Nordex SE (NDX1) Earnings Call Transcript

November 5, 2026

Deutsche Boerse Xetra DE Industrials Electrical Equipment earnings 64 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, everyone, and welcome to the Q3 figures 2026 Conference Call. This is Sherry, your Chorus Call operator. <<operator_script>> and this call is being recorded. <<operator_script>> At this point, I'm happy to turn things over to Anja Siehler. Please go ahead.

Anja Siehler executive
#2

Thanks, Sherry. Greetings from the Nordex team here in Hamburg. We appreciate you being with us for the Q3 2026 team management call. As usual, please take note of our safe harbor statement. Joining me are Jose Luis Blanco, our CEO, and Ilya Hartmann, our CFO, who will take you through the presentation. After that, we'll open the floor for your questions. At this point, I'd like to pass things over to Jose Luis.

José Luis Blanco executive
#3

Thank you so much, Anja, for that introduction. On behalf of the Management Board, I'd like to welcome all of you to our third quarter results of 2026. As the presentation title makes clear, we are still on track both financially and operationally. And as we announced in our prerelease, that has allowed us to lift our full year 2026 margin guidance. Let me begin, though, with a quick overview of the quarter's key highlights. . Turning to the next slide. All in all, I'm happy to report that in the third quarter of 2026 -- revenue growth and EBITDA margin came in above 12%, along with strong free cash flow. Thanks to these results, 3 weeks ago we raised our EBITDA margin guidance for the full year to 11.5% to 12.5%. Now let me sum up the other key highlights. First, project order intake came to 2.8 gigawatts, a rise of 30% year-on-year. Europe made up 83%, with Turkey, Germany and United States as the largest individual markets. Total sales were up 28% year-on-year to EUR 2.2 billion. Project sales represented 89% of the total and grew by 30%, while services, with a share of 11%, grew by 8%. Double-digit profit continued, and we delivered an EBITDA margin of 12.7%, above the 12% threshold and an improvement of almost 5% year-on-year.

José Luis Blanco executive
#4

Free cash flow came in strong at EUR 179 million, and working capital held steady at minus 7.8%. As a result, net cash rose to EUR 2 billion, up from EUR 1.6 billion at the end of '25, while our total cash position was EUR 2.3 billion. All in all, a solid quarter. Let me move on now to how we performed operationally, on Page 6, beginning with order intake. As we announced in our order intake press release on October 12, it was a good quarter, with our regional footprint continuing to broaden. Project order intake came to 2.8 gigawatts, up 30% year-on-year. For the first 9 months, order intake totaled 7.7 gigawatts. In euro terms, turbine order intake was EUR 2.5 billion, nearly 26% above last year. We took orders from 10 different countries, versus 9 last year, and the average selling price was broadly stable at EUR 0.9 million per megawatt, compared with EUR 0.93 a year ago. Average selling prices are shaped by project and regional mix in any given quarter, but pricing remains stable as far as we can see. Europe was still the main region, accounting for 83% of order intake, along with Turkey, Germany and the U.S.

José Luis Blanco executive
#5

Those were our strongest individual markets. We're concentrating on broadening our presence further across North America and Asia Pacific. Although no specific guidance is being given for '26, we still anticipate solid order momentum as we head into the fourth quarter. Now let's turn to Slide 7, where we'll go through how our order book has developed. At the close of the third quarter of '26, the combined order book residents further and surpassed EUR 19 billion, which reflects sustained positive momentum in both our turbine business and our Service business. The turbine order book came in at EUR 12.2 billion, a rise of 31% year-on-year. The bulk of those orders originated in Europe at 83%, with North America next at 16%, while Latin America and the rest of the world each account for 1%. Over in the Service segment, the order book grew to EUR 7.1 billion, up 28% year-on-year. Our service portfolio has kept expanding and now totals 52.2 gigawatts under contract, which represents 14,063 wind turbines. This growth remains supported by robust sales activity and a growing in-store fleet. All in all, the order book's development underpins planning visibility and demonstrates that Nordex is becoming more international and, in Service, reflects the expansion of our installed base over the past years. Let's go to Slide 8 for a closer look into the service business.

José Luis Blanco executive
#6

For our services, the third quarter of 2026 represents a significant milestone. Service sales rose 8%, hitting EUR 237 million, which accounts for roughly 11% of total group revenues. The EBIT margin improved further, reaching 20.6% and passing the 20% mark for the first time, up from 19.7% in the prior quarter. That provides a solid foundation for us to hit EBIT margins of 3% for the full year next year. On the operational side, fleet availability held steady at about 97%, and service contracts had an average tenor of 14 years. Let's go to the next slide, which offers some insight into our installation and production figures on Page #9. Installations came to 2 gigawatts, or 331 turbines, across 15 countries, versus 420 turbines across 16 countries in the third quarter of last year. That is 73% above the prior quarter, though still 22% under Q3 of last year. We keep seeing project delays on the customer side, and also because of delays in obtaining transportation permits in Germany. Beyond that, you'll recall some blade-related postponements in Turkey from our earlier communications. The main point is that these delays have not had a material financial impact year-to-date. On production, turbine output matched project scheduling and totaled 367 turbines, compared with 428 in the third quarter of last year.

