Rocket Lab Corporation (RKLB) Earnings Call Transcript
November 9, 2026
Earnings Call Speaker Segments
Good day, everyone, and thank you for joining this conference call, where we'll cover Rocket Lab's financial results for the third quarter of 2026, along with business highlights and other updates. Prior to starting, please note that remarks today might include forward-looking statements regarding how the company will perform in the future, and those statements are meant to qualify for the safe harbor protection from liability set up under the Private Securities Litigation Reform Act. No statement of that kind is a guarantee of future performance, and the factors that might affect our results are emphasized in today's press release, while additional ones appear in our filings with the Securities and Exchange Commission. These statements rest on information available to the company as of today's date and are subject to change as future developments occur. Other than where the law requires it, the company takes on no obligation to update such statements. Today's remarks, together with the press release, also include non-GAAP financial measures as defined by Regulation G enacted by the SEC. The release and our supplemental materials include reconciliations of these historical non-GAAP financial measures to the comparable financial measures calculated under GAAP. This call is being webcast as well, with a supporting presentation, and a replay plus a copy of the presentation will be posted on our website. With us today are Rocket Lab Founder and Chief Executive Officer Peter Beck, along with Chief Financial Officer Adam Spice; they will go over key business highlights, covering updates on our launch and Space Systems programs and our pending acquisition of Iridium Communications, and then financial highlights and outlook. After that, we'll open the line for questions; so with that, I'll hand the call over to Peter.
Thanks, Murielle. It was a fantastic quarter, with records set across every part of the business. Revenue came in at $268 million — that's 73% higher than the $34 million we reported in the same quarter last year, and it's also above Q2. That makes it the sixth quarter in a row of record revenue. Our Q3 earnings backlog hit an all-time high of $3.57 billion, covering 117 launches and more than 55 spacecraft. And since the quarter closed, we've locked in further launch and Space Systems contracts. As we head through the last months of the year, I want to recap what we achieved in 2026 to give some context for our growth. Go back just six years, and our annual revenue at that time was under 4% of what we expect to earn this year. In 2020 we generated $35.2 million, and today our full-year 2026 guidance stands at close to $1 billion. Gross profit margins have come a long way too — they were negative in 2020, and for 2026 we're projecting a GAAP gross margin of roughly 35%. On a non-GAAP basis, we expect margins in the 40s, which amounts to a gain of more than 69 percentage points versus 2020. In an industry where execution and reliability truly matter, Rocket Lab has continued to deliver for its customers, and even as we grow quickly, we keep raising the bar each and every year. Let me take you through the numbers business by business, beginning with the highlights from Space Systems. Year to date, we've booked $688 million in new contracts, up 319% compared with 2025. As of today, Space Systems carries $1.7 billion in backlog, representing 48% of the company's total backlog. In the past quarter alone, we signed $470 million in new space system contracts — a 51% increase from the same period last year — and that puts this year's growth at an incredibly strong level. Operationally, the team has performed at a high level: 12 satellites built by Rocket Lab launched over the last 12 months, including missions for NASA, the Space Force, and large constellation operators. Our clean rooms and factories are extremely busy right now — we have more than 55 spacecraft in development or under construction. On the satellite components side, nearly every team has exceeded its annual goals and boosted output; we're shipping more essential hardware and subsystems than ever before, supporting customers' science, national security, and commercial programs. As the title suggests, launch demand this year has been remarkable. In Q3 we booked the two largest bulk orders — commercial and defense — in company history: 18 launches for Space Force Systems Command and 20 Electron launches for Susceptive, a commercial customer of ours for many years. Neutron also posted its strongest quarter to date in Q3. We signed eight launch agreements totaling roughly $515 million, and that number covers multiple missions priced at a new, higher base of $70 million each. Two factors are fueling this demand: launch capacity worldwide is tightening, and customers believe Rocket Lab is the right partner to ease the global launch bottleneck. Strategic acquisitions also hit a record level this year, bringing new capabilities and technology into our portfolio — including laser communications, robotics, payloads, and machine capability. Iridium will take us even further, turning Rocket Lab into a genuine end-to-end space company — one that doesn't just build and launch spacecraft but also owns and operates its own constellation, creating recurring revenue and growth opportunities for future space services. On Space Services, I earlier called running our own constellation "space applications." From here on, though, we've changed the terminology so it better reflects the integrated, end-to-end services customers will receive once Iridium is part of Rocket Lab. This quarter we made strong progress toward finishing the Iridium acquisition. The deal is now fully funded — the ATM was completed in Q3 — and we've secured Iridium's credit facility for the period after closing; that leaves us well positioned, with no extra capital needing to be raised to close. We reached another key milestone when Iridium's shareholders voted overwhelmingly to approve the transaction; we're now in the final stages, securing the regulatory approvals required. That process is progressing well, and we're working hard to close on schedule. The FCC's swift approval of other deals lately shows the commission's proactive and decisive approach and its commitment to enabling the fast pace of innovation the space industry needs. We look forward to working with the commission as we build toward a generational space company in an exciting new era. Now let's turn to Space Systems' operational achievements. Over the past 12 months, 12 spacecraft that Rocket Lab built have launched and are currently operating on orbit, spanning work in national security, planetary science, and commercial constellations. More are coming, since over 55 spacecraft are at various stages of development and production. Among them are vehicles for the Space Development Agency's PWA, several permissions for NASA and the Space Force, and programs serving commercial constellation operators. Our clean rooms have never been busier, and with more opportunities ahead, we expect that momentum to continue. Now let's turn to launch for the quarter. What a fantastic slide. At the start of this call, I mentioned the record growth we've seen this year, but Q3 has truly stood out. Over $1 billion in launch contracts during just this quarter — a 512% increase from the same period last year. No other commercial small rocket flies as often as Electron, and customers keep booking with us because they recognize Rocket Lab has the proven history, the technology, and the team needed to carry out their missions. They get it too — Neutron is precisely what we intend to deliver, and our manufacturing capability can support that cadence as well. Thanks to our skilled production teams and efficient operations, we're currently producing a record number from the factory at roughly one every 8 working days. That production capacity lets us absorb spikes in custom demand like the ones seen in Q3, and we can meet tight deadlines for rapid response missions while maintaining the launch cadence our customers rely on. Electron is nearing its 100th launch, which we expect to happen in roughly the next week. As the graph shows, that puts Rocket Lab on track to reach 100 launches faster than any other commercially developed rocket in history. It's an unprecedented milestone for a commercial small lift orbital rocket and a threshold truly crossed in modern space flight. What matters most to both our team and the people we serve is this: across over 99 launches, we've achieved a reliability rate of 96%. Few competitors can claim that kind of powerful combination, and that's the experience we're carrying with us as we move into Neutron. Speaking of which, here's where Neutron stands for the quarter. After we gave our update on Neutron Stage 1, we shifted our first launch time line to 2027, following the discovery of voids in the propellant tanks for done. The team has genuinely surged to build a replacement part. The AFP machine has eliminated a new Ford dome. The structure has finished curing, and what we found is a good, clean forward dome that's set to go into assembly alongside the remainder of the Stage 1 tank; it feels good to have that issue resolved at this point.
