Thank you, Grace. Good morning, everyone, and thanks for being with us for the presentation of Vallourec's results for the third quarter of 2026. Before we start, I want to mention that this conference call is being recorded. After the call, a replay will be made available. The audio webcast can be found on our investor relations website. The slides we will refer to during the call can also be downloaded there. This call today will include forward-looking statements. Actual future results could differ materially from the statements or projections we make on this call. The forward-looking statements and the risk factors that might affect them are cited on slide two of today's presentation. They are also part of our Universal Registration Document filed with the French financial markets regulator, the AMF. A Q&A session will follow the presentation. I will now hand the call over to Philippe Guillemot.

Philippe Guillemot executive
#2

Thanks, Dan. Good morning, everyone, and I appreciate you being here as we go through Vallourec's results for the third quarter of 2026. Slide three shows the agenda for today. If we move to slide five, we'll cover our results and the outlook. During Q3, we posted a resilient set of numbers, with group EBITDA of $181 million, which came in inside guidance at a margin near 19%. Tubes volumes were up 12% quarter over quarter, even as escalation in the Middle East kept generating extra costs and logistical difficulties. EBITDA per ton dropped quarter over quarter to $592. That reflects a mix that was less favorable along with higher costs—particularly Middle East logistics—which we expect will mostly be reimbursed in the coming quarters. Beyond that, a short-term operational problem in Q3 tied to a subcontractor within our U.S. operations caused volumes and margin to fall short of expectations during the third quarter and to carry into the fourth quarter. Results have gotten better since, and we are watching things closely. Turning to cash flow, we delivered a 16th straight quarter of positive cash generation, and that figure included $349 million in warrants proceeds. Following $632 million of shareholder returns in the quarter, we closed the period with net debt of $100 million, comfortably within our leverage policy. That figure included payment of an extraordinary interim dividend of EUR 2.05 per share, the highest payout to shareholders in the company's history. For the fourth quarter, we expect Tubes volumes and EBITDA per ton to be broadly in line with Q3, reflecting a similar mix, additional costs tied to Middle East shipments, and the effect of the temporary operational issue in the U.S.; in Mine & Forest, production sold should come in around 1.1 million tons, with demand still affected by elevated sea freight costs on the Brazil to China route. For the fourth quarter, we anticipate group EBITDA between $170 million and $210 million, provided that congestion at Middle East ports below the Strait of Hormuz does not deteriorate further and the region's geopolitical conditions remain unchanged. Turning to our market: in the United States, fundamentals continue to strengthen. Demand is solid and climbing, inventories remain low and are declining, and seamless import volumes are still limited following several major trade rulings that uphold fair competition. For nine months straight, market pricing has climbed, with the pace picking up during the second half. Based on what our customers tell us, activity should keep growing in both oil and gas and geothermal. In international markets, demand in our main Middle East market is still solid, but the recent intensification of hostilities there has added logistical hurdles and caused more shipping delays. Beyond the Middle East, demand is clearly showing signs of improvement. Drilling activity is on the rise across international basins, and we anticipate additional growth in 2027, backed by a growing count of upstream project approvals. In the quarter, we shared news of additional significant offshore contracts within Project Line Pipe—our longer-cycle operation—in Brazil, Angola, and Azerbaijan, which gives us clearer visibility out to 2027. Backlog in that business is now at its highest level since 2022, and what matters is that the mix has improved as a result of the investments we've made in advanced