Home / Transcripts / V2X, Inc. (VVX) · November 3, 2025

V2X, Inc. (VVX) Earnings Call Transcript

November 3, 2025

New York Stock Exchange US Industrials Aerospace and Defense earnings 50 min

Earnings Call Speaker Segments

Mike Smith executive
#1

Thanks, and good afternoon to all of you. It's a pleasure to have you with us for V2X's Third Quarter 2025 Earnings Conference Call. With me on the line today are Jeremy Wensinger, our President and Chief Executive Officer, along with Shawn Mural, our Senior Vice President and Chief Financial Officer. You can find the slides for this presentation in the Investor Relations area of our website, gov2x.com. Let's move on to Slide 2. Throughout this presentation, management will deliver forward-looking statements under the safe harbor provisions found in the federal securities laws. We ask that you look over the safe harbor statements included in our press release and presentation materials, which describe some of the factors that could cause actual results to differ materially from what these forward-looking statements contemplate. No obligation is assumed by the company to update any forward-looking statements. Additionally, in our remarks today, we will mention certain non-GAAP financial measures, since management considers these measures useful to investors. A reconciliation of these measures to the most comparable measure calculated and presented in accordance with GAAP can be found in our slide presentation and in our earnings release filed with the SEC, both of which are accessible in the Investor Relations area of our website. At this point, I'd like to hand the call over to Jeremy.

Jeremy Wensinger executive
#2

Thanks, Mike, and good afternoon to all of you. I appreciate you being with us today. It makes me proud to walk through what we achieved this quarter. Our team's commitment keeps producing exceptional execution. If you would, please go to Slide 3. On this call, I'll review our results for the third quarter, talk about where we stand and how carrying out our strategy has generated momentum behind growth. Let's begin with how we did in quarter 3. We turned in a robust performance, producing records for both revenue and adjusted EPS in the third quarter. Revenue rose 8% compared with a year earlier, reaching $1.17 billion, with adjusted EPS coming in at $1.37. Adjusted EBITDA for the quarter totaled $85 million, equal to a 7.3% margin. Importantly, so far we haven't experienced any material effect on our business from the government shutdown currently underway; if anything, this situation has underscored how vital our services are to the government. On our last call, Shawn and I walked you through our approach to capital allocation. We've been putting that approach into action since then. In the quarter, we closed an acquisition that adds new capabilities and expands our access to customers within the intelligence community; the significance of this customer access is hard to overstate, and we expect it to contribute to our pipeline, which is already robust. On top of that, we bought back $10 million in shares during the quarter, creating further value for our shareholders. The payoff from executing our strategy is clear. This quarter brought a solid book-to-bill ratio of 1.2x, which reflects the strong demand we're encountering. We also recently secured 2 of the 5 major captures we've been chasing, the ones I mentioned on earlier calls. That includes the T-6 and F-16 Iraq program, with each valued at over $1 billion, showing the momentum we're generating. We stay optimistic about the road ahead. Based on how we've performed so far and the trends we see in our business, we're raising the midpoint of our ranges for revenue, adjusted EBITDA and adjusted EPS. Even though no material impact from the government shutdown has appeared, we're proactively bringing down the midpoint of our cash flow guidance to reflect potential temporary collection delays. I want to stress that this is purely a matter of timing and doesn't reflect any underlying shifts in our business. Please turn to Slide 4. Our customers notice what sets our solutions and offerings apart, and the programs shown here illustrate that. From beginning to end, we partner with our customers, providing a complete range of capabilities that sustain readiness across the globe. Over the last 18 months, we've captured 3 strategic awards each greater than $1 billion by leveraging the full breadth of the company and our execution. Together, these awards were worth more than $9 billion. One illustration is the T-6 award we announced previously. It's a foundational award and essential to readiness, guaranteeing that every single Navy, Air Force and Army pilot gets trained by V2X; this connects to the theme you're noticing in training, mission support and modernization, which form the basis of everything we deliver. Even though this award is being challenged, our confidence in the solution remains high, and we keep carrying out the transition work that supports our customer; we have secured what we anticipate will be a $1 billion foreign military sales deal for Iraq's F-16 program. Along with that, our $425 million cockpit modernization contract with the U.S. Air Force demonstrates the expertise we bring to supporting the F-16 fleet across multiple customers. Then, we won roughly $275 million for rapid prototyping, engineering, integration and follow-on support covering platforms such as Tempest, our counter-UAS solution and the Gateway Mission Router family of systems. Demand for our technology is strong, and I'll get into that shortly. These awards confirm the strength of our partnership with customers and our disciplined execution of strategy. Kindly move to Slide 5. V2X is seizing large, expanding market opportunities while putting money into technologies that will define our future and our industry. Data and AI strike us as powerful instruments capable of delivering mission success. Such tools assist us in boosting readiness, generating efficiencies and even altering how the marketplace functions. Paired with our operational experience and tight customer relationships, we occupy a strong position to convert data into genuine decision advantages; regarding readiness, we keep broadening our training portfolio, and our backing of the Army's Saber Junction training exercise in Germany, which simulated chemical attacks, serves as a solid illustration; this shows how the reach of our training portfolio keeps growing. Furthermore, our priority areas of readiness and modernization stay aligned with our customers' mission and budgetary priorities. Our counter-UAS platform has proven our capacity to deliver rapid prototyping and hardware integration in support of customers, and this solution represents a 1.2% share of our overall portfolio. Soon, we anticipate orders from new customers wanting to field the platforms across various theaters worldwide; we are now drawing on the core capabilities of that system to tailor it for use in other operational environments and emerging threat landscapes, which positions us for ongoing growth; combining our technology investments, our knack for turning opportunities into success and our pipeline exceeding $50 billion, the road ahead appears strong. With that, I'll hand the call to Shawn for a review of our financials. Thank