The mid assembly for the Stage 1 tank is now fully stacked. That work covered a sizable barrel section as well as the common dome housed within it, which serves to keep liquid oxygen apart from the fuel tank. Our focus now moves to completing the Ford assembly and the art assembly — the latter being a dome placed inside barrels, quite similar to the mid assembly. Once both of those are done, all 3 assemblies combined form the Stage 1 tank. The team is pushing hard to wrap up that effort as quickly as possible, and afterward the tank will undergo a round of hydrostatic tests at the Neutron factory. After that, it is transported to launch complex 3, where a cryogenic call campaign is conducted, and then we mate it with the remaining major vehicle assemblies already present in Virginia. Regarding Stage 2, the suspended stage that hangs within Stage 1 reached launch complex 3 a short time ago and has completed several pretest activities before proceeding into cryogenic proof tests. When those are finished, Stage 2 proceeds to wet dress rehearsals minus an engine, allowing us to test the stage early and in its by configuration. We're going to bring the stage up to flight-level propellant loads and run the valves through their check cycles to verify the stage is completely functional, and we'll also test how we hand off from ground control to the stage's autonomous flight computer during terminal count; after that we install the engines, integrate them, and go through additional testing before proceeding to static fires. The first flight hardware item on the LCI launch mount itself is the Neutron thrust module. It goes from the Neutron factory to Wallops Island to the launch mount in under 48 hours. That's the advantage of having our facilities close together in Maryland and Virginia. Just like with Stage 2, we're going to put the Neutron thrust module through some really crucial early tests before the engines are installed. In the zone configuration, Neutron sits on the launch mount without a strong back, which means the thrust module is the sole physical connection between the rocket and the pad. We'll be verifying the Launchpad Mount holddowns and release systems, checking quick disconnect operations, and after that running pressure tests along with propellants to make sure every interface works properly with the pad. This really showcases our parallel path development strategy — methodically reducing risk on the pad and ground systems right now so that when the full vehicle is finished, we have a direct and efficient route to integrated testing. Now regarding our commutes engine: we're still making substantial headway toward completing it. Recently we ran cold box testing using the Arcomittee's vacuum variant for Stage 2, which involved subjecting the engine to the same severe cryogenic conditions it will face during the Stage 1 flight, so we could confirm its valves, seals, igniter and turbomachinery won't freeze up or leak. Coming through that test successfully brings the < > campaign nearer to completion and gives us strong confidence in the AVEC engine and its reliability for multiple restarts on Flight One. That technical maturity is paying off in a direct way as we build the engine set for Flight 1, along with the engines that come afterward for Flight II, Flight II, and beyond. At the same time, we're exploring how to boost our output of committees more quickly after flight 1 so we can meet the high launch cadence demand we're seeing. The huge jump in neutron bookings this quarter is the clearest signal yet of where the launch market is headed. We booked 8 missions worth roughly $515 million, and several flights sold at a higher base price of $70 million per launch. All 16 of Neutron's initial flights are already spoken for, and the earliest openings now fall in the 2030s — that's counting the capacity we're holding back for our own future-based services missions too. Launch capacity is extremely tight, which is exactly the situation we predicted. We anticipated this backlog building in the launch market. So rather than sell early flights at a discount, we chose to bring a rocket to market where demand is enormous and charge full price or more. Our manifest of 4 ahead of flight one shows precisely how that's played out. Despite the extra time we're taking to get to first flight, customers have confidence that Rocket Lab will deliver and that Neutron is the vehicle they want. That wraps up the operational highlights. I'll now hand things over to Adam, who will walk us through the financial overview and outlook.
Thanks, Pete. Third-quarter 2026 revenue reached a record $267.8 million, topping the $250 million to $265 million guidance range we'd given before and equating to 73% growth compared with a year earlier. On a sequential basis, revenue climbed 14.4%, and both business segments pitched in strongly, underscoring the momentum carrying through the business. Within the quarter, our Space Systems segment generated $214.8 million in revenue, up 13.3% sequentially. That gain stemmed chiefly from ongoing scaling of our satellite platform business, along with full-quarter contributions from our laser communications and Robotics acquisitions; we additionally recorded sequential organic growth in our other component and software businesses. Space Systems continues to deliver outstanding results and provides diversification next to our strong launch business, which can be uneven from time to time. At the same time, revenue in our Long Services segment reached $53.1 million, up 19% quarter over quarter, thanks to 2 additional point-in-time electron missions, in which the entire value of the launch is recognized at launch. Moving now to gross margin: GAAP gross margin in the third quarter was 33.6%, exceeding the 29% to 31% guidance range we had given earlier. Non-GAAP gross margin for the third quarter was 38.4%, which came in above our earlier guidance range of 35% to 37%. As we had signaled in our Q3 guidance, margins came down from the prior quarter. The main reasons were the first complete quarter of contribution from Mynaric, the acquisition we recently closed that adds laser communications to what we offer, plus the absence of tariff refunds that had lifted Q2 margins. Even so, the drop turned out smaller than we expected. That was because our component businesses delivered better profitability than anticipated, led by solar and the optical systems from our GEOs acquisitions, and because launch results were favorable, thanks to lower production spending and positive absorption from a higher electron launch and build cadence. As we noted earlier, it will take Mynaric a few quarters to get to target margins while we align its cost structure, scale production and put the Rocket Lab operating system in place. In addition, we booked a forward loss reserve on our Neutron Flight II launch vehicle. That reflects how early-stage the vehicle is, along with the associated initial launch capability and how that may affect whether this particular flight turns a profit or not. On a related note, we closed Q3 with 1,728 people in production-related roles, a 40% increase over the previous quarter. Now to backlog. We finished Q3 2026 with total backlog of roughly $3.6 billion, which is up 52% quarter over quarter from about $2.4 billion at the close of Q2, with launch backlog making up approximately 52% and Space Systems accounting for 48%. During the third quarter we executed a large number of agreements in launch and Space Systems, which lifted our backlog to 117 launches plus more than 55 spacecraft, and that has made 2026 an extraordinary period of backlog expansion so far. As Pete noted, we booked 54 launches during the quarter, and 8 of those were Neutron deals, spread across multiple contracts at a newly escalated base price of $70 million. That highlights how demand is rising and how scarce medium-lift launch capacity has become. Order flow in our launch base systems is typically uneven in nature, since the timing of larger, high-impact program opportunities shifts around. Even with that, backlog has grown while we