coating solutions. Among other notable items, we've taken another step toward aligning our capital structure with our investment-grade standing by refinancing and increasing the size of our revolving credit facility on better terms, and Nathalie will cover that later. Finally, we've chosen to shift capital toward our core Tubes business and to reduce the near-term scope of the phase II extension at our Brazilian iron ore mine. Since that project is close to starting up next year, attractive Tubes investment opportunities plus this year's tough iron ore market support that choice. One example is the $48 million we put into a new premium threading line at our Youngstown facility in the U.S. Announced in November last year, that line was successfully commissioned ahead of schedule, as we just reported. Bertrand Frischmann, our Chief Operations Officer, will give further details on the mine project later in the presentation. Let's turn to the market environment on slide seven; in international markets, drilling activity rose outside the Middle East during the third quarter, hitting in September the highest level since late 2024. During the prior quarter's call, we mentioned that extended-cycle operations were beginning to react to elevated crude prices, with projects approved not long ago now shifting into execution. Across the Middle East, activity continued a gradual recovery throughout the period, though the latest surge in hostilities has introduced near-term downside exposure. The chart on the right illustrates how market pricing keeps climbing, partly to counterbalance greater logistics expenses—mainly in the Middle East—and does so with a delay. That pattern matches what we see in pricing trends within our international sales, where long-term agreement price mechanisms are steadily adapting to rising costs. Let's move to slide eight for a more detailed view of the Middle East region. Looking at the chart on the left, drilling activity in the U.A.E. has come back up to where it stood before the war, whereas Saudi Arabian activity has eased a bit since August, hit directly by Q3 strikes on export infrastructure. On a positive note, activity across other Middle East nations has been climbing steadily even with the Strait of Hormuz shut. We're now at roughly 36 rigs, which is under 10% beneath pre-war levels. That said, heavy port congestion and the recent uptick in vessel attacks in the Strait of Hormuz have compounded logistical headaches and cut into visibility. Berthing waits at U.A.E. and Oman ports have grown considerably longer. In Fujairah, the wait has stretched to 60 to 90 days versus about a week under normal conditions, since food, medicine, and military cargo get priority. Given this situation, OCTG and related stock in the region are mostly used up, and restocking is urgently needed to keep drilling going. Turning to North America on slide nine: on the demand side, drilling activity has risen sharply in reaction to higher prices, and the U.S. rig count is about 10% above its level at the close of 2025. That stronger activity, combined with restricted imports, is driving OCTG inventories down toward levels last seen in 2022 and 2023. OCTG pricing has risen substantially and has picked up pace over recent months; this mirrors supply-demand conditions that are working in our favor, and we take encouragement from customer conversations indicating activity momentum will carry on into 2027; slide 10 shows seamless imports still held back at about 10% of the overall market, far under historical levels and to the benefit of domestic producers. Starting in September, the U.S. Department of Commerce has issued a number of favorable preliminary or final determinations that cover some of the biggest sources of OCTG brought into the United States, among them Austria, South Korea, the EU, Taiwan, and Ukraine. On top of the existing 50% Section 232 tariff, these substantial anti-dumping and countervailing duties mean that for some countries the combined import duty now exceeds 100%. Imports did increase modestly during the third quarter, but looking ahead we expect these additional duties to hold imports at sustainable levels. With that, I'll hand the call to Bertrand, who will provide an update on the mining projects we announced at our Capital Markets Day in September 2023.