Shawn Mural executive
#3

Good afternoon, Jeremy, and hello everyone. If you could please turn to Slide 6, our momentum carried forward into the third quarter, which shows our emphasis on operational performance. Third quarter revenue rose 8% to $1,167 million. The WTRS, F-5 and Iraq F-16 programs drove that growth. Adjusted EBITDA for the quarter came in at $85.2 million, producing a margin of 7.3%. Interest expense during the third quarter totaled $20 million. Cash interest expense reached $18.4 million, an improvement of $7.2 million versus the same period last year. Net income for the quarter was $24.6 million. Adjusted net income came to $43.7 million, 6% higher year-over-year. Third quarter diluted EPS was $0.77, calculated on 31.9 million weighted average shares. Adjusted diluted EPS for the quarter rose roughly 6% to $1.37 compared with the prior year. Adjusted operating cash flow during the quarter was $35.8 million. Our strong balance sheet is being put to work. And in Q3, we achieved meaningful progress carrying out our capital allocation strategy. As Jeremy noted, we finished a small acquisition that brings added market opportunity and bought back $10 million in shares. These moves plainly show how focused we are on delivering value for our shareholders. Please turn to Slide 7, where I'll go over our year-to-date results. Year-to-date revenue came to $3,261 million, up 3% year-over-year. Adjusted EBITDA rose 5% across the first 9 months of the year to $234.6 million, which reflects a 10 basis point margin increase to 7.2%. Year-to-date interest expense was $60.3 million. Cash interest expense was $55.7 million, an improvement of approximately $22 million versus the prior year period. Year-to-date net income was $55.1 million. Adjusted net income reached $117.5 million, a 22% increase year-over-year. Diluted EPS over the first 9 months was $1.73. Adjusted diluted EPS was $3.68, up 22% from last year. Year-to-date net cash used by operating activities was $27.5 million. Adjusted net cash used by operating activities was $24.1 million. Please turn to Slide 8. Our strategy, together with ongoing demand for our solutions, is producing awards that underpin future growth and value creation; third quarter net bookings of $1.4 billion and sequential backlog growth of approximately $240 million reflected this. Total backlog at the close of the third quarter was $11.6 billion. Funded backlog was $2.3 billion; regarding the current government shutdown, the effect on funding or operations of the current contracts has been modest so far. We think it's important to point out that backlog excludes the approximate $4 billion T-6 award because it is currently under protest; we are continuing to carry out the transition activities supporting the customer at this time. In addition, when it comes to the F-16 Iraq program, backlog reflects no value beyond the transition amount initially awarded in Q2 of this year. The contract is currently being definitized and we <<inaudible>> these programs will add substantially to our backlog and ability to continue our growth. Book-to-bill ratio for the trailing 12 months was 0.9x. As we look forward, if some awards slide because of the shutdown, our expectation is that book-to-bill for the entire year comes in under 1, then climbs past 1 during fiscal year 2026. That said, let me be direct: we think this company is positioned extremely well to show top-line growth as we head toward 2026. Turning to Slide 9, here is our revised guidance. Execution remains our priority. Because our performance has been solid, we're raising the midpoint for 2025 guidance on revenue, adjusted EBITDA and adjusted EPS to $4.5 billion, $316 million and $4.95, respectively. On adjusted operating cash flow, we are deliberately bringing the midpoint down to reflect possible timing delays and collections tied to the government shutdown. These changes capture possible near-term payments or contract actions that we had assumed would be finished by year-end 2025 but might now move into 2026. To repeat, this is only a timing adjustment and does not signal any shift in the fundamentals of the business. All in all, we're quite pleased with how we've executed our strategic priorities, our capacity to deliver differentiated technology solutions and our strong program performance. We have confidence in a strong finish to 2025 and continued momentum going into 2026. Jeremy, back to you.