are recognizing revenue at a run rate that is substantially higher. We continue to pursue additional contract opportunities that could move the needle, and we think those will allow us to keep backlog at healthy levels while revenue continues to scale. Going forward, we expect about 32.9% of our current backlog to convert into revenue during the next 12 months. Beyond that, we continue to gain from relatively quick-turn business in our launch and Space Systems components businesses, which contributes extra top-line revenue beyond the conversion of the existing 12-month backlog. Turning to operating expenses. GAAP operating expenses for the third quarter were $169.3 million, which was above our guidance range of $143 million to $149 million. Non-GAAP operating expenses in the third quarter totaled $130.2 million, slightly above our guidance range of $121 million to $127 million. Higher GAAP operating expenses than we had guided to were primarily the result of transaction costs from the pending Iridium acquisition. Those included a $9.4 million charge connected to the change of control of Iridium's existing Term Loan B facility, which closed during the quarter. When we issued our Q3 guidance, though, we couldn't estimate or predict either whether that would succeed or what it would cost. Within R&D, GAAP expenses rose $16 million from the prior quarter, and non-GAAP expenses climbed $17.2 million. The main driver of those increases was Neutron Flight — development and production work. In particular, that means engine production and carbon composite structures as we move toward launch. Research and development staffing finished Q3 at 1,084 people, down 3% versus the previous quarter. Within SG&A, GAAP costs increased by $11.2 million quarter over quarter, whereas non-GAAP costs declined by $2.8 million. The rise on a GAAP basis in SG&A stemmed mainly from transaction fees tied to the pending Iridium acquisition I referenced earlier. The non-GAAP SG&A reduction largely reflected early gains in capturing cost synergies from our Mynaric acquisition. SG&A head count at the close of Q3 stood at $447, a 5% increase from the prior quarter. To sum up, overall head count finished the third quarter at $3,259, which is 42 more heads than the previous quarter. Moving on to cash. Capital spending on property, equipment and capitalized software licenses came to $31.1 million during Q3 of 2026, which was $5 million higher than the $26 million recorded in Q2. The uptick reflects our ongoing commitment to Neutron, encompassing the return on investment recovery barge along with launch and testing infrastructure. As we move closer to Neutron's first flight and toward production, we anticipate that capital expenditures will stay elevated while we put money into testing, production scaling and infrastructure expansion. On a GAAP basis, EPS in the third quarter showed a loss of $0.12 per share, versus a loss of $0.08 per share in the second quarter. The quarter-over-quarter widening in GAAP loss per share came mainly from transaction costs booked in SG&A and other income — largely tied to ending the bridge loan commitment for the pending Iridium acquisition we mentioned earlier. We also spent more on neutron engine prototyping and on composites for the Flight 1 engine set and the Stage 1 tank rebuild. Neutron spending should stay elevated until first launch — reflecting engine materials and the team's labor run rate as costs move toward subassembly test campaigns and vehicle integration. GAAP operating cash flow came in at positive $7.2 million for the third quarter of 2026. That compares with a use of $84.1 million in the second quarter. That change is largely driven by higher milestone payments on satellite programs, which tend to be uneven and are getting bigger over time. Similar to the capex pattern we covered earlier, cash usage will remain high because of neutron development and new Trent tail output as we expand the business and buy longer lead items for our SDA programs. In total, non-GAAP free cash flow — which we define as GAAP operating cash flow minus purchases of property, equipment and capitalized software — came to a use of $23.9 million in Q3 2026, compared with a use of $110.1 million in Q2. Cash, cash equivalents, restricted cash and marketable securities finished the third quarter at roughly $4.7 billion.
That sequential liquidity gain came from proceeds on sales of our common stock through aftermarket equity offering programs, bringing in roughly $2.4 billion in gross proceeds via the issuance of 36.8 million shares, and that program wrapped up in September. Along with Iridium's amended term loan facility plus our available liquidity, these proceeds cover in full the cash consideration and other funds needed for our pending acquisition of Iridium, which let us terminate the $3.6 billion bridge facility commitment. We ended Q3 positioned strongly to carry out both organic and inorganic growth initiatives, including deeper vertical integration of our supply chain, broadening our strategic capabilities, and growing our addressable market, in line with what we have done successfully before. Our adjusted EBITDA loss in Q3 2026 was $18 million, which sits near the bottom of the $17 million to $23 million loss range we had guided to. The $9.2 million sequential increase in that adjusted EBITDA loss stemmed primarily from higher R&D investment in Neutron. With that covered, let's move on to our Q4 2026 guidance. For the fourth quarter, we anticipate revenue in the range of $270 million to $290 million. At the midpoint, that reflects 4.5% growth quarter over quarter and 55.9% growth versus the same quarter a year ago. We anticipate robust growth in launch revenue, driven by an uptick in both point in time and overtime revenues, partly offset by a decrease in Space Systems. Within Space Systems, we anticipate a pullback in solar and satellite platforms after the really robust Q3 we just delivered, while the remaining Space Systems businesses ought to grow. On a GAAP basis, gross margin should land in the 34% to 36% range, and non-GAAP gross margin should come in between 39% and 41%. We look for margins to rise sequentially, helped by a better mix between launch and space systems as well as within Space Systems itself. For the fourth quarter, GAAP operating expenses should fall between $162 million and $168 million, with non-GAAP operating expenses between $136 million and $142 million. Those sequential increases stem largely from neutron development, testing and readiness work leading up to Flight 1. Our outlook still calls for a spending shift away from R&D toward Flight II and the neutron production inventory that follows, and that's a promising indicator of progress as we get nearer to the new trans first flight; it also underpins our route to substantial operating leverage and positive cash flow down the road. For the fourth quarter, net interest income should come in at $45 million, which largely reflects our elevated cash balance; we anticipate the fourth quarter adjusted EBITDA loss will land in the range of $14 million to $20 million, and basic weighted average common shares outstanding should be roughly 681 million shares. Lastly, as in prior quarters, we expect negative non-GAAP free cash flow in the fourth quarter to stay at elevated levels. That performance came from continued spending on neutron development and from expanding production; to sum up, the third quarter represented yet another period of solid execution. Revenue came in above our guidance, gross margins got better, our backlog hit a record of $3.6 billion, and we maintain strong liquidity to support upcoming growth efforts. We expect this momentum to continue. Our guidance points to faster revenue growth as our satellite platforms business expands and Neutron gets nearer to its first flight. We continue delivering on each metric, and we are positioned to generate substantial value in the future. Lastly, here are some of the investor events we will be attending during the next few months. With that, we'll hand the call to the operator for questions.