José Luis Blanco executive
#7

Output rose 17% for blades, reaching 1,311 versus 1,122 in the prior year. Ilya will now take you through the financials.

Ilya Hartmann executive
#8

Thanks, Jose Luis. Good afternoon from me as well. As usual, I'll begin with the income statement, which is on Page 12. Sales for the third quarter of 2026 rose 28% versus a year earlier, reaching EUR 2.2 billion, which mirrors stronger activity in both the project business and the service business. Gross margin came in at 26.7%, against 28% in the third quarter of 2025. Operating expenses declined year-on-year, largely because of FX effects and some income from the sale and leaseback of our rotor blade factory. Consequently, EBITDA more than doubled, hitting EUR 278 million, with an EBITDA margin of 12.7%, helped by the solid execution in both the project business and the service business that Jose Luis mentioned. The final result was minus EUR 70 million, somewhat above last year, reflecting the larger volumes under the guarantee facility. As I said on our Q2 call, we signed a new EUR 2.5 billion multicurrency guarantee facility, admitted to tenor through 2031, with commitments from 15 banks. Since then, we have added another EUR 500 million to that facility, bringing the total to EUR 3 billion, in order to support future growth of our order book.

Ilya Hartmann executive
#9

Building on that operating performance, we posted a solid net profit of EUR 147 million in the third quarter — an improvement of EUR 95 million versus last year. So with that, let's turn to Page 13, where we see the balance sheet. Looking at it, total assets on the balance sheet rose to EUR 7.6 billion compared with year-end, while the overall structure is largely unchanged. The third quarter closed with a continued strong gross cash level of approximately EUR 2.3 billion, and the equity ratio keeps improving, reaching 21.1% at the end of the third quarter, up from 19% at year-end. That is, of course, supported by the strong net income and by degrowth outpacing the rise in total methods. With that, let's take a close look at the next Page 14 and how some other balance sheet KPIs have developed. Net cash rose further and totaled EUR 2 billion at the end of the third quarter. The strong operational performances more than offset the normalization of working capital. The equity ratio increased further and now stands at 21.1%, and working capital now again, in total numbers, stood at EUR 659 million, which, of course, is minus EUR 659 million, and remains stable at a ratio of minus 7.8%.

Ilya Hartmann executive
#10

So that takes me to cash flow for the fundage. We already described that as a strong, solid quarter, and that result carries over into the cash flow as well. Cash flow from operating activities before net working capital came in at EUR 379 million, versus EUR 125 million in Q3 of last year. Then, with only a minor working capital impact, cash flow from operating activities reached EUR 375 million. Cash flow from investing activities was slightly positive, since payments received from the sale of a blade plant in Rostock more than offset our CapEx investments. As a result, we produced free cash of EUR 379 million in Q3, again versus EUR 149 million a year earlier. CapEx spending came to EUR 35 million — sorry, EUR 34 million in the third quarter, consistent with last year's spending. And once again, our investment priorities stay the same, mainly blade and cell production facilities, moulds and tooling, plus installation and transport equipment. With that, I'd like to hand it back to Jose Luis for his next slide.

José Luis Blanco executive
#11

Thanks, Ilya, for those explanations. And to wrap things up, given how strongly we've performed so far this year, we've lifted our full-year 2026 margin guidance, as shown on this page. Every other guidance KPI stays the same. With that, I'll hand things to Anja to open up for Q&A.

Anja Siehler executive
#12

Appreciate it, gentlemen, for walking us through the presentation. At this point I'd like to give the floor to Sherry so we can begin the Q&A.

Operator operator
#13

<<operator_script>> Our first question comes from Ajay Patel at Goldman Sachs.

Ajay Patel analyst
#14

I suppose I've got 2 questions. First, thinking about the cash we're holding on the balance sheet and how capital gets allocated — when might we get a bit more of a steer on the main drivers behind that allocation and on what your priorities are? What portion needs to stay on the balance sheet, perhaps as a buffer, and what within that figure is truly available for returning value or for further investment? Then for the second question, if you look at the implied margin for the fourth quarter, it comes in at a very healthy 15% margin. So I'm just thinking ahead to next year — to what extent could you offer us any kind of indication tied to order growth or installation? Relative to your 10% to 12% margin target, that feels like a pretty good setup. I just wondered whether you might have any high-level thoughts on that, which would be helpful.

