Home / Transcripts / Cerrado Gold Inc. (CERT) · November 23, 2026

Cerrado Gold Inc. (CERT) Earnings Call Transcript

November 23, 2026

TSX Venture Exchange CA Materials Metals and Mining earnings 30 min

Earnings Call Speaker Segments

Mike McAllister executive
#1

Thanks, operator, and good morning to all of you. If you go to slide 2 in the deck, I want to point out that forward-looking information may be included in this call, built on what the company currently expects, estimates, and believes. Kindly take a look at this slide along with the other forward-looking information found on page 2 of the presentation we're using today, and also in the company's annual information form, which is publicly available on SEDAR+ as well as on the company's website. Today's accompanying presentation can be downloaded from the company's website at www.cerradogold.com. The related press release has also been posted on our website and on SEDAR+. Keep in mind that every dollar amount discussed on today's call is stated in U.S. dollars unless we say otherwise. With us on the call today are Mark Brennan, our CEO and Chairman; Jason Brooks, our Chief Financial Officer; Andrew Kaip, our Chief Technical Officer; Carl Calandra, our VP and Legal Counsel; and David Ball, our VP Corporate Development. At this point I'd like to hand the call over to Mark Brennan, our CEO and Chairman.

Mark Brennan executive
#2

Thanks so much, Mike, and thanks as well, everyone, for being with us on today's call. We're quite happy with the results for the third quarter, which keep gaining from meaningful operational enhancements, programs aimed at reducing costs, and the buyback of the Minera Don Nicolás stream. We keep producing robust cash flows and higher output, and for 2026 we expect that output to land at the top end of guidance, at 50 to 60,000 ounces; looking ahead, we anticipate solid operational and financial expansion now that the operational optimizations and upgrades have recently been finished; we're hopeful the latest sell-off in precious metals proves short-lived and that our operational expansion offsets any lower realized prices we might see. We're eager for the new PEA, which should be done by the close of Q1 2027 and which we believe will show the potential for additional resource and production expansion as well as a longer mine life at Minera Don Nicolás. On top of that, we're thrilled about the recent purchase of the Manantial Espejo mine in Santa Cruz, Argentina. Manantial Espejo sets the company up for additional production expansion in 2027; we anticipate cash flow expansion from our operations, together with our solid current cash position, to back this expansion. As for our development plans, we keep moving the optimized feasibility study at Lagoa Salgada forward and are pushing it alongside the permitting process. We aim to be ready to submit our permit applications early in 2027 and, if we succeed in securing the environmental and RECAPE permits, to reach a construction decision by the close of the first half of 2027. I'd remind investors that, on the basis of our earlier BFS, this project should deliver substantial cash flow across a long mine life while being mostly funded and not needing meaningful dilution going forward, if any. At Mont Sorcier, the extra drilling is finished and we're advancing trade-off studies to further optimize the project economics; we're confident the outcome will be a robust project, and we expect the BFS to be finished by the close of Q2 2027. Management stays convinced that substantial value is still to be unlocked at both of these projects. I'd now like to pass the call to Jason Brooks, Cerrado's CFO, who will walk us through the financial highlights.