Hey, everybody, and good afternoon. Congrats on the quarter and the backlog. Pete, I'd like to begin with Neutron, if I can — last quarter we asked, I believe, what the path to 10 neutral launches looks like once we get past the first one. So now that the first Neutron launch has slipped a bit, how do you view that road to 10 neutral launches? And how soon could we realistically get there?
Andre, good to talk with you. Yeah, obviously we keep going back to that 135, and I'd say right now there's a lot of intense scrutiny on it. A lot of what we've been doing behind the scenes through this stretch of some of these delays has been aimed at strengthening our ability to raise that rate. So I think we're aiming to do better than that rate. And as you can see, we have a very large backlog that's starting to show through. So I don't think we're ready to revise those numbers yet, but a tremendous amount of work has gone on in the background on how we can raise that rate so we reach flight 10 sooner.
Great, that helps a lot. Thank you. Perhaps one quick thing for Adam as well. On the backlog, it's really encouraging to see that material go up again. I suppose we could call this the year — really my question is more about ASPs at launch. So if I understood you right, I believe you said that future neutron ASPs are going to rise to roughly $70 million, which is exciting; so my question on that is how should we think about electron and haste launches perhaps for next year and beyond? And could there be a chance to raise ASPs here, given how constrained launch capacity remains across the industry?
Yes. No, that's a fair question, Andre. So I'd say, just so we're clear as well, Neutron pricing isn't heading to 70%, it is at 70%, correct? So some of that has already gone into backlog at that price; so from here, I'd say the price logically moves up from that new — from that new baseline. As for electron and haste, I think some of those same forces are at work that Pete mentioned during his prepared remarks, about demand having never been stronger and us now being the leading launch provider in that small dedicated launch segment. I mean that's simply becoming more and more of a fact. I think when — if I look at where we are now and where the demand for Electron is coming from, I don't think I would necessarily have predicted we'd be in this new growth wave. It seemed like things were growing very nicely, and then demand took another leg up. And with that, you should expect pricing to rise as well. And we're beginning to see that show up in the backlog too. So I think you'll see price increases across electron and haste. And Haze is now representing a bigger and bigger piece of our backlog, which naturally comes at higher ASPs. So I think the combination of lifting prices across all of our launch services will start to become more evident in the model going forward; so I feel very good about where we stand.
I'd like to ask about Orbital Data centers. In the past, I think you guys have probably been somewhat more skeptical than certainly 1 company out there. And with this midterm election in the U.S., which many people suspect could slow down the terrestrial build-out — what's your latest thinking, I guess, on what you could potentially do on the Space Systems side overall? And would you expect interest to increase going forward, just given what happened last week?
Yes, Edison. So like you say, we've always kept a healthy level of skepticism — but I'd say we've always been bullish certainly on defense-based orbital data centers. And also, clearly, I've been wrong plenty of times. So we certainly weren't going to cut off any opportunities for ourselves, which is why we developed and brought to market the new silicon cell for orbital data centers. Obviously, we have a normal data center customer for a neutron vehicle. And I'd say that, like everybody else, we're doing our fair share of work around that opportunity. So we certainly haven't written it off, and we're monitoring all of the events; and like I said, doing our work to make sure that if we're able to gain conviction, then we're in a really good place to be able to capitalize on that.
Got it. And let me ask one more thing on that. When you consider the architectures for data centers out in space, what would you say are the biggest engineering or technical hurdles? Or is the issue more on the economic side?
Yeah. For me, it comes down to economics. Several critical things must fall into place for those economics to work out, and those critical things are incredibly hard. So yeah, I believe major technological breakthroughs are needed to make the economics viable. If you're talking about placing smaller data centers, or data centers at a small scale, in orbit, I think that's entirely achievable. That's why we're quite bullish on orbital data centers for secure communications or defense applications. I think it will certainly happen. But moving every data center off earth and into space, I think there are a few challenges to work through there.
Congratulations on hitting 100 launches of the Electron quicker than anybody else, even outpacing the Falcon 9. Clearly, so many years down the line, Falcon 9 is now performing launches at roughly that rate per year; so I thought this was a good point to revisit the multiyear forecast for Electron launches; and might you also touch on how the growth prospects for Electron shift as time goes by, eventually in tandem with Neutron.
Yes, John. Well, we still have more to do. Give us a chance. But the Electron, clearly, isn't a viable vehicle. So the major breakthrough for achieving very high cadence, naturally, is reusability. Even though, as you can tell from our factory and the production rate we currently have, we're able to turn out a small number of those, next year is going to be a major one for Electron. We've got an enormous manifest booked for Electron, and we don't expect that to taper off — particularly in this market, given that other rideshare providers are disappearing, which naturally makes Electron the next sensible option. So we're seeing really strong momentum there. The good part about Electron, though, is that it was built with manufacturability in mind. As you can see, we're turning out one every 8 days — no technological feat is needed to double, triple, or reach whatever multiple — at this stage, it's simply a matter of replicating additional factory lines and similar steps. With our pads, you can see we have several pads worldwide, so we're well equipped on that front. So I think there aren't many constraints on electron, and there never really have been; it's about how quickly the market will grow and evolve to whatever cadence that ultimately ends up being.
That's excellent. I appreciate that. And could I maybe ask something a bit different, specifically about the supply chain? There are a huge number of satellites being developed and built. Obviously, launch cadence keeps increasing too. I just wanted a temperature check on the space supply chain — is anything emerging as a problem that ought to be on our watch list?
Yeah. I mean, not really for us, since we're so vertically integrated; we handle so much of our own supply chain ourselves. So in our case, the things we're probably concerned about differ from what others building satellites and sourcing components from us and elsewhere are worried about. And for us, because we're turning raw materials into finished products, it's more about raw materials. There are certain critical minerals and so forth that remain a challenge across a number of industries. But I think when we look across our supply chain, it really extends all the way down to raw materials rather than any specific items.
Yeah, Peter, Adam, and Murielle. This is kind of a big-picture question, but clearly we've all read a fair amount about launch availability getting tighter later this decade; from your perspective, though, what do customers actually see in Neutron that makes them confident enough to commit to these launches before first slide? And then we can get into mission fit and the technical due diligence. And obviously, the 96% mission success rate, but maybe — are there things they clearly have access to, information and access to you folks, that we just can't see in the public domain, that you could speak to more, that obviously, it's very impressive to see 16 new < >. Got anything on that?