Bertrand Frischmann executive
#3

Thanks, Philippe. Before we get into the projects, it's worth framing these updates against what's happening in the market right now. Since the start of the year, iron ore prices are down more than 15%, and freight from Brazil to China has climbed to record highs, which has put a significant squeeze on the export margins of our mine's customers. Given that backdrop, our operating strategy has leaned more and more toward value rather than volume, putting priority on higher-quality ore and recovery rates instead of maximizing tons. With this approach, we've consistently posted EBITDA margins in the upper range of the benchmarks for listed Brazilian peers. Just a quick reminder that Vallourec’s premium-grade iron ore is sold at the mine gate, using a combination of spot and long-term contracts. Moving to the projects themselves, the first point is that phase I has been delivered successfully. Phase I began contributing in late 2024 and has achieved the targeted incremental EBITDA, even with an iron ore price environment materially lower than we initially assumed, and thanks to our ability to raise recovery rates. Regarding phase II, we have taken the opportunity to optimize the scope based on what our engineering and geological work has taught us. Research indicates that by extending the Pau Branco mine by 200 m, we can secure enough high-quality run-of-mine for the near to medium term, and we can do so without taking on the more capital-intensive upgrade of the second ore processing units. As a result, we have decided to postpone the upgrade of this unit, which remains available as an option. Engineering and geological studies are ongoing, with results expected in mid-2027, and at that time we will determine whether and when that additional investment generates sufficient value. Moving to slide 14, I'll outline how this decision changes the financial impact. Please note that the figures from the 2023 CMD shown below have been converted to U.S. dollars. Originally, the phase II plan called for spending somewhere in the range of $110 million to $140 million. With the narrower scope now in place, we figure it at roughly $25 million. That is a really meaningful cut in the capital we need close at hand, which keeps mine free cash flow intact over the near to medium term. It also frees us to put capital toward better-return opportunities within our core tube segment, including our advanced coating business and debottlenecking work at our U.S. operations. And with the revised phase II, we would anticipate normalized annual production of about 6 million tons. That number is basically the same as the 6 million ton baseline for 2024 we laid out at the CMD, but keep in mind it's roughly 1 million tons more than what our 2026 guidance calls for. Under our updated assumptions — which include an iron ore price of $100 per ton rather than $110 in 2023 — we're looking at normalized annual Mine & Forest EBITDA of about $110 million to $130 million. All in all, we see this as a more capital-efficient way to develop the mine while keeping the cash generation from the assets we hold today. I'll now hand it over to Nathalie, who will cover the financial results we reported.

Nathalie Delbreuve executive
#4

Thank you, Bertrand. I'll walk you through the results for Q3 2026 now. Starting on slide 16 with our track record on execution. The group keeps posting a strong, resilient EBITDA margin, at 18.9% for Q3. Over the next slides I'll take you through the key figures for the group, for Tubes, and for Mine & Forest. Working capital remains under close management. Net working capital came down to 79 days in Q3 from 84 days in Q2. Total cash generation came to $357 million, which includes $349 million of warrant proceeds. Importantly, before those proceeds, cash generation was already positive, at $8 million. We closed September with net debt of roughly $100 million. In the quarter, we returned about $632 million to shareholders, comprising $626 million of dividends and $7 million of share repurchases. Moving to our key group figures on slide 17. Q3 revenues came in at $956 million, roughly 8% higher than the $886 million posted in Q2. This sequential recovery was supported by higher Tubes volumes. EBITDA was $181 million, versus $190 million in Q2. Adjusted free cash flow came to $79 million, in line with Q3 2025 and compared with $125 million in Q2. Let's now examine the Tubes segment more closely on slide 18. The quarter's main development was higher Tube volumes; we sold 274,000 tons in Q3, against 244,000 tons in Q2. That works out to roughly 12% growth quarter-on-quarter. These higher shipments supported Tubes revenues of $887 million, up about 9% from $811 million in Q2. The average selling price stood at $3,241 per ton, versus $3,327 in Q2. North America made up 44% of Tube revenues, up from 40% a year earlier. The Middle East held steady at 21%, though its contribution fell in absolute terms. On our end market mix, Industry revenues were flat sequentially, while other, mainly power generation, declined. Oil and gas plus petrochemicals accounted for 88% of revenues, compared with 82% in Q3 last year. This segment grew 15% quarter-over-quarter, with support from all regions. Turning to Tubes profitability on slide 19. EBITDA was $162 million in Q3, versus $176 million in Q2. The EBITDA margin came to 18.3%, against 21.7% in Q2. EBITDA per ton was $592, compared with $722 the previous quarter. The decline mainly reflects higher logistic costs on Middle East shipments and a less favorable mix. The temporary operational issues in the U.S. that Philippe mentioned also weighed on volumes and margins. Now on slide 20, moving to Mine & Forest, production sold totaled roughly 1.1 million tons in Q3, compared with 1.2 million in Q2 and 1.6 million in Q3 last year. Because sea freight costs to China are significantly higher, demand for Brazilian iron ore shipments has fallen and netback prices remain under pressure. The average iron ore market price was approximately $100 per ton, down from $108 in Q2. Revenues reached $80 million, compared with $92 million the previous quarter. EBITDA came in at $30 million, versus $33 million in Q2, and weaker market prices were partly offset by some hedge sales. Even with revenues and EBITDA down, margin rose to roughly 38%, up from 36% the quarter before. If you go to slide 21, we produced $66 million of net income in Q3, against $45 million in Q2. That works out to 7% of Q3 revenue. Just to remind everyone, Q3 2025 net income of $152 million got a $30 million lift from asset disposals, mostly tied to the Serimax sale. Now on to cash generation, slide 22. Before warrant proceeds, cash generation was positive at $8 million. All told, cash generation hit $357 million in Q3, which includes $349 million from warrant exercises. The $71 million of restructuring, non-recurring, and asset disposal bar covers restructuring cash out and payments tied to the HKM divestment; over on the right, cash conversion is 41%, a touch above 40% in Q2. Cash conversion in Q3 2025 gained from the Serimax sale proceeds. Last, slide 23. Liquidity remains strong, near $1.8 billion at the close of September, with $960 million in cash and cash equivalents, about $625 million of available revolving credit facilities, and $189 million of available asset-based lending facilities. Early in November, we signed a new EUR 750 million revolving credit facility so our financing structure matches our investment-grade profile. It takes the place of the existing EUR 550 million RCF and the $189 million asset-based lending facility shown above. This new facility carries a five-year term, with two one-year extension options and a EUR 225 million accordion option. Terms are better, financing costs are lower, and it marks a significant step in how our financing structure has evolved; Philippe, back to you.