Jeremy Wensinger executive
#4

Thanks, Shawn. If everyone could go to Slide 10, we'd like to give a bit more detail regarding 2026. Given the strong awards we've locked in and very little exposure to recompetes, we have confidence in growth going forward. Beyond our ongoing wins in training efforts such as the WTRS, newer contracts—our rapid prototyping awards and the Iraq F-16 program—will help drive top line growth in the coming year. Partially countering that growth is the wrapping up of contingency task orders. On balance, these factors should produce revenue growth in 2026 compared with 2025. Should the T-6 protest resolve favorably, that would add incremental improvements in 2026. We are monitoring possible effects from the government shutdown that is currently underway, yet because our work is essential and mission-critical, we remain confident about the strength of demand. As the company matures, it shows more and more clearly in how we capture and win new business. We keep delivering on what we've committed to. Our third quarter performance makes us proud. Our teams keep bringing the full spectrum of V2X to bear on our customers' critical mission requirements. With that said, I'd like to turn the call over to questions. Operator?

Peter Arment analyst
#5

Good numbers. Shawn, might you provide a bit more detail regarding that cash decrease? You mentioned it's somewhat a matter of greater caution because of the government situation. Yet should the government reopen fairly soon, would that alter things? Or what's our thinking there?

Shawn Mural executive
#6

Yeah. Thanks. Good to hear from you, Peter. Yeah. So in the guidance, we've presumed there are specific contract actions — and this is ordinary business, Peter — where we receive change orders, that kind of item that happens regularly; they might not happen even if the government opened tomorrow, the pileup of items and what we're observing somewhat, Peter, is that although we continue to be paid, that payment has stretched out a bit, on average roughly 7 days' gap between what we saw in the first half of the year and what we see now. And so the resolution of those contract items and then the capacity to be paid, we considered it suitable to lower the midpoint by approximately $25 million. Again, entirely a timing matter. We have — we don't believe there's risk to the receipts or anything similar. It's whether or not they move into 2026. That's our way of looking at it.

Peter Arment analyst
#7

Understood. That's helpful. Then, Jeremy, you mentioned earlier this year that there's simply a far larger qualified pipeline and more opportunities to bid. Could you perhaps share a bit more detail on your progress and how things are going on that front?