Yeah, Jan. Basically, when you get right down to it, only two commercial firms have actually built a vehicle, launched it commercially, and scaled up — SpaceX and Rocket Lab. So when people come around — nobody purchases a rocket from a brochure — they visit us, tour the factories, head out to the pad, and we're completely open about how development is going and where things stand. That way customers can build confidence by seeing it for themselves. Honestly, this sector has plenty of examples of sloppy follow-through, and we've put real effort into earning a name for the opposite.
10, that’s helpful. And if I can, one quick follow-up. Regarding 2027 — I realize you’re not giving guidance on that yet — but from a launch standpoint for Haste and commercial Electrons, is 20% growth roughly the right frame? And clearly, one-third of the backlog in the prior quarter was Haste, which is very appealing from a revenue recognition standpoint; and maybe also a remark on Still Try To Launch, and hey, specifically, it seems like most of Market and that program sit in the base budget. So could we take it that there’s very little reconciliation risk for Haste?
Yes. I suppose I can handle the first part. So on the launch CAGR, I don’t see any reason to believe that continuing at 20% is truly at risk. As we mentioned earlier, we’re seeing demand keep growing; so in my view, growth should be better in many respects next year than what we saw going from 25% to 26%; so all the demand dynamics are present, the pricing dynamics are present, and now it’s simply a question of execution — though we also need to remind people that execution has 2 dimensions, correct? We must have the rockets ready, certainly, but our customers also need to have their payloads ready. And frequently in the past, when there’s been a slight hiccup in launch cadence during any quarter, the real cause hasn’t been the rocket failing to be ready — it’s that customers will have, understandably, issues at the final moment; they run their spacecraft through the last set of tests and something might not meet their expectations, so they have to send it back through testing, and that can lead to delays. So I think what helps us mitigate that is having such a robust backlog of missions that we can — and sometimes we enjoy the luxury of being able to swap around a few missions and still maintain our cadence. But it truly comes down to 2 components. And again, I’m very comfortable that all — this won’t be a demand challenge. Hopefully, our customers won’t create delivery challenges. And I believe our production teams will be able to deliver the vehicles next year to grow even faster than this year. Yes; and then .
Regarding the Host on MACT items, no reconciliation-type risks are apparent to us. Those programs have been around a long time and enjoy fairly bipartisan support. So I'd say the risk is low.
Andrew Steiner here, filling in for Ron. I wanted to revisit the topic of launch capacity. Q3 backlog along with neutron launch prices going up, I think, did a nice job of illustrating how tight capacity is. But now that the satellite operator has said it will build a ROCCAT, it looks worse than perhaps people thought — or at least worse than I thought — is that a reasonable conclusion to draw from AST's announcement last week? And also, how do you view a new launch provider without a track record coming into the market as a possibly viable competitor?
Yeah, Andrew, I was hoping nobody would pose that question. So the — look, launch capacity is extremely constrained, as you can sort of see. And in a lot of ways, we're pulling for everyone, because even when we bring new train to market, it won't meet the demand that's needed. . So — and also 50% of new diners for everybody else and 50% is for us. So I think we've always held to the thesis that the big space companies of the future are going to have their ability to launch their own stuff. And I think this is sort of playing out.
Understood. And I suppose this goes in another direction entirely. It was encouraging to see operating cash flow in Q3. Given higher launch prices, how should we think about cash generation moving forward, excluding Iridium? And once Iridium is fully integrated into the business, what does the ultimate cash generation profile look like?
Yeah, so look, I think that higher prices for Electron are definitely helping. I think bringing in the deposits for Neutron launches is helping too. But until Neutron is truly in production, nothing is really going to, I'd say, permanently turn around the cash flow negativity, right? So I think that's why all eyes are on Neutron — getting it to the launch pad, successfully through its first test flight. And then scaling into production. I think that's really — we've said for a long time that we probably become cash flow positive roughly 6 months or so after Neutron flies, right? Because that's the point when things have really shifted into production. Now obviously, that changes quite dramatically once the Iridium acquisition closes, because they already come with strong cash flow; and we've got plenty of interesting ideas to improve on that, obviously. But I think that, again, what we're focused on right now is how do we scale our business and turn it into a cash flow positive one, and really all of it hinges right now on Neutron. There's not quite yet enough scale in Space Systems, although the business is scaling very, very nicely, to offset a pretty significant lift for Neutron. And that's just the nature of bringing a new product like Neutron to market. Again, as Pete mentioned earlier in his remarks, we're making great progress there and we're looking forward to that date sooner rather than later.
Peter, I want to start with you. When you — I believe it was when we announced that Neutron would be slipping into next year. You mentioned some shifts, or perhaps your capacity to take on additional work because of the pushed schedule, much like the earlier slip involving the tank — could you give us a bit more detail on what that additional activity involves and how, with the extra time you've been handed, it might affect either subsequent launches and, I think, some — regarding what you said about the 135 cadence, or reusability, or just offer us a little more insight into what else you're now able to do given the longer timeline.
Yes, Trevor, good question. The main focus has really been everywhere on speeding up how often we can launch, since that clearly matters most. So most of the effort has gone into engine manufacturing, engine acceptance testing, and likewise composite structures, their production and acceptance testing—pushing all of that to move quicker. We haven't been working in a serial way. Many of these efforts are running side by side. So even though the tank area has seen some delays, avionics, fluid systems, and everything else have kept scaling. And we see—I've stayed quite firm on the 15%. At this point I'd say the push to raise that is overwhelming, and we're examining every lever available to us. And to boost that flight cadence. I think we have some genuinely solid options in that area. We can discuss it a bit later, once those have firmed up; but it's fair to say we're certainly — obviously Flight 1 matters in the head space, yet a lot more big brains are focused on just how, really, we speed up the scaling right now.
Great, perfect. Adam, maybe I'll turn it over to you on much the same topic — considering that rise in R&D expense, which as we've discussed for some time now is very closely linked to neutron — how should we think about that line? And perhaps more broadly, you made some helpful remarks about cash flow in earlier questions, so maybe a little more on EBITDA — and overall profitability, given — again, given the Neutron delay, how should we think about that? I know you aren't providing 2017 guidance yet, but how should we perhaps think about that R&D line in particular as we head into next year, if things have shifted or changed somewhat?