Philippe Guillemot executive
#5

Thanks, Nathalie. If we go to slide 25, we can talk about what we're expecting going forward. Let's begin with Tubes. For Q4, volumes and EBITDA per ton should stay roughly flat versus Q3. That comes from a comparable mix, extra costs tied to Middle East shipments, and the effect of the temporary operational issue in the United States; this view assumes no further worsening of congestion at Middle East ports, south of the Strait of Hormuz, or in the region's geopolitical situation. On Mine & Forest, we're looking at production sold of about 1.1 million tons for the fourth quarter. For the whole year, production sold is now expected to come in a bit below 5 million tons, which mirrors softer Chinese demand for Brazilian iron ore because sea freight costs are significantly higher. At the group level, fourth quarter EBITDA should land somewhere between $170 million and $210 million. Let's wrap up with three key takeaways on slide 26. First, we posted a resilient third quarter even as hostilities renewed and escalated and disruption grew in the Middle East, our second-largest market. Second, customers in the United States are stepping up activity in both oil and gas and geothermal, and higher pricing is structurally supported by several significant trade decisions in favor of fair competition. Third, drilling activity outside the Middle East is getting better as more and more upstream project approvals enter the execution phase, which sets the stage for profitable growth through 2027 and beyond. Thanks again for your attention. Nathalie, Bertrand, and I are now ready to take your questions.

Matt Smith analyst
#6

Hello there. Morning. Appreciate you taking my questions. I have a couple, if I may. First, regarding the U.S. operational problems. I think you mentioned those were sorted out during the quarter. Could you give us a little more context on what the issue actually was? I guess what I'm really after is understanding how much of a drag those operational issues have been baked into the 4Q guidance, whether that shows up in volumes, in costs, or simply how much EBITDA we are losing in 4Q that we would otherwise have expected to deliver? That's the first one. Second, if I could move to the Middle East. Earlier, we talked about missed deliveries amounting to approximately 20,000 to 30,000 tons per quarter, if you will. My guess is that this shortfall has likely grown, purely because shipments continue to slip further to the right. Could you share any update regarding the run rate for 3Q and 4Q? I would assume that since you must currently be carrying a substantial amount of goods in transit, when do you expect things to return to that 20,000 to 30,000 range, or perhaps even improve? Thank you.

