coming and in Q2 of 2025 took steps to navigate those cash flow difficulties. That, together with genuinely strong performance at Textron Aviation, produced the result, and as our cash flow guidance shows, we anticipate a very strong Q4 cash figure.
Understood, that's useful. So Lisa, quickly circling back to what Myles asked about regarding the industrial separation — are there any milestones or timelines you have in mind? I realize there's likely plenty you can't share, but even a little color on that would help.
Regrettably, I'd rather not go too deep into that right now, but let me keep repeating that the progress pleases me, and I'd say we will manage to hold to the timeline we communicated back in April — a separation or spin of 12 months to 18 months.
Got it. Thanks, Lisa.
Yep.
Hello, and good morning — Ben Tomic here, sitting in for David.
Good morning.
Good morning.
I just wanted to ask, is there any update regarding the Gen 3 program timeline for certification and service entry—any milestones coming up there?
As I believe I said in the script, all of the flight tests have moved forward; we're in F&R, and I do believe that in the first half of '27, we should begin to see some of those entry into service.
Great, thanks. Now moving to Defense — any upcoming competitions we should note, and is there any risk there?
Risk there? No, I wouldn’t say there’s any risk. Our Textron Aviation defense team is bidding on the Navy jet trainer program, and we expect that award to come mid-next year. I really think that one matters, and we believe we’re positioned quite strongly for it, so I feel we’re in pretty good shape on that. Sure, there’s always a chance you don’t win something, but I feel quite good about where we stand with the program.
Okay, thank you.
Hi there, I appreciate you fielding my question. I just wanted to ask about Aviation as we head into next year. I fully understand that more detailed guidance will be provided with 4Q, but the backdrop we have is strong demand, and we're hearing what sounds like somewhat easing supply chain problems. Could you give us anything just to set a baseline a bit for what's achievable in terms of delivery growth — do you have some color?
In that regard, I believe it's a bit early to begin guiding. What I would say is that my charter and ask throughout the business is for us to keep pushing toward roughly the 200 delivery range across all of our turboprops, jets, and helicopters. You're watching us put strategies, capital, and investment into our workforce to support that. As Dave mentioned, over the next 12 months it will be a journey, but I feel we're taking the right steps to get there.
Fair enough. Lisa, switching topics here, on M&A strategy broadly, a few quarters back, I felt it was somewhat more of a focus. You'd brought up possibly buying space assets or other on-theme assets. Could you give us your current thinking?
Sure. Look, I keep my game board that I watch closely regarding what we'd do when it comes to picking up certain assets, and I'm sure you've noticed that some of the multiples and some of the asset quality out there — we just want to be sure what we buy makes good sense, and yet we have a very strong balance sheet. I think as we shift further toward the pure-play A&D, you'll see us lean into that. To be clear, this spans everything we're considering, both bringing suppliers in-house that might fit well for us to make that more of a vertical asset for us, and assets on the space side, which would involve thermal protection materials complementary to what we do around our Wilmington business, plus areas complementing the rest of Systems. I remain keen on that, and we're keeping our powder dry so that when the right asset becomes available, we'll be ready.
Would you describe the concept as mainly bolt-ons, or is there any appetite for something more transformational?
Yes and. I'd say I'm open to something transformational. I do believe that's what we need to do to move Textron forward, but it's going to have to happen at the right point in time and it's going to have to be the right asset.
Great. Appreciate the color.
Thanks.
Hello, Kyle Benvenuto here speaking instead of Kristine. I appreciate you taking my question. You mentioned that roughly $100 million in reduced CapEx is the main factor behind the improved cash flow outlook. Is that mostly money pushed into 2027, or an actual decrease in the total investments needed? And given the extra Aviation tooling investment planned for next year, what should we expect for 2027 CapEx? Does that smaller 2026 spend shift the timing of any production or productivity gains? Thanks for taking my question.
As we've talked about our CapEx outlook across the coming couple of years, we had said before that we'd anticipate roughly steady-state CapEx in 2026 and in 2027 as well. That $100 million reduction for 2026, I don't believe it alters our 2027 view. We have also anticipated needing to — and continue to need to — put more CapEx into Aviation to fund productivity projects, which clearly will produce improved delivery figures later on, and that of course means stronger cash flow. I'd say the way we've framed CapEx investment here doesn't fundamentally shift because of the $100 million less CapEx spending in 2026.
Hey, good morning everyone, and thank you. Perhaps I'll start with a fairly wide-ranging question. Plenty of the specifics have already come up. Lisa, you've now occupied the role for a few quarters, and when you step back and take a look at your mandate and the portfolio, which areas get you most enthusiastic, and which ones do you reckon will prove toughest — the ones you'll need to tackle in order to bring the business to the point you're aiming for?