José Luis Blanco executive
#15

You take the first one, and we'll handle the second one as a team.

Ilya Hartmann executive
#16

Great. I'll begin with the capital allocation question. Thank you, Ajay, for raising it. As I've mentioned several times before — and it's a fair question, particularly in light of how we've performed recently — but what you're asking is when we'll come back with an update. I'm afraid we're sticking to what we've already communicated: that will come alongside our full year results. So at the end of February, when the full year results are out and we present them to you along with guidance, we'll also provide the latest on capital allocation, which we've indicated this year will be a minimum shareholder return of EUR 15 million. So any news on that at the end of February. And I mean, we'll have that done in somewhat more detail. But of course, until then, the priorities apart from shareholder returns are protecting the balance sheet, derisking the operations, and meaningful bolt-on investments and the like — but beyond that, and again, that's a very fair question, end of February.

José Luis Blanco executive
#17

As for where we stand at the moment, our entire focus is on carrying out the high volume anticipated for Q4. And right now, as we speak, we're in the midst of the planning process for next year's budget. So I will — I don't feel very comfortable discussing '27. I mean, this is project business. Typically, Q4 is a quarter of high activity. So you can't treat this as an early indicator for next year. Normally, Q1 brings low activity and low profitability. So in a nutshell, less focus on delivery during the year, which is the important task ahead of us. And we'll come back to you early next year with how we see next year.

Operator operator
#18

Constantin Hesse from Jefferies has the next question.

Constantin Hesse analyst
#19

Let me try putting that question a slightly different way, picking up on what was just asked. Ilya and Jose Luis, how much operating leverage remains at this point? If volumes move from 8.5 gigawatts potentially up toward 9, 10, 11, what margin potential is still left here? Perhaps we begin with that one first.

José Luis Blanco executive
#20

I mean, if everything stays the same, higher volume ought to mean a somewhat improved match. And, naturally, margin always comes from combining quantities with a per-unit margin, which is price less cost, less the organization required to deliver that volume, and those core factors may or may not shift over time. As of today, we observe stability, though that could or could not hold going forward.

Constantin Hesse analyst
#21

When we look at backlog, it's EUR 12.7 million for projects — and within that, '27 already has visibility.

Ilya Hartmann executive
#22

I'd say I don't have the sub figures, because as I mentioned, we're in the middle of the budget process, but this real — it's a better, I would say, it's a reasonable coverage, slightly better than the one we had 1 year ago, which was already good. We just already gone. Of course, the question might better frame in February because we need to collect against the guidance that we will give you for the next year, what level of coverage we have for the guided figure that we give you for the next year. But for the internal budget that we are working on, we see a better and slightly better coverage than 1 year ago.

Constantin Hesse analyst
#23

All right, got it. And finally — I realize this question comes up a lot, and it's clearly not an easy one to respond to. But Ilya, I know you're following this closely, given where the discussions currently stand with voluntary members regarding the grid package — perhaps approaching it differently, rather than discussing what you're actually picking up from politicians, which is obviously somewhat tougher. What sort of — what sense are you getting from your customers, meaning developers, what are they telling you about possibly taking part in 15 gigawatts of auctions across '27 and '28?

Ilya Hartmann executive
#24

Yes. That is quite an intriguing manner of posing that question. It's a distinct angle, since naturally it hinges heavily on the places where your customers' projects sit. Consequently, those kinds of factors naturally have quite varied consequences for a particular area, a particular wind region. So in that respect, naturally you won't get a uniform opinion regarding the new legislation. Naturally, everyone is advocating for improved terms, which is a normal thing to do. . Still, I believe our viewpoint, and I think the volume question then flips, I would say, considering the possibility that opportunities may not merely decline but may also rise, developers are going to need to factor those consequences into their pricing going forward. And what keeps us feeling confident in that draft is that the government has stated and has never altered that statement about raising the volume in auctions to 15 gigawatts next year and the year after. So overall, though this may be a differing view on the ground, from a broader standpoint, I would say we remain confident and above all, hoping that parliament and government now really make use of the next voting window in mid of November.

Operator operator
#25

Richard Dawson from Berenberg has the next question.

Richard Dawson analyst
#26

I have 2 questions, please. First, regarding the service business, how do you think about margins there now? You've gone past the 20% threshold. Should we begin treating the 26% margin you delivered this quarter as a new floor for that segment, and then model incremental expansion from there going forward? Is there any reason margins could deteriorate in service? And second, on the project business, just for Q3. Clearly some of that upgrade is coming through because project risk didn't materialize. Could you give a bit of background and color on what exactly those project risks were? And I suppose, looking at last year too, there were some similar effects with a margin upgrade coming through in the fourth quarter. Is it perhaps fair to say that a fairly large element of conservatism is baked into your project business? And maybe going forward, that conservatism could produce?