Yeah. Luckily, I'd put it this way: our Space Systems segment, which today accounts for the largest share of our business by a wide margin, isn't — I wouldn't characterize it as especially heavy on R&D. So my expectation is that we'll continue putting money into it at a level that sustains the revenue targets we have for a longer-term CAGR, which we've described for quite a while as around 20% — that's more or less the benchmark we've established for it. Once Neutron starts contributing, Launch will expand at a quicker pace than that. Let me make that point clear — I believe I may have skipped over it. Positive cash flow arrives somewhat later than 6 quarters after the first launch. Adjusted EBITDA inflects at that stage, essentially. Cash flow depends much more on how far along we are in building out the neutron fleet, and that process is going to take a bit more time. This connects to what Pete covered in his answer — namely, ways we might scale the business more quickly. Some of those items could be capital intensive, which would let us push that rate even beyond the level we've already talked about. So as I see it, at this moment it's all hands on deck to get neutron to the pad and complete that first flight. And once that occurs, I believe the financial model gains an enormous benefit. So once that first test flight succeeds, adjusted EBITDA should flip positive inside six months, and cash flow will trail after that. Though it does depend somewhat on choices we'll make about how aggressively we want to push fleet expansion, since the great thing about Neutron as a sensibly priced rocket is that you'll most likely be producing the largest number of units right at the start of the program, correct? After those are in place, reuse really begins to shape the economics — margins widen sharply at that point, and that's the moment cash flow genuinely picks up speed. I hope that answers your question. Again, on research and development, nothing stands out as a major needle mover besides Neutron; and naturally, after we've brought Iridium to completion, we're constantly exploring ways to speed up growth. Certain of those efforts could call for somewhat more R&D than the model has historically carried, perhaps, yet we also feel quite good about several growth vectors they've been putting money into over the last few years that are right on the verge of beginning to pay off in a major way.
So I'd like to ask about the economics of nutrients on Neutron. You've now got more production reps behind you, and you've already revised the manufacturing process for some products. How is the bill of materials trending versus the original steady-state model? And looking at the efficiency gains from automated composite layup and Aker Medis production — are there areas where costs are landing below what you expected? Then, factoring in a $70 million base launch price — which is a very big step up, and congratulations on that, by the way — how should we be thinking about margins from here? With a price that's $15 million higher than what you first anticipated, I'd figure you get to that 30% to 40% gross margin sooner, and then the steady-state gross margin ends up higher too — so any perspective on long-term gross margin and Neutron would be useful.
Sure, I'll handle the high-level part and Pete can go into some of the engineering details. That said, I'd note the higher ASP definitely helps us get there quicker. I believe our conviction has always been that on a non-GAAP basis, this is a business with gross margin above 50%. There's been a fair amount of speculation regarding what reasonable margins for comparable vehicles look like once you reach scale. Some of that has surfaced now that SpaceX is public, I believe. But we've also witnessed a fairly substantial widening of Elektron's gross margins, and that's largely a function — part of it does come from reductions in BOM cost, though that isn't really the thing that moves the needle in the launch business. What really matters is spreading those fixed costs across more launches, correct? So if you consider typical BOM reductions, call it somewhere in the 6% to 10% range annualized. That definitely provides a boost, though it doesn't have to shift the needle quite as much as doubling how often you launch—going from three per year to five, then to ten. That's the real driver of Neutron's economics. Still, I'd say the direction average selling prices are moving is extremely, extremely beneficial. And my own view is that we haven't yet reached the bottom of Neutron's pricing curve. We're only just beginning.
Yeah, I'd say you've captured it well there, Adam. I mean, yes. < > comes to fairly small costs; what really pushes a vehicle's expenses is mostly the facilities, the headcount and overhead — you have to maintain factories, launch sites, and things of that kind, barges, with roughly 170 launches or so a year; so the bond definitely isn't out of bed, but it's probably the lesser factor on margins.
Great, thank you very much. Turning to spectrum — the industry is paying far more attention to what spectrum is worth these days, and Iridium hands you L-band that's coordinated around the globe. But given that L-band is inherently limited by its own nature, when you picture where Rocket Lab should sit over the coming five to ten years, does Iridium's spectrum strike you as enough for the constellation ambitions you have? Or do you figure you'll have to bring in a partner holding higher-throughput spectrum — names like who and Cavan come to mind — to carry out your vision of being a space-as-a-Service company?
Kristine, that's a rather tricky way of putting the question about what future constellations might look like. At this moment, though, we feel quite good about L-band. What appeals to me strongly about L-band is its strength — the way it cuts through poor weather and harsh environments — and that safety-critical, defense-critical segment of the industry strikes me as genuinely interesting and set up for substantial growth. So for now, the band situation is fine. Naturally, we keep an eye on spectrum at all times. We're in the communications business these days, so spectrum matters to us. That said, there's certainly nothing imminent when it comes to acquiring more spectrum.
All right. Be well.
I wanted to ask whether you might expand a bit on how demand looks for Neutron, since, as you said, launch capacity across the industry is booked out for several years. That would seem to imply customers feel urgency to get orders in before Neutron has even proven itself on its first flight. So perhaps you could discuss how many launch opportunities you are currently chasing and what we should anticipate in terms of launch bookings in Q4 or Q1? Is the pipeline fairly full, such that we could see quarters comparable to the one we just had in Q3?
Yes, gas. It will be fascinating to watch how everything resolves. Without question, demand is enormous for the earliest launch slots, and that has now pushed us into the next slots that became available, along with all the behind-the-scenes effort to raise cadence. So I believe we have witnessed, as I mentioned, extraordinary demand, and customers with whom we have enjoyed lengthy relationships and who have collaborated with us for a long time have quite literally firmed up their intentions very rapidly. That has remained consistent; and looking ahead, another key point to keep in mind, as I noted earlier, is that roughly 50% of new tons capacity goes to everyone else while 50% is reserved for us. Consequently, we must always ensure we hold back sufficient capacity for our own ambitions.
Yes. And I’d add one more piece of context here — a little inside baseball. We actually could have booked more Neutron launches in Q3 than we did, but we deliberately opted for a higher ASP and lower volumes. So some customers wanted to book additional launches, though at a somewhat lower price. And we basically, again, held to the position Pete brought up earlier: we aren’t trying to sell launches at a discounted price. We want to be sure we’re maximizing the value — so we’re being very selective about which business we accept and how much of it we take on now, because, again, I think our bias is that we believe prices will keep rising. So why sell out all the capacity now at these prices even.
I meant to raise something — well, seems somebody got there before me. My question was going to be whether you've talked with the Office of strategic capital about potentially supporting new trend development. And then only a few minutes ago, an announcement was released on precisely that; so maybe a little more detail, $150 million, maybe the conditions attached to that loan commitment and exactly how the money is meant to be distributed? Any insight on that would be much appreciated.
Sorry. Yes. Honestly, we feel pretty lucky to be able to use this type of non-dilutive financing—whenever it's available, we take it. The terms strike us as very appealing: SOFR plus 100 basis points. That gives us extra capital to expand important areas of the business, especially Neutron. Since I came to the company nearly nine years ago, we've been fortunate to ensure that funding the business never held back growth, and that remains true. This also really highlights how much the administration is concentrating on launch capacity, and they're backing efforts to ease the problem with real substance, so this definitely contributes. I'd call it a useful signal — a very encouraging one — regarding where everyone perceives the demand bottleneck and how it might be released, and funding is clearly one piece of that; so yes, this absolutely supports what we're trying to do in helping new tried scale more quickly.