Jeremy Wensinger executive
#8

Sure, I believe I've mentioned before that Roger Mason came on board as our Chief Growth Officer. As I noted in the script, we're now witnessing the company's maturity really showing. It gives me real confidence that out of the 5 major pursuits we discussed earlier, 2 have been successfully completed; and of course, we'll watch how T-6 unfolds; but overall, I think the company's maturity, combined with the growth organization's maturity, is beginning to have an impact on our capacity to win, our capacity to develop a pipeline, and our capacity to chase many different opportunities. What excites me most is that the bids I'm reviewing are engaging the whole company in these efforts. It's genuinely making a difference, and that's the aspect that thrills me the most.

Jonathan Siegmann analyst
#9

Just a quick, straightforward question for you. You've made it quite clear that the T-6 award was not part of the backlog. However, since some publicly traded companies do count protested contracts in their backlog, I just want to verify that this reflects your normal approach rather than signaling any elevated risk tied to this choice.

Shawn Mural executive
#10

Yes, definitely. That's the policy we follow. If something is under protest, we won't take a booking on it. To be clear, there's a small amount of transition work we're performing right now. We did book that, but it's in the low single-digit millions. The primary award, if it holds to the timeline under which it was granted, would have us starting work in February of 2026 and then continuing across a 10-year span. None of that work sits in backlog, and that's how we always handle it, Jon.

Jeremy Wensinger executive
#11

And John, just to be clear, that modest transition that we're doing was funded.

Shawn Mural executive
#12

Yes.

Jonathan Siegmann analyst
#13

That helps a lot. So regarding the remaining 3 of those 5 contracts, the ones you're pursuing so aggressively, do you have any idea when they might land? Are they likely pushed back too because of the government shutdown?

Jeremy Wensinger executive
#14

Good question. My sense is that's still undetermined, though on a couple of them we are actively submitting bids right now. So we'll find out what happens regarding the shutdown and when awards come through. That said, everything remains somewhat up in the air at this moment, since many of our contracting officers aren't on the job. As Shawn mentioned, on the cash front, matters are essentially on hold until they complete the adjudication of contract modifications; so at this stage I'd call it unclear. Still, I believe that — once there's certainty about the government being up and running again, we'll have a clearer picture, because they'll return to work and we'll be able to pose those questions.

Andre Madrid analyst
#15

I don't want to keep dwelling on the shutdown, but it's clearly the big unresolved issue right in front of us. So how are we supposed to frame how much this holds back the upside from that recompete holiday you'd already told us about? Is it simply getting deferred until 2026, the way you hinted on that 10 slide?

Shawn Mural executive
#16

Honestly, yes — that's largely why we chose to discuss things a bit and offer some detail regarding 2026. So I believe we're saying, correct, 7% recompetes in the coming year. From where we stand right now, first, that's obviously a wonderful position to be in; we'll find out how those recompetes turn out. There's always a chance to arrange a bridge or take an extension or whatever, I'm not sure. Yet once more, I think we're optimistic about where we stand right now, the backlog we hold and our capacity to keep expanding.

Andre Madrid analyst
#17

Understood. Understood; and I suppose regarding that, when we look at '26, it seems to me that every quarter, growth might come in unevenly depending on which service branch and which geography you're talking about; but I suppose, as we think about what's coming in the new year, which branches and geographies do you actually anticipate will expand the quickest and...

Shawn Mural executive
#18

Well, I believe — so there are a few items. I appreciate the question. Let me offer a bit of detail. My sense is we'll see cost type revenue expand more rapidly, I should say. And as we consider these matters, we expect that to represent a larger share of the portfolio. From a region perspective, I believe we see the U.S. expanding more rapidly than certain other areas. And that's, once more, things such as what we've observed with WTRS, that sort of thing. So that's a bit of extra detail as we stand here right now. There's plenty still to come when it comes to funding, correct? So once more, we're attempting to offer a bit of detail and context for '26. Funding, as you might expect, given the shutdown is a major variable, correct? And we're watching customers make adjustments and such to accomplish as much as they can. So I'm sure that, clearly, we will offer further clarity and visibility to you when we report Q4, but believed it very important since we're witnessing solid demand. I think you noticed a really strong book-to-bill during the quarter. That had been something people asked about before. And so I wished to call attention to a few of those items. So ideally, that provides you with a bit more detail.