Philippe Guillemot executive
#7

Alright, turning to our U.S. On operations — yes, that was an unfortunate disruption we had to contend with late in Q3 and continuing into the beginning of Q4, and it has plainly prevented us from hitting the volume we had planned to deliver. In the interest of transparency, I'm not able to go into much detail, since we will of course pursue every contractual right available to us so that we're compensated for the effect on our operations. Without that event — just that one, I'm not referring to the Middle East — we would have come in above the mid-range of the guidance. It's certainly not something we expected when we issued guidance for the quarter; and at this point, obviously, things have improved considerably. Things have gotten much better on that front, though we have to keep watching closely so it doesn't slip backward. As of today, we aren't counting on this to keep boosting and affecting our figures. Before I turn things over to Nathalie regarding the Middle East — right, the Middle East situation — a few weeks back, we were still waiting roughly seven days on average to berth our vessel in Fujairah, and then all at once it jumped from one week to 60 or 90 days, which clearly has a big effect on both cost and delivery time, and has pushed back our ability to invoice even further. Eventually, both of those are meant to be recouped—there's a cost involved—since at some stage we'll clearly pass this surcharge back to our customers, and a growing number of them now have well-defined procedures in place for exactly that. You'll hear more on this in 2027. On the delivery side, at some point, considering where the inventory sits, those deliveries simply have to happen. They must happen, otherwise our customer's drilling plans would be put at risk. Nathalie?

Nathalie Delbreuve executive
#8

Yes, just to add to that. We had earlier referred to an effect of 20 kiloton to 30 kiloton, and at this point we're at the top of that range and actually beyond it. As Philippe mentioned, this also makes forecasting harder, specifically the lead time on deliveries. That's another reason our guidance covers a fairly wide range. On cost, we have not observed any reduction in shipping or insurance costs; if anything, it's the opposite. But once again it's mainly the lead time that is driving costs higher, and it is also delaying the recovery as we pass this through to customers.

Matt Smith analyst
#9

All right, thanks. Just to make sure I understand — sorry about this — regarding those U.S. operational problems: did I get it right that they hit the 3Q results, yet aren't having a negative effect on 4Q?

Nathalie Delbreuve executive
#10

It's going to affect that too —

Philippe Guillemot executive
#11

Also in Q4. Yeah. It explains the gap versus consensus.

Nathalie Delbreuve executive
#12

Yeah.

Philippe Guillemot executive
#13

Not the whole thing, only a portion of it, with the remainder clearly being the situation in the Middle East. Still, to be sure, absent that unfortunate operational problem we would have come in a bit above consensus, above the middle of the guidance range for the quarter.

Nathalie Delbreuve executive
#14

Yes, it's a bit more than $20 million in both quarters.

Matt Smith analyst
#15

Sure. Okay. Well, thanks so much. Glad to hand things over.

Guilherme Levy analyst
#16

On the first question, just building on the last one, regarding the compensation you requested tied to the subcontractor matter you mentioned, when do you anticipate that happening, and at this stage would you expect a full recovery on that issue? Second, on your fourth quarter guidance, could you perhaps take us through what bridges the low end to the high end? If we excluded Middle East costs, if we excluded U.S. Regarding costs, and if you've considered what a normalized underlying margin would be for bookings in 4Q as well as in 1Q, could you perhaps share some insight into what you're anticipating when it comes to improvement in the tube segment? Thank you.

Philippe Guillemot executive
#17

Yeah, about your first question, like I mentioned, no comment; it's clearly a matter that we'll now be discussing with this third party, and I won't say anything more on that, nor on what we're asking for, and obviously, the delay. As for what Q4 would look like if the world weren't what it is, significantly much better, that's certain. But it's hard to give you an exact number. That said, the consensus figure was a solid approximation of what we could have achieved absent the current difficulties we're facing in the Middle East along with that operational matter in the U.S.