That's really useful. So perhaps, staying with the topic of government support — since we're currently operating under a continuing resolution, are you anticipating any effect from that? Depending on how long the CR lasts, could the impact be more aggressive, or not? Or perhaps you could give me a bit more detail on how you're thinking about this in your internal models. How should we think about the duration of the CR and what it might do to the business as we head into '27?
It's really hard to forecast how government funding will play out. For us, I think — Pete mentioned this earlier — many of the programs we're involved in already have funding, and I think they're highly strategic; we don't really perceive much risk to our programs specifically; but of course, having greater clarity about where the budget will come from and where it goes from here would certainly help. But I don't know, Pete, whether you have any views on that.
Yeah, I'm with you on that, Adam. What I'd say is that, for us, the risk here is fairly low.
Peter, Adam, Daniel here covering for Jeff. Congratulations on the quarter. Regarding that next 12 months backlog—that's one of the metrics we track most closely. It rose 47% sequentially. I believe that could be the best quarter ever for it. Maybe just a bit more color on the next 12-month backlog, specifically what drove it. I say specifically because I figure, obviously, there's enormous launch backlog growth, but much of that sits in the out years. Is it within the next 12 months? And when I turn to the Space Systems backlog, it’s up 22%, so this is rising even more than Space Systems—maybe some businesses are arriving or pulling in sooner than you anticipated, where perhaps some of the timelines are shortening. Do you have any thoughts on that strength?
Yes. No. Look, Electron Haste is clearly a huge beneficiary at the moment. Pete covered what some of those drivers are. I actually think that Electron Haste, again, is entering what you could call a new leg of growth. And I believe the reason for that is people are only now beginning to understand that on the non-HASTE side of things, the eventual shortage of transporter and bandwagon—which everyone worries about—will have to be addressed somewhere, correct? And if you consider what the next best option is, it truly is Electron, right? So I suspect we might not even be witnessing the full effect of that yet—perhaps only the earliest signs, like canaries in the coal mine. That's a really positive sign for that segment. Still, as we've mentioned during other quarters, Space Systems has become an extremely substantial portion of the overall company—close to 80%. That will even out once Neutron begins launching and as electronics keeps expanding, but that segment tends to be somewhat uneven. I'd say we have a fairly solid balance between our components operation and our platforms operation; however, those—especially on the platforms side—arrive as somewhat irregular contract awards. They are becoming larger and larger. Those deals take more time to finalize, yet when they do land they make a real difference, and they also give you some longer-term protection against risk, since holding plenty of that type of work in backlog obviously makes an air pocket less likely. So on balance, for your question about the next 12 months, I'd say electron haste is really the story in the near term, given that we added some quite attractive programs to backlog during the most recent quarter. And my sense is that this will likely carry on. And once more, I'd say this is likely a quarter in which we lacked what you might call a truly sizable space systems platforms program entering backlog — and those, again, ought to take more time, yet we feel quite good about how that business is positioned. More of them will be coming.
Yeah. And perhaps that leads nicely into Space Systems, since we haven't really discussed that much at a high level — what comes next. Should we think of the main opportunities as the more evident ones, such as tranche for tracking further out? Or possibly broader work on moving target indicators, space-based intercepts. Obviously, a great deal is happening in the safe force at the moment, and on the commercial side as well. Just perhaps a few thoughts on where you see the emerging or strongest opportunities arising from.
Sure, Adam, I'll handle that one. Daniel, I believe it spans all of them, correct? And returning somewhat to your earlier question, I'd say Space Systems has now achieved a degree of maturity and cadence that is simply humming at present. It has taken us some time, clearly, we put a lot into components and into ensuring we possess the elements. So when a customer approaches us today, they can anticipate best value and certainly the best time line, but also high — 100% confidence that the spacecraft they will have built and delivered works; and meets their requirements. So whether it's heading to Mars and we just performed a couple of those trends, Mars injection burns within the last 24 hours, 48 hours, or commercial constellations for comms. We have all the best available on the shelf that we can assemble quickly. We have all the designs that we can reuse; and the execution is trusted and we build reliable platforms. And I know that merely sounds like table stakes, but it isn't as common as you might think in the space industry for all of those things to happen; so I'd say that many recurring returning customers are creating more and more opportunities for us and continuing to kind of feed itself in many respects.
Yes, and I’d like to tack just a small point onto that. My sense is we still haven’t genuinely begun to witness how other sovereign nations’ space investments will shape things, correct? That probably represents the next demand signal that will truly begin to surface, because when you examine our backlog at present, the great bulk of it comes from the U.S. on the Space Systems platform side, especially involving SDA Tranche 2 and SDA Tranche 3 and AMT and similar programs. But what I believe is the advantage we have — or the situation we’re in — is that the industrial base doesn’t truly exist in many of these locations that are coming to understand they require these capabilities. So it will be an extremely useful thing for companies such as ours that possess all those capabilities, which, as Pete said, sit on the shelf ready to assemble things together fairly swiftly. And once more, I don’t believe that has genuinely begun to show up in the model yet.
I'd like to ask about Neutron and your expectation that roughly 50% of the launches will be internal for yourselves. When do you expect that first internal Neutron launch to happen? And does that come only after you've worked through your whole existing backlog, or could an internal launch occur before that point? And then, in the same vein, I guess: does that look like an Iridium-related launch to refresh the Constellation in the mid-2030s, or do you expect the internal new trends to be used mainly for a separate ROCCAT Lab initiative going forward?
Yes, Michael — there are a number of different reasons. First, owning your own platform lets you retire a whole bunch of risks, along with new technologies and new ideas; and for us the marginal cost of doing so is really, really low. Iridium's constellation will need to be replaced at some point. So certainly, Neutron is a key enabler for that; and when I say 50% for us and 50% for everybody else, that's obviously not out of the chute — we'll burn down a whole bunch of contracted launch. So that number will skew heavily toward our customers for quite some time. But I would say the long-term view, the long-term kind of expectation, at least for me, is the 50 to 50. So certainly not imminent; but over the longer term, we expect to have not just 1 service or application on all, but we expect to have many — not just Iridium but other things. So reserving that capacity now is just prudent.
Next, I'd like to ask about the Alaska pad. What's the newest status on the construction work going on there in Alaska? And is the first launch expected in '27, early '27, or something else? Also, how many HASTE launches could that pad support each year?