Ken Herbert analyst
#19

Looking at the robust expansion we saw in Q3, you singled out F-16, F-5 and WTRS as the drivers behind that 8% increase. Could you break that down for us? And did any of them perhaps come in somewhat above plan, or was it stronger execution on contracts during the quarter?

Shawn Mural executive
#20

Not particularly. My sense is that events are unfolding much as we anticipated. We did receive a bit of modest material that had originally been scheduled to arrive earlier, and it landed in Q3, though honestly, Ken, it wasn't all that meaningful. Again, we're pleased with our current position. Sequential growth should keep going as we move through Q4. And clearly, you witnessed us raise the low end of the range because of that. Naturally, there are still some variables in play. But yes, once more, I'd say the momentum behind those 3 programs persists, and we anticipate that trajectory carrying forward into Q4.

Jeremy Wensinger executive
#21

Absolutely. Ken, one more thing from me — Shawn has made it plain throughout the entire year. Our chance was going to arrive in the year's second half, thanks to how we carry out the F-5 program and the WTRS program. So once more, nothing that turned up during the quarter truly caught us off guard. The program team is carrying out its work exactly as it ought to. They're performing really well, and we're simply getting these programs up and running.

Ken Herbert analyst
#22

That's excellent. Now, when we consider the updated guidance, it suggests margins will decline somewhat on a sequential basis as we move into Q4. Could that simply reflect a cautious approach? Or are there other factors we ought to bear in mind there?

Shawn Mural executive
#23

Expense timing always plays some role; consequently, Q4 brings a certain amount of added cost. Incidentally, this isn't — once more, not something unexpected in itself. Our teams have accomplished a fantastic job when it comes to mitigating risk. You've heard us mention this earlier during the year, particularly in the first half; so I would characterize nothing as especially meaningful, frankly, Ken. That's simply how we expect matters to unfold. We're pleased to be lifting the midpoint of the guidance, roughly $3.5 million, $4 million at the midpoint compared with our previous position, plus around 10 basis points of added margin. So, once more, relative to the earlier midpoints we had set. Thus, expense timing, for the most part, is how I would describe it.

Ken Herbert analyst
#24

That's excellent. Strong results, everyone.

Tobey Sommer analyst
#25

How big is the chance for continuing sales and fresh business beyond America, maybe to get past the limits a shutdown creates?

Jeremy Wensinger executive
#26

Sure, the deal we disclosed involving Iraq and the F-16 strikes me as a growing possibility for us in the FMS area. Customers witness what we deliver for our main group of buyers, and those nations are essentially telling us, "Hey, we want that type of backing and that type of modernization." So that aspect has given us a chance to examine how we bring what we provide the U.S. government to these other nations that are — require our backing and are U.S. allies. So beyond America, that's a route for us. Yet within America, it has truly been the modernization portion, together with the effort we're putting in on the aero business.

Tobey Sommer analyst
#27

Looking ahead 2 or 3 years, do you expect that you'll have a broader set of foreign military sales agreements that you'll be involved in?

Jeremy Wensinger executive
#28

Foreign military sales require a great deal of dwell time. That makes it difficult for me to predict precisely how things would appear 3 years from now. The F-16 FMS deal has been something we've worked on for a long time. So once more, it's tough for me to say when a nation will make its decision or what the timing will be. But what I do appreciate is the demand pull. That's probably how I'd characterize it. They observed what we were doing for the U.S. government and said, I want that. We are in region, and that's something we discuss constantly. Our presence in region generates demand pull for us; therefore, when logistics and all the rest are there in that region, it gives them the easy button to pull us through. So again, looking 3 years ahead and describing how that looks is difficult for me. What I can say is that standing shoulder to shoulder with our customer in region, and our allies witnessing that support, has generated some demand pull that makes me very happy.