Jason Brooks executive
#3

Thanks, Mark. Now if we look at the financial highlights on slide 3: our operations in Q3 2026 kept up strong production, rising 21% to 16,685 gold equivalent ounces, versus 13,382 ounces during the same period a year earlier. For the year to date, we've recorded a 23% gain, with 44,942 ounces produced compared with 36,433 ounces over the same period in 2025; during the quarter that ended September 30th, 2026, high-grade CIL output came to 7,036 gold equivalent ounces, which is 107% higher than the prior year, thanks to substantially better gold and silver grades and recoveries as underground operations fed considerably more material to the plant. Heap leach production held steady at 9,649 gold equivalent ounces for the quarter, much like the second quarter of 2026. All-in sustaining cost per ounce of gold fell 19% in Q3 2026, to $1,546 per ounce from $1,915 per ounce in the same period of 2025, which came from operational improvements that drove higher production. Basic earnings per share outstanding came in at $0.04 in Q3 2026 and $0.16 USD year-to-date once one-time adjustments are excluded. The company is keeping its 2026 guidance for gold equivalent ounce production at 50 to 60,000 ounces, and with strong quarterly results we expect to land at the upper end of that range. The company posted record adjusted EBITDA of $33.8 million in Q3 and $90.8 million year-to-date, helped by an unhedged gold position, stronger gold prices, and greater production. Net income for Q3 2026 reached $25.2 million, compared with a net loss of $12.2 million in Q3 2025. That rise in net income stems mainly from a $26.9 million increase in revenue and a $26.3 million increase in other income, partly offset by higher cost of sales of $12.9 million and higher taxes of $1.2 million. Lastly, the company closed the quarter with a solid cash position of $33.9 million. The company anticipates further improvement in its cash position while covering capital allocation needs for project growth plans and handling the payments tied to the recently announced repurchase of the company stream agreements. With that, I'd like to hand the call back to Mark Brennan, who will walk us through some production highlights for the quarter and the company's outlook.