Nathalie Delbreuve executive
#18

Regarding your third question, when it comes to the low end versus the high end of guidance, as we mentioned, deliveries in the Middle East play a significant role — naturally, the lead time needed to deliver and to get ships and vessels unloaded on schedule in Fujairah for our customers.

Guilherme Levy analyst
#19

Perfect. Thanks a lot.

Kévin Roger analyst
#20

Yeah, good morning. Appreciate you making the time. Apologies in advance, I'm going to play the bad guy here, but I get that the logistics issues in the U.S. are specific to your company. When I look, say, at the wider earnings trend you've reported for Q3 and what you're guiding to for Q4, there's a pretty large gap versus your peer Tenaris, where I actually see quite a strong step-up sequentially, Q3 against Q2, and Q4 against Q3. I do get the company-specific story around the U.S., but what is driving the big gap when it comes to the dynamics in the Middle East? Because my assumption is that the operational problem you're dealing with and flagging today, they're seeing the same thing, pricing conditions are identical, and so on. How do I, in some way, better square the difference in the earnings trajectory that we're seeing at the moment between Tenaris and Vallourec, if you could?

Philippe Guillemot executive
#21

Well, two points. First, as you're aware, as a share of our total revenue and EBITDA, the Middle East accounts for a larger percentage than at the peer you just named. Second, take a look at Q2. In Q2, our EBITDA pattern sat well above that of our peer. And the year isn't linear. The Middle East means Aramco and the countries located in the Persian Gulf. Okay, perhaps their revenue in Saudi between Q2 and Q3 flattened out more than ours did. I can't explain it. I only run Vallourec, and I'd be astonished to learn that they manage to get through the Strait of Hormuz more than we do. But it's probably a question you ought to put to them, I think. Again, recent events are exactly what we described, right? Berthing time at Fujairah suddenly jumped from one week to 60 to 90 days. All these alternative routes we're putting in place, obviously it now takes longer to convert into delivery to customers, and therefore into invoicing.

Kévin Roger analyst
#22

All right, thank you. Appreciate the time.

Paul Redman analyst
#23

Hey, everyone, and thanks so much for making time for us. I’d like to be very clear here — and I suppose your guidance implies this — but there are quite a few moving pieces involving mix, port imports, and third-party contractors. For Q3, one would assume that marks the bottom for margins and EBITDA. Should we be thinking about it that way? And second, regarding costs and so forth, could you walk me through how the reimbursement process works? So ships arrive at Fujairah, and it takes 60 to 90 days to get through. You’re bearing those costs, and you’ll be reimbursed for them upon delivery. When do you expect that reimbursement to begin flowing in, and how does that affect margin? Thanks.

Philippe Guillemot executive
#24

Regarding your second question, you said it — at delivery. First we have to deliver. Right now, with certain customers, there are very clear processes in place. We know which evidence we must provide for our surcharge, we know what steps we need to take, and we take them. There are delays in recovering this additional amount. Meanwhile, additional costs keep rising and are hitting our numbers. That is certain. That is certain.

Paul Redman analyst
#25

Could I just ask briefly, what effect does cost have on this quarter? What are you spending right now that you'll need to bill in a future quarter?

Philippe Guillemot executive
#26

Yes.

Nathalie Delbreuve executive
#27

Right. For the fourth quarter, we're looking at an impact in the high tens of millions of dollars. On customer recovery, just to give you a sense, we began getting a few million back in Q3, though that process takes time. Q4 will bring more, but some reimbursements will also land in 2027, given what we described regarding the lead time for delivery, along with the process where you obviously have to demonstrate the actual cost in order to secure pass-through from customers. There's a lag separating when we incur the cost, when we pay it, and when the reimbursement arrives. None of that has changed. We covered it on the Q2 call. What is different now is, once again, this lead time and the delivery time running longer.