Shawn Mural executive
#29

To give you a sense of how that plays out, Tempest is a perfect illustration — it got attention at the recent AUSA. With something like that, which can be used all over the world, we're seeing the team pick up on pretty significant demand. Jeremy brought it up, I believe, during his prepared remarks. So whether it ends up going the FMS route or the DCS route, I can't say. We'll find out. For us, this is a market that's still developing. The speed of our prototyping and how quickly we can get that capability out the door has us genuinely pleased, and customers are responding well to it.

Tobey Sommer analyst
#30

I appreciate that. Now, regarding when payments come in and the stretching out of DSO, is this something happening across the board because of the shutdown? Or is it a specific effect tied to certain payment offices that just happen to be significant for the company?

Shawn Mural executive
#31

Yeah. It's interesting. There's a payment — like I believe I mentioned earlier when Peter asked, there was a — we're observing that payments are taking about 7 days longer than what we saw earlier in the year. The slight complication here is that sometimes there are contract actions that require adjudication, to get funding shifted around to the right claims, that sort of thing. That's sort of the — this is a secondary consequence of not being able to have those things happen right now. So will they get done by the end of the year? Possibly. There's — we don't see risk to them in aggregate, obviously. This is, as I said, purely a matter of timing regarding the ability for, if it's funding on a certain clin, for instance, Tobey, to be moved, not issued, then issue the invoice and then pay under what are now elongated terms compared to what we've experienced before. It's nothing beyond that, if that helps provide some color.

Tobey Sommer analyst
#32

Yes, it does.

Joe Gomes analyst
#33

Nice work on the quarter. I'd like to ask, could you perhaps provide a brief update regarding what's happening with INDOPACOM, how things went during Q3, and what you expect for Q4?

Jeremy Wensinger executive
#34

We remain extremely confident about where we stand in INDOPACOM. Having a footprint there, clearly, has opened the door for us to work with the customer, whether directly or indirectly; so once more, my view is that INDOPACOM will be — and already is — a growing market for us, and consider what Shawn said earlier regarding the Tempest unit. There's a chance for us to keep growing our footprint across that area. It's somewhat disappointing that certain training activities came in below our expectations for the year. Still, on the whole, our positioning is something we take great pride in, and we anticipate a lengthy relationship with that customer in that region.

Joe Gomes analyst
#35

Alright. Thanks; and I really don't want to keep going over the same ground, but — and I realize it's tough to give a full answer on this, yet we've discussed the government shutdown, and things slipping to the right. Regarding the T-6 with the protest underway, I mean, how long could that be delayed to the point where that expected start date of February, the end of February, gets moved out a lot, rather than perhaps some of the other items we're discussing that could move more quickly. Do you have any read on that? Or could you share additional color or detail about it?

Jeremy Wensinger executive
#36

Yeah; that particular one is a difficult one. As you're aware, obviously, it sits in the court of federal claims. So predicting it is tough. the precise timing of it; we keep watching it, and I understand they are making progress. But once more, that's going to be a tough one for us to forecast whether it will slide or won't.

Shawn Mural executive
#37

Joe, I believe that's partly the reason why, once more, the information Jeremy took us through when the prepared remarks wrapped up — we aimed to shed light on the fact that we're approaching T-6 as essentially an all-or-nothing situation for '26, for precisely the causes Jeremy brought up, and we intend to expand. To repeat, no guidance is being provided by us for '26; yet given how that might unfold, should everything remain on the timeline, wonderful. Should it be delayed, we'll find out regardless — this company will expand and keep doing so, as I said, during 2026.

Trevor Walsh analyst
#38

Regarding the Tempest item, it's genuinely striking simply to observe or grasp the timeline from development through to having that system deployed. More generally, I suppose, in the counter-UAS space or even just training assistance involving UAS broadly, what sorts of things or possibilities could exist that we aren't necessarily considering? Tempest appeared to arrive incredibly quickly and aggressively. So what sorts of things might exist in the area of unmanned systems that we could be contemplating on your behalf?