Well, so, without sounding flippant, I think about this often. By my count I'm 9 months, 29 days, and roughly 7 and a half hours into this role now, and I've had the chance to examine the portfolio. As you can see, we're reshaping it so we can push forward into A&D, and that's the piece that excites me most, I'd say. I believe I grasp what's required to build synergies throughout the business, the chances for collaboration that exist in a company with such deep engineering expertise, the fact that we could pull some of that expertise from our operation up in Maryland with unmanned air and combine it with work we've got underway down at Bell on the unmanned SkyCourier — the amount of collaboration we can accomplish across the whole company is genuinely thrilling. I think we must keep driving these enterprise initiatives. A thrilling illustration of that is what the government released this month regarding Project Agincourt. I believe we're a strong fit for the direction they're pursuing with Project Agincourt, and I believe we can lean into it and demonstrate that we bring not only thrilling new defense technology but decades of experience in how to manufacture these systems and make them capable in a warfighting scenario. Apologies, I had a bit of feedback there; it gets me excited. On the challenges side, well, I'd say challenges keep emerging around suppliers. I think we're improving when it comes to workforce retention. Our retention rates are dropping to a more manageable level, roughly where we saw things around the pre-COVID period — not entirely where we'd like it, but within a couple of percentage points from attrition. We'll have to keep managing and monitoring that. And then, not really a challenge but a thrilling aspect, is when we go and do a meaningful acquisition and build the synergies and the growth within it — that always brings a bit of challenge along, but I consider it a good challenge to have, so I'm excited about it.
Great. Perhaps just one final follow-up, if I can. From a cultural standpoint, how is the company responding to that? For your workforce, this is a change. What's their reaction? Are they embracing it? And if there's a cultural gap, how do you close it?
Sure. Look, I appreciate your raising that, since I'd like to take a moment to thank the team on our Industrial side. Culturally, I believe they accepted that this was the correct answer for Textron as a whole, and they've been outstanding at carrying on with running their business and serving their customers and looking after one another through something very challenging, as you all know, since they're also dealing with a separation process. I think culturally, just embracing that and the manner in which that team has responded—I'm extremely thankful for it; as for the rest of the business, I think the remainder of the business is very energized. We've leaned into some collaboration ideas that the team has come up with—ways to work together. I think they're excited about a new phase of Textron, and I'll say a new era. I've gotten a lot of positive feedback, and I'm constantly reminded that my job is to manage people, not merely numbers. I'm excited about doing that, and I think folks are responding to it.
Understood. Excellent. Thanks for that.
Morning, and thanks. On Aviation, orders came in really strong this quarter, though I have a couple of questions. First, could you tell us whether you're noticing any change in mix as new orders arrive across your product portfolio? And then, you're still pushing to raise that production rate toward the 200 figure, but many times we've seen significant delays between placing an order and delivery, which dampens order flow. In your conversations with customers, do you see a chance to push those order numbers even higher if you're able to lift that production rate?
Definitely. You've nailed it. If a customer can be told they'll get it within a set timeframe rather than putting a deposit down and waiting years, then certainly I believe the order book opens up even more. That is precisely why we're leaning in on boosting production workflow and ensuring material is available to the team on the floor, so they have the material needed to get those products out the door. All of this works together. The more product we can put out there, I think the more you'll keep seeing the order book grow; as for mix, I don't believe we're seeing a shift. We're getting, I'd say, a fairly standard mix compared with what we've seen before. Again, even during periods when we have, I'd say, less than optimal ways of getting it out the door, we're still seeing strong order delivery. If we keep improving that production, I think we'll keep seeing even stronger orders; it's self-fulfilling.
Now, turning to a different topic, MV-75 — you made remarks about how well it matches the evolving battlefield, and obviously the battlefield is evolving fast. With an IOC arriving in 2030, and considering that schedule, plenty of other competitors are out there pursuing uncrewed aircraft and other alternatives that could enter this space as time goes on, and a number of them are prepared to put very large sums of money behind it. How do you survey the landscape as you look toward that 2030 timeframe, how will MV-75 fit into it, and you brought up Project Agincourt — but how do you expect your role might shift, whether favorably or with certain threats?
What I'd offer is that Team Cheyenne, which Bell leads, has likewise invested considerably in this technology and platform across the last 15 years. I believe we've been pushing hard in that direction for quite a while now, to ensure this capability is there for the warfighter. When you enter a warfighting scenario, you never do so relying on one platform alone. Every one of these platforms must operate in concert. That's the reason the fact that we're the first modular open systems architecture platform fielded for the Army will give it the ability to interact and interface with those other technologies that will be present on the battlefield too. I expect it to be an essential element of the future fight. Regarding threats, honestly, that doesn't concern me as much. What concerns me is ensuring we deliver what the warfighter requires on the timeline they require it, and ensuring it aligns with the plans they've established.
Very good. Thank you.
Thanks.
That wraps up our question-and-answer portion and today's conference call. Roughly two hours after this call ends, an audio replay will be accessible. To listen to it, dial 1 to 800 to 770 to 2030, then key in conference ID 6969175 and hit the pound key. Thanks for joining us. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Textron Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Textron Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.