José Luis Blanco executive
#27

Thanks a lot for those 2 questions — really good ones. On the service business, we don’t see any rationale for margins to weaken. Given the visibility we have at present, we still expect the business to grow year-on-year, roughly 10%, with modest margin gains coming alongside that growth. That’s how we view the spec business over the long term. So no change in our thinking, and we’re glad to now be passing — moving above that 20% threshold. Getting there was always our North Star. So we’re pleased to be there. We intend to stay there. And over time, there’s potential to improve it slightly on a long-term basis. You shouldn’t expect a big improvement, because — with 55 gigawatts, you lose certain gigawatts in rotation, and you bring in 8, 9 new gigawatts. But profitability is very much set by the backlog. So the new additions don’t move profitability substantially. In the project business, I mean, we need to put things in perspective. I think we’re coming off huge impacts from COVID, huge impacts tied to the Ukrainian war. So you need to form a view. We need to form a view before guiding you on what the company would do in the year, on what the risk and chances are in running a global supply chain where a big part of your supply is in Asia, in India and China, and the majority of your delivery in Europe is now growing in North America.

José Luis Blanco executive
#28

You have to take a stance on the appropriate amount of contingency to build into project execution. What I'd say is that each year this company gets better at executing. And I'm glad to say that over the last 2 years, we observed the same pattern: the risks we assessed at the start of the year did not fully materialize, and the opportunities outweighed the rate at which risks did materialize. The pattern never changes. At the beginning of the year you have less visibility than in Q2, and visibility improves in Q3. So at roughly this point in the year, given how things are progressing and given that most of the products that affect this year's revenue have already arrived in the destination geographies, you eliminate the risk tied to logistics and to disruption. Is that what people call conservative? I wouldn't describe it that way; I think it's about making provision for the political situation in which we operate. And will we alter our view of risk and chances next year? I don't believe so. I think our plan is very much to plan in a similar way to what we're doing now.

Operator operator
#29

John Kim from Deutsche Bank, you have the next question.

John-B Kim analyst
#30

Congrats on those results. If I could, a couple of things. I'd like to focus for a bit on revenue recognition, as such. When we look at your divisions, I'm really zeroing in on projects. Turbines are slightly lower. Deliveries and installations have declined, and yet revenue has risen quite a lot. Help us break that down a bit. I realize you don't always like sales ASP as a metric. But is there a better approach to give us here?

Ilya Hartmann executive
#31

Yes, I would say when you break it down, returning to what we've discussed a number of times. Our approach hasn't changed — it's cost to cost, revenue recognition, which in our case is then largely oriented toward manufacturing. And yes, that's reflected in the nacelles. And we were down, but it's the reverse. And essentially, what isn't visible because we don't present it that way — when we carry out turbine operation, which is the tower. So tower production is up considerably, meaning that combined with what we've been turning out across the south tariffs and blades, it's simply a higher level of activity, and all of that is against binding contracts, and that's how we recognize the revenue. And revenue recognition for the installations, of course, is there but to a much smaller degree, I think that would be my breakdown.

José Luis Blanco executive
#32

Much appreciated. If I could just add to that, Ilya: we're building to the contract and getting compensated for it, but we do have to meet our contractual obligations. When installations slip owing to customer delays or certain other matters — at times it's down to us being late on, say, permits or transportation — that affects when revenue gets recognized. And then there are LDs; what we can tell you is that there are no substantial LDs for installation. So in short, we are meeting our contracts.

John-B Kim analyst
#33

Alright, shifting topics a bit. When we consider the common theme for '27, there's a fair amount of cost inflation. Could you discuss underlying like-for-like pricing — what price increases are necessary to keep your price cost stable if we were to begin taking orders in '27?

José Luis Blanco executive
#34

That's a really good question, because yes, we are seeing significant inflation in the markets where we do business, and that has an impact on labor costs as well as on the services we purchase. So far, I believe we've managed to keep pace through efficiency efforts in the supply chain, along with improvements in our products and in our operations. In a pricing environment that's stable, though it's fair to say DSP isn't the indicator — what really indicates it is the gross margin on order intake, and for competitive reasons we can't disclose that to you. But even with inflationary pressures and even with the pressure from lowering tariffs in Germany, we succeeded in protecting the gross margin on order intake, backed by efficiency measures and productivity measures, both in product and in supply chain.