Jeremy Wensinger executive
#39

I'd say Tempest serves as a solid illustration of what this shifting threat environment is revealing to us as a nation; yet I want to point to something we've discussed previously. Regarding unmanned systems, whenever you consider an unmanned aerial vehicle, it possesses an airframe. It carries many of those identical traits that we currently sustain on — from the MRO angle. And I view modernization plus upgrades along with our capacity to maintain those aircraft exactly the same way I view what we're performing on an F-16 or C-130. Thus whenever I consider the developing market for UAVs, it could be what we're doing right now with Tempest or it could stretch entirely down to flight line support, entirely down to modernization and upgrades for those aircraft. Therefore I believe it's a chance for us. I believe we've proven that as a chance through Tempest, and I believe we'll keep showing our foothold within the UAS market.

Shawn Mural executive
#40

What's driving this is really the company's engineering strength—its ability to move quickly and nimbly and turn out rapid prototypes. That's exactly what you witnessed, and as Jeremy just described, there are all sorts of uses for it. So we keep building out that skill set throughout the company, rolling out technology and weaving it into many different platforms and approaches, which, once again, Jeremy touched on.

Trevor Walsh analyst
#41

Great. Perhaps only a single fast question, or one final one. Regarding the acquisition you completed, my understanding is it's likely somewhat smaller when it comes to a material contribution to '25; but could you perhaps share with us about how the '26 pipeline or even past that tied in some way to unlocking that customer around that acquisition, if that's included in, I believe, the roughly $50 billion pipeline that you mentioned today in the slides? Or is there — I suppose, how much ramp is needed to really get that moving from the wider opportunity that's presented there?

Jeremy Wensinger executive
#42

Yes. No, thank you. That's a good question. It is not in the pipeline. Right now, we're in the middle of getting the integration done. That said, nothing about it is unusual — I myself arrived from that part of the industry. Nothing exists on that side of the business that V2X isn't already doing today. What we lacked was a way in with the customer to prove we could do it; so the real issue here is reaching the customer, not scale. It wasn't a big acquisition in terms of price, but regaining entrée to that customer base, showing them our core capabilities, and giving them both confidence and access to our people — that is entirely why we pursued the deal.

Kristine Liwag analyst
#43

Jeremy, you mentioned funding as the source of uncertainty tied to the government shutdown. And given the solid book-to-bill of 1.2x this quarter, did that reflect customers pulling contract awards forward because they saw this funding uncertainty coming and wanted to get those awards pushed out the door?

Jeremy Wensinger executive
#44

I don't — for the most part it was just ordinary timing. I mean, I didn't observe anyone shifting things around. Even — I believe we discussed previously, even with certain initiatives the government had during the first half of the year, we've watched awards essentially land on schedule. And so these weren't surprises. They weren't accelerated; every one was an award we anticipated occurring. What I can't predict is in quarter 4, whether the items we believed would be adjudicated, since there are no contracting officers available to handle them, whether those will take place or not. So I have confidence in what we hold regarding our bid velocity. I have confidence in the bids we've submitted; they just — I simply don't know if they'll be adjudicated given the government shutdown.

Kristine Liwag analyst
#45

Got it. And listen, if there's room for one more question from me. Many people were caught off guard by the U.S. choosing to pull certain troops from Romania. So I wanted to ask, did that catch you off guard too? Or did you see it coming? I realize you don't earn direct revenue from that particular base. But in terms of regional priorities, how are you weighing possible added headwinds coming from Europe? And how does that square with the stronger demand signals out of INDOPACOM?

Jeremy Wensinger executive
#46

The work that we carry out in Romania, I'd say, forms a hugely significant piece of our defense strategy. So that didn't touch us, and I find it impossible to imagine that the work we're doing there would disappear anytime soon. When it comes to defense, it matters enormously. That's really all I'll say on it. But the Aegis Ashore program is a really critical one, and I don't foresee any strategic shift away from it unless the government changes its policy.

Noah Poponak analyst
#47

When I look at the revised revenue outlook for the entire year, and there's only the final quarter left, the spread suggests 4Q could be anywhere from unchanged to as much as 7% higher at the top end. Is the bottom end driven purely by the government shutdown? Or do other factors come into play that could push you somewhere else inside that band?