Yeah, good question. Actually, there are 2 pads at that location, not just one. The 2 pads sit side by side. That gives us fairly high capacity, since we're able to turn a launch around—as everyone has now witnessed—in 42 minutes. So I'd say we have ample capacity at that site, and we're still on schedule for a 2027 launch from those pads, and from several of them.
And congratulations on the backlog increase for Neutron bookings. Perhaps many of the questions have been somewhat addressed already. But regarding Iridium, which opportunities might speed up Iridium's growth within the first 2 years that you believe, once the acquisition closes, we could begin with?
Yes, Erik. Look, they have some truly exciting things, as Adam mentioned, that they have been pursuing over the last couple of years. So some of those involving P&T and director device, they have been working on. . I think beneath a Rocket Lab umbrella, there is a bit more freedom to push harder and faster. So I think those will be brought to the forefront and hopefully, in short succession.
Great. And you've clearly already discussed electron and haste quite a bit, along with the strength there; and I believe Adam mentioned something like a 20% or better cadence for next year's book. How does that mix break down for next year — assuming we're at a 20-plus percent CAGR next year, what's the split between standard electrons and haste?
I tend to hesitate on those questions, since it's entirely dependent on customers' programs, and on their capacity to execute and deliver on schedule. Nominally, I believe there are around 15 Haze missions. But those haste missions depend heavily on customers' programs and on them showing up on time. So it's fairly difficult to state with any certainty, because it can shift around quite dramatically even from one quarter to the next.
Yeah, Eric, to be a bit more specific — again, we aren't providing guidance for 2027 at this point. But roughly about 25% of all the small dedicated launches could be haste next year; it might be slightly higher, it might be, but within that range. Greater.
Which quarter or months are you all internally aiming for with Neutron in 2027?
We haven't given guidance on that yet, honestly, since we first have to get the Stage 1 tank finished; and if I give a date, well, clearly I've been wrong before. So instead, what we did was share updates roughly weekly, sometimes even daily, on how that tank is progressing. And truly, until that tank makes it through every test in the gauntlet — I just — I think it's — I simply don't want to keep being wrong.
Absolutely, that's a fair point. I realize your attention is on Neutron right now, but the trend across the industry seems to be toward bigger and more capable vehicles, and for some of those future aspirational ideas like orbital data centers, it looks as though you'd need larger rockets. So I suppose what I'm wondering is this, Pete: from where you sit, do any of the things you're hoping to build out hinge on having a bigger rocket? And do you think there will be a new product following Neutron once you're launching at a regular cadence?
Honestly, building another rocket isn't something I want to do. Two feels like plenty for one person. All joking aside, though, if you consider how much mass Falcon has averaged per launch commercially, Starlink excluded, it comes to roughly 5 tonnes. And some of the sizing work we did with Neutron—well, the factor that drove us to settle on 13 tonnes was making human spaceflight possible. That's essentially what pushed the design into that 13 tonne class. Now, when it comes to deploying constellations, the way to think about it is not cost per kilo on your rocket. What actually matters is cost per satellite delivered to orbit; that's the one metric that counts, and you can get there either with a big rocket flown infrequently or a smaller one flown more often. Still, as we look ahead to our future and everything we intend to deliver, Neutron's size fits perfectly. Your point holds, I think—if your goal were to put up data centers, which boils down to a tonnage calculation, then a large vehicle makes complete sense. But the most successful rocket in history so far is sized around roughly where Neutron sits, and while the future may shift, I'd say that for any of the aspirations we have today and any of the large markets we want to compete in, Neutron is more than big enough. Having said that, I did have to eat a hat, because I won't claim I'll never build a bigger rocket.
I won’t rule anything out.
Right, my apologies. I won’t rule anything out.
Adam, I appreciate that on Neutron you're attempting to maintain premium pricing here. But how would you think about tempering forward bookings — how far would you be willing to go in terms of units booked if you could get that price?
That's a tricky question, right? I mean, you kind of build the deal you want when it's put in front of you. And I think a deal hasn't been put in front of us that was enough to take that much capacity off of our road map. So I think we're testing where the market's elasticity is right now. And I think it's changed a lot in the last 6 months for obvious reasons; it could continue to change more in the next 6 months, right? So I think we're just trying to be judicious and keep some dry powder so that we can continue to drive those ASP increases if market conditions continue to trend as they are.
Yeah. Having this much demand is a pretty unusual situation. My second question is really this: given that Neutron is trending longer term toward half of it being used for in-house Pete, how should I think about the space cap manufacturing footprint that you have? I kind of picture it as a custom shop at the moment, but is there — would there be a trend toward a more volume shop over time? Or is it already set up the right way? I'm just curious how that would play out.
Yeah. No, it's < > I mean, look, a tremendous number of the business units within the Space Systems are volume shop. I mean, in that sense we're the largest space grade solar manufacturer in the world. So a lot of the component level pieces are already there. But going forward, you've seen, obviously, our < > and also our U.S. government contract for those platelets as a vent for the Star Shield programs. So yes, I mean, we definitely see it in our future high-volume satellite manufacturing, which is why we developed the components at high volume also that flat-like platform.
Perhaps a brief question about the gray book you reported this quarter. Particularly regarding Neutron and the uncertainty on timing. How should we consider the contract terms and that new uncertainty around trends, in terms of how easily customers could cancel or go find other vendors? What general framework should investors use there, compared with new Trump bookings at this moment given all the uncertainty?
Yes. Excellent question, Ryan. What I'd say is, none of these agreements are Janke contracts with foolish provisions baked in. Naturally, our customers perform substantial due diligence on us; we've had long-standing relationships with them, and we're extremely transparent about where things stand. . I believe every one of the early Neutron customers understands that it's — we're taking a vehicle to market, we're building something new, and we're progressing as fast as we possibly can. So we will — should anything change, we'll certainly make sure they're fully informed of whatever it is, but that's essentially the arrangement, and despite that, our customers clearly place a great deal of faith in us and trust that we're the strongest choice for their future launch requirements.
And Ryan, what I'd say is that this industry has seen quite a few shenanigans in the past, with companies presenting their backlog as genuine backlog when in reality it's options. There are no deposits behind it. That isn't what's happening here; these look very much like, if not exactly like, the standard LSA we've experienced with Electron, where people put down real deposits — they aren't options, there are cancellation fees and all kinds of things — we've always placed a lot of emphasis on making sure our backlog is very, very solid and that we don't fall into the trap that some other folks have. So I think we feel very good about the state of the backlog.
Excellent. I really appreciate everyone taking part in the call and asking such good questions. We're quite happy with how the quarter went, and we're looking forward to the next one. So thank you very much.
This concludes today's conference call. Thank you for participating. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Rocket Lab Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Rocket Lab Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.