John-B Kim analyst
#35

Alright, that's really useful. One final question, if I can. Let me recall what it is. Regarding your CapEx, does the character of your Q4 CapEx differ this year compared with last year? Since that's a fairly large additional amount you have to put in the ground, what exactly is it? And how does that connect to your factory loads or new production lines?

Ilya Hartmann executive
#36

Yes. So on the first part of your question, no, it isn't different. It's the same usual mix — particularly regarding execution when it comes to manufacturing, transporting, and installing them, meaning the turbines. And it's true that we're always quite back-end loaded for the CapEx, which isn't different from prior years, and last year we came down. But we reached the finish line slightly below the guided CapEx, and could that happen again, more or less, I'd say, within the same bandwidth. So nothing different in the mix and nothing different, but the truth is — and you're right, Jose mentioned it — there's heavy activity going on right now in this fourth quarter.

José Luis Blanco executive
#37

And it's ramping up to EUR 175 million, which, compared with prior years, most of the activity in Q4 came in at EUR 163 million. So for that product, the CapEx has already been put in. To get to EUR 175 million, you have to add transportation tooling, installation tooling and all of that. So — but there's nothing to add beyond what Ilya mentioned. Perhaps next year it will be somewhat higher, but we'll provide that in February when the time comes.

Operator operator
#38

Alex Jones from Bank of America has the next question.

Alexander Jones analyst
#39

Two questions, if I could. First, regarding that 10% to 12% midterm margin range — you've mentioned before that you might go above it for a while when the market is favorable. Obviously you're at the top end already, and in this presentation you've pointed to several helpful drivers ahead when it comes to volume, service, and so on. What would it take for you to lift or revise that guidance? What would you need to see before you'd acknowledge that perhaps you won't exceed it only briefly, but across a sustained period? Second, just on the U.S. market. There are clear tailwinds and headwinds — you've made some progress on certain DoD permitting, yet the Section 232 tariff uncertainty is still there. Please speak to the net effect of that on customer sentiment and the order momentum you're seeing, plus any early reaction to what may or may not shift following yesterday's election results.

José Luis Blanco executive
#40

Thank you, Alex. So on the midterm, I believe we've consistently said this spans the cycle, at least for the foreseeable future. And it's too early to comment on that. I think, first, we need to finish the budget, approve the budget in December. And early January, February, figure out how the year is looking like and guide you through the year with the information we have today, I don't think we will change that much because it's still an over-the-cycle view. Second, today, is super early because on top of not having visibility, the legislation for Germany, which is a very important market for us is in the legislative process, so this might have a substantial influence in what the midterm guidance could be. So we need to form a view as well once the legislation passes. And third, to mention and associated with the second question is U.S. I think U.S., the Section 232, so far, we've been able not to take that risk, and we still solve -- volume for us in U.S. Without that risk, what is holding back more permits is the FAA permit, Federal Aviation Administration permit. And honestly, I'm not sure if this is going to change after the election because it's a federal agency under the presidency administration.

José Luis Blanco executive
#41

I can't say whether this will shift or not, honestly. I'd like to offer you a clearer picture, but unfortunately I don't know — Ilya will back me up on this — yet I really don't know, and there's only so much we can say.

Ilya Hartmann executive
#42

I believe you mentioned that orders in the U.S. have risen across the market generally. I think you've witnessed that. But the bottlenecks are those you identify in your question, Alex, and Jose Luis highlighted them. I think the question will be that as we progress further through the process and get closer to the tax credit sunset deadline, we may see customers simply make decisions because the risk from those investigations exists. Yet on the other hand, people don't want to jeopardize their tax credit sunset deadline. So there's still a little time for people to hold off. But I guess that probably ought to shift in the foreseeable future. And regarding the effects of the elections, we reported these — I wouldn't foresee an immediate impact since nothing changes on the ground when it comes to rules and regulation. Sentiment, yes, I think sentiments, you have plenty of also democratic governance winning state governmentship and always local support helps. So there might be a push from that side, but I wouldn't claim any immediate effect on that.

Operator operator
#43

Our next question comes from Vlad Sergievskii at Barclays.

Vlad Sergievskiy analyst
#44

Alright, three questions, and I’ll go through them one at a time. The first is about turbine production compared with installation. When I look at your turbine production figures for the last 12 months, they come to roughly 9 gigawatts. Installations during that same stretch are 6.4. That leaves a gap of more than 2.5 gigawatts, which by my calculation works out to around 400 turbines. Can you help us understand where those turbines are? If they haven’t been delivered yet, they most likely have to be on your balance sheet. Which of the 11 line items on the balance sheet could those 400 be sitting in?