Paul Redman analyst
#28

All right. My other one was simply this: do we believe Q3 marks the bottom?

Nathalie Delbreuve executive
#29

Yes, on your first question. During the third quarter, we faced considerable headwinds, as you can see, from the lower mix, the Middle East and the U.S. operations. You have our guidance for Q4. Following that, I mean, with U.S. operations having recovered and the Middle East situation expected to stabilize as well. Better conditions await you for 2027 as the year progresses, with the offshore tenders and the PLP tenders kicking in step by step during 2027.

Philippe Guillemot executive
#30

Yeah, and on top of that, you've got the mine, which is heading into the rainy season — which is usually somewhere in the lower quarter for —

Nathalie Delbreuve executive
#31

Fourth quarter and first quarter.

Philippe Guillemot executive
#32

Fourth quarter and first quarter. Clearly, this has a seasonal effect on the figures we report, given that on top of that, as Bertrand explained, we are in a transitional period to complete the work that is part of phase II so that we can extract run-of-mine in the 200 m extension beginning in the second part of Q1. At group level this adds, I think, some, yeah, some reasons why we have a lower end of the year and start of next year, by the way, than we might have expected. Yes —

Paul Redman analyst
#33

Thanks so much.

Philippe Guillemot executive
#34

— that's in 2027. Right. We'll probably begin gradually, though momentum should build meaningfully as the year progresses, since a lot of those big projects with long lead times, such as Line Pipe, will move into invoicing during H2.

Paul Redman analyst
#35

Thanks, guys.

Jean-Luc Romain analyst
#36

Thanks for taking my question; it has to do with Brazil, and just to get a sense for the coming year, does the improvement come more in the first half or the second, when it comes to deliveries for the offshore projects? The second one concerns the shift of CapEx from the Mine to the Tubes. You mentioned two investments already decided — the heat treating in the U.S. and the lining in Espírito Santo. Are there other investments you have in view?

Philippe Guillemot executive
#37

Okay. Okay, so 2027 — like I mentioned, Q1 kicks things off and that'll probably be the softest quarter of the year. After that we build momentum, and Q2 should begin reflecting a more normalized overall performance. On CapEx, you're correct. We've already made that investment decision in the U.S., with line three now live — we announced it this week, and that's obviously a great achievement. Just one year from groundbreaking ceremony to production, which is great. Line pipe — the thermal insulation business we just brought in through the M&A move we did in 2025 — turns out to be a real success. Over the past few months, you've watched us roll out a number of Line Pipe project announcements. Clearly, we view that product as a solid investment. For offshore projects, there's demand for the capacity we offer—and those projects, as we mentioned before, keep gaining approval from our customers. On the question of what else we might pursue: certainly, we have plans to keep supplying premium product to our customer base and to keep reinforcing—yes, to keep supporting—our value over volume strategy.

Jean-Luc Romain analyst
#38

Thanks.

Jamie Franklin analyst
#39

Oh, hello. Thanks for taking my questions. I believe most of them have already been answered, but I just have one quick follow-up regarding the U.S. situation, the contractor issue. Could we rule out any chance of that problem carrying over into 2027, please? And then secondly, just on international pricing, if you could share your views on the sort of expectation for when pricing might begin to rise and recover through next year. I think your peer mentioned it would be sort of a 2H 2027 event. Thank you.

Philippe Guillemot executive
#40

No, when it comes to pricing, yes, certainly, in the U.S., I think momentum has picked up during the year and likely will keep going next year. So, fully in line with what our main peer may have said. In the rest of the world, the same. You look at the curve today, I think there is strong demand for OCTG pipe and Line Pipe, and no reason not to see that translate into higher prices. As far as the U.S. is concerned, as I said, we are back to obviously a more normal level of performance with this third party. It requires close monitoring, and obviously, we do our utmost to make sure it doesn't happen again. So now, at any manufacturing site, you can never guarantee that there will never be any issue anymore. It would be foolish. Nevertheless, we have ways to compensate and mitigate such events.