Mark Brennan executive
#4

Thanks, Jason. If you turn to slide 5, we'll walk through a handful of recent company initiatives, but before that I'd like to emphasize a couple of the items Jason mentioned: the all-in sustaining cost of 1,546, which we achieved following an extended stretch of operational cutbacks and optimizations—something we're quite proud of; and basic earnings per share of 16 cents on a normalized basis thus far, equivalent to roughly 22 cents in Canadian currency, or $0.22. That's a measure we intend to focus on heavily going forward, and we believe we can hold these levels as we move ahead. Back to slide 5, several significant events took place during and after the third quarter that, in our view, are transformational for the company. On July 17th, the company completed the repurchase from Sprott Streaming of all outstanding streaming assets and related security held over its producing Minera Don Nicolás mine in Argentina and its Lagoa Salgada project in Portugal, for $31 million. Buying back the streams on our assets enhances long-term shareholder value. We believe the streams were acquired at a reasonable cost, will improve future cash flows by removing a significant cost contributor, and will strengthen the balance sheet. Looking ahead, Cerrado and its investors stand to gain substantially from increased exposure to commodity prices through a pair of early-stage assets that are advancing quickly. Cerrado disclosed on September 3rd that it had completed a strategic non-brokered private placement with Mr. Eric Sprott, bringing in Canadian $10 million in total proceeds. This investment reflects his confidence in the company as well as its potential for future output and cash generation, and we are delighted to count Mr. Sprott among our strategic investors. Finally — and this is no less important — on November 12th we signed a share purchase agreement with Pan American Silver and Aquiline Resources covering the acquisition of every issued and outstanding share of Minera Triton Argentina. That company holds the past-producing Manantial Espejo mine along with the associated mining concessions in Santa Cruz Province, Argentina; since production began, the operation has yielded roughly 1.4 million gold equivalent ounces together with strong silver credits. Between 2008 and 2023, Manantial Espejo produced between 140,000 and 150,000 ounces, and during its final production year, 2022, it delivered 68,000 ounces while still in ore. Operations there were shut down because of depressed gold prices, COVID, and the transition to underground mining. Cerrado's total consideration came to $20 million in cash — $10 million paid at closing, plus two deferred payments of $5 million each, due on the first and second anniversaries of the closing date. The company also granted a 1% net smelter returns royalty on all future production from the property, and Cerrado will take on all historical, current, and future liabilities, including closure obligations backed by a financial closure guarantee. The site comes with processing infrastructure already built out, among it a mill capable of handling 2,500 tonnes per day, and that hands Cerrado a base for getting back into operation quickly while putting the company in line for substantial gold output starting in 2027. On top of that, exploration targets have been pinpointed close to the current workings and throughout the wider property, carrying the possibility of growing resources. Picking up Minera Triton Argentina together with the Manantial Espejo mine is something we're quite pleased about, and between 2008 and 2023 that mine produced 140,000 to 150,000 ounces. Our due diligence has produced a staged plan for redevelopment and refurbishment, one that ought to bring the operations back into production at some point in 2027. What Cerrado wants is to bring Minera Triton Argentina back up to the output levels it reached in the past. Beyond all that, we believe this transaction leaves Cerrado poised for a meaningful pickup in production growth in Santa Cruz, and taken together with MDN it should carry us closer to our goal of more than 100,000 ounces produced. Funding is available in Argentina to support our development plans. As we see it, this opportunity should add meaningfully to shareholder value, and do so with no dilution to shareholders whatsoever. On slide 6, you'll notice that operations at the company in Q3 2026 kept up solid output, which mirrors the improvements delivered across the last twelve months. The heap leach side went on gaining from the fix to the earlier irrigation problems and from upgrades to the crushing circuit. Commissioning is underway at the new crushing facility, and that should help drive more feed onto the pad. In addition, the new tailings dam is now in service and should supply roughly five years of capacity at planned operating rates. We also anticipate completion of the new heap leach pad in late Q1 2027, adding 12 million tonnes of capacity. Higher gold prices let MDN blend a larger portion of lower-grade material into what goes to the heap leach, which improved resource utilization. At the same time, selected high-grade Calandra material, typically grading above 2.5 grams per tonne gold, that had originally been designated for the heap leach pad was sent instead to the Martinetas CIL mill, where recoveries rose to as much as 95%; as a result, that material added to CIL output rather than heap leach output. To get the most gold production and the best overall margins, we intend to keep using this approach going forward. Moving to page 7, we stayed concentrated on underground development through the quarter, with more fresh feed coming available near quarter-end. We expect more underground material in Q4 2026, and that should help us deliver better-grade production over the latter six months of '26 than in the first six months. As the workings traced the mineralized zone further down beneath the Paloma pit, underground operations switched back and forth repeatedly between development and ore extraction. Our exploration program at MDN keeps advancing, and we drilled the recently acquired Falcon and Calandra 2 properties to test for possible mineral resources, which we expect will be part of the new preliminary economic assessment due for completion before Q1 2027 ends. A revised mineral resource estimate will also form part of the PA. The purpose of the new PEA is to evaluate a possible expansion of MDN's mineral resource base, a possible extension of mine life, and the opportunity to increase production rates. Over the last 24 months, MDN has invested substantial capital in building two parallel production streams — the CIL plant and the heap leach routes — and those benefits are starting to become visible now. With the CIL and heap leach facilities, we have the flexibility to process both high-grade and low-grade material, selecting whichever option performs best according to metallurgical results and economics. Combined with our surface and underground mining capabilities, this allows MDN to draw on multiple feed sources and adjust the overall production mix. Moving to page 8 for a review of our remaining projects: in Portugal, work is ongoing to advance the optimized feasibility study and the RECAPE engineering phase, with the goal of bringing Lagoa Salgada to a construction decision at the earliest opportunity. A new environmental impact assessment is also slated for submission, and Portugal's environmental regulators are allowed up to 120 days to review it. Construction could consequently start in the second half of '27, assuming the permits are granted and financing is in place. Turning to page 9, the Mont Sorcier project in Canada: efforts to advance it continued, with several workstreams under way covering permitting, social license, and various trade-off studies in support of the feasibility study. As we move that feasibility study ahead, we have also found a number of opportunities to further optimize the project's economics and lower both capital and operating costs, even as inflation persists across the industry. We are working to complete several trade-off studies so those improvements can be assessed and captured. As a result, we now expect to complete the feasibility study in the first half of 2027. In closing, we remain in a highly dynamic period for this business — a growing producer that the market undervalues, with strong cash flow, earnings, and output. A stronger balance sheet underpins our expansion efforts and the push of promising growth projects toward construction decisions. Manantial Espejo produced between 140,000 and 150,000 ounces from 2008 to 2023. That concludes the presentation portion of today's call. I'll now hand the line back to the operator so we can begin the Q&A. Thank you, Michelle.

Case Bongirne analyst
#5

Hi everyone, this is Case here, standing in for Heiko, who is currently in the air. Appreciate you joining our calls, and well done on such a strong quarter.