Shawn Mural executive
#48

Yeah. No, that's a terrific question; as you'd expect, funding is something that shifts around, and we have a terrific rhythm inside the company that examines a standard contracts waterfall depending on whether funding shifts or stays the same. So far, the effect has been quite small, as I believe we mentioned during the prepared remarks; however, looking ahead to the close of the quarter, additional consequences could arise in the form of cutbacks to existing contracts we hold. That's why we have the guide's spread, and nothing beyond that. We wanted to be certain we factored that in, since it's an uncertain element. The teams, as I mentioned, are fully on top of it. And up to now, we've observed customers reallocating funding so that capability continues and endures. I think that reflects just how essential our customers consider the services we deliver. So that's the reason behind how the distribution across the range came about.

Noah Poponak analyst
#49

All right. And Shawn, I suppose, when I examine how things move across the year, roughly flat during the opening half. At this point you've got an 8% gain at the midpoint of the 4Q range, up mid-single. You folks had mentioned that WTRS needed to ramp in order to reach that stronger growth pace during the back half. As we — as I continue running through the model into 2026 while WTRS keeps ramping, with easy comparisons in the first half, I suppose why wouldn't — would it be sensible to view '26 as resembling the exit rate of '25 when it comes to top line growth? Or does it get more complicated than that?

Shawn Mural executive
#50

Yes. A few items are involved. I'll offer a bit of color, as I mentioned, we wanted to be sure we addressed '26 since it's top of mind for clearly, everybody. So when I consider it, WTRS will keep ramping next year, the F-16 Iraq award will ramp next year on an incremental basis. There are the contingency support activities, particularly in the Middle East that have mostly ramped down across 2025. We've witnessed that. That will create quite a headwind heading into, say, the first 3 quarters, so to speak, of 2026; therefore I won't discuss numbers specifically since funding is so variable at present, to be honest with you. But yes, WTRS and F-16 Iraq ought to keep ramping at the exit rate that they finish at in '26.

Noah Poponak analyst
#51

All right, that's quite useful. Regarding margins, is V2X something we ought to view as a chance to grow margins across multiple years? Or is the better way to see it as revenue growth while keeping margins steady and turning that into cash flow?

Shawn Mural executive
#52

Look, I believe that as time goes on, we definitely see chances to expand margins. What I mean is that's simply the type of thing we exist to help produce, and our program teams deliver that reliably. We're working our way through the backlog, just as you'd anticipate. When new programs have arrived, they — and I've mentioned this previously — generally begin at a lower point and afterward climb and get better step by step. What's excellent about certain awards we hold now is that these represent long-term franchise programs, considering 5-plus years alone spanning WTRS, F-16 Iraq, and then based on what occurs with T-6, that's as much as a 10-year program. So there's solid stability, a chance to pursue margin expansion in this case, though it is — I believe your way of looking at it is precisely correct. It's a multiyear.

Noah Poponak analyst
#53

All right, that's my final question. If you truly do see that $20 million to $30 million in cash flow shift because of payment timing tied to the shutdown, should we view '26 as a typical year where you convert 100% of adjusted net income into free cash flow, plus recovering that $20 million to $30 million? Or does something like this tend to get made up across a longer stretch, so you never really capture it within a shorter conversion period?

Shawn Mural executive
#54

No, the way we're looking at '26 right now is precisely how you described it; naturally, it hinges on revenue, correct? So provided revenue stays at roughly the midpoint of the guide, as I mentioned, then it's simply a matter of timing, and we wouldn't have — we'd be incremental and at or above 100% in '26; that's precisely how you should think about it.

Jeremy Wensinger executive
#55

I’m grateful you could all set aside time today. It means a lot that each of you took the chance to hear about the results for our quarter. And once more, I truly value all that you’re doing when it comes to demonstrating interest in V2X. So thank you, and enjoy the rest of your day.

Operator operator
#56

That wraps up our conference. We appreciate your participation in today's presentation. You're welcome to disconnect at this time. Thanks again.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete V2X, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to V2X, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.