José Luis Blanco executive
#45

Those turbines have been manufactured, billed, settled and are generating cash. So those units show up in the company’s cash balance.

Vlad Sergievskiy analyst
#46

Are you still carrying delivery liability on those, or is there no delivery liability at all tied to those turbines?

José Luis Blanco executive
#47

Yes, we do, because the contracts are handled on a case-by-case basis, and I don't want to go into too much detail since we may be sharing confidential information, but you do have situations involving production obligations, dates, and installation obligation dates, along with liability tied to those. So the fact that production is finished lowers the project's overall liability, because 1 milestone — which is X work that you've completed, completed on time, and been paid for — is done. You still carry the liability related to installing those turbines if, for no reason, we fall behind versus our contractual obligations.

Vlad Sergievskiy analyst
#48

Great, that’s very clear. Now, if I may, my second question is about your margin. In the second quarter — Q3 was the second consecutive quarter in which your provisioning was really high by historical standards. The net increase in provisions came to roughly 4% this quarter, which is below the roughly 6% we saw last quarter, yet it remains well above the historical level. Of course, these provisions are mechanically reducing your earnings today. So the underlying figure is high. And perhaps later, should those provisions prove unnecessary, you could release them and generate additional profits down the road. What I’d like to ask is: what has changed over the past 2 quarters? And has the risk profile of the contracts you take on, or the way you handle those risks internally, changed such that this incremental provisioning has risen by a very large step and held that step-up in both Q2 and Q3?

Ilya Hartmann executive
#49

We'll address that jointly. You'll likely be discussing whether they get used going forward or not, since only what actually happens later will show if they're needed. But yes, that's a really good question. Thanks, Vlad. I'd say both quarters — arguably on the sales side, considering what we're doing — haven't exactly been peak periods. We've been selling a large number of turbines, order intake was elevated, and we're recording all of the provisions at the moment we bring in the orders. So those standard contractual warranty provisions account for the quarter-over-quarter increases. Nothing has shifted in how the mechanics work, nor in the quality or technology assessment behind those provisions. It's business as usual, so to speak, propelled by strong order intake momentum.

José Luis Blanco executive
#50

A 4% level seems reasonable to us.

Ilya Hartmann executive
#51

Naturally, when it comes to execution, our hope is always to outperform what we've delivered. Still, considering our track record and the conditions we've observed — you brought up the COVID period and Ukraine — the challenges aren't solely technological; they also involve supply chains and everything feeding into them. So we view the figure we've raised as a sensible one, yet the approach behind how we do this hasn't been altered for a great many quarters.

Vlad Sergievskiy analyst
#52

Great, that's very clear. My final question concerns the cash position and which portion of it might be available for allocation further down the road. Could you help us understand the growing gap between your trade payables and trade receivables? In Q3, trade receivables and the others came to roughly 5 days of revenue. And trade payables stood at approximately 130 days of cost of raw material. Could you discuss the reasons for such a large difference between the payment terms you get from your customers and the payment terms you offer that applies?

José Luis Blanco executive
#53

Well, that's management, I think. We try to — we're a company built around projects. So for an infrastructure company, money ought to be cheaper than for a project company. So we try to secure the best payment terms we can reasonably get. And the same, we want to work with our suppliers. I mean, the company is growing, is gaining market share, and we are becoming more attractive for vendors, which are willing to support our working capital efforts.

Operator operator
#54

<<operator_script>> Our following question comes from Sean McLoughlin at HSBC.

Sean McLoughlin analyst
#55

My question is about service. I wanted to break down that 200 basis points of margin improvement we've recorded over the last year. Is that just the business scaling up, meaning you get that much more productivity from each engineer? Is it about contract pricing and the underlying — you're essentially charging more for each megawatt you add to the backlog? Or is it really driven by field performance? I'm just trying to understand those 3 dynamics and what further gains remain.

José Luis Blanco executive
#56

I'd say it's a combination of several things. Part of it is users renewing contracts that you'd rather not renew — and that's actually a positive, since some of those contracts may have been weighing on profitability. So it comes from a blend of product-type mix and geographic mix. And it's fair to say that with new orders, selling more in Germany, or more in Turkey, or more in Eastern Europe, profitability in those geographies beats the average. So it's a mix — it's not renewing contracts you'd prefer not to renew that were dragging profitability — plus a scale effect.

Sean McLoughlin analyst
#57

Understood. And to return to what you said about delays — obviously, delays in Q2, sorry, Q3, didn't prevent profitability. So where do we stand on the clean-up? Are you still seeing delays on products in Q4 from the customer side, and are the Turkey issues now fully behind us?