Jamie Franklin analyst
#41

All right, thanks.

Yulia Bocharnikova analyst
#42

Hello, and thanks for taking my question. Can you remind us what effect the premium threading line you commissioned will have on U.S. pricing and U.S. volumes in 2027? Thanks.

Philippe Guillemot executive
#43

Yes, clearly that line is going to bring additional capacity in 2027; it involves a $48 million investment that we announced last year, and we have come in well under budget and ahead on timing. We got the line up earlier than we had expected; its purpose is producing high-torque connections for the unconventional business, the onshore business in the U.S., so it is genuinely needed. So it is a strong step, and clearly it will form part of our wider plan to add capacity and debottleneck as needed across our U.S. operation, so we can fully capitalize on the strong business we are seeing in the U.S., on both volume and pricing.

Yulia Bocharnikova analyst
#44

Thank you.

Philippe Guillemot executive
#45

No more question?

Paul Redman analyst
#46

Just one more thing I wanted to ask about. In your press release, you mentioned lower sales in power generation. Could you speak to that briefly? My assumption is that this is a business with margin accretion. What's causing the drop in volumes, and do you anticipate a recovery in 2027?

Philippe Guillemot executive
#47

The lower power generation figure stems mainly from the investment the Chinese are making in their coal-fired plants. As you're aware, we have a unit in China that delivers pipes to those coal-fired plants, and investment in these plants slowed down. On a temporary basis, there was a spike in the tungsten price, which of course made the raw material costlier than it previously was, and that has led to this probable slowdown in orders from customers; we'll see how it develops over the next few quarters.

Paul Redman analyst
#48

All right. If I could squeeze in one more, it concerns inventory. You brought up the inventory volumes. My guess is this relates to Saudi, though it could be the whole Middle East; the level is really low. At what point do you see those inventories beginning to refill? Is it a question of pipe availability, or do the delays at Fujairah mean that's what's keeping the Tubes from reaching inventory instead of heading directly to the fields?

Philippe Guillemot executive
#49

Typically, a drop in inventory happens when consumption outpaces supply, and that is precisely what took place. There was, I believe, a surge. Demand stayed sustained, yet supply simultaneously slowed; that is obviously true both in Saudi and in the nations surrounding the Persian Gulf; so in all likelihood customers will want to rebuild that inventory, which probably represents reservoir demand on top of normal, since the same holds for oil. Eventually the world will need to produce more oil than demand, at least across the next two years, so as to rebuild the inventory; that explains it. Looking at what lies ahead, we made certain strategic decisions in the past. Thermal insulation and Line Pipe, for one. Geothermal, where we have opened an entirely new market from scratch. This whole situation results in low inventory, which will result in demand surpassing normal demand for a time until this inventory repeats. That is why momentum next year ought to be such that, yes, we may begin slowly, but we will pick up speed as we move through the year.

Paul Redman analyst
#50

Thanks.

Philippe Guillemot executive
#51

Thanks. Once more, the third quarter shows how resilient Vallourec's business model is, since Tubes volumes came back to growth and cash generation stayed positive even with major disruption in the Middle East. Visibility over the near term in the Middle East is still limited, yet primary customer demand is solid and regional OCTG inventories have been run down, which strengthens the case for restocking once logistics return to normal. Beyond the Middle East, higher drilling activity and an expanding pipeline of upstream project approvals underpin the outlook through 2027 and beyond; in the United States, demand, pricing, and trade conditions are still supportive, and conversations with customers indicate revenue growth will continue into 2027. Last, we will keep directing capital to the highest return opportunities we identify, and a revised phase II plan at our mine clearly demonstrates that approach. Operator, you may end the call.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vallourec S.A. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Vallourec S.A. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.