Mark Brennan executive
#6

Thanks.

Case Bongirne analyst
#7

Can you walk us through a little more detail on how the sale process for the Manantial Espejo mine was run? I'd like to understand how long talks have been underway, whether you know of any other parties bidding, and maybe some sense of what you have in-house on spending at the site across the coming quarters? I think that,

Mark Brennan executive
#8

first off, there was a fair amount of competition in that process, I would say. It's located in a very, very, very productive part of Santa Cruz where a great deal of new exploration activity is underway, with plenty of success coming out of that new exploration. We felt pretty fortunate, obviously owing to the strong relationships we've established in Santa Cruz with Pan American Silver, the company from which we bought the Falcon asset previously. We probably had something of an advantage when it came to acquiring this asset, because Pan American wanted to divest it and sought assurance that it had a counterparty who wouldn't later return the property or cause friction with local officials. You may know, or perhaps recall, that the person running our Argentina operations also heads the mining chamber of commerce for Santa Cruz province. We've established excellent, truly solid relationships with every one of the mines in Santa Cruz — Newmont, Newmont, Pan American, companies like McEwen and Hochschild. Basically, we were certainly representing fairly robust operations there in Santa Cruz. We believe the respect we earned comes from a couple of things: first, from being among Argentina's lowest-cost producers, even though we're far from being one of the largest producers in Argentina; second, from our capacity to bring in several distinct discipline types of production — open pit, underground, heap leach — and to operate them efficiently. I'd say we were punching above our weight in Santa Cruz, and that was the primary reason we ultimately got this asset. On the operational plans side, as you mentioned, dewatering will take three to four months for us. Following that, we'll refurbish the plant concurrently, and once dewatering is complete, we'll refurbish the underground workings. At the same time, we'll be mining the low-grade stockpile. We estimate roughly 15 to 20,000 ounces can be mined as we continue this process. We'll also be launching a 40,000-meter exploration program, mainly to establish what lies closest to where the existing operations ended. This mine was producing 68,000 ounces, or produced 68,000 ounces, in 2022. The mine was shut in 2023, largely because gold prices were low, but COVID also played a role, along with their intention to move more operations underground. From our own due diligence, we believe we can keep going in ore and bring the mine back to its earlier output levels with extended work. Should everything break in our favor, completion would land ahead of the close of Q4 2027, and once we qualify and quantify what 43 to 101 purposes demand, more specifics will follow. That, I think, suffices to show that cash on hand, cash flows, and the capital we can access in Argentina will cover this project in full; starting in the fourth quarter, we expect very strong growth. We see about 15,000 to 20,000 ounces that can be mined as we continue this process.

Case Bongirne analyst
#9

Thanks; that was genuinely useful from your side. So as a follow-up question, since Pan American keeps a 1% NSR, we're aware that in certain parts of the site there's another 0.5% NSR. Mostly I'm wondering which areas those cover, and whether initial mining is going to affect them? Also, could you tell us who holds it, and even more importantly, is there any right to repurchase it?

Mark Brennan executive
#10

Essentially the effect on operations is going to be felt right away. That 1.5% applies to any production that comes out of the mine. And there's no option to buy it back, so regrettably that's something we're going to be carrying for a while.

Case Bongirne analyst
#11

Great, thanks for that. I'll get back in line again. Appreciate you taking our questions.

Mark Brennan executive
#12

Thanks.

Riley Venton analyst
#13

Hi everyone, congratulations on the solid quarter, and thank you for fielding my question. I was wondering about sustaining capex in Q3. I understand it came in negative in the AISC figure. Could you explain what drove that, and then what you'd view as a reasonable run-rate for sustaining capital for Q4 and 2027?

Jason Brooks executive
#14

This is Jason. Hello, Riley. You're correct that it was negative. The reason is that as we reviewed our sustaining capital at year end, we reallocated some amounts between sustaining and development capex. We had overstated sustaining capex in Q2, so we simply reversed that in Q3; it was purely a misallocation between sustaining and development. That explains the negative figure. My expectation is that the sustaining capex run-rate stays the same, so if you take the year-to-date number and divide by 3, it ought to hold at that same run-rate through the remainder of the year.