José Luis Blanco executive
#58

My take is that the problem is now behind us. Yes. And that's partly why, when we discussed risk and opportunity earlier, we built certain risks into the guidance tied to blade availability in Turkey. Fortunately, we found a way out, since we could negotiate both with the government and with the customers. So we have a fix, and although installation will still be delayed, profitability won't be affected, nor will LDs as a consequence. The other one is in Germany. As a sector, Germany is going through a huge ramp-up. And during such a huge ramp-up, everyone has to adapt, the authorities included, and transportation permits represent a bottleneck across the entire industry. Up to now, we have succeeded in offsetting those delays using the buffers built into our schedules, so the projects will be delivered late, yet without moving into meaningful LD territory — LD meaning liquidated damages territory. That's point number one. Point number two: there are also customer delays, for instance in building the balance of plant and so forth. As for our view on Q4, I'd say it's similar to Q3. We don't anticipate any meaningful shift in Q4 on that front. Naturally, though, it's a very significant quarter for us ahead, both in production and in installation.

José Luis Blanco executive
#59

We’re planning a heavy Q4 installation schedule. There are 2 months left, so we’ll see whether we can hit our goal for the quarter. If we do meet that ambition for the quarter, no meaningful LDs should be paid or booked. Should we slip during those next 2 months, there could be a small effect, but we feel comfortable. We’re comfortable with the guidance—specifically the midpoint of the guidance. That’s how I’d frame it.

Operator operator
#60

Our next question comes from Sebastian Growe at BNP Paribas.

Sebastian Growe analyst
#61

I couldn't get on the call until somewhat later, so hopefully nobody has already posed my question. First, Germany. I realize it's difficult to judge how things will develop in that country next year, but I was wondering whether you could tell us how customers are interpreting the regulatory changes that are planned, and give us some insight into what you're hearing from them in discussions at this point. Also, how should we think about possible consolidation among developers and the resulting shift in negotiating leverage for at least some portions of the customer base? And finally, setting Germany aside and turning to the order funnel more broadly, with the interest rate environment having moved to the worst, could you share your high-level view of what you're seeing — do you see book-to-bills coming under more pressure? Or does the overall pipeline still look pretty volatile this year — asset excluding Germany.

Ilya Hartmann executive
#62

Ilya, yes — a fairly similar question actually came up before, and now you're asking how our customers view the German legislation, that short in the second go. So reactions are mixed, because — and I'll repeat what I've said from where we stand — for us that isn't so critical, since we look at the total market volume, and there are so many more permits that you recall volume in the market; even if, as announced, the market volume and options increase, there are still so many more permits. So for us, that's a different part of the equation. For the customers, it really depends on where they sit, where their project sits, where their wind regime sits, but also — and that goes to your second question about potential consolidation, and I don't want to speculate. But of course, the more you have to stretch your development assets and the more creativity you must add, there might be something that people had already expected for years — that there might be a certain consolidation. I don't think we've seen too much of that in so far. But of course, then the new law is not yet the law.

Ilya Hartmann executive
#63

That said, I'd add that for certain developers this new legislation could prove quite challenging. Even so, the auctions had already been producing winners, which is simply how an oversubscribed auction works, and it's too early to say anything about consolidation. With that, Jose, perhaps you'd like to cover the remaining items.

José Luis Blanco executive
#64

Yes. I'd say the funnel looks solid. It's true that capital costs have risen substantially compared with a year earlier, but it's also true that in the markets we serve, there's a growing perception that onshore delivers a lot of value to the electrical system and, for new capacity additions, is the most competitive option, or amounts to that. I mean, solar in some cases seems to be struggling, perhaps because of cannibalization. But that might be solved on a daily basis; it doesn't solve the seasonality issue of generating electricity in winter, in fall, and in early spring. So as a sector, I think there's a shared understanding that offshore is a highly competitive new addition. And when something is very competitive, even if costs go up — whether it's capital, inflation, or whatever — the market should in theory be able to absorb that without losing sight of the fact that it remains the most competitive new addition to the electrical systems in the markets where we operate — well, maybe not in the south of the U.S., but in most European markets and the north of the U.S., and so on. I think that's the feedback our customers give us.

José Luis Blanco executive
#65

So it matters. The capex has gone up, but they aren't overly worried about it. I'm not sure — you may see it differently.

Operator operator
#66

William Mackie from Kepler Cheuvreux has the next question.

William Mackie analyst
#67

I'd like to take a step back and look at product development over the coming 3 to 5 years. Your portfolio today is mostly turbines in the 4 to 7-megawatt class. But thinking about the next 3 to 5 years, where do you see the biggest cuts in customer cost of energy coming from? Do you expect that to come from bigger turbines and rotors, or from refining the platforms you already have? And I ask this given that, I believe, in the last 6 months we've seen 4 or 5 product launches — a couple from you and your Danish competitor, but also from Chinese competitors. So it's framed around where the next wave of innovation is headed.

José Luis Blanco executive
#68

Thanks a lot for that question, really. Over the next 3 to 5 years — I mean, we launched the N175, if I'm not mistaken, 4 years ago, 5 years ago, and it still isn't the company's best-selling product. So the company's top-selling product remains the 163, which came out 9 years ago. So what I believe we'll see is the N175 picking up internal market share within the product portfolio. The 149 stays stable, since it's going to be long lead-time permits across several geographies — in France, in many geographies. It's a receivable product, but hopefully it will remain for the next 3 to 5 years. So once we lose internal market share, the 175 will gain it, and the 193 will slowly take over. So honestly, I don't expect products in the field in substantial amounts, nor any product different from the ones we've publicly announced today. So I might be right, I might be wrong. But over the next 5 years, I don't think Nordex is going to install products other than the 149, 163, 175, 193 in the different drivetrain configurations. That's — I could be wrong, and maybe some competitor launches something different, and we'd need to accelerate, or — but this is how we see it, lately.

José Luis Blanco executive
#69

And the U.S. will follow the same pattern. In the U.S., we're going from 149 last year to 163 this year. Actually, 175 installed in the U.S. So within the product portfolio, we'll see a shift in product mix.

William Mackie analyst
#70

My next question is about the pricing outlook. You called pricing stable. Clearly, mix affects the absolute number a little, but you're aiming for growth in APAC as well as North America—especially perhaps when we get to APAC, where you have a presence competing against Chinese manufacturers. So I suppose the question is: how do you maintain pricing and the longer-term positioning of returns as you enter markets where competition may be greater? And when you face that competition from Asian players, what makes you successful? Is it bankability, service capability, or in many U.S. cases, obviously, restrictions on market access? But I wonder whether, specifically in Asia Pac, you can keep winning on measures other than price.

José Luis Blanco executive
#71

Yeah, on APAC for now — and that's a view we probably should have made clearer. Sorry about the confusion there. When we say APAC, we mean Australia and New Zealand. Chinese competitors are present in that market. Yes, they are. But pricing and margins — or rather, margins don't differ from what we see in our average geographies. That's how we're reading that market so far. As for the rest, we haven't yet made a call on expanding into other countries in the region; right now it's Australia and New Zealand, and there we see average margins.

Operator operator
#72

Our next follow-up comes from John Kim at Deutsche Bank.

John-B Kim analyst
#73

Could you give us some color on what you’re seeing in German installation dynamics? I believe the last time we talked, you were saying truck permits were an issue. Are there any levers or measures the German government is throwing at this to kind of unlock deliverability here? How should we think about delivery cadence next year versus this year, again, kind of specific to Germany?

José Luis Blanco executive
#74

Yes. I believe that, quarter by quarter, we're raising both the number of units we move to sites and the number we install in Germany, and we expect that pattern to carry on through next year. Since this is an industry-wide issue, we are of course working alongside our competitors, the government, and our customers via the association in order to address this sector bottleneck. The government has therefore been competitive in grasping the challenge, and we are exploring with the government various approaches for reaching sites by waterway, which the government also asked for, in an effort to reduce the impact on citizens on the highways. So we're working with the sector and with the government to try to get the job done.

John-B Kim analyst
#75

Okay. And then a separate follow-up question. Could you give us an update on Spain as a market, especially regarding repower opportunity — is there any movement there?

José Luis Blanco executive
#76

My take would be that things have been pushed back. There are decent opportunities out there, though a major RevPar surge isn't visible at this point. In my view, the legislation granted additional time for projects won at earlier auctions to get built, not the earlier auctions that were retaxed — extra time was provided, and that has had a knock-on effect: customers are postponing their procurement choices since they now have more time to construct those projects.

Operator operator
#77

That brings us to the end of the Q&A. At this point, I’d like to return the floor to Jose Luis so he can offer any closing comments.

José Luis Blanco executive
#78

Okay, thank you everyone. And as always, let me wrap up with a few main points about this third quarter. First, we kept delivering steady margin gains, with an EBITDA margin of 12.7%, and order intake grew into new markets like New Zealand and returned to the U.S. with larger volumes. That gives us confidence in our path through the rest of the year. Second, we're still generating strong free cash flow, with EUR 379 million in free cash flow during the third quarter. That sets us up for a robust fourth quarter on cash flow. And third, we've lifted our guidance for '26. With that, we're close to reaching the upper end of our midterm target and, hopefully, a solid base for more growth next year. So once again, many thanks, and I wish you a great rest of the day. Thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nordex SE transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Nordex SE earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.