Riley Venton analyst
#15

Okay, that's clear. Thank you. And regarding the Lagoa feasibility study, I'm just wondering about when that will come. Do you still expect it before the year is out, or will the release wait on how permitting goes?

Mark Brennan executive
#16

That really hinges on the permitting process. We're eager for a strong study to come out, and it builds on an earlier study that was positive as well; at this point, we don't see much sense in putting it out until, one, it's completely finished, and two, Portugal offers a more certain environment.

Riley Venton analyst
#17

All right. Appreciate you fielding my questions, and congratulations once more on the quarter.

Mark Brennan executive
#18

Thanks.

John Tumazos analyst
#19

Hi Mark, congrats on the acquisition.

Mark Brennan executive
#20

Thanks, John.

John Tumazos analyst
#21

Can you walk me through the operating plan for Manantial Espejo, if that's how it's pronounced? Is there going to be any synergy with Don Nicolás — sharing staff, purchasing, that kind of thing — and how far apart are the two? Just trying to figure out whether it stands alone or works in tandem, and so on.

Mark Brennan executive
#22

At the start, for roughly the first 6 months, what we'll really be doing is reassessing the mine and bringing it into a mode where we can get solid production going by the end of '27. During the first 6, 9 months there will be significant synergies, with us directing our people and, to some degree, our equipment toward Manantial Espejo. As time goes on, it will turn into a standalone, separate operation. Synergies will always exist. We'll always stay focused and rely on the same executive team and executive mining team at MDN and MTA, since we're now Minera Triton Argentina. Again, we fully anticipate this becoming a completely independent operation, and ideally a strong competitor to MDN, so the two can benefit from one another.

John Tumazos analyst
#23

Looking ahead 6 or 12 months, once you restart, how many stopes do you anticipate running? To fill the mill at 2,500 tonnes a day, what number of stopes is required?

Mark Brennan executive
#24

We haven't reached that level of detail at this point; that plan is still being worked on. I believe we will also need to see how the dewatering turns out, along with the exploration results; we feel there is potential, along the existing stope where mining is actually taking place, for an extension of almost a kilometer. We remain in that mode of having a pretty good idea of what can be done in the short term. One reason our disclosure has been a little bit vague is that the plan is just being filled in right now. My expectation is that probably by the end of Q2, we'll be in a much better position to determine exactly where we're going and what the mine plan and sequencing, etc., will look like.

John Tumazos analyst
#25

Thanks and congratulations.

Mark Brennan executive
#26

Thank you, John.

Mark Brennan executive
#27

Actually, before you go on, operator,

Mike McAllister executive
#28

I'd

Mark Brennan executive
#29

I’d like to add one final point. Clearly, gold and silver prices have shown some softness over the past week or so. That matters a great deal to us, and throughout much of 2026 we worked on lowering our costs. We invested an extra $35 million in capex so that we would be positioned to produce at that $1,500, $1,600 AISC figure; we intend to push our growth further and become a strong accumulator of production; even so, what matters most materially to us is stability, solid and strong cash flow, and keeping a strong balance sheet. Even if gold prices decline, we want to remain in a position where we keep growing our balance sheet and financial strength. That is a priority for the firm. I believe it is very important, in this uncertain period, that people clearly understand that, in our view, the operations are a consequence of what they can deliver for our financial strength. With that, Mike?

Mike McAllister executive
#30

Yeah. Thanks, Mark. Since no one has any more questions, we'll wrap up today's call here. Thanks to all of you for joining us today. Just a reminder that a recording of this call and the presentation will be posted on the company's website at www.cerradogold.com. Should you have any follow-up questions or concerns, our contact details are available on our website; with that, operator, please go ahead and end the call.

Operator operator
#31

That brings us to the end of today's conference call. Thanks for joining us, and you can go ahead and disconnect now. Everyone, have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Cerrado Gold Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Cerrado Gold Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.